CN106944779B - AP1000 steam generator wall support rack mounting devices and method - Google Patents

AP1000 steam generator wall support rack mounting devices and method Download PDF

Info

Publication number
CN106944779B
CN106944779B CN201710067993.8A CN201710067993A CN106944779B CN 106944779 B CN106944779 B CN 106944779B CN 201710067993 A CN201710067993 A CN 201710067993A CN 106944779 B CN106944779 B CN 106944779B
Authority
CN
China
Prior art keywords
wall
adjustment
locating piece
frame
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710067993.8A
Other languages
Chinese (zh)
Other versions
CN106944779A (en
Inventor
郝阿全
陈赞科
蔡迎东
皮兴刚
胡杏杰
谭敦权
余丰齐
李瑞政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry Fifth Construction Co Ltd
Original Assignee
China Nuclear Industry Fifth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry Fifth Construction Co Ltd filed Critical China Nuclear Industry Fifth Construction Co Ltd
Priority to CN201710067993.8A priority Critical patent/CN106944779B/en
Priority to CN201711466027.XA priority patent/CN108274140B/en
Publication of CN106944779A publication Critical patent/CN106944779A/en
Application granted granted Critical
Publication of CN106944779B publication Critical patent/CN106944779B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K31/00Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/0426Fixtures for other work
    • B23K37/0435Clamps
    • B23K37/0443Jigs

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)
  • Connection Of Plates (AREA)

Abstract

The invention belongs to nuclear power generating equipment installing areas, and in particular to a kind of AP1000 steam generators wall support rack mounting device and method.During in order to solve the wall bracket of AP1000 steam generators and plant compartment wall being welded and fixed, there are position relationship between two carrier frame plates uncontrollable and installation accuracy it is not high the problem of, the invention discloses a kind of brand-new AP1000 steam generator wall support rack mounting devices.The device includes locating piece, connection component, support component and limiting card, and two carrier frame plates are fixed as one by locating piece, carries out the adjustment and fixation of installation site to wall bracket by support component.It so can not only carry out the accurate adjustment of height and angle to wall bracket at any time in the welding process, ensure the precision of wall bracket fixed position, and by the way that two carrier frame plates are fixed in advance into row position, so as to reduce the variable quantity of welding process, the precision of welding efficiency and installation site is improved.

Description

AP1000 steam generator wall support rack mounting devices and method
Technical field
The invention belongs to nuclear power generating equipment installing areas, and in particular to a kind of AP1000 steam generators wall bracket installation dress It puts and method.
Background technology
The support of AP1000 steam generators is made of 1 vertical support and 5 cross-braces, and cross-brace includes lower part 3 layers of lateral support member, middle part lateral support member and upper lateral support component, and these lateral support members are all logical Wall bracket is crossed to be fixed on the inner wall of steam generator device compartment.
With reference to shown in Fig. 1, the wall of AP1000 steam generators middle and lower part lateral support member and middle part lateral support member Body bracket 1 includes two independences and the identical carrier frame plate 11 of structure and pin shaft hole 12.Wherein, it is flat between two carrier frame plates 11 Line space tolerance is ± 1.6mm, and is consolidated between the connecting pin of carrier frame plate 11 and plant compartment wall 2 into 74.6 ° of angles Fixed connection.The axis requirement of two pin shaft holes 12 keeps alignment, in order to wear axis pin, realizes wall bracket 1 and lower, transverse The connection of support component and the other structures in the lateral support member of middle part.
In conventional nuclear M310 heap-type, plant compartment wall is directly poured using concrete, and is passed through Lateral support member is precisely fixedly connected by the mode of pre-embedded bolt suspension column with plant compartment wall.But in AP1000 In nuclear power station, the plant compartment wall 2 of steam generator employs the modular construction that surface is metallic plate, such carrier frame plate 11 It needs to be fixedly connected with plant compartment wall 2 by welding.
However complete plant compartment wall 2 installation, when being welded and fixed to carrier frame plate 11 find asked there are following Topic:1st, since plant compartment wall 2 uses modular construction of the surface for metallic plate, exist not by its surface after welding assembly Distortion and deformation of unevenness with degree.At this point, the welding surface out-of-flatness between carrier frame plate 11 and equipment interval wall 2, soldered Gap is irregular, and the welding force unevenness generated in the welding process to carrier frame plate 11 makes two carrier frame plates 11 and plant compartment wall 2 Between fixed position and angle irregular random variation occurs, cause the position relationship between two carrier frame plates 11 can not Control, can not meet design requirement.2nd, in the welding process, the fixation of welding position is carried out to carrier frame plate 11 by hanging device, All the position of carrier frame plate 11 and angle can not precisely be adjusted so in hoisting process and welding process, influence wall The installation accuracy of bracket 1.
The content of the invention
During in order to solve the wall bracket of AP1000 steam generators and plant compartment wall being welded and fixed, due to Welding surface irregular between wall bracket and equipment interval wall and cause the uncontrollable of position relationship between two carrier frame plates, And the problem of can not precisely being adjusted on wall bracket and influencing wall bracket installation accuracy, the present invention propose a kind of complete New AP1000 steam generator wall support rack mounting devices, and three-dimensional system of coordinate is established in the spatial position where the device, The axis direction of two pin shaft holes is x-axis wherein along wall bracket, and carrier frame plate stretches to plant compartment wall along wall bracket Direction for y-axis, be z-axis perpendicular to the direction of plane where x-axis and y-axis.The device includes:Locating piece, connection component, support Component and limiting card;Wherein,
The locating piece is three-stage structure, including centrally located locating piece and the connection positioned at end positions Block, and it is equipped with first through hole through the locating piece and the link block along the x-axis direction of the locating piece;Shown wall Pin shaft hole in bracket is set on the link block, and the carrier frame plate in the wall bracket sticks on the end face of the locating piece On;The length dimension of the locating piece along the x-axis direction is equal to the spacing dimension between two carrier frame plate opposite faces, perpendicular to The sectional dimension of x-axis is more than sectional dimension of the pin shaft hole perpendicular to x-axis;The length dimension of the link block along the x-axis direction Less than the length dimension of the pin shaft hole along the x-axis direction, it is equal to the pin shaft hole perpendicular to x-axis perpendicular to the sectional dimension of x-axis Sectional dimension;
The connection component, including two connecting plates and a connecting rod;The x-axis direction of the connecting plate is equipped with second Through hole, for wearing the connecting rod;The connecting plate is more than the pin shaft hole perpendicular to x-axis perpendicular to the sectional dimension of x-axis Sectional dimension;The end of the connecting rod is equipped with external thread structure;Two connecting plates are located at two carrier frame plates respectively Back to face, and by the connecting rod through the first through hole, second through hole and the pin shaft hole, by the wall Bracket, the locating piece and the connecting plate are connected as a single entity;
The support component, including adjustment frame and supporting rack;The adjustment frame is set there are four plane, and is set in each plane There is adjusting screw;One end of support frame as described above is connected with the adjustment frame, the other end and plant compartment wall connecting;The wall Bracket is located in the adjustment frame, and by the adjusting screw to the opposite position between the wall bracket and the adjustment frame The relation of putting is adjusted and fixes;
The limiting card is epsilon-type structure, inserts and connects with the wall bracket;It is two neighboring convex in the limiting card The distance of opposite face is equal to the length dimension of the carrier frame plate along the x-axis direction between rising, the width of intermediate projections in the limiting card Spend the spacing dimension that size is equal between carrier frame plate opposite face described in two pieces.
Preferably, four planes of the adjustment frame are respectively:Two horizontal end faces being mutually parallel and two are mutually flat Capable the vertical side face;It is set on the horizontal end face there are five adjusting screw, one of them described adjusting screw is located at the level The center of end face, remaining four described adjusting screw are located at four corner locations of the horizontal end face respectively;It is described perpendicular It is set on straight end face there are four adjusting screw, and is located at four corner locations of the perpendicular respectively.
It is further preferred that support frame as described above includes the supporting rack of adjustment frame horizontal ends and the support of adjustment frame vertical end Frame, the supporting rack of the adjustment frame horizontal ends, is used to support the horizontal end face for adjusting frame;The branch of the adjustment frame horizontal ends Support includes support platform and support leg, and the support platform is engraved structure, and is fixed with the plant compartment wall body vertical Connection;Described support leg one end is fixedly connected with the support platform, and the other end is fixedly connected with the plant compartment wall.
Preferably, the locating piece is split structure, and the link block is detachably connected with the locating piece by plug-in unit It connects;Wherein, the locating piece is equipped with third through-hole for wearing the link block along the x-axis direction, along the z-axis direction equipped with four-way For inserting the plug-in unit, the third through-hole intersects with the fourth hole to be communicated in hole;The link block is equipped with along the x-axis direction The first through hole is used to insert the plug-in unit along the z-axis direction equipped with fifth hole.
It is further preferred that the device includes two pieces limiting card, respectively positioned at the connecting pin of the wall bracket and freedom End.
A kind of AP1000 steam generator wall support rack mounting devices using described in above-mentioned any one steam AP1000 The method that vapour generator wall bracket is installed, comprises the following steps:
The first step assembles wall carriage assembly;First, the carrier frame plate is threaded through respectively by the pin shaft hole described On the link block of locating piece, and stick on the end face of the locating piece;Then, the connecting plate is placed in support described in two pieces Frame plate back on face, and the first through hole is alignd with second through hole;Finally, by the connecting rod described in First through hole, second through hole and the pin shaft hole connect the connecting plate, the carrier frame plate and the locating piece It is integrated, and passes through locking nut and be locked;
Second step, fixed support component;First, by the design fixed position of the wall bracket be incident upon the equipment every Between on wall and carry out setting-out;Then, the supporting rack of the adjustment frame horizontal ends is fixed with the plant compartment wall Connection;Then, the adjustment frame is placed on the supporting rack of the adjustment frame horizontal ends and between the plant compartment wall Into 74.6 ° of angles, adjustment the distance between the frame and the plant compartment wall are adjusted, preset clearance is used for subsequent welding Operation;
3rd step, lifting and adjustment wall carriage assembly;First, the wall carriage assembly level is put along the y-axis direction Enter in the adjustment frame, and by the locating piece with being located at the adjusting screw of horizontal ends face center along z in the adjustment frame Direction of principal axis alignment is set;Then, along the y-axis direction, while the position of the adjustment frame and the wall carriage assembly is moved, adjusted Welded gaps between the connecting pin of the wall bracket and the plant compartment wall;Then, it is vertical by the adjustment frame Two the vertical side faces of the adjustment frame are fixedly connected by the supporting rack at end with the plant compartment wall, to the adjustment The spatial position of frame is fixed;Finally, by being located at height position of the adjustment part on the adjustment frame to the wall bracket It puts and is finely adjusted and fixes with angle, make to keep stable relative position between the wall bracket and the plant compartment wall Relation;
4th step, welding wall bracket;First, by the limiting card be inserted into respectively the wall bracket connecting pin and Free end;Then, by the preset clearance between the adjustment frame and the plant compartment wall, to the wall bracket and institute Plant compartment wall is stated to be welded;
5th step removes erecting device;After completing welding and detection, successively to the limiting card, the support component And the locating piece is removed.
Preferably, when the angle that the 3rd step carries out wall carriage assembly horizontal direction adjusts, first, will be located at described The adjusting screw for adjusting the horizontal end face center of frame two screws in the inside of the adjustment frame, and contacts lock with the locating piece Tightly;Then, diagonally adjustment is located at the adjusting screw in two the vertical side faces simultaneously, to the wall bracket into The angle adjustment of row horizontal direction.
Using AP1000 steam generators wall support rack mounting device of the present invention, to AP1000 steam generator wall brackets Installation fixation is carried out, is had the advantages that:
1st, the present invention by set one with the fixed support component of plant compartment wall relative position, to wall bracket into Row position supports and fixes, and so as to improve the stability of wall bracket locations in welding process, improves the energy for bearing welding deformation Power.In addition, establishing an interim shaft to wall bracket in adjustment frame by the adjusting screw being located in support component, and lead to Cross the angle that the adjusting screw of operation other positions makes wall bracket carry out relative device compartment wall horizontal direction around the shaft It rotates, ensures the angular relationship between wall bracket and plant compartment wall, so as to meet the design of wall bracket installation site It is required that.
2nd, the present invention by set and two carrier frame plates between spacing dimension and with the corresponding positioning of axis pin pore size Part, and pass through the locating piece and fixed the position relationship between two carrier frame plates in advance.So carrying out subsequent adjustment In welding operating process, it is only necessary to control the whole fixed position of two carrier frame plates, eliminate and adjusting and welding behaviour To the control and adjustment of relative position relation between two carrier frame plates in work, so as to reduce the variable quantity of welding process, weldering is improved Connect the precision of efficiency and installation site.
Description of the drawings
Fig. 1 is the structure diagram after AP1000 steam generator wall brackets are fixedly connected with plant compartment wall;
Fig. 2 be using AP1000 steam generators wall support rack mounting device of the present invention by wall bracket mounted on equipment every Between on wall when schematic diagram;
Fig. 3 is structure diagram when carrier frame plate in Fig. 2, locating piece and connection component three connect;
Fig. 4 is the structure diagram of support component in Fig. 2;
Fig. 5 is the schematic diagram that locating piece uses split structure in the present invention;
Fig. 6 is to AP1000 steam generator walls using AP1000 steam generators wall support rack mounting device of the present invention The flow chart that bracket is installed;
Fig. 7 is to carry out horizontal direction to wall bracket using AP1000 steam generators wall support rack mounting device of the present invention The structure diagram of angle adjustment.
Specific embodiment
It describes in detail below in conjunction with the accompanying drawings to the technical solution in the present invention.With reference to shown in Fig. 1, build in the present invention A three-dimensional system of coordinate is found in order to which this incidence of criminal offenses is introduced, wherein being x-axis along the axis direction of two pin shaft holes 12, along two A carrier frame plate 11 stretches to the direction of plant compartment wall 2 for y-axis, is z-axis perpendicular to the direction of plane where x-axis and y-axis.
With reference to shown in Fig. 1 and Fig. 2, AP1000 steam generator walls support rack mounting device includes locating piece 3, connection component 4th, support component 5 and limiting card 6.Wherein, locating piece 3 is located between two carrier frame plates 11 of wall bracket 1, and passes through connection Wall bracket 1 and locating piece 3 are composed of a fixed connection wall carriage assembly by component 4.
With reference to shown in Fig. 3, locating piece 3 is three-stage structure, including centrally located locating piece 31 and positioned at both ends The link block 32 of position, and it is equipped with first through hole 33 through locating piece 31 and link block 32 along the x-axis direction of locating piece 3. Wherein, the length dimension of locating piece 31 along x-axis is equal to the design spacing between two carrier frame plates 11, and vertical in locating piece 31 It is more than sectional dimension of the pin shaft hole 12 perpendicular to x-axis in the sectional dimension of x-axis.Link block 32 is less than pin along the length dimension of x-axis Length dimension of the axis hole 12 along x-axis, and the sectional dimension in link block 32 perpendicular to x-axis is equal to the cutting along x-axis of pin shaft hole 12 Face size.In this way, carrier frame plate 11 is respectively sleeved on link block 32 by pin shaft hole 12, and sticks on determine along the x-axis direction When on the end face of position block 31, you can to fix the spacing dimension between two carrier frame plates 11, it is also ensured that two pin shaft holes 12 It is located along the same line.
Connection component 4 includes two connecting plates 41 and a connecting rod 42, wherein, cutting perpendicular to x-axis in connecting plate 41 Face size is more than sectional dimension of the pin shaft hole 12 along x-axis, and connecting plate 41 is equipped with the second through hole 411 along the x-axis direction, for wearing If connecting rod 42.Two ends of connecting rod 42 are equipped with external thread structure, for connecting clamping screw 43.When locating piece 3 and support After frame plate 11 connects, by two connecting plates 41 be respectively placed in two carrier frame plates 11 back on face, and pass through connecting rod 42 and lock Two connecting plates, 41, two carrier frame plates 11 and locating piece 3 are attached and fixed and to form wall carriage assembly by tight screw 43.
With reference to shown in Fig. 2 and Fig. 4, support component 5 includes adjustment frame 51 and supporting rack 52.Frame 51 is adjusted by four set of planes Into, be divided into two horizontal end faces 511 being mutually parallel and two the vertical side faces 512 being mutually parallel, wherein horizontal end face 511 with X/y plane is mutually parallel, and the vertical side face 512 and yz planes are mutually parallel.One end of supporting rack 52 is connected with adjustment frame 51, another End is connected with plant compartment wall 2, is used to support and fixes the spatial position of adjustment frame 51.In the present invention, support component 5 is set There are three supporting rack 52, two of which supporting rack 52 is rod-like structure, and is connected with adjusting two the vertical side faces 512 of frame 51 and fixing It connects;3rd supporting rack 52 includes a support platform 521 and two support legs 522, and positioned at the lower section of adjustment frame 51, is used for Support adjustment frame 51.The engraved structure that wherein support platform 521 is made of metal rod.
In addition, multiple adjusting screws 53 are respectively equipped in each plane of adjustment frame 51, for adjusting and fixing wall The position of bracket 1.On horizontal end face 511, if there are five adjusting screw 53, one of adjusting screw 53 is located at horizontal end face 511 center, remaining four adjusting screw 53 are located at four corner locations of horizontal end face 511 respectively.In the vertical side face On 512, if there are four adjusting screw 53, and it is located at four corner locations of the vertical side face 512 respectively.
Limiting card 6 is that two carrier frame plates 11 in epsilon-type structure, with wall bracket 1 are connected by inserting.Wherein, /V Card 6 in it is two neighboring protrusion between opposite face apart from size be equal to the length dimension of carrier frame plate 11 along the x-axis direction, limiting card 6 The width dimensions of middle intermediate projections are equal to the spacing dimension between two pieces carrier frame plate 11.
Preferably, with reference to shown in Fig. 5, locating piece 3 uses split structure, in order to realize between wall bracket 1 Fast assembling-disassembling.At this point, the link block 32 positioned at 3 both ends of locating piece is connected as an entirety, and pass through plug-in unit 34 and locating piece 31 It is dismounted.The x-axis direction of locating piece 31 is equipped with third through-hole 311 for wearing link block 33, and z-axis direction is equipped with fourth hole 312 for inserting plug-in unit 34, and wherein fourth hole 312 is mutually connected with third through-hole 311.The x-axis direction of link block 32 is equipped with For first through hole 33 for wearing connecting rod 42, z-axis direction is equipped with fifth hole 331 for inserting plug-in unit 34.The x-axis side of plug-in unit 34 To equipped with the 6th through hole 341, after locating piece 31 and link block 32 are completed connection by plug-in unit 34, the 6th through hole 341 and first is logical It aligns along the x-axis direction in hole 33.
With reference to shown in Fig. 6, using AP1000 steam generators wall support rack mounting device of the present invention, AP1000 steam is sent out Concretely comprising the following steps when raw device wall bracket is installed:
The first step assembles wall carriage assembly.With reference to shown in Fig. 3, first, two carrier frame plates 11 are divided by pin shaft hole 12 It is not threaded through on the link block 32 of locating piece 3, and sticks on along the x-axis direction on two end faces of intermediate mass 31.At this point, due to The length dimension of link block 32 along the x-axis direction is less than the length dimension of pin shaft hole 12 along the x-axis direction, so the end of link block 32 Positioned at the inside of pin shaft hole 12.Then, two connecting plates 41 in connection component 4 are sticked on to the back of the body of two carrier frame plates 11 respectively On opposite, and the second through hole 411 is alignd with first through hole 33.Finally, the second through hole 411, axis pin are passed through by connecting rod 42 Connecting plate 41, carrier frame plate 11 and locating piece 3 are connected as one, and pass through locking nut 43 by hole 12 and first through hole 33 It is locked, forms wall carriage assembly.
Second step, fixed support component.With reference to shown in Fig. 4, first, by the setting on plant compartment wall 2 of wall bracket 1 Meter position projects on the surface of plant compartment wall 2 and setting-out determines position.It then, will be positioned at the support of 51 lower section of adjustment frame Frame 52 is vertical with plant compartment wall 2 to be fixedly connected, and wherein support platform 521 is located at the lower section of setting-out position, and passes through support Leg 522 is supported fixation to support platform 521.Then, lifted by hanging device by frame 51 is adjusted to support platform 521 And adjustment frame 51 is rotated, make to keep about 74.6 ° of angle between adjustment frame 51 and plant compartment wall 2.Wherein, adjusted in lifting During whole frame 51, the horizontal end face 511 for adjusting frame 51 with support platform 521 is contacted, and will be located in horizontal end face 511 The adjusting screw 53 of heart position is placed in the intermediate hollow-out part of support platform 521, in order to be operated to adjusting screw 53.
3rd step, lifting and adjustment wall carriage assembly.With reference to shown in Fig. 2, first, by hanging device by wall bracket Component is along the y-axis direction in horizontal lifting to adjustment frame 51, and by the connecting pin of wall bracket 1, i.e., equipped with groove in carrier frame plate 11 One end, extend out to adjustment frame 51 outside.Wherein, the locating piece 31 in wall carriage assembly in adjustment frame 51 with being located at level The adjusting screw 53 of 511 center of end face is alignd along the z-axis direction.Then, along the y-axis direction, while adjustment frame 51 and wall is adjusted The position of body carriage assembly makes the distance between connecting pin and plant compartment wall 2 of wall bracket 1 be equal to welded gaps.So Afterwards, two the vertical side faces 512 for adjusting frame 51 are consolidated with plant compartment wall 2 by the supporting rack 52 of two rod-like structures Fixed connection, is fixed the spatial position for adjusting frame 51.Finally, by being located at the adjustment part 53 in adjustment 51 4 planes of frame The spatial position and angle of wall bracket 1 are finely adjusted and fixed, makes to keep between wall bracket 1 and plant compartment wall 2 Stable relative position relation.Wherein, before spatial position fixation is carried out to adjustment frame 51 by supporting rack 52, it is ensured that adjustment frame There is certain space, for subsequent welding operation between 51 and plant compartment wall 2.
4th step, welding wall bracket.With reference to shown in Fig. 2, due in the present invention by two 11 pre-assemblies of carrier frame plate For an entirety, unilateral welding operation can only be carried out back to face to two carrier frame plates 11, so there is support in the welding process Frame plate 11 is inclined to the deformation in itself groove direction.Therefore before welding, two limiting cards 6 are inserted into wall bracket respectively first 1 connecting pin and free end, and on the premise of subsequently welding operation is not influenced, limiting card 6 is mounted on connection as far as possible End and the end position of free end, to reduce the opposite shape occurred in welding process between two carrier frame plates 11 to greatest extent Variable controls the contraction distortion of connecting pin and the dilatating and deformable of free end, so that the spacing between two carrier frame plates 11 is protected Hold monolithic stability.Then, by adjusting the preset clearance between frame 51 and plant compartment wall 2, to wall bracket 1 and equipment every Between wall 2 be welded and fixed, and in the welding process, two carrier frame plates 11 are synchronized and are symmetrically welded, balance is entire The stressing conditions of wall carriage assembly.
5th step removes erecting device.After welding and relevant detection is completed, successively to limiting card 6, support component 5 And locating piece 3 is removed.Wherein, with reference to shown in Fig. 5, in the present invention, to being carried out using the locating piece 3 of split structure During dismounting, remove connection component 4 first, then take out plug-in unit 34, then by hanging device to the position of locating piece 31 into Row temporary support is fixed, and finally releases link block 32 from third through-hole 311, so as to complete the dismounting of locating piece 3.
With reference to shown in Fig. 7, when the angle that the 3rd step carries out wall bracket 1 horizontal direction adjusts, i.e., carried out along F directions Angle adjusts the design requirement for meeting 74.6 ° of angles between wall bracket 1 and plant compartment wall 2.First, adjustment will be located at The adjusting screw 531 of horizontal 511 center of end face of frame 51 two is screwed in adjustment frame 51, and contacts locking with locating piece 31. At this point, under the action of two adjusting screws 531 of horizontal 511 center of end face, one is formed along the z-axis direction of locating piece 31 Shaft L.Then, diagonally adjustment is located at the adjusting screw 53 in two the vertical side faces 512 simultaneously, i.e., adjusts position simultaneously In adjusting screw 532 or adjusting screw 533 in two the vertical side faces 512, making wall bracket 1, L carries out water along F directions around the shaft Flat turn is moved.After the adjustment for completing angle, other adjusting screws 53 are screwed in adjustment frame 51, wall carriage assembly is locked It is fixed.

Claims (7)

1. a kind of AP1000 steam generators wall support rack mounting device, three-dimensional coordinate is established in the spatial position where the device System, wherein the axis direction of two pin shaft holes is x-axis along wall bracket, carrier frame plate stretches to plant compartment wall along wall bracket The direction of body is y-axis, is z-axis perpendicular to the direction of plane where x-axis and y-axis, which is characterized in that the device include locating piece, Connection component, support component and limiting card;Wherein,
The locating piece is three-stage structure, including centrally located locating piece and the link block positioned at end positions, and And it is equipped with first through hole through the locating piece and the link block along the x-axis direction of the locating piece;Shown wall bracket In pin shaft hole be set on the link block, the carrier frame plate in the wall bracket is sticked on the end face of the locating piece; The length dimension of the locating piece along the x-axis direction is equal to the spacing dimension between two carrier frame plate opposite faces, perpendicular to x-axis Sectional dimension be more than the pin shaft hole perpendicular to x-axis sectional dimension;The length dimension of the link block along the x-axis direction is less than The length dimension of the pin shaft hole along the x-axis direction is equal to the pin shaft hole cutting perpendicular to x-axis perpendicular to the sectional dimension of x-axis Face size;
The connection component, including two connecting plates and a connecting rod;It is logical that the x-axis direction of the connecting plate is equipped with second Hole, for wearing the connecting rod;The connecting plate is more than the pin shaft hole perpendicular to x-axis perpendicular to the sectional dimension of x-axis Sectional dimension;The end of the connecting rod is equipped with external thread structure;Two connecting plates are located at the back of the body of two carrier frame plates respectively Opposite, and by the connecting rod through the first through hole, second through hole and the pin shaft hole, by the wall support Frame, the locating piece and the connecting plate are connected as a single entity;
The support component, including adjustment frame and supporting rack;The adjustment frame is set there are four plane, and each plane is equipped with and adjusts Save screw;One end of support frame as described above is connected with the adjustment frame, the other end and plant compartment wall connecting;The wall bracket The relative position between the wall bracket and the adjustment frame is closed in the adjustment frame, and by the adjusting screw System is adjusted and fixes;
The limiting card is epsilon-type structure, and inserts and connect with the wall bracket;Two neighboring protrusion in the limiting card Between the distance of opposite face be equal to the length dimension of the carrier frame plate along the x-axis direction, the width of intermediate projections in the limiting card Size is equal to the spacing dimension between carrier frame plate opposite face described in two pieces.
2. AP1000 steam generators wall support rack mounting device according to claim 1, which is characterized in that the adjustment Four planes of frame are respectively:Two horizontal end faces being mutually parallel and two the vertical side faces being mutually parallel;The horizontal ends It is set on face there are five adjusting screw, one of them described adjusting screw is located at the center of the horizontal end face, remaining four The adjusting screw is located at four corner locations of the horizontal end face respectively;Spiral shell is adjusted there are four being set in the vertical side face Nail, and it is located at four corner locations of the perpendicular respectively.
3. AP1000 steam generators wall support rack mounting device according to claim 2, which is characterized in that the support Frame includes the supporting rack of adjustment frame horizontal ends and the supporting rack of adjustment frame vertical end, and the supporting rack of the adjustment frame horizontal ends is used In the horizontal end face for supporting the adjustment frame;The supporting rack of the adjustment frame horizontal ends includes support platform and support leg, described Support platform is engraved structure, and is fixedly connected with the plant compartment wall body vertical;Described support leg one end and the support Platform is fixedly connected, and the other end is fixedly connected with the plant compartment wall.
4. AP1000 steam generators wall support rack mounting device according to claim 1, which is characterized in that the positioning Part is split structure, and the link block is detachably connected with the locating piece by plug-in unit;Wherein, the locating piece is along x-axis Direction is equipped with third through-hole for wearing the link block, described along the z-axis direction equipped with fourth hole for inserting the plug-in unit Third through-hole intersects with the fourth hole to be communicated;The link block is equipped with the first through hole along the x-axis direction, along the z-axis direction It is used to insert the plug-in unit equipped with fifth hole.
5. the AP1000 steam generator wall support rack mounting devices according to any one in claim 1-4, feature It is, which includes two pieces limiting card, respectively positioned at the connecting pin and free end of the wall bracket.
6. a kind of AP1000 steam generator wall support rack mounting devices pair in 1-5 using claim described in any one The method that AP1000 steam generator wall brackets are installed, which is characterized in that comprise the following steps:
The first step assembles wall carriage assembly;First, the carrier frame plate is threaded through by the positioning by the pin shaft hole respectively On the link block of part, and stick on the end face of the locating piece;Then, the connecting plate is placed in carrier frame plate described in two pieces Back on face, and the first through hole is alignd with second through hole;Finally, described first is passed through by the connecting rod The connecting plate, the carrier frame plate and the locating piece are connected as one by through hole, second through hole and the pin shaft hole Body, and pass through locking nut and be locked;
Second step, fixed support component;First, the design fixed position of the wall bracket is incident upon the plant compartment wall On body and carry out setting-out;Then, the supporting rack of the adjustment frame horizontal ends is fixedly connected with the plant compartment wall; Then, by it is described adjustment frame be placed in it is described adjustment frame horizontal ends supporting rack on and between the plant compartment wall into 74.6 ° of angles, adjust adjustment the distance between the frame and the plant compartment wall, and preset clearance is grasped for subsequent welding Make;
3rd step, lifting and adjustment wall carriage assembly;First, the wall carriage assembly level is put into institute along the y-axis direction It states in adjustment frame, and by the locating piece with being located at the adjusting screw of horizontal ends face center along z-axis side in the adjustment frame It is set to alignment;Then, along the y-axis direction, while the position of the mobile adjustment frame and the wall carriage assembly, described in adjustment Welded gaps between the connecting pin of wall bracket and the plant compartment wall;Then, the adjustment frame vertical end is passed through Two the vertical side faces of the adjustment frame are fixedly connected by supporting rack with the plant compartment wall, to the adjustment frame Spatial position is fixed;Finally, by be located at the adjustment part on the adjustment frame to the height and position of the wall bracket and Angle is finely adjusted and fixes, and makes between the wall bracket and the plant compartment wall stable relative position to be kept to close System;
4th step, welding wall bracket;First, the limiting card is inserted into connecting pin and the freedom of the wall bracket respectively End;Then, by the preset clearance between the adjustment frame and the plant compartment wall, to the wall bracket and described set Standby compartment wall is welded;
5th step removes erecting device;Complete welding and detection after, successively to the limiting card, the support component and The locating piece is removed.
7. AP1000 steam generators wall bracket installation method according to claim 6, which is characterized in that in the 3rd step When the angle adjustment of horizontal direction is carried out to wall carriage assembly, first, described adjustment two horizontal end face centers of frame will be located at The adjusting screw of position screws in the inside of the adjustment frame, and contacts locking with the locating piece;Then, diagonally together When adjustment be located at adjusting screw in two the vertical side faces, the angle that horizontal direction is carried out to the wall bracket adjusts.
CN201710067993.8A 2017-02-07 2017-02-07 AP1000 steam generator wall support rack mounting devices and method Active CN106944779B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710067993.8A CN106944779B (en) 2017-02-07 2017-02-07 AP1000 steam generator wall support rack mounting devices and method
CN201711466027.XA CN108274140B (en) 2017-02-07 2017-02-07 AP1000 steam generator wall bracket mounting device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710067993.8A CN106944779B (en) 2017-02-07 2017-02-07 AP1000 steam generator wall support rack mounting devices and method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201711466027.XA Division CN108274140B (en) 2017-02-07 2017-02-07 AP1000 steam generator wall bracket mounting device and method

Publications (2)

Publication Number Publication Date
CN106944779A CN106944779A (en) 2017-07-14
CN106944779B true CN106944779B (en) 2018-06-01

Family

ID=59465397

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201711466027.XA Active CN108274140B (en) 2017-02-07 2017-02-07 AP1000 steam generator wall bracket mounting device and method
CN201710067993.8A Active CN106944779B (en) 2017-02-07 2017-02-07 AP1000 steam generator wall support rack mounting devices and method

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201711466027.XA Active CN108274140B (en) 2017-02-07 2017-02-07 AP1000 steam generator wall bracket mounting device and method

Country Status (1)

Country Link
CN (2) CN108274140B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110504038B (en) * 2018-05-16 2023-05-26 中国核工业第五建设有限公司 Support assembly of nuclear island steam generator
CN109723938A (en) * 2019-01-31 2019-05-07 中国核工业二三建设有限公司 ACPR1000 reactor pressure vessel heap chamber heat-insulation support installation method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201091973Y (en) * 2007-11-13 2008-07-30 纬泰机械(上海)有限公司 Retaining support for welding workpieces
CN202866261U (en) * 2012-09-20 2013-04-10 中国核工业华兴建设有限公司 Operation hanging rack for civil construction
CN203380557U (en) * 2013-06-13 2014-01-08 天津巨龙暖通设备开发有限公司 Welding tool for heating radiator groups
CN204343692U (en) * 2014-12-02 2015-05-20 中国核工业二四建设有限公司 The large-scale penetration piece adjustable tool of a kind of nuclear power station

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1031703A1 (en) * 1982-04-19 1983-07-30 Волгодонский Филиал Всесоюзного Проектно-Конструкторского Технологического Института Атомного Машиностроения И Котлостроения Place for welding operator
KR100623767B1 (en) * 2004-06-21 2006-09-19 현대자동차주식회사 Teaching auxiliary device for a spot welding robot system
FR2877246B1 (en) * 2004-10-29 2007-03-02 Framatome Anp Sas METHOD AND APPARATUS FOR AUTOMATIC WELDING OF TWO TUBULAR CYLINDRICAL AND LARGE DIAMETER PIECES OF A NUCLEAR REACTOR COMPONENT
JP2009107076A (en) * 2007-10-31 2009-05-21 Smc Corp Clamp device
CN202271123U (en) * 2011-09-15 2012-06-13 河南卫华重型机械股份有限公司 Inclined ladder tool
CN105451930B (en) * 2013-08-13 2017-09-15 株式会社Ihi Cylindrical container manufacture support meanss
CN105665952B (en) * 2014-11-21 2018-06-12 中国核工业第五建设有限公司 The steam generator compartment of nuclear power station and the channel module packaging technology that reloads
CN205520198U (en) * 2016-01-26 2016-08-31 中国能源建设集团安徽电力建设第二工程有限公司 A special stores pylon for membrane wall installation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201091973Y (en) * 2007-11-13 2008-07-30 纬泰机械(上海)有限公司 Retaining support for welding workpieces
CN202866261U (en) * 2012-09-20 2013-04-10 中国核工业华兴建设有限公司 Operation hanging rack for civil construction
CN203380557U (en) * 2013-06-13 2014-01-08 天津巨龙暖通设备开发有限公司 Welding tool for heating radiator groups
CN204343692U (en) * 2014-12-02 2015-05-20 中国核工业二四建设有限公司 The large-scale penetration piece adjustable tool of a kind of nuclear power station

Also Published As

Publication number Publication date
CN108274140B (en) 2020-07-07
CN108274140A (en) 2018-07-13
CN106944779A (en) 2017-07-14

Similar Documents

Publication Publication Date Title
CN106944779B (en) AP1000 steam generator wall support rack mounting devices and method
CN103624467A (en) Welding fixture for large-sized workpiece
CN209837625U (en) Dish knot formula scaffold frame
CN106670716B (en) Tool for automatic welding training
CN105269036B (en) A kind of wind-powered electricity generation base slant hole processing device and its processing method
CN105196076B (en) A kind of turning tool suitable for thrust bearing balance weight
CN204183158U (en) A kind of truss joint beam welding positioner
CN106363425A (en) Engine cylinder oblique-hole processing clamp and aligning method thereof
CN109339466A (en) Big section distortion steel box-girder assembling jig frame, assembly ejector apparatus and processing method
CN105587128A (en) Special fixture for mounting wallboard with heat insulation structure and mounting method for first-layer wallboard with heat insulation structure
CN207048368U (en) A kind of adjustable anchor ear device
CN106861908B (en) Sintering machine electric precipitator maintenance process
CN214883040U (en) Basket construction bracket is hung to high pier stud
CN106196650B (en) A kind of collector bracket moment of torsion frame erecting device and its installation, application method
CN110842601B (en) One-step processing and forming device and method for Z-shaped longitudinal beam
CN106514526A (en) Clamping system and method of bogie framework
CN212539587U (en) Earthquake force testing device for earthquake-resistant support
CN211966437U (en) Auxiliary welding device
CN221277102U (en) Large-area dry-hanging stone installation structure
CN216607766U (en) Strike broken frame backup pad welding frock
CN219972821U (en) Steel slot framework supporting device
CN104232113B (en) Dry coke quenching high-rise steel structure verticality of stand column adjusting pole and using method thereof
CN110273535A (en) A kind of steel structure of housing bracket
CN211728947U (en) Tooling for controlling space size of U-shaped bolt on plateau independent foundation
CN218676371U (en) Optimize display module assembly of LED display screen concatenation effect

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant