CN106980759B - A kind of large-scale mine ecological recovery and the intelligence system and method kept - Google Patents

A kind of large-scale mine ecological recovery and the intelligence system and method kept Download PDF

Info

Publication number
CN106980759B
CN106980759B CN201710180387.7A CN201710180387A CN106980759B CN 106980759 B CN106980759 B CN 106980759B CN 201710180387 A CN201710180387 A CN 201710180387A CN 106980759 B CN106980759 B CN 106980759B
Authority
CN
China
Prior art keywords
water
water barrier
proof resin
mound
barrier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710180387.7A
Other languages
Chinese (zh)
Other versions
CN106980759A (en
Inventor
彭苏萍
冯飞胜
吴志远
杜文凤
王攀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201710180387.7A priority Critical patent/CN106980759B/en
Publication of CN106980759A publication Critical patent/CN106980759A/en
Application granted granted Critical
Publication of CN106980759B publication Critical patent/CN106980759B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G16INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS
    • G16ZINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR SPECIFIC APPLICATION FIELDS, NOT OTHERWISE PROVIDED FOR
    • G16Z99/00Subject matter not provided for in other main groups of this subclass
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2219/00Indexing scheme relating to application aspects of data processing equipment or methods
    • G06F2219/10Environmental application, e.g. waste reduction, pollution control, compliance with environmental legislation

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The invention discloses a kind of large-scale mine ecological recovery and the intelligence system of holding, the large-scale mine includes mound field (1), and the intelligence system includes being arranged on the mound field (1) internal the first water barrier (2), the second water barrier (3) and the 3rd water barrier (4);First water barrier (2) is rectangle, it is internal to be horizontally set on the mound field (1), second water barrier (3) is square sink, quantity is multiple, the top of first water barrier (2) is uniformly arranged on, the 3rd water barrier (4) is positioned close to the position of mound field (1) the surrounding side slope.Large-scale mine ecological recovery of the present invention is with the intelligence system that keeps according to the rule of coal mining, by designing its exploitation and mound form, increase water-keeping device, the vegetation and plant species of appropriate mix, reach intelligent on-line monitoring, realize type recovery of ecologic environment in a mine and the intelligence kept.

Description

A kind of large-scale mine ecological recovery and the intelligence system and method kept
Technical field
The present invention relates to mine field, more particularly to a kind of for large-scale mine ecological recovery and the intelligence system of holding With method.
Background technology
The very fast development of China's economy, persistently keeps the demand of the energy, is particularly west area large outdoors colliery Development, but the development of these large outdoors collieries causes local ground watering cone of groundwater, i.e., regional water shortage, and arrange Native field is hundreds of meters high, more causes refuse dump and mine ecological restoration difficult, ecology keeps being more difficult to;
Coal mining mode is generally divided into pit mining and strip mining transformation two ways, has an opencast mining of first to exploiting field earth's surface Peel off, serious broken ring is caused to soil layer and structure, large amounts of stripping rock solid can be produced during exploitation and is discarded The bulk deposition of thing.Considerable damage has been carried out to land resource, good farmland is lain waste, the decrease of cultivated land, land pollution, influence industrial or agricultural Production.By taking Shenhua Yi Min opencuts as an example, refuse dump is high and big, using hydrophobic exploitation, causes water level decreasing, opencut mound field Top is difficult surviving plants and vegetation, and without vegetation and plant, dust of opencut mound field etc. drifts with the wind, to surrounding environment Extreme influence is caused, ecological environment is polluted, while without the Soil and water conservation of plant, to the mound field safety of itself Cause very big hidden danger.
Major Difficulties have it is following some:
1st, design exploitation and mound form and parameter, the exploitation of optimization and mound form directly determine the later stage with parameter A series of design parameters;
2nd, the design of refuse dump inside water-keeping device;
3rd, the selection of vegetation type and planting area selection;
4th, the water level of refuse dump is too low, and water-holding capacity is too poor, and the vadose water that particularly plant needs is difficult to keep, at the same time Mound field is too high, be easy to cause the disasters such as landslide.
The content of the invention
The technical problem to be solved in the present invention is to provide one kind is simple in structure, cost is low, large-scale mine easy to operate life State recover with keep intelligence system, present invention also offers it is described can only system construction and application method.
A kind of large-scale mine ecological recovery includes mound field, the intelligence with the intelligence system kept, the large-scale mine System includes being arranged on the first water barrier, the second water barrier and the 3rd water barrier inside the mound field;First water proof Layer be rectangle, is horizontally set on inside the mound field, and second water barrier is square sink, quantity be it is multiple, The even top for being arranged on first water barrier, the 3rd water barrier are positioned close to the position of the mound field surrounding side slope Put;First water barrier includes rectangular water proof resin soft board layer and the anti-skidding waterproofing device being connected with its surrounding, described Anti-skidding waterproofing device includes horizontal eliminator plate, multiple vertical eliminator plates being arranged in parallel and multiple antiskid plates being arranged in parallel, institute The bottom that horizontal eliminator plate is connected to the multiple vertical eliminator plate is stated, forms multiple grooves that block water, the antiskid plate sets for inclination Put, the upper end is connected with the bottom of the horizontal eliminator plate.
Large-scale mine ecological recovery of the present invention and the intelligence system kept, wherein, in the water proof resin soft board Multiple first soil humidity sensors are fixed with layer, the longer plant of root system is planted on first water barrier;
The water proof resin soft board layer, the horizontal eliminator plate, the vertical eliminator plate and the antiskid plate are by water proof Resin soft board is formed;The water proof resin soft board is one kind in following two:
(I) polychloroethylene transparent soft sheet;
(II) the water proof resin soft board is prepared by the following method:By dimethyl terephthalate (DMT) 100g, methylbenzene Ethene 80g, tribasic lead sulfate 10g and each 10g of precipitated calcium carbonate are stirred under inert gas shielding, and temperature maintains during stirring 120 DEG C, palmitic acid 1.5g, palmitic acid barium 1.5g and catalyst 5g are added after being sufficiently stirred, finally puts room temperature Cheng Mo.
Large-scale mine ecological recovery of the present invention and the intelligence system kept, wherein, second water barrier includes Tank, the first small sink being connected at left and right sides of the tank, the second small sink being connected to before and after the tank; It is fixed with the second soil humidity sensor on second water barrier of part, it is shorter to be implanted with root system for kind on second water barrier Plant.
Large-scale mine ecological recovery of the present invention and the intelligence system kept, wherein, the 3rd water barrier includes Water proof resin hardboard and the multiple shield sinks being uniformly fixed on the water proof resin hardboard, the water proof resin hardboard are inclination Set, parallel with the side slope of the mound field, being horizontally disposed between mound field side slope and the water proof resin hardboard has The shield sink of multiple ship types, one end of which is fixed on the water proof resin hardboard.
Large-scale mine ecological recovery of the present invention and the intelligence system kept, wherein, the number of the 3rd water barrier Measure to be multiple, be uniformly arranged along the surrounding side slope of the mound field, multiple 3rd water barriers in same side are put down Row is set, and is had certain intervals between two neighboring 3rd water barrier, is set every 4~5 on the 3rd water barrier 3 the 3rd soil humidity sensors are equipped with, are separately fixed on the shield sink of topmost, centre and foot.
Large-scale mine ecological recovery of the present invention and the intelligence system kept, wherein, the water proof resin hardboard is One kind in following two:
(i) epoxy glass fiber plate;
(ii) the water proof resin hardboard is prepared by the following method:By dimethyl terephthalate (DMT) 100g, methylbenzene Ethene 80g, tribasic lead sulfate 10g and each 10g of precipitated calcium carbonate are stirred under inert gas shielding, and temperature maintains during stirring 120 DEG C, stearic acid 1.5g, barium stearate 1.5g and catalyst 5g are added after being sufficiently stirred, finally puts room temperature Cheng Mo.
Large-scale mine ecological recovery of the present invention and the intelligence system kept, wherein, the longer plant of the root system For following one or more of combination:Fruit tree, sweet potato, soybean, potato, peanut, green soy bean;The shorter plant of the root system be with Lower one or more of combination:Paspalum notatum, Festuca Arundinacea, annual bluegrass, velvet grass, Bai Zhilian, cockscomb, dead leaf chrysanthemum, gardenia, Sago cycas, orange, have a smile on one's face.
Large-scale mine ecological recovery of the present invention and the intelligence system kept, wherein, the first water barrier distance The distance between upper surface of the mound field is 1m, and horizontal distance of each edge between the side of the mound field is 1.2m;The height of the vertical eliminator plate and two adjacent described the distance between eliminator plates vertically are 300mm, the water The thickness of flat eliminator plate is 15mm, and the thickness of the water proof resin soft board layer is 7mm, and the thickness of the antiskid plate is 10mm, wide Spend for 200mm, length is consistent with the length of the groove that blocks water, and the spacing between the two neighboring antiskid plate is 450mm, described Angle between antiskid plate and horizontal plane is 30 °, and the top of the antiskid plate is in close to the water proof resin soft board layer center Position;
The length and width of second water barrier are 2m, a height of 0.15m, between two neighboring second water barrier away from It is respectively 1800mm, 1800mm and 150mm from the length, width and height for 2m, the tank, the length and width high score of the first small sink Not Wei 100mm, 2000mm and 150mm, the length, width and height of the second small sink are respectively 1800mm, 100mm and 150mm;
Between two neighboring first soil humidity sensor, between two neighboring second soil humidity sensor Distance be 50m;
The a length of 5m of water proof resin hardboard, width 2m, thickness 10mm, between adjacent two pieces of water proof resin hardboards At intervals of 2.5m;The shield sink is ship type, depth 100mm, lower width 150mm, length 2m, and upper width is 200mm, length 2m, the spacing on vertical direction between the two neighboring shield sink is 0.5m.
Construction and application method of the large-scale mine ecological recovery of the present invention with the intelligence system of holding, including it is as follows Step:
(A) according to Coal Mine Design drawing, find a job face region, according to direction of extraction, in the incipient stage, brushing The region upper epidermis fertile soil of 800m on direction is pushed to adopt, general top layer fertile soil thickness 200-400mm, peels off local top layer humic Soil is transported to some region, and constant temperature preserves after watering;
(B) after working face starts operation, using 500m as extreme value, i.e., when the advance of the face is more than 300m, start to continue The unstripped top layer fertile soil in stripping operation face region, peel distance 0-300m, ensures there is 500-800m's above working face Region is fertile soil stripping area;
(C) sand in working face more than coal seam is peeled away, is transported to mound field;
(D) when also having 1m apart from mound field surface, it is laid with the first water barrier, it is ensured that it is water-tight, and ensure described at this time With the horizontal distance of mound field side it is 0.5m around first water barrier, spacing is in length and breadth on first water barrier 50m lays the first soil humidity sensor, is pasted onto on first water barrier, continues mound on the top;
(E) when also having 0.3m apart from mound field surface, the second water barrier is laid with, spacing is 2m in length and breadth;Described Second soil humidity sensor is set on two water barriers;
(F) region of highest mound is had reached in the mound field, side and both sides are laid with the 3rd water proof respectively behind Layer, spacing 2.5m, and slowly down topple over sand from the 3rd water barrier interval, and it is manually applied, ensure inclined plane Add 0.7m outward in the horizontal direction;3rd soil humidity sensor is set on the 3rd water barrier;
(G) after Tu Chang has accumulated, the top layer fertile soil of 300mm thickness, top layer fertile soil are laid with upper surface and side For original surface collection, watering, suitably spills some fertilizer;The plant planted before being planted directly over second water barrier Shorter, the drought-enduring species of middle root system, if without or select if being difficult to plant again it is following it is several in one or more of groups Close:Paspalum notatum, Festuca Arundinacea, annual bluegrass, velvet grass, Bai Zhilian, cockscomb, dead leaf chrysanthemum, gardenia, sago cycas, orange, with a smile; Planting location is that cultivated area is 2 × 2m directly over second water barrier;
The longer and drought-enduring plant of root system in the plant that this area is planted before described other ecological region plantings of mound field, such as Fruit without or be difficult plant again then selection it is following it is several in one or more of combinations:Fruit tree, sweet potato, soybean, potato, Peanut, green soy bean;Shorter, the drought-enduring species of root system in the plant that this area is planted before being planted in side, if not or very Difficult plantation then selection it is following it is several in one or more of combinations:Vetiver, paspalum notatum, annual bluegrass;
(H) by first soil humidity sensor, second soil humidity sensor and the 3rd soil moisture The monitoring result of sensor, is transmitted directly to water injector, and when concentration is less than threshold value, water injector automatic water jetting, ensures to spill The intelligence of water, become more meticulous, and adequately protect environment and saving water resource.
Large-scale mine ecological recovery of the present invention is with the intelligence system difference from prior art kept:It is of the invention big Intelligence system of the type recovery of ecologic environment in a mine with keeping, by designing its exploitation and mound form, increases according to the rule of coal mining Add water-keeping device, the vegetation and plant species of appropriate mix, reach intelligent on-line monitoring, realize type recovery of ecologic environment in a mine and the intelligence kept Energyization.
In preferred solution:
Because refuse dump is high and big, hydrophobicity is strong, therefore Atmospheric precipitation and artificial watering absorb be deposited to mound soon Side off field, the first water barrier is effectively protected water resource valuable above mound field, while the first water barrier is apart from the heap The distance between upper surface of Tu Chang is 1m because the root length of plant is generally all in 200-900mm or so, 1m away from From not only can guarantee that the abundant growth of plant and can guarantee that the maximum utilization of water resource, especially for the longer plant of root system, for The sand-fixation, water-keeping of topsoil has good effect, though apart from the long then water conservation in the distance between the upper surface of the mound field without Boundary, apart from the too short growth for being unfavorable for plants on surface, and the growth of root system of plant also can cause one to the first water barrier It is fixed to destroy, therefore the design of the first water barrier is rationally effective, while the multiple antiskid plates being arranged in parallel in both ends, it ensure that overlying table The safety of soil layer, will not produce the danger of sliding;Multiple first soil humidity sensors, the growth for plant are fixed with thereon Environment provides real-time science data support.
Because refuse dump is high and big, hydrophobicity is strong, and there is provided the first water barrier, but topsoil soil resource is valuable and thin It is water-based strong, therefore topsoil and following 0.3m water resources are relatively fewer, thus set when apart from earth's surface 0.3m multiple second every Water layer, the shorter plant of topsoil plantation root system, is so formed root system length with the first water barrier above the second water barrier Reasonable distribution is spent, takes full advantage of the valuable soil resource of topsoil, and this region is the preservation region of vadose water.
3rd water barrier is the water resource for saving side slope, while spaced design and anti-skidding design strengthen side slope safety, The abundant effectively growth of plant has more consolidated the security performance of side slope at the same time, is thusly-formed benign cycle.
Three water barriers are used in combination, both abundant water conservation, promote while the growth of plant and strengthen heap in turn Tu Chang's is firm.
According to three water barriers, soil humidity sensor is evenly distributed on mound field regional, has fully ensured that plant The scientific analysis of growing environment.
The large-scale mine ecological recovery of the present invention is described further with the intelligence system kept below in conjunction with the accompanying drawings.
Brief description of the drawings
Fig. 1 is large-scale mine ecological recovery of the present invention and the cross-sectional view of the intelligence system kept;
Fig. 2 is that the plan structure of large-scale mine ecological recovery of the present invention and the first water barrier in the intelligence system of holding is illustrated Figure;
Fig. 3 is the side elevational cross-section structure diagram of the first water barrier in the present invention;
Fig. 4 is the overlooking the structure diagram of the second water barrier in the present invention;
Fig. 5 is the side elevational cross-section structure diagram of the second water barrier in the present invention;
Fig. 6 is the overall structure diagram of the first water barrier and multiple second water barriers in the present invention;
Fig. 7 is the side structure schematic view of the 3rd water barrier in the present invention;
Fig. 8 is the overall structure diagram of multiple 3rd water barriers in the present invention.
Embodiment
Embodiment 1
As shown in Fig. 1~Fig. 8, a kind of large-scale mine ecological recovery includes mound with the intelligence system kept, large-scale mine Field 1, intelligence system include being arranged on the first water barrier 2, the second water barrier 3 and the 3rd water barrier 4 inside mound field 1;First Water barrier 2 is rectangle, is horizontally set on inside mound field 1, and the second water barrier 3 is square sink, quantity be it is multiple, uniformly The top of the first water barrier 2 is arranged on, the 3rd water barrier 4 is positioned close to the position of 1 surrounding side slope of mound field.
First water barrier 2 includes rectangular water proof resin soft board layer 201 and the anti-skidding waterproofing device being connected with its surrounding, Anti-skidding waterproofing device include horizontal eliminator plate 202, multiple vertical eliminator plates 203 being arranged in parallel and it is multiple be arranged in parallel it is anti-skidding Plate 204, horizontal eliminator plate 202 are connected to the bottom of multiple vertical eliminator plates 203, form multiple grooves 205 that block water, antiskid plate 204 To be obliquely installed, the upper end is connected with the bottom of horizontal eliminator plate 202.
Following scheme is preferred solution:
Multiple first soil humidity sensors 206 are fixed with water proof resin soft board layer 201, on the first water barrier 2 Plant the longer plant of root system;Water proof resin soft board layer 201, horizontal eliminator plate 202, vertical eliminator plate 203 and antiskid plate 204 are equal It is made of water proof resin soft board, wherein, water proof resin soft board layer 201 is spliced by water proof resin soft board;Water proof resin soft board For one kind in following two:
(I) polychloroethylene transparent soft sheet, is commercial product;
(II) water proof resin soft board is prepared by the following method:By dimethyl terephthalate (DMT) 100g, methyl styrene 80g, tribasic lead sulfate 10g and each 10g of precipitated calcium carbonate are stirred under inert gas shielding, and temperature maintains 120 during stirring DEG C, palmitic acid 1.5g, palmitic acid barium 1.5g and catalyst 5g are added after being sufficiently stirred, finally puts room temperature Cheng Mo.
The material that oneself proportioning makes can not have to consider transparency, because commercial product considers the functions such as transparency more, Use occasion of the present invention is is embedded in underground, therefore transparency and turbidity, without considering, cost is lower;Secondly, the production of oneself proportioning Under condition stack pile than commercial product wear-resisting property more preferably, it can improve service life, be carried out by RCA paper tapes abrasion wear test machine Abrasion test, loading 175g scrollings are not coated with factice band and rub with sample, and commercially available polyvinyl chloride paint experience 340 encloses the material that sees the bottom, self-control Product experience 420 encloses the material that sees the bottom, and abrasion resistant effect the latter is stronger, can improve service life.
Second water barrier 3 includes tank 301, the first small sink 302 for being connected to the left and right sides of tank 301, connection The second small sink 303 before and after tank 301;The second soil humidity sensor is fixed with the second water barrier of part 3 304, kind is implanted with the shorter plant of root system on the second water barrier 3.
3rd water barrier 4 includes water proof resin hardboard 401 and the multiple shield water being uniformly fixed on water proof resin hardboard 401 Groove 402, water proof resin hardboard 401 is is obliquely installed, and parallel with the side slope of mound field 1, in mound field, 1 side slope and water proof resin are hard The shield sink 402 for there are multiple ship types is horizontally disposed between plate 401, one end of which is fixed on water proof resin hardboard 401.
The quantity of 3rd water barrier 4 is multiple, is uniformly arranged along the surrounding side slope of mound field 1, in same side Multiple 3rd water barriers 4 are arranged in parallel, and have certain intervals between two neighboring 3rd water barrier 4, every 4~5 the 3rd every 3 the 3rd soil humidity sensors 403 are provided with 3rd water barrier 4 of water layer 4, are separately fixed at topmost, centre and most On the shield sink 402 of lower part, it can be seen that, the 3rd soil moisture sensing is fitted with the 3rd not all water barrier 4 Device 403, but just installed on the part shield sink 402 on the 3rd a small amount of water barrier 4, so both reached excellent monitoring effect Fruit has saved cost again.
Water proof resin hardboard 401 is one kind in following two:
(i) epoxy glass fiber plate, is commercial product;
(ii) water proof resin hardboard is prepared by the following method:By dimethyl terephthalate (DMT) 100g, methyl styrene 80g, tribasic lead sulfate 10g and each 10g of precipitated calcium carbonate are stirred under inert gas shielding, and temperature maintains 120 during stirring DEG C, stearic acid 1.5g, barium stearate 1.5g and catalyst 5g are added after being sufficiently stirred, finally puts room temperature Cheng Mo.
The material that oneself proportioning makes can not have to consider transparency, because commercial product considers the functions such as transparency more, Use occasion of the present invention is is embedded in underground, therefore transparency and turbidity, without considering, cost is lower;Secondly, the production of oneself proportioning Under condition stack pile than commercial product wear-resisting property more preferably, it can improve service life, be carried out by RCA paper tapes abrasion wear test machine Abrasion test, loading 175g scrollings are not coated with factice band and rub with sample, and commercially available polyvinyl chloride paint experience 340 encloses the material that sees the bottom, self-control Water proof resin hardboard paint experience 470 encloses the material that sees the bottom, and abrasion resistant effect the latter is stronger, can improve service life.
The longer plant of root system is following one or more of combination:Fruit tree, sweet potato, soybean, potato, peanut, green soy bean; The shorter plant of root system is following one or more of combination:Paspalum notatum, Festuca Arundinacea, annual bluegrass, velvet grass, Bai Zhilian, chicken Be preced with flower, dead leaf chrysanthemum, gardenia, sago cycas, orange, have a smile on one's face.
First water barrier 2 is 1m apart from the distance between upper surface of mound field 1, and each edge is apart from the side of mound field 1 Between horizontal distance be 1.2m;The distance between the height of vertical eliminator plate 203 and two adjacent vertical eliminator plates 203 are For 300mm, the thickness of horizontal eliminator plate 202 is 15mm, and the thickness of water proof resin soft board layer 201 is 7mm, the thickness of antiskid plate 204 Spend for 10mm, width 200mm, length is consistent with the length for the groove 205 that blocks water, and the spacing between two neighboring antiskid plate 204 is 450mm, the angle between antiskid plate 204 and horizontal plane are 30 °, and the top of antiskid plate 204 is in towards water proof resin soft board layer The position at 201 centers, that is, be presented the structure radiated around by center;
The length and width of second water barrier 3 are 2m, a height of 0.15m, and the distance between two neighboring second water barrier 3 is 2m, the length, width and height of tank 301 are respectively 1800mm, 1800mm and 150mm, and the length, width and height of the first small sink 302 are respectively 100mm, 2000mm and 150mm, the length, width and height of the second small sink 303 are respectively 1800mm, 100mm and 150mm;
Between two neighboring first soil humidity sensor 206, between two neighboring second soil humidity sensor 304 Distance is 50m;It can be seen from the above that be not that the second soil humidity sensor 304 is fitted with each second water barrier 3, and It is that part has, has so not only reached purpose, but also saved cost.
Water proof resin hardboard 401 a length of 5m, width 2m, thickness 10mm, between adjacent two blocks of water proof resins hardboard 401 At intervals of 2.5m;Shield sink 402 is ship type, depth 100mm, lower width 150mm, length 2m, and upper width is 200mm, length 2m, the spacing on vertical direction between two neighboring shield sink 402 is 0.5m.
The design for protecting the size and structure of sink 402 ensures that whole native field lateral side regions can meet that water storage requirement again will not Because the 3rd water barrier 4 reduces the frictional force of 1 side of mound field, ensure the stabilization of side slope.The size and structure of first water barrier 2 Design both can guarantee that separate top water penetrate into lower section and also can guarantee that mound field 1 by proximal side region shearing strength more Greatly, it is more firm.
Construction and application method of the large-scale mine ecological recovery of the present invention with the intelligence system of holding, including following step Suddenly:
(A) according to Coal Mine Design drawing, find a job face region, according to direction of extraction, in the incipient stage, brushing The region upper epidermis fertile soil of 800m on direction is pushed to adopt, general top layer fertile soil thickness 200-400mm, peels off local top layer humic Soil is transported to some region, and constant temperature preserves after watering;
(B) after working face starts operation, using 500m as extreme value, i.e., when the advance of the face is more than 300m, start to continue The unstripped top layer fertile soil in stripping operation face region, peel distance 0-300m, ensures there is 500-800m's above working face Region is fertile soil stripping area;500m minimums ensure there is certain job space, and topsoil fertile soil is from this working face Coal ash of exploitation etc. pollutes, and 800m maximums ensure that operating area vegetated surface is big, and the degree of welding minimizes;
(C) sand in working face more than coal seam is peeled away, is transported to mound field 1;Mound field size design uses Excel is calculated, buried depth, and working face length, calculates mound field height and width;
(D) when also having 1m apart from 1 surface of mound field, it is laid with the first water barrier 2, it is ensured that it is water-tight, and ensure at this time the With the horizontal distance of 1 side of mound field it is 0.5m around one water barrier 2, spacing lays for 50m in length and breadth on the first water barrier 2 One soil humidity sensor 206, is pasted onto on the first water barrier 2, continues mound on the top, is careful not to damage in this process Bad first water barrier 2;
(E) when also having 0.3m apart from 1 surface of mound field, the second water barrier 3 is laid with, spacing is 2m in length and breadth;In the second water proof Second soil humidity sensor 304 is set on layer 3;
(F) region of highest mound is had reached in mound field 1, side and both sides are laid with the 3rd water barrier 4 respectively behind, Spacing is 2.5m, and slowly down topples over sand from 4 interval of the 3rd water barrier, and manually applied, ensures inclined plane along level Direction adds 0.7m outward;3rd soil humidity sensor 403 is set on the 3rd water barrier 4;
(G) after Tu Chang has accumulated, the top layer fertile soil of 300mm thickness, top layer fertile soil are laid with upper surface and side For original surface collection, watering, suitably spills some fertilizer;In the plant planted before plantation directly over the second water barrier 3 Shorter, the drought-enduring species of root system, if without or select if being difficult to plant again it is following it is several in one or more of combinations: Paspalum notatum, Festuca Arundinacea, annual bluegrass, velvet grass, Bai Zhilian, cockscomb, dead leaf chrysanthemum, gardenia, sago cycas, orange, with a smile;Plantation Position is that cultivated area is 2 × 2m directly over the second water barrier;
The longer and drought-enduring plant of root system in the plant that this area is planted before other ecological region plantings of mound field 1, if Without or be difficult plant again then selection it is following it is several in one or more of combinations:Fruit tree, sweet potato, soybean, potato, flower Raw, green soy bean;Shorter, the drought-enduring species of root system in the plant that this area is planted before being planted in side, if without or be difficult Plant again then selection it is following it is several in one or more of combinations:Vetiver, paspalum notatum, annual bluegrass;Deep-rootedness is mixed with shallow root Kind, different high-low water levels caused by coordinating artificial water-keeping device, make full use of the effect of the underground space and moisture and nutrient, protect The ecological environment on mound field surface.
(H) by the first soil humidity sensor 206, the second soil humidity sensor 304 and the 3rd soil humidity sensor 403 monitoring result, is transmitted directly to water injector, and when concentration is less than threshold value, water injector automatic water jetting, ensures watering Intelligence, become more meticulous, and adequately protect environment and saving water resource.
Embodiment described above is only that the preferred embodiment of the present invention is described, not to the model of the present invention Enclose and be defined, on the premise of design spirit of the present invention is not departed from, technical side of the those of ordinary skill in the art to the present invention The various modifications and improvement that case is made, should all fall into the protection domain that claims of the present invention determines.

Claims (9)

1. a kind of large-scale mine ecological recovery and the intelligence system kept, it is characterised in that:The large-scale mine includes mound field (1), the intelligence system includes being arranged on internal the first water barrier (2) of the mound field (1), the second water barrier (3) and the Three water barriers (4);First water barrier (2) is rectangle, and it is internal to be horizontally set on the mound field (1), described second every Water layer (3) is square sink, and quantity is multiple, is uniformly arranged on the top of first water barrier (2), the 3rd water proof Layer (4) is positioned close to the position of mound field (1) the surrounding side slope;First water barrier (2) includes rectangular water proof Resin soft board layer (201) and the anti-skidding waterproofing device being connected with its surrounding, the anti-skidding waterproofing device include horizontal eliminator plate (202), multiple vertical eliminator plates (203) being arranged in parallel and multiple antiskid plates (204) being arranged in parallel, the horizontal eliminator plate (202) bottom of the multiple vertical eliminator plate (203) is connected to, forms multiple grooves that block water (205), the antiskid plate (204) To be obliquely installed, the upper end is connected with the bottom of the horizontal eliminator plate (202).
2. large-scale mine ecological recovery according to claim 1 and the intelligence system kept, it is characterised in that:It is described every Multiple first soil humidity sensors (206) are fixed with water-resin soft board layer (201), are planted on first water barrier (2) It is longer plant to take root;
The water proof resin soft board layer (201), the horizontal eliminator plate (202), the vertical eliminator plate (203) and described anti-skidding Plate (204) is formed by water proof resin soft board;The water proof resin soft board is one kind in following two:
(I) polychloroethylene transparent soft sheet;
(II) the water proof resin soft board is prepared by the following method:By dimethyl terephthalate (DMT) 100g, methyl styrene 80g, tribasic lead sulfate 10g and each 10g of precipitated calcium carbonate are stirred under inert gas shielding, and temperature maintains 120 during stirring DEG C, palmitic acid 1.5g, palmitic acid barium 1.5g and catalyst 5g are added after being sufficiently stirred, finally puts room temperature Cheng Mo.
3. large-scale mine ecological recovery according to claim 2 and the intelligence system kept, it is characterised in that:Described second Water barrier (3) includes tank (301), the first small sink (302) being connected at left and right sides of the tank (301), connection The second small sink (303) before and after the tank (301);The second soil is fixed with second water barrier (3) of part Earth humidity sensor (304), kind is implanted with the shorter plant of root system on second water barrier (3).
4. large-scale mine ecological recovery according to claim 3 and the intelligence system kept, it is characterised in that:Described 3rd Water barrier (4) includes water proof resin hardboard (401) and the multiple shield sinks being uniformly fixed on the water proof resin hardboard (401) (402), the water proof resin hardboard (401) is parallel with the side slope of the mound field (1) to be obliquely installed, in the mound field (1) the shield sink (402) for there are multiple ship types, its one end are horizontally disposed between side slope and the water proof resin hardboard (401) It is fixed on the water proof resin hardboard (401).
5. large-scale mine ecological recovery according to claim 4 and the intelligence system kept, it is characterised in that:Described 3rd The quantity of water barrier (4) is multiple, is uniformly arranged along the surrounding side slope of the mound field (1), in the multiple of same side 3rd water barrier (4) is arranged in parallel, and has certain intervals between two neighboring 3rd water barrier (4), every 4~5 It is a that 3 the 3rd soil humidity sensors (403) are provided with the 3rd water barrier (4), it is separately fixed at topmost, centre On the shield sink (402) of foot.
6. large-scale mine ecological recovery according to claim 5 and the intelligence system kept, it is characterised in that:The water proof Resin hardboard (401) is one kind in following two:
(i) epoxy glass fiber plate;
(ii) the water proof resin hardboard is prepared by the following method:By dimethyl terephthalate (DMT) 100g, methyl styrene 80g, tribasic lead sulfate 10g and each 10g of precipitated calcium carbonate are stirred under inert gas shielding, and temperature maintains 120 during stirring DEG C, stearic acid 1.5g, barium stearate 1.5g and catalyst 5g are added after being sufficiently stirred, finally puts room temperature Cheng Mo.
7. large-scale mine ecological recovery according to claim 6 and the intelligence system kept, it is characterised in that:The root system Longer plant is following one or more of combination:Fruit tree, sweet potato, soybean, potato, peanut, green soy bean;The root system is shorter Plant be following one or more of combination:Paspalum notatum, Festuca Arundinacea, annual bluegrass, velvet grass, Bai Zhilian, cockscomb, dead leaf Chrysanthemum, gardenia, sago cycas, orange, with a smile.
8. large-scale mine ecological recovery according to claim 7 and the intelligence system kept, it is characterised in that:Described first Water barrier (2) is 1m apart from the distance between upper surface of the mound field (1), and each edge is apart from the side of the mound field (1) Horizontal distance between face is 1.2m;The height and two adjacent vertical eliminator plates of the vertical eliminator plate (203) The distance between (203) it is 300mm, the thickness of the horizontal eliminator plate (202) is 15mm, the water proof resin soft board layer (201) thickness is 7mm, and the thickness of the antiskid plate (204) is 10mm, width 200mm, length and the groove that blocks water (205) length is consistent, and the spacing between the two neighboring antiskid plate (204) is 450mm, the antiskid plate (204) and water Angle between plane is 30 °, and the top of the antiskid plate (204) is in towards water proof resin soft board layer (201) center Position;
The length and width of second water barrier (3) are 2m, a height of 0.15m, between two neighboring second water barrier (3) Distance is 2m, and the length, width and height of the tank (301) are respectively 1800mm, 1800mm and 150mm, the first small sink (302) length, width and height are respectively 100mm, 2000mm and 150mm, and the length, width and height of the second small sink (303) are respectively 1800mm, 100mm and 150mm;
Between two neighboring first soil humidity sensor (206), two neighboring second soil humidity sensor The distance between (304) it is 50m;
The water proof resin hardboard (401) a length of 5m, width 2m, thickness 10mm, adjacent two pieces of water proof resin hardboards (401) between at intervals of 2.5m;The shield sink (402) is ship type, depth 100mm, lower width 150mm, length For 2m, upper width 200mm, length 2m, the spacing on vertical direction between the two neighboring shield sink (402) is 0.5m。
9. large-scale mine ecological recovery described in any one in claim 1~8 and the construction of intelligence system that keeps and make With method, it is characterised in that:Include the following steps:
(A) according to Coal Mine Design drawing, find a job face region, and according to direction of extraction, in the incipient stage, brushing pushes to adopt The region upper epidermis fertile soil of 800m on direction, general top layer fertile soil thickness 200-400mm, the top layer fertile soil for peeling off locality are transported Some region is sent to, constant temperature preserves after watering;
(B) after working face starts operation, using 500m as extreme value, i.e., when the advance of the face is more than 300m, start to continue to peel off The unstripped top layer fertile soil in working face region, peel distance 0-300m, ensures there is the region of 500-800m above working face For fertile soil stripping area;
(C) sand in working face more than coal seam is peeled away, is transported to mound field (1);
(D) when also having 1m apart from mound field (1) surface, it is laid with the first water barrier (2), it is ensured that it is water-tight, and ensure institute at this time The horizontal distance stated around the first water barrier (2) with mound field (1) side is 0.5m, on first water barrier (2) Spacing lays the first soil humidity sensor (206) for 50m in length and breadth, is pasted onto on first water barrier (2), continues on the top Mound;
(E) when also having 0.3m apart from mound field (1) surface, the second water barrier (3) is laid with, spacing is 2m in length and breadth;Described Second soil humidity sensor (304) is set on the second water barrier (3);
(F) region of highest mound is had reached in the mound field (1), side and both sides are laid with the 3rd water barrier respectively behind (4), spacing 2.5m, and slowly down topple over sand from the 3rd water barrier (4) interval, and it is manually applied, ensure to incline Inclined-plane adds 0.7m outward in the horizontal direction;3rd soil humidity sensor is set on the 3rd water barrier (4) (403);
(G) after Tu Chang has accumulated, the top layer fertile soil of 300mm thickness is laid with upper surface and side, top layer fertile soil is original Carry out surface collection, sprinkle water, suitably spill some fertilizer;The plant planted before plantation directly over second water barrier (3) Shorter, the drought-enduring species of middle root system, if without or select if being difficult to plant again it is following it is several in one or more of groups Close:Paspalum notatum, Festuca Arundinacea, annual bluegrass, velvet grass, Bai Zhilian, cockscomb, dead leaf chrysanthemum, gardenia, sago cycas, orange, with a smile; Planting location is that cultivated area is 2 × 2m directly over second water barrier;
The longer and drought-enduring plant of root system in the plant that this area is planted before described other ecological region plantings of mound field (1), such as Fruit without or be difficult plant again then selection it is following it is several in one or more of combinations:Fruit tree, sweet potato, soybean, potato, Peanut, green soy bean;Shorter, the drought-enduring species of root system in the plant that this area is planted before being planted in side, if not or very Difficult plantation then selection it is following it is several in one or more of combinations:Vetiver, paspalum notatum, annual bluegrass;
(H) by first soil humidity sensor (206), second soil humidity sensor (304) and the 3rd soil The monitoring result of earth humidity sensor (403), is transmitted directly to water injector, and when concentration is less than threshold value, water injector is automatic Water spray, ensures the intelligence of watering, becomes more meticulous, and adequately protect environment and saving water resource.
CN201710180387.7A 2017-03-24 2017-03-24 A kind of large-scale mine ecological recovery and the intelligence system and method kept Active CN106980759B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710180387.7A CN106980759B (en) 2017-03-24 2017-03-24 A kind of large-scale mine ecological recovery and the intelligence system and method kept

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710180387.7A CN106980759B (en) 2017-03-24 2017-03-24 A kind of large-scale mine ecological recovery and the intelligence system and method kept

Publications (2)

Publication Number Publication Date
CN106980759A CN106980759A (en) 2017-07-25
CN106980759B true CN106980759B (en) 2018-04-13

Family

ID=59339620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710180387.7A Active CN106980759B (en) 2017-03-24 2017-03-24 A kind of large-scale mine ecological recovery and the intelligence system and method kept

Country Status (1)

Country Link
CN (1) CN106980759B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057799B (en) * 2018-07-11 2019-06-28 中国矿业大学 It is a kind of the north open coal mine water resource storage and concocting method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999059925A1 (en) * 1998-05-18 1999-11-25 Mitsuru Takasaki Method and device for cleaning water using dredged soil and method of improving dredged soil
CN100398751C (en) * 2007-06-28 2008-07-02 北京市水利科学研究所 Natural river alta-mud sandwich seepage-reducing method
CN100469975C (en) * 2004-06-30 2009-03-18 明道理 Soil and water conservation system for mountain slope
CN101970762A (en) * 2008-01-14 2011-02-09 赵乙济 Ecological restoration block
CN101663942B (en) * 2009-09-27 2011-06-22 四川大学 Moisture regulation structure for recovering vegetation in rock-soil residue field
CN203411948U (en) * 2013-08-01 2014-01-29 鸿鑫建设集团有限公司 Green ecological riverway revetment structure
CN103395888B (en) * 2013-08-23 2015-04-01 中国科学院武汉植物园 Ecological reef island and construction method thereof
CN103650968B (en) * 2013-12-15 2015-07-15 中铁西北科学研究院有限公司 Device for dibble planting of plants on side slope
CN204849680U (en) * 2015-07-21 2015-12-09 沈阳鸿润水利工程有限公司 Novel ecological shore protection system
CN106372384A (en) * 2016-08-19 2017-02-01 中国科学院遥感与数字地球研究所 Remote sensing big data-based pulsatility analysis method and apparatus for city ecological security

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2642030Y (en) * 2003-06-20 2004-09-22 柯思征 Ecotype planting container
CN1262167C (en) * 2003-06-20 2006-07-05 柯思征 Ecotype slope-style planting container
CN201104426Y (en) * 2007-06-25 2008-08-27 吴少伯 Suspended type outdoor greening system capable of implementing intelligentized management
CN204803839U (en) * 2015-07-15 2015-11-25 宋凤英 Water conservancy construction slope protection structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999059925A1 (en) * 1998-05-18 1999-11-25 Mitsuru Takasaki Method and device for cleaning water using dredged soil and method of improving dredged soil
CN100469975C (en) * 2004-06-30 2009-03-18 明道理 Soil and water conservation system for mountain slope
CN100398751C (en) * 2007-06-28 2008-07-02 北京市水利科学研究所 Natural river alta-mud sandwich seepage-reducing method
CN101970762A (en) * 2008-01-14 2011-02-09 赵乙济 Ecological restoration block
CN101663942B (en) * 2009-09-27 2011-06-22 四川大学 Moisture regulation structure for recovering vegetation in rock-soil residue field
CN203411948U (en) * 2013-08-01 2014-01-29 鸿鑫建设集团有限公司 Green ecological riverway revetment structure
CN103395888B (en) * 2013-08-23 2015-04-01 中国科学院武汉植物园 Ecological reef island and construction method thereof
CN103650968B (en) * 2013-12-15 2015-07-15 中铁西北科学研究院有限公司 Device for dibble planting of plants on side slope
CN204849680U (en) * 2015-07-21 2015-12-09 沈阳鸿润水利工程有限公司 Novel ecological shore protection system
CN106372384A (en) * 2016-08-19 2017-02-01 中国科学院遥感与数字地球研究所 Remote sensing big data-based pulsatility analysis method and apparatus for city ecological security

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
Identifying Regional Key Eco-Space to Maintain Ecological Security Using GIS;Xie, HL,et al.,;《INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH》;20140331;第11卷(第3期);2550-2568 *
宝日希勒露天矿内排土场边坡变形特征与防治措施;李林,等;;《露天采矿技术》;20090531(第5期);7-10 *
宝日希勒露天矿内排土场边坡稳定分析;李江,等;;《露天采矿技术》;20090331(第3期);29-31 *
植物固土边坡稳定基本原理的研究以及固坡植物的选择设计;宋云,;《中国优秀硕士学位论文全文数据库工程科技II辑(月刊)》;20060315(第03期);C038-170 *
石窑店煤矿水土保持及生态修复体系下植物护坡及拦渣坝稳定性研;时乐,;《中国优秀硕士学位论文全文数据库工程科技II辑(月刊)》;20111215(第S1期);C037-141 *

Also Published As

Publication number Publication date
CN106980759A (en) 2017-07-25

Similar Documents

Publication Publication Date Title
CN103039147B (en) Reclamation method for sunk paddy field caused by mining in mountainous regions
CN103806454B (en) Method for pollution control and vegetation recovery of metal sulfide ore solid waste storage yard
CN109854248B (en) Water-retaining reclamation method for strip mine
CN102792800B (en) A kind of sandwich construction Reclamation by filling method be combined with soil layer based on gangue
CN204670016U (en) A kind of saline land greening arbor pattern of farming
CN103636404B (en) Method for conversing water and earth of high-altitude large-temperature difference drought and dry-hot valley high-abrupt slope waste slag body
CN102067753B (en) Long-term governance method for converting saline-alkali soil into fertile farmland
CN204741975U (en) Planting technique structure
CN101580305B (en) Wetland governance method for improving ecological environmental in reservoir falling zone
CN110832964A (en) Building aggregate mine in-situ soil improvement and greening method
CN204220612U (en) Repair the green of heavy metals mining area soil and plant structure
CN108702890A (en) One kind being suitable for Stands in Arsenic Sandstone Area slope surface process for comprehensively treating
CN103628449A (en) Biochar grassed slope structure for coastal reclamation district channel
CN206599772U (en) A kind of cover type biological checkboard
CN104429216A (en) Filling and reclamation technology for coal gangues without being covered by surface soil
CN106980759B (en) A kind of large-scale mine ecological recovery and the intelligence system and method kept
CN205694611U (en) A kind of plantation in mining area ecosystem
CN103125296B (en) Plant water retention pit and water retention method of Yunnan phosphorite refuse dumps
CN209628177U (en) A kind of salt-soda soil corn covers husky plantation water structure
CN104186178A (en) Economical seashore saline soil greening quick planting method
CN111034549B (en) Ecological greening method for red mud disposal site
Barth et al. Soil depth requirements for revegetation of surface‐mined areas in Wyoming, Montana, and North Dakota
CN109429605A (en) A kind of salt-soda soil and desertification administering method
CN206895159U (en) A kind of saline soil area is locally isolated device
CN103650968B (en) Device for dibble planting of plants on side slope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant