CN106903867A - For the device of heavy caliber thick wall polyvinyl piping materials port full circle - Google Patents

For the device of heavy caliber thick wall polyvinyl piping materials port full circle Download PDF

Info

Publication number
CN106903867A
CN106903867A CN201710158989.2A CN201710158989A CN106903867A CN 106903867 A CN106903867 A CN 106903867A CN 201710158989 A CN201710158989 A CN 201710158989A CN 106903867 A CN106903867 A CN 106903867A
Authority
CN
China
Prior art keywords
full circle
seat
bearing
block
central shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710158989.2A
Other languages
Chinese (zh)
Inventor
袁本海
孙恩功
朱瑞霞
贾金金
朱明远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Quan En High-Tech Pipe Co Ltd
Original Assignee
Hebei Quan En High-Tech Pipe Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Quan En High-Tech Pipe Co Ltd filed Critical Hebei Quan En High-Tech Pipe Co Ltd
Priority to CN201710158989.2A priority Critical patent/CN106903867A/en
Publication of CN106903867A publication Critical patent/CN106903867A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C57/00Shaping of tube ends, e.g. flanging, belling or closing; Apparatus therefor, e.g. collapsible mandrels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C65/00Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor
    • B29C65/02Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor by heating, with or without pressure
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C66/00General aspects of processes or apparatus for joining preformed parts
    • B29C66/50General aspects of joining tubular articles; General aspects of joining long products, i.e. bars or profiled elements; General aspects of joining single elements to tubular articles, hollow articles or bars; General aspects of joining several hollow-preforms to form hollow or tubular articles
    • B29C66/51Joining tubular articles, profiled elements or bars; Joining single elements to tubular articles, hollow articles or bars; Joining several hollow-preforms to form hollow or tubular articles
    • B29C66/52Joining tubular articles, bars or profiled elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Revetment (AREA)

Abstract

A kind of device for heavy caliber thick wall polyvinyl piping materials port full circle, including discoidal full circle seat, being provided with the centre bore of full circle seat can be provided with round platform section with respect to the central shaft of full circle seat axial movement, central shaft middle part;Along the full circle seat several linear bearings of radial equipartition, each linear bearing is made up of bearing holder (housing, cover) and the axis of guide, each bearing holder (housing, cover) is fixed with full circle seat, the outboard end that each axis of guide is extended to outside full circle seat is provided with full circle block, the medial extremity that each axis of guide is located in full circle seat is provided with bearing block, bearing block is provided with bearing, the cylindrical active section for touching central shaft of each bearing.When described device is to tubing full circle, only need an operative, rotary middle spindle promotes each full circle block synchronously to stretch out, disposably can completing port full circle, increase substantially full circle operating efficiency, and full circle effect is good.Variety of problems caused by misalignment is big when can effectively control welding using the present invention, easily full circle operation, brings great convenience to pipeline construction progress and reliably ensures at a high speed.

Description

For the device of heavy caliber thick wall polyvinyl piping materials port full circle
Technical field
The present invention relates to a kind of tubular object extruding device, particularly for the dress of heavy caliber thick wall polyvinyl piping materials port full circle Put.
Background technology
The exploitation of polyethylene (PE) pipeline has had the history of more than 50 years so far, due to its own unique advantage --- it is nontoxic It is harmless, high intensity, high tenacity, ageing-resistant, and it is widely used in the fields such as urban water supply, field irrigation, gas transmission and distribution.Big mouth Footpath heavy wall PE tubing needed to carry out port position full circle treatment before carrying out to welding, and otherwise pipe end occurs misalignment Phenomenon, if unfitness of butt joint is more than 10%, can form that flange is asymmetric, cause the intensity of tubing interface to be had a greatly reduced quality, and make pipeline system System has potential safety hazard.Current heavy wall PE tubing is to prevent putting jack in pipe end to the full circle method before welding, is led to That crosses jack struts effect to pipe end full circle.This traditional method has following problems:One:Every time can only be to PE One point of tubing is adjusted, full circle inefficiency, influences construction speed;Secondly:Need tubing inside and outside during full circle Arrange two workmans to coordinate respectively to complete, take labor hour high.
The content of the invention
Drawback it is an object of the invention to be directed to prior art, there is provided one kind is used for heavy caliber thick wall polyvinyl piping materials end The device of mouthful full circle, can quickly to heavy wall PE pipe ends full circle and full circle quality is good, saving labor hour using described device.
Problem of the present invention is realized with following technical proposals:
A kind of device for heavy caliber thick wall polyvinyl piping materials port full circle, including discoidal full circle seat, full circle seat Centre bore in be provided with can with respect to full circle seat axial movement central shaft, central shaft middle part be provided with round platform section;Along full circle seat radially Uniform several linear bearings, each linear bearing is made up of bearing holder (housing, cover) and the axis of guide, and each bearing holder (housing, cover) is fixed with full circle seat, each axis of guide Extend to the outboard end outside full circle seat and be provided with full circle block, the medial extremity that each axis of guide is located in full circle seat is provided with bearing block, bearing Seat is provided with bearing, the cylindrical active section for touching central shaft of each bearing.
The above-mentioned device for heavy caliber thick wall polyvinyl piping materials port full circle, on the both sides end face of the full circle seat respectively Fixed end cap, described central shaft one end is light shaft part, and light shaft part is slidably matched with the sliding sleeve for being fixed on a side end cap, central shaft The other end is thread segment, and thread segment coordinates with the nut thread for being fixed on another side end cap.
The above-mentioned device for heavy caliber thick wall polyvinyl piping materials port full circle, uniformly counts on the excircle of the full circle seat Individual walking round frame, walking round frame is in " П " shape, and the affixed full circle seat of stull of walking round frame is distinguished at the two supporting legs of walking round frame Road wheel is set, and the axial direction of each road wheel is axially vertical with central shaft.
The above-mentioned device for heavy caliber thick wall polyvinyl piping materials port full circle, each full circle block is provided with two extension springs, extension spring One end and full circle seat it is fixed, the extension spring other end is with full circle block by fixation.
The above-mentioned device for heavy caliber thick wall polyvinyl piping materials port full circle, the outer face of each full circle block is arcwall face.
The above-mentioned device for heavy caliber thick wall polyvinyl piping materials port full circle, the walking round frame replaces point with full circle block On full circle seat, the number of full circle block is 4-8 blocks to cloth.
The present invention is designed for raising heavy wall PE pipe end full circle efficiency and full circle quality is solved, and described device includes Discoidal full circle seat, several full circle blocks that can radially stretch are set on the periphery of full circle seat.Using described device to thickness During wall PE pipe end full circle, an operative is only needed, rotary middle spindle promotes each full circle block synchronously to stretch out, disposable to be Can completing port full circle, increase substantially full circle operating efficiency, and full circle effect is good.Welding can effectively be controlled using the present invention When misalignment it is big caused by variety of problems, easily full circle operation at a high speed, bring great convenience to pipeline construction progress and It is reliable to ensure.
Brief description of the drawings
The invention will be further described below in conjunction with the accompanying drawings.
Fig. 1 is structural representation of the invention;
Fig. 2 is the A-A sectional views of Fig. 1.
Each list of reference numerals is in figure:1st, full circle block, 2, the axis of guide, 3, road wheel, 4, walking round frame, 5, full circle seat, 6, end Lid, 7, bearing block, 8, bearing, 9, central shaft, 9-1, light shaft part, 9-2, round platform section, 9-3, thread segment, 10, sliding sleeve, 11, nut, 12nd, bearing holder (housing, cover), 13, extension spring.
Specific embodiment
Referring to Fig. 1, Fig. 2, the present invention includes discoidal full circle seat 5, and full circle seat is provided with centre bore, the two side ends of full circle seat Outwardly end cap 6 is fixed on face respectively.Being provided with the centre bore of full circle seat can be with respect to the central shaft of full circle seat axial movement 9, central shaft is divided into three sections, and light shaft part 9-1, round platform section 9-2 and thread segment 9-3, light shaft part and thread segment are followed successively by by the right side a to left side Positioned at the outside of full circle seat.Wherein, light shaft part be fixed on right side end cap sliding sleeve 10 be slidably matched, thread segment be fixed on a left side The screw thread of nut 11 of side end cap coordinates.Full circle seat is provided with several radial holes, and radial hole is connected with centre bore, and each radial hole is built-in With linear bearing, each linear bearing being constituted with the axis of guide 2 by bearing holder (housing, cover) 12 and in bearing holder (housing, cover).Each bearing holder (housing, cover) and full circle seat Fixed, the outboard end that each axis of guide is extended to outside full circle seat is provided with full circle block 1, and the outer face of full circle block is arcwall face.It is whole to make Nahlock bounces back with moving to left for central shaft, and each full circle block is provided with two extension springs 13, and extension spring one end is fixed with full circle seat, and extension spring is another Hold and fixed near the face of full circle seat with full circle block.The medial extremity that each axis of guide is located in full circle seat is provided with bearing block 7, on bearing block It is provided with bearing 8, the cylindrical round table surface for touching central shaft of each bearing.
Referring still to Fig. 1, Fig. 2, moved in tubing for ease of device, uniform several road wheels on the excircle of full circle seat Frame 4, walking round frame is in " П " shape, and the affixed full circle seat of stull of walking round frame is respectively provided with row at the two supporting legs of walking round frame Wheel 3 is walked, the axial direction of each road wheel is axially vertical with central shaft.Walking round frame is alternately distributed on full circle seat with full circle block, whole The number of nahlock is 4-8 blocks.Full circle block is provided with six pieces in diagram embodiment.
Referring still to Fig. 1, Fig. 2, when the present invention is to heavy wall PE pipe ends position full circle, first rotary middle spindle makes central shaft Move to left, the axis of guide, full circle block radially bounce back under extension spring effect;Then device is placed into PE pipe ends, by row Walking wheel and easily can moving to device needs the position of full circle;Central shaft is rotated backward again, moves to right central shaft, round platform section Promote the axis of guide, full circle block radially overhanging through bearing 8, until full circle block presses the inwall of PE tubing, realize full circle;Full circle Full circle block is retracted again afterwards, device is taken out from PE tubing.

Claims (6)

1. a kind of device for heavy caliber thick wall polyvinyl piping materials port full circle, it is characterised in that:Including discoidal full circle Seat (5), being provided with the centre bore of full circle seat can be provided with round platform with respect to the central shaft (9) of full circle seat axial movement, central shaft middle part Section (9-2);Along the full circle seat several linear bearings of radial equipartition, each linear bearing is made up of bearing holder (housing, cover) (12) and the axis of guide (2), respectively Bearing holder (housing, cover) is fixed with full circle seat, and the outboard end that each axis of guide is extended to outside full circle seat is provided with full circle block (1), and each axis of guide is located at whole Medial extremity in round seat is provided with bearing block (7), and bearing block is provided with bearing (8), the cylindrical work for touching central shaft of each bearing Section.
2. the device for heavy caliber thick wall polyvinyl piping materials port full circle according to claim 1, it is characterised in that:Institute State and fix end cap (6) on the both sides end face of full circle seat respectively, described central shaft one end is light shaft part (9-2), light shaft part and fixation Be slidably matched in the sliding sleeve (10) of a side end cap, the other end of central shaft is thread segment (9-3), thread segment be fixed on opposite side Nut (11) screw thread of end cap coordinates.
3. the device for heavy caliber thick wall polyvinyl piping materials port full circle according to claim 2, it is characterised in that:Institute Uniform several walking round frame (4) on the excircle of full circle seat are stated, walking round frame is in " П " shape, the affixed full circle of stull of walking round frame Seat, is respectively provided with road wheel (3) at the two supporting legs of walking round frame, the axial direction of each road wheel is axially vertical with central shaft.
4. the device for heavy caliber thick wall polyvinyl piping materials port full circle according to claim 3, it is characterised in that:Respectively Full circle block is provided with two extension springs, and one end of extension spring (13) is fixed with full circle seat, and the extension spring other end is with full circle block by fixing.
5. the device for heavy caliber thick wall polyvinyl piping materials port full circle according to claim 4, it is characterised in that:Respectively The outer face of full circle block is arcwall face.
6. the device for heavy caliber thick wall polyvinyl piping materials port full circle according to claim 5, it is characterised in that:Institute State walking round frame to be alternately distributed on full circle seat with full circle block, the number of full circle block is 4-8 blocks.
CN201710158989.2A 2017-03-17 2017-03-17 For the device of heavy caliber thick wall polyvinyl piping materials port full circle Pending CN106903867A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710158989.2A CN106903867A (en) 2017-03-17 2017-03-17 For the device of heavy caliber thick wall polyvinyl piping materials port full circle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710158989.2A CN106903867A (en) 2017-03-17 2017-03-17 For the device of heavy caliber thick wall polyvinyl piping materials port full circle

Publications (1)

Publication Number Publication Date
CN106903867A true CN106903867A (en) 2017-06-30

Family

ID=59187900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710158989.2A Pending CN106903867A (en) 2017-03-17 2017-03-17 For the device of heavy caliber thick wall polyvinyl piping materials port full circle

Country Status (1)

Country Link
CN (1) CN106903867A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116352186A (en) * 2023-06-01 2023-06-30 山西天宝集团有限公司 Device and method for rounding and flattening T-shaped flange after ring rolling

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2806040Y (en) * 2005-07-19 2006-08-16 中国石油天然气集团公司 Large-expansion power pipe interior fitting device
CN202824271U (en) * 2012-07-27 2013-03-27 新都区斑竹园镇焕越金属配件厂 Inner reshaping and fitting device of conduit and conduit bend
CN106141001A (en) * 2015-03-30 2016-11-23 天津市冰科制冷设备有限公司 A kind of pipeline orifice expander
CN106439376A (en) * 2016-10-11 2017-02-22 西南石油大学 Peristaltic inner concave pipeline repairing machine
CN206623422U (en) * 2017-03-17 2017-11-10 河北泉恩高科技管业有限公司 A kind of heavy wall PE pipe end rounding devices

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2806040Y (en) * 2005-07-19 2006-08-16 中国石油天然气集团公司 Large-expansion power pipe interior fitting device
CN202824271U (en) * 2012-07-27 2013-03-27 新都区斑竹园镇焕越金属配件厂 Inner reshaping and fitting device of conduit and conduit bend
CN106141001A (en) * 2015-03-30 2016-11-23 天津市冰科制冷设备有限公司 A kind of pipeline orifice expander
CN106439376A (en) * 2016-10-11 2017-02-22 西南石油大学 Peristaltic inner concave pipeline repairing machine
CN206623422U (en) * 2017-03-17 2017-11-10 河北泉恩高科技管业有限公司 A kind of heavy wall PE pipe end rounding devices

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116352186A (en) * 2023-06-01 2023-06-30 山西天宝集团有限公司 Device and method for rounding and flattening T-shaped flange after ring rolling
CN116352186B (en) * 2023-06-01 2023-07-25 山西天宝集团有限公司 Device and method for rounding and flattening T-shaped flange after ring rolling

Similar Documents

Publication Publication Date Title
CN204802621U (en) Bearing autoloading and firing equipment
CN203843402U (en) Positioning and welding device for pipe and flange
CN104259653B (en) Full hydraulic drive closed-type double action crank press main spindle numerical control rubs under water and connects soldering equipment
CN106181203B (en) Quarter bend intelligently clamps rotary cutting apparatus
CN103753082B (en) Welding of tubes centering and gas shield device
CN206623422U (en) A kind of heavy wall PE pipe end rounding devices
CN106853564A (en) A kind of composite steel tube welding equipment
CN208513249U (en) It is a kind of self-centering from walking full-rotating cleaning device for coating of high pressure water pipeline
CN106903867A (en) For the device of heavy caliber thick wall polyvinyl piping materials port full circle
CN107051991A (en) A kind of Full-automatic of the deep pipe of the reducing threaded walls with intelligent detector
CN206840193U (en) A kind of cutting machine of plastic pipe
CN207479902U (en) Bathroom pipe fittings welder
CN112060197B (en) PE pipe processing technology
CN101362295A (en) Turning and clamping method for ultra-long and large workpieces
CN206105112U (en) Big pipe diameter circulating pipe annular inside weld submerged arc welding automatic welder
CN106392452B (en) A kind of quick pipe welding fixture of clamping
CN205465211U (en) Thrust wheel side cap machining workbench's rotatory stop gear
CN203610783U (en) Double-end-face flat cutter head
CN206477828U (en) Integrated concentric stepping layered polymer injection device
CN202804516U (en) Automatic welding device for thermocouples
CN204773202U (en) Heating device for flaring of polyethylene pipe system is used for feedwater
CN208451248U (en) A kind of rotary extension device
CN205817385U (en) A kind of sleeve positioning component
CN204997217U (en) Radial automatic welder of pipe fitting inner wall
CN208276376U (en) A kind of multiposition thin-wall steel tube bonding machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170630