CN106869090A - Dreg-blocking board sub-assembly and diversion tunnel debris retaining Slagoff method - Google Patents

Dreg-blocking board sub-assembly and diversion tunnel debris retaining Slagoff method Download PDF

Info

Publication number
CN106869090A
CN106869090A CN201710184693.8A CN201710184693A CN106869090A CN 106869090 A CN106869090 A CN 106869090A CN 201710184693 A CN201710184693 A CN 201710184693A CN 106869090 A CN106869090 A CN 106869090A
Authority
CN
China
Prior art keywords
bank
gear
dreg
blocking board
diversion tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710184693.8A
Other languages
Chinese (zh)
Other versions
CN106869090B (en
Inventor
胡志根
苏杨杨
吕国轩
邱亚锋
孟德乾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University WHU
Original Assignee
Wuhan University WHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University WHU filed Critical Wuhan University WHU
Priority to CN201710184693.8A priority Critical patent/CN106869090B/en
Publication of CN106869090A publication Critical patent/CN106869090A/en
Application granted granted Critical
Publication of CN106869090B publication Critical patent/CN106869090B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B8/00Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
    • E02B8/02Sediment base gates; Sand sluices; Structures for retaining arresting waterborne material
    • E02B8/023Arresting devices for waterborne materials
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B15/00Cleaning or keeping clear the surface of open water; Apparatus therefor
    • E02B15/04Devices for cleaning or keeping clear the surface of open water from oil or like floating materials by separating or removing these materials
    • E02B15/06Barriers therefor construed for applying processing agents or for collecting pollutants, e.g. absorbent

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention provides a kind of dreg-blocking board sub-assembly and diversion tunnel debris retaining Slagoff method, can in time deslagging slagging-off prevent rock ballast with shunting current enter hole in, it is ensured that tunnel discharge capacity.Dreg-blocking board sub-assembly provided by the present invention, is disposed in the porch of the diversion tunnel of river course side, it is characterised in that including:First gear bank, along streamflow direction arrangement;Connection bank, one end is connected with the upper end of first gear bank, and the other end extends in diversion tunnel, and is in the first angle with first gear bank;Second gear bank, upper end is connected with the other end for being connected bank, lower end extends towards the side wall of diversion tunnel, and be connected bank in the second angle, wherein, the first angle is the arbitrary value in the range of 30 ° ~ 60 °, and the second angle is the arbitrary value in the range of 85 ° ~ 95 °, seen along streamflow direction, first gear bank, connection bank and second gear bank surround a drainage gallery for gradually tapering up jointly.

Description

Dreg-blocking board sub-assembly and diversion tunnel debris retaining Slagoff method
Technical field
The invention belongs to Hydraulic and Hydro-Power Engineering field, and in particular to a kind of dreg-blocking board sub-assembly and application dreg-blocking board combination The method that part carries out debris retaining deslagging to diversion tunnel.
Background technology
During the shunting that sluices, the impurity such as silt, rock ballast in upper river is often with shunting for Construction diversion tunnel Current enter in diversion tunnel or alluvial is at hole, the excessively stream energy at the rock ballast reduction diversion tunnel hole deposited at hole Power, the erosion attack of diversion tunnel barrel and base plate can be then aggravated into the rock ballast in hole, reduce the service life of diversion tunnel. Existing deslagging mode is to clear up rock ballast in the hole of hole using modes such as artificial mechanisms in the tunnel inoperative period mostly, between causing engineering Expense increase is connect, economy is poor;Or single dreg-blocking board debris retaining is arranged at hole, debris retaining deslagging effect and structure are overall steady It is qualitative poor.
The content of the invention
The present invention is carried out to solve above-mentioned problem, it is therefore intended that provide a kind of dreg-blocking board sub-assembly and water conservancy diversion tunnel Hole debris retaining Slagoff method, can in time deslagging with reduce rock ballast deposited at diversion tunnel degree, prevent rock ballast with shunting water flow into Enter in hole, to ensureing tunnel discharge capacity, avoiding barrel erosion attack, reach and safeguard diversion tunnel safe operation, save work The purpose of Cheng Chengben.
The present invention to achieve these goals, employs following scheme.
<Dreg-blocking board sub-assembly>
The present invention provides a kind of dreg-blocking board sub-assembly, is disposed in the porch of the diversion tunnel of river course side, is used for Solid particulate matter to being carried under one's arms in the shunting current in inflow diversion tunnel is stopped and is excluded, it is characterised in that including: First gear bank, along streamflow direction arrangement;Connection bank, one end is connected with the upper end of first gear bank, and the other end is to water conservancy diversion tunnel Extend in hole, and be in the first angle with first gear bank;Second gear bank, upper end be connected bank the other end be connected, lower end towards The side wall of diversion tunnel extends, and is in the second angle with bank is connected, wherein, the first angle is any in the range of 30 °~60 ° Value, the second angle is the arbitrary value in the range of 85 °~95 °, is seen along streamflow direction, first gear bank, connection bank and the Two gear banks surround a drainage gallery for gradually tapering up jointly.
Dreg-blocking board sub-assembly involved in the present invention, can also have the feature that:First gear bank is in streamflow side Upward section is shaped as triangle, and being shaped as section of the second gear bank on streamflow direction be trapezoidal.
Dreg-blocking board sub-assembly involved in the present invention, can also have the feature that:The maximum bank of second gear bank is a height of First gear bank maximum high 2 times of bank.
Dreg-blocking board sub-assembly involved in the present invention, can also have the feature that:Seen along streamflow direction, the The bank of two gear banks is high gradually to be reduced, high 2 times of a height of minimum bank of maximum bank of second gear bank.
Dreg-blocking board sub-assembly involved in the present invention, can also have the feature that:The maximum bank of first gear bank is a height of The 1/15~1/10 of diversion tunnel height.
Dreg-blocking board sub-assembly involved in the present invention, can also have the feature that:First gear bank and second gear bank Bank is long equal, is wide 1~1.5 times in diversion tunnel hole.
Dreg-blocking board sub-assembly involved in the present invention, can also have the feature that:Connect a length of water conservancy diversion tunnel of bank of bank The 1/3~1/2 of height of holes.
Dreg-blocking board sub-assembly involved in the present invention, can also have the feature that:Second angle is 90 °.
Dreg-blocking board sub-assembly involved in the present invention, can also have the feature that:First gear bank is perpendicular to river course Section in water (flow) direction be shaped as rectangle and it is trapezoidal in any one, second gear bank is on streamflow direction Section be shaped as rectangle and it is trapezoidal in any one.
<Diversion tunnel debris retaining Slagoff method>
The present invention provides a kind of diversion tunnel debris retaining Slagoff method, it is characterised in that:The bottom surface for flowing tunnel porch is set The slope that ecto-entad gradually increases is set to, and will<Dreg-blocking board sub-assembly>Described in dreg-blocking board sub-assembly be arranged in slope On, wherein, the gradient on slope is 1:8~1:In the range of 10.
The effect of invention and effect
Dreg-blocking board sub-assembly of the invention, because first gear bank is, along streamflow direction arrangement, to connect bank One end is connected with the upper end of first gear bank, and the other end extends in diversion tunnel, and is in 30 °~60 ° angles with first gear bank, and And, the upper end of second gear bank is connected with the other end for being connected bank, and lower end extends towards the side wall of diversion tunnel, and is in bank is connected 85 °~95 ° angles, so that first gear bank, connection bank and second gear bank define a drainage gallery for gradually tapering up, Intercepted on the outside of first gear bank this makes it possible to by upstream bulk rock ballast, bulk rock ballast is combined in self gravitation and the narrow current of beam Rolled under effect into original bed, and with main flow pour downstream river course, and fine grained rock ballast is then intercepted in drainage gallery, is reached To the effect of classification debris retaining, further with contraction principle, flow rate of water flow is let out under can gradually increasing, in drainage gallery Microlith slag pours downstream river course in time by breach, so as to effectively carried under one's arms in the shunting current in diversion tunnel to flowing into Solid particulate matter stopped and excluded, and improves the pushing off the slag deslagging ability during diversion tunnel runs, and reduces later stage tunnel Manually, the program and expense of mechanical scarfing cinder, while avoid barrel erosion attack, reached the safe operation of maintenance diversion tunnel, Save the purpose of engineering cost.Also, first gear bank, connection bank and second gear bank this three bank are sequentially connected, by blocking stone dam Wedge action between the heap masonry of junction ensure that the spatial stability of structure.
Brief description of the drawings
Fig. 1 is that the spoiler group that is related in the embodiment of the present invention and the position relationship between diversion tunnel and river course are illustrated Figure;
Fig. 2 is the structural representation of the dreg-blocking board sub-assembly being related in the embodiment of the present invention;
Fig. 3 is the sectional view of the dreg-blocking board sub-assembly being related in the embodiment of the present invention, wherein, (a) is cutting for first gear bank Face figure, (b) is the sectional view for connecting bank, and (c) is the sectional view of second gear bank;
Fig. 4 is the sectional schematic diagram at tunnel import of the dreg-blocking board sub-assembly being related in the embodiment of the present invention;And
Fig. 5 is the pushing off the slag deslagging principle schematic of the dreg-blocking board sub-assembly being related in the embodiment of the present invention.
Specific embodiment
Detailed is made to dreg-blocking board sub-assembly involved in the present invention and diversion tunnel debris retaining Slagoff method referring to the drawings Illustrate.The part not elaborated in following examples belongs to prior art.
<Embodiment>
As shown in figure 1, dreg-blocking board sub-assembly 10 is disposed in the porch in the water conservancy diversion tunnel B holes of river course A sides, for right The solid particulate matter carried under one's arms in the shunting current in diversion tunnel B is flowed into be stopped and excluded.As illustrated in fig. 1 and 2, pushing off the slag Bank sub-assembly 10 includes first gear bank 11, connection bank 12 and second gear bank 13.
First gear bank 11 is arranged along the water (flow) direction of river course A, parallel with water (flow) direction.It is perpendicular to river course A water That flows the section on direction is shaped as rectangle or trapezoidal.In addition, as shown in Fig. 3 (a), first gear bank 11 is along river course A current Section on direction is shaped as triangle, triangle a length of degree L on one side.The 1/ of its a height of diversion tunnel B height of maximum bank 15~1/10.
The one end for connecting bank 12 is connected with the upper end of first gear bank 11, and the other end extends to inside diversion tunnel B, and with First gear bank 11 is in the first angle.The 1/3~1/2 of a length of diversion tunnel B height of bank of bank 12 is connected, it is along river course A water That flows the section on direction is shaped as rectangle or trapezoidal.In addition, as shown in Fig. 3 (b), connection bank 12 is perpendicular to river course A current The trapezoidal also, trapezoidal edge lengths long that are shaped as in the section on direction are 2L, and bond length is L.
The upper end of second gear bank 13 is connected with the other end for being connected bank 12, and lower end extends towards the side wall of diversion tunnel B, and It is in the second angle with bank 12 is connected, the second angle can be 85 °~95 °, be 90 ° in the present embodiment.Second gear bank 13 along The shape in the section of (diversion tunnel B shunts direction with river course A water (flow) directions near normal) in water (flow) direction in diversion tunnel B It is rectangle or trapezoidal.In addition, as shown in Fig. 3 (c), second gear bank 13 is in the section on diversion tunnel B shuntings direction Trapezoidal also, trapezoidal edge lengths long are shaped as 2L, bond length is L.The a height of first gear bank of maximum bank of second gear bank 13 High 2 times of 11 maximum banks.In the present embodiment, second gear bank 13 is long with the bank of first gear bank 11 equal, and it is wide to be 1~1.5 times of hole, And their top and Bottom Altitude arrangement are on a declining curve along water (flow) direction.
Seen along river course A water (flow) directions, first gear bank 11, connection bank 12 and second gear bank 13 surround one gradually jointly The drainage gallery of contraction, the drainage gallery has an open C.In the case of first gear Kan11Kan determinations long, drainage gallery Deslagging ability receive open C and the first angle joint effect, the first angle is smaller, and the narrow degree of beam is bigger, and current gradient is bigger, but Open C is just smaller, crosses the top of the slag and accumulates just small, crosses slag ability naturally just small;Conversely, just not having the narrow water of beam if the first angle is excessive The effect of stream and increase flow rate of water flow gradient, therefore, the first angle is unsuitable excessive or too small, is advisable with 30~60 °.
It is to the method that diversion tunnel B carries out debris retaining deslagging using the dreg-blocking board sub-assembly 10 in the present embodiment:
First, dreg-blocking board sub-assembly is determined according to the geological state at dam site, construction site layout, conditions of transportation etc. Material is used in 10 fill;
Then, determine that dreg-blocking board 1 is long with the bank of dreg-blocking board 2 according to the orographic condition before diversion tunnel B throat widths and hole, Generally can be identified as 1~1.5 times of hole wide;
Then, the hole high condition according to diversion tunnel determines the elevation arrangement of first gear bank 11 and second gear bank 13, the The maximum bank of one gear bank 11 is high to be typically arranged as the 1/15~1/10 of diversion tunnel B height, and the maximum bank of second gear bank 13 is a height of 2 times of first gear bank 11, the bank of connection bank 12 is long to be arranged as the 1/3~1/2 of diversion tunnel B height;Preferably, first gear bank 11 and second gear bank 13 maximum bank is high is generally positioned to be 1m and 2m.
Then, the top width for determining first gear bank 11, connection bank 12 and second gear bank 13 is calculated according to homeostasis condition And the both sides gradient (when section is trapezoidal);
Finally, the bottom surface of diversion tunnel B porch is arranged to the slope D that ecto-entad gradually increases, by dreg-blocking board group Component 10 is arranged on the D of slope by following space structure:First gear bank 11 and river course A water (flow) direction parallel arrangements, connect bank 12 Arrangement is mutually perpendicular to second gear bank 13, first gear bank 11 is 30~60 ° with the angle of intersection of second gear bank 13.
As shown in figure 4, in the present embodiment, the gradient on slope is 1:8~1:In the range of 10.
As shown in figure 5, when the entrance of flow direction diversion tunnel B is shunted, due to first gear bank 11 and second gear bank 13 Between the slope D gradients can increase the moving resistance of rock ballast, therefore upstream bulk rock ballast can be effectively intercepted in first gear The outside of bank 11, makes bulk rock ballast be rolled into original bed under self gravitation and the narrow current synergy of beam, and poured down with main flow In trip river course A, and middle fine grained rock ballast is then intercepted in drainage gallery, reaches the effect of classification debris retaining.
Further with contraction principle, flow rate of water flow is let out under can gradually increasing, it is thin in intercepting in drainage gallery Rock ballast pours downstream river course A in time by open C, so that effectively to being carried under one's arms in the shunting current in inflow diversion tunnel B Solid particulate matter stopped and excluded.
Also, first gear bank 11, connection bank 12 and the bank of second gear bank 13 3 are sequentially connected, by blocking stone dam junction heap Wedge action between masonry ensure that the spatial stability of structure.
To sum up, this programme is by designing simple and effective pushing off the slag structure type, the gear during lifting diversion tunnel operation Slag deslagging ability, reduces the program and expense of artificial, the mechanical scarfing cinder of later stage tunnel.
Above example is only the illustration done to technical solution of the present invention.Dreg-blocking board group involved in the present invention Component and diversion tunnel debris retaining Slagoff method are not merely defined in structure described in the embodiment above, but with right It is required that limited range is defined.Any modification that those skilled in the art of the invention are made on the basis of the embodiment or Supplement or equivalence replacement, all in scope of the present invention.

Claims (10)

1. a kind of dreg-blocking board sub-assembly, is disposed in the porch of the diversion tunnel of river course side, for being led described in inflow The solid particulate matter carried under one's arms in shunting current in stream tunnel is stopped and is excluded, it is characterised in that including:
First gear bank, along streamflow direction arrangement;
Connection bank, one end is connected with the upper end of the first gear bank, the other end to extension in the diversion tunnel, and with it is described First gear bank is in the first angle;
Second gear bank, upper end is connected with the other end of the connection bank, and lower end extends towards the side wall of the diversion tunnel, And with the connection bank in the second angle,
Wherein, first angle is the arbitrary value in the range of 30 °~60 °,
Second angle is the arbitrary value in the range of 85 °~95 °,
Seen along the streamflow direction, the first gear bank, the connection bank and the second gear bank surround one jointly The individual drainage gallery for gradually tapering up.
2. dreg-blocking board sub-assembly according to claim 1, it is characterised in that:
Wherein, section of the first gear bank on the streamflow direction is shaped as triangle,
Being shaped as section of the second gear bank on the streamflow direction is trapezoidal.
3. dreg-blocking board sub-assembly according to claim 2, it is characterised in that:
Wherein, high 2 times of a height of first gear bank maximum bank of the maximum bank of the second gear bank.
4. dreg-blocking board sub-assembly according to claim 2, it is characterised in that:
Wherein, seen along the streamflow direction, the bank of the second gear bank is high gradually to be reduced, the maximum of the second gear bank High 2 times of a height of minimum bank of bank.
5. dreg-blocking board sub-assembly according to claim 1 and 2, it is characterised in that:
Wherein, the 1/15~1/10 of a height of diversion tunnel height of the maximum bank of the first gear bank.
6. dreg-blocking board sub-assembly according to claim 1, it is characterised in that:
Wherein, the bank of the first gear bank and the second gear bank is long equal, is wide 1~1.5 times in diversion tunnel hole.
7. dreg-blocking board sub-assembly according to claim 1, it is characterised in that:
Wherein, the 1/3~1/2 of a length of diversion tunnel height of bank of the connection bank.
8. dreg-blocking board sub-assembly according to claim 1, it is characterised in that:
Wherein, second angle is 90 °.
9. dreg-blocking board sub-assembly according to claim 1, it is characterised in that:
Wherein, the first gear bank the section on the streamflow direction be shaped as rectangle and it is trapezoidal in appoint Meaning is a kind of,
The second gear bank the section on the streamflow direction be shaped as rectangle and it is trapezoidal in it is any one Kind.
10. a kind of diversion tunnel debris retaining Slagoff method, it is characterised in that:
The bottom surface for flowing tunnel porch is arranged to the slope that ecto-entad gradually increases, and will be any one in claim 1 to 9 Dreg-blocking board sub-assembly described in is arranged on the slope,
Wherein, the gradient on the slope is 1:8~1:In the range of 10.
CN201710184693.8A 2017-03-24 2017-03-24 Dreg-blocking board sub-assembly and diversion tunnel debris retaining Slagoff method Expired - Fee Related CN106869090B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710184693.8A CN106869090B (en) 2017-03-24 2017-03-24 Dreg-blocking board sub-assembly and diversion tunnel debris retaining Slagoff method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710184693.8A CN106869090B (en) 2017-03-24 2017-03-24 Dreg-blocking board sub-assembly and diversion tunnel debris retaining Slagoff method

Publications (2)

Publication Number Publication Date
CN106869090A true CN106869090A (en) 2017-06-20
CN106869090B CN106869090B (en) 2019-01-18

Family

ID=59172935

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710184693.8A Expired - Fee Related CN106869090B (en) 2017-03-24 2017-03-24 Dreg-blocking board sub-assembly and diversion tunnel debris retaining Slagoff method

Country Status (1)

Country Link
CN (1) CN106869090B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951530A (en) * 2018-09-30 2018-12-07 安徽理工大学 It is a kind of navigation diversion works except spiral shell design
CN109778798A (en) * 2019-03-12 2019-05-21 黄河勘测规划设计研究院有限公司 Multi-stage porous pipe weir shunts and warps method
CN110258468A (en) * 2019-07-05 2019-09-20 中国电建集团成都勘测设计研究院有限公司 Sand structure is blocked in hydraulic tunnel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201447689U (en) * 2009-06-26 2010-05-05 广东省电力设计研究院 Water drawing device for mountain streams with high sand content and low flow
CN201598621U (en) * 2009-12-23 2010-10-06 中国水电顾问集团华东勘测设计研究院 Sand discharging and disturbing structure
CN103938592A (en) * 2013-12-06 2014-07-23 四川大学 Method for forming flow dividing holes in sand blocking ridges for flow stopping and dividing
CN203977377U (en) * 2014-07-31 2014-12-03 中国电建集团成都勘测设计研究院有限公司 Sediment trapping training for sediment structure
CN104712010A (en) * 2015-03-25 2015-06-17 广东省水利水电科学研究院 Water diversion and silt prevention system for convex bank
CN205839715U (en) * 2016-07-27 2016-12-28 四川大川电力有限公司 A kind of sewage blocking device for power station intake

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201447689U (en) * 2009-06-26 2010-05-05 广东省电力设计研究院 Water drawing device for mountain streams with high sand content and low flow
CN201598621U (en) * 2009-12-23 2010-10-06 中国水电顾问集团华东勘测设计研究院 Sand discharging and disturbing structure
CN103938592A (en) * 2013-12-06 2014-07-23 四川大学 Method for forming flow dividing holes in sand blocking ridges for flow stopping and dividing
CN203977377U (en) * 2014-07-31 2014-12-03 中国电建集团成都勘测设计研究院有限公司 Sediment trapping training for sediment structure
CN104712010A (en) * 2015-03-25 2015-06-17 广东省水利水电科学研究院 Water diversion and silt prevention system for convex bank
CN205839715U (en) * 2016-07-27 2016-12-28 四川大川电力有限公司 A kind of sewage blocking device for power station intake

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951530A (en) * 2018-09-30 2018-12-07 安徽理工大学 It is a kind of navigation diversion works except spiral shell design
CN108951530B (en) * 2018-09-30 2024-04-16 安徽理工大学 Spiral shell removing project of navigation diversion project
CN109778798A (en) * 2019-03-12 2019-05-21 黄河勘测规划设计研究院有限公司 Multi-stage porous pipe weir shunts and warps method
CN110258468A (en) * 2019-07-05 2019-09-20 中国电建集团成都勘测设计研究院有限公司 Sand structure is blocked in hydraulic tunnel

Also Published As

Publication number Publication date
CN106869090B (en) 2019-01-18

Similar Documents

Publication Publication Date Title
CN106869090B (en) Dreg-blocking board sub-assembly and diversion tunnel debris retaining Slagoff method
CN210002360U (en) kinds of mountain gorge damming flood discharge structure
CN103243684A (en) Water permeable masonry tailing dam structure
CN103882839A (en) Sediment releasing system for water intake of low-head river channel pivotal power station
CN206693187U (en) A kind of spillway structure
CN203021973U (en) Sand intercepting groove
CN211256912U (en) Fold-line type flip bucket at outlet of bank spillway/flood discharge tunnel
CN204728261U (en) For the combining structure of blocking that ditch water treatment and mud-rock flow are protected
CN111424620A (en) Hydraulic energy dissipation structure and method
CN104099908B (en) Gravity type sand obstructing and guiding structure
CN204571433U (en) Fluid erosion prevention sulfuric acid tank
CN204282315U (en) A kind of absorption basin discharge structure
CN103614986B (en) It a kind of is applicable to the pressure free current inlet method that Tailings Dam drains off floodwaters
CN106702968B (en) It is a kind of can automatic sand washing subtract the arc line type overflow dam and its operation method of silt
CN1952269A (en) Sand-drainage construction system for diversion channel
CN102383401A (en) Overflow water drainage integral type sluice weir
CN109024492A (en) Channel
CN109356097A (en) The water discharge tunnel makeup of the imports for ditch water process
CN103132482B (en) Flow guiding ridge structure on curve
CN213267769U (en) Be applied to side direction and intake many pipelines of inverted siphon water inlet combination vortex device that disappears
CN107326876B (en) Non-closed non-pumping drainage plunge pool structure
CN201933471U (en) Double-layer separation flood discharge structure of side spillway
CN210086181U (en) Sediment dam structure is blocked to formula of permeating water
CN209538143U (en) A kind of novel spillway control segment structure
CN109083107B (en) Aeration facility for forming aeration cavity by utilizing water flow centripetal force inertia turbulence

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190118

Termination date: 20210324