CN106944779B - AP1000 steam generator wall support rack mounting devices and method - Google Patents
AP1000 steam generator wall support rack mounting devices and method Download PDFInfo
- Publication number
- CN106944779B CN106944779B CN201710067993.8A CN201710067993A CN106944779B CN 106944779 B CN106944779 B CN 106944779B CN 201710067993 A CN201710067993 A CN 201710067993A CN 106944779 B CN106944779 B CN 106944779B
- Authority
- CN
- China
- Prior art keywords
- wall
- adjustment
- locating piece
- frame
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K31/00—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/0426—Fixtures for other work
- B23K37/0435—Clamps
- B23K37/0443—Jigs
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Monitoring And Testing Of Nuclear Reactors (AREA)
- Connection Of Plates (AREA)
Abstract
The invention belongs to nuclear power generating equipment installing areas, and in particular to a kind of AP1000 steam generators wall support rack mounting device and method.During in order to solve the wall bracket of AP1000 steam generators and plant compartment wall being welded and fixed, there are position relationship between two carrier frame plates uncontrollable and installation accuracy it is not high the problem of, the invention discloses a kind of brand-new AP1000 steam generator wall support rack mounting devices.The device includes locating piece, connection component, support component and limiting card, and two carrier frame plates are fixed as one by locating piece, carries out the adjustment and fixation of installation site to wall bracket by support component.It so can not only carry out the accurate adjustment of height and angle to wall bracket at any time in the welding process, ensure the precision of wall bracket fixed position, and by the way that two carrier frame plates are fixed in advance into row position, so as to reduce the variable quantity of welding process, the precision of welding efficiency and installation site is improved.
Description
Technical field
The invention belongs to nuclear power generating equipment installing areas, and in particular to a kind of AP1000 steam generators wall bracket installation dress
It puts and method.
Background technology
The support of AP1000 steam generators is made of 1 vertical support and 5 cross-braces, and cross-brace includes lower part
3 layers of lateral support member, middle part lateral support member and upper lateral support component, and these lateral support members are all logical
Wall bracket is crossed to be fixed on the inner wall of steam generator device compartment.
With reference to shown in Fig. 1, the wall of AP1000 steam generators middle and lower part lateral support member and middle part lateral support member
Body bracket 1 includes two independences and the identical carrier frame plate 11 of structure and pin shaft hole 12.Wherein, it is flat between two carrier frame plates 11
Line space tolerance is ± 1.6mm, and is consolidated between the connecting pin of carrier frame plate 11 and plant compartment wall 2 into 74.6 ° of angles
Fixed connection.The axis requirement of two pin shaft holes 12 keeps alignment, in order to wear axis pin, realizes wall bracket 1 and lower, transverse
The connection of support component and the other structures in the lateral support member of middle part.
In conventional nuclear M310 heap-type, plant compartment wall is directly poured using concrete, and is passed through
Lateral support member is precisely fixedly connected by the mode of pre-embedded bolt suspension column with plant compartment wall.But in AP1000
In nuclear power station, the plant compartment wall 2 of steam generator employs the modular construction that surface is metallic plate, such carrier frame plate 11
It needs to be fixedly connected with plant compartment wall 2 by welding.
However complete plant compartment wall 2 installation, when being welded and fixed to carrier frame plate 11 find asked there are following
Topic:1st, since plant compartment wall 2 uses modular construction of the surface for metallic plate, exist not by its surface after welding assembly
Distortion and deformation of unevenness with degree.At this point, the welding surface out-of-flatness between carrier frame plate 11 and equipment interval wall 2, soldered
Gap is irregular, and the welding force unevenness generated in the welding process to carrier frame plate 11 makes two carrier frame plates 11 and plant compartment wall 2
Between fixed position and angle irregular random variation occurs, cause the position relationship between two carrier frame plates 11 can not
Control, can not meet design requirement.2nd, in the welding process, the fixation of welding position is carried out to carrier frame plate 11 by hanging device,
All the position of carrier frame plate 11 and angle can not precisely be adjusted so in hoisting process and welding process, influence wall
The installation accuracy of bracket 1.
The content of the invention
During in order to solve the wall bracket of AP1000 steam generators and plant compartment wall being welded and fixed, due to
Welding surface irregular between wall bracket and equipment interval wall and cause the uncontrollable of position relationship between two carrier frame plates,
And the problem of can not precisely being adjusted on wall bracket and influencing wall bracket installation accuracy, the present invention propose a kind of complete
New AP1000 steam generator wall support rack mounting devices, and three-dimensional system of coordinate is established in the spatial position where the device,
The axis direction of two pin shaft holes is x-axis wherein along wall bracket, and carrier frame plate stretches to plant compartment wall along wall bracket
Direction for y-axis, be z-axis perpendicular to the direction of plane where x-axis and y-axis.The device includes:Locating piece, connection component, support
Component and limiting card;Wherein,
The locating piece is three-stage structure, including centrally located locating piece and the connection positioned at end positions
Block, and it is equipped with first through hole through the locating piece and the link block along the x-axis direction of the locating piece;Shown wall
Pin shaft hole in bracket is set on the link block, and the carrier frame plate in the wall bracket sticks on the end face of the locating piece
On;The length dimension of the locating piece along the x-axis direction is equal to the spacing dimension between two carrier frame plate opposite faces, perpendicular to
The sectional dimension of x-axis is more than sectional dimension of the pin shaft hole perpendicular to x-axis;The length dimension of the link block along the x-axis direction
Less than the length dimension of the pin shaft hole along the x-axis direction, it is equal to the pin shaft hole perpendicular to x-axis perpendicular to the sectional dimension of x-axis
Sectional dimension;
The connection component, including two connecting plates and a connecting rod;The x-axis direction of the connecting plate is equipped with second
Through hole, for wearing the connecting rod;The connecting plate is more than the pin shaft hole perpendicular to x-axis perpendicular to the sectional dimension of x-axis
Sectional dimension;The end of the connecting rod is equipped with external thread structure;Two connecting plates are located at two carrier frame plates respectively
Back to face, and by the connecting rod through the first through hole, second through hole and the pin shaft hole, by the wall
Bracket, the locating piece and the connecting plate are connected as a single entity;
The support component, including adjustment frame and supporting rack;The adjustment frame is set there are four plane, and is set in each plane
There is adjusting screw;One end of support frame as described above is connected with the adjustment frame, the other end and plant compartment wall connecting;The wall
Bracket is located in the adjustment frame, and by the adjusting screw to the opposite position between the wall bracket and the adjustment frame
The relation of putting is adjusted and fixes;
The limiting card is epsilon-type structure, inserts and connects with the wall bracket;It is two neighboring convex in the limiting card
The distance of opposite face is equal to the length dimension of the carrier frame plate along the x-axis direction between rising, the width of intermediate projections in the limiting card
Spend the spacing dimension that size is equal between carrier frame plate opposite face described in two pieces.
Preferably, four planes of the adjustment frame are respectively:Two horizontal end faces being mutually parallel and two are mutually flat
Capable the vertical side face;It is set on the horizontal end face there are five adjusting screw, one of them described adjusting screw is located at the level
The center of end face, remaining four described adjusting screw are located at four corner locations of the horizontal end face respectively;It is described perpendicular
It is set on straight end face there are four adjusting screw, and is located at four corner locations of the perpendicular respectively.
It is further preferred that support frame as described above includes the supporting rack of adjustment frame horizontal ends and the support of adjustment frame vertical end
Frame, the supporting rack of the adjustment frame horizontal ends, is used to support the horizontal end face for adjusting frame;The branch of the adjustment frame horizontal ends
Support includes support platform and support leg, and the support platform is engraved structure, and is fixed with the plant compartment wall body vertical
Connection;Described support leg one end is fixedly connected with the support platform, and the other end is fixedly connected with the plant compartment wall.
Preferably, the locating piece is split structure, and the link block is detachably connected with the locating piece by plug-in unit
It connects;Wherein, the locating piece is equipped with third through-hole for wearing the link block along the x-axis direction, along the z-axis direction equipped with four-way
For inserting the plug-in unit, the third through-hole intersects with the fourth hole to be communicated in hole;The link block is equipped with along the x-axis direction
The first through hole is used to insert the plug-in unit along the z-axis direction equipped with fifth hole.
It is further preferred that the device includes two pieces limiting card, respectively positioned at the connecting pin of the wall bracket and freedom
End.
A kind of AP1000 steam generator wall support rack mounting devices using described in above-mentioned any one steam AP1000
The method that vapour generator wall bracket is installed, comprises the following steps:
The first step assembles wall carriage assembly;First, the carrier frame plate is threaded through respectively by the pin shaft hole described
On the link block of locating piece, and stick on the end face of the locating piece;Then, the connecting plate is placed in support described in two pieces
Frame plate back on face, and the first through hole is alignd with second through hole;Finally, by the connecting rod described in
First through hole, second through hole and the pin shaft hole connect the connecting plate, the carrier frame plate and the locating piece
It is integrated, and passes through locking nut and be locked;
Second step, fixed support component;First, by the design fixed position of the wall bracket be incident upon the equipment every
Between on wall and carry out setting-out;Then, the supporting rack of the adjustment frame horizontal ends is fixed with the plant compartment wall
Connection;Then, the adjustment frame is placed on the supporting rack of the adjustment frame horizontal ends and between the plant compartment wall
Into 74.6 ° of angles, adjustment the distance between the frame and the plant compartment wall are adjusted, preset clearance is used for subsequent welding
Operation;
3rd step, lifting and adjustment wall carriage assembly;First, the wall carriage assembly level is put along the y-axis direction
Enter in the adjustment frame, and by the locating piece with being located at the adjusting screw of horizontal ends face center along z in the adjustment frame
Direction of principal axis alignment is set;Then, along the y-axis direction, while the position of the adjustment frame and the wall carriage assembly is moved, adjusted
Welded gaps between the connecting pin of the wall bracket and the plant compartment wall;Then, it is vertical by the adjustment frame
Two the vertical side faces of the adjustment frame are fixedly connected by the supporting rack at end with the plant compartment wall, to the adjustment
The spatial position of frame is fixed;Finally, by being located at height position of the adjustment part on the adjustment frame to the wall bracket
It puts and is finely adjusted and fixes with angle, make to keep stable relative position between the wall bracket and the plant compartment wall
Relation;
4th step, welding wall bracket;First, by the limiting card be inserted into respectively the wall bracket connecting pin and
Free end;Then, by the preset clearance between the adjustment frame and the plant compartment wall, to the wall bracket and institute
Plant compartment wall is stated to be welded;
5th step removes erecting device;After completing welding and detection, successively to the limiting card, the support component
And the locating piece is removed.
Preferably, when the angle that the 3rd step carries out wall carriage assembly horizontal direction adjusts, first, will be located at described
The adjusting screw for adjusting the horizontal end face center of frame two screws in the inside of the adjustment frame, and contacts lock with the locating piece
Tightly;Then, diagonally adjustment is located at the adjusting screw in two the vertical side faces simultaneously, to the wall bracket into
The angle adjustment of row horizontal direction.
Using AP1000 steam generators wall support rack mounting device of the present invention, to AP1000 steam generator wall brackets
Installation fixation is carried out, is had the advantages that:
1st, the present invention by set one with the fixed support component of plant compartment wall relative position, to wall bracket into
Row position supports and fixes, and so as to improve the stability of wall bracket locations in welding process, improves the energy for bearing welding deformation
Power.In addition, establishing an interim shaft to wall bracket in adjustment frame by the adjusting screw being located in support component, and lead to
Cross the angle that the adjusting screw of operation other positions makes wall bracket carry out relative device compartment wall horizontal direction around the shaft
It rotates, ensures the angular relationship between wall bracket and plant compartment wall, so as to meet the design of wall bracket installation site
It is required that.
2nd, the present invention by set and two carrier frame plates between spacing dimension and with the corresponding positioning of axis pin pore size
Part, and pass through the locating piece and fixed the position relationship between two carrier frame plates in advance.So carrying out subsequent adjustment
In welding operating process, it is only necessary to control the whole fixed position of two carrier frame plates, eliminate and adjusting and welding behaviour
To the control and adjustment of relative position relation between two carrier frame plates in work, so as to reduce the variable quantity of welding process, weldering is improved
Connect the precision of efficiency and installation site.
Description of the drawings
Fig. 1 is the structure diagram after AP1000 steam generator wall brackets are fixedly connected with plant compartment wall;
Fig. 2 be using AP1000 steam generators wall support rack mounting device of the present invention by wall bracket mounted on equipment every
Between on wall when schematic diagram;
Fig. 3 is structure diagram when carrier frame plate in Fig. 2, locating piece and connection component three connect;
Fig. 4 is the structure diagram of support component in Fig. 2;
Fig. 5 is the schematic diagram that locating piece uses split structure in the present invention;
Fig. 6 is to AP1000 steam generator walls using AP1000 steam generators wall support rack mounting device of the present invention
The flow chart that bracket is installed;
Fig. 7 is to carry out horizontal direction to wall bracket using AP1000 steam generators wall support rack mounting device of the present invention
The structure diagram of angle adjustment.
Specific embodiment
It describes in detail below in conjunction with the accompanying drawings to the technical solution in the present invention.With reference to shown in Fig. 1, build in the present invention
A three-dimensional system of coordinate is found in order to which this incidence of criminal offenses is introduced, wherein being x-axis along the axis direction of two pin shaft holes 12, along two
A carrier frame plate 11 stretches to the direction of plant compartment wall 2 for y-axis, is z-axis perpendicular to the direction of plane where x-axis and y-axis.
With reference to shown in Fig. 1 and Fig. 2, AP1000 steam generator walls support rack mounting device includes locating piece 3, connection component
4th, support component 5 and limiting card 6.Wherein, locating piece 3 is located between two carrier frame plates 11 of wall bracket 1, and passes through connection
Wall bracket 1 and locating piece 3 are composed of a fixed connection wall carriage assembly by component 4.
With reference to shown in Fig. 3, locating piece 3 is three-stage structure, including centrally located locating piece 31 and positioned at both ends
The link block 32 of position, and it is equipped with first through hole 33 through locating piece 31 and link block 32 along the x-axis direction of locating piece 3.
Wherein, the length dimension of locating piece 31 along x-axis is equal to the design spacing between two carrier frame plates 11, and vertical in locating piece 31
It is more than sectional dimension of the pin shaft hole 12 perpendicular to x-axis in the sectional dimension of x-axis.Link block 32 is less than pin along the length dimension of x-axis
Length dimension of the axis hole 12 along x-axis, and the sectional dimension in link block 32 perpendicular to x-axis is equal to the cutting along x-axis of pin shaft hole 12
Face size.In this way, carrier frame plate 11 is respectively sleeved on link block 32 by pin shaft hole 12, and sticks on determine along the x-axis direction
When on the end face of position block 31, you can to fix the spacing dimension between two carrier frame plates 11, it is also ensured that two pin shaft holes 12
It is located along the same line.
Connection component 4 includes two connecting plates 41 and a connecting rod 42, wherein, cutting perpendicular to x-axis in connecting plate 41
Face size is more than sectional dimension of the pin shaft hole 12 along x-axis, and connecting plate 41 is equipped with the second through hole 411 along the x-axis direction, for wearing
If connecting rod 42.Two ends of connecting rod 42 are equipped with external thread structure, for connecting clamping screw 43.When locating piece 3 and support
After frame plate 11 connects, by two connecting plates 41 be respectively placed in two carrier frame plates 11 back on face, and pass through connecting rod 42 and lock
Two connecting plates, 41, two carrier frame plates 11 and locating piece 3 are attached and fixed and to form wall carriage assembly by tight screw 43.
With reference to shown in Fig. 2 and Fig. 4, support component 5 includes adjustment frame 51 and supporting rack 52.Frame 51 is adjusted by four set of planes
Into, be divided into two horizontal end faces 511 being mutually parallel and two the vertical side faces 512 being mutually parallel, wherein horizontal end face 511 with
X/y plane is mutually parallel, and the vertical side face 512 and yz planes are mutually parallel.One end of supporting rack 52 is connected with adjustment frame 51, another
End is connected with plant compartment wall 2, is used to support and fixes the spatial position of adjustment frame 51.In the present invention, support component 5 is set
There are three supporting rack 52, two of which supporting rack 52 is rod-like structure, and is connected with adjusting two the vertical side faces 512 of frame 51 and fixing
It connects;3rd supporting rack 52 includes a support platform 521 and two support legs 522, and positioned at the lower section of adjustment frame 51, is used for
Support adjustment frame 51.The engraved structure that wherein support platform 521 is made of metal rod.
In addition, multiple adjusting screws 53 are respectively equipped in each plane of adjustment frame 51, for adjusting and fixing wall
The position of bracket 1.On horizontal end face 511, if there are five adjusting screw 53, one of adjusting screw 53 is located at horizontal end face
511 center, remaining four adjusting screw 53 are located at four corner locations of horizontal end face 511 respectively.In the vertical side face
On 512, if there are four adjusting screw 53, and it is located at four corner locations of the vertical side face 512 respectively.
Limiting card 6 is that two carrier frame plates 11 in epsilon-type structure, with wall bracket 1 are connected by inserting.Wherein, /V
Card 6 in it is two neighboring protrusion between opposite face apart from size be equal to the length dimension of carrier frame plate 11 along the x-axis direction, limiting card 6
The width dimensions of middle intermediate projections are equal to the spacing dimension between two pieces carrier frame plate 11.
Preferably, with reference to shown in Fig. 5, locating piece 3 uses split structure, in order to realize between wall bracket 1
Fast assembling-disassembling.At this point, the link block 32 positioned at 3 both ends of locating piece is connected as an entirety, and pass through plug-in unit 34 and locating piece 31
It is dismounted.The x-axis direction of locating piece 31 is equipped with third through-hole 311 for wearing link block 33, and z-axis direction is equipped with fourth hole
312 for inserting plug-in unit 34, and wherein fourth hole 312 is mutually connected with third through-hole 311.The x-axis direction of link block 32 is equipped with
For first through hole 33 for wearing connecting rod 42, z-axis direction is equipped with fifth hole 331 for inserting plug-in unit 34.The x-axis side of plug-in unit 34
To equipped with the 6th through hole 341, after locating piece 31 and link block 32 are completed connection by plug-in unit 34, the 6th through hole 341 and first is logical
It aligns along the x-axis direction in hole 33.
With reference to shown in Fig. 6, using AP1000 steam generators wall support rack mounting device of the present invention, AP1000 steam is sent out
Concretely comprising the following steps when raw device wall bracket is installed:
The first step assembles wall carriage assembly.With reference to shown in Fig. 3, first, two carrier frame plates 11 are divided by pin shaft hole 12
It is not threaded through on the link block 32 of locating piece 3, and sticks on along the x-axis direction on two end faces of intermediate mass 31.At this point, due to
The length dimension of link block 32 along the x-axis direction is less than the length dimension of pin shaft hole 12 along the x-axis direction, so the end of link block 32
Positioned at the inside of pin shaft hole 12.Then, two connecting plates 41 in connection component 4 are sticked on to the back of the body of two carrier frame plates 11 respectively
On opposite, and the second through hole 411 is alignd with first through hole 33.Finally, the second through hole 411, axis pin are passed through by connecting rod 42
Connecting plate 41, carrier frame plate 11 and locating piece 3 are connected as one, and pass through locking nut 43 by hole 12 and first through hole 33
It is locked, forms wall carriage assembly.
Second step, fixed support component.With reference to shown in Fig. 4, first, by the setting on plant compartment wall 2 of wall bracket 1
Meter position projects on the surface of plant compartment wall 2 and setting-out determines position.It then, will be positioned at the support of 51 lower section of adjustment frame
Frame 52 is vertical with plant compartment wall 2 to be fixedly connected, and wherein support platform 521 is located at the lower section of setting-out position, and passes through support
Leg 522 is supported fixation to support platform 521.Then, lifted by hanging device by frame 51 is adjusted to support platform 521
And adjustment frame 51 is rotated, make to keep about 74.6 ° of angle between adjustment frame 51 and plant compartment wall 2.Wherein, adjusted in lifting
During whole frame 51, the horizontal end face 511 for adjusting frame 51 with support platform 521 is contacted, and will be located in horizontal end face 511
The adjusting screw 53 of heart position is placed in the intermediate hollow-out part of support platform 521, in order to be operated to adjusting screw 53.
3rd step, lifting and adjustment wall carriage assembly.With reference to shown in Fig. 2, first, by hanging device by wall bracket
Component is along the y-axis direction in horizontal lifting to adjustment frame 51, and by the connecting pin of wall bracket 1, i.e., equipped with groove in carrier frame plate 11
One end, extend out to adjustment frame 51 outside.Wherein, the locating piece 31 in wall carriage assembly in adjustment frame 51 with being located at level
The adjusting screw 53 of 511 center of end face is alignd along the z-axis direction.Then, along the y-axis direction, while adjustment frame 51 and wall is adjusted
The position of body carriage assembly makes the distance between connecting pin and plant compartment wall 2 of wall bracket 1 be equal to welded gaps.So
Afterwards, two the vertical side faces 512 for adjusting frame 51 are consolidated with plant compartment wall 2 by the supporting rack 52 of two rod-like structures
Fixed connection, is fixed the spatial position for adjusting frame 51.Finally, by being located at the adjustment part 53 in adjustment 51 4 planes of frame
The spatial position and angle of wall bracket 1 are finely adjusted and fixed, makes to keep between wall bracket 1 and plant compartment wall 2
Stable relative position relation.Wherein, before spatial position fixation is carried out to adjustment frame 51 by supporting rack 52, it is ensured that adjustment frame
There is certain space, for subsequent welding operation between 51 and plant compartment wall 2.
4th step, welding wall bracket.With reference to shown in Fig. 2, due in the present invention by two 11 pre-assemblies of carrier frame plate
For an entirety, unilateral welding operation can only be carried out back to face to two carrier frame plates 11, so there is support in the welding process
Frame plate 11 is inclined to the deformation in itself groove direction.Therefore before welding, two limiting cards 6 are inserted into wall bracket respectively first
1 connecting pin and free end, and on the premise of subsequently welding operation is not influenced, limiting card 6 is mounted on connection as far as possible
End and the end position of free end, to reduce the opposite shape occurred in welding process between two carrier frame plates 11 to greatest extent
Variable controls the contraction distortion of connecting pin and the dilatating and deformable of free end, so that the spacing between two carrier frame plates 11 is protected
Hold monolithic stability.Then, by adjusting the preset clearance between frame 51 and plant compartment wall 2, to wall bracket 1 and equipment every
Between wall 2 be welded and fixed, and in the welding process, two carrier frame plates 11 are synchronized and are symmetrically welded, balance is entire
The stressing conditions of wall carriage assembly.
5th step removes erecting device.After welding and relevant detection is completed, successively to limiting card 6, support component 5
And locating piece 3 is removed.Wherein, with reference to shown in Fig. 5, in the present invention, to being carried out using the locating piece 3 of split structure
During dismounting, remove connection component 4 first, then take out plug-in unit 34, then by hanging device to the position of locating piece 31 into
Row temporary support is fixed, and finally releases link block 32 from third through-hole 311, so as to complete the dismounting of locating piece 3.
With reference to shown in Fig. 7, when the angle that the 3rd step carries out wall bracket 1 horizontal direction adjusts, i.e., carried out along F directions
Angle adjusts the design requirement for meeting 74.6 ° of angles between wall bracket 1 and plant compartment wall 2.First, adjustment will be located at
The adjusting screw 531 of horizontal 511 center of end face of frame 51 two is screwed in adjustment frame 51, and contacts locking with locating piece 31.
At this point, under the action of two adjusting screws 531 of horizontal 511 center of end face, one is formed along the z-axis direction of locating piece 31
Shaft L.Then, diagonally adjustment is located at the adjusting screw 53 in two the vertical side faces 512 simultaneously, i.e., adjusts position simultaneously
In adjusting screw 532 or adjusting screw 533 in two the vertical side faces 512, making wall bracket 1, L carries out water along F directions around the shaft
Flat turn is moved.After the adjustment for completing angle, other adjusting screws 53 are screwed in adjustment frame 51, wall carriage assembly is locked
It is fixed.
Claims (7)
1. a kind of AP1000 steam generators wall support rack mounting device, three-dimensional coordinate is established in the spatial position where the device
System, wherein the axis direction of two pin shaft holes is x-axis along wall bracket, carrier frame plate stretches to plant compartment wall along wall bracket
The direction of body is y-axis, is z-axis perpendicular to the direction of plane where x-axis and y-axis, which is characterized in that the device include locating piece,
Connection component, support component and limiting card;Wherein,
The locating piece is three-stage structure, including centrally located locating piece and the link block positioned at end positions, and
And it is equipped with first through hole through the locating piece and the link block along the x-axis direction of the locating piece;Shown wall bracket
In pin shaft hole be set on the link block, the carrier frame plate in the wall bracket is sticked on the end face of the locating piece;
The length dimension of the locating piece along the x-axis direction is equal to the spacing dimension between two carrier frame plate opposite faces, perpendicular to x-axis
Sectional dimension be more than the pin shaft hole perpendicular to x-axis sectional dimension;The length dimension of the link block along the x-axis direction is less than
The length dimension of the pin shaft hole along the x-axis direction is equal to the pin shaft hole cutting perpendicular to x-axis perpendicular to the sectional dimension of x-axis
Face size;
The connection component, including two connecting plates and a connecting rod;It is logical that the x-axis direction of the connecting plate is equipped with second
Hole, for wearing the connecting rod;The connecting plate is more than the pin shaft hole perpendicular to x-axis perpendicular to the sectional dimension of x-axis
Sectional dimension;The end of the connecting rod is equipped with external thread structure;Two connecting plates are located at the back of the body of two carrier frame plates respectively
Opposite, and by the connecting rod through the first through hole, second through hole and the pin shaft hole, by the wall support
Frame, the locating piece and the connecting plate are connected as a single entity;
The support component, including adjustment frame and supporting rack;The adjustment frame is set there are four plane, and each plane is equipped with and adjusts
Save screw;One end of support frame as described above is connected with the adjustment frame, the other end and plant compartment wall connecting;The wall bracket
The relative position between the wall bracket and the adjustment frame is closed in the adjustment frame, and by the adjusting screw
System is adjusted and fixes;
The limiting card is epsilon-type structure, and inserts and connect with the wall bracket;Two neighboring protrusion in the limiting card
Between the distance of opposite face be equal to the length dimension of the carrier frame plate along the x-axis direction, the width of intermediate projections in the limiting card
Size is equal to the spacing dimension between carrier frame plate opposite face described in two pieces.
2. AP1000 steam generators wall support rack mounting device according to claim 1, which is characterized in that the adjustment
Four planes of frame are respectively:Two horizontal end faces being mutually parallel and two the vertical side faces being mutually parallel;The horizontal ends
It is set on face there are five adjusting screw, one of them described adjusting screw is located at the center of the horizontal end face, remaining four
The adjusting screw is located at four corner locations of the horizontal end face respectively;Spiral shell is adjusted there are four being set in the vertical side face
Nail, and it is located at four corner locations of the perpendicular respectively.
3. AP1000 steam generators wall support rack mounting device according to claim 2, which is characterized in that the support
Frame includes the supporting rack of adjustment frame horizontal ends and the supporting rack of adjustment frame vertical end, and the supporting rack of the adjustment frame horizontal ends is used
In the horizontal end face for supporting the adjustment frame;The supporting rack of the adjustment frame horizontal ends includes support platform and support leg, described
Support platform is engraved structure, and is fixedly connected with the plant compartment wall body vertical;Described support leg one end and the support
Platform is fixedly connected, and the other end is fixedly connected with the plant compartment wall.
4. AP1000 steam generators wall support rack mounting device according to claim 1, which is characterized in that the positioning
Part is split structure, and the link block is detachably connected with the locating piece by plug-in unit;Wherein, the locating piece is along x-axis
Direction is equipped with third through-hole for wearing the link block, described along the z-axis direction equipped with fourth hole for inserting the plug-in unit
Third through-hole intersects with the fourth hole to be communicated;The link block is equipped with the first through hole along the x-axis direction, along the z-axis direction
It is used to insert the plug-in unit equipped with fifth hole.
5. the AP1000 steam generator wall support rack mounting devices according to any one in claim 1-4, feature
It is, which includes two pieces limiting card, respectively positioned at the connecting pin and free end of the wall bracket.
6. a kind of AP1000 steam generator wall support rack mounting devices pair in 1-5 using claim described in any one
The method that AP1000 steam generator wall brackets are installed, which is characterized in that comprise the following steps:
The first step assembles wall carriage assembly;First, the carrier frame plate is threaded through by the positioning by the pin shaft hole respectively
On the link block of part, and stick on the end face of the locating piece;Then, the connecting plate is placed in carrier frame plate described in two pieces
Back on face, and the first through hole is alignd with second through hole;Finally, described first is passed through by the connecting rod
The connecting plate, the carrier frame plate and the locating piece are connected as one by through hole, second through hole and the pin shaft hole
Body, and pass through locking nut and be locked;
Second step, fixed support component;First, the design fixed position of the wall bracket is incident upon the plant compartment wall
On body and carry out setting-out;Then, the supporting rack of the adjustment frame horizontal ends is fixedly connected with the plant compartment wall;
Then, by it is described adjustment frame be placed in it is described adjustment frame horizontal ends supporting rack on and between the plant compartment wall into
74.6 ° of angles, adjust adjustment the distance between the frame and the plant compartment wall, and preset clearance is grasped for subsequent welding
Make;
3rd step, lifting and adjustment wall carriage assembly;First, the wall carriage assembly level is put into institute along the y-axis direction
It states in adjustment frame, and by the locating piece with being located at the adjusting screw of horizontal ends face center along z-axis side in the adjustment frame
It is set to alignment;Then, along the y-axis direction, while the position of the mobile adjustment frame and the wall carriage assembly, described in adjustment
Welded gaps between the connecting pin of wall bracket and the plant compartment wall;Then, the adjustment frame vertical end is passed through
Two the vertical side faces of the adjustment frame are fixedly connected by supporting rack with the plant compartment wall, to the adjustment frame
Spatial position is fixed;Finally, by be located at the adjustment part on the adjustment frame to the height and position of the wall bracket and
Angle is finely adjusted and fixes, and makes between the wall bracket and the plant compartment wall stable relative position to be kept to close
System;
4th step, welding wall bracket;First, the limiting card is inserted into connecting pin and the freedom of the wall bracket respectively
End;Then, by the preset clearance between the adjustment frame and the plant compartment wall, to the wall bracket and described set
Standby compartment wall is welded;
5th step removes erecting device;Complete welding and detection after, successively to the limiting card, the support component and
The locating piece is removed.
7. AP1000 steam generators wall bracket installation method according to claim 6, which is characterized in that in the 3rd step
When the angle adjustment of horizontal direction is carried out to wall carriage assembly, first, described adjustment two horizontal end face centers of frame will be located at
The adjusting screw of position screws in the inside of the adjustment frame, and contacts locking with the locating piece;Then, diagonally together
When adjustment be located at adjusting screw in two the vertical side faces, the angle that horizontal direction is carried out to the wall bracket adjusts.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710067993.8A CN106944779B (en) | 2017-02-07 | 2017-02-07 | AP1000 steam generator wall support rack mounting devices and method |
CN201711466027.XA CN108274140B (en) | 2017-02-07 | 2017-02-07 | AP1000 steam generator wall bracket mounting device and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710067993.8A CN106944779B (en) | 2017-02-07 | 2017-02-07 | AP1000 steam generator wall support rack mounting devices and method |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711466027.XA Division CN108274140B (en) | 2017-02-07 | 2017-02-07 | AP1000 steam generator wall bracket mounting device and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106944779A CN106944779A (en) | 2017-07-14 |
CN106944779B true CN106944779B (en) | 2018-06-01 |
Family
ID=59465397
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711466027.XA Active CN108274140B (en) | 2017-02-07 | 2017-02-07 | AP1000 steam generator wall bracket mounting device and method |
CN201710067993.8A Active CN106944779B (en) | 2017-02-07 | 2017-02-07 | AP1000 steam generator wall support rack mounting devices and method |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711466027.XA Active CN108274140B (en) | 2017-02-07 | 2017-02-07 | AP1000 steam generator wall bracket mounting device and method |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN108274140B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110504038B (en) * | 2018-05-16 | 2023-05-26 | 中国核工业第五建设有限公司 | Support assembly of nuclear island steam generator |
CN109723938A (en) * | 2019-01-31 | 2019-05-07 | 中国核工业二三建设有限公司 | ACPR1000 reactor pressure vessel heap chamber heat-insulation support installation method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201091973Y (en) * | 2007-11-13 | 2008-07-30 | 纬泰机械(上海)有限公司 | Retaining support for welding workpieces |
CN202866261U (en) * | 2012-09-20 | 2013-04-10 | 中国核工业华兴建设有限公司 | Operation hanging rack for civil construction |
CN203380557U (en) * | 2013-06-13 | 2014-01-08 | 天津巨龙暖通设备开发有限公司 | Welding tool for heating radiator groups |
CN204343692U (en) * | 2014-12-02 | 2015-05-20 | 中国核工业二四建设有限公司 | The large-scale penetration piece adjustable tool of a kind of nuclear power station |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1031703A1 (en) * | 1982-04-19 | 1983-07-30 | Волгодонский Филиал Всесоюзного Проектно-Конструкторского Технологического Института Атомного Машиностроения И Котлостроения | Place for welding operator |
KR100623767B1 (en) * | 2004-06-21 | 2006-09-19 | 현대자동차주식회사 | Teaching auxiliary device for a spot welding robot system |
FR2877246B1 (en) * | 2004-10-29 | 2007-03-02 | Framatome Anp Sas | METHOD AND APPARATUS FOR AUTOMATIC WELDING OF TWO TUBULAR CYLINDRICAL AND LARGE DIAMETER PIECES OF A NUCLEAR REACTOR COMPONENT |
JP2009107076A (en) * | 2007-10-31 | 2009-05-21 | Smc Corp | Clamp device |
CN202271123U (en) * | 2011-09-15 | 2012-06-13 | 河南卫华重型机械股份有限公司 | Inclined ladder tool |
CN105451930B (en) * | 2013-08-13 | 2017-09-15 | 株式会社Ihi | Cylindrical container manufacture support meanss |
CN105665952B (en) * | 2014-11-21 | 2018-06-12 | 中国核工业第五建设有限公司 | The steam generator compartment of nuclear power station and the channel module packaging technology that reloads |
CN205520198U (en) * | 2016-01-26 | 2016-08-31 | 中国能源建设集团安徽电力建设第二工程有限公司 | A special stores pylon for membrane wall installation |
-
2017
- 2017-02-07 CN CN201711466027.XA patent/CN108274140B/en active Active
- 2017-02-07 CN CN201710067993.8A patent/CN106944779B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201091973Y (en) * | 2007-11-13 | 2008-07-30 | 纬泰机械(上海)有限公司 | Retaining support for welding workpieces |
CN202866261U (en) * | 2012-09-20 | 2013-04-10 | 中国核工业华兴建设有限公司 | Operation hanging rack for civil construction |
CN203380557U (en) * | 2013-06-13 | 2014-01-08 | 天津巨龙暖通设备开发有限公司 | Welding tool for heating radiator groups |
CN204343692U (en) * | 2014-12-02 | 2015-05-20 | 中国核工业二四建设有限公司 | The large-scale penetration piece adjustable tool of a kind of nuclear power station |
Also Published As
Publication number | Publication date |
---|---|
CN108274140B (en) | 2020-07-07 |
CN108274140A (en) | 2018-07-13 |
CN106944779A (en) | 2017-07-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106944779B (en) | AP1000 steam generator wall support rack mounting devices and method | |
CN103624467A (en) | Welding fixture for large-sized workpiece | |
CN209837625U (en) | Dish knot formula scaffold frame | |
CN106670716B (en) | Tool for automatic welding training | |
CN105269036B (en) | A kind of wind-powered electricity generation base slant hole processing device and its processing method | |
CN105196076B (en) | A kind of turning tool suitable for thrust bearing balance weight | |
CN204183158U (en) | A kind of truss joint beam welding positioner | |
CN106363425A (en) | Engine cylinder oblique-hole processing clamp and aligning method thereof | |
CN109339466A (en) | Big section distortion steel box-girder assembling jig frame, assembly ejector apparatus and processing method | |
CN105587128A (en) | Special fixture for mounting wallboard with heat insulation structure and mounting method for first-layer wallboard with heat insulation structure | |
CN207048368U (en) | A kind of adjustable anchor ear device | |
CN106861908B (en) | Sintering machine electric precipitator maintenance process | |
CN214883040U (en) | Basket construction bracket is hung to high pier stud | |
CN106196650B (en) | A kind of collector bracket moment of torsion frame erecting device and its installation, application method | |
CN110842601B (en) | One-step processing and forming device and method for Z-shaped longitudinal beam | |
CN106514526A (en) | Clamping system and method of bogie framework | |
CN212539587U (en) | Earthquake force testing device for earthquake-resistant support | |
CN211966437U (en) | Auxiliary welding device | |
CN221277102U (en) | Large-area dry-hanging stone installation structure | |
CN216607766U (en) | Strike broken frame backup pad welding frock | |
CN219972821U (en) | Steel slot framework supporting device | |
CN104232113B (en) | Dry coke quenching high-rise steel structure verticality of stand column adjusting pole and using method thereof | |
CN110273535A (en) | A kind of steel structure of housing bracket | |
CN211728947U (en) | Tooling for controlling space size of U-shaped bolt on plateau independent foundation | |
CN218676371U (en) | Optimize display module assembly of LED display screen concatenation effect |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |