CN107012954A - A kind of new steel-structure factory building - Google Patents
A kind of new steel-structure factory building Download PDFInfo
- Publication number
- CN107012954A CN107012954A CN201710406882.5A CN201710406882A CN107012954A CN 107012954 A CN107012954 A CN 107012954A CN 201710406882 A CN201710406882 A CN 201710406882A CN 107012954 A CN107012954 A CN 107012954A
- Authority
- CN
- China
- Prior art keywords
- boss
- star
- factory building
- support column
- support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 21
- 239000010959 steel Substances 0.000 claims description 21
- 238000007789 sealing Methods 0.000 claims description 8
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 2
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 7
- 239000000463 material Substances 0.000 description 4
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2409—Hooks, dovetails or other interlocking connections
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2415—Brackets, gussets, joining plates
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2418—Details of bolting
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2439—Adjustable connections, e.g. using elongated slots or threaded adjustment elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention provides a kind of new steel-structure factory building, the new steel-structure factory building includes:Multiple support columns, and support beam, wherein, platform connected in star is provided with the top of each support column, the boss for being inserted into each connected in star is provided with the support beam, slidable fit in multiple skirtboards, the skirtboard is provided with the boss sliding block, and the part that the sliding block is exposed at outside the skirtboard is platform shape structure;And when the boss is inserted into described connected in star, support the skirtboard to be installed in described connected in star outside described shape structure;The support beam is welded to connect with the support column top surface.The beneficial effects of the invention are as follows:Stability of the support beam with support column when being connected is improved with the cooperation of platform connected in star by boss.
Description
Technical field
The present invention relates to the technical field of steel construction, more particularly to a kind of new steel-structure factory building.
Background technology
Steel construction is the main structure being made up of steel material, is one of main building construction types.Structure it is main by
The components such as girder steel, steel column, steel truss that shaped steel and steel plate etc. are made are constituted, generally using weld seam, spiral shell between each component or part
Bolt or rivet interlacement.Because its deadweight is lighter, and easy construction, it is widely used in the fields such as large-sized workshop, venue, Super High.Steel
The characteristics of material be intensity it is high, from heavy and light, integral rigidity be good, deformability is strong, therefore be used to building large span and superelevation, superduty
Building is particularly suitable;Material homogeneity and isotropism are good, belong to perfect elastic body, best suit the substantially false of common engineering mechanics
It is fixed;Material plasticity, good toughness, can there is moderate finite deformation, and dynamic load can be born well;Construction period is short;Its industrialization degree
Height, can carry out the high Virtual production of mechanization degree.Steel construction should study high strength steel, greatly improve its yield point strong
Degree;In addition the shaped steel of new varieties is rolled, with suitable such as H profile steel (also known as wide width wing edge shaped steel) and T steel and profiled sheet
The need for answering longspan structure and high-rise building.Heat bridge lightweight steel construction system is also whether there is in addition, building is not saved in itself,
Slip easily occurs at existing steel structure connection to come off, the fracture of structure, harm production is caused.
The content of the invention
The invention aims to overcome the deficiencies in the prior art, there is provided a kind of new steel-structure factory building.
The present invention is to be achieved through the following technical solutions:
The invention provides a kind of new steel-structure factory building, the new steel-structure factory building includes:Multiple support columns, Yi Jizhi
Crossbeam is supportted, wherein, it is provided with platform connected in star, the support beam and is provided with for being inserted into each at the top of each support column
Slidable fit in multiple skirtboards, the skirtboard is provided with boss in connected in star, the boss sliding block, and the sliding block is exposed
Part outside the skirtboard is platform shape structure;And when the boss is inserted into described connected in star, described shape knot
The skirtboard is supportted outside structure to be installed in described connected in star;The support beam is welded to connect with the support column top surface.
It is preferred that, boss is rectangular boss, and the number of the skirtboard is four, and four skirtboards are separately positioned on described convex
One side of platform.
It is preferred that, it is provided with chamfering at the opening of described connected in star.
It is preferred that, it is provided with sealing radiator on the support column.
It is preferred that, neck is provided with the support column, the sealing radiator is installed in the neck.
It is preferred that, in addition to oblique pull plate corresponding with each support column, the two ends of the oblique pull plate respectively with the support
Post and support beam are bolted to connection.
The beneficial effects of the invention are as follows:Support beam is improved with support column even by the cooperation of boss and platform connected in star
Stability when connecing.
Brief description of the drawings
Fig. 1 is the structural representation of new steel-structure factory building provided in an embodiment of the present invention;
Fig. 2 is the partial enlarged drawing at A in Fig. 1;
Fig. 3 is the structural representation of support beam provided in an embodiment of the present invention.
Embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, it is right below in conjunction with drawings and Examples
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.
Fig. 1, Fig. 2 and Fig. 3 are referred to, Fig. 1 is the structural representation for the new steel-structure factory building that the present invention is provided;Fig. 2
It is the partial enlarged drawing in Fig. 1 at A;Fig. 3 is the structural representation of support beam 1 provided in an embodiment of the present invention.
The embodiments of the invention provide a kind of new steel-structure factory building, the new steel-structure factory building includes:Multiple
Dagger 2, and support beam 1, wherein, each top of support column 2, which is provided with platform connected in star, the support beam 1, to be provided with
For the boss 11 being inserted into each connected in star, it is provided with the boss 11 in multiple skirtboards 13, the skirtboard 13 sliding
Dynamic to be equipped with sliding block 12, the part that the sliding block 12 is exposed at outside the skirtboard 13 is platform shape structure 121;And in the boss
11 when being inserted into described connected in star, and the outer support skirtboard 13 of described shape structure 121 is to be installed in described connected in star;
The support beam 1 is welded to connect with the top surface of support column 2.
In the above-described embodiments, support beam 1 is improved with support column 2 even by the cooperation of boss 11 and platform connected in star
Stability when connecing.
To facilitate understanding of the present embodiment of the invention the new steel-structure factory building 3 provided, with reference to specific embodiment
It is described in detail.
Fig. 1 ~ Fig. 3 is referred in the lump, and the embodiments of the invention provide a kind of new steel-structure factory building, the new steel construction
Factory building includes:Multiple support columns 2, and support beam 1, wherein, support beam 1 is overlapped on support column 2 and welded with support column 2
Connect in succession.In specific set, as shown in Fig. 2 the top surface of each support column 2 is provided with the groove of a platform shape, i.e., in support
Opened up on the top surface of post 2 and be provided with a boss in a big groove of the small bottom of opening, corresponding support beam 1
11, the boss 11 is used to be inserted into this connected in star, and in specific set, in the lump with reference to Fig. 3, Fig. 3 is support beam 1
Structure when being not inserted into platform connected in star.Multiple skirtboards 13 are provided with boss 11, when specifically setting, boss 11 is square
Shape boss 11, and the number of the skirtboard 13 is four, four skirtboards 13 are separately positioned on a side of the boss 11.And
Now the lateral surface of skirtboard 13 is flushed with the side of boss 11.And a sliding block 12 is provided with the space that skirtboard 13 is surrounded,
The part that the sliding block 12 is exposed at the outside of skirtboard 13 is a platform shape structure 121.And in specific set, two relative skirts
It is provided with plate 13 on chute, the side wall of sliding block 12 and is provided with the projection being inserted into chute, so as to avoids when mounted, sliding block
12 skid off out of skirtboard 13 is surrounded space.
In specific connection, boss 11 and skirtboard 13 are inserted into platform connected in star, for convenience the insertion of skirtboard 13,
Chamfering is provided with the opening of platform connected in star.Constantly increase with the depth of insertion, the platform shape structure 121 on sliding block 12 is pressed on
The bottom of platform connected in star, when boss 11 is continued into, platform shape structure 121 is due to being pressed against, now, promotes skirtboard 13 outside
Expansion so that the size that the outside of skirtboard 13 is opened is more than the opening size of platform connected in star, so that support beam 1 and support
What can be stablized between post 2 links together.In said process is completed, by the company of welding between support beam 1 and support column 2
Connect, to increase bonding strength.
In addition, in order to increase support strength, preferably, also include oblique pull plate 3 corresponding with each support column 2, it is described oblique
The two ends of arm-tie 3 are bolted to connection with the support column 2 and support beam 1 respectively.In specific set such as Fig. 1 institutes
Show, the side of support column 2 positioned at two ends is provided with oblique pull plate 3, oblique pull is being respectively arranged with positioned at the both sides of middle support column 2
Plate 3.
In addition, the waterproof effect in order to ensure factory building, preferably, being provided with sealing radiator 4 on the support column 2.In tool
When body is set, neck is provided with the support column 2, the sealing radiator 4 is installed in the neck.As shown in figure 1, in place
The side of support column 2 at two ends is provided with sealing radiator 4, sealing water is respectively arranged with the both sides positioned at Zhong Jian support column 2
Case 4.
By foregoing description as can be seen that the cooperation for the platform connected in star and boss 11 for passing through setting, improves support horizontal
The bonding strength of beam 1 and support column 2, and then improve the security of factory building.
These are only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and
Any modifications, equivalent substitutions and improvements made within principle etc., should be included in the scope of the protection.
Claims (6)
1. a kind of new steel-structure factory building, it is characterised in that including:Multiple support columns, and support beam, wherein, each
The boss being provided with platform connected in star, the support beam for being inserted into each connected in star is provided with the top of support column,
Slidable fit in multiple skirtboards, the skirtboard is provided with the boss sliding block, and the sliding block is exposed at outside the skirtboard
Part be platform shape structure;And when the boss is inserted into described connected in star, the skirtboard is supportted outside described shape structure
To be installed in described connected in star;The support beam is welded to connect with the support column top surface.
2. new steel-structure factory building according to claim 1, it is characterised in that boss is rectangular boss, and the skirt
The number of plate is four, and four skirtboards are separately positioned on a side of the boss.
3. new steel-structure factory building according to claim 2, it is characterised in that set at the opening of described connected in star
There is chamfering.
4. new steel structure factory building according to claim 3, it is characterised in that sealing water is provided with the support column
Case.
5. new steel structure factory building according to claim 4, it is characterised in that neck, institute are provided with the support column
Sealing radiator is stated to be installed in the neck.
6. new steel structure factory building according to claim 5, it is characterised in that also including corresponding with each support column oblique
Arm-tie, the two ends of the oblique pull plate are bolted to connection with the support column and support beam respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710406882.5A CN107012954B (en) | 2017-06-02 | 2017-06-02 | Steel construction factory building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710406882.5A CN107012954B (en) | 2017-06-02 | 2017-06-02 | Steel construction factory building |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107012954A true CN107012954A (en) | 2017-08-04 |
CN107012954B CN107012954B (en) | 2023-10-20 |
Family
ID=59451962
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710406882.5A Active CN107012954B (en) | 2017-06-02 | 2017-06-02 | Steel construction factory building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107012954B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109972726A (en) * | 2019-03-18 | 2019-07-05 | 上海鹄鸫重工机械有限公司 | A kind of steel skeleton construction room |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020171338A1 (en) * | 2001-05-18 | 2002-11-21 | Wetterberg Brandon Robert | Support structure and method of assembly thereof |
CN105591218A (en) * | 2014-10-24 | 2016-05-18 | 向荣集团有限公司 | Intermediate connector of tubular bus |
CN205421538U (en) * | 2016-02-02 | 2016-08-03 | 南通新华钢结构工程有限公司 | Novel steel construction |
-
2017
- 2017-06-02 CN CN201710406882.5A patent/CN107012954B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20020171338A1 (en) * | 2001-05-18 | 2002-11-21 | Wetterberg Brandon Robert | Support structure and method of assembly thereof |
CN105591218A (en) * | 2014-10-24 | 2016-05-18 | 向荣集团有限公司 | Intermediate connector of tubular bus |
CN205421538U (en) * | 2016-02-02 | 2016-08-03 | 南通新华钢结构工程有限公司 | Novel steel construction |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109972726A (en) * | 2019-03-18 | 2019-07-05 | 上海鹄鸫重工机械有限公司 | A kind of steel skeleton construction room |
Also Published As
Publication number | Publication date |
---|---|
CN107012954B (en) | 2023-10-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206052956U (en) | A kind of H types cantilever beam-column splicing construction | |
CN103015537B (en) | Beam-column joint connecting device of assembled steel structure system | |
CN205421538U (en) | Novel steel construction | |
CN101830415A (en) | Multifunctional boiler hearth overhauling platform | |
CN205444492U (en) | H type cantilever girder steel post geometric cross section mosaic structure | |
CN202481960U (en) | Wall-attached frame of tower crane | |
CN206307232U (en) | A kind of supporting construction for watercraft engine room | |
CN107012954A (en) | A kind of new steel-structure factory building | |
CN205421695U (en) | Steel structure plate | |
CN205421562U (en) | H type cantilever girder steel post mosaic structure | |
CN108086478A (en) | Quadrate steel pipe column and I-beam flat push type dovetail assembling frame Joint design method | |
CN106351402A (en) | Arch steel frame | |
CN206859725U (en) | A kind of building structure strengthening attachment means | |
CN109649578A (en) | Marine worker ship deck upper module pedestal and fabrication and installation method | |
CN204703542U (en) | The assembled passage of a kind of Construction of Steel Structure regularization | |
CN204112503U (en) | A kind of heating furnace steel structure frame beam column shock-resistant node | |
CN102259813A (en) | Hearth overhauling platform for multifunctional boiler | |
CN205153118U (en) | Steel construction | |
CN205444459U (en) | Biconjugate position steel construction | |
CN205224263U (en) | Symmetry steel construction | |
CN205840326U (en) | A kind of stair template fixing device | |
CN205014326U (en) | Big plate -girder stoplog installation device | |
CN109826317A (en) | A kind of reinforcing shaped steel frame for building | |
CN205421553U (en) | Steel structure connecting piece | |
CN205153126U (en) | Fixed steel construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A steel structure factory building Effective date of registration: 20231225 Granted publication date: 20231020 Pledgee: Wuhu Yangzi rural commercial bank Limited by Share Ltd. Pledgor: ANHUI TIANCHENG STEEL STRUCTURE Co.,Ltd. Registration number: Y2023980074420 |