CN1069946C - Method for mining on near water-level very thin coal seam manless operating face - Google Patents

Method for mining on near water-level very thin coal seam manless operating face Download PDF

Info

Publication number
CN1069946C
CN1069946C CN98110118A CN98110118A CN1069946C CN 1069946 C CN1069946 C CN 1069946C CN 98110118 A CN98110118 A CN 98110118A CN 98110118 A CN98110118 A CN 98110118A CN 1069946 C CN1069946 C CN 1069946C
Authority
CN
China
Prior art keywords
coal
coal seam
work plane
mining
conveyer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN98110118A
Other languages
Chinese (zh)
Other versions
CN1229165A (en
Inventor
翟德元
姜培旺
王祥胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MINING INST SHANDONG MINING INDUSTRY COLLEGE
Original Assignee
MINING INST SHANDONG MINING INDUSTRY COLLEGE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MINING INST SHANDONG MINING INDUSTRY COLLEGE filed Critical MINING INST SHANDONG MINING INDUSTRY COLLEGE
Priority to CN98110118A priority Critical patent/CN1069946C/en
Publication of CN1229165A publication Critical patent/CN1229165A/en
Application granted granted Critical
Publication of CN1069946C publication Critical patent/CN1069946C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention relates to a method for mining on the manless operating face of a very thin coal seam, particularly to a near water-level very thin coal seam. The present invention is characterized in that deep blast holes are drilled parallel to the operating face of a coal seam; the deep blast holes are connected in series by a blasting fuse for loading powder at intervals; coal is blasted down by blasting once; then, the coal is conveyed to a conveying flat roadway by a screw coal conveyer. Workers only need to operate the processes in a roadway without entering the operating face, and therefore, the present invention solves the problem of mining the very thin coal seam, achieves the purpose of reclaiming underground resources with high safety and high efficiency and solves the difficult problems of production and digging for old ore districts.

Description

Method for mining near water-level very thin coal seam manless operating face
The invention belongs to the exploitation method of underground coal, relate to the special exploitation of ultra-thin coal seam.
In the underground mining of colliery, the condition of coal seam occurrence complexity, for the coal seam more than 0.5 meter, existing both at home and abroad ripe exploitation method, or coal-winning machine mechanical coal mining, or artificial big gun is adopted.But less than the ultra-thin coal seam below 0.5 meter, and the inclination angle is less than 10 ° near horizontal ultra-thin coal seam for coal seam thickness, is difficult to realize that mechanical mining and big gun adopt the significant wastage that causes resource.China's easy mining coal seam in a lot of old mining areas has been adopted to the greatest extent, all is faced with the problem of the exploitation of ultra-thin coal seam, is sought after a kind of new exploitation method.
Purpose of the present invention provides the particularly exploitation method of nearly horizontal ultra-thin coal seam of a kind of ultra-thin coal seam.This method can be come out coal mining under the operatorless situation of work plane, plays the purpose that economic security reclaims subterranean resource.
Realize that technical scheme of the present invention is as follows:
One,,, carries out development heading and arrange along the bearing face of assigning a work at first as the seam mining of general condition; Promptly above pre-mining face, open up tailgate, below developing haulage way, selected according to condition on the ore deposit, haulage way deployment rails mine car, scraper plate machine or conveyor etc., selected according to condition on the ore deposit; Carry out artificial open-off cut by conventional method then, promptly manually get through work plane.
Two, installation work face coal handling system
The work plane coal handling system comprises screw coal conveyer, track flat car, temporary track, pulling equipment etc.Wherein screw coal conveyer is to realize key equipment of the present invention, and its structure will be described later.
1. respectively lay temporary track at tailgate, haulage way, install the track flat car, all arrange pulling equipment in the work plane direction of advance.
2. the flat car of tailgate installs and fixes coal conveyor tail seat, and the flat car of haulage way installs and fixes the coal conveyor head.
With the screw coal conveyer cylinder from cutting eye top one and connect gradually successively and pushing away along cutting now, until exposing first segment, be connected with the power output shaft of screw conveyer head with flange at haulage way; The afterbody of the last joint of cylinder is installed on the tail seat of return airway side.
Three, deep hole blasting coal breakage technology
1. drilling deep hole borehole.Arrange drilling cramp and rig in a tunnel therein, rig can adopt powerful electric coal drill, adopts spreading formula drilling rod, is parallel to work plane drilling deep hole borehole in the coal seam, until boring saturating opposite side tunnel;
2. filling explosive.Adopt the spaced loading structure, packing method can adopt following any:
(1) explosive cartridge is bundled at interval on the thin ropy and detonating fuse on, one of cord is bundled on the drilling rod that does not withdraw from, along with withdrawing from of drilling rod gone into borehole with string powder charge volume tractive, tractive limit, limit bundlees explosive cartridge, up to running through whole borehole;
(2) explosive cartridge is bundled on detonating fuse and the elongate rod at interval, pushes borehole from the top downwards, the limit pushes long thin bar of edge joint and binding powder stick, up to running through whole borehole;
The explosive package is finished, and exposes the detonating fuse head, borehole two shutoff stemming.
3. coal blasting.Bundle detonator on the detonating fuse head that exposes, device is ignited in-place blasting out work plane coal seam with firing.
Four, coal-face coal course of conveying
1. start screw coal conveyer after the explosion, make work plane coal revolve to push to carry and fall on the haulage device of haulage way at helical blade;
2. when starting screw coal conveyer, constantly start the puffer in tailgate and the haulage way, coal conveyor is constantly advanced to work plane the place ahead,, finish first periodic duty until quick-fried loose coal is all transferred out work plane.
Five, coal-face normal cyclic operation
Connect first circulation, repeat above-mentioned deep hole blasting coal breakage technology and coal-face coal course of conveying, the circulation that goes round and begins again advances, until adopting complete design coal mining section.
Six, realizing key equipment of the present invention, is to have designed the defeated coal task that screw coal conveyer is finished coal-face.This coal conveyor structure is made up of head, tail and spiral cylinder.Head comprises power motor and reducer, and the power output shaft of reducer is connected with the cylinder head with flange; Cylinder tail jack connection tailstock; Cylinder is to weld helical blade on the tubulose hub, and is provided with base and arc spillplate; For the ease of installing, be designed to the more piece jointing type, joint with save between employing activity socket connect easy installation and removal.
Good effect of the present invention is: realized the particularly mining problem of nearly level board girdle of ultra-thin coal seam.Because ultra-thin coal seam work plane personnel pass in and out difficulty, adopt this method, the workman only needs to operate in the tunnel, need not enter work plane, and just energy extraction coal has solved the difficult problem that the ultra-thin coal seam resource reclaims.In addition, because exploitation method is simple, equipment is simple, and work plane is unmanned without supporting, so cost of winning is low, and personal security, social benefit and remarkable in economical benefits.
Further specify embodiment of the present invention again below in conjunction with accompanying drawing.
Fig. 1 is the coal-face schematic diagram, and Fig. 2 is wherein one section a main pseudosection of screw coal conveyer, and Fig. 3 is the lateral view of Fig. 2.
Marginal data: 1-return airway; 2-top winch; The 3-winch rope; The 4-temporary track; The 5-stemming; 6-explosive and detonating fuse; The 7-borehole; The 8-working face wall; 9-fortune colliery car; The 10-flange; The 11-haulage way; 12-bottom winch and winch rope; 13-lower flat wooden handcart; The 14-motor; The 15-reduction box; The 16-spillplate; 17-cuts eye; The 18-cylinder; 19-tail seat; 20-upper flat wooden handcart; The 21-helical blade; 22-cylinder hub; The 23-bolt; 24-bearing shell lid; 25-has the drum shaft of square skewer head; The 26-seat stay; The 27-base.
The coal-mining method of Fig. 1 is: 1. open up tailgate 1 and haulage way 11 in predetermined exploiting field for about 30 meters along the bearing interval, lay temporary track 4, arrange conveying track and mine car 9 in the haulage way 11, manually dig at pre-mining face and cut eye 17; 2. in tailgate 1 and haulage way 11, arrange respectively and install puffer 2 and 12, on the track 4 of top and the bottom, install track flat car 20 and 13 respectively, and winch cable 3 is fastened respectively on the track flat car; 3. above cutting eye 17, helix drum 18 1 is pushed away for 17 times along cutting eye successively, and be connected with reducer 15 by flange 10; The afterbody of the minor details of cylinder 18 is connected on the tail seat 19, and tail seat 19 is fixed on the flat car 20.In gallery 1 or 11 apart from about 8 one meters of ribs with powerful electric coal borer machine blast hole drilling 7, load explosive cartridge 6 at interval by detonating fuse, about 0.7 meter of spacing distance, borehole two, filling back is stopped up with stemming 5, stemming length is not less than 1.0 meters.On the appearing of detonating fuse, tie up blasting cap initiation then.5. after detonating, the motor 14 that turns on the power is delivered to quick-fried back coal breakage in the mine car 9 in the gallery 11, in course of conveying, constantly start puffer 2 and 12 according to circumstances, screw coal conveyer is constantly advanced forward, finish up to whole coal breakages are carried, finish first working cycles.6. repeat the above-mentioned 4-5 course of work and enter the regular work circulation, until adopting complete design section.
The structure of one section cylinder is among Fig. 2 Fig. 3: 1. helical form is welded blade 21 on cylinder hub 22, a welding of cylinder hub 22 has the drum shaft 25 of square plug, square socket is taken the lead in the other end, when installing in the down-hole, earlier the square plug of a joint is inserted the square skewer mouth of another joint.2. weld spillplate 16 and left and right sides seat stay 26 on base 25, the length of base can be held 2 above cylinders of installation, depends on the circumstances; 3. the cylinder that links up is installed on the bracing frame, is about to drum shaft 25 and is stuck in the half slot of left and right sides seat stay 27; Bearing shell cover 24 is blocked drum shaft 25, tighten up with bolt 23 and get final product.

Claims (1)

1. the ultra-thin coal seam manless working face exploitation method of nearly horizontal ultra-thin coal seam particularly, it comprises that the following step poly-:
(1) at first along the bearing face of assigning a work, top developing tailgate, below developing haulage way and get through and cut eye;
(2) installation work face coal handling system;
(I) each is auxilliaryly established temporary track and installs flat car at tailgate and haulage way, and arranges pulling equipment in work plane the place ahead;
(II) with the haulage way flat car install and fix the coal conveyor head, the return airway flat car installs and fixes coal conveyor tail seat;
(III) from cutting eye top one and connect gradually successively and pushing away along cutting now, is connected in first segment on the power output shaft of screw coal conveyer head the screw coal conveyer cylinder with flange; The last joint of cylinder is connected on the coal conveyor tailstock;
(3) deep hole blasting coal breakage:
(I) drilling deep hole borehole; In a side tunnel, arrange drilling cramp and rig, with spreading formula drilling rod be parallel to work plane in the coal seam drilling deep hole borehole until the saturating opposite side of brill tunnel;
(II) filling explosive: adopt detonating fuse series connection spaced loading structure, bundle at interval and be bundled in cord during filling on the drilling rod that does not withdraw to withdraw from and draw in borehole, or be bundled at interval and push borehole on the elongate rod with drilling rod; On the detonating fuse head that exposes, bundle detonator, ignite quick-fried loose work plane coal seam with exploder;
(4) work plane coal is carried:
(I) starts screw conveyer, work plane coal revolved at blade push on the haulage device that is delivered to haulage way;
(II) when starting coal conveyor, the pulling equipment that constantly starts in two lanes constantly advances until all quick-fried loose coals of being totally lost conveyer to work plane the place ahead, finish first circulation;
(5) repeat above-mentioned (three) described deep hole blasting coal breakage and (four) described work plane coal and carry two steps, the propelling that goes round and begins again, circulates is until adopting complete design coal mining section.
CN98110118A 1998-03-18 1998-03-18 Method for mining on near water-level very thin coal seam manless operating face Expired - Fee Related CN1069946C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN98110118A CN1069946C (en) 1998-03-18 1998-03-18 Method for mining on near water-level very thin coal seam manless operating face

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN98110118A CN1069946C (en) 1998-03-18 1998-03-18 Method for mining on near water-level very thin coal seam manless operating face

Publications (2)

Publication Number Publication Date
CN1229165A CN1229165A (en) 1999-09-22
CN1069946C true CN1069946C (en) 2001-08-22

Family

ID=5220199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN98110118A Expired - Fee Related CN1069946C (en) 1998-03-18 1998-03-18 Method for mining on near water-level very thin coal seam manless operating face

Country Status (1)

Country Link
CN (1) CN1069946C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100504028C (en) * 2006-04-11 2009-06-24 云南锡业集团有限责任公司 W trench type ore-gathering tunnel with bottom structure and forming process thereof

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912557A (en) * 2015-05-06 2015-09-16 四川达竹煤电(集团)有限责任公司小河嘴煤矿 High-efficiency thin coal seam complete-set coal mining equipment and coal mining method
CN105019905A (en) * 2015-07-02 2015-11-04 中煤盘江重工有限公司 Mixed mining method of machine guns by aiming at complex geological conditions at southwest regions
CN105692165B (en) * 2016-05-03 2018-11-09 西安科技大学 Screw lifting formula mechanical chipping spreads coal measures system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1680988A1 (en) * 1988-12-14 1991-09-30 Сибирский металлургический институт им.Серго Орджоникидзе Method of development of thin coal seams
RU1770566C (en) * 1990-07-23 1992-10-23 Институт Физики И Механики Горных Пород Ан Киргсср Method for cutting steep coal formations in absence of people

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1680988A1 (en) * 1988-12-14 1991-09-30 Сибирский металлургический институт им.Серго Орджоникидзе Method of development of thin coal seams
RU1770566C (en) * 1990-07-23 1992-10-23 Институт Физики И Механики Горных Пород Ан Киргсср Method for cutting steep coal formations in absence of people

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100504028C (en) * 2006-04-11 2009-06-24 云南锡业集团有限责任公司 W trench type ore-gathering tunnel with bottom structure and forming process thereof

Also Published As

Publication number Publication date
CN1229165A (en) 1999-09-22

Similar Documents

Publication Publication Date Title
CN101105129B (en) Mining environment reconstructed continuous mining afterwards filling mining method
CN102472100B (en) Underground mining
CN101942999A (en) Coal mining method for high-dipping low seam
CN1474032A (en) Continuous mining method of stepped sectional extruding and ore caving followed by filling
CN101285384B (en) Large diameter, deep borehole and non undercutting mining method
CN101737047A (en) Method for mining coal of steeply inclined thin seam
CN102720500A (en) Mechanized underground mining method for sharply inclined thin ore body
CN100557195C (en) Chain bucket coal-winning machine and unmanned work face coal mining method thereof
CN114542069B (en) Upper-breaking and lower-cutting gob-side entry retaining blasting method for huge-thickness top plate
CN103411493A (en) Drilling and powder charging method for goaf-penetrating deep hole presplitting blasting
RU2397324C1 (en) Method for development of minor inclined and sloping ore lodes
CN1069946C (en) Method for mining on near water-level very thin coal seam manless operating face
CN101824986A (en) Coal mining process of drilling, loading, conveying and anchoring integral machine
CN101302932A (en) Method for underground chamber digging and laneway opening digging
US4280732A (en) Method and apparatus for mining
AU695422B2 (en) Continuous mining linear advance system
CN1067290A (en) Room-and-pilar type caving for mine
US4506931A (en) Method and apparatus for mining
CN85103628A (en) Rock tunnel boring and blasting method new technology and comprehensive unit
CN112483087A (en) Mining method of steeply inclined coal seam
RU2215147C2 (en) Method of mining of inclined ore deposits
CN1136379C (en) Advanced grid anchored minerless mining method for coal mine
CN109025996A (en) A kind of underground mine successively squeezes, photoface exploision mining methods
RU2320872C2 (en) Method for steeply-inclined low- and medium-thickness coal seam development
CN112483116A (en) Method for rapidly tunneling coal mine rock roadway

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee