CN106869193A - Stake heart centering method and grout pile heart centralising device during filling pile construction - Google Patents

Stake heart centering method and grout pile heart centralising device during filling pile construction Download PDF

Info

Publication number
CN106869193A
CN106869193A CN201710053788.6A CN201710053788A CN106869193A CN 106869193 A CN106869193 A CN 106869193A CN 201710053788 A CN201710053788 A CN 201710053788A CN 106869193 A CN106869193 A CN 106869193A
Authority
CN
China
Prior art keywords
fix bar
pair
bracing wire
heart
stake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710053788.6A
Other languages
Chinese (zh)
Other versions
CN106869193B (en
Inventor
焦德贵
崔华久
潘立
吴小鹏
韩云鹏
艾迪飞
陈仲明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201710053788.6A priority Critical patent/CN106869193B/en
Publication of CN106869193A publication Critical patent/CN106869193A/en
Application granted granted Critical
Publication of CN106869193B publication Critical patent/CN106869193B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention provides the stake heart centering method during a kind of filling pile construction and grout pile heart centralising device, first the stake heart neighbouring position in bored concrete pile finds four suitable positions, erected between relative 2 points again and set fixed beam and connected with to bracing wire, make two stakes that bored concrete pile is intersected to bracing wire side in the heart, finely tune two adjacent fixed beams respectively again, and cause that two intersect at the surface that an intersection point and the intersection point are located at the stake heart to bracing wire, remove first pair of bracing wire and second pair of bracing wire according to positioning instrument.In later stage filling pile construction, the stake heart of quick centering bored concrete pile by setting first pair of bracing wire and second pair of bracing wire between fixed beam, can be carried out with this.The present invention is solved during filling pile construction, and when carrying out centering to the stake heart, traditional centering method is only with the problem that naked-eye observation error is big.

Description

Stake heart centering method and grout pile heart centralising device during filling pile construction
Technical field
The present invention relates to the realm of building construction, and in particular to stake heart centering method and filling during a kind of filling pile construction Note stake stake heart centralising device.
Background technology
Bored concrete pile is a kind of foundation pile for being widely used in the fields such as industrial premises, civil buildings, high ferro, bridge.Filling Before note pile driving construction, usual technical staff is accurately positioned and is put a little using instrument and equipment to the stake heart of stake position.In bored concrete pile Work progress in, such as:Construction pile foundation, position of p ile machine, drill bit of pile machine positioning, pile foundation casing positioning, pile foundation steel bar cage positioning etc. Be required for the oriented stake heart repeatedly in place with check.Because the job site environment of bored concrete pile is poor, foundation ditch is uneven, mud Muddy water overflows, work progress, fixed pile crown casing, mechanical hole building, cuts the earth repeatedly, unloads soil, scarfing cinder, control hole depth, stake machine and pile crown To repeatedly move often also can off normal, so need to the oriented stake heart repeatedly in place with check.
Need to check the oriented stake heart or to it is middle when, conventional construction method is to utilize naked-eye observation, is checked Or the error of centralization is larger, engineering construction quality is influenceed.
The content of the invention
To overcome the defect existing for prior art, now provide a kind of stake heart centering method during filling pile construction and Grout pile heart centralising device, to solve during filling pile construction, is checked the oriented stake heart or during centering, is passed The centering method of system is only with the problem that naked-eye observation error is big.
To achieve the above object, on the one hand, the stake position centering method during a kind of filling pile construction is provided, it is including following Step:
Determine the stake heart of bored concrete pile;
First fix bar and the second fix bar are provided, is connected between first fix bar and second fix bar A pair of bracing wires;
First fix bar is vertically inserted in the first fixing point, second fix bar is vertically plugged and is fixed on Two fixing points, first fixing point and second fixing point are located at the both sides of the stake heart, and first pair of bracing wire is located at The top of the stake heart;
3rd fix bar and the 4th fix bar are provided, is connected between the 3rd fix bar and the 4th fix bar Two pairs of bracing wires;
3rd fix bar is vertically plugged and is fixed on the 3rd fixing point, the 4th fix bar is vertically plugged into fixation In the 4th fixing point, the 3rd fixing point and the 4th fixing point are positioned at the both sides of the stake heart, second pair of bracing wire The first intersection point is intersected to form with first pair of bracing wire, second pair of bracing wire is located at the top of the stake heart, and described first hands over Point is positioned at the top of the stake heart;
Positioning instrument is installed between the stake heart and first intersection point, the positioning instrument is used to check described first The surface of the stake heart is intersected to bracing wire and second pair of bracing wire;
First fix bar or the second fix bar are adjusted according to the positioning instrument and the 5th fixing point is vertically inserted in so that First pair of bracing wire is located at the surface of the stake heart;
3rd fix bar or the 4th fix bar are adjusted according to the positioning instrument and the 6th fixing point is vertically inserted in so that Second pair of bracing wire is located at the surface of the stake heart and intersects to form the second intersection point, described second with first pair of bracing wire Intersection point is located at the surface of the stake heart;
Remove first pair of bracing wire and second pair of bracing wire;
Construct the bored concrete pile, in the work progress of the bored concrete pile, by first fix bar and described First pair of bracing wire is set between two fix bars, sets described second pair in the 3rd fix bar and the 4th fix bar Bracing wire, the stake heart of bored concrete pile described in quick centring.
Further, the step of regulation the first fix bar or second fix bar according to the positioning instrument includes:
With first fix bar as the center of circle, first pair of bracing wire as radius, second fix bar move radially, Or with second fix bar as the center of circle, first pair of bracing wire as radius, first fix bar moves radially so that institute First pair of bracing wire is stated positioned at the surface of the positioning instrument.
Further,
With the 3rd fix bar as the center of circle, second pair of bracing wire as radius, the 4th fix bar move radially, Or with the 4th fix bar as the center of circle, second pair of bracing wire as radius, the 3rd fix bar moves radially so that institute Second pair of bracing wire is stated positioned at the surface of the positioning instrument.
Further, being set forth between the stake heart and first intersection point the step of installing positioning instrument includes:
The positioning instrument is messenger wire plummet, hangs oneself and sets the messenger wire in first pair of bracing wire or second pair of bracing wire Plummet, makes the messenger wire plummet be located at the top of the stake heart.
Further, being set forth between the stake heart and first intersection point the step of installing positioning instrument includes:It is described Positioning instrument is locating rod, and the locating rod is vertically inserted in into the stake heart.
The opposing party, the invention provides a kind of grout pile heart centralising device, including:
First fix bar, is vertically inserted in the first fixing point;
Second fix bar, is vertically inserted in the second fixing point, connects between first fix bar and second fix bar First pair of bracing wire is connected to, first fixing point and second fixing point are located at the both sides of the stake heart;
3rd fix bar, is vertically inserted in the 3rd fixing point;
4th fix bar, is vertically inserted in the 4th fixing point, connects between the 3rd fix bar and the 4th fix bar Second pair of bracing wire is connected to, the 3rd fixing point and second fixing point are located at the both sides of the stake heart, and described first pair Bracing wire intersects to form an intersection point with second pair of bracing wire, and the intersection point is located at the surface of the stake heart;And
Positioning instrument, is installed between the stake heart and the intersection point, for checking first pair of bracing wire and described Two pairs of bracing wires intersect at the surface of the stake heart.
Further, the positioning instrument is the locating rod for being vertically inserted in the stake heart, and it is described fixed that the intersection point is located at The top of position bar.
Further, the positioning instrument is messenger wire plummet, and the messenger wire plummet is hung at first pair of bracing wire or the In two pairs of bracing wires, the messenger wire plummet is perpendicularly oriented to the stake heart.
The beneficial effects of the present invention are, first in four suitable positions of stake heart neighbouring position searching of bored concrete pile, then Erected between relative 2 points and set fixed beam and connected with to bracing wire, make two stakes that bored concrete pile is intersected to bracing wire side in the heart, Finely tune two adjacent fixed beams respectively again, and cause that two intersect at an intersection point and the intersection point to bracing wire according to positioning instrument Positioned at the surface of the stake heart, remove fixed beam and put in the fixing point for plugging fixed beam and a little mark.In later stage bored concrete pile In construction, two can be connected to bracing wire by between a little make marks four fixing points are put, quick centering is come with this and is filled Note the stake heart of stake, the method compared with being positioned using instrument and being checked, is grasped with checking method compared to registration than traditional Make simply practical, save human and material resources and financial resources, reduce engineering cost, improve engineering construction quality, achieve many things at one stroke.
Brief description of the drawings
Fig. 1 is the use state figure of grout pile heart centralising device of the invention.
Fig. 2 to Fig. 7 is the construction schematic diagram of the stake heart centering method during filling pile construction of the invention.
Specific embodiment
Embodiments of the present invention are illustrated below by way of specific instantiation, those skilled in the art can be by this specification Disclosed content understands other advantages of the invention and effect easily.The present invention can also be by specific realities different in addition The mode of applying is embodied or practiced, the various details in this specification can also based on different viewpoints with application, without departing from Various modifications or alterations are carried out under spirit of the invention.
First embodiment
Fig. 1 is the use state figure of grout pile heart centralising device of the invention, and Fig. 2 to Fig. 7 is bored concrete pile of the invention The construction schematic diagram of the stake heart centering method in work progress.
Referring to Fig. 1 to Fig. 7, include that the first fix bar 2, second is consolidated the invention provides a kind of grout pile heart centralising device 3, first pair of bracing wire 4 of fixed pole, the 3rd fix bar 5,6, the second pair of bracing wire 7 of the 4th fix bar and positioning instrument 8.
First fix bar 2 is vertically plugged in the first fixing point A, and the second fix bar 3 is vertically plugged in the second fixing point B, the First pair of bracing wire 4 is connected between one fix bar 2 and the second fix bar 3, the first fixing point A and the second fixing point B is located at perfusion The opposite sides of the stake heart 1 of stake.
3rd fix bar 5 is vertically plugged in the 3rd fixing point C, and the 4th fix bar 6 is vertically plugged in the 4th fixing point D, the Second pair of bracing wire 7 is connected between three fix bars 5 and the 4th fix bar 6, the 3rd fixing point C and the second fixing point B is located at the stake heart 1 Opposite sides, and first pair of bracing wire 4 and second pair of bracing wire 7 intersect to form an intersection point, and the intersection point is located at the surface of the stake heart 1.
Positioning instrument 8 is installed between the stake heart 1 and the intersection point.Positioning instrument 8 is used to check first pair of bracing wire 4 and second The surface of a heart 1 is intersected to bracing wire 7.
In the present embodiment, 8 messenger wire plummets of instrument are positioned, messenger wire plummet can hang and be located at first pair of bracing wire 4 or the In two pairs of bracing wires 7, messenger wire plummet is perpendicularly oriented to a heart 1.
The invention provides the stake heart centering method during a kind of filling pile construction, comprise the following steps.
Step 1:
Before filling pile construction, first with the instrument such as total powerstation accurate measurement and the stake heart 1 of bored concrete pile is determined.
Step 2:
First fix bar 2 and the second fix bar 3 are provided, and first is connected between the first fix bar 2 and the second fix bar 3 To bracing wire 4, the first fix bar 2 and the second fix bar 3 can use work from two vertical reinforcing bars of equal length to bracing wire The small white line commonly used in journey construction.
Step 3:
First fix bar 2 is vertically plugged in the first fixing point A, vertical the plugging of the second fix bar 3 is fixed on second and consolidates Fixed point B, the first fixing point A and the second fixing point B are located at the both sides of the stake heart, by observation first pair of bracing wire 4 can be made to be located at stake The top of the heart.
Step 4:
3rd fix bar 5 and the 4th fix bar 6 are provided, second pair is connected between the 3rd fix bar 5 and the 4th fix bar 6 Bracing wire 7.
Step 5:
Vertical the plugging of 3rd fix bar 5 is fixed on the 3rd fixing point C, vertical the plugging of the 4th fix bar 6 is fixed on the Four fixing point D, the 3rd fixing point C and the 4th fixing point D are located at the opposite sides of the stake heart 1, second pair of bracing wire 7 and first pair of bracing wire 4 intersect to form the first intersection point so that the first intersection point is located at the top of the stake heart 1.
Step 6:
Positioning instrument 8 is installed between the intersection point of the stake heart 1 and first, positioning instrument 8 is used to check whether the first intersection point is located at The surface of the stake heart 1.Positioning instrument 8 is a messenger wire plummet, and messenger wire plummet hangs and is located in first pair of bracing wire 4 and perpendicular to ground.
Step 7:
According to the instruction of messenger wire plummet, mobile messenger wire plummet and the second fix bar 3.Specifically, being circle with the first fix bar 2 The heart, take first pair of bracing wire 4 as radius, the second fix bar 3 makees radial motion and is vertically plugged in the 5th fixing point E so that first The surface of the stake heart 1 is located to the messenger wire plummet in bracing wire 4 and a heart 1 is perpendicularly oriented to;Or with the second fix bar 3 be the center of circle, It is radius with first pair of bracing wire 4, the first fix bar 2 makees radial motion and is vertically plugged in the 5th fixing point E so that first pair of drawing Messenger wire plummet on 4 lines is located at the surface of the stake heart 1 and is perpendicularly oriented to a heart 1.
As a kind of preferably implementation method, as shown in figure 4, using hanging the messenger wire plummet, that are located in first pair of bracing wire 4 The first plane that a pair of bracing wires 4, the first fix bar 2 and the second fix bar 3 are constituted checks whether first pair of bracing wire 4 is located at the stake heart Whether 1 surface, that is, observe the first plane by the stake heart 1.When the first plane does not pass through the stake heart 1, can be by mobile the One fix bar 2 or the second fix bar 3 so that the first plane passes through the stake heart 1.Afterwards, messenger wire plummet is moved from first pair of bracing wire 4 Except and hang and be located in second pair of bracing wire 7.Consolidated using the messenger wire plummet that is located in second pair of bracing wire 7, the second pair of bracing wire the 7, the 3rd is hung The second plane that fixed pole 5 and the 4th fix bar 6 are constituted checks the surface whether second pair of bracing wire 7 is located at the stake heart 1, that is, observe Whether the second plane passes through the stake heart 1.When the second plane does not pass through the stake heart 1, can be solid by mobile 3rd fix bar 5 or the 4th Fixed pole 6 so that the second plane passes through the stake heart 1.When the first plane and the second plane pass through the stake heart 1 simultaneously, i.e., first pair bracing wire 4 With the surface that second pair of intersection point of bracing wire 7 is located at the stake heart 1.
Step 8:
According to the position in first pair of bracing wire 4 of messenger wire plummet, the 4th fix bar 6 is adjusted.Specifically, being fixed with the 3rd Bar 5 is the center of circle, take second pair of bracing wire 7 as radius, and the 4th fix bar 6 does radial motion and is vertically plugged in the 6th fixing point F, makes Obtain second pair of bracing wire 7 to be located at the surface of the stake heart 1 and intersect to form the second intersection point with first pair of bracing wire 4, the second intersection point is located at stake The surface of the heart 1;Or with the 4th fix bar 6 be the center of circle, with second pair of bracing wire 7 for radius, the 3rd fix bar 5 does radial motion And be vertically plugged in the 6th fixing point F so that the second pair of bracing wire 7 be located at the surface of the stake heart 1 and with first pair of X-shape of bracing wire 4 Into the second intersection point, the second intersection point is located at the surface of the stake heart 1.
Step 9:
Remove first pair of bracing wire 4 and second pair of bracing wire 7.As shown in fig. 7, removing first pair of bracing wire 4 and second pair of bracing wire 7 Afterwards, retain the first fix bar 2 and the second fix bar 3, the 3rd fix bar 5 and the 4th fix bar 6 are in situ.
Step 10:
Construction bored concrete pile, in the work progress of bored concrete pile, the is set by the first fix bar 2 and the second fix bar 3 A pair of bracing wires 4, set second pair of bracing wire 7 between the 3rd fix bar 5 and the 4th fix bar 6, carry out the quick stake for positioning bored concrete pile The heart 1.
Second embodiment
Include the first fix bar, the second fix bar, first pair of drawing the invention provides a kind of grout pile heart centralising device Line, the 3rd fix bar, the 4th fix bar, second pair of bracing wire and positioning instrument.
First fix bar is vertically plugged in the first fixing point, and the second fix bar is vertically plugged in the second fixing point, and first consolidates First pair of bracing wire is connected between fixed pole and the second fix bar, the first fixing point and the second fixing point are located at the stake heart of bored concrete pile Opposite sides.
3rd fix bar is vertically plugged in the 3rd fixing point, and the 4th fix bar is vertically plugged in the 4th fixing point, and the 3rd consolidates Second pair of bracing wire is connected between fixed pole and the 4th fix bar, the 3rd fixing point and the second fixing point are located at relative the two of the stake heart Side, and first pair of bracing wire intersects to form an intersection point with second pair of bracing wire, the intersection point is located at the surface of the stake heart.
Positioning instrument is installed between the stake heart and the intersection point.Positioning instrument is used to check first pair of bracing wire and second pair of drawing Line intersects at the surface of a heart.Specifically, positioning instrument is vertically to be plugged in stake locating rod in the heart, intersection point is located at locating rod Top.
The invention provides the stake heart centering method during a kind of filling pile construction, comprise the following steps.
Step 1:
Before filling pile construction, first with the instrument such as total powerstation accurate measurement and the stake heart of bored concrete pile is determined.
Step 2:
First fix bar and the second fix bar are provided, and first pair of drawing is connected between the first fix bar and the second fix bar Line, the first fix bar and the second fix bar can select two vertical reinforcing bars of equal length, and first pair of bracing wire uses engineering The small white line commonly used in construction.
Step 3:
First fix bar is vertically plugged in the first fixing point, the second fix bar is vertically plugged and is fixed on the second fixation Point, the first fixing point and the second fixing point are located at the both sides of the stake heart, by observation first pair of bracing wire can be made to be located at the upper of the stake heart Side.
Step 4:
3rd fix bar and the 4th fix bar are provided, second pair of drawing is connected between the 3rd fix bar and the 4th fix bar Line.3rd fix bar and the 4th fix bar can select two vertical reinforcing bars with the first fix bar equal length, second pair Bracing wire is using the small white line commonly used in engineering construction.
Step 5:
3rd fix bar is vertically plugged and is fixed on the 3rd fixing point, the 4th fix bar vertically plugged and is fixed on the 4th and is consolidated Fixed point, the 3rd fixing point and the 4th fixing point are located at the opposite sides of the stake heart, and second pair of bracing wire is intersected to form with first pair of bracing wire First intersection point so that the first intersection point is located at the top of the stake heart.
Step 6:
Positioning instrument is installed between the stake heart and the first intersection point, positioning instrument is used to check whether the first intersection point is located at the stake heart Surface.Positioning instrument is locating rod, and locating rod is vertically plugged in stake in the heart.
Step 7:
According to the instruction of locating rod, the second fix bar is adjusted.Specifically, with the first fix bar as the center of circle, with first pair of drawing Line is radius, and the second fix bar makees radial motion and is vertically plugged in the 5th fixing point so that positioning is located in first pair of bracing wire The surface at the top of bar;Or with the second fix bar be radius as the center of circle, with first pair of bracing wire, the first fix bar is made radially to transport Move and be vertically plugged in the 5th fixing point so that positioned at the surface at the top of locating rod in first pair of bracing wire.
Step 8:
According to the tip position of locating rod, the 4th fix bar is adjusted.Specifically, with the 3rd fix bar as the center of circle, with second It is radius to bracing wire, the 4th fix bar does radial motion and is vertically plugged in the 6th fixing point so that second pair of bracing wire is located to be determined The surface at the top of position bar and intersect to form the second intersection point with first pair of bracing wire, the second intersection point is being located at the top of locating rod just Top;Or with the 4th fix bar as the center of circle, with second pair of bracing wire as radius, the 3rd fix bar is done radial motion and is vertically plugged In the 6th fixing point so that the second pair of bracing wire is located at the surface at the top of locating rod and intersects to form second with first pair of bracing wire Intersection point, the second intersection point is located at the surface at the top of locating rod.
Step 9:
Remove first pair of bracing wire and second pair of bracing wire.
Step 10:
Construction bored concrete pile, in the work progress of bored concrete pile, first is set by the first fix bar and the second fix bar To bracing wire, second pair of bracing wire is set between the 3rd fix bar and the 4th fix bar, carrys out the quick stake heart for positioning bored concrete pile.
The beneficial effects of the present invention are, first in four suitable positions of stake heart neighbouring position searching of bored concrete pile, then Erected between relative 2 points and set fixed beam and connected with to bracing wire, make two stakes that bored concrete pile is intersected to bracing wire side in the heart, Finely tune two adjacent fixed beams respectively again, and cause that two intersect at an intersection point and the intersection point to bracing wire according to positioning instrument Positioned at the surface of the stake heart, now remove fixed beam and put in the fixing point for plugging fixed beam and a little mark.Filled in the later stage In note pile driving construction, two can be connected to bracing wire by between a little make marks four fixing points are put, come quickly right with this The stake heart of middle bored concrete pile, the method with than it is traditional check method compared with registration, and check phase with being positioned using instrument Than, it is simple to operate and practical, human and material resources and financial resources are saved, engineering cost is reduced, engineering construction quality is improve, it is many at one stroke .
It should be noted that structure, ratio, size depicted in this specification institute accompanying drawings etc., is only used to coordinate Content disclosed in bright book, so that those skilled in the art understands and reads, is not limited to enforceable limit of the invention Fixed condition, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, not Under influence effect that can be generated of the invention and the purpose to be reached, all should still fall obtained in disclosed technology contents In the range of covering.Meanwhile, in this specification it is cited as " on ", D score, "left", "right", " centre " and " one " etc. Term, is merely convenient to understanding for narration, and is not used to limit enforceable scope of the invention, the change of its relativeness or tune It is whole, under without essence change technology contents, when being also considered as enforceable category of the invention.
The present invention is described in detail above in association with accompanying drawing embodiment, those skilled in the art can be according to upper State it is bright the present invention is made many variations example.Thus, some of embodiment details should not constitute limitation of the invention, this The scope that invention will be defined using appended claims is used as protection domain.

Claims (8)

1. the stake heart centering method during a kind of filling pile construction, it is characterised in that comprise the following steps:
Determine the stake heart of bored concrete pile;
First fix bar and the second fix bar are provided, first pair is connected between first fix bar and second fix bar Bracing wire;
First fix bar is vertically inserted in the first fixing point, second fix bar is vertically plugged and is fixed on second and is consolidated Fixed point, first fixing point and second fixing point are located at the both sides of the stake heart, and first pair of bracing wire is located at described The top of the stake heart;
3rd fix bar and the 4th fix bar are provided, second pair is connected between the 3rd fix bar and the 4th fix bar Bracing wire;
3rd fix bar is vertically plugged and is fixed on the 3rd fixing point, the 4th fix bar vertically plugged and is fixed on Four fixing points, the 3rd fixing point and the 4th fixing point are located at the both sides of the stake heart, second pair of bracing wire and institute State first pair of bracing wire and intersect to form the first intersection point, second pair of bracing wire is located at the top of the stake heart, the first intersection point position In the top of the stake heart;
Positioning instrument is installed between the stake heart and first intersection point, the positioning instrument is used to check first pair of drawing Line and second pair of bracing wire intersect at the surface of the stake heart;
First fix bar or the second fix bar are adjusted according to the positioning instrument and the 5th fixing point is vertically inserted in so that be described First pair of bracing wire is located at the surface of the stake heart;
3rd fix bar or the 4th fix bar are adjusted according to the positioning instrument and the 6th fixing point is vertically inserted in so that be described Second pair of bracing wire is located at the surface of the stake heart and intersects to form the second intersection point, second intersection point with first pair of bracing wire Positioned at the surface of the stake heart;
Remove first pair of bracing wire and second pair of bracing wire;
Construct the bored concrete pile, in the work progress of the bored concrete pile, consolidate by first fix bar and described second First pair of bracing wire is set between fixed pole, second pair of drawing is set in the 3rd fix bar and the 4th fix bar Line, the stake heart of bored concrete pile described in quick centring.
2. the stake heart centering method during filling pile construction as claimed in claim 1, it is characterised in that described in the basis The step of positioning instrument regulation the first fix bar or the second fix bar, includes:
With first fix bar as the center of circle, first pair of bracing wire as radius, second fix bar move radially, or with Second fix bar is that the center of circle, first pair of bracing wire are that radius, first fix bar are moved radially so that described the A pair of bracing wires are located at the surface of the positioning instrument.
3. the stake heart centering method during filling pile construction as claimed in claim 1, it is characterised in that described in the basis The step of positioning instrument regulation the 3rd fix bar or four fix bars, includes:
With the 3rd fix bar as the center of circle, second pair of bracing wire as radius, the 4th fix bar move radially, or with 4th fix bar is that the center of circle, second pair of bracing wire are that radius, the 3rd fix bar are moved radially so that described the Two pairs of bracing wires are located at the surface of the positioning instrument.
4. the stake heart centering method during filling pile construction as claimed in claim 1, it is characterised in that be set forth in the stake The step of positioning instrument is installed between the heart and first intersection point includes:
The positioning instrument is messenger wire plummet, hangs oneself and sets the messenger wire lead in first pair of bracing wire or second pair of bracing wire Hammer, makes the messenger wire plummet be located at the top of the stake heart.
5. the stake heart centering method during filling pile construction as claimed in claim 1, it is characterised in that be set forth in the stake The step of positioning instrument is installed between the heart and first intersection point includes:The positioning instrument is locating rod, by the locating rod Vertically it is inserted in the stake heart.
6. a kind of grout pile heart centralising device, it is characterised in that including:
First fix bar, is vertically inserted in the first fixing point;
Second fix bar, is vertically inserted in the second fixing point, is connected between first fix bar and second fix bar First pair of bracing wire, first fixing point and second fixing point are located at the both sides of the stake heart;
3rd fix bar, is vertically inserted in the 3rd fixing point;
4th fix bar, is vertically inserted in the 4th fixing point, is connected between the 3rd fix bar and the 4th fix bar Second pair of bracing wire, the 3rd fixing point and second fixing point are located at the both sides of the stake heart, and first pair of bracing wire An intersection point is intersected to form with second pair of bracing wire, the intersection point is located at the surface of the stake heart;And
Positioning instrument, is installed between the stake heart and the intersection point, for checking first pair of bracing wire and described second pair Bracing wire intersects at the surface of the stake heart.
7. grout pile heart centralising device as claimed in claim 6, it is characterised in that the positioning instrument is to be vertically inserted in The locating rod of the stake heart, the intersection point is located at the top of the locating rod.
8. grout pile heart centralising device as claimed in claim 6, it is characterised in that the positioning instrument is messenger wire plummet, The messenger wire plummet is hung in first pair of bracing wire or second pair of bracing wire, and the messenger wire plummet is perpendicularly oriented to the stake heart.
CN201710053788.6A 2017-01-22 2017-01-22 Stake heart centering method and grout pile heart centralising device during filling pile construction Active CN106869193B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710053788.6A CN106869193B (en) 2017-01-22 2017-01-22 Stake heart centering method and grout pile heart centralising device during filling pile construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710053788.6A CN106869193B (en) 2017-01-22 2017-01-22 Stake heart centering method and grout pile heart centralising device during filling pile construction

Publications (2)

Publication Number Publication Date
CN106869193A true CN106869193A (en) 2017-06-20
CN106869193B CN106869193B (en) 2019-01-22

Family

ID=59159075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710053788.6A Active CN106869193B (en) 2017-01-22 2017-01-22 Stake heart centering method and grout pile heart centralising device during filling pile construction

Country Status (1)

Country Link
CN (1) CN106869193B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024577A (en) * 2018-08-24 2018-12-18 中铁六局集团广州工程有限公司 Engineering method stake stake heart positioning auxiliary device and engineering method stake stake heart localization method
CN110438995A (en) * 2019-07-19 2019-11-12 中国十七冶集团有限公司 It is a kind of quickly to detect the inclined aperture apparatus of Punching Borehole Cast-in-place Concrete Pile and its application method
CN113774901A (en) * 2021-08-27 2021-12-10 重庆新洲建筑工程有限公司 Construction method for rotary drilling hole-forming cast-in-place threaded pile

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102767182A (en) * 2012-07-18 2012-11-07 上海建工二建集团有限公司 Verticality adjustment system for lattice column correcting mount and construction method thereof
CN204199336U (en) * 2014-09-24 2015-03-11 中国建筑第八工程局有限公司 Steel pipe column location survey aid
CN204200093U (en) * 2014-09-24 2015-03-11 中国建筑第八工程局有限公司 Bored piles machine is to middle auxiliary device
JP2015067961A (en) * 2013-09-26 2015-04-13 株式会社アルファーソリューション Installation device of steel pipe pile
CN204676540U (en) * 2015-04-02 2015-09-30 中国建筑第八工程局有限公司 Anchor jacked pile anchor rod locating device
CN205475363U (en) * 2016-01-11 2016-08-17 中国建筑第八工程局有限公司 A shrink locating support for confirming pile foundation center

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102767182A (en) * 2012-07-18 2012-11-07 上海建工二建集团有限公司 Verticality adjustment system for lattice column correcting mount and construction method thereof
JP2015067961A (en) * 2013-09-26 2015-04-13 株式会社アルファーソリューション Installation device of steel pipe pile
CN204199336U (en) * 2014-09-24 2015-03-11 中国建筑第八工程局有限公司 Steel pipe column location survey aid
CN204200093U (en) * 2014-09-24 2015-03-11 中国建筑第八工程局有限公司 Bored piles machine is to middle auxiliary device
CN204676540U (en) * 2015-04-02 2015-09-30 中国建筑第八工程局有限公司 Anchor jacked pile anchor rod locating device
CN205475363U (en) * 2016-01-11 2016-08-17 中国建筑第八工程局有限公司 A shrink locating support for confirming pile foundation center

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024577A (en) * 2018-08-24 2018-12-18 中铁六局集团广州工程有限公司 Engineering method stake stake heart positioning auxiliary device and engineering method stake stake heart localization method
CN110438995A (en) * 2019-07-19 2019-11-12 中国十七冶集团有限公司 It is a kind of quickly to detect the inclined aperture apparatus of Punching Borehole Cast-in-place Concrete Pile and its application method
CN113774901A (en) * 2021-08-27 2021-12-10 重庆新洲建筑工程有限公司 Construction method for rotary drilling hole-forming cast-in-place threaded pile
CN113774901B (en) * 2021-08-27 2022-08-19 重庆新洲建筑工程有限公司 Construction method for rotary-digging hole-forming cast-in-place screw pile

Also Published As

Publication number Publication date
CN106869193B (en) 2019-01-22

Similar Documents

Publication Publication Date Title
CN106869193A (en) Stake heart centering method and grout pile heart centralising device during filling pile construction
CN106894422B (en) Complex environment deep foundation pit supporting construction method
CN109555116A (en) A kind of high density karst intense development area fully-sleeved filled pile construction method
CN102635120A (en) Supportless construction structure and supportless construction method for round deep base pit
CN106759350B (en) A kind of application method of the vertical lattice column positioning steering control system of Extra-Deep Foundation Pit
CN107503353A (en) Pile foundation steel bar cage off normal and inclination preventing mean and method
CN204200093U (en) Bored piles machine is to middle auxiliary device
CN107130592A (en) A kind of long screw auger and impact drill two-shipper is combined pore-creating filling pile construction
CN106988305A (en) A kind of pile-column pier construction method of underground integrated molding
CN206503141U (en) A kind of overlength casing in bridge pile foundation construction is accurately positioned mounting tool
CN107989057A (en) A kind of Bridge Pile Foundation Construction method
CN106284311B (en) A kind of dry efficient construction technology of pore-forming cast-in-place concrete pile of rotary drilling rig
CN108625386A (en) A kind of Conveyor belt steel pipe spliced pile and construction method
CN208650087U (en) Steel pipe column fast-positioning device for contrary sequence method
CN212405119U (en) Bored concrete pile leaking stoppage solid hole structure
CN107905108A (en) Tubular arch bolted web member hole group's accuracy control method
CN107299640A (en) A kind of variable cross-section well shaft type ground continuous wall base and its construction method
CN110965550A (en) Method and structure for plugging and fixing hole of cast-in-place pile
CN206495243U (en) Building foundation pit hole for grout pile hole diameter detection apparatus
CN105951844B (en) A kind of cap excavation method top plate node structure and its construction method
CN108612097B (en) Pile position centering device and pile position centering process applying same
CN105625424A (en) Device used for controlling perpendicularity and azimuth angle of rectangular bracket pile and construction method
CN102021917B (en) Method for constructing n-shaped rod foundation of power transmission line
CN206328750U (en) One kind occlusion drilled pile
CN214089863U (en) Highway bridge stake foundation construction positioner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant