A kind of high-altitude spiral cable car sightseeing entertainment systems
Technical field
The present invention relates to a kind of show business of large-scale outdoor amusement equipment, gone sightseeing amusement for high-altitude, especially
A kind of high-altitude spiral cable car sightseeing entertainment systems.
Background technology
At present, there are two big shortcomings in high-altitude amusement facility such as sightseeing ferris wheel and high-altitude glass overline bridge:The shortcoming of ferris wheel
It is to take up an area greatly, speed is slow, and people can not leave the cable car of operation;The shortcoming of glass overline bridge is to need natural environment (such as overhanging cliff)
As the support of equipment, thus cannot be used in city.It is whole that two recreation facilities each can not independently be combined unified simultaneously
Body.So needing a kind of high-altitude spiral cable car sightseeing entertainment systems badly to solve traditional high-altitude amusement equipment, take up an area big, speed slowly,
The not enough problem of thrill.
The content of the invention
Traditional high-altitude amusement is solved it is an object of the invention to provide a kind of high-altitude spiral cable car sightseeing entertainment systems to set
It is standby, take up an area big, speed slowly, the not enough problem of thrill.
The present invention uses following technical scheme:
A kind of high-altitude spiral cable car sightseeing entertainment systems, including high tower (1), helical orbit (2), the helical orbit (2)
High tower (1) tower body is wound along the high tower (1) bottom of towe to tower top longitudinal spiral to set, set on the helical orbit (2)
There is cable car (3), the cable car (3) is slided along the helical orbit (2);
The helical orbit (2) includes interior rail (21), outer rail (22), and the interior rail (21) is two, winds described respectively
High tower (1) is upwardly into tower top spiral winding structure in pairs and sets by bottom of towe, and the interior rail (21) is close to the high tower (1) side wall simultaneously
It is secured to;One end of the outer rail (22) after one week, winds high tower (1) spirality along the high tower (1) bottom plate
Rise to the ascent stage that tower top forms outer rail, then wind the high tower (1) spirality and drop to bottom of towe after being turned back by tower top top
The descending branch of outer rail is formed, the double-spiral structure track to form a closed circulation is finally docked with the other end of the outer rail,
The ascent stage of the outer rail, spacing, and interior rail described with two respectively are left between descending branch and the side wall of the high tower (1)
(21) correspondence is be arranged in parallel, and many support beams (23) side by side, institute are horizontally arranged between the interior rail (21) and outer rail (22)
The two ends for stating support beam (23) are separately fixed on the interior rail (21) and outer rail (22), and the cable car (3) is arranged at described outer
On rail (22).
The high tower (1) is nail-shaped high tower, and its tower top (11) is the truss structure for being inverted frustum type, the tower top (11)
Top surface is circular tower top platform one (18), and the top of the tower top platform one (18) is supported by the vertical beam (181) that border is set
Tower top platform two (12) that is parallel and being arranged concentrically constitutes two floor formula structures, and the tower top platform one (18) is flat with the tower top
Platform two (12) is correspondingly arranged on two circular cavities (13) respectively up and down, and the outer rail (22) is worn by the bottom sidewall of the tower top (11)
Enter the tower top (11), and be upward through top institute after being passed by the one of described hole (13) of the tower top platform one (18)
State the described hole (13) that tower top platform two (12) is correspondingly arranged to pass, then turn back by another institute of the tower top platform two (12)
Hole (13) is stated to penetrate and be passed down through the hole (13) lower section positioned at corresponding another institute on the tower top platform one (18)
Hole (13) is stated, the tower top (11) is finally passed by the tower top (11) bottom sidewall, positioned at the tower top platform two (12)
The outer rail (22) between two described hole tops is laterally into horizontally disposed, the cylindrical tower body of tower top (11) bottom
By many cylindrical columns (14), circumferentially corral is closed and formed, and column (14) bottom is placed in ground and fixes, top and institute
The bottom surface for stating tower top (11) is fixed, and the outer ring of the tower top platform one (18) positioned at sustained height is outwards fixed by truss structure
There is ring glass plank road platform one (15), connected by stair between the tower top platform one (18) and the tower top platform two (12)
Connect.
Many places cable car station (16) is provided with the outer rail of the high tower (1) bottom of towe.
Four high velocity vertical sightseeing elevators (17) are provided with high tower (1) the tower body column.
The cable car (3) is multi-section, is driven by two high power motors.
The ring glass plank road platform one (15) has outwards been arranged concentrically ring glass plank road platform two (19).
The outer rail (22) between described hole top overlooks into S types.
The double helix of the double helix winding arrangement is parallel to each other, pitch is equal.
Advantages of the present invention is as follows:
1. outer rail described in uses a closed circulation track, and carry visitor by cable car significantly carries compared with traditional ferris wheel
Gait of march high, improves efficiency, it is possible to leave cable car in tower top platform, and visitor can be in tower top platform or glass plank road
Looked around.Due to using artificial high tower structure, therefore land used is saved, glass plank road also no longer duplicates in traditional glass stack
Road relies on natural environment, fabulous.
2. due to leaving spacing between outer rail and tower body, therefore cable car can be suspended from outside tower body, increase thrill degree.
3. high tower skeleton is in itself the fixed structures of a similar high-rise, and its internal high velocity vertical goes sightseeing electric
Ladder, on the one hand makes the convenient and safe reliability of height rescue.On the other hand, can make to have acrophobia or think the trip got off from tower top at once
Visitor rapidly returns back to ground.Plank road cat ladder is set in the support beam of interior rail side can also conveniently be succoured.
Brief description of the drawings:
Fig. 1 is overall structure diagram of the invention;
Fig. 2 is positive structure schematic of the invention;
Fig. 3 is overlooking the structure diagram of the present invention;
Specific embodiment
Specific embodiment of the invention is described further below in conjunction with the accompanying drawings.
Following examples are only clearly to express example for of the invention, and not to embodiments of the present invention
Limit.For those of ordinary skill in the field, other multi-forms can also be made on the basis of the following description
Change or variation, and these belong to the obvious change or change still in guarantor of the invention that spirit of the invention drawn
Among shield scope.
Referring to each accompanying drawing, a kind of high-altitude spiral cable car sightseeing entertainment systems, including high tower 1, helical orbit 2, the spiral
Track 2 winds the tower body of high tower 1 and sets along the bottom of towe of the high tower 1 to tower top longitudinal spiral, is provided with the helical orbit 2
Cable car 3, the cable car 3 is slided along the helical orbit 2;
The helical orbit 2 includes interior rail 21, outer rail 22, and the interior rail 21 is two, and the high tower 1 is wound respectively by tower
Bottom is upwardly into tower top spiral winding structure in pairs and sets, and the interior rail 21 is close to the side wall of the high tower 1 and is secured to;It is described outer
One end of rail 22 after one week, winds the spirality of high tower 1 and rises to the upper of tower top formation outer rail along the bottom plate of the high tower 1
Rise section, then wind the spirality of the high tower 1 and drop to the descending branch that bottom of towe forms outer rail after being turned back by tower top top, finally and institute
The other end for stating outer rail docks the double-spiral structure track to form a closed circulation, ascent stage of the outer rail, descending branch with
Spacing is left between the side wall of the high tower 1, and interior rail 21 described with two is corresponding respectively be arranged in parallel, the interior rail 21 with it is outer
Be horizontally arranged with many support beams 23 side by side between rail 22, the two ends of the support beam 23 be separately fixed at the interior rail 21 with
On outer rail 22, the cable car 3 is arranged on the outer rail 22.
The high tower 1 is nail-shaped high tower, and its tower top 11 is the truss structure of inversion frustum type, and the top surface of the tower top 11 is
Circular tower top platform 1, the top of the tower top platform 1 is supported parallel and is set with one heart by the vertical beam 181 that border is set
The tower top platform 2 12 put constitutes two floor formula structures, and the tower top platform 1 is right respectively about 2 12 with the tower top platform
Two circular cavities 13 should be provided with, the outer rail 22 penetrates the tower top 11 by the bottom sidewall of the tower top 11, and by the tower
The one of described hole 13 of roof panel 1 is upward through that the top tower top platform 2 12 is correspondingly arranged after passing described
Hole 13 is passed, then another described hole 13 by the tower top platform 2 12 of turning back is penetrated and is passed down through the lower section of hole 13
Corresponding another described hole 13 on the tower top platform 1, is finally passed described by the bottom sidewall of the tower top 11
Tower top 11, the outer rail 22 between 2 12 two described hole tops of the tower top platform is laterally into horizontally disposed, institute
Circumferentially corral is closed and formed by many cylindrical columns 14 to state the cylindrical tower body of the bottom of tower top 11, and the bottom of the column 14 is put
Fixed in ground, top is fixed with the bottom surface of the tower top 11, the outer ring of tower top platform 1 positioned at sustained height passes through
Truss structure is outwards fixed with ring glass plank road platform 1, between the tower top platform 1 and the tower top platform 2 12
Connected by stair.
Many places cable car station 16 is provided with the outer rail of the bottom of towe of the high tower 1.
Four high velocity vertical sightseeing elevators 17 are provided with the tower body column of the high tower 1.
The cable car 3 is multi-section, is driven by two high power motors.
The ring glass plank road platform 1 has outwards been arranged concentrically ring glass plank road platform 2 19.
The outer rail 22 between described hole top overlooks into S types.
The double helix of the double helix winding arrangement is parallel to each other, pitch is equal.
Concrete construction method and principle:
High tower top layer is provided with high-altitude ring glass plank road and helical orbit cable car.Tour tower is steel construction, and 120 meters high, main
A diameter of 6 meters of body, is made up of the high-strength special type steel of 16 a diameter of 600mm.Body interior is four high speed sightseeing elevators, outward
Portion, along 12 rice diameter spiral windings, and is connected by contacting bar by diameter 600mm high tensile steel tubes with main body.Spiral steel pipe will be made
It is the supporter of spiral cable car.Tour tower top layer platform diameter is 24 meters, and sets one again completely by glass structure in outside
The glass ring-shaped overline bridge of composition.Spiral cable car is the variant form of conventional high-altitude cable car, by two high power motors, cable and numbers
Portion's cable car composition, around tour tower up and down with helical trajectory circular flow.
Visitor climbs up cable car by the cable car station below bottom of towe, along outer rail spiral to tower top platform after, can following cable car,
Played on tower top platform and glass plank road with glass platform, gone sightseeing, then drop to bottom of towe multiplied by the cable car spiral sat below.
Because outer rail is a cyclic track for closing so different is interruption with other cable car tracks, therefore effect greatly improved
Rate and visit speed.Outer rail above its described hole is into horizontally disposed, it is ensured that cable car is the most steady at this moment, in convenient trip
Under, under vertical view state into S types, arc transition also ensures that the stability of cable car.The design of tower body has also been broken with natural ring
Border is the limitation for relying on design glass plank road.The sightseeing entertainment mode of glass plank road can be replicated in city, watch city
Scene.