CN106903797A CN201710095104.9A CN201710095104A CN106903797A CN 106903797 A CN106903797 A CN 106903797A CN 201710095104 A CN201710095104 A CN 201710095104A CN 106903797 A CN106903797 A CN 106903797A
Authority
CN
China
Prior art keywords
gear
welding
cement
bull stick
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710095104.9A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanchang Run Technology Co Ltd
Original Assignee
Nanchang Run Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanchang Run Technology Co Ltd filed Critical Nanchang Run Technology Co Ltd
Priority to CN201710095104.9A priority Critical patent/CN106903797A/en
Publication of CN106903797A publication Critical patent/CN106903797A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C5/00Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions
    • B28C5/08Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions using driven mechanical means affecting the mixing
    • B28C5/18Mixing in containers to which motion is imparted to effect the mixing
    • B28C5/26Mixing in containers to which motion is imparted to effect the mixing rotating about a vertical or steeply inclined axis during the mixing, e.g. comprising a flat bottomplate rotating about a vertical axis, co-operating with blades or stirrers
    • B28C5/32Mixing in containers to which motion is imparted to effect the mixing rotating about a vertical or steeply inclined axis during the mixing, e.g. comprising a flat bottomplate rotating about a vertical axis, co-operating with blades or stirrers with driven stirrers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C5/00Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions
    • B28C5/08Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions using driven mechanical means affecting the mixing
    • B28C5/0806Details; Accessories
    • B28C5/0831Drives or drive systems, e.g. toothed racks, winches
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C7/00Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
    • B28C7/16Discharge means, e.g. with intermediate storage of fresh concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Dispersion Chemistry (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention relates to a kind of cement mixing equipment, more particularly to a kind of construction site mixing plant is stored with cement.The technical problem to be solved in the present invention is to provide storage cement that can be temporary transient and the stirring of continuation, carry out cement mixing during it is less surrounding environment is polluted, stir needed for a kind of time shorter construction site cement storage mixing plant.In order to solve the above-mentioned technical problem, mixing plant is stored with cement the invention provides such a construction site, includes base plate etc.;Right side is provided with discharging device on base plate, and base plate upper left side is provided with first support bar by way of welding, and first support bar upper end is provided with guide rail by way of welding, and guide rail is provided with agitating device.Invention achieves can be temporary transient storage cement and continuation stirring, carry out it is less during cement mixing surrounding environment is polluted, stir needed for time shorter effect.

Description

A kind of construction site stores mixing plant with cement
Technical field
The present invention relates to a kind of cement mixing equipment, more particularly to a kind of construction site mixing plant is stored with cement.
Background technology
Cement:Powdery hydraulicity inorganic coagulation material.Add water after stirring into slurry, can harden in atmosphere or in water Preferably hardening, and can the materials such as sand, stone is cemented together securely.Mixture of the early stage lime with volcanic ash and modern times Lime pozzolanic cement is much like, the concrete being made of its cementing rubble, and not only intensity is higher after hardening, and can also resist The erosion of fresh water or brackish water.For a long time, it is used as a kind of important Binder Materials, be widely used in civil construction, water conservancy, The engineerings such as national defence.
All it is to use manually to carry out blanking and stirring to cement when cement mixing is carried out on current construction site, Certainly some equipment also are stirred cement, but current cement mixing mode major part is unable to reach holds to cement Continuous stirring, that is, current cement mixing is all that raw material are stirred, stirring is accomplished by after completing, it is impossible to enter The of short duration reservation of row, otherwise can harden, causes the damage of equipment and the waste of resource, and after the completion of cement mixing if Running into workman needs rest, then the cement that these are stirred will be hardened, if run into the cement for needing to use used Still there are some cement to be left after complete, then these cement will be slatterned, and crossing cannot just use for one day, and current The artificial major part that is stirred to cement is to use to be carried out in situ dispensing and stirring, causes follow-up cleaning to bother, and right Speed is slower when cement is stirred, and wastes time and energy.
Therefore during needing a kind of storage cement that can be temporary transient of research and development and the stirring of continuation badly, carrying out cement mixing It is less surrounding environment is polluted, stir needed for time shorter construction site with cement mixing plant is stored to overcome mesh The storage cement that preceding artificial or mini-plant has cannot be temporary transient to the mode of cement mixing causes the waste of cement, enters on the spot Row cement mixing causes follow-up cleaning trouble, traditional agitating mode time shortcoming more long.
The content of the invention
(1)The technical problem to be solved
There is storage cement that cannot be temporary transient to the mode of cement mixing to overcome current artificial or mini-plant in the present invention Cause the waste of cement, be carried out in situ cement mixing and cause follow-up cleaning trouble, traditional agitating mode time shortcoming more long, this The invention technical problem to be solved is to provide storage cement that can be temporary transient and the stirring of continuation, carries out cement mixing process In it is less surrounding environment is polluted, stir needed for time it is shorter a kind of construction site cement storage mixing plant.
(2)Technical scheme
In order to solve the above-mentioned technical problem, mixing plant is stored with cement the invention provides such a construction site, including There are base plate, discharging device, first support bar, guide rail and agitating device, right side is provided with discharging device on base plate, base plate upper left side leads to The mode for crossing welding is provided with first support bar, and first support bar upper end is provided with guide rail, is set on guide rail by way of welding There is agitating device.
Preferably, discharging device includes the first fixed station, first bearing seat, the first bull stick, hopper, first gear, One motor and second gear, are provided with right side in the first fixed station, the first fixed station and pass through spiral shell on base plate by way of welding Tether the mode for connecing and first bearing seat is installed, first bearing seat is interior to be connected with the first bull stick, the first bull stick upper end by interference Hopper is installed by way of welding, the mode that middle part is bolted on the first bull stick is provided with first gear, first The mode that fixed station upper left is bolted is provided with the first motor, and the first motor is located at the first bull stick left, first First motor output shaft of motor upper end is connected with second gear by shaft coupling, and second gear is engaged with first gear.
Preferably, agitating device include guide pin bushing, fixed plate, second bearing seat, the second bull stick, paddle, the 3rd gear, Second motor and the 4th gear, slidingtype is connected with guide pin bushing on guide rail, and the tangent plane of guide rail is circle, and guide pin bushing right upper portion is by weldering The mode for connecing is provided with the mode being bolted in right side in fixed plate, fixed plate and is provided with second bearing seat, the second axle The second bull stick is connected with bearing, the second bull stick lower section left and right sides is provided with paddle, the second bull stick by way of welding Upside is provided with the 3rd gear, and the mode that fixed plate upper right is bolted is provided with the second motor, the second motor position In the second bull stick left, the second motor output shaft of the second motor upper end is connected with the 4th gear, the 4th gear by shaft coupling Engaged with the 3rd gear.
Preferably, also include tilting gearing, tilting gearing include supporting plate, first rotating shaft, block, the first slide rail, First sliding block, pressing plate, the first nut and the first screw rod, the first bull stick upper end are semicircle, and middle side part is by welding under hopper Mode is provided with two pieces of supporting plates, and the first bull stick is provided with tilting gearing, and supporting plate is located at the front and rear both sides of the first bull stick respectively, Rotary type is connected with first rotating shaft between supporting plate, and first rotating shaft passes through through the first bull stick upside on front side of the supporting plate of front side The mode of welding is provided with block, and block middle part is provided with the second through hole, and the mode that the first bull stick upside is bolted is installed There is the first slide rail, the first slide rail inner sliding type is connected with two the first sliding blocks, and the first upper end of slide block is installed by way of welding Have a pressing plate, pressing plate upside is provided with first through hole, first through hole and the second through hole on same horizontal line, the left side of left side pressing plate Top is provided with the first nut by way of welding, the first nut and the second through hole in the same horizontal line, the first nut, the The first screw rod, the first screw rod and the first nut screw connection are placed with one through hole and the second through hole.
Preferably, fixed block, the second rotating shaft, baffle plate, the 3rd rotating shaft, connecting rod and cylinder are also included, feed hopper bottom is right Side is provided with third through-hole, and the mode that feed hopper bottom passes on left welding is provided with fixed block, and fixed block is located at third through-hole left, Fixed block front side rotatably is connected with the second rotating shaft, and baffle plate is provided with by way of welding in the second rotating shaft, and baffle plate blocks the Three through holes, baffle plate right side is rotatably connected with the 3rd rotating shaft, and the mode that hopper passes on left welding is provided with cylinder, cylinder lower end The mode that is bolted of Telescopic-cylinder bar connecting rod is installed, connecting rod lower end is arranged on the 3rd by way of welding In rotating shaft.
Preferably, also include distributor, distributor include the second fixed station, 3rd bearing seat, the 3rd bull stick, Mounting table, the 5th gear, the 3rd motor and the 6th gear, base plate right-hand member are provided with distributor, the side that base plate right-hand member passes through welding Formula is provided with the mode that middle part is bolted in the second fixed station, the second fixed station and is provided with 3rd bearing seat, the 3rd axle The 3rd bull stick is connected with by interference in bearing, the 3rd bull stick upper end is provided with mounting table by way of welding, on mounting table The side left and right sides is provided with standing groove, and the mode that the 3rd bull stick upside is bolted is provided with the 5th gear, the 5th gear position In mounting table lower section, the mode that right side is bolted on the second fixed station is provided with the 3rd motor, the 3rd motor upper end 3rd motor output shaft is connected with the 6th gear by shaft coupling, and the 6th gear and the 5th gear are engaged.
Preferably, the 3rd screw rod and push pedal are also included, screwed hole is provided with the inwall of the mounting table left and right sides, in screwed hole The 3rd screw rod is placed with, the 3rd screw rod coordinates with screwed hole, and side rotary is connected with push pedal in the 3rd screw rod.
Preferably, proportioning device is also included, proportioning device includes second support bar, the second slide rail, the second sliding block, L Shape bar, ball float, travel switch, the second nut, the second screw rod and briquetting, mounting table top are provided with proportioning device, mounting table middle part The mode that the upside left and right sides is bolted in second support bar, second support bar is installed by way of welding to install There is the second slide rail, the second slide rail inner sliding type is connected with the second sliding block, and the mode that the second upper end of slide block is bolted is installed There is travel switch, the second sliding block outside is provided with L-shaped bar, the mode that L-shaped bar lower end is bolted by way of welding Ball float is installed, the second slide rail upper end is provided with the second nut, the second screw rod is placed with the second nut by way of welding, Second screw rod lower end is put in the second slide rail, the second screw rod and the second nut screw connection, and the second screw rod lower end is by way of welding Briquetting is installed.
Preferably, the material of first support bar is Q235 steel.
Preferably, the first motor, the second motor and the 3rd motor are servomotor.
Operation principle:When workman needs to be stirred cement or to making exhaustless cement carry out temporary transient preservation When, cement can be placed on discharging device, then control agitating device to be stirred the cement of discharging device, continued Being slowly stirred for shape just can temporary transient preservation cement.
Because discharging device includes the first fixed station, first bearing seat, the first bull stick, hopper, first gear, the first electricity Machine and second gear, are provided with right side in the first fixed station, the first fixed station and are connected by bolt on base plate by way of welding The mode for connecing is provided with first bearing seat, first bearing seat and is connected with the first bull stick by interference, and the first bull stick upper end passes through The mode of welding is provided with hopper, and the mode that middle part is bolted on the first bull stick is provided with first gear, and first fixes The mode that platform upper left is bolted is provided with the first motor, and the first motor is located at the first bull stick left, the first motor First motor output shaft of upper end is connected with second gear by shaft coupling, and second gear is engaged with first gear, when workman needs When placing cement, can be placed on cement on hopper by workman, then open the first motor, and the first motor will drive second gear Rotation, second gear drives the first gear rotation being engaged with, and first gear rotarily drives the first bull stick by clutch shaft bearing Seat rotation, the first bull stick rotation will drive hopper rotation.
Because agitating device includes guide pin bushing, fixed plate, second bearing seat, the second bull stick, paddle, the 3rd gear, Two motors and the 4th gear, slidingtype is connected with guide pin bushing on guide rail, and the tangent plane of guide rail is circle, and guide pin bushing right upper portion is by welding Mode fixed plate is installed, the mode being bolted in right side in fixed plate is provided with second bearing seat, second bearing The second bull stick is connected with seat, the second bull stick lower section left and right sides is provided with paddle by way of welding, on the second bull stick Side is provided with the 3rd gear, and the mode that fixed plate upper right is bolted is provided with the second motor, and the second motor is located at Second bull stick left, the second motor output shaft of the second motor upper end is connected with the 4th gear by shaft coupling, the 4th gear and 3rd gear is engaged, and when workman needs to place cement in discharging device, first can be lifted guide pin bushing, then around guide rail rotation Go out discharging device, to be placed on discharging device cement, rotate through to come again after putting cement well, then open the second motor, Second motor will drive the rotation of the 4th gear, the rotation of the 4th gear to drive the 3rd gear rotation being engaged with, the 3rd gear Rotation will drive the rotation of the second bull stick, and the rotation of the second bull stick will drive paddle rotation, so as to enter to the cement on discharging device Row stirring.
Because also including tilting gearing, tilting gearing includes supporting plate, first rotating shaft, block, the first slide rail, first Sliding block, pressing plate, the first nut and the first screw rod, the first bull stick upper end are semicircle, and middle side part is by way of welding under hopper Two pieces of supporting plates are installed, the first bull stick is provided with tilting gearing, and supporting plate is respectively positioned at the front and rear both sides of the first bull stick, support Rotary type is connected with first rotating shaft between plate, and, through the first bull stick upside, the front side of front side supporting plate is by welding for first rotating shaft Mode block is installed, block middle part is provided with the second through hole, and the mode that the first bull stick upside is bolted is provided with the One slide rail, the first slide rail inner sliding type is connected with two the first sliding blocks, and the first upper end of slide block is provided with pressure by way of welding Plate, pressing plate upside is provided with first through hole, first through hole and the second through hole on same horizontal line, the left side of left side pressing plate top First nut is installed by way of welding, in the same horizontal line, the first nut, first are led to for the first nut and the second through hole The first screw rod, the first screw rod and the first nut screw connection are placed with hole and the second through hole, when workman is needed to being stirred in hopper Cement when falling down, workman can rotate the first screw rod, and the first screw rod is taken out from the first nut, first through hole and the second through hole Go out, remove the pressing plate on both sides, around first rotating shaft revolving hopper, hopper is had an inclined angle, make hopper to side clockwise To rotation so as in whipping process can Turnover bunker, the cement in hopper can be enable to overturn.
Because also including fixed block, the second rotating shaft, baffle plate, the 3rd rotating shaft, connecting rod and cylinder, feed hopper bottom right side opening There is third through-hole, the mode that feed hopper bottom passes on left welding is provided with fixed block, and fixed block is located at third through-hole left, fixed Block front side is rotatably connected with the second rotating shaft, and baffle plate is provided with by way of welding in the second rotating shaft, and baffle plate blocks threeway Hole, baffle plate right side is rotatably connected with the 3rd rotating shaft, and the mode that hopper passes on left welding is provided with cylinder, the gas of cylinder lower end The mode that cylinder expansion link is bolted is provided with connecting rod, and connecting rod lower end is arranged on the 3rd rotating shaft by way of welding On, when tilting gearing inclines hopper, control cylinder elongation, cylinder elongation will promote connecting rod to move down and the inverse time Pin rotates, so that promote baffle plate to be turned clockwise around the second rotating shaft, and this when, the cement in hopper will be from third through-hole In flow down, along baffle plate flow out hopper.
Because also including distributor, distributor includes the second fixed station, 3rd bearing seat, the 3rd bull stick, puts Platform, the 5th gear, the 3rd motor and the 6th gear are put, base plate right-hand member is provided with distributor, and base plate right-hand member is by way of welding The mode that middle part is bolted in second fixed station, the second fixed station is installed 3rd bearing seat, 3rd bearing are installed The 3rd bull stick is connected with by interference in seat, the 3rd bull stick upper end is provided with mounting table, mounting table upside by way of welding The left and right sides is provided with standing groove, and the mode that the 3rd bull stick upside is bolted is provided with the 5th gear, and the 5th gear is located at Mounting table lower section, the mode that is bolted of right side is provided with the 3rd motor on the second fixed station, and the of the 3rd motor upper end Three motor output shafts are connected with the 6th gear by shaft coupling, and the 6th gear and the 5th gear are engaged, when workman is needed from hopper When the cement for inside flowing down is collected, barrel of cement can be placed in standing groove, then control the rotation of the 3rd motor, the 3rd electricity Machine will drive the rotation of the 6th gear, the rotation of the 6th gear to drive the 5th gear rotation being engaged with, and the rotation of the 5th gear will Drive the 3rd bull stick to rotate, the rotation of the 3rd bull stick will drive mounting table rotation, when rotating to hopper lower right, control the 3rd motor Stop the rotation, cement after this barrel of cement has been installed, continues to control electricity by from the barrel of cement flowed in hopper on standing groove Machine is rotated, and makes mounting table continue to rotate, and another standing groove then is rotated into hopper lower right, then stops the rotation of the 3rd motor Turn.
Because also including the 3rd screw rod and push pedal, screwed hole is provided with the inwall of the mounting table left and right sides, is put in screwed hole The 3rd screw rod is equipped with, the 3rd screw rod coordinates with screwed hole, and side rotary is connected with push pedal in the 3rd screw rod, when user is needed to not When the barrel of cement of same size is placed on mounting table and then is fixed, user can rotate the 3rd screw rod, and the 3rd screw rod leads to Cross in the dead slot of cooperation precession the 3rd with screwed hole, the 3rd screw rod promotes the push pedal push pedal is fixed barrel of cement in standing groove On this position.
Because also including proportioning device, proportioning device includes second support bar, the second slide rail, the second sliding block, L-shaped Bar, ball float, travel switch, the second nut, the second screw rod and briquetting, mounting table top are provided with proportioning device, and mounting table middle part is logical The mode for crossing welding is provided with second support bar, and the mode that the interior upside left and right sides of second support bar is bolted is provided with Second slide rail, the second slide rail inner sliding type is connected with the second sliding block, and the mode that the second upper end of slide block is bolted is provided with Travel switch, the second sliding block outside is provided with L-shaped bar by way of welding, and the mode that L-shaped bar lower end is bolted is pacified Equipped with ball float, the second slide rail upper end is provided with the second nut by way of welding, and the second screw rod is placed with the second nut, the Two screw rod lower ends are put in the second slide rail, the second screw rod and the second nut screw connection, and the second screw rod lower end is pacified by way of welding Equipped with briquetting, when workman needs to distribute the barrel of cement blanking on distributor automatically, the second screw rod can be rotated, the Two screw rods will be moved up or down, be then put into ball float by the second nut precession or back-out, the second screw rod band dynamic pressure plate In barrel of cement, the 3rd motor is then opened, the 3rd motor drives mounting table rotation, after cement enters in barrel of cement, ball float is past Top is pushed up, and ball float drives the second sliding block to be moved up by the second slide rail, then goes up when travel switch is touched pressing plate, Travel switch is switched on, control the 3rd motor rotation, rotates to another bucket position controlled motor when hopper lower right and stops rotation Turn, then withdraw the barrel of cement for putting cement well, be put into another empty barrel of cement.
Because the material of first support bar is Q235 steel, Q235 steel hardness is high, it is not easy to deforms, makes the service life of device It is longer.
Because the first motor, the second motor and the 3rd motor are servomotor, anti-overload ability is strong, and high speed performance is good, energy It is precisely controlled its rotating speed.
(3)Beneficial effect
Invention achieves can be temporary transient storage cement and continuation stirring, carry out it is less to week during cement mixing Collarette border pollutes, stir needed for time shorter effect, place cement and then revolving hopper and right by using hopper The mode that cement in hopper is stirred, is not only able to carry out cement the stirring of continuation so as to temporary transient preservation, moreover it is possible to It is enough cement ingredient is stirred when cement is needed to use, the cement of finished product is stirred out, because placing water using hopper Mud is stirred, it is possible to not resulting in larger pollution to the environment of surrounding.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the invention.
Fig. 2 is the first main structure diagram of tilting gearing of the present invention.
Fig. 3 is the main structure diagram of hopper of the present invention.
Fig. 4 is second main structure diagram of the invention.
Fig. 5 is the main structure diagram of distributor of the present invention.
Fig. 6 is the main structure diagram of mounting table of the present invention.
Fig. 7 is the main structure diagram of proportioning device of the present invention.
Mark in accompanying drawing for:1- base plates, 2- discharging devices, the fixed stations of 21- first, 22- first bearing seats, 23- first Bull stick, 24- hoppers, 25- first gears, the motors of 26- first, 27- second gears, 3- first support bars, 4- guide rails, 5- stirring dresses Put, 51- guide pin bushings, 52- fixed plates, 53- second bearing seats, the bull sticks of 54- second, 55- paddles, the gears of 56- the 3rd, 57- second Motor, the gears of 58- the 4th, 6- tilting gearings, 60- supporting plates, 61- first rotating shafts, 62- blocks, the slide rails of 63- first, 64- first Sliding block, 65- pressing plates, 66- first through hole, the through holes of 67- second, the nuts of 68- first, the screw rods of 69- first, 610- third through-holes, 611- fixed blocks, the rotating shafts of 612- second, 613- baffle plates, the rotating shafts of 614- the 3rd, 615- connecting rods, 616- cylinders, 7- distributors, The fixed stations of 71- second, 72- 3rd bearings seat, the bull sticks of 73- the 3rd, 74- mounting tables, 75- standing grooves, the gears of 76- the 5th, 77- the Three motors, the gears of 78- the 6th, 741- screwed holes, the screw rods of 742- the 3rd, 743- push pedals, 79- proportioning devices, 790- second is supported Bar, the slide rails of 7901- second, the sliding blocks of 791- second, 792-L shape bars, 793- ball floats, 794- travel switches, the nuts of 795- second, The screw rods of 796- second, 797- briquettings.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of construction site stores mixing plant with cement, as shown in figs. 1-7, includes base plate 1, discharging device 2, first and supports Bar 3, guide rail 4 and agitating device 5, right side is provided with discharging device 2 on base plate 1, and the upper left side of base plate 1 is provided with by way of welding First support bar 3, the upper end of first support bar 3 is provided with guide rail 4 by way of welding, and guide rail 4 is provided with agitating device 5.
Embodiment 2
A kind of construction site stores mixing plant with cement, as shown in figs. 1-7, includes base plate 1, discharging device 2, first and supports Bar 3, guide rail 4 and agitating device 5, right side is provided with discharging device 2 on base plate 1, and the upper left side of base plate 1 is provided with by way of welding First support bar 3, the upper end of first support bar 3 is provided with guide rail 4 by way of welding, and guide rail 4 is provided with agitating device 5.
Discharging device 2 includes the first fixed station 21, first bearing seat 22, the first bull stick 23, hopper 24, first gear 25th, the first motor 26 and second gear 27, the first fixed station 21, the first fixed station are provided with base plate 1 by way of welding The mode that right side is bolted in 21 is provided with first bearing seat 22, first bearing seat 22 and is connected with first by interference Bull stick 23, the upper end of the first bull stick 23 is provided with hopper 24 by way of welding, and middle part is bolted on the first bull stick 23 Mode first gear 25 is installed, the mode that the upper left of the first fixed station 21 is bolted is provided with the first motor 26, the first motor 26 is located at the left of the first bull stick 23, and the output shaft of the first motor 26 of the upper end of the first motor 26 is connected by shaft coupling Second gear 27 is connected to, second gear 27 is engaged with first gear 25.
Embodiment 3
A kind of construction site stores mixing plant with cement, as shown in figs. 1-7, includes base plate 1, discharging device 2, first and supports Bar 3, guide rail 4 and agitating device 5, right side is provided with discharging device 2 on base plate 1, and the upper left side of base plate 1 is provided with by way of welding First support bar 3, the upper end of first support bar 3 is provided with guide rail 4 by way of welding, and guide rail 4 is provided with agitating device 5.
Discharging device 2 includes the first fixed station 21, first bearing seat 22, the first bull stick 23, hopper 24, first gear 25th, the first motor 26 and second gear 27, the first fixed station 21, the first fixed station are provided with base plate 1 by way of welding The mode that right side is bolted in 21 is provided with first bearing seat 22, first bearing seat 22 and is connected with first by interference Bull stick 23, the upper end of the first bull stick 23 is provided with hopper 24 by way of welding, and middle part is bolted on the first bull stick 23 Mode first gear 25 is installed, the mode that the upper left of the first fixed station 21 is bolted is provided with the first motor 26, the first motor 26 is located at the left of the first bull stick 23, and the output shaft of the first motor 26 of the upper end of the first motor 26 is connected by shaft coupling Second gear 27 is connected to, second gear 27 is engaged with first gear 25.
Agitating device 5 includes guide pin bushing 51, fixed plate 52, second bearing seat 53, the second bull stick 54, paddle the 55, the 3rd Gear 56, the second motor 57 and the 4th gear 58, slidingtype is connected with guide pin bushing 51 on guide rail 4, and the tangent plane of guide rail 4 is circle, is led Cover 51 right upper portions and fixed plate 52 is installed by way of welding, the mode being bolted in the interior right side of fixed plate 52 is pacified Equipped with second bearing seat 53, the second bull stick 54 is connected with second bearing seat 53, the lower section left and right sides of the second bull stick 54 is by weldering The mode for connecing is provided with paddle 55, and the upside of the second bull stick 54 is provided with the 3rd gear 56, and the upper right of fixed plate 52 passes through spiral shell Tether the mode for connecing and the second motor 57 is installed, the second motor 57 is located at the left of the second bull stick 54, the of the upper end of the second motor 57 The output shaft of two motor 57 is connected with the 4th gear 58 by shaft coupling, and the 4th gear 58 and the 3rd gear 56 are engaged.
Embodiment 4
A kind of construction site stores mixing plant with cement, as shown in figs. 1-7, includes base plate 1, discharging device 2, first and supports Bar 3, guide rail 4 and agitating device 5, right side is provided with discharging device 2 on base plate 1, and the upper left side of base plate 1 is provided with by way of welding First support bar 3, the upper end of first support bar 3 is provided with guide rail 4 by way of welding, and guide rail 4 is provided with agitating device 5.
Discharging device 2 includes the first fixed station 21, first bearing seat 22, the first bull stick 23, hopper 24, first gear 25th, the first motor 26 and second gear 27, the first fixed station 21, the first fixed station are provided with base plate 1 by way of welding The mode that right side is bolted in 21 is provided with first bearing seat 22, first bearing seat 22 and is connected with first by interference Bull stick 23, the upper end of the first bull stick 23 is provided with hopper 24 by way of welding, and middle part is bolted on the first bull stick 23 Mode first gear 25 is installed, the mode that the upper left of the first fixed station 21 is bolted is provided with the first motor 26, the first motor 26 is located at the left of the first bull stick 23, and the output shaft of the first motor 26 of the upper end of the first motor 26 is connected by shaft coupling Second gear 27 is connected to, second gear 27 is engaged with first gear 25.
Agitating device 5 includes guide pin bushing 51, fixed plate 52, second bearing seat 53, the second bull stick 54, paddle the 55, the 3rd Gear 56, the second motor 57 and the 4th gear 58, slidingtype is connected with guide pin bushing 51 on guide rail 4, and the tangent plane of guide rail 4 is circle, is led Cover 51 right upper portions and fixed plate 52 is installed by way of welding, the mode being bolted in the interior right side of fixed plate 52 is pacified Equipped with second bearing seat 53, the second bull stick 54 is connected with second bearing seat 53, the lower section left and right sides of the second bull stick 54 is by weldering The mode for connecing is provided with paddle 55, and the upside of the second bull stick 54 is provided with the 3rd gear 56, and the upper right of fixed plate 52 passes through spiral shell Tether the mode for connecing and the second motor 57 is installed, the second motor 57 is located at the left of the second bull stick 54, the of the upper end of the second motor 57 The output shaft of two motor 57 is connected with the 4th gear 58 by shaft coupling, and the 4th gear 58 and the 3rd gear 56 are engaged.
Tilting gearing 6 is also included, tilting gearing 6 includes supporting plate 60, first rotating shaft 61, block 62, the first slide rail 63rd, the first sliding block 64, pressing plate 65, the first nut 68 and the first screw rod 69, the upper end of the first bull stick 23 are semicircle, the downside of hopper 24 Middle part is provided with two pieces of supporting plates 60 by way of welding, and the first bull stick 23 is provided with tilting gearing 6, the difference of supporting plate 60 position In the front and rear both sides of the first bull stick 23, rotary type is connected with first rotating shaft 61 between supporting plate 60, and first rotating shaft 61 passes through first The upside of bull stick 23, the front side of front side supporting plate 60 is provided with block 62 by way of welding, and the middle part of block 62 is provided with second and leads to Hole 67, the mode that the upside of the first bull stick 23 is bolted is provided with the first slide rail 63, the connection of the inner sliding type of the first slide rail 63 There are two the first sliding blocks 64, the upper end of the first sliding block 64 is provided with pressing plate 65 by way of welding, and the upside of pressing plate 65 is provided with first Through hole 66, on same horizontal line, the left side top of left side pressing plate 65 is by welding for the through hole 67 of first through hole 66 and second Mode is provided with the first nut 68, the first nut 68 and the second through hole 67 in the same horizontal line, the first nut 68, first through hole 66 and second are placed with the first screw rod 69 in through hole 67, and the first screw rod 69 and the first nut 68 coordinate.
Fixed block 611, the second rotating shaft 612, baffle plate 613, the 3rd rotating shaft 614, connecting rod 615 and cylinder 616 are also included, The bottom right of hopper 24 is provided with third through-hole 610, and the bottom left of hopper 24 is provided with fixed block 611 by way of welding, Gu Block 611 is determined positioned at the left of third through-hole 610, and the front side of fixed block 611 is rotatably connected with the second rotating shaft 612, in the second rotating shaft 612 Baffle plate 613 is installed by way of welding, baffle plate 613 blocks third through-hole 610, the right side of baffle plate 613 is rotary to be connected with the Three rotating shafts 614, the mode that hopper 24 passes on left welding is provided with cylinder 616, and the expansion link of cylinder 616 of the lower end of cylinder 616 leads to Cross bolted mode and connecting rod 615 is installed, the lower end of connecting rod 615 is arranged on the 3rd rotating shaft 614 by way of welding On.
Distributor 7 is also included, distributor 7 includes the second fixed station 71,3rd bearing the 72, the 3rd bull stick of seat 73rd, mounting table 74, the 5th gear 76, the 3rd motor 77 and the 6th gear 78, the right-hand member of base plate 1 are provided with distributor 7, and base plate 1 is right End is provided with the second fixed station 71 by way of welding, and the mode that middle part is bolted in the second fixed station 71 is provided with 3rd bearing seat 72, the 3rd bull stick 73 is connected with 3rd bearing seat 72 by interference, and the upper end of the 3rd bull stick 73 is by welding Mode is provided with mounting table 74, and the upside left and right sides of mounting table 74 is provided with standing groove 75, and the upside of the 3rd bull stick 73 is connected by bolt The mode for connecing is provided with the 5th gear 76, and the 5th gear 76 is located at the lower section of mounting table 74, and right side passes through spiral shell on the second fixed station 71 Tether the mode for connecing and the 3rd motor 77 is installed, the output shaft of the 3rd motor 77 of the upper end of the 3rd motor 77 is connected with by shaft coupling 6th gear 78, the 6th gear 78 and the 5th gear 76 are engaged.
The 3rd screw rod 742 and push pedal 743 are also included, screwed hole 741, screw thread are provided with the left and right sides inwall of mounting table 74 The 3rd screw rod 742 is placed with hole 741, the 3rd screw rod 742 coordinates with screwed hole 741, side rotary connection in the 3rd screw rod 742 There is push pedal 743.
Proportioning device 79 is also included, proportioning device 79 includes second support bar 790, the second slide rail 7901, second and slides Block 791, L-shaped bar 792, ball float 793, travel switch 794, the second nut 795, the second screw rod 796 and briquetting 797, mounting table 74 Top is provided with proportioning device 79, and the middle part of mounting table 74 is provided with second support bar 790, second support bar by way of welding The mode that the upside left and right sides is bolted in 790 is provided with the second slide rail 7901, and the inner sliding type of the second slide rail 7901 connects The second sliding block 791 is connected to, the mode that the upper end of the second sliding block 791 is bolted is provided with travel switch 794, the second sliding block 791 outsides are provided with L-shaped bar 792 by way of welding, and the mode that the lower end of L-shaped bar 792 is bolted is provided with ball float 793, the upper end of the second slide rail 7901 is provided with the second nut 795 by way of welding, and the second spiral shell is placed with the second nut 795 Bar 796, the lower end of the second screw rod 796 is put in the second slide rail 7901, and the second screw rod 796 and the second nut 795 coordinate, the second screw rod 796 lower ends are provided with briquetting 797 by way of welding.
The material of first support bar 3 is Q235 steel.
First motor 26, the second motor 57 and the 3rd motor 77 are servomotor.
Operation principle:When workman needs to be stirred cement or to making exhaustless cement carry out temporary transient preservation When, cement can be placed on discharging device 2, then control agitating device 5 to be stirred the cement of discharging device 2, carry out Continue shape is slowly stirred the just temporary transient preservation cement of energy.
Because discharging device 2 includes the first fixed station 21, first bearing seat 22, the first bull stick 23, hopper 24, the first tooth Wheel the 25, first motor 26 and second gear 27, are provided with the first fixed station 21 by way of welding on base plate 1, first fixes The mode that right side is bolted in platform 21 is provided with first bearing seat 22, first bearing seat 22 and is connected with the by interference One bull stick 23, the upper end of the first bull stick 23 is provided with hopper 24 by way of welding, and middle part is connected by bolt on the first bull stick 23 The mode for connecing is provided with first gear 25, and the mode that the upper left of the first fixed station 21 is bolted is provided with the first motor 26, the first motor 26 is located at the left of the first bull stick 23, and the output shaft of the first motor 26 of the upper end of the first motor 26 is connected by shaft coupling Second gear 27 is connected to, second gear 27 is engaged with first gear 25, when workman needs to place cement, workman can put cement Put on hopper 24, then open the first motor 26, the first motor 26 will drive second gear 27 to rotate, and second gear 27 drives The first gear 25 being engaged with is rotated, and first gear 25 is rotarily driven the first bull stick 23 and rotated by first bearing seat 22, the One bull stick 23 rotates will drive hopper 24 to rotate.
Because agitating device 5 include guide pin bushing 51, fixed plate 52, second bearing seat 53, the second bull stick 54, paddle 55, 3rd gear 56, the second motor 57 and the 4th gear 58, slidingtype is connected with guide pin bushing 51 on guide rail 4, and the tangent plane of guide rail 4 is circle Shape, the right upper portion of guide pin bushing 51 is provided with what is be bolted in right side in fixed plate 52, fixed plate 52 by way of welding Mode is provided with second bearing seat 53, second bearing seat 53 and is connected with the second bull stick 54, the lower section left and right sides of the second bull stick 54 Paddle 55 is installed by way of welding, the upside of the second bull stick 54 is provided with the 3rd gear 56, the upper right of fixed plate 52 The mode being bolted is provided with the second motor 57, and the second motor 57 is located at the left of the second bull stick 54, on the second motor 57 The output shaft of second motor 57 at end is connected with the 4th gear 58 by shaft coupling, and the 4th gear 58 and the 3rd gear 56 are engaged, when Workman needs to place cement in discharging device 2, first can lift guide pin bushing 51, and discharging device is rotated out of then around guide rail 4 2, to be placed on discharging device 2 cement, rotate through to come again after putting cement well, then open the second motor 57, the second electricity Machine 57 will drive the 4th gear 58 to rotate, and the 4th gear 58 rotates will drive the 3rd gear 56 being engaged with to rotate, the 3rd tooth The rotation of wheel 56 will drive the second bull stick 54 to rotate, and the second bull stick 54 rotates will drive paddle 55 to rotate, so as to discharging device 2 On cement be stirred.
Because also including tilting gearing 6, tilting gearing 6 includes supporting plate 60, first rotating shaft 61, block 62, first Slide rail 63, the first sliding block 64, pressing plate 65, the first nut 68 and the first screw rod 69, the upper end of the first bull stick 23 are semicircle, hopper 24 Lower middle side part is provided with two pieces of supporting plates 60 by way of welding, and the first bull stick 23 is provided with tilting gearing 6,60 points of supporting plate Not Wei Yu the first bull stick 23 front and rear both sides, rotary type is connected with first rotating shaft 61 between supporting plate 60, and first rotating shaft 61 is passed through The upside of first bull stick 23, the front side of front side supporting plate 60 is provided with block 62 by way of welding, and the middle part of block 62 is provided with the Two through holes 67, the mode that the upside of the first bull stick 23 is bolted is provided with the first slide rail 63, the inner sliding type of the first slide rail 63 Two the first sliding blocks 64 are connected with, the upper end of the first sliding block 64 is provided with pressing plate 65 by way of welding, and the upside of pressing plate 65 is provided with First through hole 66, on same horizontal line, the left side top of left side pressing plate 65 is by weldering for the through hole 67 of first through hole 66 and second The mode for connecing is provided with the first nut 68, the first nut 68 and the second through hole 67 in the same horizontal line, the first nut 68, first The first screw rod 69 is placed with the through hole 67 of through hole 66 and second, the first screw rod 69 and the first nut 68 coordinate, when workman's needs are right When the cement being stirred in hopper 24 falls down, workman can rotate the first screw rod 69, by the first screw rod 69 from the first nut 68, the Extracted out in one through hole 66 and the second through hole 67, remove the pressing plate 65 on both sides, around the revolving hopper 24 of first rotating shaft 61, make hopper 24 Have an inclined angle, hopper 24 is rotated clockwise so as in whipping process can Turnover bunker 24, can make Cement in hopper 24 is overturn.
Because also including fixed block 611, the second rotating shaft 612, baffle plate 613, the 3rd rotating shaft 614, connecting rod 615 and cylinder 616, the bottom right of hopper 24 is provided with third through-hole 610, and the bottom left of hopper 24 is provided with fixed block by way of welding 611, fixed block 611 is located at the left of third through-hole 610, and the front side of fixed block 611 is rotatably connected with the second rotating shaft 612, second turn Baffle plate 613 is installed by way of welding, baffle plate 613 blocks third through-hole 610, and the right side of baffle plate 613 rotatably connects on axle 612 The 3rd rotating shaft 614 is connected to, the mode that hopper 24 passes on left welding is provided with cylinder 616, and the cylinder 616 of the lower end of cylinder 616 is stretched The mode that contracting bar is bolted is provided with connecting rod 615, and the lower end of connecting rod 615 is arranged on the 3rd turn by way of welding On axle 614, when tilting gearing 6 inclines hopper 24, control cylinder 616 extends, and the elongation of cylinder 616 will promote connecting rod 615 move down and rotate counterclockwise, so that promote baffle plate 613 to be turned clockwise around the second rotating shaft 612, and this when, Cement in hopper 24 will be flowed down from third through-hole 610, and hopper 24 is flowed out along baffle plate 613.
Because also including distributor 7, distributor 7 includes the 72, the 3rd turn of the second fixed station 71,3rd bearing seat Bar 73, mounting table 74, the 5th gear 76, the 3rd motor 77 and the 6th gear 78, the right-hand member of base plate 1 are provided with distributor 7, base plate 1 Right-hand member is provided with the second fixed station 71 by way of welding, and the mode that middle part is bolted in the second fixed station 71 is installed There is 3rd bearing seat 72, the 3rd bull stick 73 is connected with by interference in 3rd bearing seat 72, the upper end of the 3rd bull stick 73 is by welding Mode mounting table 74 is installed, the upside left and right sides of mounting table 74 is provided with standing groove 75, and the upside of the 3rd bull stick 73 passes through bolt The mode of connection is provided with the 5th gear 76, and the 5th gear 76 is located at the lower section of mounting table 74, and right side passes through on the second fixed station 71 Bolted mode is provided with the 3rd motor 77, and the output shaft of the 3rd motor 77 of the upper end of the 3rd motor 77 is connected by shaft coupling There is the 6th gear 78, the 6th gear 78 and the 5th gear 76 are engaged, when workman needs the cement flowed down from hopper 24 to be received During collection, barrel of cement can be placed in standing groove 75, then control the 3rd motor 77 to rotate, the 3rd motor 77 will drive the 6th Gear 78 rotates, and the 6th gear 78 rotates will drive the 5th gear 76 being engaged with to rotate, and the rotation of the 5th gear 76 will drive 3rd bull stick 73 rotates, and the 3rd bull stick 73 rotates will drive mounting table 74 to rotate, when rotating to 24 lower right of hopper, control the 3rd Motor 77 stops the rotation, in the barrel of cement that cement will be flowed on standing groove 75 in hopper 24, after this barrel of cement has been installed, Continue controlled motor rotation, make mounting table 74 continue to rotate, another standing groove 75 is then rotated into the lower right of hopper 24, so Stop the 3rd motor 77 afterwards to rotate.
Because also including the 3rd screw rod 742 and push pedal 743, screwed hole 741 is provided with the left and right sides inwall of mounting table 74, The 3rd screw rod 742 is placed with screwed hole 741, the 3rd screw rod 742 coordinates with screwed hole 741, side rotary in the 3rd screw rod 742 Push pedal 743 is connected with, when user needs that the barrel of cement of different sizes is placed on mounting table 74 and then is fixed, is used Family can rotate the 3rd screw rod 742, the 3rd screw rod 742 by the dead slot of cooperation precession the 3rd with screwed hole 741, the 3rd screw rod 742 promotion push pedals 743 make push pedal 743 fix barrel of cement on this position in standing groove 75.
Because also including proportioning device 79, proportioning device 79 includes second support bar 790, the second slide rail 7901, Two sliding blocks 791, L-shaped bar 792, ball float 793, travel switch 794, the second nut 795, the second screw rod 796 and briquetting 797, place The top of platform 74 is provided with proportioning device 79, and the middle part of mounting table 74 is provided with second support bar 790, the second support by way of welding The mode that the upside left and right sides is bolted in bar 790 is provided with the second slide rail 7901, the inner sliding type of the second slide rail 7901 The second sliding block 791 is connected with, the mode that the upper end of the second sliding block 791 is bolted is provided with travel switch 794, the second sliding block 791 outsides are provided with L-shaped bar 792 by way of welding, and the mode that the lower end of L-shaped bar 792 is bolted is provided with ball float 793, the upper end of the second slide rail 7901 is provided with the second nut 795 by way of welding, and the second spiral shell is placed with the second nut 795 Bar 796, the lower end of the second screw rod 796 is put in the second slide rail 7901, and the second screw rod 796 and the second nut 795 coordinate, the second screw rod 796 lower ends are provided with briquetting 797 by way of welding, when workman needs to carry out the barrel of cement blanking on distributor 7 certainly During dynamic distribution, the second screw rod 796 can be rotated, the second screw rod 796 will be by the precession of the second nut 795 or back-out, the second screw rod 796 band dynamic pressure plates 65 are moved up or down, and then ball float 793 is put into barrel of cement, then open the 3rd motor 77, the 3rd Motor 77 drives mounting table 74 to rotate, and after cement enters in barrel of cement, ball float 793 is pushed up toward top, and ball float 793 drives second to slide Block 791 is moved up by the second slide rail 7901, is then gone up when travel switch 794 is touched pressing plate 65, travel switch 794 are switched on, and the 3rd motor 77 of control rotates, and rotate to another bucket position controlled motor when 24 lower right of hopper and stop rotation Turn, then withdraw the barrel of cement for putting cement well, be put into another empty barrel of cement.
Because the material of first support bar 3 is Q235 steel, Q235 steel hardness is high, it is not easy to deforms, makes the use longevity of device Life is longer.
Because the first motor 26, the second motor 57 and the 3rd motor 77 are servomotor, anti-overload ability is strong, high speed performance It is good, its rotating speed can be precisely controlled.
Embodiment described above only expresses the preferred embodiment of the present invention, and its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations, improvement can also be made and substituted, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (10)

1. a kind of construction site stores mixing plant with cement, it is characterised in that include base plate(1), discharging device(2), One support bar(3), guide rail(4)And agitating device(5), base plate(1)Upper right side is provided with discharging device(2), base plate(1)Upper left side leads to The mode for crossing welding is provided with first support bar(3), first support bar(3)Upper end is provided with guide rail by way of welding(4), Guide rail(4)It is provided with agitating device(5).
2. a kind of construction site according to claim 1 stores mixing plant with cement, it is characterised in that discharging device (2)Include the first fixed station(21), first bearing seat(22), the first bull stick(23), hopper(24), first gear(25), One motor(26)And second gear(27), base plate(1)On welding by way of the first fixed station is installed(21), first fixes Platform(21)The mode that interior right side is bolted is provided with first bearing seat(22), first bearing seat(22)It is interior to be connected by interference It is connected to the first bull stick(23), the first bull stick(23)Upper end is provided with hopper by way of welding(24), the first bull stick(23)On The mode that middle part is bolted is provided with first gear(25), the first fixed station(21)What upper left was bolted Mode is provided with the first motor(26), the first motor(26)Positioned at the first bull stick(23)Left, the first motor(26)The of upper end One motor(26)Output shaft is connected with second gear by shaft coupling(27), second gear(27)With first gear(25)Engagement.
3. a kind of construction site according to claim 2 stores mixing plant with cement, it is characterised in that agitating device (5)Include guide pin bushing(51), fixed plate(52), second bearing seat(53), the second bull stick(54), paddle(55), the 3rd gear (56), the second motor(57)With the 4th gear(58), guide rail(4)Upper slidingtype is connected with guide pin bushing(51), guide rail(4)Tangent plane be Circle, guide pin bushing(51)Right upper portion is provided with fixed plate by way of welding(52), fixed plate(52)Pass through spiral shell in interior right side Tether the mode for connecing and second bearing seat is installed(53), second bearing seat(53)Inside it is connected with the second bull stick(54), the second bull stick (54)The lower section left and right sides is provided with paddle by way of welding(55), the second bull stick(54)Upside is provided with the 3rd gear (56), fixed plate(52)The mode that upper right is bolted is provided with the second motor(57), the second motor(57)It is located at Second bull stick(54)Left, the second motor(57)Second motor of upper end(57)Output shaft is connected with the 4th gear by shaft coupling (58), the 4th gear(58)With the 3rd gear(56)Engagement.
4. a kind of construction site according to claim 3 stores mixing plant with cement, it is characterised in that also includes and inclines Ramp(6), tilting gearing(6)Include supporting plate(60), first rotating shaft(61), block(62), the first slide rail(63), first Sliding block(64), pressing plate(65), the first nut(68)With the first screw rod(69), the first bull stick(23)Upper end is semicircle, hopper (24)Lower middle side part is provided with two pieces of supporting plates by way of welding(60), the first bull stick(23)It is provided with tilting gearing(6), Supporting plate(60)The first bull stick is located at respectively(23)Front and rear both sides, supporting plate(60)Between rotary type be connected with first rotating shaft (61), first rotating shaft(61)Through the first bull stick(23)Upside, front side supporting plate(60)Front side welding by way of install There is block(62), block(62)Middle part is provided with the second through hole(67), the first bull stick(23)The mode that upside is bolted is pacified Equipped with the first slide rail(63), the first slide rail(63)Inner sliding type is connected with two the first sliding blocks(64), the first sliding block(64)Upper end Pressing plate is installed by way of welding(65), pressing plate(65)Upside is provided with first through hole(66), first through hole(66)With second Through hole(67)On same horizontal line, left side pressing plate(65)Left side top welding by way of the first nut is installed (68), the first nut(68)With the second through hole(67)In the same horizontal line, the first nut(68), first through hole(66)With second Through hole(67)Inside it is placed with the first screw rod(69), the first screw rod(69)With the first nut(68)Coordinate.
5. a kind of construction site according to claim 4 stores mixing plant with cement, it is characterised in that also include solid Determine block(611), the second rotating shaft(612), baffle plate(613), the 3rd rotating shaft(614), connecting rod(615)And cylinder(616), hopper (24)Bottom right is provided with third through-hole(610), hopper(24)Bottom left is provided with fixed block by way of welding (611), fixed block(611)Positioned at third through-hole(610)Left, fixed block(611)Front side is rotatably connected with the second rotating shaft (612), the second rotating shaft(612)On welding by way of baffle plate is installed(613), baffle plate(613)Block third through-hole (610), baffle plate(613)Right side is rotatably connected with the 3rd rotating shaft(614), hopper(24)The mode for passing on left welding is provided with Cylinder(616), cylinder(616)The cylinder of lower end(616)The mode that expansion link is bolted is provided with connecting rod(615), Connecting rod(615)Lower end is arranged on the 3rd rotating shaft by way of welding(614)On.
6. a kind of construction site according to claim 5 stores mixing plant with cement, it is characterised in that also include point With device(7), distributor(7)Include the second fixed station(71), 3rd bearing seat(72), the 3rd bull stick(73), mounting table (74), the 5th gear(76), the 3rd motor(77)With the 6th gear(78), base plate(1)Right-hand member is provided with distributor(7), base plate (1)Right-hand member is provided with the second fixed station by way of welding(71), the second fixed station(71)What interior middle part was bolted Mode is provided with 3rd bearing seat(72), 3rd bearing seat(72)It is interior that 3rd bull stick is connected with by interference(73), the 3rd bull stick (73)Upper end is provided with mounting table by way of welding(74), mounting table(74)The upside left and right sides is provided with standing groove(75), 3rd bull stick(73)The mode that upside is bolted is provided with the 5th gear(76), the 5th gear(76)Positioned at mounting table (74)Lower section, the second fixed station(71)The mode that upper right side is bolted is provided with the 3rd motor(77), the 3rd motor (77)3rd motor of upper end(77)Output shaft is connected with the 6th gear by shaft coupling(78), the 6th gear(78)With the 5th tooth Wheel(76)Engagement.
7. a kind of construction site according to claim 6 stores mixing plant with cement, it is characterised in that also include the Three screw rods(742)And push pedal(743), mounting table(74)Screwed hole is provided with the inwall of the left and right sides(741), screwed hole(741)It is interior It is placed with the 3rd screw rod(742), the 3rd screw rod(742)With screwed hole(741)Coordinate, the 3rd screw rod(742)Interior side rotary connects It is connected to push pedal(743).
8. a kind of construction site according to claim 7 stores mixing plant with cement, it is characterised in that it is fixed also to include Amount device(79), proportioning device(79)Include second support bar(790), the second slide rail(7901), the second sliding block(791), L-shaped Bar(792), ball float(793), travel switch(794), the second nut(795), the second screw rod(796)And briquetting(797), mounting table (74)Top is provided with proportioning device(79), mounting table(74)Middle part is provided with second support bar by way of welding(790), the Two support bars(790)The mode that the interior upside left and right sides is bolted is provided with the second slide rail(7901), the second slide rail (7901)Inner sliding type is connected with the second sliding block(791), the second sliding block(791)The mode that upper end is bolted is provided with row Cheng Kaiguan(794), the second sliding block(791)Outside is provided with L-shaped bar by way of welding(792), L-shaped bar(792)Lower end leads to Cross bolted mode and ball float is installed(793), the second slide rail(7901)Upper end is provided with the second spiral shell by way of welding It is female(795), the second nut(795)Inside it is placed with the second screw rod(796), the second screw rod(796)Lower end puts in the second slide rail (7901)It is interior, the second screw rod(796)With the second nut(795)Coordinate, the second screw rod(796)Installed by way of welding lower end There is briquetting(797).
9. a kind of construction site according to claim 8 stores mixing plant with cement, it is characterised in that first support bar (3)Material be Q235 steel.
10. a kind of construction site according to claim 9 stores mixing plant with cement, it is characterised in that the first motor (26), the second motor(57)With the 3rd motor(77)It is servomotor.
CN201710095104.9A 2017-02-22 2017-02-22 A kind of construction site stores mixing plant with cement Withdrawn CN106903797A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710095104.9A CN106903797A (en) 2017-02-22 2017-02-22 A kind of construction site stores mixing plant with cement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710095104.9A CN106903797A (en) 2017-02-22 2017-02-22 A kind of construction site stores mixing plant with cement

Publications (1)

Publication Number Publication Date
CN106903797A true CN106903797A (en) 2017-06-30

Family

ID=59208901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710095104.9A Withdrawn CN106903797A (en) 2017-02-22 2017-02-22 A kind of construction site stores mixing plant with cement

Country Status (1)

Country Link
CN (1) CN106903797A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107469993A (en) * 2017-08-01 2017-12-15 南昌浩牛科技有限公司 It is a kind of for Chinese herbal medicine smash and milling apparatus
CN107817181A (en) * 2017-10-27 2018-03-20 南昌叁润科技有限公司 One kind building special quality detection apparatus of brick
CN108147517A (en) * 2018-01-23 2018-06-12 赣州汇桔科技有限公司 Settling apparatus is mixed with coagulant in a kind of wastewater coagulating sedimentation pond
CN108246179A (en) * 2018-01-03 2018-07-06 刘世荣 A kind of finishing powder of lacquer putty for use on mixing plant
CN112452473A (en) * 2020-11-02 2021-03-09 湖南先导电子陶瓷科技产业园发展有限公司 Electronic ceramic tape-casting slurry equipment

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203502088U (en) * 2013-07-31 2014-03-26 南京梅山冶金发展有限公司 Novel liquid level detection device
CN204182306U (en) * 2014-10-27 2015-03-04 立昌科技(赣州)有限公司 Biaxial mixing device
CN205045803U (en) * 2015-09-25 2016-02-24 福建省康辉食品有限公司 Fluid filling device
CN205380774U (en) * 2016-01-27 2016-07-13 信阳农林学院 Concrete mixer who has sieving mechanism for building
CN205630987U (en) * 2016-05-14 2016-10-12 青岛建安建设集团有限公司 High -efficient agitating unit of mortar for building
CN205651502U (en) * 2016-04-08 2016-10-19 张保国 High -efficient agitating unit of cement for building
CN205735511U (en) * 2016-05-14 2016-11-30 四川晟邦建设工程有限公司 A kind of bridge construction cement stirring device
CN205766835U (en) * 2016-05-21 2016-12-07 张桂坤 A kind of finishing cement blending device
CN106272969A (en) * 2016-08-29 2017-01-04 钟文华 A kind of cement mortar quick agitator for building

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203502088U (en) * 2013-07-31 2014-03-26 南京梅山冶金发展有限公司 Novel liquid level detection device
CN204182306U (en) * 2014-10-27 2015-03-04 立昌科技(赣州)有限公司 Biaxial mixing device
CN205045803U (en) * 2015-09-25 2016-02-24 福建省康辉食品有限公司 Fluid filling device
CN205380774U (en) * 2016-01-27 2016-07-13 信阳农林学院 Concrete mixer who has sieving mechanism for building
CN205651502U (en) * 2016-04-08 2016-10-19 张保国 High -efficient agitating unit of cement for building
CN205630987U (en) * 2016-05-14 2016-10-12 青岛建安建设集团有限公司 High -efficient agitating unit of mortar for building
CN205735511U (en) * 2016-05-14 2016-11-30 四川晟邦建设工程有限公司 A kind of bridge construction cement stirring device
CN205766835U (en) * 2016-05-21 2016-12-07 张桂坤 A kind of finishing cement blending device
CN106272969A (en) * 2016-08-29 2017-01-04 钟文华 A kind of cement mortar quick agitator for building

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107469993A (en) * 2017-08-01 2017-12-15 南昌浩牛科技有限公司 It is a kind of for Chinese herbal medicine smash and milling apparatus
CN107817181A (en) * 2017-10-27 2018-03-20 南昌叁润科技有限公司 One kind building special quality detection apparatus of brick
CN107817181B (en) * 2017-10-27 2019-12-24 广东合准检测鉴定有限公司 Special quality detection equipment of building brick
CN108246179A (en) * 2018-01-03 2018-07-06 刘世荣 A kind of finishing powder of lacquer putty for use on mixing plant
CN108147517A (en) * 2018-01-23 2018-06-12 赣州汇桔科技有限公司 Settling apparatus is mixed with coagulant in a kind of wastewater coagulating sedimentation pond
CN112452473A (en) * 2020-11-02 2021-03-09 湖南先导电子陶瓷科技产业园发展有限公司 Electronic ceramic tape-casting slurry equipment

Similar Documents

Publication Publication Date Title
CN106903797A (en) A kind of construction site stores mixing plant with cement
CN106677504B (en) A kind of construction site ground cement installation apparatus
CN106733985A (en) A kind of construction site barrel of cement cleaning equipment
CN107175022A (en) A kind of road and bridge construction raw material blending device
CN108097718A (en) A kind of processing unit for repairing polluted soil
CN205651501U (en) Cement flash mixed device for building
CN206445950U (en) A kind of cement mixing apparatus for building
CN107558336A (en) A kind of municipal cement flooring laying apparatus
CN107755364A (en) Set cement equipment is cleaned in a kind of construction site with rebar surface
CN107088963A (en) A kind of concrete mixer of Quick uniform stirring
CN106823964A (en) A kind of soil remediation mixed stirring device
CN207058912U (en) A kind of construction cement uniform stirrer
CN107090864A (en) A kind of construction site irrigation canals and ditches cement highly efficient pad device
CN205735503U (en) A kind of cement highly efficient agitating device for building
CN107984623A (en) A kind of construction site high-effective concrete agitating device
CN107984616A (en) A kind of architectural engineering is stirred with building building cement and distributing equipment
CN207567098U (en) A kind of Treatment of Sludge dehydration device
CN2853360Y (en) Multifunction concret mixing, transporting truck
CN209255471U (en) A kind of portable soil is automatically repaired vehicle
CN107213830A (en) A kind of agricultural liquids fertilizer high-efficiency mixing device
CN206720665U (en) A kind of construction walling cement highly efficient transmission equipment
CN216031649U (en) Concrete proportioning machine
JPH09294998A (en) Method and apparatus for reutilizing sludge as resources
CN209178345U (en) A kind of waste emulsified mixture sludge treatment equipment
CN209174037U (en) A kind of crushing plant of brick-making raw material

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20170630

WW01 Invention patent application withdrawn after publication