CN106930449A - Can various dimensions adjustment unit curtain wall system - Google Patents
Can various dimensions adjustment unit curtain wall system Download PDFInfo
- Publication number
- CN106930449A CN106930449A CN201710280123.9A CN201710280123A CN106930449A CN 106930449 A CN106930449 A CN 106930449A CN 201710280123 A CN201710280123 A CN 201710280123A CN 106930449 A CN106930449 A CN 106930449A
- Authority
- CN
- China
- Prior art keywords
- adaptor
- curtain wall
- adaptors
- various dimensions
- wall system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
It is a kind of can various dimensions adjustment unit curtain wall system, including for adjusting the adjustment adaptor of curtain wall unit locus, be characterized in that:The adjustment adaptor includes adjustable three adaptors being fixed on building floor, the adjustable secondary adaptor and the spacing hook in secondary adaptor end being fixed on three adaptors;Secondary adaptor is adjustably spacing on three adaptors by the bolt being connected between secondary adaptor and three adaptors.Fundamentally solve the processing of clod wash unit, assemble difficulty defect high, effectively raise unit processing and the efficiency of assembling, greatly reduce the integral manufacturing cost of curtain wall.
Description
Technical field
The present invention relates to a kind of connecting elements of building curtain wall, it is particularly suited for curtain wall angle change, entirety
The curtain wall unit that moulding is reversed is arranged on a kind of cell curtain wall connecting elements on the outside of building structure.
Background technology
Growing with modern architecture industry, application of the cell curtain wall on building is more and more.Because curtain wall is made
Type is that architectural effect is most directly expressed, so curtain wall moulding becomes to become increasingly complex also with the development of building.Due to some
Reversing occurs in architectural image, curved shape, cause to exist between the adjacent curtain wall unit of cell curtain wall in fall, fall, tilt outward, curtain
Wall unit clod wash.And in the prior art, traditional curtain wall is put down on floor and buries connecting member system and all can not well realize curtain wall
The three-dimensional regulation of installation.The three-dimensional adjustment of a kind of curtain wall disclosed in the application for a patent for invention of CN103088943A such as application publication number
Formula switching device, the technical scheme includes, including the switching group that the left and right vertical keel of curtain wall is connected with major structure of construction
Part, C-shaped channel steel built-in fitting and T-bolt component and the bolt assembly with chock, are characterized in that:Merely with symmetrical
The left and right hanging conversion with teeth of perpendicular type with horizontal, vertical waist through hole of arrangement, one end is by horizontal cushion block with teeth and T-shaped
Bolt assembly is assembled on C-shaped channel steel built-in fitting, and the other end is by being vertically arranged cushion block with teeth and bolt assembly with chock
Fitted together with left and right vertical keel.Human and material resources, workload required during in-site installation can be further reduced, curtain is improved
The installation accuracy and construction quality of wall keel.But the technical scheme is usually applicable only to the installation of flat curtain, and reversing,
In the case of bending, circular arc, broken line etc. are various, it is still necessary to design various connectors in advance, increased design time, material cost,
Process time.
There is torsion, curved shape due to some architectural images in existing curtain wall system, causes cell curtain wall adjacent cells
Fallen in existing between plate, fall, tilt outward, unit plate clod wash, the flat connecting member system that buries cannot well in fact on floor
The three-dimensional regulation that existing curtain wall is installed, because traditional flat connection for burying connecting member system structure to various angle changes has limitation
Property, and in order to realize reversing, bend, circular arc, broken line situations such as connection when, then need to design various connectors, cause design
Time, material cost, process time increase.And clod wash during due to that cannot install at the scene, cause 4 points of non-coplanar curtain wall lists
Unit must be assembled into special-shaped clod wash curtain wall unit in workshop, reduce design efficiency and curtain wall unit processing, assembling effect
Rate.
The content of the invention
It is an object of the invention to provide it is a kind of can various dimensions adjustment unit curtain wall system, fundamentally solve clod wash list
Unit's processing, assembling difficulty defect high, effectively raise unit processing and the efficiency of assembling, greatly reduce the entirety of curtain wall
Cost of manufacture.
To achieve the above object, the invention provides following technical scheme:This can various dimensions adjustment unit curtain wall system
Including the adjustment adaptor for adjusting curtain wall unit locus, it is characterized in that:The adjustment adaptor includes adjustable
Three adaptors that solidating is scheduled on building floor, the adjustable secondary adaptor being fixed on three adaptors and it is spacing
The hook of secondary adaptor end;Secondary adaptor can adjust by the bolt being connected between secondary adaptor and three adaptors
Ground is spacing on three adaptors.
The section of three adaptors is " several " shape, and secondary adaptor passes through " several " shape bottom.
The all embedded parts of card are provided with the building floor, three adaptors are provided with pressing plate, and three times adaptor passes through T-bolt
Can be slided along all embedded part directions of card spacing on building floor.
Intermeshing tooth slot structure is provided between adaptor and pressing plate described three times.
Three adaptors are provided with bar-shaped trough.
Described to link up with upper limit once adaptor, an adaptor sidepiece is provided with C-shaped channel, and hook is assembled by C-shaped channel
On an adaptor, and the relative position between an adaptor and hook is adjusted by the jackscrew being arranged in C-shaped channel.
The limited block for locking hook is fixed with the secondary adaptor.
Pad is provided between the secondary adaptor and building floor.
Present invention also offers it is a kind of can various dimensions adjustment unit curtain wall system installation method, be characterized in that,
Comprise the following steps:
Step 1) the preset all embedded parts of card in building floor, curtain wall unit is fixed on an adaptor, it is standby;
Step 2) secondary adaptor is placed on building floor;
Step 3) three gathering sills of adaptor are accordingly fastened on secondary adaptor, and by through secondary turn
The bolt of fitting one end is fixed on secondary adaptor is adjustable on three adaptors;
Step 4) by the adjustment tooth that in all embedded parts of card sets inverted T-bolt and be arranged on three adaptors
Plate is fixed on three adaptors are adjustable on building floor;
Step 5) hook is snapped in into an adaptor along the C-shaped channel of an adaptor, jackscrew is installed in C-shaped channel, pass through
Hook is installed to secondary adaptor end by the c-type rounded channels of hook, adjusts the precession depth of Height Adjustment jackscrew, adjusts curtain wall
The position of unit;
Step 6) by three depth of adaptor of adjustment bolt precession, adjust the position of curtain wall unit;
Step 7) limited block that insertion is linked up with is installed on secondary adaptor, limited block is fixed with self threading pin.
The step 2) in, it is provided with pad between the secondary adaptor and building floor.
Beneficial effects of the present invention:The components such as aluminium alloy curtain wall supporting member are moved to realize on curtain wall unit three-dimensional
Regulation, be used widely in terms of cell curtain wall is connected with floor, curtain can be easily realized during installation according to actual needs
The three-dimensional adjustment of wall unit, coupling assembly is combined and is engaged using aluminium alloy extrusions and is integrated, and not only intensity is high, bear change potential energy
Power is strong, and realizes being adjusted into outgoing direction and spacing by between cog cooperation, and low cost.In work progress, only by adjusting
Bolt between turn over fitting carries out the three-dimensional regulation of curtain wall unit by being screwed into depth, realize the overall clod wash of curtain wall unit,
So that can be in the clod wash operation of erecting bed real-time adjustment curtain wall unit, without being pre-designed.In curtain wall unit processing, assembling
When, 4 points of non-coplanar curtain wall units can according to 4 points it is coplanar be processed, assemble, simplify curtain wall unit processing, assembling shape
Formula.Three adaptors are fixed on building floor by T-bolt, adjustment tooth plate, all embedded parts of card, by adjusting T-bolt
Position in all embedded parts of card, adjusts the X of curtain wall unit to position;Curtain wall unit is arranged on hook by an adaptor
On, and by the Z-direction position of jackscrew adjustment curtain wall unit when can install at the scene;By adjusting secondary adaptor and three switchings
Bolt precession depth between part adjusts the Y-direction position of curtain wall unit.Additionally, by installing limited block at hook, realizing one
Spacing, other end freedom is held, so as to cause due to expanding with heat and contract with cold when avoiding due to the existing direct aluminium section bar installation using rigidity
Alignment error.
In sum, reasonable in design of the present invention, the present invention realizes reversing by three adjustment members for installing successively,
Curtain wall unit is installed in the case of bending, circular arc, broken line etc. are various, achievable curtain wall unit is forward and backward, upper and lower and left and right three-dimensional
Three-dimensional regulation, manufacture, install, adjustment operation is very easy, while being conducive to the torsion for absorbing, adjusting curtain wall supporting member inclined
Difference, so as to further meet ensure the requirement of curtain wall installation accuracy.Add so as to improve design efficiency, reduce material cost, raising
Work efficiency rate, not by munnion and agent structure identity distance from being influenceed, makes that curtain wall system is safer reasonably to be used.
Brief description of the drawings
Fig. 1 is the cell structure schematic diagram of invention unit curtain wall;
Fig. 2 is the cross section structure diagram along line A-A of Fig. 1;
Fig. 3 is the cross section structure diagram along line B-B of Fig. 1;
Fig. 4 is the cross section structure diagram of another embodiment of the present invention.
Description of reference numerals:1 bolt, 2 two adaptors, 3 three adaptors, 4T types bolt, the 5 all embedded parts of card, 6 adjustment teeth
Plate, 7 limited blocks, 8 self threading pins, 9 hooks, 10 adaptors, 11 jackscrews, 12 pads.
Specific embodiment
Below in conjunction with Fig. 1~4, particular content of the invention is described in detail by specific embodiment.This can various dimensions adjustment
Unit curtain wall system include for adjusting the adjustment adaptor of curtain wall unit locus.Adjustment adaptor includes adjustable solidating
Three adaptors 3 being scheduled on building floor, the adjustable secondary adaptor 2 being fixed on three adaptors 3 and it is spacing
The hook 9 of the end of secondary adaptor 2.Three adaptor sections are to run through to be provided with for installation bolt at the top of " several " shape, " several " shape
Screw, secondary adaptor 2 passes through " several " shape bottom, and adjustable spacing on three adaptors by bolt 1, by adjusting
Precession depth of the whole bolt 1 on three adaptors 3 is position of the adjustable secondary adaptor along Y-direction, and then adjusts curtain wall list
First position along Y-direction, three times adaptor is provided with bar-shaped trough.The all embedded parts 5 of card are provided with building floor, three times adaptor is provided with
Adjustment tooth plate 6 (i.e. with the pressing plate of the tooth slot structure being meshed with three adaptors), adjustment tooth plate 6 is by tooth slot structure in Y
Anti-skid structure is upwardly formed, three adaptors can slide spacing on building floor by T-bolt 4 along all embedded part directions of card.
Pad 12 (being preferably made up of Teflon) is provided between secondary adaptor and building floor, self threading pin 8 is passed through on secondary adaptor
It is fixed with the limited block 7 for locking hook.Upper limit once adaptor 10 are linked up with, one time adaptor sidepiece is provided with C-shaped channel,
Hook is assemblied on an adaptor by C-shaped channel, and is adjusted an adaptor and hung by the jackscrew 11 being arranged in C-shaped channel
Relative position between hook.
The installation process of said structure, specifically includes following steps:
Step 1) the preset all embedded parts of card in building floor, curtain wall unit is fixed on by soket head cap screw and is once turned
It is standby on fitting;
Step 2) Teflon pad is placed on the structural member of building, secondary adaptor is placed on Teflon pad;
Step 3) it is fastened on the gathering sill of three adaptors is corresponding on secondary adaptor, and by through secondary turn
The bolt of fitting one end is fixed on secondary adaptor is adjustable on three adaptors;
Step 4) by after a pair of T-bolts inversions, the chute of the edge all embedded parts of card symmetrically inserts secondary adaptor both sides
Block in the chute of all embedded parts, a pair of adjustment tooth plates be sleeved on T-bolt, and be engaged with three adaptors by teeth groove,
By three bar-shaped troughs of adaptor, can adjust three adaptors and (reserve curtain wall unit turnover left and right adjustment along the position of Y-direction
Space), slide T-bolt by all embedded parts of card, being actually needed according to building and curtain wall, select three adaptors
The size of upper strip hole;Along X to adjustment three positions of adaptor, after being adjusted in place on T-bolt tightening nut so that will
Three adaptor position lockings;
Step 5) hook is snapped in into an adaptor along the C-shaped channel of an adaptor, jackscrew is installed in C-shaped channel, then curtain
Wall unit can be spacing on hook by an adaptor by the Action of Gravity Field of itself, will be linked up with by the c-type rounded channels linked up with
Secondary adaptor end is installed to, the precession depth of Height Adjustment jackscrew, position of the regulation curtain wall unit in Z-direction is adjusted;
Step 6) by three depth of adaptor of adjustment bolt precession, position of the regulation curtain wall unit in Y-direction;
Step 7) limited block that insertion is linked up with is installed on secondary adaptor, limited block is fixed with self threading pin, realize curtain
The left and right of wall unit is spacing.
Additionally, when needing to install the curtain wall unit with certain angle of inclination, as shown in figure 4, need to only be determined in advance one
The inclination angle of secondary adaptor and curtain wall unit connecting side, only need to be now adjustable Y-direction by the precession depth of adjustment bolt
The deviation of displacement, realizes the clod wash of curtain wall.
Above-mentioned installation process mainly includes curtain wall unit along the adjustment in X, Y, Z-direction.
X includes three adjustment of relative position between adaptor and building floor to adjustment, specifically:In building floor
The interior preset all embedded parts of card, set Teflon pad on building structural member, and three adaptors are arranged on into Teflon pad, three times
Adjustment tooth plate is arranged with adaptor, intermeshing tooth slot structure is provided between three adaptors and adjustment tooth plate, to improve
Frictional force, after T-bolt is inverted along all embedded part chute direction insertion all embedded parts of card of card, inserts adjustment at the top of T-bolt
After tooth plate, T-bolt is rotated by 90 ° with Z-direction (axle), makes T-bolt spacing in all embedded parts of card, adjusted along the chute of all embedded parts of card
Whole three adaptors X to position after, three adaptors are locked by nut.T-bolt bottom and all chute rigidity of card
Contact, adjustment tooth plate bottom prevents adjustment tooth plate from being slided along Y-direction by intermeshing tooth slot structure.Y-direction adjustment includes three times
The adjustment of relative position between adaptor and building floor, the adjustment of relative position between secondary adaptor and three adaptors,
Specifically:Three adaptor sections are " several " shape, and " several " shape top is through the screw being provided with for installation bolt, secondary switching
Part passes through " several " shape bottom, and adjustable spacing on three adaptors by bolt.Secondary adaptor and three adaptors
Between by bolt be connected, the precession depth by swivel bolt on secondary adaptor, adjustable secondary adaptor is in Y-direction
Position.Meanwhile, Teflon pad is provided between secondary adaptor and building floor, provide smooth work for three adaptors are slided
Make face, prevent aluminium alloy extrusions from corroding aluminium alloy extrusions when being contacted with concrete.Z-direction adjustment include an adaptor with it is secondary
The adjustment of relative position between adaptor, specifically:Curtain wall unit is arranged on an adaptor side by soket head cap screw,
Adaptor opposite side is provided with the C-shaped channel set along Z-direction, and hook one end is spacing in C-shaped channel, and jackscrew is provided with C-shaped channel, leads to
Height of the adjustment jackscrew in chute is crossed, and then adjusts position of the whole curtain wall unit in Z-direction.After limited block insertion hook,
Limited block is fixed on secondary adaptor by screw, so as to be linked up with by locking, curtain wall unit is locked indirectly.
Claims (10)
1. it is a kind of can various dimensions adjustment unit curtain wall system, including for adjust curtain wall unit locus adjustment transfer
Part, it is characterised in that:The adjustment adaptor includes adjustable three adaptors being fixed on building floor, adjustable fixation
Secondary adaptor and the spacing hook in secondary adaptor end on three adaptors;Secondary adaptor is by linking two
Bolt between secondary adaptor and three adaptors is adjustably spacing on three adaptors.
2. it is according to claim 1 can various dimensions adjustment unit curtain wall system, it is characterised in that:Three adaptors
Section be " several " shape, secondary adaptor pass through " several " shape bottom.
3. it is according to claim 1 and 2 can various dimensions adjustment unit curtain wall system, it is characterised in that:The building building
The all embedded parts of card are provided with plate, three adaptors are provided with pressing plate, and three adaptors can be slided by T-bolt along all embedded part directions of card
It is dynamic spacing on building floor.
4. it is according to claim 3 can various dimensions adjustment unit curtain wall system, it is characterised in that:Three adaptors
Intermeshing tooth slot structure is provided between pressing plate.
5. it is according to claim 4 can various dimensions adjustment unit curtain wall system, it is characterised in that:Three adaptors
It is provided with bar-shaped trough.
6. it is according to claim 5 can various dimensions adjustment unit curtain wall system, it is characterised in that:The hook upper limit
Once adaptor, an adaptor sidepiece is provided with C-shaped channel, and hook is assemblied on an adaptor by C-shaped channel, and by setting
Put the relative position that the jackscrew in C-shaped channel is adjusted between an adaptor and hook.
7. it is according to claim 6 can various dimensions adjustment unit curtain wall system, it is characterised in that:The secondary adaptor
On be fixed with for lock hook limited block.
8. it is according to claim 7 can various dimensions adjustment unit curtain wall system, it is characterised in that:The secondary adaptor
Pad is provided between building floor.
9. it is a kind of can various dimensions adjustment unit curtain wall system installation method, it is characterised in that comprise the following steps:
Step 1) the preset all embedded parts of card in building floor, curtain wall unit is fixed on an adaptor, it is standby;
Step 2) secondary adaptor is placed on building floor;
Step 3) three gathering sills of adaptor are accordingly fastened on secondary adaptor, and by through secondary adaptor
The bolt of one end is fixed on secondary adaptor is adjustable on three adaptors;
Step 4) will by the adjustment tooth plate in all embedded parts of card setting inverted T-bolt and being arranged on three adaptors
Three adaptors are adjustable to be fixed on building floor;
Step 5) hook is snapped in into an adaptor along the C-shaped channel of an adaptor, jackscrew is installed in C-shaped channel, by hook
C-type rounded channels hook is installed to secondary adaptor end, adjust the precession depth of Height Adjustment jackscrew, adjust curtain wall unit
Position;
Step 6) by three depth of adaptor of adjustment bolt precession, adjust the position of curtain wall unit;
Step 7) limited block that insertion is linked up with is installed on secondary adaptor, limited block is fixed with self threading pin.
10. according to claim 9 can various dimensions adjustment unit curtain wall system installation method, it is characterised in that:It is described
Step 2) in, it is provided with pad between the secondary adaptor and building floor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710280123.9A CN106930449B (en) | 2017-04-25 | 2017-04-25 | Unit curtain wall system capable of being adjusted in multiple dimensions |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710280123.9A CN106930449B (en) | 2017-04-25 | 2017-04-25 | Unit curtain wall system capable of being adjusted in multiple dimensions |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106930449A true CN106930449A (en) | 2017-07-07 |
CN106930449B CN106930449B (en) | 2022-11-22 |
Family
ID=59438164
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710280123.9A Active CN106930449B (en) | 2017-04-25 | 2017-04-25 | Unit curtain wall system capable of being adjusted in multiple dimensions |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106930449B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107762013A (en) * | 2017-11-24 | 2018-03-06 | 沈阳远大铝业工程有限公司 | A kind of rapid dismounting type aluminium sheet decoration element mounting structure |
CN107842137A (en) * | 2017-11-24 | 2018-03-27 | 沈阳远大铝业工程有限公司 | Adjustable breast board curtain wall adapting system |
CN112502330A (en) * | 2020-12-03 | 2021-03-16 | 深圳广田方特科建集团有限公司 | Unit type curtain wall structure and unit type curtain wall system |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009074390A2 (en) * | 2007-12-13 | 2009-06-18 | SCHÜCO International KG | Suspension device for a facade, and facade |
CN201400948Y (en) * | 2008-12-24 | 2010-02-10 | 邱建平 | Connecting mechanism for realizing large-scaled three-dimensional adjustment of curtain wall |
CN202194281U (en) * | 2011-07-08 | 2012-04-18 | 沈阳远大铝业工程有限公司 | Adjustable falling-preventive unit screen wall connecting system |
CN202519841U (en) * | 2012-02-21 | 2012-11-07 | 沈阳远大铝业工程有限公司 | Connecting structure of unit curtain wall and building body |
CN102900172A (en) * | 2011-07-28 | 2013-01-30 | 沈阳远大铝业工程有限公司 | T-shaped connection component for curtain wall |
CN103362282A (en) * | 2013-04-11 | 2013-10-23 | 厦门大端工业设计有限公司 | Dry-hanging wall slab structure |
CN103938830A (en) * | 2014-04-28 | 2014-07-23 | 赵希誉 | Stone non-curtain hanging piece, non-curtain unit and keel-free non-curtain system |
CN204551831U (en) * | 2015-02-12 | 2015-08-12 | 金刚幕墙集团有限公司 | A kind of multidimensional regulon formula curtain wall support system |
KR101592905B1 (en) * | 2015-10-30 | 2016-02-12 | 주식회사 한국종합건축사사무소 | Stone Fastening Device for Apartment House |
CN207032588U (en) * | 2017-04-25 | 2018-02-23 | 沈阳远大铝业工程有限公司 | Can various dimensions adjustment unit curtain wall system |
-
2017
- 2017-04-25 CN CN201710280123.9A patent/CN106930449B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009074390A2 (en) * | 2007-12-13 | 2009-06-18 | SCHÜCO International KG | Suspension device for a facade, and facade |
CN201400948Y (en) * | 2008-12-24 | 2010-02-10 | 邱建平 | Connecting mechanism for realizing large-scaled three-dimensional adjustment of curtain wall |
CN202194281U (en) * | 2011-07-08 | 2012-04-18 | 沈阳远大铝业工程有限公司 | Adjustable falling-preventive unit screen wall connecting system |
CN102900172A (en) * | 2011-07-28 | 2013-01-30 | 沈阳远大铝业工程有限公司 | T-shaped connection component for curtain wall |
CN202519841U (en) * | 2012-02-21 | 2012-11-07 | 沈阳远大铝业工程有限公司 | Connecting structure of unit curtain wall and building body |
CN103362282A (en) * | 2013-04-11 | 2013-10-23 | 厦门大端工业设计有限公司 | Dry-hanging wall slab structure |
CN103938830A (en) * | 2014-04-28 | 2014-07-23 | 赵希誉 | Stone non-curtain hanging piece, non-curtain unit and keel-free non-curtain system |
CN204551831U (en) * | 2015-02-12 | 2015-08-12 | 金刚幕墙集团有限公司 | A kind of multidimensional regulon formula curtain wall support system |
KR101592905B1 (en) * | 2015-10-30 | 2016-02-12 | 주식회사 한국종합건축사사무소 | Stone Fastening Device for Apartment House |
CN207032588U (en) * | 2017-04-25 | 2018-02-23 | 沈阳远大铝业工程有限公司 | Can various dimensions adjustment unit curtain wall system |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107762013A (en) * | 2017-11-24 | 2018-03-06 | 沈阳远大铝业工程有限公司 | A kind of rapid dismounting type aluminium sheet decoration element mounting structure |
CN107842137A (en) * | 2017-11-24 | 2018-03-27 | 沈阳远大铝业工程有限公司 | Adjustable breast board curtain wall adapting system |
CN107762013B (en) * | 2017-11-24 | 2023-11-10 | 沈阳远大铝业工程有限公司 | Can dismantle formula aluminum plate fast and decorate component mounting structure |
CN112502330A (en) * | 2020-12-03 | 2021-03-16 | 深圳广田方特科建集团有限公司 | Unit type curtain wall structure and unit type curtain wall system |
Also Published As
Publication number | Publication date |
---|---|
CN106930449B (en) | 2022-11-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106930449A (en) | Can various dimensions adjustment unit curtain wall system | |
CN207032588U (en) | Can various dimensions adjustment unit curtain wall system | |
CN208137439U (en) | A kind of civil engineering building template connection frame being conveniently adjusted | |
CN215107335U (en) | Small-size entrance to a cave template system of consolidating | |
CN209384471U (en) | A kind of curtain wall built-in fitting | |
CN216157171U (en) | Template piece anti-seepage device | |
CN214739017U (en) | Steel tube bundle combined shear wall and steel beam connecting device | |
CN215948620U (en) | Spherical aluminum curtain wall main joist connecting device | |
CN211369540U (en) | Constructional engineering frame roof beam reinforcing apparatus | |
CN104015257B (en) | Method for adjusting gap between concrete formworks | |
CN216766788U (en) | Load conversion structure of I-shaped steel beam for bottom of high and large formwork support frame | |
JPH10169058A (en) | Mounting structure for spandrel wall panel | |
CN206815161U (en) | A kind of tiltedly T-shaped combination beam fixing device | |
CN220354219U (en) | Aluminum alloy track connecting system | |
CN217652317U (en) | Building engineering civil construction support convenient to installation | |
CN218482796U (en) | Double-vertical-row flexible photovoltaic support | |
CN214663526U (en) | Adjustable oil cooler support | |
CN214941454U (en) | Clamp for mounting aluminum plate | |
CN217325838U (en) | Be suitable for standardized curtain system of burying of fan groove formula of breathing out of multi-angle fossil fragments installation | |
CN218814615U (en) | Three-dimensional adjusting adapter system for T-shaped steel of curtain wall | |
CN216541607U (en) | Section steel extension line type adjusting and fixing device | |
CN214995053U (en) | Novel multidirectional curtain wall aluminum alloy connecting piece | |
CN218117218U (en) | Flue manger plate bank mould | |
CN217420482U (en) | Retractable wall opening crossbeam side form general fixer | |
CN213305181U (en) | Gear motor easy to install |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |