CN107012908A - A kind of building foundation mud transportation resources and building foundation mud transporting equipment - Google Patents

A kind of building foundation mud transportation resources and building foundation mud transporting equipment Download PDF

Info

Publication number
CN107012908A
CN107012908A CN201710290574.0A CN201710290574A CN107012908A CN 107012908 A CN107012908 A CN 107012908A CN 201710290574 A CN201710290574 A CN 201710290574A CN 107012908 A CN107012908 A CN 107012908A
Authority
CN
China
Prior art keywords
mud
building foundation
thick solid
foundation mud
storage pool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710290574.0A
Other languages
Chinese (zh)
Inventor
黄钊平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710290574.0A priority Critical patent/CN107012908A/en
Publication of CN107012908A publication Critical patent/CN107012908A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F7/00Equipment for conveying or separating excavated material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Treatment Of Sludge (AREA)

Abstract

The invention discloses building foundation mud transportation resources, comprise the following steps:A, digging feeding;B, wash away;C, vibratory sieve material;D, sub-material transport.The invention also discloses building foundation mud transporting equipment, equipment base is provided with the decomposer that can decompose the building foundation mud that excavating equipment digging is sent, decomposer includes the current scour part for being used to be washed away to building foundation mud and make building foundation mud resolve into mud and thick solid thing, decomposer also includes to drip for mud and the vibration screen fallen at the thick solid thing stacking on equipment base that thick solid thing can shake, mud storage pool is provided with equipment base and positioned at the lower section of vibration screen, the mud in mud storage pool can be drawn into pumping part of the soil by Na Chang by being additionally provided with equipment base, pumping part includes suction pump and suction channel.Building foundation mud is transported using building foundation mud transportation resources of the present invention and building foundation mud transporting equipment, efficiency high, cost is low.

Description

A kind of building foundation mud transportation resources and building foundation mud transporting equipment
【Technical field】
The present invention relates to a kind of building foundation mud transportation resources, the invention further relates to a kind of building foundation mud transporting equipment.
【Background technology】
Substantial amounts of building foundation mud can be excavated in Process of Urban Development at present, 90% in these building foundation mud Part is soil, and 10% or so is stone, reinforcing bar in addition, iron block, the stiff materials such as wood.But many cities are native at present Ground is rare, and the building foundation mud excavated just is not available for the place stacked at all, causes building foundation mud to be stacked difficult. At present, general mode be by ship by the building foundation mud excavated be transported to the littoral soil of other urban rivers by Receive in field, these soil are typically all discarded fish pond or natural depression by Na Chang, for example, many buildings of Shenzhen at present The soil that basic mud is transported to Zhongshan city is stacked by Na Chang.But in transportation, load the ship of building foundation mud After oceangoing ship pulls in shore, it is still desirable to dig the building foundation mud on ship by excavator and be sent in transport vehicle, then transported by transport vehicle Received and outwelled in field to soil.Due to being all the soft road of soil matrix between general ship harbour and discarded fish pond or natural depression, so Before transport vehicle transport, in addition it is also necessary to use stone, brick slag, iron plate is repaired the roads for transport vehicle, causes cost high, and pass through fortune The general heap of building foundation mud that defeated car is outwelled obtains higher, and out-of-flatness is easily caved in, once caving in, river is influenceed again Littoral fisherman's is current, more likely causes danger to the body of fisherman.So the transporter transported back and forth using transport vehicle Formula, efficiency is very low, and cost is very high.
Therefore, the present invention is based on the deficiency of the above and produced.
【The content of the invention】
It is high there is provided a kind of conevying efficiency the present invention seeks to overcome the deficiencies in the prior art, and the low building of cost Basic mud transportation resources.
The present invention also provides a kind of conevying efficiency height, being capable of cost-effective building foundation mud transporting equipment
The present invention is achieved by the following technical solutions:
A kind of building foundation mud transportation resources, it is characterised in that:Comprise the following steps:
A, digging feeding:The building foundation mud 30 on cargo ship 20 is dug by excavating equipment 10 and is sent on decomposer 3;
B, wash away:31 pairs of current scour part digs the building foundation mud 30 sent and washed away, and building foundation mud 30 passes through Be decomposed into after washing away the mud 301 that can pass through from the sieve aperture of vibration screen 32 and can not pass through from the sieve aperture of vibration screen 32 it is thick Solids 302;
C, vibratory sieve material:Vibration screen 32 is vibrated, and sieve aperture of the mud 301 then from vibration screen 32 in step B is dropped to In the mud storage pool 5 of the lower section of vibration screen 32, thick solid thing 302 is then shaken by vibration screen 32 to be fallen at thick solid thing stacking 4;
D, sub-material transport:By pumping part 6 by the suction-discharge of mud 301 in mud storage pool 5 to soil by Na Chang In 50, and the thick solid thing 302 at thick solid thing stacking 4 is transported by transport vehicle 40.
Building foundation mud transportation resources as described above, it is characterised in that:Also include by stirring in described step D Part 8 is mixed to be stirred the mud in mud storage pool 5.
A kind of building foundation mud transporting equipment, it is characterised in that:Including equipment base 1, set on described equipment base 1 Excavating equipment can be dug the decomposer 3 that the building foundation mud sent is decomposed by having, and described decomposer 3 includes being used for building Build the current scour part 31 that basic mud is washed away and makes building foundation mud resolve into mud and thick solid thing, described point Solution device 3 also includes to drip for mud and thick solid thing shaking falling on 4 at the thick solid thing stacking on equipment base 1 Mud storage pool 5, described equipment are provided with vibration screen 32, described equipment base 1 and positioned at the lower section of vibration screen 32 The mud in mud storage pool 5 can be drawn into pumping part 6 of the soil by Na Chang, described suction section by being additionally provided with pedestal 1 Part 6 includes suction pump 61 and the suction channel 62 being connected with suction pump 61.
Building foundation mud transporting equipment as described above, it is characterised in that:Described decomposer 3 also includes being located at shaking The dynamic upside of screen cloth 32 and the hopper 33 for receiving building foundation mud, described current scour part 31 are connected on hopper 33.
Building foundation mud transporting equipment as described above, it is characterised in that:Described equipment base 1 is can be in the water surface On the hull that floats.
Building foundation mud transporting equipment as described above, it is characterised in that:Described equipment base 1, which is provided with, can supply institute The platform 2 that the excavating equipment stated is walked thereon.
Building foundation mud transporting equipment as described above, it is characterised in that:Described current scour part 31 includes being located at The main pipeline 312 that draws water, the described main pipeline that draws water are connected with suction pump 311 on equipment base 1, described suction pump 311 The many water spray that can outwards spray water branch pipes 313 are connected with 312, described draws water between main pipeline 312 and suction channel 62 It is additionally provided with moisturizing pipeline 7 connecting the two.
Building foundation mud transporting equipment as described above, it is characterised in that:Provided with stirring in described mud storage pool 5 Part 8, described mixing component 8 includes the puddle support 81 being located in mud storage pool 5, and described puddle support 81 is provided with drive Be connected with moving part 82, the output shaft of described actuator 82 can the relative rotation of puddle support 81 stirring blade 83.
Building foundation mud transporting equipment as described above, it is characterised in that:On described equipment base 1 and positioned at mud Pedestal 11 is provided with storage pool 5, described puddle support 81 is rotated with pedestal 11 to be connected, and described equipment base 1 is provided with support Frame 91, described support frame 91 with puddle support 81 provided with being connected and stretchy puddle support 81 is rotated relative to pedestal 11 and will stirred Mix the drag-line 92 that knife 83 pulls out mud storage pool 5.
Building foundation mud transporting equipment as described above, it is characterised in that:Being additionally provided with described equipment base 1 to supply The haul road 12 of the transport coarse solids of transport vehicle 40.
Compared with prior art, the present invention has the following advantages:
1st, building foundation mud is washed away by current scour part in building foundation mud transportation resources of the present invention, made Obtain building foundation mud and be decomposed into mud and thick solid thing, these thick solids are mainly stone, reinforcing bar in building foundation mud, iron 70% to 80% or so soil turns to mud and drops onto mud storage pool in block, the lump such as wood, building foundation mud It is interior, and remaining about 20% to the 30% big pimple thick solid thing that can not turn to mud then falls into the stacking of thick solid thing Place.Mud in mud storage pool, which is sucked part and is drawn into soil, to be received in field, and the soil in mud stays in mud by precipitation Soil is received in field, and the moisture in mud then by evaporation or is received default water stream channel in field by soil and flowed away.And it is thick Stone, reinforcing bar at solids stacking, iron block, the thick solid thing such as wood then transport recycling by transport vehicle.Due to inciting somebody to action Major part in building foundation mud has turned to mud, by pumping part pumping slurries, and pumping velocity is fast, and efficiency high is same with this When, it is necessary to the amount of the thick solid thing transported by transport vehicle is considerably less, reduce the transport number of times back and forth of transport vehicle, improve Conevying efficiency, reduces cost, and the thick solid thing transported can be recycled, more environmentally friendly.Base is built using the present invention Plinth mud transportation resources, is compared with Traditional Transportation method, is unloaded the time of the cargo ship of a fully loaded building foundation mud and is reduced 3 More than times, production efficiency is greatly improved, and cost is reduced.
2nd, during building foundation mud transporting equipment work of the present invention, the building foundation mud on cargo ship is dug and sent by excavating equipment On decomposer on to equipment base, by the vibration of current scour part and vibration screen, mud drops into equipment base On mud storage pool in, thick solid thing is fallen at thick solid thing stacking, and the mud in mud storage pool is sucked part and taken out Walk, because mud is transported with fluid state, travelling speed is quite fast, efficiency high, and can not pass through vibration screen sieve aperture The amount of thick solid thing seldom, so the thick solid thing transported by transport vehicle is seldom, reduces the transport number of times back and forth of transport vehicle, The saving time, human cost is reduced, improve conevying efficiency, and thick solid thing can also be recycled, more energy efficient environmental protection.
3rd, the equipment base of building foundation mud transporting equipment of the present invention is the hull that can be kept afloat, therefore, builds base Plinth mud transporting equipment can be travelled in river as needed, and the place for needing to berth is moored to as needed, that is, when one Individual soil can drive to another soil by near Na Chang after being filled up by Na Chang, therefore building foundation mud of the present invention is transported Equipment can be used repeatedly.
4th, hopper is provided with the upside of the vibration screen of building foundation mud transporting equipment of the present invention, current scour part is connected to On hopper, thus building foundation mud in hopper with regard to being washed away, it is to avoid washed away on vibration screen and cause building foundation mud Resolving time is too short, also it is avoided that causing the big walk that can be decomposed not decompose and drop in time because flushing time is too short To at thick solid thing stacking, so as to farthest make building foundation mud decomposition and inversion be mud and thick solid thing, reduce The thick solid thing dropped at thick solid thing stacking, reduces the transport number of times of subsequent transportation car, and then improves efficiency, reduces into This.
5th, building foundation mud transportation resources process of the present invention is simple, and efficiency high reduces cost.And building foundation of the present invention Mud transporting equipment is simple in construction, and the building foundation mud on cargo ship, efficiency are unloaded using building foundation mud transporting equipment of the present invention Height, cost is substantially reduced, and is adapted to popularization and application.
【Brief description of the drawings】
Fig. 1 is the principle schematic of building foundation mud transportation resources of the present invention;
Fig. 2 is the stereogram of building foundation mud transporting equipment of the present invention;
Fig. 3 is the zoomed-in view at A in Fig. 2;
Fig. 4 is the stereogram of the part of the present invention.
【Embodiment】
As shown in figure 1, a kind of building foundation mud transportation resources, comprises the following steps:
A, digging feeding:The building foundation mud 30 on cargo ship 20 is dug by excavating equipment 10 and is sent on decomposer 3;
B, wash away:31 pairs of current scour part digs the building foundation mud 30 sent and washed away, and building foundation mud 30 passes through Be decomposed into after washing away the mud 301 that can pass through from the sieve aperture of vibration screen 32 and can not pass through from the sieve aperture of vibration screen 32 it is thick Solids 302;
C, vibratory sieve material:Vibration screen 32 is vibrated, and sieve aperture of the mud 301 then from vibration screen 32 in step B is dropped to In the mud storage pool 5 of the lower section of vibration screen 32, thick solid thing 302 is then shaken by vibration screen 32 to be fallen at thick solid thing stacking 4;
D, sub-material transport:By pumping part 6 by the suction-discharge of mud 301 in mud storage pool 5 to soil by Na Chang In 50, and the thick solid thing 302 at thick solid thing stacking 4 is transported by transport vehicle 40.
As shown in figure 1, also including entering the mud in mud storage pool 5 by mixing component 8 in described step D Row stirring.
As shown in figure 1, current scour part 31 washes away to building foundation mud 30 so that building foundation mud 30 is decomposed For mud 301 and thick solid thing 302,70% to 80% or so soil turns to mud 301 and dropped onto in building foundation mud 30 In mud storage pool 5, and remaining about 20% to the 30% big pimple thick solid thing 302 that can not turn to mud is then fallen into 4 at thick solid thing stacking.Mud 301 in mud storage pool 5, which is sucked part 6 and is drawn into soil, to be received in field 50, mud Soil in 301 stays in soil by precipitation and received in field 50, and the moisture in mud 301 is then by evaporating or passing through soil Default water stream channel in field 50 of being received flows away.And 4 stone, reinforcing bar at thick solid thing stacking, iron block, the thick solid such as wood Thing 302 then transports recycling by transport vehicle 40.Due to the major part in building foundation mud 30 has been turned into mud 301, By the pumping slurries 301 of pumping part 6, pumping velocity is fast, efficiency high, at the same time, it is necessary to by transport vehicle 40 transport it is thick The amount of solids 302 is considerably less, reduces the transport number of times back and forth of transport vehicle 40, improves conevying efficiency, reduce cost, It is more environmentally friendly and the thick solid thing 302 transported can be recycled.Using building foundation mud transportation resources of the present invention, with passing System transportation resources is compared, and is unloaded the time of the cargo ship of a fully loaded building foundation mud and is reduced more than 3 times, production efficiency is big Big to improve, cost is reduced.
As shown in Figure 2 to Figure 3, a kind of building foundation mud transporting equipment, including equipment base 1, described equipment base 1 Provided with the platform 2 that can be walked for excavating equipment thereon, the described side of platform 2, which is provided with, to dig what be sent by excavating equipment The decomposer 3 that building foundation mud is decomposed, described decomposer 3 includes being used to wash away building foundation mud and make to build The current scour part 31 that basic mud resolves into mud and thick solid thing is built, described decomposer 3 also includes that mud can be supplied Drippage falls at the thick solid thing stacking on equipment base 14 vibration screen 32, described equipment with thick solid thing can shake Mud storage pool 5 is provided with pedestal 1 and positioned at the lower section of vibration screen 32, being additionally provided with described equipment base 1 can be by mud Mud in storage pool 5 is drawn into pumping part 6 of the soil by Na Chang, described pumping part 6 include suction pump 61 and with The suction channel 62 that suction pump 61 is connected.
As depicted in figs. 1 and 2, described decomposer 3 also includes being located at the upside of vibration screen 32 and for receiving building The hopper 33 of basic mud, described current scour part 31 is connected on hopper 33.Excavating equipment digs the building foundation mud sent and thrown Throw in hopper 33, building foundation mud is just washed away in hopper 33, and the mud and thick solid logistics being decomposed to form are rolled into and shaken Vibratory sieve material is carried out on dynamic screen cloth 32, it is to avoid building foundation mud, which is directly thrown, to be washed away on vibration screen 32 and cause to build Build that the basic mud resolving time is too short, also it is avoided that because flushing time is too short cause the big walk that can decompose without and the time-division Solve and drop at thick solid thing stacking, so as to farthest make building foundation mud decomposition and inversion be mud and thick solid Thing, reduces the thick solid thing dropped at thick solid thing stacking, reduces the transport number of times of subsequent transportation car, and then improve effect Rate, reduces cost, and thick solid thing can also be recycled, more energy efficient environmental protection.
As shown in Fig. 2 described equipment base 1 is the hull that can float on the water surface.Therefore, building foundation mud is transported Transfer device can be travelled in river as needed, and the place for needing to berth is moored to as needed, that is, when a soil Another soil can be driven to after being filled up by Na Chang by near Na Chang, therefore building foundation mud transporting equipment of the present invention can Repeatedly to use.
As shown in Fig. 2 described equipment base 1 is provided with the platform 2 that can be walked for described excavating equipment thereon. During work, excavating equipment is walked on platform 2, can conveniently and freely dig feeding.Because, if excavating equipment reaches transport Digging feeding is carried out on the cargo ship of building foundation mud, activity space is small, and efficiency will be reduced.
As shown in Figures 2 and 3, described current scour part 31 includes the suction pump 311 being located on equipment base 1, institute It is connected with the suction pump 311 stated and is connected with many on the main pipeline 312 that draws water, the described main pipeline 312 that draws water and can outwards spray The water spray branch pipe 313 of water, described water spray branch pipe 313 is connected on hopper 33.
As shown in Fig. 2 described drawing water is additionally provided with filling pipe connecting the two between main pipeline 312 and suction channel 62 Road 7.When mud is seldom in mud storage pool 5, moisturizing pipeline 7 is opened and to the moisturizing of suction channel 62, mud can be avoided to deposit Mud seldom causes the situation of the suction of pumping part 6 in reservoir 5, it is to avoid device damage.
As shown in figure 4, being provided with mixing component 8 in described mud storage pool 5, described mixing component 8 includes being located at mud The puddle support 81 in storage pool 5 is starched, described puddle support 81 is provided with actuator 82, on the output shaft of described actuator 82 It is connected with the stirring blade 83 that can be rotated relative to puddle support 81.The driving stirring blade 83 of actuator 82 is rotated, and mud can be avoided to exist Precipitated in mud storage pool 5, but also the larger walk in the mud that will can be fallen from the sieve aperture of vibration screen 32 stirs more Carefully, mud is more diluted, received so as to ensure that mud is easier to be sucked into soil in field.
As shown in figure 4, being provided with pedestal 11, described stirring on described equipment base 1 and in mud storage pool 5 Frame 81 is rotated with pedestal 11 and is connected, and described equipment base 1 is provided with support frame 91, and described support frame 91 is provided with stirring Mix that frame 81 is connected and stretchy puddle support 81 rotates relative to pedestal 11 and pull out stirring blade 83 drag-line of mud storage pool 5 92.When swaging clamp occurs in stirring blade 83, stirring blade 83 can be pulled out by mud storage pool 5 by drag-line 92 and be repaired, repaired It is more convenient.
As shown in Fig. 2 the haul road 12 of transport vehicle transport coarse solids can be supplied by being additionally provided with described equipment base 1. During transport vehicle transport coarse solids, transport vehicle can be directly reached on equipment base 1 by haul road.
As shown in Fig. 2 set two groups of decomposers 3 on equipment base 1, therefore, two can be walked on platform 2 simultaneously Platform excavating equipment, is dug from cargo ship and send building foundation mud simultaneously by two excavating equipments, more efficient.

Claims (10)

1. a kind of building foundation mud transportation resources, it is characterised in that:Comprise the following steps:
A, digging feeding:The building foundation mud (30) on cargo ship (20) is dug by excavating equipment (10) and is sent to decomposer (3) On;
B, wash away:The building foundation mud (30) that current scour part (31) is sent to digging washes away, building foundation mud (30) warp Cross after washing away and be decomposed into the mud (301) that can pass through from vibration screen (32) sieve aperture and can not lead to from vibration screen (32) sieve aperture The thick solid thing (302) crossed;
C, vibratory sieve material:Vibration screen (32) vibrates, and sieve aperture of the mud (301) in step B then from vibration screen (32) drops In mud storage pool (5) below to vibration screen (32), thick solid thing (302) is then shaken by vibration screen (32) falls on thick solid At thing stacking (4);
D, sub-material transport:Mud (301) suction-discharge in mud storage pool (5) is received to soil by pumping part (6) In field (50), and the thick solid thing (302) in (4) at thick solid thing stacking is transported by transport vehicle (40).
2. building foundation mud transportation resources according to claim 1, it is characterised in that:Also include in described step D The mud in mud storage pool (5) is stirred by mixing component (8).
3. a kind of building foundation mud transporting equipment, it is characterised in that:Including equipment base (1), set on described equipment base (1) Excavating equipment can be dug the decomposer (3) that the building foundation mud that send is decomposed by having, and described decomposer (3) includes being used for pair The current scour part (31) that building foundation mud is washed away and makes building foundation mud resolve into mud and thick solid thing, it is described Decomposer (3) also includes to stack for mud drippage and the thick solid thing fallen on equipment base (1) that thick solid thing can shake Locate to be provided with mud storage pool on the vibration screen (32) of (4), described equipment base (1) and positioned at the lower section of vibration screen (32) (5) soil can be drawn into by the mud in mud storage pool (5) and aspirated by Na Chang by, being additionally provided with described equipment base (1) Part (6), the suction channel (62) that described pumping part (6) includes suction pump (61) and is connected with suction pump (61).
4. building foundation mud transporting equipment according to claim 3, it is characterised in that:Described decomposer (3) is also wrapped The hopper (33) for being located on the upside of vibration screen (32) and being used for and receive building foundation mud is included, described current scour part (31) is even It is connected on hopper (33).
5. the building foundation mud transporting equipment according to claim 3 or 4, it is characterised in that:Described equipment base (1) is The hull that can float on the water surface.
6. the building foundation mud transporting equipment according to claim 3 or 4, it is characterised in that:On described equipment base (1) Provided with the platform (2) that can be walked for described excavating equipment thereon.
7. the building foundation mud transporting equipment according to claim 3 or 4, it is characterised in that:Described current scour part (31) include being connected with the main pipeline that draws water on the suction pump (311) being located on equipment base (1), described suction pump (311) (312) many water spray that can outwards spray water branch pipes (313), are connected with the described main pipeline that draws water (312), described draws water Moisturizing pipeline (7) connecting the two is additionally provided between main pipeline (312) and suction channel (62).
8. the building foundation mud transporting equipment according to claim 3 or 4, it is characterised in that:Described mud storage pool (5) Interior to be provided with mixing component (8), described mixing component (8) includes the puddle support (81) being located in mud storage pool (5), described Puddle support (81) be provided with actuator (82), the output shaft of described actuator (82) be connected with can relative puddle support (81) turn Dynamic stirring blade (83).
9. building foundation mud transporting equipment according to claim 8, it is characterised in that:On described equipment base (1) simultaneously Pedestal (11) is provided with mud storage pool (5), described puddle support (81) is rotated with pedestal (11) to be connected, described equipment Pedestal (1) is provided with support frame (91), and described support frame (91) is provided with the simultaneously stretchy puddle support that is connected with puddle support (81) (81) rotate relative to pedestal (11) and pull out stirring blade (83) drag-line (92) of mud storage pool (5).
10. the building foundation mud transporting equipment according to claim 3 or 4, it is characterised in that:Described equipment base (1) On be additionally provided with can supply transport vehicle (40) transport coarse solids haul road (12).
CN201710290574.0A 2017-04-28 2017-04-28 A kind of building foundation mud transportation resources and building foundation mud transporting equipment Pending CN107012908A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710290574.0A CN107012908A (en) 2017-04-28 2017-04-28 A kind of building foundation mud transportation resources and building foundation mud transporting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710290574.0A CN107012908A (en) 2017-04-28 2017-04-28 A kind of building foundation mud transportation resources and building foundation mud transporting equipment

Publications (1)

Publication Number Publication Date
CN107012908A true CN107012908A (en) 2017-08-04

Family

ID=59447558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710290574.0A Pending CN107012908A (en) 2017-04-28 2017-04-28 A kind of building foundation mud transportation resources and building foundation mud transporting equipment

Country Status (1)

Country Link
CN (1) CN107012908A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109632409A (en) * 2018-11-15 2019-04-16 无锡飞述科技有限公司 A kind of sample preparation apparatus and preparation method for Soil K+adsorption

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06299570A (en) * 1993-04-13 1994-10-25 Ube Ind Ltd Device for conveying sludge under pressure
CN103924624A (en) * 2014-03-17 2014-07-16 仇心金 Automatic dehydrating dredge boat for riverway sludge and application method of dredge boat
CN206667339U (en) * 2017-04-28 2017-11-24 黄钊平 A kind of building foundation mud transporting equipment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06299570A (en) * 1993-04-13 1994-10-25 Ube Ind Ltd Device for conveying sludge under pressure
CN103924624A (en) * 2014-03-17 2014-07-16 仇心金 Automatic dehydrating dredge boat for riverway sludge and application method of dredge boat
CN206667339U (en) * 2017-04-28 2017-11-24 黄钊平 A kind of building foundation mud transporting equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109632409A (en) * 2018-11-15 2019-04-16 无锡飞述科技有限公司 A kind of sample preparation apparatus and preparation method for Soil K+adsorption
CN109632409B (en) * 2018-11-15 2021-08-10 山东科建检测服务有限公司 Sample preparation device and preparation method for soil detection

Similar Documents

Publication Publication Date Title
CN103334469B (en) The treatment system removed for inner city pollution of river bed mud and treatment process
JP6209698B1 (en) Improvement method of underwater ground, work boat, pressure control system in bucket
CN103951104B (en) Pile foundation construction mud treatment system and mud treatment process
CN104712003B (en) A kind of small hydropower station desilting equipment
CN202193183U (en) Sea turtle type pumping boat
CN105731758A (en) Sea dredged silt dewatering and solidifying treatment integrated device and method
CN207997960U (en) A kind of self-tipping type stone dumper
CN205590538U (en) Silt dehydration solidification treatment integrated device is dredged to ocean
CN206667339U (en) A kind of building foundation mud transporting equipment
CN107012908A (en) A kind of building foundation mud transportation resources and building foundation mud transporting equipment
CN106759076A (en) Harbour dredging structure
CN102124164B (en) Method for delivering large quantities of under water soil to a reclamation area
JP2007063934A (en) Sediment transportation system
CN106884451A (en) Ecological dredging and synchronous sludge dewatering integrated construction technique
JP3211875B2 (en) Effective use of rising soil by improving the ground over water
JPH1018345A (en) Reclamation construction method by soft earth and dredging reclamation-through execution work system
CN104895006A (en) Riverway dredging method
CN211816535U (en) Desilting solidification construction equipment
JP2000129652A (en) Placing ship
JP2005330731A (en) Artificial tideland material using dredged cohesive soil, manufacturing device for the same, and artificial tideland construction method
JP4925950B2 (en) Dredging and landfill methods
CN205055914U (en) Channel deposit silt solidification ratio experimental apparatus
CN205804321U (en) A kind of silt soft soil foundation with real-time feed proportioning system reinforces special equipment
CN109958156A (en) A kind of hydraulic engineering Accrete clearing device
CN218282678U (en) Resource separation equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170804

RJ01 Rejection of invention patent application after publication