CN106988563A - A kind of intelligent integration fast-assembling operating room - Google Patents

A kind of intelligent integration fast-assembling operating room Download PDF

Info

Publication number
CN106988563A
CN106988563A CN201710379303.2A CN201710379303A CN106988563A CN 106988563 A CN106988563 A CN 106988563A CN 201710379303 A CN201710379303 A CN 201710379303A CN 106988563 A CN106988563 A CN 106988563A
Authority
CN
China
Prior art keywords
operating room
keel
group
intelligent integration
assembling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710379303.2A
Other languages
Chinese (zh)
Inventor
王博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Dianling Medical Purification Engineering Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CN106988563A publication Critical patent/CN106988563A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H3/00Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons
    • E04H3/08Hospitals, infirmaries, or the like; Schools; Prisons
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • E04F19/04Borders; Finishing strips, e.g. beadings; Light coves for use between floor or ceiling and wall, e.g. skirtings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Floor Finish (AREA)

Abstract

The present invention relates to purified operation room technical field, more particularly to a kind of intelligent integration fast-assembling operating room, including:If the support frame being spliced by some keel, drywall panel and some top plates, support frame includes ground joist group, top keel group and the centre keel group for being fixedly connected with ground joist group and top keel group, wallboard is fixed to form operating room metope with centre keel group, top plate is fixed to form operating room top surface with top keel group, supporting frame is also surrounded on the outside of the support frame, the top keel group is fixedly connected with supporting frame.The invention provides a kind of intelligent integration fast-assembling operating room, also surrounded on the outside of support frame and be provided with supporting frame, top keel group is set to be fixedly connected with supporting frame, make operating room that there is independent load bearing system structure, shadowless lamp can be easily installed thereon, laminar flow case and all size tower crane, operating room whole system have independent firm and stable construction, without again to building reinforcement by connection itself.

Description

A kind of intelligent integration fast-assembling operating room
Technical field
The present invention relates to purified operation room technical field, a kind of particularly intelligent integration fast-assembling operating room.
Background technology
Clean operating room is to utilize air cleaning treatment technology by the particulate in air in the range of particular space, You Haikong The contaminant exclusions such as gas, bacterium, and by indoor temperature, cleanliness factor, room pressure, air velocity and air flow method, noise vibration And illumination, Electrostatic Control give specially designed room in a certain range of needs.No matter external air conditionses Can all there is the characteristic for maintaining the originally performance such as cleanliness factor, humiture and pressure of set provisioning request in change, clean operation room.
The modularized design of integrated fast-assembling operating room so that the disassembled resettlement refitting of operating room is reused.It can expire Sufficient situation of all-level hospitals is newly-built, enlarging, reconstruction, the demand of resettlement clean operating room, can also meet hospital operating room quick assembling and Resettlement demand.
The A of Chinese patent CN 103031964 disclose a kind of Modular clean operating room and its mounting process, and specific public Open:Including Modular keel, wallboard, top plate and various electricity, gas class pipe fitting;Multiple Modular keels are fixedly connected to form hand The basic forming framework of art room;The upper and lower part of basic forming framework is fixed with building ground and construction ceiling respectively;It is multiple Modular keel is built into the overall keel structure of operating room;Various electricity, gas class pipe fitting are fixed in overall keel structure;Wallboard Modular keel is fixed to form operating room metope;Top plate is fixed to form operating room top surface with Modular keel.The operating room does not have There is independent load bearing system, the installation of shadowless lamp thereon, the installation of laminar flow case and all size tower crane are, it is necessary to building Reinforcement by connection, its own weight capacity itself is poor;And the fixation between the orthogonal keel of the operating room is connected by L-shaped Fitting is fixed, and two sheets of L-shaped connector are bolted with keel respectively, erector's duration of the fixed form, is adjusted The examination time is long.
The content of the invention
The technical problems to be solved by the invention are:In order to solve existing fast-assembling operating room without independent load-bearing system System, the installation of shadowless lamp thereon, the installation of laminar flow case and all size tower crane, it is necessary to building reinforcement by connection itself, The problem of its own weight capacity is poor, the invention provides a kind of intelligent integration fast-assembling operating room, on the outside of support frame also Surround and be provided with supporting frame, top keel group is fixedly connected with supporting frame, make operating room that there is independent load bearing system Structure, can easily install shadowless lamp, laminar flow case and all size tower crane thereon, and operating room whole system has independent hard Gu and stable construction, without again to building reinforcement by connection itself.
The technical solution adopted for the present invention to solve the technical problems is:A kind of intelligent integration fast-assembling operating room, including: If the support frame being spliced by some keel, drywall panel and some top plates, support frame includes ground joist group, top keel Group and the centre keel group for being fixedly connected with ground joist group and top keel group, wallboard are fixed to form operating room metope with centre keel group, Top plate is fixed to form operating room top surface with top keel group, and supporting frame, the top dragon are also surrounded on the outside of the support frame Bone group is fixedly connected with supporting frame.
Specifically, sealed between above-mentioned wallboard and wallboard by seal.
Specifically, sealed between above-mentioned top plate and top plate by seal.
Specifically, above-mentioned seal be rubber weather strip, fluid sealant or other can meet medical environment seal.
Specifically, the centre keel in above-mentioned centre keel group is fixed with the ground joist in ground joist group by bolt and connector Centre keel in connection, the centre keel group is fixedly connected with the top keel in the keel group of top by bolt and connector.
Specifically, above-mentioned connector includes L-shaped transverse slat and riser, side of the riser away from transverse slat is fixedly installed Face is provided with least one L-shaped clamp, is formed between the L-shaped clamp and riser on the bayonet socket towards transverse slat, the transverse slat Provided with fixing hole, the centre keel close end at least side side wall is offered and L-shaped clamp number identical neck, the L-shaped card When board is located in neck, bolt may pass through fixing hole and be fixed with ground joist or top keel.
Specifically, one side both sides of the above-mentioned riser away from transverse slat are respectively provided with a L-shaped clamp.
Specifically, above-mentioned wallboard is snapped onto by bayonet unit on the centre keel of centre keel group.
Specifically, above-mentioned bayonet unit includes the opening being opened on centre keel and the fastener being arranged on wallboard, described The position of fastener is corresponding with the position of opening and is interlockingly connected with opening.
Specifically, above-mentioned fastener includes the substrate and L-shaped block tongue for being easy to fix with wallboard, and the L-shaped block tongue hangs down with substrate Straight to set, one end of L-shaped block tongue is fixedly connected with substrate, and the other end is fastened in the opening of centre keel.
Specifically, the tip that above-mentioned L-shaped block tongue is fastened on one end in the opening of centre keel to be caught in opening.
Specifically, above-mentioned top plate is fixed with top keel by fastener.
Specifically, above-mentioned fastener is to buckle code greatly.
Specifically, power supply box is installed on above-mentioned operating room metope.
Specifically, above-mentioned operating room top surface is provided with laminar flow case, the laminar flow case and the load-bearing frame on operating room top surface top Frame is fixed, and air return system is provided with the operating room, and return air inlet is arranged on operating room metope.
Specifically, above-mentioned operating room top surface is fixed with light bar.
Specifically, above-mentioned operating room top surface is provided with tower crane and/or shadowless lamp, the tower crane and operating room top surface top Supporting frame is fixed, and the shadowless lamp and the supporting frame on operating room top surface top are fixed.Specifically, on above-mentioned operating room metope It is fixed with some cabinets.
Specifically, above-mentioned cabinet is instrument cabine and/or medical cupboard and/or thermal insulation cabinet and/or cold insulation cabinet and/or read tablet lamp cabinet And/or air source box.
Specifically, above-mentioned operating room metope bottom is provided with skirting board.
Specifically, above-mentioned floor of operating room is equipped with rubber or PVC ground cushions.
Specifically, the skirt plate thickness is less than wallboard thickness, and skirting board is formed with a step with wallboard junction, described Ground cushion has flanging, and the flanging is covered in skirt plate surface, and is against at the step that skirting board is formed with wallboard.
The beneficial effects of the invention are as follows:
A kind of intelligent integration fast-assembling operating room that the present invention is provided, also surrounds on the outside of support frame and is provided with supporting frame, Top keel group is fixedly connected with supporting frame, make operating room that there is independent load bearing system structure, thereon can be convenient Shadowless lamp, laminar flow case and all size tower crane are installed, operating room whole system has independent firm and stable construction, without Again to building reinforcement by connection itself.
It is attached between a kind of intelligent integration fast-assembling operating room that the present invention is provided, keel using bolt and connector Fixed, protection wallboard protection wallboard is snapped onto on the keel of support frame by bayonet unit, and it has thoroughly broken away from welding assembly Mode so that the flexibility of construction and security are greatly improved, can be easily assembled into screw driver spanner and electric drill Work(.
Traditional operating room is in build process, and centre keel typically selects square duct keel or C-shaped keel, from square During duct keel, it is fixed between general centre keel and ground joist or top surface keel by the way of welding, is selecting C-shaped keel When, either it is fixed by the way of welding, or fixed using L-shaped connector, in centre keel with being used on ground joist Bolt is fixed, it is necessary to will first be bolted in the neck of C-shaped keel, and construction is relatively difficult, and a kind of intelligence that the present invention is provided The integrated fast-assembling operating room of energyization, connector can be caught in the neck of centre keel by L-shaped clamp, and the transverse slat of connector passes through spiral shell Bolt is fixed with ground joist or top surface keel, easy for installation, installation work-hour and debug time is greatly decreased, it is entirely avoided traditional The problem of bolt that operating room runs into build process fixes difficult.
A kind of intelligent integration fast-assembling operating room that the present invention is provided, wallboard passes through fastener and centre keel clamping, installation side Just, construct flexible.
A kind of intelligent integration fast-assembling operating room that the present invention is provided, after operating room is scrapped, can be reused with 100%, Strange land is rebuild, with higher construction flexibility and repeatable usability.
A kind of intelligent integration fast-assembling operating room that the present invention is provided, rubber floor mat, wherein rubber are laid in floor of operating room The size of glue ground cushion is more than the actual size of floor of operating room, in laying, retrousse flanging can be formed, due to skirt thickness of slab Degree is less than wallboard thickness, and skirting board is formed with a step with wallboard junction, and the flanging of ground cushion is covered in skirt plate surface, and supports At skirting board and the step of wallboard formation, it is not necessary to which extra fixing device is fixed, and operation can be effectively ensured Room floor is without corner or spot as yet untouched by a clean-up campaign.
Brief description of the drawings
The present invention is further described with reference to the accompanying drawings and examples.
Fig. 1 is a kind of intelligent integration fast-assembling operating room support frame and supporting frame structural representation of the present invention;
Fig. 2 is the preferred structure schematic diagram of the connector of the present invention;
Fig. 3 is Fig. 2 top view;
The connector of Fig. 4 present invention fixes the structural representation of ground joist and centre keel;
Fig. 5 is the structural representation of the centre keel of the present invention;
Fig. 6 is Fig. 5 right view;
Fig. 7 is the structural representation of the fastener of the present invention;
Fig. 8 is Fig. 7 right view;
Fig. 9 is a kind of partial sectional view of intelligent integration fast-assembling operating room of the present invention;
Figure 10 is a kind of top view of intelligent integration fast-assembling operating room of the present invention;
Figure 11 is a kind of upward view of intelligent integration fast-assembling operating room of the present invention;
Figure 12 is A directions view in Figure 10;
Figure 13 is B directions view in Figure 10;
Figure 14 is C directions view in Figure 10;
Figure 15 is D directions view in Figure 10;
Figure 16 is E, F, G and H direction view in Figure 10;
In figure:1. support frame, 2. wallboards, 3. top plates, 4. supporting frames, 5. centre keels, 6. ground joists, 7. top keel, 8. Bolt, 9. connectors, 10. fasteners, 11. fasteners, 12. power supply boxs, 13. laminar flow casees, 14. air return systems, 15. return air inlets, 16. light bar, 17. tower cranes, 18. instrument cabines, 19. medical cupboards, 20. thermal insulation cabinets, 21. cold insulation cabinets, 22. read tablet lamp cabinets, 23. skirts Plate, 24. ground cushions, 25. flanging, 26. chamfering plates, 27. support feets, 28. seals, 29. automatically-controlled doors, 30. air source boxes, 31. nothings Shadow lamp, 101. substrates, 102.L shape block tongues, 501. necks, 502. openings, 901. transverse slats, 902. risers, 903.L shape clamps, 904. bayonet sockets, 905. fixing holes.
Embodiment
In conjunction with the accompanying drawings, the present invention is further explained in detail.These accompanying drawings are simplified schematic diagram, only with Illustration illustrates the basic structure of the present invention, therefore it only shows the composition relevant with the present invention.
As shown in figure 1, a kind of intelligent integration fast-assembling operating room, including:The support frame being spliced by some keel If the 1, drywall panel 2 and some top plates 3, support frame 1 includes ground joist group, top keel group and is fixedly connected with ground joist group and top The centre keel group of portion's keel group, wallboard 2 is fixed to form operating room metope with centre keel group, and top plate 3 fixes shape with top keel group Into operating room top surface, the outside of support frame 1 also surrounds supporting frame 4, and top keel group is fixedly connected with supporting frame 4.
In this specific embodiment, the adjacent ground joist 6 in ground joist group passes through straight type connecting plate, L-type connecting plate or different Shape connecting plate is fixedly connected(It can certainly be any connecting plate that other are easy to fix ground joist 6), then ground joist 6 is led to Cross expansion bolt and be fixed on building ground;Ground joist 6 directly can certainly be fixed on building ground.
In this specific embodiment, the adjacent top keel 7 in the keel group of top pass through straight type connecting plate, L-type connecting plate Or special-shaped connecting plate is fixedly connected(It can certainly be any connecting plate that other are easy to fix ground joist 6), then by top Keel 7 are fixedly connected with centre keel 5.
In this specific embodiment, fast-assembling Operating Room Design is into tetrahedroid, and its four corners all have transition Chamfering plate 26, wherein supporting frame 4 have four support feets 27, and four support feets 27 are located at four of fast-assembling operating room respectively Top keel 7 in corner, top keel group are fixedly connected with four support feets 27.Wherein support feet 27 can also be by swollen It is swollen to be bolted to building ground.
In this specific embodiment, supporting frame 4 in selection, can select I-steel or channel-section steel, or other have compared with The steel construction of strong weight capacity.
In a kind of embodiment, the centre keel 5 in centre keel group passes through bolt with the ground joist 6 in ground joist group 8 are fixedly connected with connector 9, and the centre keel 5 in centre keel group and the top keel 7 in the keel group of top are by bolt 8 and even Fitting 9 is fixedly connected.
In a kind of embodiment, as shown in figures 2-6, connector 9 includes the L-shaped He of transverse slat 901 is fixedly installed Riser 902, one side of the riser 902 away from transverse slat 901 is provided with least one L-shaped clamp 903, L-shaped clamp 903 and riser The bayonet socket 904 towards transverse slat 901 is formed between 902, transverse slat 901 is provided with fixing hole 905, the close end of centre keel 5 at least one Side side wall is offered counts identical neck 501 with L-shaped clamp 903, and when L-shaped clamp 903 is fastened in neck 501, bolt 8 can be worn Fixing hole 905 is crossed to fix with ground joist 6 or top keel 7.
Centre keel 5 and ground joist 6 are being fixed using connector 9(Top keel 7)When, the L-shaped clamp 903 on connector 9 The neck 501 opened on centre keel 5 is penetrated, and downwards(On)Motion, makes the plate body of centre keel 5 be caught in bayonet socket 904, then passes through spiral shell Bolt 8 is penetrated in fixing hole 905, so with ground joist 6(Top keel 7)It is fixedly connected.In actual production process, L-shaped clamp 903 is unsuitable excessive with the distance between riser 902, optimal preferred scheme be L-shaped clamp 903 with the distance between riser 902 with The thickness of the plate of centre keel 5 is equal, naturally it is also possible to be that the distance between L-shaped clamp 903 and riser 902 are slightly larger than the plate of centre keel 5 Thickness.
In this embodiment, neck 501 preferably vertically on flat port, the shape of L-shaped clamp 903 with The shape of neck 501 matches.
In a kind of embodiment, one side both sides of the riser 902 away from transverse slat 901 are respectively provided with a L-shaped clamp 903.It ensure that the fixation uniform force between centre keel 5 and ground joist 6.
In a kind of embodiment, the close end both sides side wall of centre keel 5 is offered counts identical with L-shaped clamp 903 Neck 501, by both sides simultaneously centre keel 5 is fixed with ground joist 6 or top keel 7.
In a kind of embodiment, wallboard 2 is snapped onto on the centre keel 5 of centre keel group by bayonet unit.
Specifically, as Figure 7-8, bayonet unit includes the opening 502 being opened on centre keel 5 and is arranged on wallboard 2 On fastener 10, the position of fastener 10 is corresponding with the position of opening 502 and is interlockingly connected with opening 502.
Preferably, fastener 10 include be easy to wallboard 2 fix substrate 101 and L-shaped block tongue 102, L-shaped block tongue 102 with Substrate 101 is vertically arranged, and one end of L-shaped block tongue 102 is fixedly connected with substrate 101, and the other end is fastened on the opening of centre keel 5 In 502.
The tip that wherein L-shaped block tongue 102 is fastened on one end in the opening 502 of centre keel 5 to be caught in opening 502.
As shown in figure 9, in a kind of embodiment, in order to ensure the sealing of operating room, wallboard 2 and wallboard 2 it Between sealed by seal 28;Certainly, seal 28 can for rubber weather strip, fluid sealant or other can meet medical environment use Seal 28.
In a kind of embodiment, as shown in figure 9, top plate 3 is fixed with top keel 7 by fastener 11.At this In embodiment, fastener 11 is preferably to buckle code greatly.
In a kind of embodiment, in order to ensure the sealing of operating room, pass through sealing between top plate 3 and top plate 3 Part 28 is sealed;Certainly, seal 28 can for rubber weather strip, fluid sealant or other can meet medical environment seal 28.
As shown in Figure 10-16, in a kind of embodiment, power supply box 12 is installed on operating room metope.
In a kind of embodiment, operating room top surface is provided with laminar flow case 13, laminar flow case 13 and operating room top surface The supporting frame 4 in portion is fixed, and air return system 14 is provided with operating room, and return air inlet 15 is arranged on operating room metope.
In a kind of embodiment, operating room top surface is fixed with light bar 16.
In a kind of embodiment, operating room top surface is provided with tower crane 17, tower crane 17 and operating room top surface top Supporting frame 4 is fixed.
In a kind of embodiment, operating room top surface is provided with shadowless lamp 31, shadowless lamp 31 and operating room top surface The supporting frame 4 in portion is fixed.In this embodiment, shadowless lamp 31 is fixedly installed on the crossbeam at the top of supporting frame 4, The position of shadowless lamp 31 is arranged on the middle part of laminar flow case 13;Certainly, shadowless lamp 31 can also be mounted in other positions, and a use can expire Foot operation is required.
In a kind of embodiment, some cabinets are fixed with operating room metope.
Specifically, cabinet is instrument cabine 18 and/or medical cupboard 19 and/or thermal insulation cabinet 20 and/or cold insulation cabinet 21 and/or read tablet Lamp cabinet 22 and/or air source box 30.In this specific embodiment, instrument cabine 18, medical cupboard 19 are fixed with operating room metope, is protected Warm cabinet 20, cold insulation cabinet 21 and read tablet lamp cabinet 22.
In a kind of embodiment, operating room metope bottom is provided with skirting board 23.
In a kind of embodiment, floor of operating room is equipped with rubber or PVC ground cushions 24.
In a kind of embodiment, the thickness of skirting board 23 is less than the thickness of wallboard 2, skirting board 23 and the junction of wallboard 2 A step is formed with, ground cushion 24 has flanging 25, and flanging 25 is covered in the surface of skirting board 23, and is against skirting board 23 and wallboard 2 At the step of formation.
In a kind of embodiment, complete prefabricated ready-package purified operation room is necessarily required to include door, and wherein door is used Be automatically-controlled door 29(Push the door open), naturally it is also possible to it is sliding door.
Specifically installation steps are:
1. ground levelling, lays ground joist 6, the level of ground joist 6 can be used in 6 times cushion materials of ground joist to ensure, earthworm The expansion bolt of bone 6 is fixed on building ground;
2. installing centre keel 5 on ground joist 6, the perpendicularity of centre keel 5 is calibrated using laser leveler, then using connector 9 fix centre keel 5 with ground joist 6;
3. adjacent top keel 7 are fixedly connected into whole section with by straight type connecting plate, L-type connecting plate or special-shaped connecting plate, And connected together it with centre keel 5 using connector 9;
4. building supporting frame 4 in the periphery of support frame 1, first four positions of support feet 27 of supporting frame 4 are fixed, and passes through Expansion bolt is fixed on ground, and then the top of supporting frame 4 is built according to the actual requirements, finally by top keel 7 and The support feet 27 of supporting frame 4 is fixed, for reinforcing brace frame frame 1;
5. mounting wallboard 2 successively by diagram, the wallboard 2 that bottom is first mounted when hanging equipped position mounts centre again Equipment, notices that writing counter first overleaf will be fixed on wall 22 with rivet and mounted again by small-sized writing counter etc, arranges power supply The wallboard 2 of case 12 and air source box 30 can directly first wallboard 2, then be mounted directly inside operating room power supply box 12 and air source box 30;
6. having mounted installation top plate 3 after wallboard, the top keel 7 of top plate 3 are fixed using big button code, and is reserved on top plate 3 The installation site of the top assemblies such as tower crane 17, laminar flow case 13;
7. the gap between top plate 3 and top plate 3, between wallboard 2 and wallboard 2 between wallboard 2 and top plate 3 is entered by seal 28 Row filling, seal 28 typically can for rubber weather strip, fluid sealant or other can meet medical environment seal 28, certainly It can also be weather-resistant glue;
Laminar flow case 13 is lifted into the reserved installation site in the middle of top plate 3 again after laminar flow case 13 8. having assembled on the ground, And be fixed on supporting frame 4, laminar flow case is noted with being directly lifted on supporting frame 4, is not sent out with operating room wall body keel Life is rigidly connected, i.e., operating room keel are not subject to the weight of laminar flow case.
9. mounting light bar 16, light bar 16 is internally with rivet interlacement to keel.
10. last break a weather-resistant glue or filling sealing strip again(Depend on the circumstances).
11. laying rubber floor mat 24 in floor of operating room, the wherein size of rubber floor mat 24 is more than the reality of floor of operating room Border size, laying when, retrousse flanging 25 can be formed, due to the thickness of skirting board 23 be less than the thickness of wallboard 2, skirting board 23 with The junction of wallboard 2 is formed with a step, and the flanging 25 of ground cushion 24 is covered in the surface of skirting board 23, and is against skirting board 23 and wallboard At 2 steps formed.
Using the above-mentioned desirable embodiment according to the present invention as enlightenment, by above-mentioned description, relevant staff is complete Various changes and amendments can be carried out without departing from the scope of the technological thought of the present invention' entirely.The technology of this invention Property scope is not limited to the content on specification, it is necessary to its technical scope is determined according to right.

Claims (17)

1. a kind of intelligent integration fast-assembling operating room, it is characterised in that including:The support frame being spliced by some keel (1)If, drywall panel(2)With some top plates(3), support frame(1)Including ground joist group, top keel group and it is fixedly connected with earthworm The centre keel group of bone group and top keel group, wallboard(2)Fix to form operating room metope, top plate with centre keel group(3)With top Keel group fixes to form operating room top surface, the support frame(1)Outside also surrounds supporting frame(4), the top keel group With supporting frame(4)It is fixedly connected.
2. a kind of intelligent integration fast-assembling operating room according to claim 1, it is characterised in that:In the centre keel group Centre keel(5)With the ground joist in ground joist group(6)Pass through bolt(8)And connector(9)It is fixedly connected, the centre keel group In centre keel(5)With the top keel in the keel group of top(7)Pass through bolt(8)And connector(9)It is fixedly connected.
3. a kind of intelligent integration fast-assembling operating room according to claim 2, it is characterised in that:The connector(9)Bag Include and L-shaped transverse slat is fixedly installed(901)And riser(902), the riser(902)Away from transverse slat(901)One side on set There is at least one L-shaped clamp(903), the L-shaped clamp(903)With riser(902)Between be formed with towards transverse slat(901)Card Mouthful(904), the transverse slat(901)It is provided with fixing hole(905), the centre keel(5)Close end at least side side wall is offered With L-shaped clamp(903)Number identical neck(501), the L-shaped clamp(903)It is fastened on neck(501)When interior, bolt(8)Can Through fixing hole(905)With ground joist(6)Or top keel(7)It is fixed.
4. a kind of intelligent integration fast-assembling operating room according to claim 3, it is characterised in that:The riser(902)Far From transverse slat(901)One side both sides be respectively provided with a L-shaped clamp(903).
5. a kind of intelligent integration fast-assembling operating room according to claim 1, it is characterised in that:The wallboard(2)Pass through Bayonet unit snaps onto the centre keel of centre keel group(5)On.
6. a kind of intelligent integration fast-assembling operating room according to claim 5, it is characterised in that:The bayonet unit includes It is opened in centre keel(5)On opening(502)Be arranged on wallboard(2)On fastener(10), the fastener(10)Position with Opening(502)Position it is corresponding and with opening(502)It is interlockingly connected.
7. a kind of intelligent integration fast-assembling operating room according to claim 6, it is characterised in that:The fastener(10)Including It is easy to and wallboard(2)Fixed substrate(101)With L-shaped block tongue(102), the L-shaped block tongue(102)With substrate(101)Vertically set Put, L-shaped block tongue(102)One end and substrate(101)It is fixedly connected, the other end is fastened on centre keel(5)Opening(502)It is interior.
8. a kind of intelligent integration fast-assembling operating room according to claim 1, it is characterised in that:The top plate(3)With top Portion's keel(7)Pass through fastener(11)It is fixed.
9. a kind of intelligent integration fast-assembling operating room according to claim 1, it is characterised in that:On the operating room metope Power supply box is installed(12).
10. a kind of intelligent integration fast-assembling operating room according to claim 1, it is characterised in that:The operating room top surface It is provided with laminar flow case(13), the laminar flow case(13)With the supporting frame on operating room top surface top(4)It is fixed, in the operating room Air return system is installed(14), return air inlet(15)It is arranged on operating room metope.
11. a kind of intelligent integration fast-assembling operating room according to claim 1, it is characterised in that:The operating room top surface It is fixed with light bar(16).
12. a kind of intelligent integration fast-assembling operating room according to claim 1, it is characterised in that:The operating room top surface It is provided with tower crane(17)And/or shadowless lamp(31), the tower crane(17)With the supporting frame on operating room top surface top(4)It is fixed, The shadowless lamp(31)With the supporting frame on operating room top surface top(4)It is fixed.
13. a kind of intelligent integration fast-assembling operating room according to claim 1, it is characterised in that:The operating room metope On be fixed with some cabinets.
14. a kind of intelligent integration fast-assembling operating room according to claim 13, it is characterised in that:The cabinet is apparatus Cabinet(18)And/or medical cupboard(19)And/or thermal insulation cabinet(20)And/or cold insulation cabinet(21)And/or read tablet lamp cabinet(22)And/or source of the gas Case(30).
15. a kind of intelligent integration fast-assembling operating room according to claim 1, it is characterised in that:The operating room metope Bottom is provided with skirting board(23).
16. a kind of intelligent integration fast-assembling operating room according to claim 15, it is characterised in that:The floor of operating room It is equipped with rubber or PVC ground cushions(24).
17. a kind of intelligent integration fast-assembling operating room according to claim 16, it is characterised in that:The skirting board(23) Thickness is less than wallboard(2)Thickness, skirting board(23)With wallboard(2)Junction is formed with a step, the ground cushion(24)With pressure Side(25), the flanging(25)It is covered in skirting board(23)Surface, and it is against skirting board(23)With wallboard(2)The step of formation Place.
CN201710379303.2A 2017-04-28 2017-05-25 A kind of intelligent integration fast-assembling operating room Pending CN106988563A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710296955 2017-04-28
CN201710296955X 2017-04-28

Publications (1)

Publication Number Publication Date
CN106988563A true CN106988563A (en) 2017-07-28

Family

ID=59419830

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201710379303.2A Pending CN106988563A (en) 2017-04-28 2017-05-25 A kind of intelligent integration fast-assembling operating room
CN201720595068.8U Expired - Fee Related CN206707348U (en) 2017-04-28 2017-05-25 A kind of intelligent integration fast-assembling operating room

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201720595068.8U Expired - Fee Related CN206707348U (en) 2017-04-28 2017-05-25 A kind of intelligent integration fast-assembling operating room

Country Status (1)

Country Link
CN (2) CN106988563A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797848A (en) * 2018-08-31 2018-11-13 江苏达实久信医疗科技有限公司 The grid system of modular surgical room
CN108867878A (en) * 2018-08-31 2018-11-23 江苏达实久信医疗科技有限公司 Modular surgical room
CN110185366A (en) * 2019-07-01 2019-08-30 常州市浩东净化设备科技有限公司 Plug-in automatic door of operating room mounting structure
CN110200422A (en) * 2019-07-01 2019-09-06 常州市浩东净化设备科技有限公司 The built-in cabinet mounting structure of buckle-type operating room

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988563A (en) * 2017-04-28 2017-07-28 王博 A kind of intelligent integration fast-assembling operating room

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2220848Y (en) * 1995-03-10 1996-02-28 东莞羚亚医护用品制造厂有限公司 Prefabricated combination steel structure octagon operating room
CN2721779Y (en) * 2004-06-30 2005-08-31 江苏久信医用净化工程有限公司 Main body structure of assembled purified operation room
DE202012003176U1 (en) * 2011-03-30 2012-05-16 Ht Labor + Hospitaltechnik Ag Modular space in scaffolding construction, especially an operating room in the medical sector and control module
CN103031964A (en) * 2011-10-08 2013-04-10 江苏久信医用净化工程有限公司 Modularized clean operating room and installation technology thereof
CN104533109A (en) * 2014-11-27 2015-04-22 浙江盛源医用工程有限公司 Sand aerated concrete block operation room and building and constructing method thereof
CN205100597U (en) * 2015-09-28 2016-03-23 天津龙川精工洁净技术发展有限公司 Clean operating room
CN205502225U (en) * 2016-04-15 2016-08-24 昆山市德信致远环境科技有限公司 Frame construction of toilet
CN205913226U (en) * 2016-05-31 2017-02-01 中建七局建筑装饰工程有限公司 Pelmet light gauge steel framework
CN206707348U (en) * 2017-04-28 2017-12-05 王博 A kind of intelligent integration fast-assembling operating room

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2220848Y (en) * 1995-03-10 1996-02-28 东莞羚亚医护用品制造厂有限公司 Prefabricated combination steel structure octagon operating room
CN2721779Y (en) * 2004-06-30 2005-08-31 江苏久信医用净化工程有限公司 Main body structure of assembled purified operation room
DE202012003176U1 (en) * 2011-03-30 2012-05-16 Ht Labor + Hospitaltechnik Ag Modular space in scaffolding construction, especially an operating room in the medical sector and control module
CN103031964A (en) * 2011-10-08 2013-04-10 江苏久信医用净化工程有限公司 Modularized clean operating room and installation technology thereof
CN104533109A (en) * 2014-11-27 2015-04-22 浙江盛源医用工程有限公司 Sand aerated concrete block operation room and building and constructing method thereof
CN205100597U (en) * 2015-09-28 2016-03-23 天津龙川精工洁净技术发展有限公司 Clean operating room
CN205502225U (en) * 2016-04-15 2016-08-24 昆山市德信致远环境科技有限公司 Frame construction of toilet
CN205913226U (en) * 2016-05-31 2017-02-01 中建七局建筑装饰工程有限公司 Pelmet light gauge steel framework
CN206707348U (en) * 2017-04-28 2017-12-05 王博 A kind of intelligent integration fast-assembling operating room

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108797848A (en) * 2018-08-31 2018-11-13 江苏达实久信医疗科技有限公司 The grid system of modular surgical room
CN108867878A (en) * 2018-08-31 2018-11-23 江苏达实久信医疗科技有限公司 Modular surgical room
CN110185366A (en) * 2019-07-01 2019-08-30 常州市浩东净化设备科技有限公司 Plug-in automatic door of operating room mounting structure
CN110200422A (en) * 2019-07-01 2019-09-06 常州市浩东净化设备科技有限公司 The built-in cabinet mounting structure of buckle-type operating room
CN110200422B (en) * 2019-07-01 2024-06-11 常州市浩东净化设备科技有限公司 Built-in cabinet mounting structure of buckle formula operating room

Also Published As

Publication number Publication date
CN206707348U (en) 2017-12-05

Similar Documents

Publication Publication Date Title
CN206707348U (en) A kind of intelligent integration fast-assembling operating room
CN103031964B (en) Modularized clean operating room and installation technology thereof
CN207776110U (en) A kind of dismountable steel house
JP7312253B2 (en) modular building system
CN109162355A (en) A kind of assembling type steel structure modularization campsite building construction system
CN101736922A (en) Clean operating room and construction method thereof
CN207597814U (en) A kind of assembling type steel structure elevator device for existing apartment
WO2003104576A2 (en) Structure having preinstalled utilities and amenities
CN103850373B (en) Combined curtain wall system
CN104452969B (en) A kind of easy-disassembling-assembling toilet
CN207905205U (en) A kind of prefabricated floor construction and its structural system
CN112900682B (en) Assembly type medical wall and medical unit assembly method
CN206015894U (en) A kind of modular surgical room
TWI759958B (en) Underground divider for raised floors
US11365540B2 (en) Functional modular building cartridges and methods
CN215949071U (en) Steel construction building medical ward module
CN205100599U (en) Porch of clean operating room
TWM609059U (en) Underground partition plate for raised floor
CN206174256U (en) Corridor passageway furred ceiling
CN1431374A (en) Assembled division wall system
ITVR20100214A1 (en) PROFESSIONAL CABIN FOR WELL-BEING TREATMENTS, SUCH AS TURKISH, SAUNA AND SIMILAR BATHROOMS AS WELL AS METHOD TO REALIZE SUCH CABINS
JPH09195426A (en) Building
CN219164893U (en) Multi-layer expandable micro-module data center
JP3484232B2 (en) Unit building
CN213330198U (en) Operating room with air conditioning module

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190108

Address after: 650000 Room 807, 5 Wanhong International Building, Panlong District, Kunming City, Yunnan Province

Applicant after: Yunnan Dianling Medical Purification Engineering Co., Ltd.

Address before: 650000 Crystal Palace Apartment, No. 1 Crystal Palace, Wuhua District, Kunming City, Yunnan Province, Room 12, Renxuan F Block

Applicant before: Wang Bo