CN106897791A - A kind of public transport subway composite network model building method - Google Patents

A kind of public transport subway composite network model building method Download PDF

Info

Publication number
CN106897791A
CN106897791A CN201710009947.2A CN201710009947A CN106897791A CN 106897791 A CN106897791 A CN 106897791A CN 201710009947 A CN201710009947 A CN 201710009947A CN 106897791 A CN106897791 A CN 106897791A
Authority
CN
China
Prior art keywords
subway
network
station
public transport
website
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710009947.2A
Other languages
Chinese (zh)
Other versions
CN106897791B (en
Inventor
宋玉蓉
彭景新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Post and Telecommunication University
Nanjing University of Posts and Telecommunications
Original Assignee
Nanjing Post and Telecommunication University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Post and Telecommunication University filed Critical Nanjing Post and Telecommunication University
Priority to CN201710009947.2A priority Critical patent/CN106897791B/en
Publication of CN106897791A publication Critical patent/CN106897791A/en
Application granted granted Critical
Publication of CN106897791B publication Critical patent/CN106897791B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • G06Q10/047Optimisation of routes or paths, e.g. travelling salesman problem
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/40Business processes related to the transportation industry

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Game Theory and Decision Science (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Navigation (AREA)
  • Traffic Control Systems (AREA)

Abstract

The invention discloses a kind of public transport subway composite network model building method, an optimal model parameter d can be obtained in the average cluster coefficient and average path length of the condition of having no right and the weighted average path length of weighting conditions lower network by Integrated comparative composite network.Implementation step is:First according to double-layer network model construction public transport subway double-layer network, the connection between the existing internal nodes of network of double-layer network also has the connection of network interlayer.When subway network is compound in public traffic network, it would be desirable to process node mapping (fusion of the node mapping comprising node with newly-built) and company side reconnects, wherein connect reconnecting for side influenceed by model parameter d.Compare the parameter of composite network under the conditions of different d values, it may be determined that the optimal value of d.Optimal model parameter d causes that public transport and subway are reasonably engaged togather, and that improves passenger goes out line efficiency.

Description

A kind of public transport subway composite network model building method
Technical field
The present invention relates to public traffic network technical field, particularly a kind of public transport subway composite network model construction side Method.
Background technology
Urban public transport is the important component of Urban Transportation, with the continuous propulsion of urbanization process and people Mouthful be continuously increased, contradiction between the development of urban public transport and the increasingly increased transport need of city dweller, These traffic problems have also had a strong impact on the economic construction in city and the operational efficiency in city.In recent years, public affairs are carried out energetically by China Strategy is first developed in friendship, is progressively developed into be key overall transportation system with track traffic based on traffic above-ground. Therefore, the linking between public transport and subway is directly connected to the conevying efficiency of whole public transport subway network.
The public traffic network achievement in research for being currently based on Complex Networks Theory is very abundant, and existing single layer network also has multilayer The research of network facet.The research of single layer network is studied primarily directed to single public traffic network or subway network etc., The research of double-layer network is also single public traffic network to be abstracted into the physical layer based on road network and the logical layer based on wagon flow enters Row research.A global network comprising public transport and subway information is not set up in these researchs, it is impossible to whole public transport Network is analyzed.
Existing public transport subway composite network construction method is carrying out when node maps being also the presence of those simultaneously Same website is merged into the bus station in somewhere and subway station, public transport and the linking of subway are exactly based on the generation of these websites 's.Subway is built in public traffic network as basic routing line, and its travel speed is high, Waiting time is short and delivery energy Power is all by force that public transport to be compared.But the website that another aspect subway can be reached is limited after all, outside basic routing line Website public bus network is needed for cover, therefore the combination of subway and public transport can make the trip of people more efficient, reachable Property is more preferable.There are a large amount of mutual transfers between public transport and subway, this transfer not only exists only in those and there are public affairs simultaneously The place of website and subway station is handed over, a subway station influences whether a range of many bus stations around it.Such as Fruit have ignored those walkings one only using the simultaneous website in bus station and subway station as public transport and the connecting points of subway The situation that segment distance is mutually changed to, this is invisible to reduce a coverage for subway station, is had differences with actual conditions.
The content of the invention
The technical problems to be solved by the invention are to overcome the deficiencies in the prior art and provide a kind of public transport subway composite web Network model building method, by the structure of composite network, can obtain the totality of the urban public transport based on public transport and subway Situation, optimal model parameter d causes that public transport and subway are reasonably engaged togather, and that improves passenger goes out line efficiency.
The present invention uses following technical scheme to solve above-mentioned technical problem:
According to a kind of public transport subway composite network model building method proposed by the present invention, comprise the following steps:
Step 1) public transport, subway double-layer network are set up according to current public transport subway data, one layer is constituted for bus station Public traffic network, another layer be subway station constitute subway network;If distance is less than pre- between bus station and subway station If threshold value d, then have between the two websites even side, when this connects the company of network interlayer in as double-layer network;
Step 2) double-layer network is complex as the composite network of individual layer, it is specific as follows:
The subway station that will have even side in subway network with public traffic network is classified as A class websites, and remaining subway station is classified as B Class website;
A class websites are mapped in public traffic network:The bus station that each A classes website has even side with it is combined, with A classes Website has Lian Bian and the bus station nearest apart from the A class websites is used as spot;
B class websites are mapped in public traffic network, i.e., a newly-built website represents the subway station in public traffic network;
Step 3) treat the mapping of all of website after the completion of, to being combined after website addition even side, it is specific as follows:After mapping The subway station company of addition side in composite network according to the annexation in its in situ iron net network, if same in composite network When there are two existing public transport of website and connect while and be then complex as same when thering is subway to connect and connect side, each subway station is preset with it In the range of bus station connection;
So as to obtain a composite network comprising public transport, subway data, and then calculate the average cluster of composite network Coefficient and average path length;
Step 4) weights are assigned according to the near linear distance between adjacent sites and even in the company during classification is composite network, Calculate the weighted average path length of composite network;
Step 5) model parameter d is varied multiple times, often change a model parameter d, then it is repeated once step 3~4;Than less With the weighted average path length and the average cluster coefficient peace of step 3 gained composite network of composite network under the conditions of d values Equal path length, determines optimal model parameter d.
As a kind of further prioritization scheme of public transport subway composite network model building method of the present invention, step 4 Near linear between middle adjacent sites is apart from computing formula:
Wherein, dis12It is the near linear distance between adjacent sites;Long1、Lat1Respectively 1 longitude and latitude of website Degree, Long2、Lat2The longitude and latitude of another respectively adjacent website;R is earth radius.
As a kind of further prioritization scheme of public transport subway composite network model building method of the present invention, R values It is 6370.
As a kind of further prioritization scheme of public transport subway composite network model building method of the present invention, the step Weights in rapid 4 are specific as follows:
Near linear distance between adjacent sites includes near linear distance, the subway station of bus station and bus station With the near linear distance of subway station and the near linear distance of bus station and subway station;Wherein,
If the weights that adjacent bus station connects side are the near linear distance between adjacent bus station, adjacent subway station connects The weights on side are the near linear distance between adjacent subway station;
If bus station is with the weights on the company side of subway stationWherein, dis12For subway station is preset with it In the range of the distance between each bus station, W be constant and be bus average walking of the average overall travel speed with people The ratio of speed.
As a kind of further prioritization scheme of public transport subway composite network model building method of the present invention, adjacent public affairs Hand over the near linear distance between website between 0.5km~1.0km, the near linear distance between adjacent subway station is in 1.0km Between~2.0km, the value of model parameter d is between 0~1km.
As a kind of further prioritization scheme of public transport subway composite network model building method of the present invention, W values It is 8.
As a kind of further prioritization scheme of public transport subway composite network model building method of the present invention, step 4 Middle near linear distance is obtained by the calculation of longitude & latitude of website.
The present invention uses above technical scheme compared with prior art, with following technique effect:
(1) overall network comprising public transport and subway data is constructed rather than to single public transport or subway network It is analyzed;
(2) public traffic network and subway network are incorporated into a network, the transfer that can be carried out between public transport and subway is ground Study carefully;
(3) optimal model parameter d causes that public transport and subway are reasonably engaged togather, and that improves passenger goes out line efficiency.
Brief description of the drawings
Fig. 1 is schematic diagram of the double-layer network model to the evolution of composite network model in the present invention.
Fig. 2 is the flow chart of structure public transport subway composite network model in the present invention.
Specific embodiment
Technical scheme is described in further detail below in conjunction with the accompanying drawings:
As shown in Fig. 2 the method is comprised the following steps:
Step 1), set up public transport, subway double-layer network.
In order to more intuitively explicitly go out actual effect of the invention, using the present invention in Nanjing City public transport MTR network Network.Wherein public transport, subway data are the public transport subway data of Nanjing City.
Step 2), the subway station that will have even side in subway network with public traffic network is classified as A class websites, and remaining is classified as B Class is that those do not have interlayer to connect the subway station on side.
This step master is to be processed to be how subway station is mapped to public traffic network to build composite network.If certain There is bus station and subway station simultaneously in place, then just by corresponding public affairs when the subway station is mapped to public traffic network Website is handed over to replace, then the website has the annexation of bus station and subway station concurrently;Otherwise, it is necessary to new in public traffic network A website is built to represent subway station.
Fig. 1 be in the present invention double-layer network model to the evolution of composite network model schematic diagram, in double-layer network, network The connection of interlayer appears in those existing bus stations the place of subway station again, i.e., A1 and G1, A2 and G3 in figure, A1 this When class website is mapped in public traffic network, A1 and G1 is complex as same website, i.e., need not add extra website Represent A1 websites.The bus station that B1 is not attached thereto in public traffic network, it is necessary to set up a website to represent the subway Website.
Step 3), it is reconnecting for side that this step master is to be processed, and reconnecting for side is broadly divided into two classes.
I. after the mapping that step 2 has processed subway station, it would be desirable to enter according to the original annexation in subway station Even therefore side occurs that those represent the node that bus station represents subway station again to row, and these nodes can have public transport and ground concurrently The annexation of iron.
II. construction cost and its conveniently feature in view of subway, a coverage for subway station can compare Relatively extensively, and somewhere there is bus station simultaneously and the situation of subway station is few.In most cases with subway station phase Place away from certain distance is dispersed with some bus stations, these bus stations and the subway station be connected in the absence of real but There is the transfer between these bus stations and the subway station again in real life.Therefore, build composite network when The present invention is waited to take into account this relation.Present invention provide that centered on subway station, radius is that (span is arrived d for 0 What bus station and the subway station in the range of 1km) were connected to, therefore addition even side is needed between these nodes.
Step 4), the near linear distance that the weights on side are depended between adjacent sites is connected in network, the distance can be by station The calculation of longitude & latitude of point is obtained;
Step 5), be that power is assigned on company side in composite network according to the distance and classification between adjacent sites, calculating network plus Weight average path length;
The weights for connecting side in composite network are influenced by two factors, and one is distance between adjacent sites, and another is The classification of adjacent sites.Wherein bus station-bus station, subway station-subway station they be all same type of website and Connection is physical presence, therefore its weights is exactly the distance between adjacent sites.For bus station-subway station, this is different Connection and this connection between types of sites are not actually existed, in order to by this kind of situation and two kinds of other situation phase regions Point, the weight that bus station-subway station connects side introduces the effect of d and constant W.The bigger public transport being connected with subway station of d Website is more, and the connectivity of composite network is better, and at the same time d is bigger, and the distance of walking is also got over, when its value is walked more than people Row institute it is receptible apart from when, this connection also just it is nonsensical.This patent is it is determined that need when optimal model parameter d Result of both considering:
I. step 3 can obtain a composite network had no right after terminating, and the value of d can directly affect the poly- of composite network Class coefficient and average path length, with d increase network cluster coefficients can it is increasing illustrate website between connection it is tighter It is close;Average path length can also reduce with the increase of d, illustrate that the website number passed through during trip can be reduced, and this is that d increases The big favourable change for bringing.
Ii. analysis can obtain d and can not continue to increase, therefore this patent adds the factor of weight to suppress the increase of d.D's The such even side of bus station-subway station increases during increase can cause network, and the weights on this even side are very big, finally Cause the weight_length obtained by calculatingavgThe value of (network weights average path length) is also bigger, and we are intended to Take less value.
Comprehensively have no right influences and weighted network of the model parameter d to network clustering coefficient and network average path in network Influences of the middle d to network weights average path, can obtain optimal model parameter d.
Distance parameter d in model determines the scope that subway station can influence.D is bigger, and its coverage is also bigger, But d value more than people be ready walking apart from when the model just do not conform to the actual conditions, present invention provide that the value of d is 0 to 1 Between, after the value of d is more than 1km, people are unwilling that walking distance so long is changed to.Side right is carried out assignment when Wait, the weight on even side this kind of to bus station-subway station is distinguished, the weight on this kind of even side is very big, as model parameter d Value increase when composite network in it is this kind of even side will increase, the composite network weighted average path length being calculated Value is bigger.
Those skilled in the art of the present technique it is understood that unless otherwise defined, all terms used herein (including skill Art term and scientific terminology) have with art of the present invention in those of ordinary skill general understanding identical meaning.Also It should be understood that those terms defined in such as general dictionary should be understood that with the context of prior art in The consistent meaning of meaning, and unless defined as here, will not be explained with idealization or excessively formal implication.
Above-described specific embodiment, has been carried out further to the purpose of the present invention, technical scheme and beneficial effect Describe in detail, should be understood that and the foregoing is only specific embodiment of the invention, be not limited to this hair Bright, all any modification, equivalent substitution and improvements within the spirit and principles in the present invention, done etc. should be included in the present invention Protection domain within.

Claims (7)

1. a kind of public transport subway composite network model building method, it is characterised in that comprise the following steps:
Step 1) set up public transport, subway double-layer network, one layer of public affairs constituted for bus station according to current public transport subway data Network is handed over, another layer is the subway network that subway station is constituted;If distance is less than default between bus station and subway station Threshold value d, then have even side between the two websites, when this connects the company of network interlayer in as double-layer network;
Step 2) double-layer network is complex as the composite network of individual layer, it is specific as follows:
The subway station that will have even side in subway network with public traffic network is classified as A class websites, and remaining subway station is classified as B classes station Point;
A class websites are mapped in public traffic network:The bus station that each A classes website has even side with it is combined, with A class websites There is Lian Bian and the bus station nearest apart from the A class websites is used as spot;
B class websites are mapped in public traffic network, i.e., a newly-built website represents the subway station in public traffic network;
Step 3) treat the mapping of all of website after the completion of, to being combined after website addition even side, it is specific as follows:Subway after mapping The website company of addition side in composite network according to the annexation in its in situ iron net network, if deposited simultaneously in composite network Connect while and be then complex as same when thering is subway to connect in two existing public transport of website and connect side, each subway station and its preset range Interior bus station connection;
So as to obtain a composite network comprising public transport, subway data, and then calculate the average cluster coefficient of composite network And average path length;
Step 4) weights are assigned according to the near linear distance between adjacent sites and even in the company during classification is composite network, calculate The weighted average path length of composite network;
Step 5) model parameter d is varied multiple times, often change a model parameter d, then it is repeated once step 3~4;Compare different d The average cluster coefficient and average road of the weighted average path length of composite network and step 3 gained composite network under the conditions of value Electrical path length, determines optimal model parameter d.
2. a kind of public transport subway composite network model building method according to claim 1, it is characterised in that in step 4 Near linear between adjacent sites is apart from computing formula:
Wherein, dis12It is the near linear distance between adjacent sites;Long1、Lat1Respectively 1 longitude and latitude of website, Long2、Lat2The longitude and latitude of another respectively adjacent website;R is earth radius.
3. a kind of public transport subway composite network model building method according to claim 2, it is characterised in that R values are 6370。
4. a kind of public transport subway composite network model building method according to claim 2, it is characterised in that the step Weights in 4 are specific as follows:
Near linear distance between adjacent sites includes near linear distance, subway station and the ground of bus station and bus station The near linear distance of iron website and the near linear distance of bus station and subway station;Wherein,
If the weights that adjacent bus station connects side are the near linear distance between adjacent bus station, adjacent subway station connects side Weights are the near linear distance between adjacent subway station;
If bus station is with the weights on the company side of subway stationWherein, dis12It is subway station and its preset range The distance between each interior bus station, W is constant and is the average overall travel speed of bus and the average walking speed of people Ratio.
5. a kind of public transport subway composite network model building method according to patent requirements 4, it is characterised in that adjacent public transport Near linear distance between website between 0.5km~1.0km, near linear distance between adjacent subway station 1.0km~ Between 2.0km, the value of model parameter d is between 0~1km.
6. a kind of public transport subway composite network model building method according to claim 4, it is characterised in that W values are 8。
7. a kind of public transport subway composite network model building method according to claim 1, it is characterised in that in step 4 Near linear distance is obtained by the calculation of longitude & latitude of website.
CN201710009947.2A 2017-01-06 2017-01-06 Method for constructing public transport subway composite network model Active CN106897791B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710009947.2A CN106897791B (en) 2017-01-06 2017-01-06 Method for constructing public transport subway composite network model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710009947.2A CN106897791B (en) 2017-01-06 2017-01-06 Method for constructing public transport subway composite network model

Publications (2)

Publication Number Publication Date
CN106897791A true CN106897791A (en) 2017-06-27
CN106897791B CN106897791B (en) 2020-05-12

Family

ID=59198362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710009947.2A Active CN106897791B (en) 2017-01-06 2017-01-06 Method for constructing public transport subway composite network model

Country Status (1)

Country Link
CN (1) CN106897791B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107563028A (en) * 2017-08-22 2018-01-09 南京邮电大学 A kind of public transport subway coupling network construction method based on spatial network
CN109544927A (en) * 2018-12-10 2019-03-29 中南大学 A kind of multitiered network collaboration restricted driving method
CN109871874A (en) * 2019-01-21 2019-06-11 华南理工大学 Subway changes to public transport Activity recognition method, system, computer equipment and storage medium
CN112529292A (en) * 2020-12-11 2021-03-19 重庆邮电大学 Traffic network line optimization method based on improved Floyd algorithm
CN115497326A (en) * 2022-11-21 2022-12-20 南京邮电大学 Multi-mode bus travel path planning method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1154389A1 (en) * 2000-05-10 2001-11-14 DaimlerChrysler AG Method to determine the traffic situation in a road network
CN104200650A (en) * 2014-08-27 2014-12-10 浙江工业大学 Multimode public transportation transferring method in urban congestion period
CN106294869A (en) * 2016-08-23 2017-01-04 浙江工业大学 Public transport network modeling method with public bicycle subnets based on space network

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1154389A1 (en) * 2000-05-10 2001-11-14 DaimlerChrysler AG Method to determine the traffic situation in a road network
CN104200650A (en) * 2014-08-27 2014-12-10 浙江工业大学 Multimode public transportation transferring method in urban congestion period
CN106294869A (en) * 2016-08-23 2017-01-04 浙江工业大学 Public transport network modeling method with public bicycle subnets based on space network

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
JIANWEI ZHANG;ETAL: "A multimodal transport network model for advanced traveler information system", 《PROCEDIA COMPUTER SCIENCE》 *
徐勇 等: "公交地铁一体化下的网络模型与最优路选择算法", 《智能***学报》 *
罗艺 等: "公交-地铁复合网络构建及网络特性分析", 《交通运输***工程与信息》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107563028A (en) * 2017-08-22 2018-01-09 南京邮电大学 A kind of public transport subway coupling network construction method based on spatial network
CN107563028B (en) * 2017-08-22 2020-09-08 南京邮电大学 Public transport-subway coupling network construction method based on space network
CN109544927A (en) * 2018-12-10 2019-03-29 中南大学 A kind of multitiered network collaboration restricted driving method
CN109544927B (en) * 2018-12-10 2019-11-29 中南大学 A kind of multitiered network collaboration restricted driving method
CN109871874A (en) * 2019-01-21 2019-06-11 华南理工大学 Subway changes to public transport Activity recognition method, system, computer equipment and storage medium
CN112529292A (en) * 2020-12-11 2021-03-19 重庆邮电大学 Traffic network line optimization method based on improved Floyd algorithm
CN115497326A (en) * 2022-11-21 2022-12-20 南京邮电大学 Multi-mode bus travel path planning method

Also Published As

Publication number Publication date
CN106897791B (en) 2020-05-12

Similar Documents

Publication Publication Date Title
CN106897791A (en) A kind of public transport subway composite network model building method
CN104200650B (en) Multimode public transportation transferring method in urban congestion period
CN104881710A (en) Urban express delivering method based on vehicle self-organized network
CN108647802B (en) Anti-congestion method based on double-layer traffic network model
CN112580176B (en) Three-layer complex traffic network model construction method, system, equipment and storage medium
CN104217086A (en) Urban public transport network optimization method
CN106203725A (en) Door-to-door trip route scheme personalized recommendation method based on heuristic search
CN105050095B (en) A kind of topological construction method of the heterogeneous wireless sensor net based on energy predicting
CN107092986A (en) The bus passenger travel route choice method based on website and collinearly run
CN103413433A (en) Traffic-jam bus transferring method based on passenger flow volume information
CN101159966A (en) Peer-to-peer network topology matching method in mobile environment
CN103248688B (en) Access control method of vehicle-mounted intelligent terminal
CN105160429B (en) It is a kind of that there is the multi-mode Public Transport Transfer method for virtually changing to micro- hinge
CN113408790A (en) Modular vehicle operation path and combination strategy collaborative optimization method and system
CN115169795A (en) Method and device for evaluating importance of site
CN106330541A (en) Method for predicting unknown connection edges of network based on second-order local community and preference connection
CN106303901A (en) In a kind of wireless sense network, infallible data based on collaborative filtering merges optimization method
CN113946924A (en) Method for identifying key repair node in transportation network based on double-layer coupling complex network
Fadhly et al. implementation of transit oriented development in handling congestion effect on urban sprawl phenomenon and traffic growth in Banda Aceh
CN113723859B (en) Method for evaluating stability of multi-layer urban group comprehensive passenger transport network
CN107800771A (en) Tramcar and shared bicycle integrated transfer system
Sun et al. Research on intelligent guidance optimal path of shared car charging in the IOT environment
Shao et al. Reorganizations of complex networks: Compounding and reducing
CN107679653A (en) A kind of OD distribution methods based on advantage trip distance
CN106327012A (en) Method for predicting unknown connected edges of network based on second-order local community and node degree information

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant