CN106896212A - The device of monitoring deepwater drilling liquid invasion procedure hydrate reservoir physical property change - Google Patents

The device of monitoring deepwater drilling liquid invasion procedure hydrate reservoir physical property change Download PDF

Info

Publication number
CN106896212A
CN106896212A CN201710095540.6A CN201710095540A CN106896212A CN 106896212 A CN106896212 A CN 106896212A CN 201710095540 A CN201710095540 A CN 201710095540A CN 106896212 A CN106896212 A CN 106896212A
Authority
CN
China
Prior art keywords
tubing string
straight tube
reservoir
tube tubing
hydrate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710095540.6A
Other languages
Chinese (zh)
Other versions
CN106896212B (en
Inventor
陈野
孙宝江
高永海
李�昊
刘凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum East China
Original Assignee
China University of Petroleum East China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum East China filed Critical China University of Petroleum East China
Priority to CN201710095540.6A priority Critical patent/CN106896212B/en
Publication of CN106896212A publication Critical patent/CN106896212A/en
Application granted granted Critical
Publication of CN106896212B publication Critical patent/CN106896212B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Food Science & Technology (AREA)
  • Analytical Chemistry (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Medicinal Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Remote Sensing (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to a kind of device for monitoring the change of deepwater drilling liquid invasion procedure hydrate reservoir physical property, including:Pit shaft hydrate reservoir coupled heat and mass transfer unit and circulation of drilling fluid unit;Pit shaft hydrate reservoir coupled heat and mass transfer unit simulates reservoir structure by the method that back-up sand is compacted, for Hydrate in Porous Medium generation, decompose with regeneration reacting environment is provided, and using including the various monitoring measures including temperature and pressure sensing, electrical impedance sensing, monitoring ultrasonic, TDR monitoring and nuclear magnetic resonance tracking isotope, the physical parameter of diverse location changes in real time record reservoir;Circulation of drilling fluid unit is used to simulate the circulation of drilling fluid of different drilling parameters;The device can simulate the hydrate reservoir under the conditions of different water depth, and reservoir internal temperature, pressure, the change of electrical impedance and the Transport of the materials such as fluid, original solid phase hydration thing is decomposed during mud filtrate invasion, during monitoring pit shaft reservoir heat and mass.

