CN106948835A - A kind of tunnel model preparation method for shield model test - Google Patents

A kind of tunnel model preparation method for shield model test Download PDF

Info

Publication number
CN106948835A
CN106948835A CN201710266085.1A CN201710266085A CN106948835A CN 106948835 A CN106948835 A CN 106948835A CN 201710266085 A CN201710266085 A CN 201710266085A CN 106948835 A CN106948835 A CN 106948835A
Authority
CN
China
Prior art keywords
jurisdiction
bolt
section
tunnel
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710266085.1A
Other languages
Chinese (zh)
Inventor
郑刚
孙基斌
崔涛
葛隆博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201710266085.1A priority Critical patent/CN106948835A/en
Publication of CN106948835A publication Critical patent/CN106948835A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of tunnel model method for shield model test, using following steps:One) quantity, physical dimension and the material for the pipe ring quantity for forming tunnel model, the ring bolt of section of jurisdiction quantity, physical dimension and material for forming all pipe rings and the connection section of jurisdiction and interannular bolt are determined using the theory of similarity;Two) section of jurisdiction, the ring bolt and the interannular bolt are made;Three) section of jurisdiction is connected into by multiple pipe rings using the ring bolt;Four) all pipe rings are connected into by tunnel model using the interannular bolt.The present invention application theory of similarity, solve conventional tunnel model and offending problem is simulated to prototype tunnel, a variety of shield tunnel environment can be simulated, especially underground engineering accident is difficult to the shield tunnel environment of field observation and control, has widened research range of the model test to shield tunnel problem.

Description

A kind of tunnel model preparation method for shield model test
Technical field
The present invention relates to a kind of preparation method of underground engineering model test device, and in particular to one kind is used for shield model The tunnel model preparation method of experiment.
Background technology
Into 21st century, with the development and the progress of science and technology of society, urban Underground pipeline traffic there has also been considerable Development, wherein shield tunnel construction method because of its construction flexibly, cost economic and the spy small to surface structures and traffic impact Put and be widely used.At this stage, engineering evaluation and evaluation for shield-tunneling construction mainly have experience equation, finite element Numerical simulation, model testing method.Wherein, model test is one of research very important method of shield tunnel.Particularly underground Engineering accident is difficult to field observation and control, and effective model test is just particularly important.It is prominent by certain simplification Go out the influence of specific factor, model test can effective simulation Practical Project truth;Pass through accurately design and implementation Experiment, can obtain the important reliable reference data corresponding to Practical Project.This is related for research shield tunnel Problem is significant.
The model test in research shield tunnel direction, is carried out using complete homogeneous annulus to shield tunnel more at this stage Simulation.And each ring of shield tunnel is spliced by some sections of jurisdiction in Practical Project, therefore at this stage in experiment Tunnel model in Practical Project with having bigger difference, it is impossible to fine simulation Practical Project environment, the reliability of its reference data Also have a greatly reduced quality.Preferably to carry out model test, data reliability is improved, the tunnel model more become more meticulous just becomes very It is important.
The content of the invention
The present invention provides a kind of tunnel for shield model test to solve technical problem present in known technology Model production method, adopt this method making tunnel model can the more fine actual shield tunnel environment of simulation, be applied to Shield model test, can obtain more reliable reference data.
The present invention is adopted the technical scheme that to solve technical problem present in known technology:One kind is used for shield mould The tunnel model method of type experiment, using following steps:One) the pipe ring number for forming tunnel model is determined using the theory of similarity Amount, the ring bolt of section of jurisdiction quantity, physical dimension and material for forming all pipe rings and the connection section of jurisdiction and Quantity, physical dimension and the material of interannular bolt;Two) section of jurisdiction, the ring bolt and the interannular bolt are made;Three) The section of jurisdiction is connected into by multiple pipe rings using the ring bolt;Four) all pipe rings are connected using the interannular bolt It is connected into tunnel model.
The interannular bolt is bent bolt, and the ring bolt is straight bolt, be provided with the section of jurisdiction with it is described straight The corresponding installation hand hole of bolt.
The installation hand hole is arranged on the outer surface of the section of jurisdiction.
All sections of jurisdiction for forming each pipe ring are made up of multiple standard sections of jurisdiction and a section of jurisdiction of binding, described in adjacent two The ring bolt connection is used between standard section of jurisdiction and between the standard section of jurisdiction and the section of jurisdiction of binding.
The present invention has the advantages and positive effects of:The present invention application theory of similarity, solves conventional tunnel model pair Prototype tunnel simulates offending problem, can simulate a variety of shield tunnel environment, especially underground engineering accident is difficult to The shield tunnel environment of field observation and control, has widened research range of the model test to shield tunnel problem.The present invention can With section of jurisdiction in precise restoration prototype tunnel and the stress form and working environment of bolt, tunnel model is set preferably to reflect related rule Rule, while also making experiment the data obtained more accurate, reliable, is conducive to shield tunnel problem more in-depth study.
Brief description of the drawings
Fig. 1 is one of structural representation of the application present invention;
Fig. 2 is the two of the structural representation of the application present invention;
Fig. 3 is the pipe ring structural representation of the application present invention;
Fig. 4 is the tunnel segment structure schematic diagram that binds of the application present invention;
Fig. 5-1 is the standard section of jurisdiction outboard structure schematic diagram of the application present invention;
Fig. 5-2 is the standard section of jurisdiction inside structure schematic diagram of the application present invention;
Fig. 6 is section of jurisdiction attachment structure schematic diagram in the ring of the application present invention;
Fig. 6-1 is Fig. 6 auspicious figure in A portions;
Fig. 7 is the interannular section of jurisdiction attachment structure schematic diagram of the application present invention.
In figure:1st, bind section of jurisdiction;2nd, standard section of jurisdiction;3rd, interannular bolt;4th, ring bolt;5th, installation hand hole;6th, ring spiral shell Keyhole;7th, interannular bolt hole;8th, nut;9th, aluminium cap;10th, fastener.
Embodiment
For the content of the invention, feature and effect of the present invention can be further appreciated that, following examples are hereby enumerated, and coordinate accompanying drawing Describe in detail as follows:
Refer to accompanying drawing, a kind of tunnel model method for shield model test, using following steps:One) phase is used Like the theoretical pipe ring quantity, the section of jurisdiction quantity for forming all pipe rings, physical dimension determined for forming tunnel model With quantity, physical dimension and the material of the ring bolt 4 and interannular bolt 3 of material and the connection section of jurisdiction;Two) make described Section of jurisdiction, the ring bolt 4 and the interannular bolt 3;Three) section of jurisdiction is connected into by multiple pipes using the ring bolt 4 Ring;Four) all pipe rings are connected into by tunnel model using the interannular bolt 3.
The tunnel model made using the above method is similar to the structure of prototype tunnel, including multiple longitudinally disposed pipes Ring, two adjacent pipe rings are connected using interannular bolt 3, and each pipe ring is formed by connecting using multiple sections of jurisdiction, adjacent Two sections of jurisdiction between connected using ring bolt 4.
In the present embodiment, the interannular bolt 3 is bent bolt, and the ring bolt 4 is straight bolt, in the section of jurisdiction It is provided with installation hand hole 5 corresponding with the straight bolt.Straight bolt is used in the connection of section of jurisdiction ring, using curved in interannular connection Bent bolt, it is possible to reduce the quantity slotted in section of jurisdiction, makes the splicing of the domain more facilitate with loading.In the present embodiment, in order to Facilitate the installation of ring bolt 4, it is constant in the bolt hole position of ring bolt 4 in the case of, the installation hand hole 5 is arranged on institute State on the outer surface of section of jurisdiction.In the present embodiment, all sections of jurisdiction for forming each pipe ring can be by multiple standard sections of jurisdiction 2 and one Section of jurisdiction 1 of binding is constituted, between two adjacent standard sections of jurisdiction 2 and between the standard section of jurisdiction 2 and the section of jurisdiction 1 of binding Connected using the ring bolt 4;Forming all sections of jurisdiction of each pipe ring can also be made up of by all multiple standard sections of jurisdiction 2, Connected between two adjacent standard sections of jurisdiction 2 using the ring bolt 4.In the present embodiment, prototype tunnel section of jurisdiction connects The water-proof strip at the place of connecing is not considered to simplify installation with rebate.
Application example:
First, the similarity relation of section of jurisdiction and section of jurisdiction connection in similarity analysis, including model test is carried out.Its mesarcs tunnel Road mainly includes with tunnel model in the parametric variable that static relays are compared:Physical dimension, material property, stress and deformation parameter And external force.By the theory, the similarity relation of section of jurisdiction and connecting bolt and prototype tunnel in tunnel model is can obtain, so as to enter One step obtains relevant parameter, to make section of jurisdiction and connecting bolt.
In this application example, the likelihood ratio is used for 20, so that the part of some of prototype tunnel more details exists It is difficult in tunnel model.Therefore, using do not influence test data reliability as principle, be adjusted using following methods:
One) to make, the ring bolt between ring section of jurisdiction is convenient in practical operation to be installed, in the feelings that bolt hole position is constant Under condition, the position of installation hand hole 5 is by moving to the section of jurisdiction outer surface of tunnel model inside the section of jurisdiction of prototype tunnel.
Two) to make the connection between pipe ring more facilitate, straight bolt is used in the section of jurisdiction ring connection in same pipe ring, together When, the longitudinally connected middle use bent bolt between pipe ring, it is possible to reduce the quantity slotted on section of jurisdiction.In prototype tunnel, ring Between in longitudinally connected and ring ring connection generally use bent bolt.
Three) water-proof strip in section of jurisdiction junction is not considered with rebate in tunnel model to simplify installation.
The making of tunnel model:
One) section of jurisdiction makes:
First, the intensity and size of concrete pipe sheet are strengthened according to the C50 commonly used in China's subway tunnel, tunnel external diameter is 6200mm, section of jurisdiction thickness 350mm, longitudinally wide 1200mm, are 20 based on the likelihood ratio, and selection PP pipes are the material of tunnel model, Determine tunnel model external diameter 310m, section of jurisdiction thickness 17.5mm, ring width 60mm.On the basis of complete PP pipes, first, incited somebody to action by crosscutting PP pipes are cut into single complete circle according to section of jurisdiction width.Then, according to the angle of circumference corresponding to prototype tunnel section of jurisdiction, rip cutting is passed through Single pipe ring is cut into some sections of jurisdiction.Again section of jurisdiction is polished smooth to meet design requirement as far as possible.Finally, according to prototype tunnel The quantity of installation hand hole and bolt hole drills ring bolt hole 6 and interannular bolt hole 7, cutting with distributing position on section of jurisdiction in road It is used for installation bolt to form installation hand hole 5.
Two) bolt makes:
According in prototype tunnel frequently with M30 bolts intensity, based on the likelihood ratio, selection aluminum steel is used as connecting bolt. Bolt length is determined according to the need for tunnel model.
Ring bolt:In this application example, using a diameter of 2mm aluminum steel.First, aluminum steel is switched to setting length, Length can strictly be controlled by termination of polishing.Then, a nut 8 is respectively set at two ends.
Interannular bolt:Diameter 1.6mm, long 33mm.First, aluminium cap 9 is fixed in bolt one end, fastener is installed in the other end 10.When tunnel model is assembled, it is necessary to apply pretightning force set in advance on interannular bolt 3, pretightning force can pass through dynamometry Meter is accurately controlled, then, is fixed using fixture 10.Fastener can ensure the bolt fixation by application pretightning force without producing Raw sliding, i.e., will not occur the situation of pretightning force off-load.
Three) tunnel model is assembled:
After section of jurisdiction completes with connecting bolt, it can be subjected to through seam assembling or mistake according to the structure shown in Fig. 1 and Fig. 2 Seam is assembled.
Although the preferred embodiments of the present invention are described above in conjunction with accompanying drawing, the invention is not limited in upper The embodiment stated, above-mentioned embodiment is only schematical, be not it is restricted, this area it is common Technical staff is under the enlightenment of the present invention, in the case where not departing from present inventive concept and scope of the claimed protection, also Many forms can be made, these are belonged within protection scope of the present invention.

Claims (4)

1. a kind of tunnel model preparation method for shield model test, it is characterised in that use following steps:
One) using the theory of similarity determine for form tunnel model pipe ring quantity, the section of jurisdiction for forming all pipe rings Quantity, physical dimension and the material of the ring bolt and interannular bolt of quantity, physical dimension and material and the connection section of jurisdiction;
Two) section of jurisdiction, the ring bolt and the interannular bolt are made;
Three) section of jurisdiction is connected into by multiple pipe rings using the ring bolt;
Four) all pipe rings are connected into by tunnel model using the interannular bolt.
2. the tunnel model preparation method according to claim 1 for shield model test, it is characterised in that the ring Between bolt be bent bolt, the ring bolt is straight bolt, and install corresponding with the straight bolt is provided with the section of jurisdiction Hand hole.
3. the tunnel model preparation method according to claim 1 for shield model test, it is characterised in that the peace Dress hand hole is arranged on the outer surface of the section of jurisdiction.
4. the tunnel model preparation method according to claim 1 for shield model test, it is characterised in that form every All sections of jurisdiction of individual pipe ring are made up of multiple standard sections of jurisdiction and a section of jurisdiction of binding, between two adjacent standard sections of jurisdiction with And the ring bolt connection is used between the standard section of jurisdiction and the section of jurisdiction of binding.
CN201710266085.1A 2017-04-21 2017-04-21 A kind of tunnel model preparation method for shield model test Pending CN106948835A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710266085.1A CN106948835A (en) 2017-04-21 2017-04-21 A kind of tunnel model preparation method for shield model test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710266085.1A CN106948835A (en) 2017-04-21 2017-04-21 A kind of tunnel model preparation method for shield model test

Publications (1)

Publication Number Publication Date
CN106948835A true CN106948835A (en) 2017-07-14

Family

ID=59476555

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710266085.1A Pending CN106948835A (en) 2017-04-21 2017-04-21 A kind of tunnel model preparation method for shield model test

Country Status (1)

Country Link
CN (1) CN106948835A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756927A (en) * 2018-07-05 2018-11-06 中国铁建重工集团有限公司 A kind of development machine steel arch-shelf installation system
CN109493710A (en) * 2018-12-21 2019-03-19 同济大学 The shield tunnel liner design methods and model of the circumferential assembled performance of analog
CN112324467A (en) * 2020-12-08 2021-02-05 中铁第四勘察设计院集团有限公司 Model of shield tunnel cast-in-place internal structure and test manufacturing method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0829297A (en) * 1994-07-12 1996-02-02 Nishimatsu Constr Co Ltd Method and apparatus for test of shield excavation model
CN101299008A (en) * 2008-06-13 2008-11-05 同济大学 Trial model capable of simulating shield tunnel pipe slice joint and manufacturing method thereof
CN103277115A (en) * 2013-05-24 2013-09-04 西南交通大学 Segment and segment ring used for indoor tunneling test of shield tunneling machine model
CN103953349A (en) * 2014-04-24 2014-07-30 西南交通大学 Test method for tunnel model with duct piece connectors with rigidity in controllable changes
CN105426619A (en) * 2015-11-29 2016-03-23 北京市勘察设计研究院有限公司 Analysis method for determining longitudinal bending rigidity of shield tunnel
CN105548504A (en) * 2016-01-29 2016-05-04 天津大学 Three-dimensional model tunnel test device for simulating tunnel excavation and compensation grouting process
CN106285716A (en) * 2015-05-27 2017-01-04 上海申通地铁集团有限公司 The scheme comparison of shield tunnel loop partitioned mode analyzes method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0829297A (en) * 1994-07-12 1996-02-02 Nishimatsu Constr Co Ltd Method and apparatus for test of shield excavation model
CN101299008A (en) * 2008-06-13 2008-11-05 同济大学 Trial model capable of simulating shield tunnel pipe slice joint and manufacturing method thereof
CN103277115A (en) * 2013-05-24 2013-09-04 西南交通大学 Segment and segment ring used for indoor tunneling test of shield tunneling machine model
CN103953349A (en) * 2014-04-24 2014-07-30 西南交通大学 Test method for tunnel model with duct piece connectors with rigidity in controllable changes
CN106285716A (en) * 2015-05-27 2017-01-04 上海申通地铁集团有限公司 The scheme comparison of shield tunnel loop partitioned mode analyzes method
CN105426619A (en) * 2015-11-29 2016-03-23 北京市勘察设计研究院有限公司 Analysis method for determining longitudinal bending rigidity of shield tunnel
CN105548504A (en) * 2016-01-29 2016-05-04 天津大学 Three-dimensional model tunnel test device for simulating tunnel excavation and compensation grouting process

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
叶飞等: "基于模型试验的盾构隧道纵向刚度分析", 《岩土工程学报》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108756927A (en) * 2018-07-05 2018-11-06 中国铁建重工集团有限公司 A kind of development machine steel arch-shelf installation system
CN108756927B (en) * 2018-07-05 2024-01-19 中国铁建重工集团股份有限公司 Steel arch installing system of heading machine
CN109493710A (en) * 2018-12-21 2019-03-19 同济大学 The shield tunnel liner design methods and model of the circumferential assembled performance of analog
CN112324467A (en) * 2020-12-08 2021-02-05 中铁第四勘察设计院集团有限公司 Model of shield tunnel cast-in-place internal structure and test manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN207194905U (en) A kind of tunnel model for shield model test
CN106948835A (en) A kind of tunnel model preparation method for shield model test
CN106595918B (en) A kind of long term monitoring device and method of the outer soil pressure of duct pieces of shield tunnel
Liu et al. Longitudinal structural deformation mechanism of shield tunnel linings considering shearing dislocation of circumferential joints
CN109493710A (en) The shield tunnel liner design methods and model of the circumferential assembled performance of analog
CN108932902B (en) Lining ring model design method capable of simulating shield tunnel circumferential joint
CN103410516A (en) Surrounding rock deformation early-warning construction method for small-diameter tunnel full-section excavation
CN106017961A (en) Test model for simulating shield tunnel segment joint
Wang et al. Mechanism for buckling of shield tunnel linings under hydrostatic pressure
Ghadimi et al. Analysis profile of the fully grouted rock bolt in jointed rock using analytical and numerical methods
Liu et al. Research on the law of stress development along backfilling process between crest and valley of buried corrugated steel pipe culverts
CN108984969A (en) A kind of soft soil foundation shield tunnel operation phase settlement calculation method
Xie et al. Effects of curved shield tunnelling adjacent to existing power tunnel
CN112380757A (en) Analysis method for offset distance of surface subsider peak point during construction of curved tunnel
CN106441758A (en) Multi-scale model design method for shield tunnel vibration test bench
Zheng et al. Experimental research on the transverse effective bending rigidity of shield tunnels
CN106991254B (en) Multi-scale design method for steel bridge deck pavement of highway and railway dual-purpose bridge
Tang et al. Experimental study on the transverse effective bending rigidity of segmental lining structures
CN209653123U (en) Structure is pre-buried to use casing and anchor
CN209430206U (en) Form duct pieces of shield tunnel
Xiong et al. Analytical solution on highway U-shape bridges using isotropic plate theory
CN106971035B (en) Method for quickly identifying geological information in bridge foundation design
CN201891418U (en) Clamping and drawing device for tunnel geology advanced prediction receiving probe protective casing
Ocel The behavior of thin hollow structural section (HSS) to plate connections
Dastjerdy et al. 3D computational study of tunnel segment behaviour under loading by TBM thrust jacks

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170714