CN106875152A - A kind of task creation method and device - Google Patents

A kind of task creation method and device Download PDF

Info

Publication number
CN106875152A
CN106875152A CN201611167900.0A CN201611167900A CN106875152A CN 106875152 A CN106875152 A CN 106875152A CN 201611167900 A CN201611167900 A CN 201611167900A CN 106875152 A CN106875152 A CN 106875152A
Authority
CN
China
Prior art keywords
task
target resource
resource
template
created
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611167900.0A
Other languages
Chinese (zh)
Inventor
张海侠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
New H3C Technologies Co Ltd
Original Assignee
New H3C Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by New H3C Technologies Co Ltd filed Critical New H3C Technologies Co Ltd
Priority to CN201611167900.0A priority Critical patent/CN106875152A/en
Publication of CN106875152A publication Critical patent/CN106875152A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/101Collaborative creation, e.g. joint development of products or services

Landscapes

  • Business, Economics & Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)

Abstract

The embodiment of the present application discloses a kind of task creation method and device, is related to field of computer technology, wherein, the above method includes:Determine the target resource that required by task to be created is wanted;The corresponding To Template file of the target resource is obtained from the foundation forms storehouse for previously generating, wherein, the foundation forms storehouse, for storing the corresponding template file of various resources;The target resource according to the To Template document creation, completes to create the task to be created.The scheme provided using the embodiment of the present application creates task, can reduce the workload and the probability of error of user during task creation.

Description

A kind of task creation method and device
Technical field
The application is related to field of computer technology, more particularly to a kind of task creation method and device.
Background technology
As the fast development of hardware technology and network technology, various systems are more and more huger, these systems are supported Task it is also more and more, wherein, customizable task is widely used one kind in numerous task types.
For task, corresponding one or more resource of task in the prior art, is appointed customizable is created When business, be normally based on the resource of template establishment task, and then complete the establishment of task, for example, create successively task 1, During 3 three tasks of task 2 and task, detailed process is as follows:
First, task 1 is created:The template file of the correlation of task 1 is write firstly the need of user, these template files are then based on Asset creation is completed, establishment task 1 is completed;
2nd, task 2 is created:The template file of the correlation of task 2 is write firstly the need of user, these template files are then based on Asset creation is completed, establishment task 2 is completed;
3rd, the task 3 that task 1 and the series connection of task 2 are performed is created:The template text of the correlation of task 1 is write firstly the need of user The template file of part, the correlation of task 2, is then based on the template file related to task 2 of above-mentioned task 1 and completes asset creation, complete Into establishment task 3.
Can be very good to create above three task successively using aforesaid way, but when task 1 and task 2 is created, In the case that user had write correlate template file, when creating task 3, it is still desirable to which user writes task 1 and task 2 again Correlate template file, amount of user effort increase is not only resulted in, write template file again in addition and also increase template file Wrong probability, that is, increased the probability malfunctioned during task creation.
The content of the invention
The embodiment of the present application discloses a kind of task creation method and device, and the work of user in task process is created to reduce Measure, reduce the probability malfunctioned during task creation.
To reach above-mentioned purpose, the embodiment of the present application discloses a kind of task creation method, and methods described includes:
Determine the target resource that required by task to be created is wanted;
The corresponding To Template file of the target resource is obtained from the foundation forms storehouse for previously generating, wherein, it is described Foundation forms storehouse, for storing the corresponding template file of various resources;
The target resource according to the To Template document creation, completes to create the task to be created.
To reach above-mentioned purpose, the embodiment of the present application discloses a kind of task creation device, and described device includes:
Resource determination module, for determining the target resource that required by task to be created is wanted;
Template obtains module, for obtaining the corresponding target mould of the target resource from the foundation forms storehouse for previously generating Plate file, wherein, the foundation forms storehouse, for storing the corresponding template file of various resources;
Task creation module, for the target resource according to the To Template document creation, completes to be treated described in establishment Establishment task.
As seen from the above, in the scheme that the embodiment of the present application is provided, after determining the target resource that required by task to be created is wanted, The corresponding To Template file of target resource is obtained from the foundation forms storehouse for previously generating, is then created according to To Template file Target resource is built, completes to create task to be created.In the scheme provided due to the embodiment of the present application, To Template file is basis Resource is obtained with the corresponding relation of template file from the foundation forms storehouse for previously generating, so nothing during establishment task Need user first to write template for task every time, thus reduce the workload of user, further, since in foundation forms storehouse Same template file only needs user to write once, it is thus possible to which to reduce write template text due to repeating during task creation Part and the error probability that brings.
Brief description of the drawings
In order to illustrate more clearly of the embodiment of the present application or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of application, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
A kind of schematic flow sheet of task creation method that Fig. 1 is provided for the embodiment of the present application;
The schematic flow sheet of another task creation method that Fig. 2 is provided for the embodiment of the present application;
A kind of structural representation of task creation device that Fig. 3 is provided for the embodiment of the present application;
The structural representation of another task creation device that Fig. 4 is provided for the embodiment of the present application.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present application, the technical scheme in the embodiment of the present application is carried out clear, complete Site preparation is described, it is clear that described embodiment is only some embodiments of the present application, rather than whole embodiments.It is based on Embodiment in the application, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of the application protection.
A kind of schematic flow sheet of task creation method that Fig. 1 is provided for the embodiment of the present application, the method includes:
S101:Determine the target resource that required by task to be created is wanted.
Specifically, may be received before task to be created is created as the equipment of executive agent to be created for this The task creation request of task, wherein, can carry above-mentioned required by task resource to be created in above-mentioned task creation request The information such as mark, in consideration of it, when determining the target resource of task to be created, can be according to carrying in the request of above-mentioned task creation The information such as the mark of resource, determine target resource.
The target resource of above-mentioned task to be created can simply correspond to a resource, it is also possible to corresponding to two and its with On resource, in addition, the resource corresponding to target resource can be identical resource, or the resource for differing, this Shen Please it is defined not to this.
S102:The corresponding To Template file of target resource is obtained from the foundation forms storehouse for previously generating.
Wherein, above-mentioned foundation forms storehouse, for storing the corresponding template file of various resources, that is to say, that pre-build Corresponding relation between resource and template file, above-mentioned resource can be that single resource, or single resource carry out group The combined resource that conjunction is obtained, the application is defined not to this.
It should be understood that the template file in above-mentioned foundation forms storehouse can be the template file being externally introduced, also may be used To be user's template file for directly writing in advance according to demand, the application is defined not to this.
Can be externally introduced in view of the file in above-mentioned foundation forms storehouse, that is, template file can be realized It is shared, then during in order that obtaining the template file during user uses foundation forms storehouse in other equipment, to be not repeated to write this A little template files, can also derive the template file in above-mentioned foundation forms storehouse.
Although in addition, can cannot ensure current certain comprising many template files in above-mentioned foundation forms storehouse To Template file comprising target resource.The corresponding To Template of target resource is not included currently in above-mentioned foundation forms storehouse During file, in a kind of implementation, To Template can be obtained by way of user directly writes above-mentioned To Template file File.
Further, after user writes the above-mentioned To Template file of completion, can also be according to target resource and above-mentioned mesh Corresponding relation between mark template file, To Template file is stored into above-mentioned foundation forms storehouse, is so creating other When above-mentioned To Template file is also required to during task, To Template text can be directly obtained from foundation forms storehouse Part.
From for the angle of storage location, above-mentioned foundation forms storehouse can be in the ATL being locally stored, such case Down, it is necessary to when obtaining template file, directly access the foundation forms storehouse being locally stored and can obtain this document;Above-mentioned foundation forms Storehouse can also be the ATL stored in other equipment, in this case, it is necessary to when obtaining template file, need to be by accessing it His equipment and then the foundation forms storehouse for wherein storing is had access to, then can just obtain above-mentioned template file, so can also be effective Realize template file share.
S103:According to To Template document creation target resource, complete to create task to be created.
As seen from the above, in the scheme that the present embodiment is provided, after determining the target resource that required by task to be created is wanted, from pre- The corresponding To Template file of target resource is obtained in the foundation forms storehouse for first generating, then according to To Template document creation mesh Mark resource, completes to create task to be created.In the scheme provided due to the present embodiment, To Template file is according to resource and mould What the corresponding relation of plate file was obtained from the foundation forms storehouse for previously generating, so every without user during establishment task It is secondary first to write template for task, thus the workload of user is reduced, further, since the same template in foundation forms storehouse File only needs user to write once, it is thus possible to which reducing brought due to repeating to write template file during task creation Error probability.
In a kind of implementation of the application, referring to Fig. 2, there is provided the flow of another task creation method is illustrated Figure, compared with previous embodiment, in the present embodiment, when target resource includes at least two resources, according to To Template file Target resource is created, the step of creating task to be created S103 is completed, including:
S103A:The corresponding To Template file of each target resource is combined, gang form file is obtained.
Wherein, at least two resources that above-mentioned target resource is included are probably same resource, it is also possible to different The resource planted, the application is defined not to this.
Specifically, when above-mentioned at least two resource belongs to same resource, the corresponding template file of these resources is phase Together, when above-mentioned at least two resource belongs to not resource of the same race, the corresponding template file of these resources is differed.
S103B:According to gang form document creation target resource, complete to create task to be created.
Because user is when initially template file is write, typically for the template text for needing the task of single resource to write Part, but being continually changing with user's request, on the basis of the single resource tasks of above-mentioned needs may extend one is Arrange related task, the resource no longer unification that these required by task for extending are wanted, it may be possible to aforesaid plurality of single resource Combination.According to above-mentioned embodiment illustrated in fig. 2 provide technical scheme, run into after task as the above-mentioned task class for extending, Gang form file can be obtained by way of being combined to template file, completes to create target resource, so basic mould Although in the absence of the template file of the corresponding combined resource of multiple single resources in plate storehouse, not needing still user to write again Write template file.
In view of the foregoing, in a kind of implementation of the application, in step S103B according to gang form document creation After target resource, a kind of combined resource can also be determined according to above-mentioned target resource, identified combined resource can be referred to as It is objective cross resource, and according to the corresponding relation between the objective cross resource and combinations thereof template file, by above-mentioned group Shuttering file is stored into foundation forms storehouse.
So during follow-up task creation, if in the case of needing to create above-mentioned objective cross resource again, can Directly to find the corresponding gang form file of above-mentioned objective cross resource from foundation forms storehouse, and without finding each one by one The template file of target resource, then template file combination is carried out, target resource is created, the speed of task creation can be improved.
Wherein, when determining a kind of combined resource according to above-mentioned target resource, each involved target resource can be entered Row combination operation, and then determine a kind of combined resource;Combinations thereof operation can not also be carried out, and it is each involved by only recording Syntagmatic between individual target resource, and then determine a kind of combined resource.The application is only illustrated as example, not The application is constituted and is limited.
In addition, in view of the situation, in foundation forms storehouse involved in above-mentioned S102, can be stored with single resource pair The template file answered, it is also possible to the corresponding template file of combined resource that two or more resource that is stored with is formed.
As seen from the above, in the scheme that the present embodiment is provided, in the case where target resource includes at least two resources, can The corresponding template file of each target resource is found from foundation forms storehouse with elder generation, then these template files are combined, obtained Gang form file is obtained, gang form document creation target resource is then based on again, complete the establishment of task to be created.Therefore i.e. Make not comprising in the case of the corresponding complete template file of all target resources in foundation forms storehouse, still without user Template file is write, the workload and the probability of storage of user during task creation is reduce further.
Due to the identical resource correspondence identical template file in foundation forms storehouse, and phase can be included in target resource Same resource, therefore, based on the embodiment shown in above-mentioned Fig. 2, when at least two identical resources is included in target resource, can To create target resource by way of generating gang form.But can be included in the gang form file for like this being generated The content for repeating, the memory space for causing generated gang form file to take is larger, and the essence of the gang form file It is template file identical corresponding with resource.
Based on above-mentioned situation, in a kind of implementation of the application, at least two identical resources are included in target resource When, according to To Template document creation target resource, completing the step of creating task to be created S103 can include:
The value of the first attribute of the corresponding To Template file of either objective resource is set to the quantity of target resource, Wherein, above-mentioned first attribute is:For the attribute of same asset occurrence number in expression task;
According to the above-mentioned quantity of the To Template document creation target resource set after the first attribute, complete establishment and treat Establishment task.
It is assumed that target resource includes 3 resource A, the corresponding template files of resource A are FA, then according to the mode shown in Fig. 2 Template file F can occur three times in the gang form file of generationAContent, and apply this implementation provide scheme, only The template file F that will need to be obtained from foundation forms storehouseAThe value of the first attribute be set to 3, both compare, this realization New gang form file need not be generated in mode, the process of generation gang form file is eliminated, establishment task can be accelerated Speed, additionally, due to gang form file need not be generated, and then need of the task creation process for memory space can be reduced Ask.
It is similar with above-mentioned situation, in a kind of implementation of the application, when target resource needs to be called at least twice, According to To Template document creation target resource, completing the step of creating task to be created S103 can include:
The value of the second attribute of To Template file is set into target resource needs called number of times, wherein, on Stating the second attribute is:The attribute of called number of times is needed for same resource in expression task;
According to the To Template document creation target resource set after the second attribute, complete to create task to be created, so that Above-mentioned target resource for several times is called when must perform task to be created.
When so creating above-mentioned task to be created, target resource is only created once, but due to belonging to above-mentioned second Property value set, when performing the task, can repeatedly call above-mentioned target resource according to the value of the second attribute, and then Simplify task creation process.
As seen from the above, when the scheme for being provided using the present embodiment creates task, need to be called at least in target resource In the case of twice, without generating new gang form file, the process of generation gang form file is eliminated, wound can be accelerated The speed of task is built, additionally, due to need not generate gang form file, and then it is empty for storage to reduce task creation process Between demand.
Corresponding with above-mentioned task creation method, the embodiment of the present application additionally provides a kind of task creation device.
A kind of structural representation of task creation device that Fig. 3 is provided for the embodiment of the present application, the device includes:
Resource determination module 301, for determining the target resource that required by task to be created is wanted;
Template obtains module 302, for obtaining the corresponding mesh of the target resource from the foundation forms storehouse for previously generating Mark template file, wherein, the foundation forms storehouse, for storing the corresponding template file of various resources;
Task creation module 303, for the target resource according to the To Template document creation, completes to create described Task to be created.
As seen from the above, in the scheme that the present embodiment is provided, after determining the target resource that required by task to be created is wanted, from pre- The corresponding To Template file of target resource is obtained in the foundation forms storehouse for first generating, then according to To Template document creation mesh Mark resource, completes to create task to be created.In the scheme provided due to the present embodiment, To Template file is according to resource and mould What the corresponding relation of plate file was obtained from the foundation forms storehouse for previously generating, so every without user during establishment task It is secondary first to write template for task, thus the workload of user is reduced, further, since the same template in foundation forms storehouse File only needs user to write once, it is thus possible to which reducing brought due to repeating to write template file during task creation Error probability.
In a kind of implementation of the application, referring to Fig. 4, there is provided the structural representation of another task creation device Figure, compared with previous embodiment, in the present embodiment, when the target resource includes at least two resources, the task creation Module 303, including:
Template obtaining unit 303A, for carrying out group to the corresponding To Template file of each target resource Close, obtain gang form file;
First task creating unit 303B, for the target resource according to the gang form document creation, completes wound Build the task to be created.
Based on embodiment illustrated in fig. 4, in a kind of implementation of the application, above-mentioned task creation device can also be wrapped Include:
Resource determining unit, for determining a kind of combined resource according to the target resource;
File storage unit, for according to the corresponding relation between the combined resource and the gang form file, inciting somebody to action The gang form file is stored into the foundation forms storehouse.
As seen from the above, in the scheme that the present embodiment is provided, in the case where target resource includes at least two resources, can The corresponding template file of each target resource is found from foundation forms storehouse with elder generation, then these template files are combined, obtained Gang form file is obtained, gang form document creation target resource is then based on again, complete the establishment of task to be created.Therefore i.e. Make not comprising in the case of the corresponding complete template file of all target resources in foundation forms storehouse, still without user Template file is write, the workload and the probability of storage of user during task creation is reduce further.
In a kind of implementation of the application, when the target resource includes at least two identical resources, described Business creation module 303 can include:
First attribute setting unit, for by the first category of the corresponding To Template file of any target resource The value of property is set to the quantity of the target resource, wherein, first attribute is:Go out for same asset in expression task The attribute of occurrence number;
Second task creation unit, for according to the To Template document creation set after first attribute The quantity target resource, completes to create the task to be created.
In a kind of implementation of the application, when the target resource needs to be called at least twice, the task wound Modeling block 303 can include:
Second attribute setting unit, for the value of the second attribute of the To Template file to be set into the target Resource needs called number of times, wherein, second attribute is:Called number of times is needed for same resource in expression task Attribute;
3rd task creation unit, for according to the To Template document creation set after second attribute Target resource, completes to create the task to be created, is called during causing and perform the task to be created described secondary described for several times Target resource.
As seen from the above, when the scheme for being provided using above-mentioned two embodiment creates task, at least two are included in target resource In the case that individual identical resource or target resource need to be called at least twice, without generating new gang form file, The process of generation gang form file is eliminated, the speed of establishment task can be accelerated, additionally, due to gang form need not be generated File, and then demand of the task creation process for memory space can be reduced.
For device embodiment, because it is substantially similar to embodiment of the method, so description is fairly simple, it is related Part is illustrated referring to the part of embodiment of the method.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or deposited between operating In any this actual relation or order.And, term " including ", "comprising" or its any other variant be intended to Nonexcludability is included, so that process, method, article or equipment including a series of key elements not only will including those Element, but also other key elements including being not expressly set out, or also include being this process, method, article or equipment Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that Also there is other identical element in process, method, article or equipment including the key element.
One of ordinary skill in the art will appreciate that realize that all or part of step in above method implementation method is can Completed with instructing the hardware of correlation by program, described program can be stored in computer read/write memory medium, The storage medium for obtaining designated herein, such as:ROM/RAM, magnetic disc, CD etc..
The preferred embodiment of the application is the foregoing is only, the protection domain of the application is not intended to limit.It is all Any modification, equivalent substitution and improvements made within spirit herein and principle etc., are all contained in the protection domain of the application It is interior.

Claims (10)

1. a kind of task creation method, it is characterised in that methods described includes:
Determine the target resource that required by task to be created is wanted;
The corresponding To Template file of the target resource is obtained from the foundation forms storehouse for previously generating, wherein, the basis ATL, for storing the corresponding template file of various resources;
The target resource according to the To Template document creation, completes to create the task to be created.
2. method according to claim 1, it is characterised in that when the target resource includes at least two resources, institute The target resource according to the To Template document creation is stated, the step of creating the task to be created is completed, including:
The corresponding To Template file of each target resource is combined, gang form file is obtained;
The target resource according to the gang form document creation, completes to create the task to be created.
3. method according to claim 2, it is characterised in that methods described also includes:
A kind of combined resource is determined according to the target resource;
According to the corresponding relation between the combined resource and the gang form file, by the gang form file store to In the foundation forms storehouse.
4. method according to claim 1, it is characterised in that include at least two identical resources in the target resource When, the target resource according to the To Template document creation completes the step of creating the task to be created, bag Include:
The value of the first attribute of the corresponding To Template file of any target resource is set to the target money The quantity in source, wherein, first attribute is:For the attribute of same asset occurrence number in expression task;
The quantity target resource according to the To Template document creation set after first attribute, completes wound Build the task to be created.
5. method according to claim 1, it is characterised in that the target resource need it is called at least twice when, The target resource according to the To Template document creation, completes the step of creating the task to be created, including:
The value of the second attribute of the To Template file is set into the target resource needs called number of times, its In, second attribute is:The attribute of called number of times is needed for same resource in expression task;
The target resource according to the To Template document creation set after second attribute, completes to wait to create described in establishment Task is built, described target resource described for several times is called during causing and perform the task to be created.
6. a kind of task creation device, it is characterised in that described device includes:
Resource determination module, for determining the target resource that required by task to be created is wanted;
Template obtains module, for obtaining the corresponding To Template text of the target resource from the foundation forms storehouse for previously generating Part, wherein, the foundation forms storehouse, for storing the corresponding template file of various resources;
Task creation module, for the target resource according to the To Template document creation, completes to create described to be created Task.
7. device according to claim 6, it is characterised in that when the target resource includes at least two resources, institute Task creation module is stated, including:
Template obtaining unit, for being combined to the corresponding To Template file of each target resource, acquisition group Shuttering file;
First task creating unit, for the target resource according to the gang form document creation, completes to be treated described in establishment Establishment task.
8. device according to claim 7, it is characterised in that described device also includes:
Resource determining unit, for determining a kind of combined resource according to the target resource;
File storage unit, for according to the corresponding relation between the combined resource and the gang form file, by described in Gang form file is stored into the foundation forms storehouse.
9. device according to claim 6, it is characterised in that include at least two identical resources in the target resource When, the task creation module, including:
First attribute setting unit, for by the first attribute of the corresponding To Template file of any target resource Value is set to the quantity of the target resource, wherein, first attribute is:Go out occurrence for same asset in expression task Several attributes;
Second task creation unit, for the quantity according to the To Template document creation set after first attribute The individual target resource, completes to create the task to be created.
10. device according to claim 6, it is characterised in that the target resource need it is called at least twice when, The task creation module, including:
Second attribute setting unit, for the value of the second attribute of the To Template file to be set into the target resource Called number of times is needed, wherein, second attribute is:The category of called number of times is needed for same resource in expression task Property;
3rd task creation unit, for the target according to the To Template document creation set after second attribute Resource, is completed to create the task to be created, and described target described for several times is called during causing and perform the task to be created Resource.
CN201611167900.0A 2016-12-16 2016-12-16 A kind of task creation method and device Pending CN106875152A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611167900.0A CN106875152A (en) 2016-12-16 2016-12-16 A kind of task creation method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611167900.0A CN106875152A (en) 2016-12-16 2016-12-16 A kind of task creation method and device

Publications (1)

Publication Number Publication Date
CN106875152A true CN106875152A (en) 2017-06-20

Family

ID=59164829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611167900.0A Pending CN106875152A (en) 2016-12-16 2016-12-16 A kind of task creation method and device

Country Status (1)

Country Link
CN (1) CN106875152A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107729139A (en) * 2017-09-18 2018-02-23 北京京东尚科信息技术有限公司 A kind of method and apparatus for concurrently obtaining resource
CN107844371A (en) * 2017-10-12 2018-03-27 北京京东尚科信息技术有限公司 Task processing method, system and electronic equipment
CN108733472A (en) * 2018-03-21 2018-11-02 北京猎户星空科技有限公司 A kind of task creation method and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2546520A1 (en) * 2006-05-11 2007-11-11 Cognos Incorporated Adaptive analytics system and method of using same
CN101188692A (en) * 2007-11-19 2008-05-28 新奥特(北京)视频技术有限公司 An image preparing and playing system by using share template library
JP2008269551A (en) * 2007-03-29 2008-11-06 Ricoh Co Ltd Contract document preparation device, and contract document preparation method
CN101667172A (en) * 2009-09-14 2010-03-10 成都市科陆洲电子有限公司 Method for making spreadsheet by utilizing word
CN103793223A (en) * 2013-12-27 2014-05-14 远光软件股份有限公司 Rule creating method and system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2546520A1 (en) * 2006-05-11 2007-11-11 Cognos Incorporated Adaptive analytics system and method of using same
JP2008269551A (en) * 2007-03-29 2008-11-06 Ricoh Co Ltd Contract document preparation device, and contract document preparation method
CN101188692A (en) * 2007-11-19 2008-05-28 新奥特(北京)视频技术有限公司 An image preparing and playing system by using share template library
CN100531322C (en) * 2007-11-19 2009-08-19 新奥特(北京)视频技术有限公司 An image preparing and playing system by using share template library
CN101667172A (en) * 2009-09-14 2010-03-10 成都市科陆洲电子有限公司 Method for making spreadsheet by utilizing word
CN103793223A (en) * 2013-12-27 2014-05-14 远光软件股份有限公司 Rule creating method and system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107729139A (en) * 2017-09-18 2018-02-23 北京京东尚科信息技术有限公司 A kind of method and apparatus for concurrently obtaining resource
CN107729139B (en) * 2017-09-18 2021-02-26 北京京东尚科信息技术有限公司 Method and device for concurrently acquiring resources
CN107844371A (en) * 2017-10-12 2018-03-27 北京京东尚科信息技术有限公司 Task processing method, system and electronic equipment
CN108733472A (en) * 2018-03-21 2018-11-02 北京猎户星空科技有限公司 A kind of task creation method and device

Similar Documents

Publication Publication Date Title
US11068508B2 (en) Methods and systems for multi-dimensional aggregation using composition
US8224825B2 (en) Graph-processing techniques for a MapReduce engine
KR101959153B1 (en) System for efficient processing of transaction requests related to an account in a database
CN103853618B (en) Resource allocation method with minimized cloud system cost based on expiration date drive
EP3459017A1 (en) Progressive neural networks
JP2019511059A (en) Method and device for outputting risk information and constructing risk information
CN104199912B (en) A kind of method and device of task processing
US11068507B2 (en) Methods and systems for multi-dimensional aggregation using composition
CN105897805A (en) Method and device for cross-layer scheduling of resources of data center with multi-layer architecture
CN108170656A (en) Template establishment method, document creating method, rendering intent and device
CN106548261A (en) A kind of Business Process Control method, device and electronic equipment
CN109408590A (en) Expansion method, device, equipment and the storage medium of distributed data base
CN109063049A (en) A kind of account processing method, device, equipment and the storage medium of block chain network
CN108446976A (en) A kind of common reserve fund transfer method, computer readable storage medium and terminal device
CN106875152A (en) A kind of task creation method and device
WO2021057482A1 (en) Method and device for generating bloom filter in blockchain
CN108241531A (en) A kind of method and apparatus for distributing resource for virtual machine in the cluster
Xia et al. Cloud security and privacy metamodel
TW201915893A (en) Dynamically-organized system for distributed calculations
CN111402058A (en) Data processing method, device, equipment and medium
CN113206893B (en) Method for block synchronization and node joining block chain network
CN109344173B (en) Data management method and device and data structure
JP2013089236A (en) System and method for parallel edge division in and/or graph search
CN104239520B (en) A kind of HDFS data block Placement Strategies based on historical information
Conde A MIP formulation for the minmax regret total completion time in scheduling with unrelated parallel machines

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170620

RJ01 Rejection of invention patent application after publication