Description

The device of monitoring deepwater drilling liquid invasion procedure hydrate reservoir physical property change
Technical field
The invention belongs to natural petroleum gas field field, in particular it relates to a kind of monitoring deepwater drilling liquid invasion procedure water The device of compound reservoir change, the internal act for observing and analyzing mud filtrate invasion hydrate reservoir under different condition Dynamic change, so that summary and induction goes out corresponding rule.
Background technology
Hydrate is a kind of cagelike structure complex compound, generally by small molecule hydrocarbon (such as methane, ethane, propane, normal butane) Constituted with hydrone.It has the advantages that rich reserves, widely distributed, energy density are high and post-combustion pollution is small, is considered as Future can replace the clean energy resource of conventional fossil fuel, receive pursuing and concern for countries in the world.Many countries are all first After carried out gas hydrates pilot production project, but the only former Soviet Union has considerable business in the pilot production of Messoyakha field at present Industry benefit.
The main preservation of gas hydrates in nature is in deep water stratum and continental shelf frozen soil layer.Exceedingly odious Environment brings a variety of difficulties to exploitation engineering, and requirement higher is proposed to technical staff and corollary equipment.Except storm, The influence of the factor such as shake and stormy waves stream, hydrate itself is also the weight for needing to overcome in engineering to temperature, the sensitiveness of pressure Hang-up.The decomposition of hydrate frequently can lead to the things such as formation collapse, borehole well instability, well kick blowout, line clogging with regeneration Therefore, the normal production of influence endangers the safety of personnel and equipment.
Drilling well is the necessary means of the recovery of subterranean energy.When drilling fluid invades reservoir in cyclic process, meeting and reservoir Generation heat and mass.Different from conventional reservoir, after certain energy is absorbed, temperature can be gradually increasing until exceeding hydrate reservoir Hydrate phase balance curve, decomposes the substantial amounts of gas of heat absorption generation and water.And the fluid for generating can spread under partial pressure differential effect, Hinder drilling fluid to be flowed to reservoir depths, if suitable temperature, pressure, can also regenerate hydrate solids particle, change Reservoir properties.The process contains the interaction between drilling fluid and reservoir, has been related to multiple variable parameters, relatively multiple It is miscellaneous.Once control is improper, a series of geology disaster can be triggered, cause the loss for being difficult to retrieve.
At present, experimental study of the domestic and foreign scholars in hydrate field is concentrated mainly on the generation of simulating hydrate and divides Solution, the phase balance condition probed under hydrate varying environment.And the research of heat and mass is still immature in hydrate reservoir, to boring The understanding that well liquid invades the behavior dynamic law after hydrate reservoir is even more near barren.
For above-mentioned situation, it is necessary to design a set of can monitoring indoors and analyze mud filtrate invasion process under deepwater environment The device of middle hydrate reservoir change, by changing drilling fluid temperature, wellbore pressure, reservoir porosity, hydrate saturation The corresponding data of gain of parameter such as degree, go out corresponding rule, so that for deep water drilling hydrate provides optimization side with summary and induction Case and the theoretical foundation of forecasting risk, ensure the safety of field operation.
The content of the invention
To fill up current technological gap, the present invention provides a kind of mud filtrate invasion hydrate under being used to simulate deepwater environment and stores up Layer, and by changing drilling fluid temperature, wellbore pressure, reservoir porosity, hydrate concentration, reservoir initial temperature and pressure etc. Parameter analyzes the device of related law, is to avoid the drilling fluid from triggering hydrate mass to decompose during deep water drilling hydrate Accident provides the theoretical foundation of prioritization scheme and forecasting risk.
In order to solve the above technical problems, the technical solution adopted in the present invention is as follows:
The device of monitoring deepwater drilling liquid invasion procedure hydrate reservoir physical property change, including:Pit shaft-hydrate reservoir coupling Close heat and mass unit and circulation of drilling fluid unit;Pit shaft-hydrate reservoir coupled heat and mass transfer unit is compacted by back-up sand Method simulation reservoir structure, be Hydrate in Porous Medium generation and mud filtrate invasion under the conditions of hydrate decomposition with again Generation provides reacting environment, and utilization includes temperature pressure sensing, electrical impedance sensing, monitoring ultrasonic, TDR monitorings and nuclear-magnetism The physical parameter change of isotope diverse location in interior various monitoring measures, real time record reservoir is followed the trail of in resonance;Drilling fluid Cycling element is used to simulate the circulation of drilling fluid of different drilling parameters, and invades drilling well using the difference metering for circulating front and rear flowmeter Liquid measure;The device can simulate the hydrate reservoir under the conditions of different water depth, be subjected to the feelings of different work parameter mud filtrate invasion Condition, in monitoring pit shaft-reservoir heat and mass transfer process, reservoir internal temperature, pressure, the change of electrical impedance and decomposes fluid, original The Transport of the predetermined substances such as solid phase hydration thing.
Relative to prior art, beneficial effects of the present invention are as follows:
1st, diverse location in reservoir can be monitored by temperature, pressure, sound wave, electromagnetic wave, electrical impedance multiple means Physical parameter is mutually authenticated with the change of mud filtrate invasion, data accuracy and reliability is improved, so as to analyze corresponding behavior Dynamic law;
2nd, the hole of simulation reservoir can be changed by changing the particle diameter of filling sandstone and the gas-liquid ratio of injection sandstone The saturation degree of degree and hydrate, analyzes its influence to mud filtrate invasion reservoir behavior dynamic law;
3rd, it can be analyzed by changing salinity, temperature, circulation discharge capacity and the wellbore pressure of drilling fluid to invade drilling fluid Enter the influence of reservoir behavior dynamic law;
4th, can be put including the hydrocarbon oxygen including H3, C14, O20 by changing the labelled element in injection gas and liquid Injectivity isotope, during following the trail of mud filtrate invasion reservoir, the diffusion feelings of the decompositions situation of different hydrates and decomposition fluid Condition;
5th, can be by changing the environment temperature and environmental pressure of experimental system, drilling fluid is invaded under the conditions of simulation different water depth Enter the situation of hydrate reservoir;
6th, pit shaft part and reservoir portion thermal insulation can be dielectrically separated from before circulation of drilling fluid, it is to avoid influence each other, It is more close with on-site actual situations.
Brief description of the drawings
Fig. 1 is the schematic diagram for monitoring deepwater drilling liquid invasion procedure hydrate reservoir physical property changeable device;
Fig. 2 is distribution schematic diagram of the same group of comprehensive sensor on vertical section;
Fig. 3 is connection diagram between adiabatic insulation flashboard and horizontal straight tube tubing string;
In figure:101st, vertical straight tube tubing string, 102, horizontal straight tube tubing string, 103, horizontal straight tube tubing string lid plug, 201, comprehensive Sensor, 202, NMR system, 203, ultrasonic atomization probe, 204, coaxial type TDR probes, 301, first flowmeter, 302nd, second flowmeter, 303, first pressure table, 304, second pressure table, the 305, the 3rd pressure gauge, the 306, first thermometer, 307th, second temperature table, the 308, the 3rd thermometer, 401, mud pit, 402, controllable heater, 403, high pressure reciprocation cycle pump, 404th, back-pressure valve, 501, controllable telescopic pipe, 502, adiabatic insulation flashboard, 503, gas-liquid mixed supplying module.
Specific embodiment
As shown in figure 1, the device of monitoring deepwater drilling liquid invasion procedure hydrate reservoir physical property change, including:Pit shaft-water Compound reservoir coupled heat and mass transfer unit and circulation of drilling fluid unit;Pit shaft-hydrate reservoir coupled heat and mass transfer unit leads to Cross the method simulation reservoir structure of back-up sand compacting, be Hydrate in Porous Medium generation and mud filtrate invasion under the conditions of hydrate Decomposition with regeneration provide reacting environment, and using include temperature pressure sensing, electrical impedance sensing, monitoring ultrasonic, TDR supervise Survey and the physical parameter of nuclear magnetic resonance tracking isotope diverse location in interior various monitoring measures, real time record reservoir becomes Change;Circulation of drilling fluid unit is used to simulate the circulation of drilling fluid of different drilling parameters, and using the difference meter of flowmeter before and after circulation Amount invades drilling well liquid measure;The device can simulate the hydrate reservoir under the conditions of different water depth, be subjected to different work parameter drilling well The situation that liquid is invaded, in monitoring pit shaft-reservoir heat and mass transfer process, reservoir internal temperature, pressure, the change and decomposition of electrical impedance The Transport of the predetermined substances such as fluid, original solid phase hydration thing.
Pit shaft-hydrate reservoir coupled heat and mass transfer unit, including:Vertical straight tube tubing string 101, horizontal straight tube tubing string 102, Horizontal straight tube tubing string lid plug 103;Wherein, vertical straight tube tubing string 101 is using circular tubing string, vertically placement, horizontal straight tube tubing string 102 Using circular tubing string, horizontal positioned, vertical straight tube tubing string 101, horizontal straight tube tubing string 102 are fixedly connected, vertical straight tube tubing string 101 It is in 90 ° of angles between horizontal straight tube tubing string 102,102 points by horizontal straight tube tubing string of vertical straight tube tubing string 101 is upper and lower two-section; Horizontal straight tube tubing string 102 uses compacting back-up sand, and reservoir porosity is changed by adjusting gravel size, for simulation and pit shaft The one-dimensional hydrate reservoir of radial direction of contact, its one end is connected with the middle part of vertical straight tube tubing string 101, and the other end is by horizontal straight tube tubing string Lid plug 103 is blocked, a length of L of horizontal straight tube tubing string 102, and internal diameter is D, and vertical straight tube tubing string 101 is used to simulate circulation of drilling fluid mistake The pit shaft contacted with reservoir in journey.
Horizontal straight tube tubing string 102 equidistantly uniformly installs totally 20 groups of comprehensive sensors 201 along horizontal axis direction, and every group comprehensive Close sensor 201 and include 4 probes positioned at same perpendicular, every probe is disposed radially, and every group of 4 probes are mutual Be distributed in the horizontal vertical section of straight tube tubing string 102 in 90 °, two be vertically arranged, two be horizontally disposed with;Carried on every probe 2 groups of probes, 2 groups of probes are respectively apart from horizontal straight tube tubing string 102 inner tubal wall D/5,2D/5, every group of temperature of probe monitors present position Degree, pressure, electrical impedance;The outer end of comprehensive sensor 201 is provided with NMR system 202, is centered around the whole body of horizontal straight tube tubing string 102 Outward, for following the trail of Diffusion Law of the specific isotope in reservoir.
Press close to vertical being provided with the vertical position of straight tube tubing string 101 on horizontal straight tube tubing string 102 to be longer than in horizontal straight tube tubing string 102 Controllable telescopic pipe 501 is set in the slideway in footpath, slideway with adiabatic insulation flashboard 502;Wherein controllable telescopic pipe 501 insulate with adiabatic Flashboard 502 is rigidly connected, and controllable telescopic pipe 501 drives adiabatic the insulation complete pair of vertical straight tube tubing string 101 of flashboard 502 and level Envelope between straight tube tubing string 102 is cut;Thermal insulation insulation flashboard 502 is located inside slideway, and controllable using adiabatic insulating rigid material The connecting portion of telescoping tube 501 is in T shape, and dynamic sealing is formed with slideway.
Horizontal straight tube tubing string lid plug 103 uses high pressure resistant cylinder, and its is same to be diametrically provided with two at the D/6 of the center of circle Flowing ports, for providing fluid Vomitory for horizontal straight tube tubing string 102;The 3rd pressure is separately installed with two in flowing ports The thermometer 308 of power table 305 and the 3rd, measures the temperature and pressure of the horizontal fluid of straight tube tubing string 102 that comes in and goes out respectively;End is flowed at two Mouth is connected by the first adiabatic pipeline with gas-liquid mixed feed unit 503, the gas for providing abundance for horizontal straight tube tubing string 102 Liquid fluid-mixing is generating hydrate.
The inner circle centre position of horizontal straight tube tubing string lid plug 103 is provided with coaxial TDR sensing seats, be provided with sensing seat five groups it is coaxial TDR probes 204, five groups of coaxial TDR probes 204 L/6,2L/6,3L/6,4L/6,5L/6 long, five groups of coaxial TDR probes 204 respectively It is horizontally fixed on center line, horizontal straight tube tubing string 102 is equidistantly divided into six parts, satisfies for testing hydrate in different zones With degree and the change of moisture content, mud filtrate invasion state is analyzed;Horizontal straight tube tubing string lid plug 103 is provided with ultrasound near circle centre position Ripple atomization probe 203, for the change of hydrate concentration in testing level straight tube tubing string 102 and moisture content.
Circulation of drilling fluid unit, including:Mud pit 401, high pressure reciprocation cycle pump 402, controllable heater 403 and back-pressure valve 404;Mud pit 401 is connected by the first adiabatic feed-line with the vertical upper port of straight tube tubing string 101, the first adiabatic feed-line On from mud pit 401 to the vertical upper port of straight tube tubing string 101 be sequentially arranged with first flowmeter 302, high pressure reciprocation cycle pump 402, Controllable heater 403, first pressure table 303, the first thermometer 306;The vertical lower port of straight tube tubing string 101 is adiabatic defeated by second Send pipeline to be connected with mud pit 401, on the second adiabatic feed-line from the vertical lower port of straight tube tubing string 101 to mud pit 401 according to It is secondary equipped with back-pressure valve 404, second pressure table 304, second temperature table 307, second flowmeter 302;Mud pit 401 fills enough Specify the drilling fluid of ionic species and concentration;High pressure reciprocation cycle pump 402 is used to provide power for circulation of drilling fluid, while regulation and control Circulation discharge capacity;Controllable heater 403 is used to regulate and control the temperature of drilling fluid;Back-pressure valve 404 be used for regulate and control circulation of drilling fluid during Pressure in vertical straight tube tubing string 101;First flowmeter 302 and second flowmeter 302 are respectively used to measurement and flow in and out vertically The mud flow rate of straight tube tubing string 101;First pressure table 303 and second pressure table 304 are respectively used to measure vertical straight tube tubing string The real-time pressure of 101 upper ports and lower port;First thermometer 306 and second temperature table 307 are respectively used to measurement and flow into and flow Go out the drilling fluid real time temperature of vertical straight tube tubing string 101.
One layer of insulating materials of coaxial type TDR probes 204 outside hot compresses, can reduce when electromagnetic wave is propagated in media as well Loss, strengthens transmission capacity, reduces error, so that measurement result is more accurate.
The distribution such as Fig. 2 of 8 groups of probes on the same vertical section of horizontal straight tube tubing string 102 in every group of comprehensive sensor 201 It is shown.
Controllable telescopic pipe 502 is as shown in Figure 3 in the installation of the horizontal sliding way of straight tube tubing string 102 with thermal insulation insulation flashboard 503.
The method for monitoring deepwater drilling liquid invasion procedure hydrate reservoir physical property dynamic rule, using above-mentioned monitoring depth The device of aqueous drilling fluid invasion procedure hydrate reservoir physical property change, it is concretely comprised the following steps:
(1) back-up sand gas injection liquid, cooling supercharging simulating hydrate reservoir
Controllable telescopic pipe 501 is driven, thermal insulation insulation flashboard 502 the horizontal bottom of straight tube tubing string 102 is pushed into, by vertical straight tube Tubing string 101 and horizontal straight tube tubing string 102 insulate completely.
Horizontal straight tube tubing string lid plug 103 is unloaded, sandstone species and particle diameter is selected according to default reservoir matrix and porosity, To back-up sand in horizontal straight tube tubing string 102 until overflowing, horizontal straight tube tubing string lid plug 103 is installed, then by horizontal straight tube tubing string 102 Inside vacuumizes.
It is that horizontal straight tube tubing string 102 freezes with immersion method, until the temperature data of the acquisition of comprehensive sensor 201 and the 3rd temperature The reading for spending table 308 is consistent, reaches preset value and stablizes constant.
According to default gaseous species, class of liquids and mixed proportion needed for gas-liquid mixed feed unit 503 is configured Fluid, and injected in horizontal straight tube tubing string 102, until pressure data and the 3rd pressure gauge 305 that comprehensive sensor 201 is obtained Reading is consistent, reaches preset value and stablizes constant, now thinks that hydrate balances each other under the conditions of having reached this in porous media, root Hydrate concentration in reservoir can be estimated according to the consumption of fluid in gas-liquid mixed feed unit 503.
(2) circulating fluid, simulation invades reservoir heat and mass
Open and set high pressure reciprocation cycle pump 402 and controllable heater 403, by mud pit 401 according to default ion Species and the drilling fluid of concentration configuration, inject in vertical straight tube tubing string 101 according to default circulation discharge capacity and temperature.Regulation back pressure Valve 404, is preset value to control in vertical straight tube tubing string 101 and horizontal straight tube tubing string 102 that pressure is constant.
Observation second pressure table 304 and second temperature table 307, when reading reaches preset value and stablizes constant, driving can Control telescoping tube 501, thermal insulation insulation flashboard 502 is pulled up, until straight tube tubing string 101 and horizontal straight tube tubing string 102 connect completely vertically It is logical, now start simulation loop mud filtrate invasion hydrate reservoir.
(3) reservoir change is monitored, mud filtrate invasion dynamic law is analyzed
Collection comprehensive sensor 201, NMR system 202, ultrasonic atomization probe 203, coaxial type TDR probes 204, First flowmeter 301, second flowmeter 302, first pressure table 303, second pressure table 304, first the 306, second temperature of thermometer Spending the live signal of table 307, and these signals are converted into corresponding data carries out Treatment Analysis.
Wherein, what comprehensive sensor 201 was recorded is temperature, pressure, the electrical impedance of reservoir diverse location, and reflection drilling fluid is invaded Reservoir temperature, pressure field and electrical impedance change with time under the conditions of entering.
What NMR system 202 was followed the trail of and recorded is the movement locus of material where default radioactive element, and reflection is bored Well liquid invade under the conditions of in reservoir original certain predetermined substance bent by decomposition of hydrate, secondary generation and drilling fluid replace influenceed and The Transport of generation.When occurring physically or chemically to react in reservoir, default radioactive element can be from original place material It is transformed into new material, monitors its real-time location status, may infer that reservoir internal dynamic and reaction progress.For lifting is accurate Exactness, once only marks a kind of radioactive element.
The record of ultrasonic atomization probe 203 is that different frequency sound wave is turned back the time used, hydrate in reflection reservoir Saturation degree and moisture content.
The record of coaxial type TDR probes 204 is the oscillogram drawn after reflection of electromagnetic wave, so as to calculate different positions in reservoir The dielectric constant put, hydrate concentration and moisture content in reflection reservoir are mutually authenticated with ultrasonic atomization probe 203, so that Round-off error.
The record of first flowmeter 301 is flow of the drilling fluid into vertical straight tube tubing string 101, and second flowmeter 302 is remembered What is recorded is the flow that drilling fluid flows out vertical straight tube tubing string 101, can be counted by first flowmeter 301 and second flowmeter 302 Calculate total filter loss of mud filtrate invasion reservoir.
The record of 303 and first thermometer of first pressure table 306 be drilling fluid flow out vertical straight tube tubing string 101 pressure and Temperature, second pressure table 304 and the record of second temperature table 307 are pressure and temperature of the drilling fluid into vertical straight tube tubing string 102 Degree, by first pressure table 303, second pressure table 304, the first thermometer 306, second temperature table 307 can estimate drilling well Liquid passes to the gross energy of reservoir.
Sandstone species, the particle diameter of horizontal straight tube tubing string 102 are packed into by changing respectively, multi-pass operation, research storage is carried out Layer species and influence of the initial porosity to mud filtrate invasion hydrate reservoir behavior dynamic law.
By changing the gas-liquid mixed ratio in gas-liquid mixed feed unit 503, multi-pass operation is carried out, water in Study In Reservoir The influence of compound saturation degree, void fraction, moisture content to mud filtrate invasion hydrate reservoir behavior dynamic law.
By changing in gas-liquid mixed feed unit 503 carbon isotope (such as C14) in gas molecule, adjustment nuclear-magnetism is total to The receives frequency of vibrating system 202 carries out real-time tracing to the carbon isotope, and decomposition of hydrate generates the expansion of gas in Study In Reservoir Dissipate rule.
By changing in gas-liquid mixed feed unit 503 protium isotope (such as H3) in fluid molecule, adjustment nuclear-magnetism is total to The receives frequency of vibrating system 202 carries out real-time tracing to the hydrogen isotope, and decomposition of hydrate generates the expansion of liquid in Study In Reservoir Dissipate rule.
By adjusting and reforming the environment temperature and pressure of the horizontal straight tube tubing string 102 of change, carry out multi-pass operation, research different water depth and Mud filtrate invasion hydrate reservoir behavior dynamic law under water temperature.
By adjusting high pressure reciprocation cycle pump 402 and controllable heater 403, the discharge capacity and temperature of circulating fluid are changed respectively Degree, carries out multi-pass operation, studies mud filtrate invasion hydrate reservoir behavior dynamic law under different drilling conditions.
By changing the ionic species and concentration of drilling fluid in mud pit 401 respectively, multi-pass operation is carried out, study different brills Well liquid ionic species and concentration are to mud filtrate invasion hydrate reservoir behavior dynamic law.

Claims (10)

1. the device that a kind of monitoring deepwater drilling liquid invasion procedure hydrate reservoir physical property changes, including:Pit shaft-hydrate reservoir Coupled heat and mass transfer unit and circulation of drilling fluid unit;Characterized in that, pit shaft-hydrate reservoir coupled heat and mass transfer unit The method being compacted by back-up sand simulates reservoir structure, is hydrated under the conditions of the generation and the mud filtrate invasion that are Hydrate in Porous Medium The decomposition of thing provides reacting environment with regeneration, and utilization includes temperature pressure sensing, electrical impedance sensing, monitoring ultrasonic, TDR Monitoring and nuclear magnetic resonance follow the trail of the physical parameter of isotope diverse location in interior various monitoring measures, real time record reservoir Change;Circulation of drilling fluid unit is used to simulate the circulation of drilling fluid of different drilling parameters, and using the difference of flowmeter before and after circulation Metering invades drilling well liquid measure.
2. the device that monitoring deepwater drilling liquid invasion procedure hydrate reservoir physical property according to claim 1 changes, it is special Levy and be, pit shaft-hydrate reservoir coupled heat and mass transfer unit, including:Vertical straight tube tubing string, horizontal straight tube tubing string, level are straight Bobbin post lid plug;Wherein, using circular tubing string, vertically placement, horizontal straight tube tubing string is using circular tubing string, water for vertical straight tube tubing string Placing flat, vertical straight tube tubing string, horizontal straight tube tubing string are fixedly connected, and vertical straight tube tubing string is divided into upper and lower two by horizontal straight tube tubing string Cut;Horizontal straight tube tubing string uses compacting back-up sand, and reservoir porosity is changed by adjusting gravel size, for simulation and pit shaft The one-dimensional hydrate reservoir of radial direction of contact, its one end is connected with vertical straight tube tubing string middle part, and the other end is by horizontal straight tube tubing string lid Plug closure, the horizontal a length of L of straight tube tubing string, internal diameter is D, and vertical straight tube tubing string is used to simulate connect with reservoir during circulation of drilling fluid Tactile pit shaft.
3. the device that the monitoring deepwater drilling liquid invasion procedure hydrate reservoir physical property according to claim 1-2 changes, its It is characterised by, horizontal straight tube tubing string equidistantly uniformly installs totally 20 groups of comprehensive sensors, every group of comprehensive biography along horizontal axis direction Sensor includes 4 probes positioned at same perpendicular, and every probe is disposed radially, and every group of 4 probes are mutually in 90 ° points Cloth in horizontal straight tube tubing string vertical section, two be vertically arranged, two be horizontally disposed with;2 groups of probes, 2 are carried on every probe Group probe is respectively apart from horizontal straight tube tubing string inner tubal wall D/5,2D/5, every group of temperature of probe monitors present position, pressure, resistance It is anti-;Comprehensive sensor outer end is provided with NMR system, is centered around outside the horizontal straight tube tubing string whole body, for following the trail of specific isotope Diffusion Law in reservoir.
4. the device that the monitoring deepwater drilling liquid invasion procedure hydrate reservoir physical property according to claim 1-3 changes, its It is characterised by, vertical straight tube tubing string position is pressed close on horizontal straight tube tubing string and sets the slideway for being longer than horizontal straight tube tubing string internal diameter vertically, Controllable telescopic pipe is set in slideway with adiabatic insulation flashboard;Wherein controllable telescopic pipe is rigidly connected with thermal insulation insulation flashboard, controllable Telescoping tube drives the envelope between the adiabatic insulation complete pair of vertical straight tube tubing string of flashboard and horizontal straight tube tubing string to cut;Thermal insulation insulation lock Plate is located inside slideway, in T shape with controllable telescopic pipe connecting portion using adiabatic insulating rigid material, forms dynamic with slideway Sealing.
5. the device that the monitoring deepwater drilling liquid invasion procedure hydrate reservoir physical property according to claim 1-4 changes, its It is characterised by, horizontal straight tube tubing string lid plug uses high pressure resistant cylinder, its same being diametrically provided with the D/6 of the center of circle at two is flowed Moved end mouthful, for providing fluid Vomitory for horizontal straight tube tubing string;The 3rd pressure gauge is separately installed with two in flowing ports With the 3rd thermometer, the temperature and pressure of the horizontal straight tube tubing string fluid that comes in and goes out are measured respectively;Flowing ports are exhausted by first at two Hot pipeline is connected with gas-liquid mixed feed unit, for providing the gas-liquid mixture fluid of abundance for horizontal straight tube tubing string to generate water Compound.
6. the device that the monitoring deepwater drilling liquid invasion procedure hydrate reservoir physical property according to claim 1-5 changes, its Be characterised by, horizontal straight tube tubing string lid plug the inner circle centre position is provided with coaxial TDR sensing seats, be provided with sensing seat five groups it is coaxial TDR probes, five groups of coaxial TDR probes L/6,2L/6,3L/6,4L/6,5L/6 long respectively, five groups of coaxial TDR probe levels are fixed On center line, horizontal straight tube tubing string is equidistantly divided into six parts, for test in different zones hydrate concentration with it is aqueous The change of rate, analyzes mud filtrate invasion state;Horizontal straight tube tubing string lid plug is provided with ultrasonic atomization probe near circle centre position, uses In the change of hydrate concentration in testing level straight tube tubing string and moisture content.
7. the device that the monitoring deepwater drilling liquid invasion procedure hydrate reservoir physical property according to claim 1-6 changes, its It is characterised by, circulation of drilling fluid unit, including:Mud pit, high pressure reciprocation cycle pump, controllable heater and back-pressure valve;Mud pit Be connected with vertical straight tube tubing string upper port by the first adiabatic feed-line, from mud pit to vertical on the first thermal insulation feed-line Straight tube tubing string upper port is sequentially arranged with first flowmeter, high pressure reciprocation cycle pump, controllable heater, first pressure table, the first temperature Degree table;Vertical straight tube tubing string lower port is connected by the second adiabatic feed-line with mud pit, on the second adiabatic feed-line certainly Vertical straight tube tubing string lower port to mud pit is sequentially arranged with back-pressure valve, second pressure table, second temperature table, second flowmeter;Mud Stock tank fills the drilling fluid of enough specified ionic species and concentration.
8. the device that the monitoring deepwater drilling liquid invasion procedure hydrate reservoir physical property according to claim 1-7 changes, its It is characterised by, coaxial type TDR probes one layer of insulating materials of outside hot compress.
9. it is a kind of monitor deepwater drilling liquid invasion procedure hydrate reservoir physical property dynamic rule method, using claim The device of deepwater drilling liquid invasion procedure hydrate reservoir physical property change is monitored described in 1-8, it is characterised in that concretely comprise the following steps:
(1) back-up sand gas injection liquid, cooling supercharging simulating hydrate reservoir
Controllable telescopic pipe is driven, thermal insulation insulation flashboard is pushed into horizontal straight tube tubing string bottom, vertical straight tube tubing string and level is straight Bobbin post is insulated completely;
Horizontal straight tube tubing string lid plug is unloaded, sandstone species and particle diameter is selected according to default reservoir matrix and porosity, to level Back-up sand in straight tube tubing string is until overflow, the horizontal straight tube tubing string lid plug of installation will then be vacuumized inside horizontal straight tube tubing string;
It is that horizontal straight tube tubing string freezes with immersion method, until the reading of the temperature data of comprehensive sensor acquisition and the 3rd thermometer Unanimously, reach preset value and stablize constant;
According to default gaseous species, class of liquids and mixed proportion in the required fluid of gas-liquid mixed feed unit configuration, and Injected in horizontal straight tube tubing string, until the pressure data that comprehensive sensor is obtained is consistent with the 3rd pressure gauge reading, reached pre- If being worth and stablizing constant, now think that hydrate balances each other under the conditions of having reached this in porous media, supplied according to gas-liquid mixed The consumption of fluid can estimate hydrate concentration in reservoir in unit;
(2) circulating fluid, simulation invades reservoir heat and mass
High pressure reciprocation cycle pump and controllable heater are opened and set, will be configured according to default ionic species and concentration in mud pit Drilling fluid, injected in vertical straight tube tubing string according to default circulation discharge capacity and temperature.Regulation back-pressure valve, to control vertical straight tube It is preset value that pressure is constant in tubing string and horizontal straight tube tubing string;
Observation second pressure table and second temperature table, when reading reaches preset value and stablizes constant, drive controllable telescopic pipe, will Thermal insulation insulation flashboard pull-up, until straight tube tubing string is connected completely with horizontal straight tube tubing string vertically, now starts simulation loop drilling well Liquid invades hydrate reservoir;
(3) reservoir change is monitored, mud filtrate invasion dynamic law is analyzed
Collection comprehensive sensor, NMR system, ultrasonic atomization probe, coaxial type TDR probes, first flowmeter, second Flowmeter, first pressure table, second pressure table, the first thermometer, the live signal of second temperature table, and these signals are converted For corresponding data carry out Treatment Analysis;
Wherein, what comprehensive sensor was recorded is temperature, pressure, the electrical impedance of reservoir diverse location, reflects mud filtrate invasion condition Lower reservoir temperature, pressure field and electrical impedance change with time;
What NMR system was followed the trail of and recorded is the movement locus of material where default radioactive element, reflects mud filtrate invasion Under the conditions of in reservoir original certain predetermined substance bent by decomposition of hydrate, secondary generation and drilling fluid and replace what is influenceed and occurred to move Move rule;When occurring physically or chemically to react in reservoir, default radioactive element can be transformed into newly from original place material Material in, monitor its real-time location status, may infer that reservoir internal dynamic and reaction progress;It is the lifting degree of accuracy, one It is secondary only to mark a kind of radioactive element;
Ultrasonic atomization probes records are that different frequency sound wave is turned back the time used, in reflection reservoir hydrate concentration and Moisture content;
Coaxial type TDR probe records are the oscillograms drawn after reflection of electromagnetic wave, so as to calculate Jie of diverse location in reservoir Electric constant, hydrate concentration and moisture content in reflection reservoir are mutually authenticated, so that round-off error with ultrasonic atomization probe;
First flowmeter record is flow of the drilling fluid into vertical straight tube tubing string, and second flowmeter record is drilling fluid stream Go out the flow of vertical straight tube tubing string, total filter of mud filtrate invasion reservoir can be calculated by first flowmeter and second flowmeter Vector;
What first pressure table and the first thermometer were recorded is the pressure and temperature that drilling fluid flows out vertical straight tube tubing string, second pressure What table and second temperature token were recorded is the pressure and temperature that drilling fluid enters vertical straight tube tubing string, by first pressure table, second Pressure gauge, the first thermometer, second temperature table can estimate the gross energy that drilling fluid passes to reservoir.
10. monitoring deepwater drilling liquid invasion procedure hydrate reservoir physical property dynamic rule according to claim 9 Method, it is characterised in that:
Sandstone species, the particle diameter of horizontal straight tube tubing string are packed into by changing respectively, multi-pass operation is carried out, Study In Reservoir species with Influence of the initial porosity to mud filtrate invasion hydrate reservoir behavior dynamic law;
By changing the gas-liquid mixed ratio in gas-liquid mixed feed unit, multi-pass operation is carried out, hydrate is satisfied in Study In Reservoir Influence with degree, void fraction, moisture content to mud filtrate invasion hydrate reservoir behavior dynamic law;
By changing in gas-liquid mixed feed unit carbon isotope (such as C14) in gas molecule, NMR system is adjusted Receives frequency real-time tracing is carried out to the carbon isotope, in Study In Reservoir decomposition of hydrate generate gas Diffusion Law;
By changing in gas-liquid mixed feed unit protium isotope (such as H3) in fluid molecule, adjustment NMR system Receives frequency carries out real-time tracing to the hydrogen isotope, and decomposition of hydrate generates the Diffusion Law of liquid in Study In Reservoir;
By adjusting and reforming the environment temperature and pressure of the horizontal straight tube tubing string of change, multi-pass operation is carried out, under research different water depth and water temperature Mud filtrate invasion hydrate reservoir behavior dynamic law;
By adjusting high pressure reciprocation cycle pump and controllable heater, the discharge capacity and temperature of circulating fluid are changed respectively, carried out many Secondary operation, studies mud filtrate invasion hydrate reservoir behavior dynamic law under different drilling conditions;
By changing the ionic species and concentration of drilling fluid in mud pit respectively, carry out multi-pass operation, study different drilling fluids from Subcategory and concentration are to mud filtrate invasion hydrate reservoir behavior dynamic law.
CN201710095540.6A 2017-02-22 2017-02-22 Monitor the device of deepwater drilling liquid invasion procedure hydrate reservoir physical property variation Active CN106896212B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710095540.6A CN106896212B (en) 2017-02-22 2017-02-22 Monitor the device of deepwater drilling liquid invasion procedure hydrate reservoir physical property variation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710095540.6A CN106896212B (en) 2017-02-22 2017-02-22 Monitor the device of deepwater drilling liquid invasion procedure hydrate reservoir physical property variation

Publications (2)

Publication Number Publication Date
CN106896212A true CN106896212A (en) 2017-06-27
CN106896212B CN106896212B (en) 2019-06-21

Family

ID=59185477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710095540.6A Active CN106896212B (en) 2017-02-22 2017-02-22 Monitor the device of deepwater drilling liquid invasion procedure hydrate reservoir physical property variation

Country Status (1)

Country Link
CN (1) CN106896212B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107345896A (en) * 2017-06-30 2017-11-14 中国石油大学(北京) Utilize the measurement apparatus and measuring method of the monitoring shale imbibition of sound bullet characteristic
CN108181379A (en) * 2017-12-22 2018-06-19 中国科学院广州能源研究所 Entirety is solids monitoring and de-plugging effect assessment experimental provision and method in pipeline
CN109209359A (en) * 2018-08-01 2019-01-15 中国石油大学(华东) Gas hydrates drilling microcosmic Simulation device
CN109252857A (en) * 2018-08-01 2019-01-22 中国石油大学(华东) For Study In Reservoir-pit shaft coupled heat and mass transfer rule device and method
CN109254027A (en) * 2018-11-01 2019-01-22 西南石油大学 A kind of mud cake closure evaluating apparatus and evaluation method based on low-field nuclear magnetic resonance
CN110853475A (en) * 2019-11-25 2020-02-28 中国海洋石油集团有限公司 Deep sea drilling process pit shaft oil gas invasion simulation test device
CN111122638A (en) * 2020-03-31 2020-05-08 南京昊绿生物科技有限公司 Nuclear magnetic testing device and method for monitoring reaction process in real time on line
CN112347675A (en) * 2020-10-13 2021-02-09 中国石油大学(华东) Method for cooperatively regulating and controlling reservoir natural gas hydrate phase state by drilling fluid additive and temperature and pressure field
CN114280099A (en) * 2021-12-27 2022-04-05 中国地质大学(武汉) Experimental device and method for evaluating thermoacoustic characteristics of deepwater drilling fluid under latent hydrate
CN115684556A (en) * 2023-01-04 2023-02-03 中国市政工程西南设计研究总院有限公司 Intelligent monitoring system and method for mine geothermal deep well water content

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102323394A (en) * 2011-08-23 2012-01-18 中国地质大学(武汉) Experimental apparatus and method for researching response characteristic of natural gas hydrate stratum to drilling fluid intrusion
CN102495090A (en) * 2011-11-24 2012-06-13 大连理工大学 Device and method for low-temperature high-pressure nuclear magnetic resonance imaging of natural gas hydrate
CN204627595U (en) * 2015-05-14 2015-09-09 西南石油大学 A kind of visual experimental apparatus of simulating drilling well leakage
CN105178953A (en) * 2015-10-12 2015-12-23 中国石油大学(华东) Device and method for measuring hydrate reservoir decomposition rate in drilling process
CN105277660B (en) * 2015-10-12 2016-09-07 中国石油大学(华东) The device and method in decomposition of hydrate region under the different drilling method of monitoring
CN106351621A (en) * 2016-09-08 2017-01-25 中国石油大学(华东) Experiment equipment used for studying gas invasion and migration mechanism of oil and gas pitshaft
CN106353069A (en) * 2016-09-30 2017-01-25 青岛海洋地质研究所 Indoor test method and device for micro-migration process of sand in decomposition zone of marine natural gas hydrate

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102323394A (en) * 2011-08-23 2012-01-18 中国地质大学(武汉) Experimental apparatus and method for researching response characteristic of natural gas hydrate stratum to drilling fluid intrusion
CN102495090A (en) * 2011-11-24 2012-06-13 大连理工大学 Device and method for low-temperature high-pressure nuclear magnetic resonance imaging of natural gas hydrate
CN204627595U (en) * 2015-05-14 2015-09-09 西南石油大学 A kind of visual experimental apparatus of simulating drilling well leakage
CN105178953A (en) * 2015-10-12 2015-12-23 中国石油大学(华东) Device and method for measuring hydrate reservoir decomposition rate in drilling process
CN105277660B (en) * 2015-10-12 2016-09-07 中国石油大学(华东) The device and method in decomposition of hydrate region under the different drilling method of monitoring
CN106351621A (en) * 2016-09-08 2017-01-25 中国石油大学(华东) Experiment equipment used for studying gas invasion and migration mechanism of oil and gas pitshaft
CN106353069A (en) * 2016-09-30 2017-01-25 青岛海洋地质研究所 Indoor test method and device for micro-migration process of sand in decomposition zone of marine natural gas hydrate

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
宁伏龙 等: "钻井液侵入海洋含水合物地层的一维数值模拟研究", 《地球物理学报》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107345896A (en) * 2017-06-30 2017-11-14 中国石油大学(北京) Utilize the measurement apparatus and measuring method of the monitoring shale imbibition of sound bullet characteristic
CN108181379A (en) * 2017-12-22 2018-06-19 中国科学院广州能源研究所 Entirety is solids monitoring and de-plugging effect assessment experimental provision and method in pipeline
CN109252857B (en) * 2018-08-01 2022-02-22 中国石油大学(华东) Device and method for researching reservoir-shaft coupling heat and mass transfer law
CN109252857A (en) * 2018-08-01 2019-01-22 中国石油大学(华东) For Study In Reservoir-pit shaft coupled heat and mass transfer rule device and method
CN109209359A (en) * 2018-08-01 2019-01-15 中国石油大学(华东) Gas hydrates drilling microcosmic Simulation device
CN109254027A (en) * 2018-11-01 2019-01-22 西南石油大学 A kind of mud cake closure evaluating apparatus and evaluation method based on low-field nuclear magnetic resonance
CN110853475A (en) * 2019-11-25 2020-02-28 中国海洋石油集团有限公司 Deep sea drilling process pit shaft oil gas invasion simulation test device
CN111122638A (en) * 2020-03-31 2020-05-08 南京昊绿生物科技有限公司 Nuclear magnetic testing device and method for monitoring reaction process in real time on line
CN111122638B (en) * 2020-03-31 2020-06-26 南京昊绿生物科技有限公司 Nuclear magnetic testing device and method for monitoring reaction process in real time on line
CN112347675A (en) * 2020-10-13 2021-02-09 中国石油大学(华东) Method for cooperatively regulating and controlling reservoir natural gas hydrate phase state by drilling fluid additive and temperature and pressure field
CN112347675B (en) * 2020-10-13 2022-08-19 中国石油大学(华东) Method for cooperatively regulating and controlling reservoir natural gas hydrate phase state by drilling fluid additive and temperature and pressure field
CN114280099A (en) * 2021-12-27 2022-04-05 中国地质大学(武汉) Experimental device and method for evaluating thermoacoustic characteristics of deepwater drilling fluid under latent hydrate
CN114280099B (en) * 2021-12-27 2024-02-09 中国地质大学(武汉) Experimental device and method for evaluating thermoacoustic characteristics of deepwater drilling fluid under submersible compound
CN115684556A (en) * 2023-01-04 2023-02-03 中国市政工程西南设计研究总院有限公司 Intelligent monitoring system and method for mine geothermal deep well water content

Also Published As

Publication number Publication date
CN106896212B (en) 2019-06-21

Similar Documents

Publication Publication Date Title
CN106896212B (en) Monitor the device of deepwater drilling liquid invasion procedure hydrate reservoir physical property variation
CN109557253B (en) A kind of comprehensive hydrate simulation system and its experimental method
CN103471976B (en) A kind of device measured containing hydrate porous deposit permeability
CN105156102B (en) Bottom water reservoir water energy three-dimensional physical simulation device and method
CN107860569A (en) The evaluation experimental device and method of sand control screen blocking characteristic during exploitation of gas hydrates
CN105277660A (en) Apparatus and method for monitoring hydrate decomposition area during different drilling and production processes
CN108169062B (en) Simulate the visual test device and method of subterranean coal gas preservation desorption process
CN103233704A (en) Method and device for simulating experiment of permafrost region natural gas hydrate mining through replacement of CO2/N2
CN106522928B (en) Well testing method for unstable pressure drop of well logging head by stopping pump after acidizing and fracturing
CN111075441B (en) Three-dimensional physical simulation experiment device and method for cold recovery after thermal recovery of side-bottom water heavy oil reservoir
CN112282705B (en) Evaluation device and experimental method for phase stability of drilling fluid additive to natural gas hydrate
CN102042947A (en) Natural gas hydrate permeability simulation experimental device
CN113008682A (en) True triaxial hydraulic fracturing simulation test device and method for natural gas hydrate reservoir
CN109557252A (en) A kind of comprehensive hydrate simulation system
CN103161436B (en) A kind of heavy crude heat extraction horizontal well Well Test Data Analysis Method
CN107014698A (en) The measurement apparatus and measuring method of a kind of high temperature compressed coefficient of rock and permeability
CN109826612A (en) Gas hydrates reservoir radially horizontal well drilling simulator and method
CN104389592B (en) Oil loss evaluation experiment test method for water flooded layer of bottom water condensate gas reservoir with oil rim
CN106194164A (en) Rock core experiment simulation method and device for edge-bottom water reservoir development
CN114016997B (en) Heterogeneous oil reservoir development and adjustment simulation experiment device and method
CN112881652B (en) Supercritical CO2Shale reservoir injection Joule-Thomson effect test simulation device
CN108106687A (en) A kind of bedrock underground water drift net containing soft interlayer probes into method and double-capsule water-stop
CN201749075U (en) Stimulation experimental device for permeability of natural gas hydrates
Kaijun et al. Sparse well pattern and high-efficient development of metamorphic buried hills reservoirs in Bohai Sea area, China
CN114991728B (en) Simulated CO 2 Electrical tomography experimental device, method and application of gas-driven oil reservoir

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant