CN106932613A - A kind of 35kV and 110kV transformers routine test wiring cross box - Google Patents
A kind of 35kV and 110kV transformers routine test wiring cross box Download PDFInfo
- Publication number
- CN106932613A CN106932613A CN201710141588.6A CN201710141588A CN106932613A CN 106932613 A CN106932613 A CN 106932613A CN 201710141588 A CN201710141588 A CN 201710141588A CN 106932613 A CN106932613 A CN 106932613A
- Authority
- CN
- China
- Prior art keywords
- groups
- cross box
- transformer
- transformers
- routine test
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009666 routine test Methods 0.000 title claims abstract description 14
- 239000011810 insulating material Substances 0.000 claims abstract description 4
- 239000000463 material Substances 0.000 claims abstract description 4
- 239000011347 resin Substances 0.000 claims abstract description 4
- 229920005989 resin Polymers 0.000 claims abstract description 4
- 230000009194 climbing Effects 0.000 abstract description 4
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000012360 testing method Methods 0.000 description 14
- 238000004804 winding Methods 0.000 description 7
- 238000004382 potting Methods 0.000 description 3
- 238000010998 test method Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical group [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000010292 electrical insulation Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R1/00—Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
- G01R1/02—General constructional details
- G01R1/04—Housings; Supporting members; Arrangements of terminals
- G01R1/0408—Test fixtures or contact fields; Connectors or connecting adaptors; Test clips; Test sockets
- G01R1/0416—Connectors, terminals
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Transformers For Measuring Instruments (AREA)
Abstract
A kind of 35kV and 110kV transformers routine test wiring cross box, its structure is:Cross box(1)In cuboid, cross box(1)Top set A groups(2), B groups(3), C groups(4), D groups(5), E groups(6)Five groups of connector lugs pass through wire with five groups of connector lugs of sidepiece respectively(8)Turn on two-by-two, cross box(1)Side be provided with handle(7).The cross box(1)It is made up of insulating materials.The cross box(1)It is made up of resin material.The beneficial effects of the present invention are:Reduce the number of times for climbing main transformer;The time that reduction works on the transformer.Improve operating efficiency and security.After using the cross box, the dangerous work of transformer top is transferred to ground to do, improves operating efficiency, reduce the danger of work.
Description
First, technical field
The present invention relates to technical field of electric power, and in particular to a kind of 35kV and 110kV transformers routine test wiring cross box.
2nd, background technology
The transformer of long-term heavy-duty service is susceptible to failure, and common transformer fault has built-in electrical insulation aging, winding turns
Between short circuit etc..State Grid Corporation of China company standard Q/GDW1168-2013《Power transmission and transformation equipment state overhauling testing regulations》Regulation is right
The transformer of 110kV and 35kV needs the high-potting for periodically carrying out.Being needed when high-potting is carried out to transformer will experiment
The lead of instrument is connected on the sleeve pipe pile crown of each side of transformer, according to different pilot projects, changes its each side sleeve pipe pile crown
Connected mode.At present, traditional test method is to carry out the change of each side winding connection mode with test wire on the transformer,
Often conduct an experiment the change for being accomplished by climbing a time main transformer carrying out the mode of connection, therefore we have developed transformer routine test
Wiring cross box.
3rd, the content of the invention
The present invention provides a kind of 35kV and 110kV transformers routine test wiring cross box in view of the shortcomings of the prior art, and it is special
Levy and be:Cross box(1)In cuboid, cross box(1)Top set A groups(2), B groups(3), C groups(4), D groups(5), E groups
(6)Five groups of connector lugs pass through wire with five groups of connector lugs of sidepiece respectively(8)Turn on two-by-two, cross box(1)Side be provided with
Handle(7).
The cross box(1)It is made up of insulating materials.
The cross box(1)It is made up of resin material.
Application method of the invention is:By test connection cross box top A groups(2), B groups(3), C groups(4), D groups(5)、E
Group(6)Five groups of connector lugs are connected with the high pressure on transformer, middle pressure, low pressure connector lug respectively, B groups(3), C groups(4), D groups(5)、
E groups(6)First connector lug is connected with the high pressure on transformer, B groups(3), C groups(4), D groups(5), E groups(6)Intermediate connection head
It is connected with the middle pressure on transformer, B groups(3), C groups(4), D groups(5), E groups(6)Low pressure on 3rd connector lug and transformer
Connection, when high pressure is tested, by cross box(1)Corresponding middle pressure and low-voltage short-circuiting, just can be tested on side, in experiment
During middle pressure, by cross box(1)Corresponding high pressure and low-voltage short-circuiting on side, when low pressure is tested, by cross box(1)It is right on side
The medium and high pressure short circuit answered, operating personnel need not frequently climb electric pole wiring short circuit again in this experiment, reduce labour intensity.
The beneficial effects of the present invention are:
Reduce the number of times for climbing main transformer.
Transformer high-voltage routine test mainly has:Winding D.C. resistance, iron core folder insulaion resistance, each side winding resistance,
Winding insulation dielectric dissipation factor and capacitance, load ratio bridging switch inspection, winding deformation.For 110kV three-winding transformers
Transformer number of times statistics, altogether 12 times are climbed in items experiment.And after using the junction box, it is only necessary to climbing 2 times can just complete to become
Depressor high pressure routine test project.
The time that reduction works on the transformer.
When transformer high-voltage routine test is carried out, traditional test method is that the test wire of test apparatus is connected into change
On the corresponding each side sleeve pipe pile crown of depressor, while the requirement shorting stub according to each pilot project changes the wiring of other windings
Mode, after the completion of items experiment, removes test lead and shorting stub, then carry out the next item down pilot project.Above all of work,
Testing crew is all to carry out on the transformer.And after using the case, it is only necessary to transformer is climbed up by the test lead of the cross box
It is connected at each side sleeve pipe pile crown of transformer, the test lead of test apparatus is connected to the cross box on the ground during experiment
On, and change the mode of connection of each side on the cross box, greatly reduce the time for working on the transformer.
Improve operating efficiency and security.
Traditional test method wiring is all carried out on the transformer, and transformer is higher, and transformer top structure is answered
Miscellaneous, testing crew movement is difficult, and bushing pile crown is very high, and testing crew wiring is difficult, while bringing larger to experiment work
Danger.After using the cross box, the dangerous work of transformer top is transferred to ground to do, improves operating efficiency,
Reduce the danger of work.
The cross box stable performance, meets test specification, and all pilot projects change of transformer routine test connects
The work of line mode is all carried out on the ground, and staff does not need safety belt, while the also constraint without safety belt, solves
Night, in the danger of transformer top repairing work, improves the operating efficiency of testing crew, and main transformer high-potting works by original
Five people for coming, are reduced to three people.
4th, illustrate
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the A-A sectional views of Fig. 1;
In figure:1st, cross box, 2, A groups, 3, B groups, 4, C groups, 5, D groups, 6, E groups, 7, handle, 8, wire.
5th, specific embodiment
Embodiment 1, a kind of 35kV and 110kV transformers routine test wiring cross box, it is characterised in that:Cross box(1)In length
Cube, cross box(1)Top set A groups(2), B groups(3), C groups(4), D groups(5), E groups(6)Five groups of connector lugs respectively with
Five groups of connector lugs of sidepiece pass through wire(8)Turn on two-by-two, cross box(1)Side be provided with handle(7).
The cross box(1)It is made up of insulating materials.
The cross box(1)It is made up of resin material.
Claims (3)
1. a kind of 35kV and 110kV transformers routine test wiring cross box, it is characterised in that:Cross box(1)In cuboid, turn
Change case(1)Top set A groups(2), B groups(3), C groups(4), D groups(5), E groups(6)Five groups of connector lugs are respectively with the five of sidepiece
Group connector lug passes through wire(8)Turn on two-by-two, cross box(1)Side be provided with handle(7).
2. a kind of 35kV and 110kV transformers routine test wiring cross box according to claim 1, it is characterised in that:
The cross box(1)It is made up of insulating materials.
3. a kind of 35kV and 110kV transformers routine test wiring cross box described in claim 1 or 2,
It is characterized in that:The cross box(1)It is made up of resin material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710141588.6A CN106932613A (en) | 2017-03-10 | 2017-03-10 | A kind of 35kV and 110kV transformers routine test wiring cross box |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710141588.6A CN106932613A (en) | 2017-03-10 | 2017-03-10 | A kind of 35kV and 110kV transformers routine test wiring cross box |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106932613A true CN106932613A (en) | 2017-07-07 |
Family
ID=59432114
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710141588.6A Pending CN106932613A (en) | 2017-03-10 | 2017-03-10 | A kind of 35kV and 110kV transformers routine test wiring cross box |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106932613A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109374934A (en) * | 2018-11-13 | 2019-02-22 | 国网重庆市电力公司璧山供电分公司 | A kind of power transformer electrical test auxiliary connection case |
CN111707887A (en) * | 2020-05-22 | 2020-09-25 | 国网河北省电力有限公司保定供电分公司 | Optimal scheme for routine test of power transformer |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2233585Y (en) * | 1995-08-18 | 1996-08-21 | 何排枝 | High-precision batch meter |
CN203178307U (en) * | 2013-03-18 | 2013-09-04 | 国家电网公司 | Grounding box used for transformer test |
CN203849288U (en) * | 2014-04-30 | 2014-09-24 | 国家电网公司 | Wiring conversion device for electrical routine tests of transformer |
CN204575693U (en) * | 2015-04-20 | 2015-08-19 | 国家电网公司 | A kind of transformer insulated test multifunctional switching device |
US20160187389A1 (en) * | 2014-12-29 | 2016-06-30 | Eaton Corporation | Voltage sensor housing and assembly including the same |
-
2017
- 2017-03-10 CN CN201710141588.6A patent/CN106932613A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2233585Y (en) * | 1995-08-18 | 1996-08-21 | 何排枝 | High-precision batch meter |
CN203178307U (en) * | 2013-03-18 | 2013-09-04 | 国家电网公司 | Grounding box used for transformer test |
CN203849288U (en) * | 2014-04-30 | 2014-09-24 | 国家电网公司 | Wiring conversion device for electrical routine tests of transformer |
US20160187389A1 (en) * | 2014-12-29 | 2016-06-30 | Eaton Corporation | Voltage sensor housing and assembly including the same |
CN204575693U (en) * | 2015-04-20 | 2015-08-19 | 国家电网公司 | A kind of transformer insulated test multifunctional switching device |
Non-Patent Citations (1)
Title |
---|
唐小峰: "变压器现场试验装置的研制及应用", 《通讯世界》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109374934A (en) * | 2018-11-13 | 2019-02-22 | 国网重庆市电力公司璧山供电分公司 | A kind of power transformer electrical test auxiliary connection case |
CN111707887A (en) * | 2020-05-22 | 2020-09-25 | 国网河北省电力有限公司保定供电分公司 | Optimal scheme for routine test of power transformer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204269765U (en) | A kind of transformer for power frequency withstand test and test unit | |
CN103308832A (en) | Partial discharge test device for high-voltage cable insulation middle joint and use method | |
CN205670479U (en) | The combination transformer that a kind of high pressure plug formula connects | |
CN102156242B (en) | Method for testing transformer insulation combination | |
CN204422710U (en) | A kind of oil-immersed type testing transformer | |
CN106932613A (en) | A kind of 35kV and 110kV transformers routine test wiring cross box | |
CN201251622Y (en) | Heavy current up-flow aggregate unit for field test of 750v current transformator | |
CN202693622U (en) | Power transformer test connecting device | |
CN202749216U (en) | Discharge-preventing shielding device for current transformer | |
CN202067649U (en) | On-load capacity-regulating power transformer | |
CN205450042U (en) | Experimental switching operation platform of power transformer | |
CN104808022A (en) | Temperature rise test connection method for three-side combined operation of three-phase three-winding transformer | |
CN106501619A (en) | Core loss pilot system and method between a kind of lamination under short trouble | |
CN103809146A (en) | Test method of main transformer CT (Current Transformer) | |
CN201181633Y (en) | 10KV and 20KV dual-purpose single-phase rolled iron-core transformer | |
CN107978205A (en) | A kind of measuring equipment load simulator | |
CN202041553U (en) | Combined wiring device for transformer test | |
CN102543410A (en) | Cascade high-potential energy supply device | |
CN203746639U (en) | Line-terminal on-load voltage regulating single-phase 220kV high-impedance transformer | |
CN204065243U (en) | The straight resistive of dry-type transformer compares testing auxiliary device | |
CN103794343B (en) | A kind of line end on-load voltage regulation single-phase 220kV high-impedance transformer | |
CN204495857U (en) | The portable test connection platform of high-potting | |
CN200953279Y (en) | Transformer for dynamic analog testing | |
CN109655677B (en) | Multifunctional test device, test method and manufacturing method of current-limiting reactor | |
CN105301550A (en) | Split series combined voltage transformer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170707 |