Prior art keywords
rail
track plates
replaced
plate
transverse direction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710344424.3A
Other languages
Chinese (zh)
Other versions
CN106988169A (en
Inventor
郑新国
刘竞
谢永江
程冠之
冯仲伟
曾志
李书明
董全霄
翁智财
朱长华
杨德军
刘相会
潘永健
王月华
周骏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
Beijing Tieke Special Engineering Technology Co Ltd
Original Assignee
China Academy of Railway Sciences Corp Ltd CARS
Railway Engineering Research Institute of CARS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Railway Sciences Corp Ltd CARS, Railway Engineering Research Institute of CARS filed Critical China Academy of Railway Sciences Corp Ltd CARS
Priority to CN201710344424.3A priority Critical patent/CN106988169B/en
Publication of CN106988169A publication Critical patent/CN106988169A/en
Application granted granted Critical
Publication of CN106988169B publication Critical patent/CN106988169B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The invention discloses a kind of methods that transverse direction pulls out progress track plates replacement after rail.The method includes rail actual lock rail temperature and when front rail temperature test equipment, rail stress strain testing equipment, rail lateral pushing equipment, track plate transporting transfer device, track plates hanging device, measuring device, rail return pulling device.The method includes setting up counter-force link stopper or counterforce device on certain distance route before and after being replaced track plates, pushing tow point is set up on rail, unclamp certain length fastener, using incremental launching device by rail pushing tow to being replaced on the outside of track plates, using vertical lifting mode carry out old plate removal and new plate it is in place.The stress test equipment overall process measures rail stress;The measuring device, which is set on the outside of platform sling operation area, controls new plate plan-position.This method has the characteristics that tooling is light, replacement is quick, work efficiency is high, small to rail failure, particularly suitable for high-speed rail " Window time " operation.

Description

A kind of method that transverse direction pulls out progress track plates replacement after rail
Technical field
The invention belongs to high speed railway track Structural defect remedial technology fields, in particular to a kind of plate-type ballastless track knot The replacing options of structure hurt track plates.
Background technique
In recent years, high-speed railway is developed rapidly in China.The route that 250km/h is reached for overall trip speed, is adopted Use ballastless track structure.As the main force in ballastless track structure, platy ballastless track structure (I type of CRTS, II type of CRTS, III type of CRTS) it builds to have obtained large-scale application in China express railway.Platy ballastless track structure mainly by rail, buckle Part, track plates, mortar (self-leveling concrete) filled layer, concrete bed composition.As a kind of reinforced concrete structure, in ring Under the action of border and train load, bad damage, destruction inevitably occur for track plates, and high-speed rail operating line is faced with " skylight The demand of time " progress track plates replacement.In addition, fractional orbital plate bad damage due to quality of production difference is accelerated or due to outer Portion, which is hit, causes hurt, and the current demand for replacing track plates shifts to an earlier date significantly.
Since high-speed rail operating line can only carry out maintenance work in Window time, large scale equipment can not be used, and track plates Length be greater than 5m, thickness be greater than 0.20m, width be greater than 2.5m, every piece 5 tons of track plates weight or more, how in limited skylight It is the disaster put in face of work business personnel that time is interior, carries out replacement to bad damage track plates in the case where not using large-scale equipment Topic.Further, since track structure route is divided into straightway, curved section, the track structure of superrelation on curve section, different section carries out rail When guidance tape is replaced, the requirement to technique is also different, especially the track plates of superrelation on curve section, and replacement difficulty is bigger.
Conceptual phase is still in the research of track plates replacement technology at present both at home and abroad.Works department is carried out in Window time The method that track plates replacement uses is " cut rail replacement method ", i.e., when carrying out track plates replacement, first by track plates to be replaced and its Certain length rail cutting in front and back removes, and the lifting appliance of second hand rail road vehicle removes hurt track plates, new-track plate moves into, Then welding locks rail again.This method benefit be the old plate of track plates remove and new plate hang in it is relatively simple, it is existing Greatest problem is must to be cut, be removed to rail before changing plate.On the one hand this means that rail weldering must also be carried out after changing plate It connects, polish and the special work such as seam inspection, regulation investment is considerably increased, in addition, everywhere joint-cutting means steel at one Rail connector, and welding is larger to rail failure, forms new security risk point, in addition, this method work efficiency is low, puts into manpower It is more, it is generally desirable to which three skylights could complete the replacement of one block of plate.It can be said that this is a kind of side to do something against one's will Method.
Patent " a kind of plate-type ballastless track track plates more changing device and replacing options (201310108682.3) " provides One kind not cutting off rail and carries out plate-type ballastless track track plates more changing device and replacing options, i.e., after being jacked to rail, from The method that side removes or shift-in track plates carry out track plates replacement.This method avoid " cutting rail replacement method " to the wound of rail Damage, but existing deficiency is that tooling is heavier, complex procedures, is unsuitable for constructing in Window time, meanwhile, engineering method is only adapted to directly The replacement of line segment track plates can not carry out the replacement of curve freeboard section track plates." a kind of subway changes wooden handcart and comprising the subway to patent That changes wooden handcart changes trigger group (201420251605.3) " there is also equipment enlarging, complicate the problem of, when being not suitable for skylight Between construct.
It studies one kind and does not cut the track plates replacement that rail, tooling are simple, process is easy, suitable for straight line, superrelation on curve section Complete set technology is this field urgent problem to be solved.
Summary of the invention
The purpose of the present invention is to solve the above problem, provide a kind of transverse direction pull out the system that track plates replacement is carried out after rail and Method.Main technical schemes are that the replacement of track plates is carried out after pulling out rail by transverse direction.One side rail transverse direction stiffness is small, laterally pulls out Power needed for power needed for rail is much smaller than vertical head track, it is more controllable in an implementation, and be not easy that rail is caused to damage, it completely can be with Carry out lateral pushing;After two aspect rail unplug, space needed for accordingly releasing track structure vertical lifting, for straight line Section, superrelation on curve Duan Junke are removed and are replaced using the method for vertical lifting to track plates, avoid existing technology from side Face replacement track plates bring tooling weight is big, complex procedures, is not suitable with a series of problems, such as superrelation on curve section, also solves and cuts It could vertical lifting bring a series of problems after rail;Third is that required tooling device minimizes, operation work efficiency is fast, is adapted to The requirement of high-speed rail " Window time " maintenance.
Major technique summary of the invention is as follows.
A kind of method that transverse direction pulls out progress track plates replacement after rail.The method includes rail actual lock rail temperature and work as Front rail temperature test equipment, rail stress strain testing equipment, rail lateral pushing equipment, track plate transporting transfer device, track plates are hung Install standby, measuring device, rail returns pulling device.The method includes setting up on certain distance route before and after being replaced track plates Counter-force link stopper or counterforce device, set up pushing tow point on rail, unclamp certain length fastener, using incremental launching device by rail pushing tow To being replaced on the outside of track plates, releasing is replaced the constraint of plate surrounding, using vertical lifting mode carry out old plate removal and new plate It is in place.
The rail actual lock rail temperature and when front rail temperature test equipment precision be 0~2 DEG C;The lateral pushing device by Counter-force link stopper or counterforce device, pushing tow jack, ball-shaped regulating valve, rail collet composition, the convex blocking platform before and after being replaced plate It is fixed on upper or track plates.
The transverse direction carries out the method for track plates replacement the following steps are included: (1) sets up pushing reaction block after pulling out rail Or counterforce device;(2) temperature difference (t1) of practical rail temperature and rail fastening down temperature is measured;(3) determine that laterally distance is moved on top to rail; (4) anchor bolt for being replaced track plates and its front and back certain length rail fastener system is unclamped;(5) rail is set up in pushing tow point Collet installs thrustor between counterforce device and rail collet, by rail lateral pushing to being replaced on the outside of track plates;(6) Mark is replaced track plates plane relative position, and releasing is replaced the constraint of plate surrounding, makes it using adjuster jacking track plate It is detached from under-filled layer;(7) it to track plates progress vertical lifting is replaced, removes, new plate is vertically hung in and is replaced track Board position;(8) lateral pushing device is unclamped, rail is returned and pulls out, fasten;(9) limit for restoring track plates, restores track plates and fills out Fill layers cementing;(10) accurate adjustment is carried out to route, opens operation.
The pushing reaction shelves and counterforce device are symmetrically set up being replaced at left and right sides of plate.
The rail fastener system unclamps length according to the temperature difference of practical rail temperature and rail fastening down temperature, rail lateral pushing Amount determines.
When the lateral pushing, rail jacking force is constantly monitored.
The lateral pushing device is hydraulic jack, mechanical push rods;Rail carries out pushing tow respectively when pushing tow or so, independent Control, sustainable pushing tow can also pushing tows stage by stage.
When the lateral pushing, left and right rail carries out pushing tow, independent control, sustainable pushing tow using pushing tow jack respectively It can also pushing tow stage by stage.
It is described to be constrained to track plates limit constraint, such as the boss resin between convex blocking platform and plate, width seam and latch fitting, side To block.
Detailed description of the invention
Fig. 1: rail schematic diagram is laterally dialled in typical case's ballastless track boards replacement provided by the present invention;
Description of symbols: 1- track plates to be replaced;2- track plates adjacent orbit plate to be replaced;3- mechanical push rods;4- thousand Jin top.
Specific embodiment
Below by embodiment, technical solution of the present invention is further illustrated.
Embodiment 1: the embodiment of the invention provides a kind of track plates replacement sides of I plate-type ballastless track structure of CRTS Method, the method includes the following contents:
(1) "T"-shaped block is fixed by the way of bar planting on the convex blocking platform for being replaced plate two sides.It is checked before bar planting convex Shape block machine steel bar arrangement figure, hurt reinforcing bar when avoiding bar planting."T"-shaped block uses the long 30cm in bottom surface, the steel plate and length of wide 30cm 30cm, high 15cm steel plate are welded, steel plate thickness 1cm.
(2) 31.2 DEG C of rail fastening down temperature, 12.5 DEG C of rail observed temperature are measured.18.7 DEG C of the two difference.
(3) for I template of CRTS, the lateral amount of pulling out 60cm.
(4) it according to the temperature difference and the lateral amount of pulling out, calculates to obtain fastener release length 50m.
(5) to be replaced plate middle line as symmetry axis, each anchor bolt 25m for unclamping fastener in left and right.
(6) negative rail pushing tow clamping device is installed in the "T"-shaped block of fixation corresponding left and right rail side.
(7) stress test device is pasted in the corresponding rail side of pushing tow point.
(8) pushing tow jack is placed between the "T"-shaped block of fixation and rail clamping device, and lateral pushing is carried out to rail. Rail internal stress situation of change is monitored during pushing tow.
(9) lateral pushing 70cm.Survey rail maximum stress 920N.Lock pushing tow jack.
(10) measurement is replaced the plane relative position of track plates.
(11) the boss resin being replaced in the boss of plate two sides is cut, plate is replaced using track crane vertical lifting, by it It is lifted on flat car.
(12) new plate is hung in using track crane, is controlled using position of the measuring device to new-track plate.
(13) pushing tow jack is unclamped, rail is returned and is pulled out, is locked.
(14) boss resin is poured, to the off-seam between new-track plate and mortar using mechanical property and the consistent elasticity of mortar Polyurethane material is filled.
(15) accurate adjustment is carried out to route, opens operation.
Embodiment 1: the embodiment of the invention provides a kind of track plates replacement sides of II plate-type ballastless track structure of CRTS Method, the method includes the following contents:
(1) "T"-shaped block is fixed by the way of bar planting on the track plates for being replaced plate two sides.Track is checked before bar planting Slab muscle layout drawing, hurt reinforcing bar when avoiding bar planting."T"-shaped block uses the long 40cm in bottom surface, the steel plate of wide 30cm and long 40cm, High 15cm steel plate is welded, steel plate thickness 1cm.
(2) 29.0 DEG C of rail fastening down temperature, 15 DEG C of rail observed temperature are measured.14 DEG C of the two difference.
(3) for II template of CRTS, the lateral amount of pulling out 80cm.
(4) it according to the temperature difference and the lateral amount of pulling out, calculates to obtain fastener release length 30m.
(5) to be replaced plate middle line as symmetry axis, each anchor bolt 15m for unclamping fastener in left and right.
(6) negative rail pushing tow clamping device is installed in the "T"-shaped block of fixation corresponding left and right rail side.
(7) stress test device is pasted in the corresponding rail side of pushing tow point.
(8) pushing tow jack is placed between the "T"-shaped block of fixation and rail clamping device, and lateral pushing is carried out to rail. Rail internal stress situation of change is monitored during pushing tow.
(9) lateral pushing 80cm.Survey rail maximum stress 830N.Lock pushing tow jack.
(10) measurement is replaced the plane relative position of track plates.
(11) it cuts and is replaced plate two sides width joint concrete, grabbed using accurate adjustment and jack track plates, make itself and mortar Layer is detached from.Plate is replaced using track crane vertical lifting, is lifted on flat car.
(12) new plate is hung in using track crane, is controlled using position of the measuring device to new-track plate.
(13) pushing tow jack is unclamped, rail is returned and is pulled out, is locked.
(14) width joint concrete is poured, it is consistent with mortar using mechanical property between off-seam of the new-track plate with mortar Epoxy resin be filled.
(15) accurate adjustment is carried out to route, opens operation.
The above description of the embodiments is intended to facilitate those skilled in the art it will be appreciated that and using this Invention.Person skilled in the art obviously easily can make various modifications to these embodiments, and illustrating herein General Principle be applied in other embodiments without having to go through creative labor.Therefore, the present invention is not limited to realities here Example is applied, those skilled in the art's announcement according to the present invention, the improvement made for the present invention and modification all should be in the present invention Protection scope within.

Claims (8)

1. a kind of method that transverse direction pulls out progress track plates replacement after rail, the method includes rail actual lock rail temperature and currently Rail temperature test equipment, rail stress strain testing equipment, rail lateral pushing equipment, track plate transporting transfer device, track plates lifting Equipment, measuring device, rail return pulling device, anti-the method includes setting up on certain distance route before and after being replaced track plates Power link stopper or counterforce device, set up pushing tow point on rail, unclamp certain length fastener, using incremental launching device by rail pushing tow extremely Be replaced on the outside of track plates, releasing is replaced the constraint of plate surrounding, using vertical lifting mode carry out old plate removal and new plate In place.
2. the method that transverse direction according to claim 1 pulls out progress track plates replacement after rail, it is characterised in that: the rail Actual lock rail temperature and when front rail temperature test equipment precision be 0~2 DEG C;The lateral pushing device is filled by counter-force link stopper or counter-force It sets, pushing tow jack, ball-shaped regulating valve, rail collet composition, it is fixed on convex blocking platform or on track plates before and after being replaced plate.
3. the method that transverse direction according to claim 1 pulls out progress track plates replacement after rail, it is characterised in that including following Step: (1) pushing reaction block or counterforce device are set up;(2) temperature difference (t1) of practical rail temperature and rail fastening down temperature is measured; (3) determine that laterally distance is moved on top to rail;(4) anchoring for being replaced track plates and its front and back certain length rail fastener system is unclamped Bolt;(5) rail collet is set up in pushing tow point, thrustor is installed between counterforce device and rail collet, rail is laterally pushed up It is pushed into be replaced on the outside of track plates;(6) mark is replaced track plates plane relative position, and releasing is replaced the constraint of plate surrounding, benefit It is detached from under-filled layer with adjuster jacking track plate;(7) it to track plates progress vertical lifting is replaced, removes, New plate is vertically hung in and is replaced track Board position;(8) lateral pushing device is unclamped, rail is returned and pulls out, fasten;(9) restore rail The limit of guidance tape restores track plates and filling layers cementing;(10) accurate adjustment is carried out to route, opens operation.
4. the method that transverse direction according to claim 3 pulls out progress track plates replacement after rail, it is characterised in that: the pushing tow Counter-force shelves and counterforce device are symmetrically set up being replaced at left and right sides of plate.
5. the method that transverse direction according to claim 3 pulls out progress track plates replacement after rail, it is characterised in that: the rail Fastener system discloses length and is determined according to the temperature difference of practical rail temperature and rail fastening down temperature, rail lateral pushing amount.
6. the method that transverse direction according to claim 3 pulls out progress track plates replacement after rail, it is characterised in that: the transverse direction When pushing tow, rail jacking force is constantly monitored.
7. the method that transverse direction according to claim 3 pulls out progress track plates replacement after rail, it is characterised in that: the transverse direction Thrustor is hydraulic jack, mechanical push rods, stroke 20cm~80cm;Rail carries out pushing tow respectively when the pushing tow or so, Independent control, sustainable pushing tow can also pushing tows stage by stage.
8. the method that transverse direction according to claim 3 pulls out progress track plates replacement after rail, it is characterised in that: the constraint It limits and constrains for track plates, such as the boss resin between convex blocking platform and plate, width seam and latch fitting, lateral block.
CN201710344424.3A 2017-05-16 2017-05-16 A kind of method that transverse direction pulls out progress track plates replacement after rail Active CN106988169B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710344424.3A CN106988169B (en) 2017-05-16 2017-05-16 A kind of method that transverse direction pulls out progress track plates replacement after rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710344424.3A CN106988169B (en) 2017-05-16 2017-05-16 A kind of method that transverse direction pulls out progress track plates replacement after rail

Publications (2)

Publication Number Publication Date
CN106988169A CN106988169A (en) 2017-07-28
CN106988169B true CN106988169B (en) 2019-03-29

Family

ID=59420883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710344424.3A Active CN106988169B (en) 2017-05-16 2017-05-16 A kind of method that transverse direction pulls out progress track plates replacement after rail

Country Status (1)

Country Link
CN (1) CN106988169B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108130825B (en) * 2017-12-31 2019-03-19 天津市金荣通核修护工程有限公司 Subgrade of metro concrete replacement technique in special limiting condition
CN108385456A (en) * 2018-03-07 2018-08-10 中国铁道科学研究院铁道建筑研究所 A kind of board-like ballastless track bed board integral replacing method of cast-in-place railway roadbed
CN108385454A (en) * 2018-03-07 2018-08-10 中国铁道科学研究院铁道建筑研究所 A kind of railway plate-type ballastless track working drawing review operational method
CN108385455B (en) * 2018-03-07 2021-11-05 中国铁道科学研究院集团有限公司铁道建筑研究所 Construction and maintenance operation method for cast-in-situ ballast bed slab ballastless track
CN108385451A (en) * 2018-03-07 2018-08-10 中国铁道科学研究院铁道建筑研究所 Board-like ballastless track boards replacing options under a kind of special operation condition
CN111794024A (en) * 2020-07-07 2020-10-20 中国铁建高新装备股份有限公司 Ballastless track polishing system and method

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3644540A1 (en) * 1986-12-24 1988-07-07 Guenter Finke Rail-joint aligning device for aligning the facing ends of railway and tramway rails
DE4442498A1 (en) * 1994-11-30 1996-06-05 Hochtief Ag Hoch Tiefbauten Mobile concreting machine
US6755135B2 (en) * 2001-03-16 2004-06-29 Nordco Inc. Combined tie extractor and plate remover for rail maintenance
CN202945513U (en) * 2012-12-11 2013-05-22 中铁二十局集团有限公司 Hoisting bracket for replacing plate-type ballastless track reinforced concrete base plate
CN202945512U (en) * 2012-12-11 2013-05-22 中铁二十局集团有限公司 Device for replacing plate-type ballastless track reinforced concrete base plate
CN203188070U (en) * 2013-03-29 2013-09-11 中铁一局集团有限公司 Plate-type ballast-less track plate replacing device
CN203807900U (en) * 2014-04-16 2014-09-03 徐州徐工铁路装备有限公司 Plate changing device for high-speed railway ballastless track
CN106436492A (en) * 2015-12-30 2017-02-22 中国铁道科学研究院铁道建筑研究所 Maintaining method of base plates of CRTS II-shaped plate type ballastless tracks
CN105908583B (en) * 2016-04-22 2020-12-01 北京瑞威世纪岩土工程有限公司 System for replacing ballast track bed of tunnel with ballastless track under condition of uninterrupted driving
CN205741779U (en) * 2016-05-31 2016-11-30 中铁第四勘察设计院集团有限公司 A kind of little beam type for CRTS III plate-type non-fragment orbit repairs structure

Also Published As

Publication number Publication date
CN106988169A (en) 2017-07-28

Similar Documents

Publication Publication Date Title
CN106988169B (en) A kind of method that transverse direction pulls out progress track plates replacement after rail
CN106978784B (en) A kind of Long span highway suspension bridge Demolition Construction method
CN113802424B (en) Sedimentation bag type grouting lifting repair method for ballastless track of high-speed railway
CN202170456U (en) Construction device of ballastless track
CN102490003B (en) Method for installing telescopic full-rotating rudder propeller device
CN106284079A (en) A kind of bridge break post replace classification synchronize integral jacking construction method
CN103266573A (en) Self-anchored suspension bridge steel box girder three-slideway synchronous jacking construction method
CN106522096A (en) Curved incremental launching construction technology for 48m-long-span railway simply-supported box girders and high piers
CN105484162B (en) Suspension bridge construction stiff girder secondary on the bank swings moving device and method
CN106149576A (en) On across the whole assembling and dismantling of the most wired bridge except and construction method of installation
CN107059506A (en) A kind of plate-type ballastless track track plates replacing options
CN101372231B (en) Technique for drawing, transporting and lifting ground rail type cable railway equipment
CN106758590A (en) The construction beam and construction method of railroad track are changed under the conditions of for not stopping transport
CN106948228B (en) Quick replacement method for track plate of plate-type ballastless track
CN206189270U (en) Integral pulling and track set stay knot structure
CN105908583A (en) System for replacing tunnel ballast track bed with ballastless track under non-interruption traveling condition
CN102094393A (en) Steel-concrete joint for steel and concrete mixed continuous steel structure bridge
WO2015016220A1 (en) Blast furnace repair method
CN107059507B (en) A kind of curved section plate-type ballastless track track plates replacing options
CN103273052A (en) Method and device for rapidly transferring hanging type casting bogie
CN214005452U (en) High-position pushing longitudinal moving device for 900t bridge girder erection machine
CN205369040U (en) Suspension bridge is under construction on bank stiffening beam secondary and is swung and move device
CN202416191U (en) Descending-type movable mould frame offshore dismounting main beam lifting device
CN212668345U (en) Simple pile supply platform equipment for shore-connected wharf pile foundation construction
CN108044789A (en) Pretensioning prestressed concrete track board assembly line tensioning system and its application

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: No. 2, Da Liu Shu Road, Haidian District, Beijing

Applicant after: Railway Construction Research Institute of China Railway Research Institute Group Co., Ltd.

Applicant after: China Railway Scientific Research Institute Group Co., Ltd.

Address before: No. 2, Da Liu Shu Road, Haidian District, Beijing

Applicant before: Railway Construction Institute of China Academy of Railway Sciences

Applicant before: China Academy of Railway Sciences

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191220

Address after: 100081 Beijing city Haidian District Daliushu Road No. 2 district two building 303

Co-patentee after: China Railway Scientific Research Institute Group Co., Ltd.

Patentee after: Railway Construction Research Institute of China Railway Research Institute Group Co., Ltd.

Co-patentee after: Beijing Tieke Special Engineering Technology Co., Ltd.

Address before: 100081 Beijing city Haidian District Daliushu Road No. 2

Co-patentee before: China Railway Scientific Research Institute Group Co., Ltd.

Patentee before: Railway Construction Research Institute of China Railway Research Institute Group Co., Ltd.