CN106948279A CN201710249802.XA CN201710249802A CN106948279A CN 106948279 A CN106948279 A CN 106948279A CN 201710249802 A CN201710249802 A CN 201710249802A CN 106948279 A CN106948279 A CN 106948279A
Authority
CN
China
Prior art keywords
top board
bale handle
base plate
prefabricated case
studs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710249802.XA
Other languages
Chinese (zh)
Other versions
CN106948279B (en
Inventor
李方柯
梁志新
胡明
王合希
苏国明
薛红云
刘俊
李莉
田明
王冰
朱勇战
罗支贵
夏文明
毕文文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Fifth Survey and Design Institute Group Co Ltd
Fourth Engineering Co Ltd of CTCE Group
Original Assignee
China Railway Fifth Survey and Design Institute Group Co Ltd
Fourth Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Fifth Survey and Design Institute Group Co Ltd, Fourth Engineering Co Ltd of CTCE Group filed Critical China Railway Fifth Survey and Design Institute Group Co Ltd
Priority to CN201710249802.XA priority Critical patent/CN106948279B/en
Publication of CN106948279A publication Critical patent/CN106948279A/en
Application granted granted Critical
Publication of CN106948279B publication Critical patent/CN106948279B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

This patent discloses a kind of high-speed railway two-wire prefabricated case beam bale handle reinforcement means, including:Before prefabricated case beam bale handle, apply external prestressing between the top board (6) and base plate (7) of box beam, the top board (6) and web (8) junction concrete of box beam is set to be in pressured state before bale handle, it is to avoid crackle occurs in concrete in tension at this during bale handle.Precompression is provided to box beam top board, web junction so that the common stress of top board, base plate, the problem of box beam top board, web junction concrete in tension ftracture is solved from the angle of structure stress before bale handle.

Description

A kind of high-speed railway two-wire prefabricated case beam bale handle reinforcement means
Technical field
This patent is related to building structure and technical field of construction, relates generally to high-speed railway two-wire precast prestressed concrete Simple supported box beam, more specifically a kind of high-speed railway two-wire prefabricated case beam bale handle reinforcement means.
Background technology
During high speed railway construction, to reduce floor space, adaptation to the ground and geological conditions as far as possible, through frequently with bridge Beam, the ratio of bridge is general higher, in bridge structure based on precast prestressed concrete simple supported box beam bridge-type.Prefabricated freely-supported case Beam is in place from installation is fabricated onto, and need to repeatedly carry out bale handle operation.At present, the prefabricated simple supported box beam of two-wire uses single box single chamber knot substantially Structure, sets suspension centre to carry out bale handle operation, top board concrete cracking easily occurs with web joint during bale handle, influences in box beam top board The outward appearance and durability of structure.
Regarding to the issue above, imitated more than prior art using the measures such as concrete cover control, stiffener configuration are strengthened It is really not satisfactory, the situation of concrete cracking still generally existing during bale handle.
The content of the invention
The purpose of this patent is to provide a kind of high-speed railway two-wire prefabricated case beam bale handle reinforcement means, it is to avoid concrete occur Bale handle crackle, to meet the requirement of High Speed Rail Projects acceptance criteria.
This patent is achieved through the following technical solutions:
A kind of high-speed railway two-wire prefabricated case beam bale handle reinforcement means, including:
Before prefabricated case beam bale handle, external prestressing is applied between the top board 6 and base plate 7 of box beam, makes the top board 6 and abdomen of box beam The junction concrete of plate 8 is in pressured state before bale handle, it is to avoid crackle occurs in concrete in tension at this during bale handle.
The method of described application external prestressing includes:
Multiple strainers are set between top board 6 and base plate 7, and top board 6 is fixed in strainer upper end, and bottom is fixed in lower end Plate 7, external prestressing is applied between top board 6 and base plate 7.
The perforate on nut and top board 6 and base plate 7 that described strainer coordinates including studs 1, two ends;
Studs 1 is through the perforate on top board 6 and base plate 7, in the underrun nut of the top surface and base plate 7 of top board 6 It is fixed;
Applying external prestressing method includes:According to the Space Calculation Analysis of box-beam structure, it is determined that avoiding concrete cracking Required pre-add force value, the parameter of studs 1 and nut is chosen according to pre-add force value;
Studs 1 is penetrated from the perforate of box beam top board 6, is passed from the perforate of base plate 7, and is fixed on nut base plate 7 Bottom surface;
Box beam top board 6 top surface using jack pair studs 1 carry out tensioning, after tensioning in place, tighten double end spiral shell The nut of the upper end of post 1, removes jack, applies precompression process and completes.
Pvc pipe pore-forming is taken out after pre-buried pvc pipe is poured in perforate before the box girder webs on top board 6 and base plate 7, and Set active module, after the completion of construction in preformed hole placing expansive concrete.
After described bale handle installation terminates, utilize jack to unclamp studs 1, remove strainer.
Described strainer is located at bale handle lifting hole(eyelet) 5 and is symmetrical arranged by box-beam structure centerline side, and the position set Put and avoid box beam longitudinal prestressing steel beam 2, beam falling prevention stopping block embedded sleeve barrel 3 and bearing pre-embedded steel slab 4.
A kind of high-speed railway two-wire precast box that this patent is provided it can be seen from the technical scheme that above-mentioned this patent is provided Beam bale handle reinforcement means, provides precompression so that the common stress of top board, base plate before bale handle to box beam top board, web junction, The problem of box beam top board, web junction concrete in tension ftracture is solved from the angle of structure stress.
Brief description of the drawings
The facade structures schematic diagram for the bale handle reinforcement measure that Fig. 1 provides for this patent;
The planar structure schematic diagram for the bale handle reinforcement measure that Fig. 2 provides for this patent.
In figure:
1st, studs, 2, longitudinal prestressing steel beam, 3, beam falling prevention stopping block built-in fitting, 4, bearing pre-embedded steel slab, 5, bale handle Lifting hole(eyelet), 6, top board, 7, base plate, 8, web, 9, hang pre-embedded steel slab.
Embodiment
This patent embodiment will be described in further detail below.
As shown in figs. 1 and 2, a kind of high-speed railway two-wire prefabricated case beam bale handle reinforcement means, according to prefabricated case beam structure determination Arrangement, the arrangement of longitudinal prestressing steel beam 2, the arrangement of beam falling prevention stopping block embedded sleeve barrel 3 and the bearing pre-buried steel of bale handle lifting hole(eyelet) 5 The arrangement of plate 4.Lifted when using by installing drop hanger additional at bale handle lifting hole(eyelet) 5, will also at the beam lifting hole(eyelet) 5 below set up hang it is pre- Steel plate 9 is buried, to increase intensity, specific method includes:
Before prefabricated case beam bale handle, external prestressing is applied between the top board 6 and base plate 7 of box beam, makes the top board 6 and abdomen of box beam The junction concrete of plate 8 is in pressured state before bale handle, it is to avoid crackle occurs in concrete in tension at this during bale handle.
Here, the method for described application external prestressing includes:
Multiple strainers are set between top board 6 and base plate 7, and multiple strainers are located at bale handle lifting hole(eyelet) 5 by box beam Structure centre line side is symmetrical arranged, and can set quantity as needed.And box beam longitudinal prestressing steel is avoided in the position set Beam 2, beam falling prevention stopping block embedded sleeve barrel 3 and bearing pre-embedded steel slab 4.Top board 6 is fixed in strainer upper end, and base plate is fixed in lower end 7, apply external prestressing between top board 6 and base plate 7.Coordinate specifically, described strainer includes studs 1, two ends Nut and top board 6 and base plate 7 on perforate;In actual use, before described box girder webs on top board 6 and base plate 7 Perforate in pre-buried pvc pipe pour after take out pvc pipe pore-forming, and set bed die active module to provide studs 1 in base plate 7 The anchoring space of downside.After the completion of construction in preformed hole placing expansive concrete.Studs 1 passes through top board 6 and bottom Perforate on plate 7, is fixed in the top surface of top board 6 with the underrun nut of base plate 7.
Applying external prestressing method includes:
(1), according to the Space Calculation Analysis of box-beam structure, it is determined that the pre-add force value needed for avoiding concrete cracking, according to Pre-add force value chooses the parameter of studs 1 and nut;
Space Calculation Analysis is conventional structure design means, and those skilled in the art can skillfully grasp, mainly Determine to use when pre-add force value works for follow-up jack, determine the parameter of studs 1 and nut, such as material, diameter is waited, Influence the parameter of intensity.
For convenience of technical staff's work, take a single example, certain prefabricated case beam determines single double end spiral shell according to Space Calculation Analysis The pre-applied force that post 1 need to apply is 40t.60t and the jack of the above are chosen according to 1.5 times of safety coefficients during construction, according to 1.5 times The studs 1 and matching nut that safety coefficient chooses bearing capacity 60t or higher can be (as from diameter 32mm, tension standards Intensity 830MPa, single bearing capacity are 66.7t finish rolling deformed bar and matching nut).
(2) studs 1, is penetrated from the perforate of box beam top board 6, is passed from the perforate of base plate 7, and bottom is fixed on nut The bottom surface of plate 7;
(3), box beam top board 6 top surface using jack pair studs 1 carry out tensioning, after tensioning in place, tensioning is arrived Position, which refers to, reaches pre-add force value, tightens the nut of the upper end of studs 1, removes jack, applies precompression process and completes.
(4) after, the installation of described bale handle terminates, utilize jack to unclamp studs 1, remove strainer.And pre- Box out interior placing expansive concrete.
The advantage of this patent is:
1st, this patent solves prefabricated case beam bale handle process by the way of external prestressing is applied from structure stress angle The problem of middle concrete cracking, effect significantly, is influenceed small by external condition.
2nd, the studs 1 involved by this patent reinforcement measure is interim construction, dismountable recycling after the completion of construction, It is cost-effective;Studs 1 is recyclable to be used for other permanent structures.
3rd, the installation position and pre-add force value for the studs 1 that this patent reinforcement measure is related to calculate determination as required, It can implement in the prefabricated case beam of various use top board bale handles, have a wide range of application.
The above, only this patent preferably embodiment, but the protection domain of this patent is not limited thereto, Any one skilled in the art is in the technical scope that this patent is disclosed, the change or replacement that can be readily occurred in, It should all cover within the protection domain of this patent.Therefore, the protection domain of this patent should be with the protection model of claims Enclose and be defined.

Claims (6)

1. a kind of high-speed railway two-wire prefabricated case beam bale handle reinforcement means, it is characterised in that including:
Before prefabricated case beam bale handle, external prestressing is applied between the top board (6) and base plate (7) of box beam, make box beam top board (6) and Web (8) junction concrete is in pressured state before bale handle, it is to avoid crackle occurs in concrete in tension at this during bale handle.
2. high-speed railway two-wire prefabricated case beam bale handle reinforcement means according to claim 1, it is characterised in that described applies Plus the method for external prestressing includes:
Multiple strainers are set between top board (6) and base plate (7), and top board (6) is fixed in strainer upper end, and lower end is fixed on Base plate (7), external prestressing is applied between top board (6) and base plate (7).
3. high-speed railway two-wire prefabricated case beam bale handle reinforcement means according to claim 2, it is characterised in that described The perforate on nut and top board (6) and base plate (7) that tight mechanism coordinates including studs (1), two ends;
Studs (1) leads to through the perforate on top board (6) and base plate (7) in the top surface of top board (6) with the bottom surface of base plate (7) Nut is crossed to fix;
Applying external prestressing method includes:According to the Space Calculation Analysis of box-beam structure, it is determined that needed for avoiding concrete cracking Pre-add force value, choose studs (1) and the parameter of nut according to pre-add force value;
Studs (1) is penetrated from the perforate of box beam top board (6), is passed from the perforate of base plate (7), and base plate is fixed on nut (7) bottom surface;
Box beam top board (6) top surface using jack pair studs (1) carry out tensioning, after tensioning in place, tighten double end spiral shell The nut of post (1) upper end, removes jack, applies precompression process and completes.
4. high-speed railway two-wire prefabricated case beam bale handle reinforcement means according to claim 3, it is characterised in that the box beam Pvc pipe pore-forming is taken out after pre-buried pvc pipe is poured in perforate before pouring on top board (6) and base plate (7), and movable mold is set Block, after the completion of construction in preformed hole placing expansive concrete.
5. high-speed railway two-wire prefabricated case beam bale handle reinforcement means according to claim 3, it is characterised in that described carries After beam installation terminates, utilize jack to unclamp studs (1), remove strainer.
6. the high-speed railway two-wire prefabricated case beam bale handle reinforcement means according to claim 2,3,4 or 5, it is characterised in that Described strainer is located at bale handle lifting hole(eyelet) (5) and is symmetrical arranged by box-beam structure centerline side, and the position set is avoided Box beam longitudinal prestressing steel beam (2), beam falling prevention stopping block embedded sleeve barrel (3) and bearing pre-embedded steel slab (4).
CN201710249802.XA 2017-04-17 2017-04-17 A kind of high-speed railway two-wire prefabricated case beam bale handle reinforcement means Active CN106948279B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710249802.XA CN106948279B (en) 2017-04-17 2017-04-17 A kind of high-speed railway two-wire prefabricated case beam bale handle reinforcement means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710249802.XA CN106948279B (en) 2017-04-17 2017-04-17 A kind of high-speed railway two-wire prefabricated case beam bale handle reinforcement means

Publications (2)

Publication Number Publication Date
CN106948279A true CN106948279A (en) 2017-07-14
CN106948279B CN106948279B (en) 2018-08-14

Family

ID=59476109

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710249802.XA Active CN106948279B (en) 2017-04-17 2017-04-17 A kind of high-speed railway two-wire prefabricated case beam bale handle reinforcement means

Country Status (1)

Country Link
CN (1) CN106948279B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605212A (en) * 2021-07-29 2021-11-05 广东省交通规划设计研究院集团股份有限公司 Anti-cracking structure for single-box double-chamber prefabricated segment box girder in construction period and construction method thereof
CN114922125A (en) * 2022-05-07 2022-08-19 山东交通学院 PC beam type bridge, and reinforcing device and method for PC beam type bridge

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202047377U (en) * 2011-04-26 2011-11-23 中铁二院工程集团有限责任公司 Reinforcing structure of concrete box girder
KR20110126781A (en) * 2010-05-18 2011-11-24 동도산업 주식회사 Inner formwork for pre-stressed concrete box girder of precast segmental method
CN202247707U (en) * 2011-06-10 2012-05-30 广东工业大学 Vertical external prestress and steel plate combined reinforcing box girder structure
JP2013142226A (en) * 2012-01-10 2013-07-22 Sumitomo Mitsui Construction Co Ltd Construction method for box girder bridge
CN103485286A (en) * 2013-10-08 2014-01-01 中铁二局股份有限公司 Method for strengthening box girder prefabricated segment box chamber

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110126781A (en) * 2010-05-18 2011-11-24 동도산업 주식회사 Inner formwork for pre-stressed concrete box girder of precast segmental method
CN202047377U (en) * 2011-04-26 2011-11-23 中铁二院工程集团有限责任公司 Reinforcing structure of concrete box girder
CN202247707U (en) * 2011-06-10 2012-05-30 广东工业大学 Vertical external prestress and steel plate combined reinforcing box girder structure
JP2013142226A (en) * 2012-01-10 2013-07-22 Sumitomo Mitsui Construction Co Ltd Construction method for box girder bridge
CN103485286A (en) * 2013-10-08 2014-01-01 中铁二局股份有限公司 Method for strengthening box girder prefabricated segment box chamber

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605212A (en) * 2021-07-29 2021-11-05 广东省交通规划设计研究院集团股份有限公司 Anti-cracking structure for single-box double-chamber prefabricated segment box girder in construction period and construction method thereof
CN114922125A (en) * 2022-05-07 2022-08-19 山东交通学院 PC beam type bridge, and reinforcing device and method for PC beam type bridge

Also Published As

Publication number Publication date
CN106948279B (en) 2018-08-14

Similar Documents

Publication Publication Date Title
CN212743091U (en) Two-way superimposed sheet with repeatedly usable rings
CN101748674B (en) Road construction method
CN103821359A (en) Large-cross-section concrete beam layered casting construction method
CN104631332B (en) PC T beam precast erection construction method
CN106988436A (en) A kind of method of reserving hole closure
CN106948279A (en) A kind of high-speed railway two-wire prefabricated case beam bale handle reinforcement means
CN105507470A (en) Periphery-overlapped integral fabricated floor and construction method thereof
CN110080454A (en) LPM light filling body Construction of Cast-in-situ Concrete Hollow
CN107984610B (en) A kind of prestressing force small box girder production method
CN103195259A (en) Foam concrete prefabricated slab and method for reinforcing concrete structure by same
CN106498847B (en) A kind of connection structure and connection method of prefabricated bent cap and prefabricated stand column
CN105735099B (en) Construction time uses the simple supported-to-continuous girder bridge and its construction method of external prestressing
CN207812307U (en) The construction system of Cable stayed Bridge Main Tower and steel anchor beam
CN208121795U (en) Connecting structure of PHC pipe pile foundation pile and bearing platform of overhead transmission line
CN103552911B (en) A kind of movable boom hoisting and the construction installation method of use thereof
CN105649248A (en) Fabricated prestressed concrete hollow slab and cast-in-place beam integrated construction method
CN206319620U (en) A kind of floor concrete casting controls scale
CN210828319U (en) Post-cast strip mold hanging combination tool free of support
CN109138280A (en) A kind of concrete pad and its application in control bar spacing, slab thickness
CN207686147U (en) Floor and double steel bar protective layer thickness control device
CN203904785U (en) Multifunctional pressing rod of track slab of CRTS III plate type ballastless track
CN207794322U (en) A kind of built-in fitting
CN106437150A (en) Fixing device for preventing flotation of reinforcing steel bars in reinforced concrete
CN203129604U (en) Structure for controlling thickness of reinforced concrete floor slab
CN206815795U (en) A kind of new builder's jack component

Legal Events

Date Code Title Description