CN106885661A - 模拟水、土荷载作用的盾构隧道管环抗渗性能试验方法 - Google Patents
模拟水、土荷载作用的盾构隧道管环抗渗性能试验方法 Download PDFInfo
- Publication number
- CN106885661A CN106885661A CN201710099671.1A CN201710099671A CN106885661A CN 106885661 A CN106885661 A CN 106885661A CN 201710099671 A CN201710099671 A CN 201710099671A CN 106885661 A CN106885661 A CN 106885661A
- Authority
- CN
- China
- Prior art keywords
- water
- water pocket
- pipe ring
- hydraulic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 145
- 230000003487 anti-permeability effect Effects 0.000 title claims abstract description 12
- 238000004088 simulation Methods 0.000 title claims abstract description 11
- 238000000034 method Methods 0.000 title claims abstract description 7
- 238000011056 performance test Methods 0.000 title claims abstract description 7
- 230000003068 static effect Effects 0.000 claims abstract description 11
- 230000002459 sustained effect Effects 0.000 claims abstract description 8
- 238000006073 displacement reaction Methods 0.000 claims abstract description 5
- 238000004826 seaming Methods 0.000 claims abstract description 3
- 238000010998 test method Methods 0.000 claims abstract description 3
- 239000002689 soil Substances 0.000 claims description 10
- 238000002474 experimental method Methods 0.000 claims description 4
- 239000011150 reinforced concrete Substances 0.000 description 12
- 238000012360 testing method Methods 0.000 description 5
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000007789 sealing Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 125000003367 polycyclic group Chemical group 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M3/00—Investigating fluid-tightness of structures
- G01M3/02—Investigating fluid-tightness of structures by using fluid or vacuum
- G01M3/36—Investigating fluid-tightness of structures by using fluid or vacuum by detecting change in dimensions of the structure being tested
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明涉及一种模拟水、土荷载作用的盾构隧道管环抗渗性能试验方法,所采用的装置包括水压加载***、多个液压千斤顶4和水囊2,水囊2固定在管环的外部,根据管环的各条接缝位置在水囊的内层开设多排孔11;试验方法包括:将水囊2套装在管环上;布置承压板和液压千斤顶;水压加载***通过不同的水管10向水囊2的各个子水囊注水,当带刻度尺的压力水罐充有一定深度的水时停止注水,记录此时的刻度值,作为初始读数;控制液压千斤顶4对水囊加压以模拟实际盾构隧道所受到的水、土荷载,当发现漏水时维持荷载一段时间,记录维持荷载期间压力水罐刻度值;利用激光位移传感器可以测量管片接缝的张开量。
Description
技术领域
本发明属于隧道工程技术领域,涉及一种模拟水、土荷载作用的盾构隧道管环抗渗性能试验装置。
背景技术
目前,盾构隧道衬砌结构大多数是由预制钢筋混凝土管片和螺栓拼装而成的,由于隧道衬砌结构构造方面的原因,盾构隧道衬砌存在接缝,盾构隧道接缝分为纵向接缝和环向接缝,在不良地质条件、周边工程活动等因素作用下盾构隧道接缝有可能会出现张开变形及错位变形。调查发现,大多数情况下水是通过纵缝和环缝向隧道内渗漏,除纵缝和环缝渗水之外,螺栓孔也存在漏水现象。渗漏水会对盾构隧道结构和地铁运营安全造成威胁。目前盾构隧道抗渗性能试验装置主要测试接缝处弹性密封垫、嵌缝、螺栓孔、手孔封堵材料的极限抗渗能力,尚无测量一环或者多环管片渗水量的装置,所以亟待研制一种试验装置定量测量一环及多环管片的渗水量。
发明内容
本发明的目的就是提供一种模拟水、土荷载作用的盾构隧道管环抗渗性能试验装置,通过该试验装置能测量盾构隧道在模拟水、土荷载作用下管环的渗水量和管片张开量,用于解决现有技术中试验装置模拟试验不符合实际的问题。本发明的目的可以通过以下的试验方案来实现:
一种模拟水、土荷载作用的盾构隧道管环抗渗性能试验方法,用于由相邻管片1密封连接构成的管环的抗渗性能试验,所采用的试验装置包括水压加载***、多个液压千斤顶4和水囊2,水囊2固定在管环的外部,根据管环的各条接缝位置在水囊的内层开设多排孔11;水囊2被划分成多个子水囊,相邻子水囊之间留有足够的间隙,用以放置土压承压板17,水压加载***包括水箱6、加压泵7和带有刻度尺的压力水罐8,压力水罐8通过不同的水管10与水囊2的各个子水囊连接;试验方法包括下列步骤:
1)将水囊2套装在管环上,使得水囊内层的每排孔11各正对管环的一条接缝;
2)将土压承压板17置于相邻子水囊之间的间隙,将水压承压板3置于子水囊上,并在各个承压板上布置液压千斤顶4;
3)水压加载***通过不同的水管10向水囊2的各个子水囊注水,当带刻度尺的压力水罐充有一定深度的水时停止注水,记录此时的刻度值,作为初始读数;
4)控制液压千斤顶4对水囊加压以模拟实际盾构隧道所受到的水、土荷载,当发现漏水时维持荷载一段时间,记录维持荷载期间压力水罐刻度值,即可得知渗水量;
5)利用激光位移传感器可以测量管片接缝的张开量。
与现有技术相比,本发明具有以下特点:本发明用上、下、左、右四个千斤顶模拟盾构隧道衬砌结构受到上、下、左、右四个方向的土荷载,用其余的千斤顶模拟盾构隧道结构所受的径向的水荷载。水、土荷载加载量可以独立调节,从而可以测试任意的水、土荷载组合对盾构隧道衬砌结构的影响。本试验***能够测量模拟盾构隧道衬砌结构在实际受力情况下的管片的张开量,配合水压加载***能够测量盾构隧道管环在不同工况下的渗水量,得到渗水量和管片张开量、水压与管片张开量的关系,从而为隧道工程抗渗设计提供定量参考依据。
附图说明
图1是本发明实施例的结构示意图;
图2是水囊(充满水)的俯视图;
图3是图2的1-1剖视图;
图4是图3中A处的局部放大图;
图5是管片纵缝连接结构示意图;
图中,1-钢筋混凝土管片、2-水囊、3-水压承压板、4-液压千斤顶、5-千斤顶固定梁、6-水箱、7-加压泵、8-压力水罐、9-阀门、10-水管、11-方孔、12-弹性密封垫、13-直螺栓、14-螺栓密封垫、15-手孔、16-注水通道、17-土压承压板。
具体实施方式
下面结合附图和具体实施例来对本发明进行说明。
如图1所示,模拟水、土荷载作用的盾构隧道管环抗渗性能试验装置测试一环管片,每环管片有6块管片组成。钢筋混凝土管片1的接缝处有相对应的框形沟槽,该框形沟槽呈封闭形状,且内部填充有弹性密封垫12。钢筋混凝土管片1设有手孔15,手孔15中填有封堵材料。钢筋混凝土管片1还设有螺栓孔,通过连接螺栓固定连接,连接螺栓为直螺栓13,直螺栓13底部设有螺栓密封垫14。在实验时把水囊2套在钢筋混凝土管片1上,在水囊2与钢筋混凝土管片1接缝处设有一串具有一定间隔的方孔11,并在水囊2和钢筋混凝土管片1接触边缘涂上防水胶。水囊注水通道16与水压加载***相连。水压加载***由水箱6、加压泵7、压力水罐8以及阀门9组成。压力水罐8通过水管10与水囊2连接,每一个与水囊2连接的水管10都设有一个阀门9。水囊2被划分成多个子水囊,相邻子水囊之间留有足够的间隙,用以放置土压承压板17。在水囊2外圈有8片水压承压板3和4片土压承压板17,承压板与水囊2接触面设有橡胶板。将土压承压板17置于相邻子水囊之间的间隙,将水压承压板3置于子水囊上,在每块承压板外圈都设有一个液压千斤顶4,本实例共采用12个液压千斤顶4,承压板和液压千斤顶4固定连接。液压千斤顶4固定在千斤顶固定梁5上,采用厚钢板的基座为正方形,千斤顶固定梁5固定在基座上。
本实施例的模拟水、土荷载作用的盾构隧道管环抗渗性能试验装置在使用过程中需要与激光位移传感、液压千斤顶控制***等设备配合使用。
下面对本实例所涉及的试验流程进行说明:
1、首先将千斤顶固定梁5固定到基座的预定位置,接下来把与承压板固定好的液压千斤顶4固定到千斤顶固定梁5上。
2、将预先装配好的一环钢筋混凝土管片1吊装到基座的预定位置。
3、将水囊套装到管环预定位置,此时水囊内部方孔中央正对准钢筋混凝土管片1接缝。通过水压加载***向水囊注水,通过控制与注水通道16相连水管10上的阀门9依次向水囊2的四个子水囊注水,注水完成后打开所有与注水通道16相连水管10上的阀门9,当带刻度尺的压力水罐充满水时,记录此时的刻度值,作为初始读数,关闭与加压泵7相连水管上的阀门。
4、使用控制***控制液压千斤顶4对水囊加压以模拟实际盾构隧道所受到的水、土荷载,当发现漏水时维持荷载一段时间,记录维持荷载期间压力水罐刻度值,即可得知渗水量;利用激光位移传感器可以测量钢筋混凝土管片1接缝的张开量。通过对管环施加不同水、土荷载组合可以测得对应的渗水量和接缝张开量,从而得到渗水量和钢筋混凝土管片1张开量、水压与钢筋混凝土管片1张开量的关系。
Claims (2)
1.一种模拟水、土荷载作用的盾构隧道管环抗渗性能试验方法,用于由相邻管片(1)密封连接构成的管环的抗渗性能试验,所采用的试验装置包括水压加载***、多个液压千斤顶(4)和水囊(2),水囊(2)固定在管环的外部,根据管环的各条接缝位置在水囊的内层开设多排孔(11);水囊(2)被划分成多个子水囊,相邻子水囊之间留有足够的间隙,用以放置土压承压板(17),水压加载***包括水箱(6)、加压泵(7)和带有刻度尺的压力水罐8,压力水罐8通过不同的水管(10)与水囊(2)的各个子水囊连接。试验方法包括下列步骤:
1)将水囊(2)套装在管环上,使得水囊内层的每排孔(11)各正对管环的一条接缝;
2)将土压承压板(17)置于相邻子水囊之间的间隙,将水压承压板(3)置于子水囊上,并在各个承压板上布置液压千斤顶(4);
3)水压加载***通过不同的水管(10)向水囊(2)的各个子水囊注水,当带刻度尺的压力水罐充有一定深度的水时停止注水,记录此时的刻度值,作为初始读数;
4)控制液压千斤顶(4)对水囊加压以模拟实际盾构隧道所受到的水、土荷载,当发现漏水时维持荷载一段时间,记录维持荷载期间压力水罐刻度值,即可得知渗水量;
5)利用激光位移传感器可以测量管片接缝的张开量。
2.根据权利要求1所述的抗渗性能试验方法,其特征在于,土压承压板(17)和水压承压板(3)与水囊(2)的接触面还设有橡胶板。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710099671.1A CN106885661A (zh) | 2017-02-23 | 2017-02-23 | 模拟水、土荷载作用的盾构隧道管环抗渗性能试验方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710099671.1A CN106885661A (zh) | 2017-02-23 | 2017-02-23 | 模拟水、土荷载作用的盾构隧道管环抗渗性能试验方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106885661A true CN106885661A (zh) | 2017-06-23 |
Family
ID=59180025
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710099671.1A Pending CN106885661A (zh) | 2017-02-23 | 2017-02-23 | 模拟水、土荷载作用的盾构隧道管环抗渗性能试验方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106885661A (zh) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108414363A (zh) * | 2018-04-24 | 2018-08-17 | 华南理工大学 | 一种模拟输水隧洞高内水压的试验装置 |
CN108918287A (zh) * | 2018-09-19 | 2018-11-30 | 西安建筑科技大学 | 一种隧道蠕变模型试验装置及试验方法 |
CN109000899A (zh) * | 2018-05-03 | 2018-12-14 | 天津大学 | 盾构隧道管片缝隙张开量测量装置 |
CN109001094A (zh) * | 2018-05-03 | 2018-12-14 | 天津大学 | 一种盾构隧道渗水速率预测方法 |
CN109029308A (zh) * | 2018-05-03 | 2018-12-18 | 天津大学 | 盾构隧道管片缝隙张开量预测方法 |
CN109297658A (zh) * | 2018-09-19 | 2019-02-01 | 同济大学 | 一种测试盾构管片防水密封垫密封性能的方法 |
CN109342097A (zh) * | 2018-11-06 | 2019-02-15 | 宁波用躬科技有限公司 | 一种盾构法隧道综合试验平台及其试验方法 |
CN109357939A (zh) * | 2018-12-12 | 2019-02-19 | 中铁十八局集团有限公司 | 盾构空推现场试验方法 |
CN109459311A (zh) * | 2018-12-19 | 2019-03-12 | 中国地质大学(武汉) | 一种模拟不同受力条件下隧道管环受力变形的实验装置 |
CN109556965A (zh) * | 2018-11-26 | 2019-04-02 | 上海市基础工程集团有限公司 | 盾构管片力学性能模拟试验装置 |
CN109653208A (zh) * | 2019-01-07 | 2019-04-19 | 宁波工程学院 | 定向时时调控位移的隔离桩和方法 |
CN112147060A (zh) * | 2020-09-18 | 2020-12-29 | 徐州新通预制构件制造有限公司 | 一种模拟隧道的多灾种耦合实验***及其实验方法 |
CN112798189A (zh) * | 2021-02-09 | 2021-05-14 | 中建七局交通建设有限公司 | 一种盾构管片接缝防水性能测试试验装置及方法 |
CN112924296A (zh) * | 2021-03-03 | 2021-06-08 | 山东大学 | 海底盾构隧道受力变形及止水失效试验***及方法 |
CN113009112A (zh) * | 2021-03-08 | 2021-06-22 | 天津大学 | 一种挤压排液式盾构开挖模拟试验装置及方法 |
CN115839822A (zh) * | 2023-02-27 | 2023-03-24 | 交通运输部公路科学研究所 | 一种强降雨诱发山岭隧道淹没与抽排过程试验***及方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105300601A (zh) * | 2015-09-23 | 2016-02-03 | 同济大学 | 盾构隧道管片纵缝抗渗性能试验*** |
CN106198236A (zh) * | 2016-08-26 | 2016-12-07 | 武大巨成结构股份有限公司 | 一种管道内部均匀加载装置 |
CN106290001A (zh) * | 2016-08-30 | 2017-01-04 | 天津大学 | 盾构隧道管片衬砌受高温组合荷载作用的加载试验装置 |
-
2017
- 2017-02-23 CN CN201710099671.1A patent/CN106885661A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105300601A (zh) * | 2015-09-23 | 2016-02-03 | 同济大学 | 盾构隧道管片纵缝抗渗性能试验*** |
CN106198236A (zh) * | 2016-08-26 | 2016-12-07 | 武大巨成结构股份有限公司 | 一种管道内部均匀加载装置 |
CN106290001A (zh) * | 2016-08-30 | 2017-01-04 | 天津大学 | 盾构隧道管片衬砌受高温组合荷载作用的加载试验装置 |
Cited By (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108414363A (zh) * | 2018-04-24 | 2018-08-17 | 华南理工大学 | 一种模拟输水隧洞高内水压的试验装置 |
CN109000899A (zh) * | 2018-05-03 | 2018-12-14 | 天津大学 | 盾构隧道管片缝隙张开量测量装置 |
CN109001094A (zh) * | 2018-05-03 | 2018-12-14 | 天津大学 | 一种盾构隧道渗水速率预测方法 |
CN109029308A (zh) * | 2018-05-03 | 2018-12-18 | 天津大学 | 盾构隧道管片缝隙张开量预测方法 |
CN108918287A (zh) * | 2018-09-19 | 2018-11-30 | 西安建筑科技大学 | 一种隧道蠕变模型试验装置及试验方法 |
CN109297658A (zh) * | 2018-09-19 | 2019-02-01 | 同济大学 | 一种测试盾构管片防水密封垫密封性能的方法 |
CN108918287B (zh) * | 2018-09-19 | 2023-09-19 | 西安建筑科技大学 | 一种隧道蠕变模型试验装置及试验方法 |
CN109342097A (zh) * | 2018-11-06 | 2019-02-15 | 宁波用躬科技有限公司 | 一种盾构法隧道综合试验平台及其试验方法 |
CN109556965B (zh) * | 2018-11-26 | 2021-07-30 | 上海市基础工程集团有限公司 | 盾构管片力学性能模拟试验装置 |
CN109556965A (zh) * | 2018-11-26 | 2019-04-02 | 上海市基础工程集团有限公司 | 盾构管片力学性能模拟试验装置 |
CN109357939B (zh) * | 2018-12-12 | 2023-11-21 | 中铁十八局集团有限公司 | 盾构空推现场试验方法 |
CN109357939A (zh) * | 2018-12-12 | 2019-02-19 | 中铁十八局集团有限公司 | 盾构空推现场试验方法 |
CN109459311A (zh) * | 2018-12-19 | 2019-03-12 | 中国地质大学(武汉) | 一种模拟不同受力条件下隧道管环受力变形的实验装置 |
CN109459311B (zh) * | 2018-12-19 | 2024-02-27 | 中国地质大学(武汉) | 一种模拟不同受力条件下隧道管环受力变形的实验装置 |
CN109653208A (zh) * | 2019-01-07 | 2019-04-19 | 宁波工程学院 | 定向时时调控位移的隔离桩和方法 |
CN112147060B (zh) * | 2020-09-18 | 2023-03-10 | 徐州新通预制构件制造有限公司 | 一种模拟隧道的多灾种耦合实验***及其实验方法 |
CN112147060A (zh) * | 2020-09-18 | 2020-12-29 | 徐州新通预制构件制造有限公司 | 一种模拟隧道的多灾种耦合实验***及其实验方法 |
CN112798189A (zh) * | 2021-02-09 | 2021-05-14 | 中建七局交通建设有限公司 | 一种盾构管片接缝防水性能测试试验装置及方法 |
CN112924296B (zh) * | 2021-03-03 | 2022-06-17 | 山东大学 | 海底盾构隧道受力变形及止水失效试验***及方法 |
CN112924296A (zh) * | 2021-03-03 | 2021-06-08 | 山东大学 | 海底盾构隧道受力变形及止水失效试验***及方法 |
CN113009112B (zh) * | 2021-03-08 | 2023-01-31 | 天津大学 | 一种挤压排液式盾构开挖模拟试验装置及方法 |
CN113009112A (zh) * | 2021-03-08 | 2021-06-22 | 天津大学 | 一种挤压排液式盾构开挖模拟试验装置及方法 |
CN115839822A (zh) * | 2023-02-27 | 2023-03-24 | 交通运输部公路科学研究所 | 一种强降雨诱发山岭隧道淹没与抽排过程试验***及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106885661A (zh) | 模拟水、土荷载作用的盾构隧道管环抗渗性能试验方法 | |
CN106679904A (zh) | 模拟水、土荷载作用的盾构隧道管环抗渗性能试验装置 | |
Ding et al. | Development and application of the integrated sealant test apparatus for sealing gaskets in tunnel segmental joints | |
CN206504840U (zh) | 模拟水、土荷载作用的盾构隧道管环抗渗性能试验装置 | |
CN109724865B (zh) | 隧道衬砌水压监测***试验装置及试验方法 | |
CN106872334B (zh) | 一种突水突泥开挖模拟装置及模拟突水突泥灾害的方法 | |
CN108169427B (zh) | 一种平面应力模型的隧道突水物理模拟试验***及试验方法 | |
CN205038028U (zh) | 一种盾构隧道多道防线止水密封的接缝防水性能试验装置 | |
Zhang et al. | Waterproofing behavior of sealing gaskets for circumferential joints in shield tunnels: A full-scale experimental investigation | |
CN104865012A (zh) | 隧道接缝防水性能试验装置及试验方法 | |
CN103512806B (zh) | 一种混凝土圆筒壳安全性能的新型测试方法 | |
CN105486840A (zh) | 一种固结渗透联合实验装置 | |
CN111351699B (zh) | 二维承压水上采煤相似模拟试验装置及使用方法 | |
CN110082218A (zh) | 一种隧洞衬砌结构模型试验装置及试验方法 | |
CN104568595A (zh) | 一种煤层开采底板注浆减渗模拟试验*** | |
CN105300601A (zh) | 盾构隧道管片纵缝抗渗性能试验*** | |
CN107121245A (zh) | 盾构隧道衬砌管片两道密封垫防水能力测试装置及方法 | |
CN204924568U (zh) | 隧道接缝防水性能试验装置 | |
CN208969089U (zh) | 漏点位置、漏缝宽度可控的海底盾构隧道模型试验装置 | |
Zhang et al. | An incident of water and soil gushing in a metro tunnel due to high water pressure in sandy silt | |
CN206038341U (zh) | 模拟隧道内水压力的试验装置 | |
CN108319805A (zh) | 一种等效水平受荷桩受力过程和荷载传递机理的模拟方法 | |
Zhou et al. | A fluid-solid coupled modeling on water seepage through gasketed joint of segmented tunnels | |
CN105334142A (zh) | 一种用于模拟盾构泥膜形成的实验装置 | |
CN107401403A (zh) | 页岩气井多级压裂水泥环气密封完整可视评价装置和方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170623 |