CN106925471B - The automatic coating apparatus of steel billet - Google Patents

The automatic coating apparatus of steel billet Download PDF

Info

Publication number
CN106925471B
CN106925471B CN201710239456.7A CN201710239456A CN106925471B CN 106925471 B CN106925471 B CN 106925471B CN 201710239456 A CN201710239456 A CN 201710239456A CN 106925471 B CN106925471 B CN 106925471B
Authority
CN
China
Prior art keywords
steel billet
capacitance
capacitance sensor
central controller
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710239456.7A
Other languages
Chinese (zh)
Other versions
CN106925471A (en
Inventor
姚柳
居殿春
邱家用
徐敏人
白妮
杨志彬
陈春钰
焦丽娜
伊军英
张小立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangjiagang Industrial Technology Research Institute of Jiangsu University of Science and Technology
Original Assignee
Zhangjiagang Industrial Technology Research Institute of Jiangsu University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhangjiagang Industrial Technology Research Institute of Jiangsu University of Science and Technology filed Critical Zhangjiagang Industrial Technology Research Institute of Jiangsu University of Science and Technology
Priority to CN201710239456.7A priority Critical patent/CN106925471B/en
Publication of CN106925471A publication Critical patent/CN106925471A/en
Application granted granted Critical
Publication of CN106925471B publication Critical patent/CN106925471B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0278Arrangement or mounting of spray heads
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B12/00Arrangements for controlling delivery; Arrangements for controlling the spray area
    • B05B12/08Arrangements for controlling delivery; Arrangements for controlling the spray area responsive to condition of liquid or other fluent material to be discharged, of ambient medium or of target ; responsive to condition of spray devices or of supply means, e.g. pipes, pumps or their drive means
    • B05B12/084Arrangements for controlling delivery; Arrangements for controlling the spray area responsive to condition of liquid or other fluent material to be discharged, of ambient medium or of target ; responsive to condition of spray devices or of supply means, e.g. pipes, pumps or their drive means responsive to condition of liquid or other fluent material already sprayed on the target, e.g. coating thickness, weight or pattern
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B12/00Arrangements for controlling delivery; Arrangements for controlling the spray area
    • B05B12/08Arrangements for controlling delivery; Arrangements for controlling the spray area responsive to condition of liquid or other fluent material to be discharged, of ambient medium or of target ; responsive to condition of spray devices or of supply means, e.g. pipes, pumps or their drive means
    • B05B12/12Arrangements for controlling delivery; Arrangements for controlling the spray area responsive to condition of liquid or other fluent material to be discharged, of ambient medium or of target ; responsive to condition of spray devices or of supply means, e.g. pipes, pumps or their drive means responsive to conditions of ambient medium or target, e.g. humidity, temperature position or movement of the target relative to the spray apparatus
    • B05B12/124Arrangements for controlling delivery; Arrangements for controlling the spray area responsive to condition of liquid or other fluent material to be discharged, of ambient medium or of target ; responsive to condition of spray devices or of supply means, e.g. pipes, pumps or their drive means responsive to conditions of ambient medium or target, e.g. humidity, temperature position or movement of the target relative to the spray apparatus responsive to distance between spray apparatus and target

Landscapes

  • Spray Control Apparatus (AREA)

Abstract

The invention discloses a kind of automatic coating apparatus of steel billet, including:Transportation system, detecting system, coating input-output system and control system;The transportation system includes:Conveyor roller, the electric machines for roller being connect with the conveyor roller, the first godet pair and the second godet pair;The coating input-output system includes material conveying box, automatic control switch, air compressor machine, feeding pipe, gas pipeline, nozzle;The conveyor roller upper edge transporting direction be disposed with first godet to, the first detection station, spray station, the second detection station and second godet pair.The automatic coating apparatus of steel billet of the present invention has the function of automatic charging, can guarantee the continuity of production.And may identify whether that steel billet arrived in front of nozzle, unnecessary paint waste is avoided during continuous production;And steel billet counting can also be carried out, facilitate user to get out steel billet in advance and accordingly counted.Also ensure steel billet not holiday, and can be in failure alarm.

Description

The automatic coating apparatus of steel billet
Technical field
The present invention relates to steel billet coating material equipment equipment technical field, especially a kind of automatic coating apparatus of steel billet.
Background technology
Steel billet can occur in heating and subsequent rolling, heat treatment, forging and cooling procedure because itself being in high temperature Oxidation and decarburization phenomenon, there is also the dilution of alloying element, to influence end properties sometimes.In addition, hot procedure Middle high-temperature steel loss is about averagely 10%, and huge economic loss is caused to enterprise.And such issues that solve at present, is most simple Effectively, the feasible method of most convenient is exactly to apply last layer preventing high temperature oxidation decarburization coating on steel billet in advance.Preventing high temperature oxidation is de- The research of carbon coating is quite ripe, but the research in relation to the automatic coating apparatus of steel billet rarely has people to do.
Invention content
In view of the above-mentioned deficiencies in the prior art, the technical problem to be solved by the present invention is that it is automatic to provide a kind of steel billet Coating apparatus.To improve final product quality, save entreprise cost.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of automatic coating apparatus of steel billet, including: Transportation system, detecting system, coating input-output system and control system;
The transportation system includes:Conveyor roller, the electric machines for roller being connect with the conveyor roller, the first godet pair and Two godets pair;
The coating input-output system include material conveying box, automatic control switch, air compressor machine, feeding pipe, gas pipeline, Nozzle;
The conveyor roller upper edge transporting direction is disposed with first godet to, the first detection station, spraying work Position, the second detection station and second godet pair.
Preferably, the control system includes detection unit and central controller;The detection unit includes the first electricity Hold sensor, the second capacitance sensor and signal switching processor;The signal switching processor includes at the first signal conversion Manage device and second signal conversion processor;Frequency-modulated generator, amplitude limiter circuit, mirror are included at least inside the signal switching processor Frequency circuit and amplifying circuit.
Preferably, first capacitance sensor is electrically connected with first signal switching processor, second electricity Hold sensor to be electrically connected with the second signal conversion processor, at first signal switching processor and second signal conversion Reason device is electrically connected with the central controller;The central controller also with the air compressor machine, nozzle solenoid valve, electric machines for roller It is electrically connected.
Preferably, the two-plate of first capacitance sensor is set to the conveyor roller at first detection station Both sides, formed between the first capacitance sensor two-plate for steel billet by the first sense channel;Second capacitance sensing The two-plate of device is set to the conveyor roller both sides at second detection station, shape between the second capacitance sensor two-plate At for steel billet by the second sense channel.
Preferably, the nozzle includes 4, and solenoid valve is both provided on each nozzle;The nozzle is set to described In spray station;The feeding pipe include a total material-conveying pipe and be connected to the total material-conveying pipe by a Five-way tube 4 are defeated Expect branch pipe;The gas pipeline includes the first gas transmission supervisor and the second gas transmission master being connected to the air compressor machine by a three-way pipe Pipe is responsible for 4 gas transmission branch pipes being connected to by a Five-way tube with second gas transmission;Described in the every conveying branch pipe and one Gas transmission branch pipe is communicated to by a three-way pipe on a nozzle, to realize 4 conveying branch pipes and 4 gas transmission branch pipes Correspondence is communicated on 4 nozzles.
Preferably, the control system detects whether steel billet reaches between its pole plate simultaneously by first capacitance sensor Steel billet is counted, while the opening and closing of the nozzle solenoid is controlled by central controller, it is specific to control Method includes the following steps:
1) measured in advance capacitance C10、C11, and result is stored in the central controller;
Wherein, C10The electricity of first capacitance sensor when medium between the first capacitance sensor two-plate is air Capacitance;C11When the steel billet part of the non-sprayed coating in outer surface being parked between the first capacitance sensor two-plate, first electricity Hold the capacitance of sensor;
2) when the automatic coating apparatus of the steel billet works, the capacitance C of first capacitance sensoraAutomatically it is transmitted to institute The first signal switching processor is stated, the central controller is transmitted to after first signal switching processor processing;
3) central controller is by CaValue and pre-stored data after carry out corresponding control:Work as Ca=C10 When, the central controller controls close the nozzle solenoid;Work as Ca=C11When, the central controller controls open institute Nozzle solenoid is stated, normal coating work is carried out;
4) central controller is according to the capacitance C of first capacitance sensoraSituation of change to described in arrival Steel billet between first capacitance sensor two-plate is counted, and specific method is:The central controller monitoring described first The capacitance C of capacitance sensoraChange with time situation, works as CaValue by it is low mutation to it is high when count once.
Preferably, the control system monitors steel billet by second capacitance sensor and is in second capacitance biography Whether the outer surface of the part between the pole plate of sensor coats coating completely, and the steel billet part for controlling incomplete sprayed coating is returned It returns to spray station to spray again, specific control method includes the following steps:
1) measured in advance capacitance C20、C21、C22, and result is stored in the central controller;
Wherein, C20The electricity of second capacitance sensor when medium between the second capacitance sensor two-plate is air Capacitance;C21When the steel billet part of the non-sprayed coating in outer surface being parked between the second capacitance sensor two-plate, second electricity Hold the capacitance of sensor;C22The steel billet that outer surface is coated with coating completely is parked between the second capacitance sensor two-plate When part, the capacitance of second capacitance sensor;
2) when the automatic coating apparatus of the steel billet works, the capacitance C of second capacitance sensorbAutomatically it is transmitted to institute Second signal conversion processor is stated, the central controller is transmitted to after second signal conversion processor processing;
3) central controller is by CbValue and pre-stored data after carry out corresponding control:Work as Cb=C20Or Cb=C22When, electric machines for roller described in the central controller controls keep rotating forward;Work as Cb>C22Or Cb=C21When, that is, judge to be in The incomplete sprayed coating in outer surface of steel billet part between the second capacitance sensor two-plate or non-sprayed coating, in described It entreats controller to control the electric machines for roller reversion, while controlling the air compressor machine and being stopped and close the solenoid valve, until After the steel billet part of the incomplete sprayed coating or non-sprayed coating returns to spray station, the central controller controls institute again Electric machines for roller rotating forward is stated, while controlling the air compressor machine and resuming work and open the solenoid valve.
Preferably, the control system further includes alarm module, and complete painting is preset in the central controller The average time T that a complete steel billet needs, when the central controller detects that the electric machines for roller invert twice in succession Between interval when being less than T, alarm module alarm described in the central controller controls, while controlling and closing the air compressor machine and roller-way Motor.
Preferably, the material conveying box includes intermediate storage tank, the storing packet that is set to above the intermediate storage tank, uses In the communicating pipe for being connected to the storing packet and intermediate storage tank, the sealing ring being set to inside the communicating pipe, be plugged in it is described Stopper in sealing ring, the connecting rod being connect with the stopper top, is connected to the company at the floating plug for being connected to the stopper bottom The bead of the movable end of bar and the fulcrum for being set to the connecting rod and the storing packet contact position;The floating plug and the sealing Circle cooperation is to seal the communicating pipe;It is connected to first gas transmission supervisor above the intermediate storage tank side, the centre It is connected to the total material-conveying pipe below storage tank side.
Preferably, the automatic control switch includes pillar, the overhead gage being connect with the pillar upper end and the branch The lower baffle plate of column lower end connection, is connected on the movable end of the spring spring being connected on the overhead gage lower surface Pallet, the first binding post being connected on the pallet lower surface and be connected on the lower baffle plate and with first binding post Second binding post of face, the automatic control switch are connected with the air compressor machine.
The present invention includes at least following advantageous effect:
(1) the automatic coating apparatus of steel billet of the invention has the function of automatic charging, can guarantee the continuity of production.
(2) the first capacitance sensor of the invention coordinates control system, may identify whether that steel billet arrived in front of nozzle, Unnecessary paint waste is avoided during continuous production;And steel billet counting can also be carried out, facilitate user to get out steel in advance It base and is accordingly counted.
(3) the second capacitance sensor of the invention coordinates control system, can monitor whether steel billet billet surface sprays completely Coating, and the steel billet part for controlling incomplete sprayed coating returns and sprays again, ensures steel billet not holiday, and can occurring therefore Hinder alarm.
(4) nozzle of use four of the invention from the horizontal by certain inclination angle, and godet is added to ensure steel billet Positional precision when being moved on conveyor roller, it is ensured that without dead angle in spraying process.
Description of the drawings
Fig. 1 is the system composition schematic diagram of the automatic coating apparatus of steel billet of the present invention;
Fig. 2 is the cooperation principle schematic of the material conveying box and automatic control switch of the present invention;
Fig. 3 is the flow diagram of the conveying gas pipeline of the automatic coating apparatus of steel billet of the present invention;
Fig. 4 is the position relationship schematic diagram between the steel billet cross section and nozzle of the automatic coating apparatus of steel billet of the present invention;
Fig. 5 is the schematic block diagram of the signal switching processor of the automatic coating apparatus of steel billet of the present invention;
Fig. 6 is capacitance sensor output and the time chart of the present invention;
Fig. 7 is the functional block diagram of the control system of the automatic coating apparatus of steel billet of the present invention.
Reference sign:
1-conveyor roller;2-material conveying box;3-automatic control switch;4-air compressor machines;5-nozzles;10-the first godet It is right;11-the first detection station;12-spray stations;13-the second detection station;14-the second godet pair;15-steel billets;6— First capacitance sensor;7-the second capacitance sensor;8-total material-conveying pipes;9-the first gas transmission is responsible for;20-intermediate storage tanks; 21-storing packets;22-communicating pipes;23-sealing rings;24-stoppers;25-floating plugs;26-connecting rods;27-beads;28- Point;30-pillars;31-overhead gages;32-lower baffle plates;33-springs;34-pallets;35-the first binding post;36-the second connects Terminal;37-spring balancing positions;40-gas transmission feeding pipe seal boxs.
Specific implementation mode
Present invention will be described in further detail below with reference to the accompanying drawings, to enable those skilled in the art with reference to specification text Word can be implemented according to this.
It should be appreciated that such as " having ", "comprising" and " comprising " term used herein do not allot one or more The presence or addition of a other elements or combinations thereof.
It need to be intended that, signified steel billet 15 selects common square billet in the present invention, and due in subsequent rolling process In, head-tail will produce warpage, and the head-tail of blank can be cut away after rolling in actual production, thus, in subsequent painting In the narration for expecting work, pair two faces vertical with 15 direction of motion of steel billet are not considered, i.e., follow-up signified 15 surface of steel billet Do not consider when whether being coated with coating or incomplete sprayed coating or complete sprayed coating vertical with 15 direction of motion of steel billet Two faces.
As shown in Figure 1, a kind of 15 automatic coating apparatus of steel billet of the present embodiment, which is characterized in that including:Transportation system, Detecting system, coating input-output system and control system;
Transportation system includes:Conveyor roller 1, the electric machines for roller being connect with conveyor roller 1, the first godet pair 10 and second are led Disk pair 14;
Coating input-output system include material conveying box 2, automatic control switch 3, air compressor machine 4, feeding pipe, gas pipeline, Nozzle 5;
1 upper edge transporting direction of conveyor roller is disposed with the first godet pair 10, the first detection station 11, spray station 12, the second detection station 13 and the second godet pair 14.
Wherein, to including 2 godets, the first godet pair 10 and the second godet pair 14 are used to ensure that steel billet 15 exists each godet The positional precision moved on conveyor roller 1, to ensure that coating can be ejected into each ground on 15 surface of steel billet by four nozzles 5 Side.
With reference to figure 5 and Fig. 7, control system includes detection unit and central controller;Detection unit is passed including the first capacitance Sensor 6, the second capacitance sensor 7 and signal switching processor;Signal switching processor include the first signal switching processor and Second signal conversion processor;Frequency-modulated generator, amplitude limiter circuit, frequency-discriminating circuit are included at least inside signal switching processor and are put Big circuit.The signal that signal switching processor transmits the first capacitance sensor 6 and the second capacitance sensor 7 carries out conversion process It is transmitted to central controller again afterwards.
Wherein, microcomputer or microcontroller can be selected in central controller.
First capacitance sensor 6 is electrically connected with the first signal switching processor, and the second capacitance sensor 7 turns with second signal Processor electrical connection is changed, the first signal switching processor and second signal conversion processor are electrically connected with central controller;In Centre controller is also electrically connected with air compressor machine 4,5 solenoid valve of nozzle, electric machines for roller.
Wherein, when air compressor machine 4 stops, central controller automatically control close nozzle 5 on solenoid valve to stop material spray, Electric machines for roller stopping is controlled simultaneously.
With reference to figure 3, nozzle 5 includes 4, and solenoid valve is both provided on each nozzle 5;Nozzle 5 is set to spray station 12 On;Feeding pipe includes a total material-conveying pipe 8 and 4 conveying branch pipes being connected to total material-conveying pipe 8 by a Five-way tube;Gas pipeline Include the first gas transmission supervisor 9 being connected to air compressor machine 4 by a three-way pipe and the second gas transmission supervisor, by a Five-way tube and second 4 gas transmission branch pipes of gas transmission supervisor's connection;Every conveying branch pipe and a gas transmission branch pipe are communicated to one by a three-way pipe On nozzle 5, to realize that 4 conveying branch pipes and 4 gas transmission branch pipe correspondences are communicated on 4 nozzles 5.Connect on each nozzle 5 Lead to a conveying branch pipe and a gas transmission branch pipe, coating spraying is carried out using compressed air as power.Feeding pipe and appendix Road is sealed by gas transmission feeding pipe seal box 40.
With reference to figure 4, nozzle 5 is put according to such as figure, position shown in 4, the four of the center alignment steel billet 15 of nozzle 5 A angle and nozzle 5 are adjusted from the horizontal by certain inclination angle (mostly using square billet in production, therefore initial angle is set as 45 °) The position of nozzle 5 ensures that the coating sprayed from 5 edge of each nozzle can be sprayed onto the midpoint on the side of similar two rectangles therewith. Since in subsequent rolling process, head-tail will produce warpage, the head-tail of blank can be cut after rolling in actual production It removes, thus we are not considered two faces vertical with 15 direction of motion of steel billet.The figure is along 15 direction of motion of steel billet The view of side-looking direction.
The two-plate of first capacitance sensor 6 is set to 1 both sides of conveyor roller at the first detection station 11, the first capacitance Between 6 two-plate of sensor formed for steel billet 15 by the first sense channel;The two-plate of second capacitance sensor 7 is set to 1 both sides of conveyor roller at two detection stations 13, formed between 7 two-plate of the second capacitance sensor for steel billet 15 by the second inspection Survey channel.Steel billet 15 successively passes through the first detection that the two-plate of the first capacitance sensor 6 is formed under the action of conveyor roller 1 The second sense channel that the two-plate of channel and the second capacitance sensor 7 is formed, passing through for steel billet 15 can make the first capacitance sensing The capacitance of device 6 and the second capacitance sensor 7 changes, and is examined to first by testing and analyzing the situation of change of its capacitance Whether survey in channel and the second sense channel has the sprayed coating situation of steel billet 15 and steel billet 15 to be judged.
Wherein, the capacitance of capacitance sensor:
The dielectric constant of ε media between capacitance sensor two-plate, S are pole plate facing area, distances of the d between pole plate. Gu the medium between capacitance sensor two-plate changes, capacitance C can occur accordingly to change, so capacitance sensor two Whether there is or not the coating on the surface of 15 part of steel billet between steel billet 15, capacitance sensor two-plate brushing situations between pole plate can be to capacitance The capacitance C of sensor has an impact, and the detection so as to form the present invention on this basis judges scheme.
Its specific detection judgement scheme is for example following.
Whether I control systems detect steel billet 15 by the first capacitance sensor 6 and reach between its pole plate and carried out to steel billet 15 It counts, while the opening and closing of 5 solenoid of nozzle is controlled by central controller, specific control method includes following step Suddenly:
1) measured in advance capacitance C10、C11, and result is stored in central controller;
Wherein, C10The capacitance of first capacitance sensor 6 when medium between 6 two-plate of the first capacitance sensor is air Value;C11When 15 part of steel billet of the non-sprayed coating in outer surface being parked between 6 two-plate of the first capacitance sensor, which passes The capacitance of sensor 6;
2) when 15 automatic coating apparatus of steel billet works, the capacitance C of the first capacitance sensor 6aAutomatically it is transmitted to the first letter Number conversion processor is transmitted to central controller after the processing of the first signal switching processor;
3) central controller is by CaValue and pre-stored data after carry out corresponding control:Work as Ca=C10When, i.e., 5 solenoid of nozzle is closed without steel billet 15, central controller controls between 6 two-plate of the first capacitance sensor at this time, thus Next steel billet 15 stops material spray before arriving, can be to avoid coating;Work as Ca=C11When, i.e., there is steel billet 15 to reach the first electricity at this time Between holding 6 two-plate of sensor, central controller controls open 5 solenoid of nozzle, and normal coating work is carried out to steel billet 15;
4) central controller is according to the capacitance C of the first capacitance sensor 6aSituation of change to reaching the first capacitance sensing Steel billet 15 between 6 two-plate of device is counted, and specific method is:Central controller monitors the capacitance of the first capacitance sensor 6 Value CaChange with time situation, works as CaValue by it is low mutation to it is high when count once.
With reference to figure 6, in one embodiment, central controller monitors the capacitance C of the first capacitance sensor 6aAt any time Situation of change, and draw the first capacitance sensor 6 output (i.e. its capacitance Ca) with the relational graph of time, work as CaValue by Low mutation counts primary, that is, the number of steel billet 15 reached plus one when arriving high, to carry out counting system to the steel billet 15 of arrival in realizing Meter, statistical result are stored in central controller.
II 15 automatic coating apparatus of steel billet according to claim 6, which is characterized in that control system is passed by the second capacitance Whether the outer surface that sensor 7 monitors the part that steel billet 15 is between the pole plate of the second capacitance sensor 7 coats coating completely, and 15 part of steel billet of the incomplete sprayed coating of control sprays again back to spray station 12, and specific control method includes following Step:
1) measured in advance capacitance C20、C21、C22, and result is stored in central controller;
Wherein, C20The capacitance of second capacitance sensor 7 when medium between 7 two-plate of the second capacitance sensor is air Value;C21When 15 part of steel billet of the non-sprayed coating in outer surface being parked between 7 two-plate of the second capacitance sensor, which passes The capacitance of sensor 7;C2215 part of steel billet that outer surface is coated with coating completely is parked between 7 two-plate of the second capacitance sensor When, the capacitance of second capacitance sensor 7;
2) when 15 automatic coating apparatus of steel billet works, the capacitance C of the second capacitance sensor 7bAutomatically it is transmitted to the second letter Number conversion processor is transmitted to central controller after the processing of second signal conversion processor;
3) central controller is by CbValue and pre-stored data after carry out corresponding control:Work as Cb=C20(i.e. this When 7 two-plate of the second capacitance sensor between without steel billet 15, need to wait for the arrival of next steel billet 15, Gu motor need to keep rotating forward) or Cb =C22When (i.e. 15 part of steel billet that outer surface is coated with coating completely is parked between 7 two-plate of the second capacitance sensor), center control Device control electric machines for roller processed keep rotating forward;Work as C22<Cb<C21(it is incomplete that surface is parked between 7 two-plate of the second capacitance sensor at this time 15 part of steel billet of sprayed coating, i.e. 15 part surface of steel billet between 7 two-plate of the second capacitance sensor are coated with part coatings, But 15 surface of steel billet is not completely covered for coating) or Cb=C21When (15 part of steel billet being parked between 7 two-plate of the second capacitance sensor The non-sprayed coating in outer surface), that is, judge that the outer surface of 15 part of steel billet between 7 two-plate of the second capacitance sensor is not complete Full sprayed coating or non-sprayed coating, the reversion of central controller controls electric machines for roller, while controlling air compressor machine 4 and being stopped and close Solenoid valve is closed, until after 15 part of steel billet of the incomplete sprayed coating or non-sprayed coating returns to spray station 12, center Controller controls electric machines for roller rotating forward again, while controlling air compressor machine 4 and resuming work and open solenoid valve, re-starts spraying.From And ensure that 15 surface of steel billet is sprayed completely, not holiday.
Wherein, coating of the invention is non electrically conductive material, if the part that steel billet 15 is between two-plate is sprayed-on completely, Obviously 15 outer surface of steel billet can not assemble charge at this time, but still can generate production to the dielectric constant the two-plate of capacitance sensor It is raw to influence, even if the total capacitance of capacitance sensor increases.Above-mentioned each capacitance size order is:,C11>C10;C21>C22>C20
Identical capacitance sensor can be selected in first capacitance sensor 6 and the second capacitance sensor 7, also can be selected different Capacitance sensor, when the model that the first capacitance sensor 6 and the second capacitance sensor 7 are selected is identical, C10=C20
Control system further includes alarm module, is preset in central controller and is painted with what a steel billet 15 needed completely Average time T, when central controller detects that the time interval that electric machines for roller invert twice in succession is less than T, central controller Alarm module alarm is controlled, while controlling and closing air compressor machine 4 and electric machines for roller.
With reference to figure 2, material conveying box 2 includes intermediate storage tank 20, is set to the storing packet 21 of 20 top of intermediate storage tank, is used for The communicating pipe 22 of connection storing packet 21 and intermediate storage tank 20 sealing ring 23 being set to inside communicating pipe 22, it is plugged in sealing Circle 23 in stopper 24, be connected to 24 bottom of stopper floating plug 25, connect with 24 top of stopper connecting rod 26, be connected to connecting rod 26 Movable end bead 27 and be set to the fulcrum 28 of connecting rod 26 and 21 contact position of storing packet.Stopper 24 can be within communicating pipe 22 Sealing ring 23 in stretch, 25 size of floating plug is matched with sealing ring 23, to seal communicating pipe 22;Above 20 side of intermediate storage tank It is connected to the first gas transmission supervisor 9, is connected to total material-conveying pipe 8 below 20 side of intermediate storage tank.
Wherein, when stopper 24, which moves up to floating plug 25, to be bonded with sealing ring 23, floating plug 25 seals communicating pipe 22, storage Raw material in material packet 21 can not be flowed downward by communicating pipe 22;It is detached from sealing ring 23 when stopper 24 moves downwardly to floating plug 25 When, due to having gap between stopper 24 and sealing ring 23, the air of 20 top of intermediate storage tank outside the gap by arranging, storing packet Raw material in 21 is flowed downwardly to by the gap in intermediate storage tank 20.
Automatic control switch 3 includes pillar 30, is connect with 30 upper end of pillar overhead gage 31 is connect with 30 lower end of pillar Lower baffle plate 32, the pallet 34 being connected on the movable end of spring 33, is connected to the spring 33 being connected on 31 lower surface of overhead gage The first binding post 35 on 34 lower surface of pallet and be connected on lower baffle plate 32 and with the second wiring of 35 face of the first binding post Column 36, automatic control switch 3 are connected with air compressor machine 4.First binding post 35 and the second binding post 36 are connect with power cord respectively, when It when first binding post 35 and the second binding post 36 contact, is connected between the first binding post 35 and the second binding post 36, i.e., automatic control System switch 3 is in channel status, and air compressor machine 4 can work normally;When the first binding post 35 and the second binding post 36 separate, first Binding post 35 and the second binding post 36 it is separated, i.e., automatic control switch 3 is in off state, and air compressor machine 4 is stopped.
Material conveying box 2 and the process of 3 cooperating of automatic control switch are:When the liquid level in intermediate storage tank 20 declines, Floating plug 25 can move down under gravity until floating plug 25 and sealing ring 23 completely disengage, and connecting rod 26 and second is filled at this time The connecting pin of stick 24 moves downward, and under the action of fulcrum 28, the bead 27 on the other end of connecting rod 26 moves up, until bead 27 It disappears to the pressure of pallet 344,33 column of spring returns to spring balancing position 37, at this time the first binding post 35 and the second binding post 36 It separates, off state is between two groups, is i.e. automatic control switch 3 disconnects, and stops with 3 concatenated air compressor machine 4 of automatic control switch It only works, central controller automatically controls the solenoid valve on closing nozzle 5 to stop material spray, while controlling electric machines for roller stopping. The compressed air of ullage can be between stopper 24 and sealing ring 23 gap overflow until reaching balance with outside pressure.This Afterwards, the coating in storing packet 21 injects intermediate storage tank 20 under gravity.
When the liquid level in intermediate storage tank 20 gradually rises to 25 lower surface of floating plug, under the action of buoyancy, floating plug 25 It can rise and be fully sealed until between sealing ring 23, floating plug 25 reaches peak, under the raw material in storing packet 21 can not continue It flow in intermediate storage tank 20, the raw material stored in intermediate storage tank 20 reaches maximum, the connection of 26 stopper 24 of connecting rod at this time End moves up to vertex, and under the action of fulcrum 28, the bead 27 on the other end of connecting rod 26 is displaced downwardly to minimum point, bead 27 Pallet 34 is pressed into minimum point, by the first binding post 35 being pressed onto on the second binding post 36 tightly, makes 35 He of the first binding post It is between second binding post 36, makes to resume work with 3 concatenated air compressor machine 4 of automatic control switch, in central controller Control under, solenoid valve on nozzle 5, which is opened, starts material spray, while controlling electric machines for roller and resuming work, and coating is again with certain Pressure enter conveying pipeline, restore coating work.
In the description of the present invention, it is to be understood that, term "center", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside", " up time The orientation or positional relationship of the instructions such as needle ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " be orientation based on ... shown in the drawings or Position relationship is merely for convenience of description of the present invention and simplification of the description, and does not indicate or imply the indicated device or element must There must be specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
Although the embodiments of the present invention have been disclosed as above, but its is not only in the description and the implementation listed With.It can be applied to various suitable the field of the invention completely.It for those skilled in the art, can be easily Realize other modification.Therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is simultaneously unlimited In specific details and legend shown and described herein.

Claims (9)

1. a kind of automatic coating apparatus of steel billet, which is characterized in that including:Transportation system, detecting system, coating input-output system And control system;
The transportation system includes:Conveyor roller, the electric machines for roller being connect with the conveyor roller, the first godet pair and second are led Disk pair;
The coating input-output system includes material conveying box, automatic control switch, air compressor machine, feeding pipe, gas pipeline, spray Head;
The conveyor roller upper edge transporting direction be disposed with first godet to, the first detection station, spray station, Two detection stations and second godet pair;
The control system includes detection unit and central controller;The detection unit includes the first capacitance sensor, second Capacitance sensor and signal switching processor;The signal switching processor includes the first signal switching processor and second signal Conversion processor;Frequency-modulated generator, amplitude limiter circuit, frequency-discriminating circuit and amplification electricity are included at least inside the signal switching processor Road.
2. the automatic coating apparatus of steel billet according to claim 1, which is characterized in that first capacitance sensor with it is described First signal switching processor is electrically connected, and second capacitance sensor is electrically connected with the second signal conversion processor, institute It states the first signal switching processor and second signal conversion processor is electrically connected with the central controller;The center control Device is also electrically connected with the air compressor machine, nozzle solenoid valve, electric machines for roller.
3. the automatic coating apparatus of steel billet according to claim 2, which is characterized in that the two poles of the earth of first capacitance sensor Plate is set to the conveyor roller both sides at first detection station, is formed for steel billet between the first capacitance sensor two-plate By the first sense channel;The two-plate of second capacitance sensor is set to the transport roller at second detection station Road both sides, formed between the second capacitance sensor two-plate for steel billet by the second sense channel.
4. the automatic coating apparatus of steel billet according to claim 3, which is characterized in that the nozzle includes 4, each nozzle On be both provided with solenoid valve;The nozzle is set in the spray station;The feeding pipe includes a total material-conveying pipe and leads to Cross 4 conveying branch pipes that a Five-way tube is connected to the total material-conveying pipe;The gas pipeline include by a three-way pipe with it is described The the first gas transmission supervisor and the second gas transmission supervisor of air compressor machine connection, 4 be connected to second gas transmission supervisor by a Five-way tube Root gas transmission branch pipe;The every conveying branch pipe and a gas transmission branch pipe are communicated to a nozzle by a three-way pipe On, to realize that 4 conveying branch pipes and 4 gas transmission branch pipe correspondences are communicated on 4 nozzles.
5. the automatic coating apparatus of steel billet according to claim 4, which is characterized in that the control system passes through described first Whether capacitance sensor detection steel billet reaches between its pole plate and is counted to steel billet, while by central controller to the spray The opening and closing of head solenoid is controlled, and specific control method includes the following steps:
1) measured in advance capacitance C10、C11, and result is stored in the central controller;
Wherein, C10The capacitance of first capacitance sensor when medium between the first capacitance sensor two-plate is air Value;C11When the steel billet part of the non-sprayed coating in outer surface being parked between the first capacitance sensor two-plate, first capacitance The capacitance of sensor;
2) when the automatic coating apparatus of the steel billet works, the capacitance C of first capacitance sensoraAutomatically it is transmitted to described One signal switching processor is transmitted to the central controller after first signal switching processor processing;
3) central controller is by CaValue and pre-stored data after carry out corresponding control:Work as Ca=C10When, it is described Central controller controls close the nozzle solenoid;Work as Ca=C11When, the central controller controls open the nozzle Solenoid carries out normal coating work;
4) central controller is according to the capacitance C of first capacitance sensoraSituation of change to reach it is described first electricity The steel billet held between sensor two-plate is counted, and specific method is:The central controller monitors first capacitance and passes The capacitance C of sensoraChange with time situation, works as CaValue by it is low mutation to it is high when count once.
6. the automatic coating apparatus of steel billet according to claim 5, which is characterized in that the control system passes through described second Whether the outer surface for the part that capacitance sensor monitoring steel billet is between the pole plate of second capacitance sensor coats completely Coating, and the steel billet part for controlling incomplete sprayed coating sprays again back to spray station, specific control method includes Following steps:
1) measured in advance capacitance C20、C21、C22, and result is stored in the central controller;
Wherein, C20The capacitance of second capacitance sensor when medium between the second capacitance sensor two-plate is air Value;C21When the steel billet part of the non-sprayed coating in outer surface being parked between the second capacitance sensor two-plate, second capacitance The capacitance of sensor;C22The steel billet portion that outer surface is coated with coating completely is parked between the second capacitance sensor two-plate Timesharing, the capacitance of second capacitance sensor;
2) when the automatic coating apparatus of the steel billet works, the capacitance C of second capacitance sensorbAutomatically it is transmitted to described Binary signal conversion processor is transmitted to the central controller after second signal conversion processor processing;
3) central controller is by CbValue and pre-stored data after carry out corresponding control:Work as Cb=C20Or Cb= C22When, electric machines for roller described in the central controller controls keep rotating forward;Work as Cb>C22Or Cb=C21When, that is, judge in described The incomplete sprayed coating in outer surface of steel billet part between second capacitance sensor two-plate or non-sprayed coating, the center control Device processed controls the electric machines for roller reversion, while controlling the air compressor machine and being stopped and close the solenoid valve, until this is not After the steel billet part of complete sprayed coating or non-sprayed coating returns to spray station, the central controller controls the roller again Road motor rotates forward, while controlling the air compressor machine and resuming work and open the solenoid valve.
7. the automatic coating apparatus of steel billet according to claim 6, which is characterized in that the control system further includes alarm mould Block is preset with the average time T for being painted with steel billet needs completely in the central controller, when the central controller When detecting that the time interval that the electric machines for roller invert twice in succession is less than T, mould of alarming described in the central controller controls Block is alarmed, while being controlled and being closed the air compressor machine and electric machines for roller.
8. the automatic coating apparatus of steel billet according to claim 5, which is characterized in that the material conveying box includes intermediate storing Tank, the communicating pipe for being connected to the storing packet and intermediate storage tank, is set the storing packet being set to above the intermediate storage tank The sealing ring that is placed in inside the communicating pipe, the stopper being plugged in the sealing ring, the floating plug for being connected to the stopper bottom, The connecting rod that is connect with the stopper top, be connected to the connecting rod movable end bead and be set to the connecting rod and the storage Expect the fulcrum of packet contact position;The floating plug coordinates with the sealing ring to seal the communicating pipe;The intermediate storage tank side It is connected to first gas transmission supervisor above portion, is connected to the total material-conveying pipe below the intermediate storage tank side.
9. the automatic coating apparatus of steel billet according to claim 1, which is characterized in that the automatic control switch includes branch Column, the lower baffle plate being connect with the lower rod end, is connected to the overhead gage following table at the overhead gage being connect with the pillar upper end Spring on face, the pallet being connected on the movable end of the spring, the first binding post being connected on the pallet lower surface And be connected on the lower baffle plate and with the second binding post of the first binding post face, the automatic control switch with it is described Air compressor machine is connected.
CN201710239456.7A 2017-04-13 2017-04-13 The automatic coating apparatus of steel billet Active CN106925471B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710239456.7A CN106925471B (en) 2017-04-13 2017-04-13 The automatic coating apparatus of steel billet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710239456.7A CN106925471B (en) 2017-04-13 2017-04-13 The automatic coating apparatus of steel billet

Publications (2)

Publication Number Publication Date
CN106925471A CN106925471A (en) 2017-07-07
CN106925471B true CN106925471B (en) 2018-11-06

Family

ID=59436590

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710239456.7A Active CN106925471B (en) 2017-04-13 2017-04-13 The automatic coating apparatus of steel billet

Country Status (1)

Country Link
CN (1) CN106925471B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108580118B (en) * 2018-05-18 2021-02-12 湖南博溥立材料科技有限公司 Automatic spraying system and method for anode carbon block anti-oxidation coating

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2314868Y (en) * 1997-11-21 1999-04-21 魏云虎 Number spray machine for hot steel blank
CN201622256U (en) * 2010-03-26 2010-11-03 武汉钢铁(集团)公司 Experimental device for billet anti-oxidation coating
CN202805899U (en) * 2012-05-09 2013-03-20 华南理工大学 Full-automatic visual silicon chip printing device with double platforms
CN103240660A (en) * 2013-05-22 2013-08-14 江苏启迪合金有限公司 Process for removing surface coating in high nickel alloy steel hot rolling
CN203830682U (en) * 2014-05-23 2014-09-17 雷恒波 Steel billet electric arc spraying labeling device
CN104369551A (en) * 2014-11-25 2015-02-25 柳州钢铁股份有限公司 Automatic online mark spraying machine for steel plates
JP2016147231A (en) * 2015-02-12 2016-08-18 東レエンジニアリング株式会社 Coating apparatus
CN106076721A (en) * 2016-08-31 2016-11-09 唐山元力科技有限公司 The on-line automatic paint finishing of steel billet high temp. protective coating
CN104210802B (en) * 2014-09-03 2016-11-30 本钢板材股份有限公司 A kind of steel billet roller-way automatic safety device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2314868Y (en) * 1997-11-21 1999-04-21 魏云虎 Number spray machine for hot steel blank
CN201622256U (en) * 2010-03-26 2010-11-03 武汉钢铁(集团)公司 Experimental device for billet anti-oxidation coating
CN202805899U (en) * 2012-05-09 2013-03-20 华南理工大学 Full-automatic visual silicon chip printing device with double platforms
CN103240660A (en) * 2013-05-22 2013-08-14 江苏启迪合金有限公司 Process for removing surface coating in high nickel alloy steel hot rolling
CN203830682U (en) * 2014-05-23 2014-09-17 雷恒波 Steel billet electric arc spraying labeling device
CN104210802B (en) * 2014-09-03 2016-11-30 本钢板材股份有限公司 A kind of steel billet roller-way automatic safety device
CN104369551A (en) * 2014-11-25 2015-02-25 柳州钢铁股份有限公司 Automatic online mark spraying machine for steel plates
JP2016147231A (en) * 2015-02-12 2016-08-18 東レエンジニアリング株式会社 Coating apparatus
CN106076721A (en) * 2016-08-31 2016-11-09 唐山元力科技有限公司 The on-line automatic paint finishing of steel billet high temp. protective coating

Also Published As

Publication number Publication date
CN106925471A (en) 2017-07-07

Similar Documents

Publication Publication Date Title
CN204434252U (en) A kind of Full-automatic linear formula bottle placer
CN211013425U (en) Tightness detection device of liquid raw material belt bottle
CN106925471B (en) The automatic coating apparatus of steel billet
CN201780204U (en) Device for detecting flexibility of bearing
CN103586166A (en) Coating production line and on-line automatic identification device thereof
CN104191845B (en) Production and coating technology and online processing device of three plates for zip-top can
CN207547898U (en) A kind of device of the automatic rotary marking blanking of safety equipment plastic products
CN203540798U (en) Coating production line and online automatic marking device for coating production line
CN205384325U (en) Pipeline powder static monitoring ware
CN201697881U (en) Online copper pipe flaw ink mark detection device
CN202482261U (en) Red coke detecting and removing device
CN102179327B (en) Electrostatic spraying equipment
CN203750870U (en) Electric detection device for medicament bottle cap
CN207124229U (en) Barrier film rippled edge improves device online
CN203307030U (en) Injection packing volume detecting device
CN207890049U (en) Glue monitoring device under a kind of GDX2 packing machines
CN206372993U (en) A kind of battery steel shell inner-wall spraying system
CN206199547U (en) A kind of automatic spraying machine
CN112113149A (en) Air tightness detection device for air duct of automobile roof
CN205015128U (en) Location piston rod mechanism of leakage detecting device
CN207622955U (en) It is a kind of to use the intelligent robot with quality testing function for valve manufacture
CN204170979U (en) A kind of print coating machine coating iron plate holiday check processing device
CN104062566A (en) Power cable online power frequency voltage withstand test device
CN204096161U (en) Lack bottle detecting device
CN209216261U (en) Batch can area combustible gas leakage monitoring and alarming system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant