CN106978865A - A kind of constructional column, which is poured, exempts from formwork prefabricated components - Google Patents
A kind of constructional column, which is poured, exempts from formwork prefabricated components Download PDFInfo
- Publication number
- CN106978865A CN106978865A CN201710410849.XA CN201710410849A CN106978865A CN 106978865 A CN106978865 A CN 106978865A CN 201710410849 A CN201710410849 A CN 201710410849A CN 106978865 A CN106978865 A CN 106978865A
- Authority
- CN
- China
- Prior art keywords
- device main
- main body
- construction
- prefabricated components
- poured
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009415 formwork Methods 0.000 title claims abstract description 26
- 238000009434 installation Methods 0.000 claims abstract description 9
- 238000007789 sealing Methods 0.000 claims description 6
- 238000010276 construction Methods 0.000 abstract description 60
- 238000000034 method Methods 0.000 abstract description 20
- 239000000463 material Substances 0.000 abstract description 12
- 230000001360 synchronised effect Effects 0.000 abstract description 9
- 239000004566 building material Substances 0.000 abstract description 8
- 239000004575 stone Substances 0.000 abstract description 8
- 239000002699 waste material Substances 0.000 abstract description 8
- 238000005516 engineering process Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 210000000746 body region Anatomy 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/64—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete
- E04B2/68—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete made by filling-up wall cavities
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/34—Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
Poured the invention discloses a kind of constructional column and exempt from formwork prefabricated components, including the first device main body, the side of first device main body is provided with the first mounting groove, and the side of first mounting groove is provided with the first installation protrusion, and the side of first device main body is provided with the second device main body.This constructional column, which is poured, exempts from formwork prefabricated components, with reference to masonry structure scantling, structural seismic performance is considered simultaneously, formed using fine-stone concrete is prefabricated, form the prefabricated components with height stack pile with building material, it is applicable to the Constructional Col-umn Construction at different wall positions, flexible combination, it is easy to operate, completely with masonry synchronous construction, later structural column template is reduced to install, the processes such as dismounting, greatly reduce construction cost, on the basis of construction quality is ensured, efficiently solve conventional Constructional Col-umn Construction complex procedures, the problems such as waste of material, greatly reduce construction cost, accelerate engineering construction progress, with good versatility.
Description
Technical field
Poured the present invention relates to constructional column and exempt from formwork technical field of prefabricated, specifically a kind of constructional column, which is poured, exempts from formwork
Prefabricated components.
Background technology
In the construction of architectural engineering masonry structure, according to《Masonry structure specification》, can be set on request in corresponding site
Constructional column, so as to reach preferable structural integrity and anti-seismic performance.Due to constructional column and material of the masonry structure for unlike material
Expect and construction technology is entirely different, generally require first bar planting(Or reserved joint bar), colligation constructional column steel reinforcement cage, masonry panel, stay
Putting horse tooth trough, constructional column model sheetinstallat, constructional column concrete placings, constructional column form removable, constructional column column cap Local treatment etc. one is
Complicated working procedure is arranged, this just badly influences masonry project integral construction quality and duration, increases material and manages into
This expense.If it is desired to improving these problems, it is necessary to improve working procedure, the technique for breaking complexity is invented a kind of constructional column and poured
Build and exempt from formwork prefabricated components, reach the construction construction work for carrying out, reducing model sheetinstallat synchronous with masonry structure construction of constructional column
Skill.
The content of the invention
Poured it is an object of the invention to provide a kind of constructional column and exempt from formwork prefabricated components, with applying for reduction model sheetinstallat
The advantage of work technique, to solve the problems mentioned in the above background technology.
To achieve the above object, the present invention provides following technical scheme:
A kind of constructional column, which is poured, exempts from formwork prefabricated components, including the first device main body, and the side of first device main body is set
There is the first mounting groove, the side of first mounting groove is provided with the first installation protrusion, and the side of first device main body is set
It is equipped with the second device main body.
It is used as further scheme of the invention:First mounting groove and the first shape for installing protrusion are coincide.
It is used as further scheme of the invention:First device main body is sealed with the second device main body splices.
It is used as further scheme of the invention:The first mounting groove and first is provided with second device main body and installs convex
Go out.
It is used as further scheme of the invention:The quantity of first device main body and the second device main body is 2.
Compared with prior art, beneficial effect of the present invention:
This constructional column, which is poured, exempts from formwork prefabricated components, is to combine masonry structure scantling, while considering structural seismic performance, adopts
Formed with fine-stone concrete is prefabricated, formed with building material with the prefabricated components of height stack pile, be applicable to different wall positions
Constructional Col-umn Construction, it is flexible combination, easy to operate, completely with masonry synchronous construction, reduce later structural column template and install, remove etc.
Process, greatly reduces construction cost, on the basis of construction quality is ensured, efficiently solves conventional Constructional Col-umn Construction process and answers
The problems such as miscellaneous, waste of material, construction cost is greatly reduced, engineering construction progress is accelerated, with good versatility.
Brief description of the drawings
Fig. 1 is the structure chart of embodiments of the invention one;
Fig. 2 is the structure chart of embodiments of the invention two;
Fig. 3 is the structure chart of embodiments of the invention three;
Fig. 4 is the structure chart of embodiments of the invention four;
Fig. 5 is the structure chart of embodiments of the invention five;.
In figure:1- first installs protrusion;The mounting grooves of 2- first;The device main bodies of 3- first;The device main bodies of 4- second;5- the 3rd
Device main body;6- four device main bodys;The device main bodies of 7- the 5th;The device main bodies of 8- the 6th;The device main bodies of 9- the 7th;10- the 8th
Device main body;The device main bodies of 11- the 9th;The device main bodies of 12- the tenth;The device main bodies of 13- the 11st.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made
Embodiment, belongs to the scope of protection of the invention.
Referring to Fig. 1, embodiment one, a kind of constructional column, which is poured, exempts from formwork prefabricated components, including the first device main body 3, the
The side of one device main body 3 is provided with the first mounting groove 2, and the side of the first mounting groove 2 is provided with the first installation protrusion 1, first
The shape that mounting groove 2 and first installs protrusion 1 is coincide, and the side of the first device main body 3 is provided with the second device main body 4, first
The first mounting groove 2 and first is provided with the sealing splicing of the device main body 4 of device main body 3 and second, the second device main body 4 and installs convex
Go out 1, the quantity of the first device main body 3 and the second device main body 4 is 2, and this constructional column, which is poured, exempts from formwork prefabricated components, be to combine to build
Body structural material size, while considering structural seismic performance, is formed using fine-stone concrete is prefabricated, is formed same with height with building material
The prefabricated components of thickness, are applicable to the Constructional Col-umn Construction at different wall positions, flexible combination, easy to operate, completely and masonry
Synchronous construction, reduces the processes such as the installation of later structural column template, dismounting, greatly reduces construction cost, is ensureing construction quality
On the basis of, the problems such as efficiently solving conventional Constructional Col-umn Construction complex procedures, waste of material greatly reduces construction cost,
Engineering construction progress is accelerated, with good versatility.
Referring to Fig. 2, embodiment two, a kind of constructional column, which is poured, exempts from formwork prefabricated components, including the 3rd device main body 5, the
The side of three device main bodies 5 is provided with the first mounting groove 2, and the side of the first mounting groove 2 is provided with the first installation protrusion 1, first
The shape that mounting groove 2 and first installs protrusion 1 is coincide, and the side of the 3rd device main body 5 is provided with four device main body 6, the 3rd
Device main body 5 and the sealing of four device main body 6 are spliced, and the first mounting groove 2 and first is provided with four device main body 6 and installs convex
Go out 1, this constructional column, which is poured, exempts from formwork prefabricated components, be to combine masonry structure scantling, while considering structural seismic performance, adopt
Formed with fine-stone concrete is prefabricated, formed with building material with the prefabricated components of height stack pile, be applicable to different wall positions
Constructional Col-umn Construction, it is flexible combination, easy to operate, completely with masonry synchronous construction, reduce later structural column template and install, remove etc.
Process, greatly reduces construction cost, on the basis of construction quality is ensured, efficiently solves conventional Constructional Col-umn Construction process and answers
The problems such as miscellaneous, waste of material, construction cost is greatly reduced, engineering construction progress is accelerated, with good versatility.
Referring to Fig. 3, embodiment three, a kind of constructional column, which is poured, exempts from formwork prefabricated components, including the 5th device main body 7, the
The side of five device main bodies 7 is provided with the first mounting groove 2, and the side of the first mounting groove 2 is provided with the first installation protrusion 1, first
The shape that mounting groove 2 and first installs protrusion 1 is coincide, and the side of the 5th device main body 7 is provided with the 6th device main body 8, the 5th
The first mounting groove 2 and first is provided with the sealing splicing of the device main body 8 of device main body 7 and the 6th, the 6th device main body 8 and installs convex
Go out 1, this constructional column, which is poured, exempts from formwork prefabricated components, be to combine masonry structure scantling, while considering structural seismic performance, adopt
Formed with fine-stone concrete is prefabricated, formed with building material with the prefabricated components of height stack pile, be applicable to different wall positions
Constructional Col-umn Construction, it is flexible combination, easy to operate, completely with masonry synchronous construction, reduce later structural column template and install, remove etc.
Process, greatly reduces construction cost, on the basis of construction quality is ensured, efficiently solves conventional Constructional Col-umn Construction process and answers
The problems such as miscellaneous, waste of material, construction cost is greatly reduced, engineering construction progress is accelerated, with good versatility.
Referring to Fig. 4, example IV, a kind of constructional column, which is poured, exempts from formwork prefabricated components, including the 7th device main body 9, the
The side of seven device main bodies 9 is provided with the first mounting groove 2, and the side of the first mounting groove 2 is provided with the first installation protrusion 1, first
The shape that mounting groove 2 and first installs protrusion 1 is coincide, and the side of the 7th device main body 9 is provided with the 8th device main body 10, the 7th
The first mounting groove 2 and first is provided with the sealing splicing of the device main body 10 of device main body 9 and the 8th, the 8th device main body 10 to install
Protrusion 1, this constructional column, which is poured, exempts from formwork prefabricated components, is to combine masonry structure scantling, while consider structural seismic performance,
Formed using fine-stone concrete is prefabricated, formed with building material with the prefabricated components of height stack pile, be applicable to different wall positions
Constructional Col-umn Construction, it is flexible combination, easy to operate, completely with masonry synchronous construction, reduce later structural column template and install, remove
Etc. process, construction cost is greatly reduced, on the basis of construction quality is ensured, conventional Constructional Col-umn Construction process is efficiently solved
The problems such as complexity, waste of material, construction cost is greatly reduced, engineering construction progress is accelerated, with good versatility.
Referring to Fig. 5, embodiment five, a kind of constructional column, which is poured, exempts from formwork prefabricated components, including the 9th device main body 11, the
The side of nine device main bodies 11 is provided with the first mounting groove 2, and the side of the first mounting groove 2 is provided with the first installation protrusion 1, first
The shape that mounting groove 2 and first installs protrusion 1 is coincide, and the side of the 9th device main body 11 is provided with the tenth device main body 12, the
The side of ten device main bodies 12 is provided with the 11st device main body 13, the 9th device main body 11, the tenth device main body 12 and the tenth
The sealing splicing of one device main body 13, the first mounting groove 2 and the are provided with the tenth device main body 12 and the 11st device main body 13
One installs protrusion 1, and this constructional column, which is poured, exempts from formwork prefabricated components, is to combine masonry structure scantling, while considering that structure resists
Shock stability, is formed using fine-stone concrete is prefabricated, is formed with building material with the prefabricated components of height stack pile, is applicable to different walls
The Constructional Col-umn Construction of body region, it is flexible combination, easy to operate, completely with masonry synchronous construction, reduce later structural column template peace
The processes such as dress, dismounting, greatly reduce construction cost, on the basis of construction quality is ensured, efficiently solve conventional constructional column
The problems such as working procedure complexity, waste of material, construction cost is greatly reduced, engineering construction progress is accelerated, with good
Versatility.
In summary:This constructional column, which is poured, exempts from formwork prefabricated components, is to combine masonry structure scantling, while considering knot
Structure anti-seismic performance, is formed using fine-stone concrete is prefabricated, is formed with building material with the prefabricated components of height stack pile, is applicable to not
It is flexible combination, easy to operate with the Constructional Col-umn Construction at wall position, completely with masonry synchronous construction, reduce later structural post mould
The processes such as plate is installed, dismounting, greatly reduce construction cost, on the basis of construction quality is ensured, efficiently solve conventional structure
The problems such as making complicated post working procedure, waste of material, greatly reduces construction cost, engineering construction progress is accelerated, with good
Good versatility.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie
In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power
Profit is required rather than described above is limited, it is intended that all in the implication and scope of the equivalency of claim by falling
Change is included in the present invention.Any reference in claim should not be considered as to the claim involved by limitation.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped
Containing an independent technical scheme, this narrating mode of specification is only that for clarity, those skilled in the art should
Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
It may be appreciated other embodiment.
Claims (5)
1. a kind of constructional column, which is poured, exempts from formwork prefabricated components, including the first device main body(3), it is characterised in that:First device
Part main body(3)Side be provided with the first mounting groove(2), first mounting groove(2)Side be provided with the first installation protrusion
(1), first device main body(3)Side be provided with the second device main body(4).
2. a kind of constructional column according to claim 1, which is poured, exempts from formwork prefabricated components, it is characterised in that:Described first installs
Groove(2)Install and protrude with first(1)Shape coincide.
3. a kind of constructional column according to claim 1, which is poured, exempts from formwork prefabricated components, it is characterised in that:First device
Main body(3)With the second device main body(4)Sealing splicing.
4. a kind of constructional column according to claim 1, which is poured, exempts from formwork prefabricated components, it is characterised in that:Second device
Main body(4)On be provided with the first mounting groove(2)Protrusion is installed with first(1).
5. a kind of constructional column according to claim 1, which is poured, exempts from formwork prefabricated components, it is characterised in that:First device
Main body(3)With the second device main body(4)Quantity be 2.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710410849.XA CN106978865A (en) | 2017-06-04 | 2017-06-04 | A kind of constructional column, which is poured, exempts from formwork prefabricated components |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710410849.XA CN106978865A (en) | 2017-06-04 | 2017-06-04 | A kind of constructional column, which is poured, exempts from formwork prefabricated components |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106978865A true CN106978865A (en) | 2017-07-25 |
Family
ID=59343285
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710410849.XA Pending CN106978865A (en) | 2017-06-04 | 2017-06-04 | A kind of constructional column, which is poured, exempts from formwork prefabricated components |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106978865A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111002432A (en) * | 2019-07-01 | 2020-04-14 | 中国二十冶集团有限公司 | Prefabricated constructional column template and using method thereof |
CN113047507A (en) * | 2021-03-30 | 2021-06-29 | 西北民族大学 | Self-compacting light concrete heat-insulation constructional column formwork building block and construction method thereof |
CN114961105A (en) * | 2022-06-20 | 2022-08-30 | 中国一冶集团有限公司 | Constructional column formwork-free prefabricated part and construction method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES1017171U (en) * | 1991-04-15 | 1991-12-16 | Iraolagoitia Ugalde Sixto | Formwork plate for the construction of pillars and the like. (Machine-translation by Google Translate, not legally binding) |
CN103422606A (en) * | 2013-08-14 | 2013-12-04 | 歌山建设集团有限公司 | Structural column erecting-free block and construction method thereof |
CN204174820U (en) * | 2014-09-03 | 2015-02-25 | 中国建筑第四工程局有限公司 | The building block of a kind of constructional column template |
CN204370660U (en) * | 2014-11-08 | 2015-06-03 | 昆山通海建材科技有限公司 | Interlocking grass-planting brick |
CN205062600U (en) * | 2015-09-29 | 2016-03-02 | 安徽华普节能材料股份有限公司 | Brick body permeates water on road surface |
CN106049217A (en) * | 2016-06-16 | 2016-10-26 | 昆山通海建材科技有限公司 | Assembly type permeable pavement paving c, block bodies and paving structure |
CN206752755U (en) * | 2017-06-04 | 2017-12-15 | 中国建筑第七工程局有限公司 | A kind of constructional column, which pours, exempts from formwork prefabricated components |
-
2017
- 2017-06-04 CN CN201710410849.XA patent/CN106978865A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES1017171U (en) * | 1991-04-15 | 1991-12-16 | Iraolagoitia Ugalde Sixto | Formwork plate for the construction of pillars and the like. (Machine-translation by Google Translate, not legally binding) |
CN103422606A (en) * | 2013-08-14 | 2013-12-04 | 歌山建设集团有限公司 | Structural column erecting-free block and construction method thereof |
CN204174820U (en) * | 2014-09-03 | 2015-02-25 | 中国建筑第四工程局有限公司 | The building block of a kind of constructional column template |
CN204370660U (en) * | 2014-11-08 | 2015-06-03 | 昆山通海建材科技有限公司 | Interlocking grass-planting brick |
CN205062600U (en) * | 2015-09-29 | 2016-03-02 | 安徽华普节能材料股份有限公司 | Brick body permeates water on road surface |
CN106049217A (en) * | 2016-06-16 | 2016-10-26 | 昆山通海建材科技有限公司 | Assembly type permeable pavement paving c, block bodies and paving structure |
CN206752755U (en) * | 2017-06-04 | 2017-12-15 | 中国建筑第七工程局有限公司 | A kind of constructional column, which pours, exempts from formwork prefabricated components |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111002432A (en) * | 2019-07-01 | 2020-04-14 | 中国二十冶集团有限公司 | Prefabricated constructional column template and using method thereof |
CN113047507A (en) * | 2021-03-30 | 2021-06-29 | 西北民族大学 | Self-compacting light concrete heat-insulation constructional column formwork building block and construction method thereof |
CN114961105A (en) * | 2022-06-20 | 2022-08-30 | 中国一冶集团有限公司 | Constructional column formwork-free prefabricated part and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106978865A (en) | A kind of constructional column, which is poured, exempts from formwork prefabricated components | |
CN103374880B (en) | The connecting structure of a kind of precast pier and cushion cap and dock construction method thereof | |
CN108240041A (en) | A kind of bean column node reinforcing bar avoiding structure and its construction method | |
CN203200760U (en) | Detachable prestress support frame system | |
CN105350639B (en) | A kind of facade intersects grid structure peripheral frame and its installation method | |
CN204983662U (en) | To drawing screw rod and steel pipe framed bent combination unilateral formwork device | |
CN214739251U (en) | Assembled combination tie-beam window opening component and connection structure thereof | |
CN107178209A (en) | A kind of constructional column and agent structure integrated construction method | |
CN104153486A (en) | Precast concrete wall component and connecting method | |
CN206752755U (en) | A kind of constructional column, which pours, exempts from formwork prefabricated components | |
CN103696564A (en) | Novel construction joint formwork | |
CN108222283A (en) | A kind of flexible connecting structure and its construction method for filling wall and main body frame | |
CN202247903U (en) | Soft stratum open-cut tunnel with deformation joints having anti-shearing functions | |
CN204715764U (en) | The structure that a kind of constructional column and agent structure are constructed simultaneously | |
CN216276904U (en) | Irregular polygon post formwork structure | |
CN206245480U (en) | A kind of flat post steel frame supporting structure system of prefabrication and assembly construction | |
CN210002951U (en) | integrally-installed house system with concrete structure steel bar templates | |
CN104264668B (en) | Stake mould of X-shaped Model Pile and preparation method thereof | |
CN205712473U (en) | A kind of PC beam column node connection device | |
CN205742988U (en) | The explosion-proof membrane module of template one word piece | |
CN206987196U (en) | A kind of embedded combined type exempts from formwork end structure post | |
CN105804086A (en) | Construction method for support change joints in foundation trench reverse building method construction | |
CN210562835U (en) | Steel bar formwork integrated L-shaped wall component | |
CN211257292U (en) | T-shaped corner joint of assembled wall | |
CN206987109U (en) | A kind of embedded combined type exempts from formwork crisscross configuration post |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |