CN107014141A - A kind of freezing and refrigeration cabinet performance testing device air treatment system - Google Patents

A kind of freezing and refrigeration cabinet performance testing device air treatment system Download PDF

Info

Publication number
CN107014141A
CN107014141A CN201710194779.9A CN201710194779A CN107014141A CN 107014141 A CN107014141 A CN 107014141A CN 201710194779 A CN201710194779 A CN 201710194779A CN 107014141 A CN107014141 A CN 107014141A
Authority
CN
China
Prior art keywords
air
evaporator
box body
freezing
unit box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710194779.9A
Other languages
Chinese (zh)
Other versions
CN107014141B (en
Inventor
张忠斌
徐冠依
陈智明
黄虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Guotong Refrigeration Technology Co Ltd
Original Assignee
Nanjing Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Normal University filed Critical Nanjing Normal University
Priority to CN201710194779.9A priority Critical patent/CN107014141B/en
Publication of CN107014141A publication Critical patent/CN107014141A/en
Application granted granted Critical
Publication of CN107014141B publication Critical patent/CN107014141B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D17/00Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces
    • F25D17/04Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces for circulating air, e.g. by convection
    • F25D17/06Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces for circulating air, e.g. by convection by forced circulation
    • F25D17/062Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces for circulating air, e.g. by convection by forced circulation in household refrigerators
    • F25D17/065Arrangements for circulating cooling fluids; Arrangements for circulating gas, e.g. air, within refrigerated spaces for circulating air, e.g. by convection by forced circulation in household refrigerators with compartments at different temperatures
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D21/00Defrosting; Preventing frosting; Removing condensed or defrost water
    • F25D21/06Removing frost
    • F25D21/08Removing frost by electric heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D2317/00Details or arrangements for circulating cooling fluids; Details or arrangements for circulating gas, e.g. air, within refrigerated spaces, not provided for in other groups of this subclass
    • F25D2317/04Treating air flowing to refrigeration compartments
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25DREFRIGERATORS; COLD ROOMS; ICE-BOXES; COOLING OR FREEZING APPARATUS NOT OTHERWISE PROVIDED FOR
    • F25D2317/00Details or arrangements for circulating cooling fluids; Details or arrangements for circulating gas, e.g. air, within refrigerated spaces, not provided for in other groups of this subclass
    • F25D2317/06Details or arrangements for circulating cooling fluids; Details or arrangements for circulating gas, e.g. air, within refrigerated spaces, not provided for in other groups of this subclass with forced air circulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)
  • Other Air-Conditioning Systems (AREA)

Abstract

The present invention relates to a kind of freezing and refrigeration cabinet performance testing device air treatment system.The present invention includes the unit box body being arranged in test, unit box body side is provided with to be entered and the return air inlet with primary efficient filter screen for air, provided with the first evaporator set along air-flow direction, the second evaporator, rearmounted electric heater, dry saturated steam humidification jet pipe and blower fan in unit box body, first evaporator and the first Condensing units are used for the cooling-dehumidifying air to 35~0 DEG C, second evaporator and the second Condensing units are used for the cooling-dehumidifying air to 0~50 DEG C, and unit box body is provided with the bypass air-valve for being expelled directly out partial air.The present invention can be handled the air in a wide range of temperature, the corresponding cooling cycle system of selective enabling can be prevented effectively from cooling cycle system pressure it is excessive and to equipment cause damage, improve cooling cycle system security.The present invention can with depth dehumidify and accurately attain subject unit humiture requirement.

Description

A kind of freezing and refrigeration cabinet performance testing device air treatment system
Technical field
The invention belongs to freezing and refrigeration cabinet equipment technical field of performance test, a kind of freezing and refrigeration cabinet performance is specifically related to Test device air treatment system.
Background technology
Fresh, fruit storage problem causes freezing and refrigeration cabinet largely to come into operation.Therefore, the performance of freezing and refrigeration cabinet is surveyed Trial assembly, which is put, also urgently to be developed.Temperature, humidity and air current composition that the performance testing device of freezing and refrigeration cabinet is used in simulated environment Every air conditionses under freezing and refrigeration cabinet practical service environment are close to, so as to ensure that freezing and refrigeration cabinet can be in actual environment Middle normal work.Patent of invention CN103217310A discloses a kind of food freezer performance test device, and the device is using air-supply Orifice plate is parallel with air orifice plate to send air manner, using air orifice plate is equably sent, so as to obtain stable air flow method and fit Suitable wind speed air quantity, the real normal wind speed of simulated foods refrigerator and humiture environment.Evaporated in the refrigerating circuit of the device Device is formed in parallel by the evaporation coil of three independent refrigeration systems, on the basis of existing evaporator is only capable of realizing heat exchange The exchange between refrigeration working medium is realized, caused working medium uneven to air-treatment during each refrigeration system independent operating is reduced Difference between thermodynamic properties, so that the disposal ability of air-treatment unit is further increased, while improving air-treatment effect Really, the uniformity and stability of air-treatment are increased.But the shortcoming of the device is that refrigerating circuit is not suitable for true environment The air of middle large temperature range is handled, and aging effects are serious after refrigerating circuit long-term work.Evaporated in the other device Device is limited to the effect on moisture extraction of air, and use requirement can not be then met for some work condition environments for needing depth to dehumidify.
The content of the invention
In order to solve the above-mentioned technical problem, the present invention provides a kind of freezing and refrigeration cabinet performance testing device air-treatment system System.
In order to realize the purpose of the present invention, present invention employs following technical scheme:
A kind of freezing and refrigeration cabinet performance testing device air treatment system, it is characterised in that:Including being arranged between test Interior unit box body, the unit box body side is provided with to be entered and the return air inlet with primary efficient filter screen, the set box for air In vivo provided with the first evaporator, the second evaporator, rearmounted electric heater and the dry saturated steam set gradually along air-flow direction The jet pipe and blower fan of humidifier connection, the rearmounted electric heater are located at the second evaporator air outlet overlying regions, institute The first outer Condensing units match the cooling-dehumidifying air for p- 35~0 DEG C between stating the first evaporator and testing, described The second outer Condensing units are matched for the cooling-dehumidifying air to 0~50 DEG C, the machine between second evaporator and test The bypass air-valve for being expelled directly out the partial air entered from the return air inlet in unit box body is additionally provided with group casing.
Further, the unit box body side where the bypass air-valve and the unit box body side where the return air inlet It is adjacent, and the return air inlet is located at the second evaporator air outlet rear, the bypass air-valve is venetian blind type structure.
Further, first Condensing units, the second Condensing units sharing cooling tower, first compression Condensation unit, the second Condensing units are each configured with being provided with load energy regulation on two compressors, the compressor Controlling switch.
Further, the assembling is at the top of the unit box body, top regions between the outlet and test of the blower fan The air duct connection in domain, it is outside between the test that the variable-frequency motor used with the matched with blower is installed.
Further, the preposition electric heater preheated to air, the air warp are additionally provided with the unit box body Pass through first evaporator to realize the defrosting to the first evaporator plate pipeline section after the preposition electric heater preheating.
Further, first evaporator, the second evaporator are fin-tube heat exchanger, the fin tube type heat exchange The coil section of device includes some copper pipes in a row that are arranged in parallel along windward side, flow direction arrangement of the copper pipe along wind There is the copper pipe between 6~10 rows and adjacent row to be staggeredly arranged, the fin being arranged on the copper pipe is the stainless steel plate of four Edge Bends; The total feed liquor pipe diameter of refrigerant is less than the diameter of the total gas collection outlet of refrigerant in the fin-tube heat exchanger, the copper pipe Diameter is less than the total feed liquor pipe diameter of the refrigerant.
Further, it is provided with below the jet pipe at the first drip tray being in tilted layout, the low level of first drip tray It is connected with the first drainage pipeline;The unit box body inner bottom part is provided with the second water receiving being in tilted layout and for collecting condensed water Disk, second drip tray, which is located at first evaporator, the second evaporator lower section, the low level of second drip tray, to be connected There is the second drainage pipeline.
Further, the rearmounted electric heater includes power fixation electric heating unit, power adjustable electric heating unit, institute State rearmounted electric heater be configured with too high temperature of air then stop heating protection switch and blower fan import and export blast it is too small When stop heating pressure difference switch.
Further, row's spacing of the copper pipe is 30~35mm, and often row includes 50~55 copper pipes, often arranges interior adjacent copper The spacing of pipe is 35~40mm and is 1.25~1.5 times of calibers, and the length-width ratio of the copper pipe is 10.
The beneficial effects of the present invention are:
(1) the first evaporator of the present invention and the first Condensing units are responsible for the air of p- 35~0 DEG C of temperature ranges Handled, second evaporator is responsible for handling the air of 0~50 DEG C of temperature range with the second Condensing units. When measurement condition dry-bulb temperature is higher than 0 DEG C, second Condensing units are run, when measurement condition dry-bulb temperature is less than 0 DEG C or when needing artificial snow-making, run first Condensing units.The present invention can meet to -35 in true environment~50 temperature The air of scope is handled, and is the distribution according to air themperature, the corresponding cooling cycle system of selective enabling, effectively Avoid that cooling cycle system pressure is excessive and damage that caused to equipment, system is also improved while extension device service life The security of SAPMAC method system.
In addition, the air quantity that bypass air-valve of the present invention can pass through the evaporator is reduced, realize air with small Air quantity is by the evaporator, when the refrigerating capacity change of evaporator is not very notable or constant holding, then through pervaporation The enthalpy difference for the air that device is imported and exported will increase, and air will be handled by depth cooling and dehumidifying, embody the big enthalpy difference enhancing of small air quantity and remove The effect of wet effect.The present invention can not only be dehumidified with depth, and there is the air after depth dehumidifies bigger humidity to adjust Surplus amount, then the humiture requirement of subject unit can more precisely be reached by dry saturated steam humidification jet pipe humidification.This Invention can make the environment in test meet different working condition requirements, and larger work is required especially for some moisture removals Condition.The present invention more can accurately simulate air conditionses of the freezing and refrigeration cabinet under true environment, be conducive to improving freezing The performance test precision of refrigerator.
Because the air current composition temperature around the first evaporator, the second evaporator is relatively low and density big, and electric heater is all The air current composition temperature enclosed is compared with high and density is small, when air enters from the return air inlet, then formd in unit box body from lower and On airflow circulating, so as to be conducive to accelerating the heat transfer rate of air and the first evaporator or the second evaporator.In addition described the One evaporator be arranged on the front of the second evaporator, i.e. air first pass through the first evaporator again pass through the second evaporator, such as when Between test during 2 DEG C/1 DEG C of wet and dry bulb temperature, first evaporator is easier to frosting, when running first evaporator, can be with Effectively reduce time of second evaporator under frozen condition, it is to avoid asking for frosting occurs in second evaporator Topic.
(2) the bypass air-valve is venetian blind type structure, and the regulation of open degree can be carried out by automatic or manual mode. When running into the operating mode for needing progress depth dehumidifying, the bypass air-valve, the structure of bypass air-valve of the present invention are opened Simply, open degree can easily be accommodated, and realize that the effect of air depth dehumidifying is protruded.
(3) the first Condensing units, the second Condensing units are equipped with two compressors, and compressed in the present invention Machine adjusts controlling switch with load energy, such as 50% load may be selected and 100% two grades of load is run, so can be with More accurate regulating and controlling temperature, the significantly more efficient ambient temperature conditions for simulating needs.
(4) use of variable-frequency motor can realize the stepless speed regulation of blower fan in the present invention, in order to carry out constant pressure to air Or the control of constant flow, and allow air to easily form loop control loop so that fan operation energy consumption is most saved, can be with Meet the environmental requirement such as wind speed, air quantity of simulation required between testing.Variable-frequency motor, which is used, in the present invention lengthens drive shaft, so as to Outside variable-frequency motor is placed between test, internal temperature is subcooled and influences variable-frequency motor just between can so avoiding test Often operation, it is ensured that internal temperature and humidity conditions is accurate between test, can preferably simulate outdoor environment.
(5) such as when 2 DEG C/1 DEG C of wet and dry bulb temperature between test, the first evaporator plate pipeline section is easy to frosting, when During the first evaporator plate pipeline section frosting, open the preposition electric heater and the pre-heat treatment is carried out to air, so that blowing the Hot blast on one evaporator plate pipeline section, which melts the frost on the first evaporator plate pipeline section, to be removed, while can also improve the first evaporator To the effect of cooling-dehumidifying air.
(6) the first evaporator of the present invention, the second evaporator use combined type caliber:The total feed tube of refrigerant Interior is gas-liquid two-phase, only gas phase in the total gas collection outlet of refrigerant, so by the diameter of the total feed tube of the refrigerant The diameter for being set smaller than copper pipe in the caliber of the total gas collection outlet of the refrigerant, the evaporator is minimum.The combined type Caliber is by controlling the total feed tube caliber of evaporator less than total gas collection outlet caliber, in the case that total feed tube caliber is small, The gas-liquid two-phase cold-producing medium amount of entrance is suitable, is further further separated into the smaller copper pipe of caliber, and total gas collection outlet caliber is big, The refrigerant vapour for being conducive to fully quick discharge evaporator inner refrigerant vaporization to produce, it is therefore prevented that the refrigerant that vaporization is produced steams Vapour aggressiveness, so as to hinder the efficiency of refrigerant vaporization, improves evaporator heat exchange performance inside evaporator.
The arrangement of the combined type caliber and the copper pipe can be realized under conditions of identical windward side air mass flow, Heat exchange amount is improved, and is significantly reduced by the air drag of evaporator plate pipeline section, in other words the present invention can be met by changing Wind face air mass flow improves evaporator heat exchange performance.
(7) first drip tray is used to collect the condensed water at the dry saturated steam humidification jet pipe, second drip tray For the condensed water for collecting first evaporator, air is formed after cooling and dehumidifying at the second evaporator, first water receiving Disk, the second drip tray are obliquely installed, in order to which the condensed water being collected into is completely exhausted out in unit box body by drainage pipeline.
(8) the rearmounted electric heater is such as by 45kW adjustable electric heating unit and 15kW fixation electric heating unit structure Into can so meet temperature of the subject freezing and refrigeration cabinet under different operating modes by adjusting the power of adjustable electric heating unit It is required that, and temperature adjustment is precisely, it is wider using scope.The protection switch or pressure difference switch are to be used to protect electrical heating Device, to prevent electric heating tube from occurring dry combustion method.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention.
Fig. 2 is evaporation structure schematic diagram.
The implication marked in accompanying drawing is as follows:
Between 1- tests;2- unit box bodies;3- return air inlets;The evaporators of 4- first;The evaporators of 5- second;The rearmounted electrical heating of 6- Device;7- jet pipes;8- blower fans the first Condensing units of 9-;The Condensing units of 10- second;11- bypasses air-valve;12- is humidified Device;13- cooling towers;14- air ducts;15- variable-frequency motors;The preposition electric heaters of 16-;17- copper pipes;The drip trays of 18- first; The drip trays of 19- second.
Embodiment
More specific detail is made to technical solution of the present invention with reference to embodiment:
As shown in figure 1, the present invention includes being arranged on the unit box body 2 between test in 1, the unit box body 2 is provided with supplying Air enters and the return air inlet 3 with primary efficient filter screen, is provided with what is set gradually along air-flow direction in the unit box body 2 First evaporator 4, the second evaporator 5, rearmounted electric heater 6, the jet pipe 7 and blower fan 8 being connected with dry steam humidifier 12, institute Rearmounted electric heater 6 is stated positioned at the air outlet overlying regions of the second evaporator 5, first evaporator 4 and the first compression are cold Solidifying unit 9 is supporting, and second evaporator 5 and the second Condensing units 10 are supporting, be additionally provided with the unit box body 2 by from The bypass air-valve 11 that the partial air that the return air inlet 3 enters in unit box body 2 is expelled directly out.
The Condensing units 9 of first evaporator 4 and first of the present invention are responsible for the air of p- 35~0 DEG C of temperature ranges Handled, second evaporator 5 is responsible for the air of 0~50 DEG C of temperature range with the second Condensing units 10 Reason.When measurement condition dry-bulb temperature is higher than 0 DEG C, second Condensing units 10 are run, when measurement condition dry-bulb temperature Less than 0 DEG C or when needing artificial snow-making, first Condensing units 9 are run.The present invention can meet to -35 in true environment~ The air of 50 temperature ranges is handled, and is the distribution according to air themperature, the corresponding kind of refrigeration cycle system of selective enabling System, effectively prevent that cooling cycle system pressure is excessive and damage that caused to equipment, while extension device service life Improve the security of cooling cycle system.
In addition, bypass air-valve 11 of the present invention can pass through first evaporator 4, the wind of the second evaporator 5 Amount is reduced, and it, by the evaporator, is not very notable or guarantor when the refrigerating capacity of evaporator changes with small air quantity to realize air When holding constant, then it will increase by the enthalpy difference of the air of evaporator inlet-outlet, air will be handled by depth cooling and dehumidifying, and embodied The small big enthalpy difference of air quantity strengthens the effect of effect on moisture extraction.The present invention can not only be dehumidified with depth, and the sky after depth dehumidifies Gas has bigger humidity regulation surplus, then can more precisely reach subject by the dry saturated steam humidification humidification of jet pipe 7 The humiture requirement of unit.The present invention can make the environment in test meet different working condition requirements, especially for some Moisture removal requires larger operating mode.The present invention more can accurately simulate air bar of the freezing and refrigeration cabinet under true environment Part, is conducive to improving the performance test precision of freezing and refrigeration cabinet.
Because the air current composition temperature around the first evaporator 4, the second evaporator 5 is relatively low and density big, and electric heater 8 Around air current composition temperature compared with high and density is small, when air enters from the return air inlet, then formd in unit box body 2 under oneself And on airflow circulating, so as to be conducive to accelerating the heat transfer rate of air and the first evaporator 4 or the second evaporator 5.Other institute State the front that the first evaporator 4 is arranged on the second evaporator 5, i.e. air and first pass through the first evaporator 4 again by the second evaporator 5, such as when 2 DEG C/1 DEG C of wet and dry bulb temperature between test, first evaporator 4 is easier to frosting, runs first evaporation During device 4, time of second evaporator 5 under frozen condition can be effectively reduced, it is to avoid second evaporator 5 goes out The problem of existing frosting.
The power of motor that compressor is configured in the first Condensing units 9 described in the present embodiment is 62kW, described second The power of motor that compressor is configured in Condensing units 10 is 17.5kW, it is clear that compressor in the first Condensing units 9 Power of motor is significantly larger than the power of motor of compressor in the second Condensing units 10.
The side of unit box body 2 where the bypass air-valve 11 and the side phase of unit box body 2 where the return air inlet 3 Neighbour, and the return air inlet 3 is located at the air outlet rear of the second evaporator 5.The bypass air-valve 11 is venetian blind type structure, can To carry out the regulation of open degree by automatic or manual mode.When running into the operating mode for needing progress depth dehumidifying, open described Air-valve 11 is bypassed, of the present invention to bypass the simple in construction of air-valve 11, open degree can easily be accommodated, realize that air depth dehumidifies Effect protrude.
First Condensing units 9, the second Condensing units 10 are installed between the test 1 outside and the two is common With cooling tower 13, first Condensing units 9, the second Condensing units 10 are each configured with two compressors, described Load energy regulation controlling switch is provided with compressor.First Condensing units 9, the second Condensing units in the present invention 10 are equipped with two compressors, and compressor adjusts controlling switch with load energy, such as may be selected 50% load and 100% two grades of load is run, so can more accurate regulating and controlling temperature, the significantly more efficient environment temperature for simulating needs Degree condition.
The blower fan 8 is arranged on the top of unit box body 2, the sky of 1 top area between the outlet and test of the blower fan 8 Gas passage 14 is connected, 1 between the test outside be provided with and the matching used variable-frequency motor 15 of the blower fan 8.Become in the present invention The use of frequency motor 15 can realize the stepless speed regulation of blower fan 8, in order to carry out the control of constant pressure or constant flow to air, and make Loop control loop can be easily formed by obtaining air so that the operation energy consumption of blower fan 8 is most saved, and can meet required mould between test The environmental requirements such as wind speed, the air quantity of plan.Variable-frequency motor 15 is using drive shaft is lengthened in the present invention, in order to which variable-frequency motor 15 is put Outside putting between test, internal temperature is subcooled and influences the normal operation of variable-frequency motor 15 between can so avoiding test, it is ensured that Internal temperature and humidity conditions is accurate between test, can preferably simulate outdoor environment.
It is additionally provided with the preposition electric heater 16 preheated to air in the unit box body 2, the air is through before described Put after electric heater 16 is preheated and pass through first evaporator to realize the defrosting to the first evaporator plate pipeline section.Such as When 2 DEG C/1 DEG C of wet and dry bulb temperature between test, the coil section of the first evaporator 4 is easy to frosting, when the coil pipe of the first evaporator 4 During section frosting, open the preposition electric heater 16 and the pre-heat treatment is carried out to air, so that blowing in the coil pipe of the first evaporator 4 Hot blast in section, which melts the frost in the coil section of the first evaporator 4, to be removed, and air is cooled down while can also improve the first evaporator 4 The effect of dehumidifying.
First evaporator 4, the second evaporator 5 are fin tube type heat exchange in fin-tube heat exchanger, the present embodiment The size of device is 3190 (W) mm × 314 (D) mm × 2104 (H) mm, and the evaporator size ratio is 9~11:1:6~8, have Imitate a length of 3100mm, it is slightly shorter than (W) length, about its 97% or so, spacing of fin is 3~5mm, and this example removes 4mm, the copper Pipe diameter is 14~16mm, and this example takes 15mm, wall thickness to be 0.40~0.50mm, and this example takes 0.45mm, and the bend pipe of connecting copper pipe is thick Spend for 0.7mm, fin for length of side 1.5mm four Edge Bends stainless steel plate.Evaporator uses combined type described in the present embodiment In a diameter of 35mm of the total gas collection outlet of a diameter of 28mm of the total feed tube of caliber, wherein refrigerant, refrigerant, the evaporator A diameter of 22mm of copper pipe, the combined type caliber ratio is 1.2~1.3:1.5~1.7:1, the total feed tube of refrigerant, The total gas collection outlet of refrigerant is connected to the two ends of the evaporator plate pipeline section.Using combined type caliber evaporator its change Heat and heat exchange power are significantly improved, and efficiency is essentially identical.8 row's copper pipes are provided with along the flow direction of wind in the present embodiment, The length-width ratio of copper pipe is about 10, and under the conditions of identical windward side air mass flow, heat exchange amount increases, and heat exchanger air drag shows Reduction is write, performance of evaporator is improved by changing windward side flow.Plumbers shed is away from too small or excessive can reduce the property of heat exchanger In tube pitch S1 selections 38mm in energy, preferably 1.25~1.5 times calibers, the present embodiment, the row selection 33mm of interval S 2, the present invention often The quantity N of copper pipe 17 of row takes 54, quantity N to be 50~55.
The lower section of jet pipe 7, which is provided with the first drip tray 18 being in tilted layout, the low level of first drip tray 18, to be connected There is the first drainage pipeline;The inner bottom part of unit box body 2 is provided with the second drip tray 19 being in tilted layout and for collecting condensed water, Second drip tray 19 is located at first evaporator 4, the lower section of the second evaporator 5, the low level of second drip tray 19 It is connected with the second drainage pipeline.First drip tray 18 is used to collect the condensed water at the dry saturated steam humidification jet pipe 7, described Second drip tray 19 is used for the condensation for collecting first evaporator 4, air is formed after cooling and dehumidifying at the second evaporator 5 Water, first drip tray 18, the second drip tray 19 are obliquely installed, in order to which the condensed water being collected into is passed through into drainage pipeline It is completely exhausted out in unit box body 2.
The protection switch or pressure difference switch are to be used to protect electric heater, to prevent electric heating tube from occurring dry combustion method. The rearmounted electric heater 6 includes power and fixes electric heating unit, power adjustable electric heating unit, the rearmounted electric heater 6 It is configured with the pressure that too high temperature of air then stops the protection switch of heating and stops heating when blower fan import and export blast is too small Difference switch.The rearmounted electric heater 6 is such as made up of 45kW adjustable electric heating unit and 15kW fixation electric heating unit, Temperature of the subject freezing and refrigeration cabinet under different operating modes can be so met by adjusting the power of adjustable electric heating unit will Ask, and temperature adjustment is precisely, it is wider using scope.

Claims (9)

1. a kind of freezing and refrigeration cabinet performance testing device air treatment system, it is characterised in that:Including be arranged on test between (1) Interior unit box body (2), the unit box body (2) is provided with sideways to be entered and the return air inlet (3) with primary efficient filter screen, institute for air State in unit box body (2) provided with the first evaporator (4) set gradually along air-flow direction, the second evaporator (5), rearmounted Electric heater (6), the jet pipe (7) and blower fan (8) being connected with dry steam humidifier (12), rearmounted electric heater (6) position First compression of (1) outside is cold between the second evaporator (5) air outlet overlying regions, first evaporator (4) and test Solidifying unit (9) matches the cooling-dehumidifying air for p- 35~0 DEG C, second evaporator (5) with test between (1) outside the Two Condensing units (10) are matched for the cooling-dehumidifying air to 0~50 DEG C, be additionally provided with the unit box body (2) by from The bypass air-valve (11) that the partial air that the return air inlet (3) enters in unit box body (2) is expelled directly out.
2. freezing and refrigeration cabinet performance testing device air treatment system as claimed in claim 1, it is characterised in that:The side Unit box body (2) where ventilation valve (11) is adjacent sideways with the unit box body (2) where the return air inlet (3) sideways, and institute Return air inlet (3) is stated positioned at the second evaporator (5) air outlet rear, the bypass air-valve (11) is venetian blind type structure.
3. freezing and refrigeration cabinet performance testing device air treatment system as claimed in claim 1, it is characterised in that:Described One Condensing units (9), the second Condensing units (10) sharing cooling tower (13), first Condensing units (9), Second Condensing units (10) are each configured with being provided with load energy regulation control on two compressors, the compressor and opened Close.
4. freezing and refrigeration cabinet performance testing device air treatment system as claimed in claim 1, it is characterised in that:The wind Machine (8) is arranged at the top of the unit box body (2), the air duct of (1) top area between the outlet and test of the blower fan (8) (14) connect, be provided with and the blower fan (8) matching used variable-frequency motor (15) outside (1) between the test.
5. freezing and refrigeration cabinet performance testing device air treatment system as claimed in claim 1, it is characterised in that:The machine The preposition electric heater (16) preheated to air is additionally provided with group casing (2), the air is through the preposition electric heater (16) pass through first evaporator (4) to realize the defrosting to the first evaporator (4) coil section after preheating.
6. freezing and refrigeration cabinet performance testing device air treatment system as claimed in claim 1, it is characterised in that:Described One evaporator (4), the second evaporator (5) are fin-tube heat exchanger, if the coil section of the fin-tube heat exchanger includes The dry copper pipe (17) in a row that is arranged in parallel along windward side, the copper pipe (17) is disposed with 6~10 along the flow direction of wind Copper pipe (17) between row and adjacent row is staggeredly arranged, and the fin being arranged on the copper pipe is the stainless steel plate of four Edge Bends;Institute State the total feed liquor pipe diameter of refrigerant in fin-tube heat exchanger be less than the total gas collection outlet of refrigerant diameter, the copper pipe it is straight Footpath is less than the total feed liquor pipe diameter of the refrigerant.
7. freezing and refrigeration cabinet performance testing device air treatment system as claimed in claim 1, it is characterised in that:The spray Provided with the first drip tray (18) being in tilted layout below pipe (7), first row is connected with the low level of first drip tray (18) Waterpipe;Unit box body (2) inner bottom part is provided with the second drip tray (19) being in tilted layout and for collecting condensed water, described Second drip tray (19) is located at first evaporator (4), below the second evaporator (5), second drip tray (19) it is low The second drainage pipeline is connected with position.
8. freezing and refrigeration cabinet performance testing device air treatment system as claimed in claim 1, it is characterised in that:After described Put electric heater (6) and fix electric heating unit, power adjustable electric heating unit including power, the rearmounted electric heater (6) is matched somebody with somebody It is equipped with the pressure difference that too high temperature of air then stops the protection switch of heating and stops heating when blower fan import and export blast is too small Switch.
9. freezing and refrigeration cabinet performance testing device air treatment system as claimed in claim 6, it is characterised in that:The copper The row's spacing for managing (17) is 30~35mm, and often row includes 50~55 copper pipes (17), and the spacing for often arranging interior adjacent copper pipe (17) is 35~40mm and be 1.25~1.5 times of calibers, the length-width ratio of the copper pipe (17) is 10.
CN201710194779.9A 2017-03-28 2017-03-28 Air treatment system for performance test device of freezing and refrigerating cabinet Active CN107014141B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710194779.9A CN107014141B (en) 2017-03-28 2017-03-28 Air treatment system for performance test device of freezing and refrigerating cabinet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710194779.9A CN107014141B (en) 2017-03-28 2017-03-28 Air treatment system for performance test device of freezing and refrigerating cabinet

Publications (2)

Publication Number Publication Date
CN107014141A true CN107014141A (en) 2017-08-04
CN107014141B CN107014141B (en) 2020-04-21

Family

ID=59445863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710194779.9A Active CN107014141B (en) 2017-03-28 2017-03-28 Air treatment system for performance test device of freezing and refrigerating cabinet

Country Status (1)

Country Link
CN (1) CN107014141B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108072132A (en) * 2018-01-23 2018-05-25 南通中远克莱芬船舶工程有限公司 A kind of freezing type dehumidifier
CN108151180A (en) * 2018-01-23 2018-06-12 南通中远克莱芬船舶工程有限公司 A kind of Combined dehumidifier
CN108895751A (en) * 2018-07-24 2018-11-27 华东交通大学 Air-cooler device in a kind of freezing-cooling storeroom of novel refrigerant piping
CN108917247A (en) * 2018-08-22 2018-11-30 申联生物医药(上海)股份有限公司 Refrigeration system and its working method without accumulated ice frost accumulated
CN107606843B (en) * 2017-08-18 2019-11-05 浙江海洋大学 A kind of Novel frost-free refrigerator-freezer refrigerating plant with solution dehumidification
CN114279146A (en) * 2021-12-29 2022-04-05 赣州中祥制冷设备有限公司 Intelligent freezer that possesses humidity control

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3433119A1 (en) * 1984-09-08 1986-03-20 Alfred Teves Gmbh, 6000 Frankfurt Process and apparatus for dehumidification
CN2771704Y (en) * 2005-03-18 2006-04-12 王学平 Operation-condition-variable air conditioner
CN2826242Y (en) * 2005-11-18 2006-10-11 广东省吉荣空调设备公司 Big enthalpy difference full fresh air secondary refrigerating type roof air conditioner
CN101813343A (en) * 2010-04-19 2010-08-25 广东吉荣空调有限公司 High-precision constant-temperature and humidity air conditioner operated in wide temperature range
CN102388223A (en) * 2009-04-09 2012-03-21 开利公司 Dual duty compression machine
CN103609206A (en) * 2011-04-19 2014-02-26 力博特公司 High efficiency cooling system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3433119A1 (en) * 1984-09-08 1986-03-20 Alfred Teves Gmbh, 6000 Frankfurt Process and apparatus for dehumidification
CN2771704Y (en) * 2005-03-18 2006-04-12 王学平 Operation-condition-variable air conditioner
CN2826242Y (en) * 2005-11-18 2006-10-11 广东省吉荣空调设备公司 Big enthalpy difference full fresh air secondary refrigerating type roof air conditioner
CN102388223A (en) * 2009-04-09 2012-03-21 开利公司 Dual duty compression machine
CN101813343A (en) * 2010-04-19 2010-08-25 广东吉荣空调有限公司 High-precision constant-temperature and humidity air conditioner operated in wide temperature range
CN103609206A (en) * 2011-04-19 2014-02-26 力博特公司 High efficiency cooling system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
韩建华: "焓差试验室室外侧测试间用空气处理机组设计", 《制冷与空调》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107606843B (en) * 2017-08-18 2019-11-05 浙江海洋大学 A kind of Novel frost-free refrigerator-freezer refrigerating plant with solution dehumidification
CN108072132A (en) * 2018-01-23 2018-05-25 南通中远克莱芬船舶工程有限公司 A kind of freezing type dehumidifier
CN108151180A (en) * 2018-01-23 2018-06-12 南通中远克莱芬船舶工程有限公司 A kind of Combined dehumidifier
CN108895751A (en) * 2018-07-24 2018-11-27 华东交通大学 Air-cooler device in a kind of freezing-cooling storeroom of novel refrigerant piping
CN108917247A (en) * 2018-08-22 2018-11-30 申联生物医药(上海)股份有限公司 Refrigeration system and its working method without accumulated ice frost accumulated
CN114279146A (en) * 2021-12-29 2022-04-05 赣州中祥制冷设备有限公司 Intelligent freezer that possesses humidity control
CN114279146B (en) * 2021-12-29 2024-01-09 赣州中祥制冷设备有限公司 Intelligent freezer that possesses humidity control

Also Published As

Publication number Publication date
CN107014141B (en) 2020-04-21

Similar Documents

Publication Publication Date Title
CN107014141A (en) A kind of freezing and refrigeration cabinet performance testing device air treatment system
CN107014198B (en) The quadruple effect removal moisture drying system of temperature controllable
CN201706831U (en) Energy-saving constant-temperature constant-humid preserving refrigeratory system
JPH07145743A (en) Combustion air precooling system for gas turbine
CN205641396U (en) Double -cold -source fresh air conditioning unit
JPH05133244A (en) Method and device for preparatorily cooling air
EP1015833B1 (en) Rotating disk evaporative cooler
CN102445066B (en) Natural air dehydrating and preheating drying oven system adopting condensate water waste heat for two-effect flash evaporation
CN107439661A (en) A kind of dehumidification control method of the fillet class seafood tunnel drying system based on heat pump
CN107062884A (en) A kind of heat pump drying dehumidifying integrated machine
CN110887303A (en) Refrigerator with air conditioning and humidifying device
CN211041530U (en) Refrigerator with air conditioning and humidifying device
CN201973816U (en) Air dehumidifier for purifying operating room
CN210808053U (en) Container cooling system combining indirect evaporative cooling and gravity heat pipe
CN202254205U (en) Direct expansion type air conditioning unit adopting tubular indirect evaporative cooling air side economizer
CN107023899A (en) A kind of depth dehumidified air handles unit
CN203595206U (en) Heat pipe type cooling capacity recovery type air dehumidifier for purifying operating room
CN107975958A (en) A kind of air-conditioner set and its except the damp and hot white control method of fluorination
CN108931070B (en) Wet film type low-temperature total heat recovery air-cooled heat pump unit
CN108800355A (en) A kind of air conditioning method and system
CN2397415Y (en) Temp.-regulating dehumidifier
CN114484613A (en) Heat pump air conditioner and control method thereof
CN107940788A (en) A kind of dehumidifier suitable for hot environment
CN101424471A (en) Cooling plant
CN205505203U (en) Air -conditioner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200331

Address after: 211302 room 121, building 2, No.8 Huashan Road, Gaochun Economic Development Zone, Nanjing City, Jiangsu Province

Applicant after: Nanjing Guotong Refrigeration Technology Co., Ltd

Address before: 210024 No. 122 Ninghai Road, Gulou District, Nanjing City, Jiangsu Province

Applicant before: NANJING NORMAL University

TA01 Transfer of patent application right
GR01 Patent grant