CN107013216A - A kind of colliery deep mining impulsion pressure prevention and controls - Google Patents

A kind of colliery deep mining impulsion pressure prevention and controls Download PDF

Info

Publication number
CN107013216A
CN107013216A CN201710342792.4A CN201710342792A CN107013216A CN 107013216 A CN107013216 A CN 107013216A CN 201710342792 A CN201710342792 A CN 201710342792A CN 107013216 A CN107013216 A CN 107013216A
Authority
CN
China
Prior art keywords
coal seam
working face
mining
coal
hill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710342792.4A
Other languages
Chinese (zh)
Inventor
刘振江
张传庆
牟宗龙
崔国建
吴青钱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Institute of Rock and Soil Mechanics of CAS
Original Assignee
Wuhan Institute of Rock and Soil Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Institute of Rock and Soil Mechanics of CAS filed Critical Wuhan Institute of Rock and Soil Mechanics of CAS
Priority to CN201710342792.4A priority Critical patent/CN107013216A/en
Publication of CN107013216A publication Critical patent/CN107013216A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Remote Sensing (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention belongs to dig up mine and safety engineering field, a kind of colliery deep mining impulsion pressure prevention and controls are disclosed, are comprised the following steps:Step a:First mining face is arranged in upper coal seam along district rise direction;Step b:The stress relaxed area arrangement district rise preparatory working group below goaf;Step c:After the preparatory working group that goes up a hill is formed, working face of coal seam and lower working face of coal seam carry out back production in the arrangement of main system both sides;Step d:Before exploitation or in recovery process, the pre- release processing of locality or impulsion pressure danger releasing measures are taken haulage way, tailgate, open-off cut of upper working face of coal seam etc..The method that the present invention provides a kind of effective lifting colliery deep mining impulsion pressure prevention effect.

Description

A kind of colliery deep mining impulsion pressure prevention and controls
Technical field
The present invention relates to mining and safety engineering field, more particularly to a kind of colliery deep mining impulsion pressure preventing and treating Method.
Background technology
Current pit mining intensity and depth are stepped up, and large quantities of mines subsequently enter the deep mining stage, with annual 10 ~20m depth increase, has been enter into or will enter below km and exploit, or even the first working face of some new mines reaches km.
Mining of deep mine faces the adverse circumstances of " a three high disturbances ", in addition irrational developing exploitation arrangement, geology Construction etc., originally shallow mining do not occur or the unconspicuous disaster of performance progressively appear or more strong.Wherein, impulsion pressure It is complicated and destructive as typical coal rock dynamic disaster, the safety and high efficiency of serious threat mine.
The coal petrography dynamic impact problem disaster that deep mining induces is increasingly notable, especially the exploiting field of coal seam group double-vane combined layout On coal column area of going down the hill it is more prominent.At present, the preventing and treating for deep mining impulsion pressure focuses primarily upon locality measure, expends Greatly, effect is limited, it is difficult to fundamentally solve deep mining thump disaster problem, and existing protective coat extracted is focused primarily upon Protrusion-dispelling, using less and mainly for getting working face in terms of erosion control, for above going down the hill, coal column area impulsion pressure prevents and treats problem Applied.
The content of the invention
The present invention provides a kind of colliery deep mining impulsion pressure prevention and controls, solves coal seam group double-vane in the prior art and joins (main entry) coal column area impulsion pressure diaster prevention and control effect of going down the hill on the exploiting field for closing arrangement is poor, expends big technical problem.
In order to solve the above technical problems, the invention provides a kind of colliery deep mining impulsion pressure prevention and controls, exploiting field According to direction arrangement of going up a hill;Comprise the following steps:
Step a:First mining face is arranged in upper coal seam along district rise direction;
Step b:The stress relaxed area arrangement district rise preparatory working group below goaf;
Step c:After the preparatory working group that goes up a hill is formed, working face of coal seam and lower coal seam work in the arrangement of main system both sides Make face and carry out back production;
Step d:Before exploitation or in recovery process, haulage way, tailgate, open-off cut of upper working face of coal seam etc. are adopted Take the pre- release processing of locality or impulsion pressure danger releasing measures.
Further, the step a is specifically included:
Along district rise direction, a first mining face is arranged in upper coal seam;
Wherein, 150~200m of working face length;Advance distance is slightly larger than length of going up a hill, using the long-armed coal-mining method of inclination.
Further, the step b is specifically included:
Arranged between the upper coal seam and lower coal seam of the first mining face lower goaf in rock stratum or lower seat earth Including exploiting field transport is gone up a hill, return air is gone up a hill, the preparatory working of ginney group, goaf stress relaxed area is at;
Wherein, 19~21m of spacing of the preparatory working group.
Further, the step c is specifically included:
After preparatory working group is formed, working face of coal seam and lower working face of coal seam in the arrangement of main system both sides;
Wherein, upper working face of coal seam uses mining advancing, and lower working face of coal seam uses drawing back, reduces working face The mining influence of stress, energy and dynamic loading to coal column area roadway group of entirely going up a hill in digging disturbance.
Further, in Mining Area, following erosion control arrangement and parameter are specifically included:
Preferentially coal column, as Protective Coal Seam, is not left in the upper coal seam of exploitation in exploiting field;
Working face, which stops adopting line horizontal range, goes up a hill more than or equal to 80m;
Lower working face of coal seam stops adopting line or the parallel interior wrong upper 10~20m of working face of coal seam goaf of open-off cut, is unloaded in it In nip;
Wrong upper 10~50m of working face of coal seam goaf in lower working face of coal seam tunnel;
3~5m of section coal pillar width between Adjacent Working Face.
Further, in the step d, using large diameter borehole, coal-bed flooding as pre- unloading pressure means, using coal body Explosion, top plate presplit blasting release are used as danger releasing measures;
Specific technical parameter, large diameter borehole:1~2m of pitch-row, hole depth 15m~20m, 110~125mm of aperture;Coal seam Water filling:Pitch-row 5m, aperture 82mm, hole depth 30m, sealed borehole length 10m, 6~10MPa of water injection pressure;Coal body explosion:Aperture 42mm, Hole depth 10m, spacing 5m, sealed borehole length 5m, explosive payload 3.0kg;Top plate presplit blasting:Pitch-row 5m, aperture 42mm, hole depth 20m, envelope Hole length 10m, explosive payload 6.0kg.
Further, exploiting field according to go down the hill direction arrangement or on go down the hill combined layout or zone formula arrange.
The one or more technical schemes provided in the embodiment of the present application, have at least the following technical effects or advantages:
The colliery deep mining impulsion pressure prevention and controls provided in the embodiment of the present application, especially for Deep Well Coal Bed, group is double Go down the hill on the exploiting field of the wing combined layout protection coal pillar area.During using the erosion control optimization placement method, by the length of service long, stability It is required that high, long-term should in the upper working face of coal seam lower goaf bottom plate exploited in advance by roadway layout of going down the hill on mining influence Power reduces area, it is to avoid coal column high stress concentration zone of going down the hill in formation, reduces dead load, improves roadway surrounding rock stress distribution, Reduce roadway maintenance cost, improve Drift stability;Upper working face of coal seam mining advancing, avoids ahead work face branch bearing capacity To the disturbing influence to above going down the hill, shaken while being shaken using the first mining face goaf incompact fractured surrounding rock structure in upper coal seam to ore deposit The strong attenuation of ripple weakens lower working face of coal seam lead abutment pressure and the dynamic load of upper go-downhill roadway is disturbed, and then reduces both sides The digging disturbance of working face of coal seam up and down, makes go-downhill roadway be carried overlaying influence by sound most weak;Coal seam above and below main system both sides The optimization design of roadway workface arrangement parameter can reduce stress concentration degree to greatest extent, and reduction impulsion pressure occurs Possibility;In addition, in the upper working face of coal seam mining process higher to shock hazard implement large diameter borehole, coal body explosion and The locality impulsive control measure such as top plate presplit blasting release, other regions show situation according to impact and take adaptable part Control measure, the further supplement controlled as whole deep mining impulsion pressure dynamic disaster.
Brief description of the drawings
Horizontal layout schematic diagram in the colliery deep mining impulsion pressure prevention and controls that Fig. 1 provides for the present invention;
Fig. 2 is Fig. 1 profile.
Embodiment
The embodiment of the present application solves coal in the prior art by providing a kind of colliery deep mining impulsion pressure prevention and controls (main entry) coal column area impulsion pressure diaster prevention and control effect of going down the hill on the exploiting field of floor group's double-vane combined layout is poor, expends big technology and asks Topic;Lifting local control effect has been reached, the technique effect of cost is reduced.
In order to be better understood from above-mentioned technical proposal, below in conjunction with Figure of description and specific embodiment to upper State technical scheme to be described in detail, it should be understood that the specific features in the embodiment of the present invention and embodiment are to the application skill The detailed description of art scheme, rather than the restriction to technical scheme, in the case where not conflicting, the embodiment of the present application And the technical characteristic in embodiment can be mutually combined.
A kind of colliery deep mining impulsion pressure prevention and controls, exploiting field is arranged according to direction of going up a hill;Comprise the following steps:
Step a:First mining face is arranged in upper coal seam along district rise direction;
Step b:The stress relaxed area arrangement district rise preparatory working group below goaf;
Step c:After the preparatory working group that goes up a hill is formed, working face of coal seam and lower coal seam work in the arrangement of main system both sides Make face and carry out back production;
Step d:Before exploitation or in recovery process, haulage way, tailgate, open-off cut of upper working face of coal seam etc. are adopted Take the pre- release processing of locality or impulsion pressure danger releasing measures.
The step a is specifically included:
Along district rise direction, a first mining face is arranged in upper coal seam;
Wherein, 150~200m of working face length;Advance distance is slightly larger than length of going up a hill, using the long-armed coal-mining method of inclination.
The step b is specifically included:
Arranged between the upper coal seam and lower coal seam of the first mining face lower goaf in rock stratum or lower seat earth Gone up a hill including exploiting field transport, the preparatory working such as return air is gone up a hill, ginney group, be at goaf stress relaxed area;
Wherein, 19~21m of spacing of the preparatory working group.
The step c is specifically included:
After preparatory working group is formed, working face of coal seam and lower working face of coal seam in the arrangement of main system both sides;
Wherein, upper working face of coal seam uses mining advancing, and lower working face of coal seam uses drawing back, reduces working face The mining influence of stress, energy and dynamic loading to coal column area roadway group of entirely going up a hill in digging disturbance.
In Mining Area, following erosion control arrangement and parameter are specifically included:
Preferentially coal column, as Protective Coal Seam, is not left in the upper coal seam of exploitation in exploiting field;
Working face, which stops adopting line horizontal range, goes up a hill more than or equal to 80m;
Lower working face of coal seam stops adopting line or the parallel interior wrong upper 10~20m of working face of coal seam goaf of open-off cut, is unloaded in it In nip;
Wrong upper 10~50m of working face of coal seam goaf in lower working face of coal seam tunnel;
3~5m of section coal pillar width between Adjacent Working Face.
In the step d, using large diameter borehole, coal-bed flooding as pre- unloading pressure means, using coal body explosion, top plate Presplit blasting release is used as danger releasing measures;
Specific technical parameter, large diameter borehole:1~2m of pitch-row, hole depth 15m~20m, 110~125mm of aperture;Coal seam Water filling:Pitch-row 5m, aperture 82mm, hole depth 30m, sealed borehole length 10m, 6~10MPa of water injection pressure;Coal body explosion:Aperture 42mm, Hole depth 10m, spacing 5m, sealed borehole length 5m, explosive payload 3.0kg;Top plate presplit blasting:Pitch-row 5m, aperture 42mm, hole depth 20m, envelope Hole length 10m, explosive payload 6.0kg.
Referring to Fig. 1 and Fig. 2, in figure:Described a kind of colliery deep mining impulsion pressure prevention and controls, first in upper coal seam Arrange a first mining face 1 in coal column area of going up a hill;Then 2 are gone up a hill in its gob floor stress relaxed area deployment rails, transport The preparatory working group 3 such as go up a hill;Main system carries out rational exploitation arrangement after being formed to upper working face of coal seam 4, lower working face of coal seam 5, Upper working face of coal seam protrusive, lower working face of coal seam drawing back;Needed during exploitation to upper working face of coal seam tailgate 6, The upper working face of coal seam stope drift active workings entity coal side such as upper working face of coal seam haulage way 7, upper working face of coal seam open-off cut 8 is taken greatly The pre- release processing of the localities such as diameter bores, coal-bed flooding, coal body explosion and top plate presplit blasting or impact danger releasing measures, simultaneously Lower working face of coal seam tailgate 9, lower working face of coal seam haulage way 10, lower working face of coal seam are opened according to field monitoring situation Cut working face of coal seam tunnel and ginney 2 under the grade of eye 11, transport preparatory workings such as 3 of going up a hill and take corresponding measure, as whole The further supplement of deep mining impulsion pressure dynamic disaster design arrangement method.
Said structure is arranged according to district rise, but the application not limited to this, is also accommodated in district dip arrangement, up and down Mountain combined layout or zone formula arrangement etc..
Certain colliery deep mining impulsion pressure prevention and controls and Mining block design method for arranging that the present embodiment is provided, especially Suitable for the method for km Deep Well Coal Bed group's double-vane combined layout exploiting field thump dynamic disaster preventing and treating.
First, a working face is arranged in upper coal seam along direction of going up a hill, then on its goaf arranged beneath exploiting field Mountain preparatory working, arranges working face of coal seam, lower working face of coal seam after main system is formed in its both sides, and it includes following step Suddenly:
A first mining face, 150~200m of working face length are arranged in upper coal seam along district rise direction, it is however generally that It is not less than 100m, advance distance is generally the length sum of three working faces, depending on the length gone up a hill, slightly larger than length of going up a hill Degree, tilts long-armed coal-mining method, that is, faces upward to adopt or bow and adopt.
Then arrange and adopt in rock stratum or lower seat earth between coal seam and lower coal seam on first mining face lower goaf The preparatory workings such as area's transport is gone up a hill, return air is gone up a hill, ginney, spacing about 20m is at the reduction of gob floor stress Area, improves surrouding rock stress distribution occasion, improves Drift stability.
After roadway group to be prepared is formed, working face of coal seam and lower working face of coal seam, upper coal seam in the arrangement of main system both sides Working face mining advancing, lower working face of coal seam drawing back reduces stress, energy and dynamic loading in working face digging disturbance To the mining influence for coal column area roadway group of entirely going up a hill.
Upper working face of coal seam is as protective coat extracted, and its mining work shock hazard is higher, exploits preceding or recovery process Middle needs take large diameter borehole, coal-bed flooding, coal body explosion and top plate presplit blasting release etc. in tunnel both sides entity coal side The pre- release processing of locality or impact danger releasing measures;And lower working face of coal seam is exploited under protective layer, its shock hazard is obvious Weaken, surge guard dynamics is relatively small, does not according to circumstances take or take slight locality prevention and control measure;Additionally will be Bord-up group monitors its surrouding rock stress situation of change at the embedded pressure cushion moment, takes suitable when working face is close to back production line Local provisions.
Further, preferably, the specific erosion control arrangement parameter of the Mining Area of coal seam group double-vane combined layout:Exploiting field is excellent Upper coal seam is first exploited as Protective Coal Seam, coal column is not left as far as possible, lower working face of coal seam is under upper working face of coal seam goaf In square distressed zone;Working face stops adopting line horizontal range district rise not less than 80m, reduces digging disturbance to whole bord-up group Influence;Working face open-off cut or stop adopts the parallel interior wrong arrangement of line between upper coal seam, and lower working face of coal seam stops adopting line or open-off cut Interior wrong upper 10~20m of working face of coal seam goaf, in its distressed zone;Wrong upper coal seam work in lower working face of coal seam section road 10~50m of face goaf;Coal mine goaf, 3~5m of working face section coal pillar width are used between Adjacent Working Face;This coal of exploiting field Order mining between layer working face, forbids island working face occur;Face length is not less than 100m;Ahead work face supporting is long Degree is not less than 150m.
The one or more technical schemes provided in the embodiment of the present application, have at least the following technical effects or advantages:
The colliery deep mining impulsion pressure prevention and controls provided in the embodiment of the present application, especially for Deep Well Coal Bed, group is double Go down the hill on the exploiting field of the wing combined layout protection coal pillar area.During using the erosion control optimization placement method, by the length of service long, stability It is required that high, long-term should in the upper working face of coal seam lower goaf bottom plate exploited in advance by roadway layout of going down the hill on mining influence Power reduces area, it is to avoid coal column high stress concentration zone of going down the hill in formation, reduces dead load, improves roadway surrounding rock stress distribution, Reduce roadway maintenance cost, improve Drift stability;Upper working face of coal seam mining advancing, avoids ahead work face branch bearing capacity To the disturbing influence to above going down the hill, shaken while being shaken using the first mining face goaf incompact fractured surrounding rock structure in upper coal seam to ore deposit The strong attenuation of ripple weakens lower working face of coal seam lead abutment pressure and the dynamic load of upper go-downhill roadway is disturbed, and then reduces both sides The digging disturbance of working face of coal seam up and down, makes go-downhill roadway be carried overlaying influence by sound most weak;Coal seam above and below main system both sides The optimization design of roadway workface arrangement parameter can reduce stress concentration degree to greatest extent, and reduction impulsion pressure occurs Possibility;In addition, in the upper working face of coal seam mining process higher to shock hazard implement large diameter borehole, coal body explosion and The locality impulsive control measure such as top plate presplit blasting release, other regions show situation according to impact and take adaptable part Control measure, the further supplement controlled as whole deep mining impulsion pressure dynamic disaster.
It should be noted last that, above embodiment is merely illustrative of the technical solution of the present invention and unrestricted, Although the present invention is described in detail with reference to example, it will be understood by those within the art that, can be to the present invention Technical scheme modify or equivalent substitution, without departing from the spirit and scope of technical solution of the present invention, it all should cover Among scope of the presently claimed invention.

Claims (7)

1. a kind of colliery deep mining impulsion pressure prevention and controls, it is characterised in that exploiting field is arranged according to direction of going up a hill;Including such as Lower step:
Step a:First mining face is arranged in upper coal seam along district rise direction;
Step b:The stress relaxed area arrangement district rise preparatory working group below goaf;
Step c:After the preparatory working group that goes up a hill is formed, working face of coal seam and lower working face of coal seam in the arrangement of main system both sides Carry out back production;
Step d:Before exploitation or in recovery process, office is taken to haulage way, tailgate, open-off cut of upper working face of coal seam etc. The pre- release processing of portion's property or impulsion pressure danger releasing measures.
2. colliery deep mining impulsion pressure prevention and controls as claimed in claim 1, it is characterised in that the step a is specific Including:
Along district rise direction, a first mining face is arranged in upper coal seam;
Wherein, 150~200m of working face length;Advance distance is slightly larger than length of going up a hill, using the long-armed coal-mining method of inclination.
3. colliery deep mining impulsion pressure prevention and controls as claimed in claim 1, it is characterised in that the step b is specific Including:
Being arranged between the upper coal seam and lower coal seam of the first mining face lower goaf in rock stratum or lower seat earth includes Exploiting field transport is gone up a hill, return air is gone up a hill, the preparatory working of ginney group, is at goaf stress relaxed area;
Wherein, 19~21m of spacing of the preparatory working group.
4. colliery deep mining impulsion pressure prevention and controls as claimed in claim 1, it is characterised in that the step c is specific Including:
After preparatory working group is formed, working face of coal seam and lower working face of coal seam in the arrangement of main system both sides;
Wherein, upper working face of coal seam uses mining advancing, and lower working face of coal seam uses drawing back, reduces working face digging The mining influence of stress, energy and dynamic loading to coal column area roadway group of entirely going up a hill in disturbance.
5. colliery deep mining impulsion pressure prevention and controls as claimed in claim 1, it is characterised in that in Mining Area, Specifically include following erosion control arrangement and parameter:
Preferentially coal column, as Protective Coal Seam, is not left in the upper coal seam of exploitation in exploiting field;
Working face, which stops adopting line horizontal range, goes up a hill more than or equal to 80m;
Lower working face of coal seam stops adopting line or the parallel interior wrong upper 10~20m of working face of coal seam goaf of open-off cut, in its distressed zone It is interior;
Wrong upper 10~50m of working face of coal seam goaf in lower working face of coal seam tunnel;
3~5m of section coal pillar width between Adjacent Working Face.
6. colliery deep mining impulsion pressure prevention and controls as claimed in claim 1, it is characterised in that
In the step d, using large diameter borehole, coal-bed flooding as pre- unloading pressure means, using coal body explosion, top plate presplitting Unloading pressure by blasting is used as danger releasing measures;
Specific technical parameter, large diameter borehole:1~2m of pitch-row, hole depth 15m~20m, 110~125mm of aperture;Coal-bed flooding: Pitch-row 5m, aperture 82mm, hole depth 30m, sealed borehole length 10m, 6~10MPa of water injection pressure;Coal body explosion:Aperture 42mm, hole depth 10m, spacing 5m, sealed borehole length 5m, explosive payload 3.0kg;Top plate presplit blasting:Pitch-row 5m, aperture 42mm, hole depth 20m, sealing of hole is long Spend 10m, explosive payload 6.0kg.
7. the colliery deep mining impulsion pressure prevention and controls as described in all items of claim 1~6, it is characterised in that:Exploiting field According to go down the hill direction arrangement or on go down the hill combined layout or zone formula arrangement.
CN201710342792.4A 2017-05-16 2017-05-16 A kind of colliery deep mining impulsion pressure prevention and controls Pending CN107013216A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710342792.4A CN107013216A (en) 2017-05-16 2017-05-16 A kind of colliery deep mining impulsion pressure prevention and controls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710342792.4A CN107013216A (en) 2017-05-16 2017-05-16 A kind of colliery deep mining impulsion pressure prevention and controls

Publications (1)

Publication Number Publication Date
CN107013216A true CN107013216A (en) 2017-08-04

Family

ID=59449762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710342792.4A Pending CN107013216A (en) 2017-05-16 2017-05-16 A kind of colliery deep mining impulsion pressure prevention and controls

Country Status (1)

Country Link
CN (1) CN107013216A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107725053A (en) * 2017-11-08 2018-02-23 山东科技大学 Lane is reserved for one's own use without pillar mining method suitable for the exploiting field of gently inclined seam
CN107882565A (en) * 2017-10-31 2018-04-06 中国中煤能源集团有限公司 A kind of adopted without driving without coal column stays integral production practice
CN109854245A (en) * 2018-12-26 2019-06-07 龙口矿业集团有限公司 A kind of erosion control safety method of Coal Face Passing Through connection roadway
WO2019148788A1 (en) * 2018-01-31 2019-08-08 中国矿业大学 Method for preventing rock bursts by means of active support reinforcement and active pressure relief
CN111271120A (en) * 2020-01-22 2020-06-12 天地科技股份有限公司 Coal mine rock burst dynamic and static load source-based danger relieving method
CN113236360A (en) * 2021-06-29 2021-08-10 中煤科工开采研究院有限公司 Method for preventing and controlling exploding roadway group rock burst
CN113482718A (en) * 2021-08-10 2021-10-08 中煤科工开采研究院有限公司 Method for preventing rock burst through pressure relief arrangement of roadway group of coal seam panel

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101936162A (en) * 2010-04-16 2011-01-05 兖州煤业股份有限公司 Method for preventing rock burst of bottom plate of layered tunnel in tectonic stress region of coal mine
CN103244179A (en) * 2013-04-28 2013-08-14 中国矿业大学 Evaluation method for predicting coal mine underground impact mine pressure danger
EP2801697A1 (en) * 2012-01-06 2014-11-12 He, Manchao Longwall working face, non-pillared mining method
CN105673014A (en) * 2016-01-07 2016-06-15 山东科技大学 Method for controlling rock burst of hard roof jump mining working face

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101936162A (en) * 2010-04-16 2011-01-05 兖州煤业股份有限公司 Method for preventing rock burst of bottom plate of layered tunnel in tectonic stress region of coal mine
EP2801697A1 (en) * 2012-01-06 2014-11-12 He, Manchao Longwall working face, non-pillared mining method
CN103244179A (en) * 2013-04-28 2013-08-14 中国矿业大学 Evaluation method for predicting coal mine underground impact mine pressure danger
CN105673014A (en) * 2016-01-07 2016-06-15 山东科技大学 Method for controlling rock burst of hard roof jump mining working face

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
刘振江: "千米深井下山保护煤柱区诱冲机理及防治研究", 《中国优秀硕士学位论文全文数据库 工程科技I辑》 *
吕建为等: "济三煤矿深部采区冲击矿压综合治理技术", 《煤矿安全》 *
李志民等: "基于上保护层开采的千米深井冲击矿压防治", 《煤矿安全》 *
李志民等: "深井上下山煤柱区覆岩结构演化特征及对冲击矿压的影响", 《煤矿安全》 *
郭兴明等: "煤矿深部采区冲击矿压典型案例及防治探讨", 《煤炭技术》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107882565A (en) * 2017-10-31 2018-04-06 中国中煤能源集团有限公司 A kind of adopted without driving without coal column stays integral production practice
CN107725053A (en) * 2017-11-08 2018-02-23 山东科技大学 Lane is reserved for one's own use without pillar mining method suitable for the exploiting field of gently inclined seam
CN107725053B (en) * 2017-11-08 2019-04-05 山东科技大学 Lane is reserved for one's own use without pillar mining method in exploiting field suitable for gently inclined seam
WO2019148788A1 (en) * 2018-01-31 2019-08-08 中国矿业大学 Method for preventing rock bursts by means of active support reinforcement and active pressure relief
US10655465B2 (en) 2018-01-31 2020-05-19 China University Of Mining And Technology Method for rock burst prevention by active support reinforcement and active pressure relief
CN109854245A (en) * 2018-12-26 2019-06-07 龙口矿业集团有限公司 A kind of erosion control safety method of Coal Face Passing Through connection roadway
CN111271120A (en) * 2020-01-22 2020-06-12 天地科技股份有限公司 Coal mine rock burst dynamic and static load source-based danger relieving method
CN113236360A (en) * 2021-06-29 2021-08-10 中煤科工开采研究院有限公司 Method for preventing and controlling exploding roadway group rock burst
WO2023273091A1 (en) * 2021-06-29 2023-01-05 中煤科工开采研究院有限公司 Method for preventing and controlling rock bursts in development roadway group
CN113482718A (en) * 2021-08-10 2021-10-08 中煤科工开采研究院有限公司 Method for preventing rock burst through pressure relief arrangement of roadway group of coal seam panel
CN113482718B (en) * 2021-08-10 2024-05-31 中煤科工开采研究院有限公司 Method for preventing rock burst through pressure relief arrangement of coal seam disc zone roadway group

Similar Documents

Publication Publication Date Title
CN107013216A (en) A kind of colliery deep mining impulsion pressure prevention and controls
CN107313778B (en) A kind of second mining super high seam stops the method for adopting line coal column
US20200232323A1 (en) Multi-section non-pillar staggered protected roadway for deep inclined thick coal seam and method for coal pillar filling between sections
CN101338674B (en) Non-pillar sublevel caving mining method for direct loading for ore
CN110700883B (en) Gob-side entry driving prevention and control method for large-dip-angle coal seam composite disaster small coal pillar
CA3044307A1 (en) Stress-transfer method in tunnel with high ground pressure based on fracturing ring
CN103775085B (en) High-dipping medium-thickness seam flexible type shield digging one supporting is without pillar working
CN103557000B (en) Method for preventing gob-side entry rock burst through side-drawing filling
CN104314610A (en) Outburst eliminating method for coal roadway stripe region
CN108343418B (en) Method for controlling mining influence range from surface directional hydraulic fracturing pre-cracked bedrock
CN107559008A (en) A kind of method combined second mining super high seam and stop adopting line coal column
AU2021106168A4 (en) High-gas Coal Seam Group Pressure Relief Mining Method Based on Gob-side Entry Retaining in the First Mining Whole Rock Pressure Relief Working Face
CN108397227A (en) A kind of progressive extinction roadway layout method of tendency
CN101915118A (en) Method for progressive gas drainage in high gas medium-hard coal seam
CN104847401A (en) Regional coal and gas outburst coal seam coal face outburst preventing and controlling method
CN106337685A (en) Method for combined exploitation of coal and its associated oil shales
CN113431577A (en) Method for arranging same-direction inward-staggered roadways in ultra-close coal seam mining
CN113756809A (en) Load migration impact mine pressure prevention and control method for ground fracturing thick and hard rock stratum
CN108506000A (en) A kind of projecting coal bed gallery speedy drivage method
CN115749776A (en) Coal pillar recovery method based on fault grouting transformation
CN113847031A (en) Method for maintaining stability of down-going paste filling surrounding rock of coal pressed under water body
CN110080772B (en) Stoping route arrangement method of gently inclined medium-thickness ore body sill-pillar-free sublevel caving method
CN109025999B (en) One-field three-purpose top coal weakening method
CN108894783B (en) A kind of half-edge coal seam paste body filling coal-mining technique
CN110080768A (en) A kind of a wide range of rock-burst prevention method of coal mine roadway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170804

RJ01 Rejection of invention patent application after publication