CN106950461A - Non-Destructive Testing formula power monitoring equipment, system and method - Google Patents

Non-Destructive Testing formula power monitoring equipment, system and method Download PDF

Info

Publication number
CN106950461A
CN106950461A CN201710317587.2A CN201710317587A CN106950461A CN 106950461 A CN106950461 A CN 106950461A CN 201710317587 A CN201710317587 A CN 201710317587A CN 106950461 A CN106950461 A CN 106950461A
Authority
CN
China
Prior art keywords
voltage value
processor
concentrator
voltage
destructive testing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710317587.2A
Other languages
Chinese (zh)
Inventor
樊明延
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Thinking Technology Co Ltd
Original Assignee
Beijing Thinking Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Thinking Technology Co Ltd filed Critical Beijing Thinking Technology Co Ltd
Priority to CN201710317587.2A priority Critical patent/CN106950461A/en
Publication of CN106950461A publication Critical patent/CN106950461A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

The present invention provides a kind of Non-Destructive Testing formula power monitoring equipment, system and method.The Non-Destructive Testing formula power monitoring equipment that the present invention is provided includes:Multiturn spiral induction coil, AD sampling modules and processor, multiturn spiral induction coil are used for the power line for being wrapped in electrical equipment, and the first end of multiturn spiral induction coil is connected with AD sampling modules, and AD sampling modules are also connected with processor;Multiturn spiral induction coil is used for the power frequency electromagnetic field of induction power supply line;Processor is used to control AD sampling modules to collect the corresponding first voltage value of power frequency electromagnetic field and obtain first voltage value, and judges whether power line there occurs failure according to the relation of first voltage value and preset voltage value.Non-Destructive Testing formula power monitoring equipment that the present invention is provided, system and method, realize the working condition of power line is effectively monitored while, it is ensured that the safe class of supply line and the integrality of power line, improve the satisfaction of user.

Description

Non-Destructive Testing formula power monitoring equipment, system and method
Technical field
The present invention relates to electric power monitoring technology, more particularly to a kind of Non-Destructive Testing formula power monitoring equipment, system and method.
Background technology
At present, internet of things sensors monitoring is generally the ambient parameters, above-mentioned ambient parameter such as temperature, humidity, air quality Whether it is up to standard be by air conditioner, take out the environment maintenance equipment such as dehumidifier, air purifier or exhaust pump determine, therefore ensure The normally operation of environment maintenance equipment is significant.Normal power supply to environment maintenance equipment is to ensure environmental unit just The primary factor often run, it is therefore desirable to which electric power monitoring is carried out to environment maintenance equipment.Wherein, electric power monitoring refers to detect environment The power line of maintained equipment whether normal work.
The electric power monitoring of prior art is mainly using online monitoring and transformer monitoring.Online monitoring is in power line Upper series connection measuring apparatus is monitored, and transformer monitoring is mainly inserted on the live wire of power line using mutual inductor to be supervised Survey.Online monitoring is due to measuring apparatus of being connected on circuit, if measuring apparatus failure can cause the entirety of environment maintenance equipment Line fault, reduces the safe class of overall circuit, it is impossible to apply the occasion in high safety grade.Transformer is monitored due to mutual The live wire that sense coil can only be individually inserted on power line could effectively, so needing the power supply that live wire and zero line are packaged together Line is splitted, and transformer is individually enclosed within live wire, and such occupation mode user is usually unacceptable.
The content of the invention
The present invention provides a kind of Non-Destructive Testing formula power monitoring equipment, system and method, to realize that Non-Destructive Testing electricity consumption is set Standby power line whether the purpose of normal work.
The present invention provides a kind of Non-Destructive Testing formula power monitoring equipment, including:Multiturn spiral induction coil, AD sampling modules And processor, power line of the multiturn spiral induction coil for being wrapped in electrical equipment, the multiturn spiral line of induction The first end of circle is connected with the AD sampling modules, and the AD sampling modules are also connected with the processor;
The multiturn spiral induction coil is used for the power frequency electromagnetic field for sensing the power line;
The processor is used to control the AD sampling modules to collect the corresponding first voltage of the power frequency electromagnetic field It is worth and obtains the first voltage value, and the power line is judged according to the relation of the first voltage value and preset voltage value Whether failure there occurs.
Device as described above, the Non-Destructive Testing formula power monitoring equipment also includes earthing module.
Device as described above, the Non-Destructive Testing formula power monitoring equipment also includes detection rectification module, the detection One end of rectification module is connected with the first end of the multiturn spiral induction coil, the other end of the detection rectification module and institute State the connection of AD sampling modules.
Device as described above, the detection rectification module includes the first detector diode, the second detector diode, filtering Electric capacity and voltage-regulator diode;
Wherein, the positive pole of first detector diode is connected with the first end of the multiturn spiral induction coil, described The negative pole of first detector diode and the negative pole of second detector diode, one end of the filter capacitor, the voltage stabilizing two The negative pole of pole pipe is connected in the first tie point;The AD sampling modules are connected with first tie point;
The positive pole of the positive pole of second detector diode, the other end of the filter capacitor and the voltage-regulator diode is equal Ground connection.
Device as described above, the Non-Destructive Testing formula power monitoring equipment also includes power module and radio communication mold Block, the power module and the wireless communication module are connected with the processor.
Device as described above, the earthing module includes magnet, housing of the magnet adsorption in the electrical equipment Go up and be grounded.
The present invention also provides a kind of Non-Destructive Testing formula power monitoring system, including:Concentrator is as described above with least one Non-Destructive Testing formula power monitoring equipment, each electrical equipment is correspondingly arranged a Non-Destructive Testing formula power monitoring equipment, Each Non-Destructive Testing formula power monitoring equipment and the concentrator wireless connection;
The processor of the Non-Destructive Testing formula power monitoring equipment is additionally operable to send first voltage value to the concentrator; The electrical equipment that the first voltage value senses for the multiturn spiral induction coil of the Non-Destructive Testing formula power monitoring equipment The corresponding magnitude of voltage of power frequency electromagnetic field of power line;
The concentrator is used for the power supply that electrical equipment is judged according to the relation of the first voltage value and preset voltage value Whether line there occurs failure.
System as described above, the power monitoring system also includes remote control equipment, the remote control equipment with The concentrator wireless connection, the remote control equipment is used for the power frequency electromagnet for receiving each power line that the concentrator is sent The working condition of each self-corresponding first voltage value in field and each power line, so that working condition of the user to each power line Carry out remote monitoring.
System as described above, the processor specifically for,
Judge whether to receive the response message of the concentrator in the first preset duration, the response message is used to refer to Show that the concentrator have received the first voltage value that the processor is sent;
If so, control AD sampling modules stop collection voltages value and control the processor to enter resting state;In warp Go through after the second preset duration, control the processor to enter working condition and control the AD sampling modules to resurvey voltage Value;
If it is not, resending the first voltage using the corresponding frequency hopping channel of multiple modules of the concentrator successively Value, until the number of times for the response message or the transmission first voltage value for receiving the concentrator transmission reaches preset times, Control AD sampling modules stop collection voltages value and control process device enters resting state;Undergoing second preset duration Afterwards, control process device enters working condition and controls the AD sampling modules to resurvey magnitude of voltage.
The present invention also provides a kind of method of Non-Destructive Testing formula electric power monitoring, including:
Processor control AD sampling module collection first voltage values, the first voltage value is multiturn spiral induction coil sense The corresponding magnitude of voltage of power frequency electromagnetic field of the power line for the electrical equipment answered;The multiturn spiral induction coil is used to be wrapped in use On the power line of electric equipment;
The processor obtains the first voltage value, and judges institute according to the relation of first voltage value and preset voltage value State whether power line there occurs failure.
Method as described above, the processor also includes after the first voltage value is obtained:
The processor sends the first voltage value to concentrator so that concentrator according to the first voltage value with The relation of preset voltage value judges whether the power line there occurs failure.
Method as described above, the processor sends to concentrator by the first voltage value, also included:
The processor judges the response message of the concentrator, the response whether are received in the first preset duration Message is used to indicate that the concentrator have received the first voltage value that the processor is sent;
If so, the processor control AD sampling modules stop collection voltages value and control the processor to enter dormancy State;After the second preset duration is undergone, control the processor to enter working condition and control the AD sampling modules weight New collection voltages value;
If it is not, resending the first voltage using the corresponding frequency hopping channel of multiple modules of the concentrator successively Value, until the number of times for the response message or the transmission first voltage value for receiving the concentrator transmission reaches preset times, Control AD sampling modules stop collection voltages value and control process device enters resting state;Undergoing second preset duration Afterwards, control process device enters working condition and controls the AD sampling modules to resurvey magnitude of voltage.
The present invention provides a kind of Non-Destructive Testing formula power monitoring equipment, system and method.The Non-Destructive Testing that the present invention is provided Formula power monitoring equipment includes:Multiturn spiral induction coil, AD sampling modules and processor, multiturn spiral induction coil are used to twine It is wound on the power line of electrical equipment, the first end of multiturn spiral induction coil is connected with AD sampling modules, and AD sampling modules are also It is connected with processor;Multiturn spiral induction coil is used for the power frequency electromagnetic field of induction power supply line;Processor is used to control AD to sample Module collects the corresponding first voltage value of power frequency electromagnetic field and obtains first voltage value, and according to first voltage value and in advance If the relation of magnitude of voltage judges whether power line there occurs failure.Non-Destructive Testing formula power monitoring equipment that the present invention is provided, it is System and method, while realization is effectively monitored to the working condition of power line, it is ensured that the safe class of supply line And the integrality of power line, improve the satisfaction of user.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are this hairs Some bright embodiments, for those of ordinary skill in the art, without having to pay creative labor, can be with Other accompanying drawings are obtained according to these accompanying drawings.
The structural representation one for the Non-Destructive Testing formula power monitoring equipment that Fig. 1 provides for the present invention;
The schematic diagram that Fig. 2 is wound on the power line for the multiturn spiral induction coil that the present invention is provided;
The structural representation two for the Non-Destructive Testing formula power monitoring equipment that Fig. 3 provides for the present invention;
The structural representation for the detection rectification module that Fig. 4 provides for the present invention;
The structural representation three for the Non-Destructive Testing formula power monitoring equipment that Fig. 5 provides for the present invention;
The structural representation one for the Non-Destructive Testing formula power monitoring system that Fig. 6 provides for the present invention;
The structural representation two for the Non-Destructive Testing formula power monitoring system that Fig. 7 provides for the present invention;
The schematic flow sheet one for the Non-Destructive Testing formula electric power monitoring method that Fig. 8 provides for the present invention;
The schematic flow sheet two for the Non-Destructive Testing formula electric power monitoring method that Fig. 9 provides for the present invention.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art The every other embodiment obtained under the premise of creative work is not made, belongs to the scope of protection of the invention.
The structural representation one for the Non-Destructive Testing formula power monitoring equipment that Fig. 1 provides for the present invention, Fig. 2 provides for the present invention The schematic diagram that winds on the power line of multiturn spiral induction coil;Referring to Fig. 1~2, the power monitoring equipment bag of the present embodiment Include:
Non-Destructive Testing formula power monitoring equipment includes multiturn spiral induction coil 11, AD sampling modules 12 and processor 13, Multiturn spiral induction coil 11 is used for the power line 21 for being wrapped in electrical equipment, one end of multiturn spiral induction coil 11 and AD Sampling module 12 is connected, and AD sampling modules 12 are also connected with processor 13;
Multiturn spiral induction coil 11 is used for the power frequency electromagnetic field of induction power supply line;
Processor 13 is used to control AD sampling modules 12 to collect the corresponding first voltage value of power frequency electromagnetic field and obtain First voltage value is taken, and judges whether power line 21 there occurs failure according to the relation of first voltage value and preset voltage value.
Specifically, Non-Destructive Testing formula power monitoring equipment includes multiturn spiral induction coil 11, AD sampling modules 12 and place Device 13 is managed, multiturn spiral induction coil 11 is used for the power line 21 for being wrapped in electrical equipment, multiturn spiral induction coil 11 One end 31 is connected with AD sampling modules 12, and AD sampling modules 12 are also connected with processor 13.
The workflow to the Non-Destructive Testing formula power monitoring equipment of the present embodiment is illustrated below.
Multiturn spiral induction coil 11 is wrapped on the power line 21 of electrical equipment, and sensing obtains the power frequency electric of power line 21 The corresponding analog voltage signal in magnetic field;The corresponding voltage analog signal of the collection power frequency electromagnetic field of AD sampling modules 12, and will simulation Voltage signal changes into digital voltage signal, that is, specific magnitude of voltage, referred to herein as first voltage value.Then AD sample mould Block 12 will collect first voltage value and send to processor 13, and processor 13 receives first voltage value, according to first voltage value Judge whether power line 21 there occurs failure with the relation of preset voltage value;Wherein, the collection of AD sampling modules 12 power frequency electromagnetic field The opportunity of corresponding voltage analog signal is controlled by processor 13.Be stored with preset voltage value, processor in processor 13 13 are compared first voltage value and preset voltage value, if first voltage value is more than or equal to preset voltage value, illustrate power line 21 normal works;If first voltage value is less than preset voltage value, illustrate the cisco unity malfunction of power line 21, the control report of processor 13 Alert unit is alarmed, and alarm unit can be integrated in the inside of processor 13, can also be arranged on the outside of processor 13, is made For a part of Non-Destructive Testing formula power monitoring equipment.
Wherein, the power line 21 in the present embodiment can be that live wire, zero line and ground wire are encapsulated into bundles of power line, multiturn spiral shell It is the power frequency electromagnetic field between the live wire and ground in power line to revolve the power frequency electromagnetic field of the sensing of induction coil 11.
Because the field intensity of the power frequency electromagnetic field between live wire and ground is faint, so needing to take what the spiral line of induction was wound The mode of " tight " coupling increases the degree of coupling, that is, spiral induction coil needs to use multiturn.In addition, spiral induction coil The number of turn is more, and induction field is stronger, and circle is embodied preferably more than 15 circles in the number of turn of the present embodiment multiturn spiral induction coil Number can select the numbers of turn such as 15,20,25,30,35,50.Table 1 is in power line normal work, using the spiral sense of the different numbers of turn The magnitude of voltage that AD sampling modules are collected when answering coil.
Table 1, using the different numbers of turn spiral induction coil when the magnitude of voltage that collects of AD sampling modules
The spiral number of turn (number of turn) 5 10 15 20 25 30 35 50
Induced voltage (millivolt) 234 400 590 700 715 753 760 783
It will be appreciated by persons skilled in the art that when the number of turn of the spiral induction coil of use is differed, memory The value of the predeterminated voltage of memory storage is differed.
The signal of the power frequency electromagnetic field between live wire and ground in order to strengthen the sensing of multiturn spiral induction coil, Non-Destructive Testing Formula power monitoring equipment also includes earthing module (not shown).Earthing module includes magnet, and magnet adsorption is in electrical equipment Housing on and be grounded, or earthing module includes long line, long line ground connection.It will be appreciated by persons skilled in the art that this The mode that earthing module can be realized simply is show schematically in embodiment, the implementation of earthing module can also be used It is not construed as limiting in other implementations, the present embodiment.
The power frequency electric sensed on the power line between live wire and ground is wound in the present embodiment using multiturn spiral induction coil Magnetic field, is not the device of the corresponding voltage signal of series connection measurement power frequency electromagnetic field in the supply line of original user equipment, keeps away The reduction for the safe class to bulk supply circuit that measurement apparatus failure is caused is exempted from, it is ensured that safety of supply line etc. Level;Splitted also without by power line, it is ensured that the integrality of power line, improve the satisfaction of user.
The Non-Destructive Testing formula power monitoring equipment of the present embodiment includes:Multiturn spiral induction coil, AD sampling modules and place Device is managed, multiturn spiral induction coil is used for the power line for being wrapped in electrical equipment, one end of multiturn spiral induction coil and AD Sampling module is connected, and AD sampling modules are also connected with processor;Multiturn spiral induction coil is used for the power frequency electric of induction power supply line Magnetic field;Processor is used to control AD sampling modules to collect the corresponding first voltage value of power frequency electromagnetic field and obtain the first electricity Pressure value, and judge whether power line there occurs failure according to the relation of first voltage value and preset voltage value.This implementation it is lossless Detection formula power monitoring equipment is while realization is effectively monitored to the working condition of power line, it is ensured that supply line The integrality of safe class and power line, improves the satisfaction of user.
In order to protect AD sampling modules, the Non-Destructive Testing formula power monitoring equipment of the present embodiment is on the basis of a upper embodiment On improved.The structural representation two for the Non-Destructive Testing formula power monitoring equipment that Fig. 3 provides for the present invention, Fig. 4 is this hair The structural representation of the detection rectification module of bright offer.Referring to Fig. 3~4, the Non-Destructive Testing formula power monitoring equipment of the present embodiment Also include:Detection rectification module 14, one end of detection rectification module 14 is connected with one end 31 of multiturn spiral induction coil 11, inspection 14 other ends of ripple rectification module are connected with AD sampling modules 12.
Specifically, referring to Fig. 4, the detection rectification module 14 of this implementation includes the first detector diode 141, the second detection two Pole pipe 142, filter capacitor 143 and voltage-regulator diode 144;The positive pole of first detector diode 141 and multiturn spiral induction coil 11 one end 31 is connected, the negative pole of the negative pole of the first detector diode 141 and the second detector diode 142, filter capacitor 143 One end, the negative pole of voltage-regulator diode 144 are connected in the first tie point 145;AD sampling modules 12 are connected with the first tie point 145; The positive pole of the positive pole of second detector diode 142, the other end of filter capacitor 143 and voltage-regulator diode 144 is grounded.
Wherein, the first detector diode 141, the second detector diode 142 play a part of filtering clutter, filter capacitor 143 play a part of filtering high fdrequency component, and voltage-regulator diode 144 plays a part of voltage-limiting protection, so that AD sampling modules 12 are adopted Collect obtained magnitude of voltage not over the magnitude of voltage that it can bear.
The Non-Destructive Testing formula power monitoring equipment of the present embodiment can protect A/D module just by setting detection rectification module Often work.
In order that obtaining electric force monitoring apparatus can easily set on a user device and can be carried out with external equipment Radio communication, the Non-Destructive Testing formula power monitoring equipment of the present embodiment is improved on the basis of above-described embodiment.Fig. 5 is The structural representation three for the Non-Destructive Testing formula power monitoring equipment that the present invention is provided, referring to Fig. 5, the Non-Destructive Testing formula of the present embodiment Power monitoring equipment also includes power module 15 and wireless communication module 16, power module 15 and wireless communication module 16 with place Reason device 13 is connected.
Specifically, the power module 15 of this implementation is preferred to use battery.The Non-Destructive Testing formula electric power monitoring dress of the present embodiment Put and be integrated with power module without powering using external power supply, can make it that Non-Destructive Testing formula power monitoring equipment is flexible Disposed in electrical equipment.
Non-Destructive Testing formula power monitoring equipment in the present embodiment is by setting power module and wireless communication module so that Electric force monitoring apparatus can easily set on a user device and can carry out radio communication with external equipment.
In order to manage each Non-Destructive Testing formula power monitoring equipment concentratedly, present invention also offers a kind of Non-Destructive Testing formula Power monitoring system.The structural representation one for the Non-Destructive Testing formula power monitoring system that Fig. 6 provides for the present invention.Referring to Fig. 6, sheet The power monitoring system of embodiment includes:The Non-Destructive Testing formula electricity corresponding with least one such as above-mentioned any embodiment of concentrator 2 Power monitoring device 1, each electrical equipment is correspondingly arranged a Non-Destructive Testing formula power monitoring equipment 1, each Non-Destructive Testing formula electric power Monitoring device 1 and the wireless connection of concentrator 2.
The processor 13 of Non-Destructive Testing formula power monitoring equipment 1 is additionally operable to send first voltage value to concentrator 2;First The power frequency of the power line for the electrical equipment that magnitude of voltage senses for the multiturn spiral induction coil of Non-Destructive Testing formula power monitoring equipment The corresponding magnitude of voltage of electromagnetic field;
Concentrator is used to judge whether the power line of electrical equipment is sent out according to the relation of first voltage value and preset voltage value Failure is given birth to.
Specifically, the Non-Destructive Testing formula power monitoring system of the present embodiment includes concentrator 2 and at least one Non-Destructive Testing Formula power monitoring equipment 1, each electrical equipment is correspondingly arranged a Non-Destructive Testing formula power monitoring equipment 1, that is to say, that one Non-Destructive Testing formula power monitoring equipment 1 is used to carry out electric power monitoring to the power line of an electrical equipment.It is stored with concentrator 2 The parameters such as title, model and the performance indications of each electrical equipment.
Non-Destructive Testing formula power monitoring equipment 1 in the present embodiment can be the Non-Destructive Testing formula electricity in any of the above-described embodiment Repeated no more in power monitoring device, the present embodiment.
For the processor in Non-Destructive Testing formula power monitoring equipment 1, it collects work except control AD sampling modules The corresponding first voltage value of frequency electromagnetic field and acquisition first voltage value, and according to first voltage value and the relation of preset voltage value Judge whether power line there occurs outside failure, first voltage value can also be sent to concentrator, so that concentrator is used for basis First voltage value and the relation of preset voltage value judge whether the power line of electrical equipment there occurs failure.
Wherein, be stored with preset voltage value in concentrator 2, and concentrator 2 is compared first voltage value with preset voltage value Compared with, if first voltage value illustrates power line cisco unity malfunction corresponding with the first voltage value less than preset voltage value, concentration Device 2 is alarmed and the title of the corresponding user equipment of the power line is shown in the corresponding user interface of concentrator 2, so that management is used Learn which power line occurs in that failure in family;If first voltage value is more than or equal to preset voltage value, illustrate and the first voltage It is worth corresponding power line normal work.
Below to a kind of specific working method of the processor of the Non-Destructive Testing formula power monitoring equipment in the present embodiment It is described in detail.
Processor by working condition-resting state alternately in the way of be operated.
In a working condition-in the resting state cycle, processor controls AD sampling modules collection the in the operating condition One magnitude of voltage, and first voltage value is obtained, judge whether power line occurs according to the relation of first voltage value and preset voltage value Failure;Meanwhile, processor is acquiring first voltage value, and first voltage value is sent to concentrator.
First voltage value is sent to concentrator in processor, judges concentration whether is received in the first preset duration The response message of device, response message is used for the first voltage value for indicating that concentrator have received processor transmission.
If receiving the response message of concentrator in the first preset duration, processor control AD sampling modules stop collection Magnitude of voltage and control itself to enter resting state;Undergo the second preset duration after, control itself enter working condition and Control AD sampling modules resurvey magnitude of voltage;
If not receiving the response message of concentrator in the first preset duration, multiple modules of concentrator are used successively Corresponding frequency hopping channel resends first voltage value, until receiving the response message of concentrator transmission or sending first voltage The transmission times of value reaches preset times, and control AD sampling modules stop collection voltages value and control itself to enter dormancy shape State;After the second preset duration is undergone, control itself to enter working condition and control AD sampling modules resurvey magnitude of voltage.
If specifically, the response message of concentrator is not received in the first preset duration, using the n-th module of concentrator Corresponding frequency hopping channel resends first voltage value, if being sent out again using the corresponding frequency hopping channel of the n-th module of concentrator Send in the first preset duration after first voltage value and do not receive response message, then it is corresponding using the (n+1)th module of concentrator Frequency hopping channel resends first voltage value, if resending the in the corresponding frequency hopping channel of the (n+1)th module using concentrator Response message is not received in the first preset duration after one magnitude of voltage, then using the corresponding frequency hopping of the n-th+2 module of concentrator Channel resends first voltage value;Said process is repeated, until receiving response message or the transmission of concentrator transmission The number of times of first voltage value reaches preset times, and control AD sampling modules stop collection voltages value and control itself to enter dormancy State;After the second preset duration is undergone, control itself to enter working condition and control AD sampling modules resurvey voltage Value.
If that is, preset times are 15 times, after first voltage value 6 times is resend, receiving concentrator and sending Response message, then control AD sampling modules to stop collection voltages value and control itself to enter resting state;In experience second After preset duration, control itself to enter working condition and control AD sampling modules resurvey magnitude of voltage.If preset times are 15 times, after first voltage value 14 times is resend, the response message of concentrator transmission is not received yet, then controls AD sampling moulds Block stops collection voltages value and controls itself to enter resting state;After the second preset duration is undergone, control itself to enter work Make state and control AD sampling modules resurvey magnitude of voltage.
It will be understood by those skilled in the art that repeating above-mentioned step in each work-dormancy period inner treater Suddenly.
Processor uses the working method of above-mentioned periodic duty-dormancy, can effectively reduce Non-Destructive Testing formula electric power The power consumption of monitoring device, can select the small power module powered to Non-Destructive Testing formula power monitoring equipment of capacity, and then make Obtain Non-Destructive Testing formula power monitoring equipment small volume, it is easy to dispose or set in electrical equipment.
In actual application process, the location of user is managed sometimes and the positional distance of electrical equipment is distant, In order to allow management user can also obtain electrical equipment power line working condition, the power monitoring system of the present embodiment is upper State and improved on the basis of embodiment, the structural representation for the Non-Destructive Testing formula power monitoring system that Fig. 7 provides for the present invention Figure two, referring to Fig. 7, the power monitoring system of the present embodiment also includes remote control equipment 3, remote control equipment 3 and concentrator 2 Wireless connection, remote control equipment 3 is used to receive the first voltage value of the transmission of concentrator 2 and the working condition of each power line, So that user carries out remote monitoring to the working condition of each power line.
The working condition of each power line refers to power line normal power supply or break down can not normal work.Power line Working condition refers to the first voltage value that AD sampling modules obtain and the working condition of power line.
The user of remote control equipment can obtain the work of the respective power line of each user equipment by remote control equipment Make situation, to take treatment measures in time when power line breaks down, it is ensured that the normal operation of electrical equipment.
The power monitoring system of the present embodiment is by setting remote supervisory and control(ling) equipment so that management user can be each with remote monitoring The working condition of power line, to ensure the normal operation of electrical equipment.
The present invention also provides a kind of method of Non-Destructive Testing formula electric power monitoring.The Non-Destructive Testing formula that Fig. 8 provides for the present invention The schematic flow sheet one of the method for electric power monitoring, the method for the present embodiment includes:
Step S801, processor control AD sampling module collection first voltage values, first voltage value sense for multiturn spiral The corresponding magnitude of voltage of power frequency electromagnetic field of the power line of coil-induced electrical equipment;Multiturn spiral induction coil is used to be wrapped in On the power line of electrical equipment;
Step S802, processor obtain first voltage value, and are judged according to first voltage value and the relation of preset voltage value Whether power line there occurs failure.
Specifically, the device realization that the method for the present embodiment can be based on any corresponding embodiments of above-mentioned Fig. 1~Fig. 5, It can be realized based on other devices.
The electric power monitoring method realized based on the Non-Destructive Testing formula power monitoring equipment shown in Fig. 5 is carried out in detail below Explanation.
Multiturn spiral induction coil is wrapped on the power line of electrical equipment, and the power frequency electromagnetic field of induction power supply line is obtained The corresponding analog voltage signal of power frequency electromagnetic field;The corresponding analog voltage signal of power frequency electromagnetic field is whole through detection rectification module detection Stream.The collection of AD sampling modules is detected the analog voltage signal after rectification, and analog voltage signal is changed into digital voltage letter Number, that is, specific magnitude of voltage, referred to herein as first voltage value;Processor obtains the first electricity that AD sampling modules are collected Pressure value, judges whether power line there occurs failure according to the relation of first voltage value and preset voltage value.
Wherein, processor judges whether power line there occurs failure according to the relation of first voltage value and preset voltage value, Specially:First voltage value and preset voltage value are compared, if first voltage value is more than or equal to preset voltage value, illustrate electricity Source line normal work;If first voltage value is less than preset voltage value, illustrate power line cisco unity malfunction.If processor determines electricity After the line cisco unity malfunction of source, processor can control alarm unit to be alarmed;Wherein, alarm unit can be integrated in processing The inside of device, can also be arranged on the outside of processor.
The method of the Non-Destructive Testing formula electric power monitoring of the present embodiment, the first voltage value that processor is obtained is through multiturn spiral The corresponding magnitude of voltage of power frequency electromagnetic field of the power line of the electrical equipment of induction coil sensing, wherein multiturn spiral induction coil is twined It is wound on the power line of electrical equipment.Wound on the power line using the power supply wire turn spiral induction coil for being wrapped in electrical equipment Sense the power frequency electromagnetic field between live wire and ground, rather than the series connection measurement power frequency electromagnet in the supply line of original user equipment The device of corresponding voltage signal, it is to avoid the drop for the safe class to bulk supply circuit that measurement apparatus failure is caused It is low, it is ensured that the safe class of supply line;Split, it is ensured that the integrality of power line, improve also without by power line The satisfaction of user.
The method of the Non-Destructive Testing formula electric power monitoring of the present embodiment includes:Processor control AD sampling modules the first electricity of collection Pressure value, first voltage value is the corresponding voltage of power frequency electromagnetic field of the power line for the electrical equipment that multiturn spiral induction coil senses Value;Multiturn spiral induction coil is used for the power line for being wrapped in electrical equipment;Processor obtains first voltage value, and according to the The relation of one magnitude of voltage and preset voltage value judges whether power line there occurs failure.The method of the electric power monitoring of the present embodiment, While realizing the working condition to power line and effectively being monitored, it is ensured that the safe class and power line of supply line Integrality, improve the satisfaction of user.
The schematic flow sheet two of the method for the Non-Destructive Testing formula electric power monitoring that Fig. 9 provides for the present invention, the side of the present embodiment Method includes:
Step S901, processor control AD sampling module collection first voltage values, first voltage value sense for multiturn spiral The corresponding magnitude of voltage of power frequency electromagnetic field of the power line of coil-induced electrical equipment;Multiturn spiral induction coil is used to be wrapped in On the power line of electrical equipment;
Step S902, processor obtain first voltage value, and are judged according to first voltage value and the relation of preset voltage value Whether power line there occurs failure;
Step S903, processor send first voltage value to concentrator, so that concentrator is according to first voltage value and in advance If the relation of magnitude of voltage judges whether power line there occurs failure;
Step S904, processor judge the response message of concentrator whether is received in the first preset duration, and response disappears Cease for indicating that concentrator have received the first voltage value of processor transmission;
If so, processor control AD sampling modules stop collection voltages value and control process device enters resting state; Undergo after the second preset duration, control process device enters working condition and control AD sampling modules resurvey magnitude of voltage;
If it is not, first voltage value is resend using the corresponding frequency hopping channel of multiple modules of concentrator successively, until connecing The response message for receiving concentrator transmission or the number of times for sending first voltage value reach preset times, and control AD sampling modules stop Collection voltages value and control process device enter resting state;After the second preset duration is undergone, control process device enters work State and control AD sampling modules resurvey magnitude of voltage.
Specifically, the method for the present embodiment can also may be used based on the Non-Destructive Testing formula power monitoring system described in Fig. 6 or Fig. 7 To be realized based on other systems.
Below to the Non-Destructive Testing formula electric power monitoring method based on the Non-Destructive Testing formula power monitoring system realization shown in Fig. 6 It is described in detail.
Multiturn spiral induction coil is wrapped on the power line of electrical equipment, and the power frequency electromagnetic field of induction power supply line is obtained The corresponding analog voltage signal of power frequency electromagnetic field;The corresponding analog voltage signal of power frequency electromagnetic field is whole through detection rectification module detection Stream.If AD sampling modules are in running order, that is to say, that processor control AD sampling modules are in collection voltages state, then AD Sampling module collection is detected the analog voltage signal after rectification, and analog voltage signal is changed into digital voltage signal, It is exactly specific magnitude of voltage, referred to herein as first voltage value.Processor obtains the first voltage value that AD sampling modules are collected, Judge whether power line there occurs failure according to the relation of first voltage value and preset voltage value;Simultaneous processor is by first voltage Value is sent to concentrator, so that concentrator judges whether power line occurs according to the magnitude of voltage of reception and the relation of preset voltage value Failure.
Processor is sent to concentrator by first voltage value, judges collection whether is received in the first preset duration The response message of middle device, response message is used for the first voltage value for indicating that concentrator have received processor transmission.
If receiving the response message of concentrator in the first preset duration, processor control AD sampling modules stop collection electricity Pressure value and control itself to enter resting state;After the second preset duration is undergone, control itself to enter working condition and control AD sampling modules processed resurvey magnitude of voltage;
If not receiving the response message of concentrator in the first preset duration, multiple modules of concentrator are used successively Corresponding frequency hopping channel resends first voltage value, until receiving the response message of concentrator transmission or sending above-mentioned voltage The number of times of value reaches preset times, and control AD sampling modules stop collection voltages value and control itself to enter resting state; Undergo after the second preset duration, control itself to enter working condition and control AD sampling modules resurvey magnitude of voltage.
If specifically, the response message of concentrator is not received in the first preset duration, using the n-th module of concentrator Corresponding frequency hopping channel resends first voltage value, if being sent out again using the corresponding frequency hopping channel of the n-th module of concentrator Send in the first preset duration after first voltage value and do not receive response message, then it is corresponding using the (n+1)th module of concentrator Frequency hopping channel resends first voltage value, if resending the in the corresponding frequency hopping channel of the (n+1)th module using concentrator Response message is not received in the first preset duration after one magnitude of voltage, then using the corresponding frequency hopping of the n-th+2 module of concentrator Channel resends first voltage value;Said process is repeated, until receiving response message or the transmission of concentrator transmission The number of times of first voltage value reaches preset times, and control AD sampling modules stop collection voltages value and control itself to enter dormancy State;After the second preset duration is undergone, control itself to enter working condition and control AD sampling modules resurvey voltage Value.
Such as, if preset times are 15 times, after first voltage value 6 times is resend, answering for concentrator transmission is received Message is answered, then controls AD sampling modules to stop collection voltages value and control itself to enter resting state;Preset in experience second After duration, control itself to enter working condition and control AD sampling modules resurvey magnitude of voltage.If preset times are 15 times, After first voltage value 14 times is resend, the response message of concentrator transmission is not received yet, then controls AD sampling modules to stop Only collection voltages value and control itself to enter resting state;After the second preset duration is undergone, control itself to enter work shape State and control AD sampling modules resurvey magnitude of voltage.
One cyclic process of the Non-Destructive Testing formula electric power monitoring method of said process the present embodiment, that is to say, that this implementation The Non-Destructive Testing formula electric power monitoring method circulation of example performs said process, and therefore, concentrator is to receive at regular intervals everywhere Manage the magnitude of voltage for the current time AD sampling module collection that device is sent.
Using the working method of above-mentioned periodicity electric power monitoring, Non-Destructive Testing in power monitoring system can be effectively reduced The power consumption of formula power monitoring equipment, is that can be achieved to Non-Destructive Testing formula in power monitoring system using the battery of low capacity therefore The power supply of power monitoring equipment, and then cause Non-Destructive Testing formula power monitoring equipment small volume, it is easy to disposed in electrical equipment Or set.
The method of the Non-Destructive Testing formula electric power monitoring of the present embodiment, by being directly arranged multiturn spiral sense on the power line The power frequency electromagnetic field between coil-induced live wire and ground is answered, and periodically gathers the corresponding voltage signal of power frequency electromagnetic field and obtains electricity Pressure value so that concentrator judge power line whether normal work, effectively monitored realizing the working condition to power line While, it is ensured that the safe class of supply line and the integrality of power line, reduce Non-Destructive Testing formula power monitoring equipment Power module capacity, improve the satisfaction of user.
One of ordinary skill in the art will appreciate that:Realizing all or part of step of above-mentioned each method embodiment can lead to The related hardware of programmed instruction is crossed to complete.Foregoing program can be stored in a computer read/write memory medium.The journey Sequence upon execution, performs the step of including above-mentioned each method embodiment;And foregoing storage medium includes:ROM, RAM, magnetic disc or Person's CD etc. is various can be with the medium of store program codes.
Finally it should be noted that:Various embodiments above is merely illustrative of the technical solution of the present invention, rather than its limitations;To the greatest extent The present invention is described in detail with reference to foregoing embodiments for pipe, it will be understood by those within the art that:Its according to The technical scheme described in foregoing embodiments can so be modified, or which part or all technical characteristic are entered Row equivalent;And these modifications or replacement, the essence of appropriate technical solution is departed from various embodiments of the present invention technology The scope of scheme.

Claims (12)

1. a kind of Non-Destructive Testing formula power monitoring equipment, it is characterised in that including:Multiturn spiral induction coil, AD sampling modules And processor, power line of the multiturn spiral induction coil for being wrapped in electrical equipment, the multiturn spiral line of induction The first end of circle is connected with the AD sampling modules, and the AD sampling modules are also connected with the processor;
The multiturn spiral induction coil is used for the power frequency electromagnetic field for sensing the power line;
The processor be used for control the AD sampling modules collect the corresponding first voltage value of the power frequency electromagnetic field with And the first voltage value is obtained, and whether the power line is judged according to the relation of the first voltage value and preset voltage value It there occurs failure.
2. device according to claim 1, it is characterised in that the Non-Destructive Testing formula power monitoring equipment also includes ground connection Module.
3. device according to claim 2, it is characterised in that the Non-Destructive Testing formula power monitoring equipment also includes detection Rectification module, one end of the detection rectification module is connected with the first end of the multiturn spiral induction coil, and the detection is whole The other end of flow module is connected with the AD sampling modules.
4. device according to claim 3, it is characterised in that the detection rectification module include the first detector diode, Second detector diode, filter capacitor and voltage-regulator diode;
Wherein, the positive pole of first detector diode is connected with the first end of the multiturn spiral induction coil, and described first The negative pole of detector diode and the negative pole of second detector diode, one end of the filter capacitor, the voltage-regulator diode Negative pole connected in the first tie point;The AD sampling modules are connected with first tie point;
The positive pole of the positive pole of second detector diode, the other end of the filter capacitor and the voltage-regulator diode connects Ground.
5. device according to claim 4, it is characterised in that the Non-Destructive Testing formula power monitoring equipment also includes power supply Module and wireless communication module, the power module and the wireless communication module are connected with the processor.
6. the device according to Claims 2 or 3 or 5, it is characterised in that the earthing module includes magnet, the magnet Absorption is on the housing of the electrical equipment and is grounded.
7. a kind of Non-Destructive Testing formula power monitoring system, it is characterised in that including:Concentrator and at least one such as claim 1 Non-Destructive Testing formula power monitoring equipment described in~6 any one, each electrical equipment is correspondingly arranged a Non-Destructive Testing formula Power monitoring equipment, each Non-Destructive Testing formula power monitoring equipment and the concentrator wireless connection;
The processor of the Non-Destructive Testing formula power monitoring equipment is additionally operable to send first voltage value to the concentrator;It is described The power supply for the electrical equipment that first voltage value senses for the multiturn spiral induction coil of the Non-Destructive Testing formula power monitoring equipment The corresponding magnitude of voltage of power frequency electromagnetic field of line;
The concentrator is used to judge that the power line of electrical equipment is according to the relation of the first voltage value and preset voltage value It is no to there occurs failure.
8. system according to claim 7, it is characterised in that the power monitoring system also includes remote control equipment, The remote control equipment and the concentrator wireless connection, the remote control equipment are used to receive what the concentrator was sent Each self-corresponding first voltage value of power frequency electromagnetic field and the working condition of each power line of each power line, so that user couple The working condition of each power line carries out remote monitoring.
9. the system according to claim 7 or 8, it is characterised in that the processor specifically for,
Judge whether to receive the response message of the concentrator in the first preset duration, the response message is used to indicate institute State concentrator and have received the first voltage value that the processor is sent;
If so, control AD sampling modules stop collection voltages value and control the processor to enter resting state;In experience the After two preset durations, control the processor to enter working condition and control the AD sampling modules to resurvey magnitude of voltage;
If it is not, resending the first voltage value using the corresponding frequency hopping channel of multiple modules of the concentrator successively, directly Preset times are reached to the response message for receiving the concentrator transmission or the number of times for sending the first voltage value, AD is controlled Sampling module stops collection voltages value and control process device enters resting state;After second preset duration is undergone, control Processor processed enters working condition and controls the AD sampling modules to resurvey magnitude of voltage.
10. a kind of method of Non-Destructive Testing formula electric power monitoring, it is characterised in that including:
Processor control AD sampling module collection first voltage values, the first voltage value is what multiturn spiral induction coil sensed The corresponding magnitude of voltage of power frequency electromagnetic field of the power line of electrical equipment;The multiturn spiral induction coil is set for being wrapped in electricity consumption On standby power line;
The processor obtains the first voltage value, and judges the electricity according to the relation of first voltage value and preset voltage value Whether source line there occurs failure.
11. method according to claim 10, it is characterised in that the processor obtain the first voltage value it Afterwards, also include:
The processor sends the first voltage value to concentrator, so that concentrator is according to the first voltage value and presets The relation of magnitude of voltage judges whether the power line there occurs failure.
12. method according to claim 11, it is characterised in that the processor by the first voltage value send to After concentrator, also include:
The processor judges the response message of the concentrator, the response message whether are received in the first preset duration For indicating that the concentrator have received the first voltage value that the processor is sent;
If so, the processor control AD sampling modules stop collection voltages value and control the processor to enter dormancy shape State;After the second preset duration is undergone, the processor is controlled to enter working condition and control the AD sampling modules again Collection voltages value;
If it is not, resending the first voltage value using the corresponding frequency hopping channel of multiple modules of the concentrator successively, directly Preset times are reached to the response message for receiving the concentrator transmission or the number of times for sending the first voltage value, AD is controlled Sampling module stops collection voltages value and control process device enters resting state;After second preset duration is undergone, control Processor processed enters working condition and controls the AD sampling modules to resurvey magnitude of voltage.
CN201710317587.2A 2017-05-08 2017-05-08 Non-Destructive Testing formula power monitoring equipment, system and method Pending CN106950461A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710317587.2A CN106950461A (en) 2017-05-08 2017-05-08 Non-Destructive Testing formula power monitoring equipment, system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710317587.2A CN106950461A (en) 2017-05-08 2017-05-08 Non-Destructive Testing formula power monitoring equipment, system and method

Publications (1)

Publication Number Publication Date
CN106950461A true CN106950461A (en) 2017-07-14

Family

ID=59479035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710317587.2A Pending CN106950461A (en) 2017-05-08 2017-05-08 Non-Destructive Testing formula power monitoring equipment, system and method

Country Status (1)

Country Link
CN (1) CN106950461A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111478447A (en) * 2020-05-13 2020-07-31 武汉盛帆电子股份有限公司 Concentrator and power supply method
WO2023184949A1 (en) * 2022-03-28 2023-10-05 广东电网有限责任公司江门供电局 Electromagnetic monitoring-based apparatus and method for monitoring hot plug module of distribution terminal

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5272440A (en) * 1991-05-21 1993-12-21 Merlin Gerin Isolation monitors and measuring device for an electrical power system with isolated neutral
CN201724978U (en) * 2010-05-18 2011-01-26 武汉大学 Wireless automatic electricity getting current sensor
CN102195274A (en) * 2010-03-12 2011-09-21 深圳市银骏科技有限公司 Distribution line fault detection control method and system
CN202486253U (en) * 2012-03-12 2012-10-10 深圳和而泰智能控制股份有限公司 Electric leakage detecting circuit and device thereof
CN104215883A (en) * 2014-09-12 2014-12-17 国家电网公司 Power transmission line fault detection device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5272440A (en) * 1991-05-21 1993-12-21 Merlin Gerin Isolation monitors and measuring device for an electrical power system with isolated neutral
CN102195274A (en) * 2010-03-12 2011-09-21 深圳市银骏科技有限公司 Distribution line fault detection control method and system
CN201724978U (en) * 2010-05-18 2011-01-26 武汉大学 Wireless automatic electricity getting current sensor
CN202486253U (en) * 2012-03-12 2012-10-10 深圳和而泰智能控制股份有限公司 Electric leakage detecting circuit and device thereof
CN104215883A (en) * 2014-09-12 2014-12-17 国家电网公司 Power transmission line fault detection device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111478447A (en) * 2020-05-13 2020-07-31 武汉盛帆电子股份有限公司 Concentrator and power supply method
WO2023184949A1 (en) * 2022-03-28 2023-10-05 广东电网有限责任公司江门供电局 Electromagnetic monitoring-based apparatus and method for monitoring hot plug module of distribution terminal

Similar Documents

Publication Publication Date Title
CN107132329A (en) A kind of LoRaWAN multi-parameter water qualities on-line monitoring system and method
CN105606666A (en) Gas sensor based portable switch cabinet partial discharge detection device and method
CN106771900A (en) Switch cubicle big data state evaluating method and system based on intelligent shelf depreciation live detection
CN105021959A (en) Novel partial discharge live-line detection system and method for main equipment of distribution network
CN103140766A (en) Apparatus and method for monitoring an electric power transmission system through partial discharges analysis
CN103743436A (en) Remote control environment monitoring system, and method for realizing environment and system inspection
CN106950461A (en) Non-Destructive Testing formula power monitoring equipment, system and method
CN108022412A (en) Buried cable monitoring and warning system based on Internet of Things
CN108054835A (en) A kind of arrester intelligent cloud monitor system
KR102000431B1 (en) Apparatus for monitoring transformer using ultrasonic waves
CN107370240A (en) A kind of aerial power transmission line intelligent monitor system
CN207424136U (en) A kind of arrester on-line monitoring system
CN207198271U (en) Non-Destructive Testing formula power monitoring equipment and system
CN210464555U (en) Base station detection system
CN207964966U (en) A kind of arrester on-line monitoring system
CN204241581U (en) Transformer allophone analytical equipment
CN108663970B (en) Electric power operation safety monitoring system
KR101959708B1 (en) Apparatus and method for detecting discharge for electric power facility
CN202724855U (en) Wireless intelligent service life monitoring system for filter element
CN108847013A (en) Data transmission system and data transmission method of solar module
CN107500069A (en) Detection means, method and elevator warning system
CN208547674U (en) A kind of monitoring device and monitoring system of purifier
CN103680073A (en) Wireless environment gas monitoring and alarming system
CN206470060U (en) A kind of dynamic monitoring early-warning device of air cooling blower fan multiple bearing
CN218634306U (en) Multi-functional intelligent appearance of patrolling and examining of thing networking

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170714