CN106840582A - A kind of impulse wind tunnel operation control system and impulse wind tunnel progress control method - Google Patents

A kind of impulse wind tunnel operation control system and impulse wind tunnel progress control method Download PDF

Info

Publication number
CN106840582A
CN106840582A CN201611203362.6A CN201611203362A CN106840582A CN 106840582 A CN106840582 A CN 106840582A CN 201611203362 A CN201611203362 A CN 201611203362A CN 106840582 A CN106840582 A CN 106840582A
Authority
CN
China
Prior art keywords
pressure
drive section
valve
section
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611203362.6A
Other languages
Chinese (zh)
Other versions
CN106840582B (en
Inventor
孙日明
刘吴月
宋可清
袁明伦
陈星�
毕志献
李海燕
李辰
吴健
蒋博
张冰冰
王玉东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Aerospace Aerodynamics CAAA
Original Assignee
China Academy of Aerospace Aerodynamics CAAA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Aerospace Aerodynamics CAAA filed Critical China Academy of Aerospace Aerodynamics CAAA
Priority to CN201611203362.6A priority Critical patent/CN106840582B/en
Publication of CN106840582A publication Critical patent/CN106840582A/en
Application granted granted Critical
Publication of CN106840582B publication Critical patent/CN106840582B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M9/00Aerodynamic testing; Arrangements in or on wind tunnels
    • G01M9/02Wind tunnels
    • G01M9/04Details

Landscapes

  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The present invention relates to a kind of impulse wind tunnel operation control system and impulse wind tunnel progress control method, system include PLC module, drive section charging valve, drive section deflation valve, drive section pressure sensor, 1/2 valve, double films section deflation valve, double films section pressure sensor, valve of being deflated by drive section charging valve, by drive section, by drive section pressure measuring module, by drive section vacuum-pumping valve, test section deflation valve, test section vacuum-pumping valve, test section pressure sensor, vacuum pump set;Automatically controlling for wind tunnel test process is realized by PLC module, using distributed control mode, all operations are completed between observing and controlling, it is not necessary to carried out operation into scene, isolated high-pressure air source, it is ensured that personnel's operation safety.

Description

A kind of impulse wind tunnel operation control system and impulse wind tunnel progress control method
Technical field
The present invention relates to a kind of impulse wind tunnel operation control system and impulse wind tunnel progress control method, belong to hypersonic The gas circuit operation control of impulse wind tunnel system and status monitoring field.
Background technology
Impulse type wind-tunnel refers to the wind-tunnel that pulse testing air-flow is produced in very short time (a few tens of milliseconds was to 1 second) (《GJB4296 wind tunnel tests term and symbol》).Impulse wind tunnel is main by drive section, double films section, by drive section, single clip film, spray The part such as pipe and test section is constituted.Experimentation major demands parameter is Mach number, Reynolds number, stagnation temperature, stagnation pressure.Mach number passes through Change jet pipe to realize, be pressure ratio before and after guarantee jet pipe, experimentation needs for test section to be evacuated to low-pressure state;Reynolds number passes through quilt Drive section gas pressure, the control of drive section gas pressure;Stagnation temperature, stagnation pressure are by driving gas Stress control;It is control driving gas Body Rupture of Membrane pressure, there is provided double diaphragm sandwiched film mechanisms, to form gradient pressure, treat that high-pressure gas pressure reaches predetermined Rupture of Membrane pressure When rapid release sandwiched film mechanism internal pressure, make rupture of diaphragm.
Common source of the gas trend and factory building layout are as shown in Figure 1.The most of control work of wind tunnel experiment is by experimenter's craft Operation is completed, and whole high-pressure air sources are both needed to be incorporated into control room and carry out manual control, and whole source of the gas circuit is long, pressure is high, easily go out Failure, be unfavorable for safeguard, there is great potential safety hazard.Secondly, conventional control mode uses manually operated valve, visually observes The process of recording status information, operation controls poor repeatability and data record has deviation.
The content of the invention
It is an object of the invention to overcome the deficiencies in the prior art, there is provided a kind of impulse wind tunnel operation control system and pulse Wind tunnel operation control method, realizes the automatic operating of wind tunnel test.
The object of the invention is achieved by following technical solution:
A kind of impulse wind tunnel operation control system, including PLC module, drive section charging valve, drive section vent valve are provided Door, drive section pressure sensor, 1/2 valve, double films section deflation valve, double films section pressure sensor, by drive section charging valve, By drive section deflate valve, by drive section pressure measuring module, by drive section vacuum-pumping valve, test section deflation valve, experiment Section vacuum-pumping valve, test section pressure sensor, vacuum pump set;
The drive section charging valve is used to be controlled under the control of PLC module the inflation of drive section, and the drive section is put Air valve is used to be controlled under the control of PLC module the deflation of drive section, and the drive section pressure sensor is used to detect driving The pressure P1 of section, and it is sent to PLC module;
1/2 valve controls the inflation of double film sections under the control of PLC module, and double film section deflation valves are used in PLC The deflation of double film sections is controlled under the control of module, described pair of film section pressure sensor is used to measure the pressure P2 of double film sections, concurrently Give PLC module;
Controlled to be inflated by drive section under the control of PLC module by drive section charging valve, existed by drive section deflation valve Control to be deflated by drive section under the control of PLC module, controlled to be driven under the control of PLC module by drive section vacuum-pumping valve Section is connected with vacuum pump set, is measured under the control of PLC module by the pressure P3 of drive section by drive section pressure measuring module;
The deflation of test section deflation valve Control experiment section under the control of PLC module, test section vacuum-pumping valve is in PLC Control experiment section is connected with vacuum pump set under the control of module, and test section pressure sensor measures examination under the control of PLC module Test the pressure P4 of section;
What vacuum pump set was connected under the control of PLC module for it is vacuumized by drive section or test section;
PLC module controls the drive section charging valve to open for drive section is inflated, and receives the drive section pressure sensing Device is used for the pressure P1 for detecting;It is double film section inflations that PLC module controls 1/2 valve opening, receives described pair of film section pressure Sensor is used for the pressure P2 for detecting, when the difference of P1-P2 is more than the half of drive section pressure set points, controls the driving Section charging valve is closed, until when the difference of P1-P2 is less than or equal to the half of P1 setting values, reopening drive section charge valve Door;
As bleed pressure Psource>During 15MPa, control drive section charging valve is closed when P1 reaches α times of setting value, Stop inflation, 0.95<α<0.97, as bleed pressure 10MPa<Psource<During 15MPa, P1 is controlled when reaching β times of setting value Drive section charging valve is closed, and stops inflation, 0.97<β<0.99, as bleed pressure Psource<During 10MPa, pressure is opened in control Contracting machine is inflated for source of the gas;Drive section inflation stop after, wait drive section gas pressure balancing after, judge detect pressure P1 whether Meet the requirements, think to meet if the difference between the pressure P1 and setting value of detection is more than setting value less than 1% or P1 It is required that, inflation is completed, if undesirable, open drive section charging valve and drive section charging valve is closed after N seconds, until The pressure P1 of detection meets the requirements;
PLC module control is opened by drive section vacuum-pumping valve, and control vacuum pump set receives institute to being vacuumized by drive section The pressure P3 for being used for detection by drive section pressure sensor is stated, when the pressure P3 of detection reaches setup pressure value, PLC module control Vacuum-pumping valve processed is closed, and it is to be inflated by drive section to control described unlatching by drive section charging valve;As bleed pressure Psource >During 10MPa, control drive section charging valve is closed when P3 reaches 1 times of the α of setting value, stops inflation, 0.97<α1<0.99;When Bleed pressure Psource<During 10MPa, control to open compressor for source of the gas is inflated;After drive section inflation stops, drive section is waited After gas pressure balancing, judge whether the pressure P3 of detection meets the requirements, if the difference between the pressure P3 and setting value of detection Value then thinks to meet the requirements less than 1% or P3 more than setting value, and inflation is completed, if undesirable, opens drive section Drive section charging valve is closed after charging valve N seconds, until the pressure P3 of detection meets the requirements;
PLC module Control experiment section vacuum-pumping valve is opened, and control vacuum pump set is vacuumized to test section, and PLC module connects Acceptance test section pressure sensor sends the pressure P4 of test section, when the pressure P4 of test section reaches setup pressure value, PLC module Control experiment section vacuum-pumping valve is closed;
After PLC module detection P1, P2, P3, P4 are satisfied by requiring, all valves are closed;
When on-test, the double film section deflation valve openings of PLC module control, the gas of drive section breaks through the film of double film sections Piece enters by drive section, then breaks through single-iris and enter test section;Drive section deflation valve is opened after the time of specifying, is put by drive section Air valve and test section deflation valve, complete experiment.
Preferably, high-pressure measurement pipeline, low pressure measurement pipeline, first are included by drive section pressure measuring module Valve, the second valve, high pressure sensor, low pressure sensor and vacuum transducer;The first Valve controlling high-pressure measurement Pipeline is connected with by drive section, and the second Valve controlling low pressure measurement pipeline measures pipeline connection with high-pressure, high Pressure P31 in pressure sensor measurement high-pressure measurement pipeline, low pressure sensor and vacuum transducer measurement low pressure are surveyed Pressure in buret road, pressure measuring value is respectively P32 and P33;
After PLC module control is opened by drive section vacuum-pumping valve, the first valve opening is controlled, high pressure sensor measurement is high Pressure P31 in pressure pressure measurement pipeline, and PLC module is sent to, PLC module is using P31 as by the pressure P3 of drive section; When pressure P31 is less than in the range upper limit equal to low pressure sensor, the second valve, low pressure sensor are opened in PLC module control Pressure P32 in measurement low pressure measurement pipeline, and PLC module is sent to, PLC module is using P32 as by drive section Pressure P3;When the range upper limits of the pressure P32 less than or equal to vacuum transducer, vacuum transducer measurement low pressure measurement is opened Pressure P33 in pipeline, and PLC module is sent to, PLC module is using P33 as by the pressure P3 of drive section;When pressure P3 reaches During to setup pressure value, PLC module control vacuum-pumping valve and the second valve closing, PLC module is using P31 as by drive section Pressure P3.
Preferably, the PLC module includes a PLC, the 2nd PLC and the 3rd PLC;First PLC receives the 3rd PLC Control instruction, control drive section charging valve, drive section deflation valve, 1/2 valve, double films section deflation valve, by drive section Charging valve, valve of being deflated by drive section, the first valve, the second valve, the opening and closing of test section deflation valve, receive and drive The pressure data that dynamic section pressure sensor, double films section pressure sensor, test section pressure sensor send, and it is sent to the 3rd PLC;2nd PLC receives the control instruction of the 3rd PLC, control by drive section vacuum-pumping valve, test section vacuum-pumping valve, The opening and closing of vacuum pump set, and the timing of vacuum pump set running state parameter is sent to the 3rd PLC;3rd PLC connects The outside test parameters instruction for sending of receipts, experiment preparation instruction, on-test, instruct and are sent to a PLC, will control to be driven Dynamic section vacuum-pumping valve, test section vacuum-pumping valve, the opening and closing instruction of vacuum pump set are sent to the 2nd PLC.
Preferably, when it is higher than by drive section low pressure sensor range to set the blowing pressure, PLC module is controlled by drive section When charging valve is opened, by drive section vacuum-pumping valve and the second valve closing and locked, it is impossible to manually opened.
Preferably, when pressure P1 reaches 0.8 times of setting value in test section gas replenishment process, PLC module control is vacuumized Valve and the second valve closing are simultaneously locked, it is impossible to manually opened.
Preferably, when low pressure sensor and vacuum transducer measured pressure value exceed itself range, PLC module sends alarm Signal.
A kind of control method using the impulse wind tunnel operation control system is provided simultaneously, is comprised the following steps:
(1) PLC module control is vacuumized to test section, until setup pressure value;
(2) in (1) vacuum, PLC module control by drive section to carrying out pressure regulation, until reaching setting pressure Force value;
(3) after the completion of (1) (2) step, PLC module control is to drive section and the section inflation of double films, until drive section and double Film section pressure reaches setup pressure value;
(4) whether PLC module judges be satisfied by requiring by the pressure of drive section, test section, drive section and double films section, if Meet and require to close all valves, start experiment, if being unsatisfactory for requiring, timing 15 minutes, wait 15 are started since step (3) Still backlog demand after minute, applies for manual intervention;
(5) PLC module opens double film section vent valves, self-driven section of test air-flow, double films section, is flowed to by drive section and tested Section, is tested, off-test after double film section rupture 1s;All vent valves are opened in PLC controls.
The present invention has the following advantages that compared with prior art:
(1) present invention uses distributed control mode, and all operations are completed between observing and controlling, it is not necessary to made into scene Industry, has isolated high-pressure air source, it is ensured that personnel's operation safety.
(2) present invention carries out data acquiring and recording using PLC, can realize display and the accurate recording of control parameter, carries The high confidence level and the repeatability of running status of service data.
(3) present invention carries out inflation/deflation operation using PLC, by setting value and real time contrast's mode of desired value, for Different the blowing pressures take Different Strategies, improve the inflation degree of accuracy, and reduce the personnel to operate intensity.
(4) for by the pressure range larger part such as drive section, taking vacuum meter, low pressure sensor and high pressure to sense The mode that device is combined, fragmet auto-switch display currency, improves data collection and control precision.
Brief description of the drawings
Fig. 1 is common wind-tunnel gas circuit and operation logic figure;
Fig. 2 is segmented pressure instrumentation plan;
Fig. 3 is impulse wind tunnel operation logic figure;
Fig. 4 is wind tunnel operation control system theory diagram;
Fig. 5 is experiment process figure of the present invention.
Specific embodiment
Impulse wind tunnel operation control system of the invention includes PLC module, drive section charging valve, drive section vent valve Door, drive section pressure sensor, 1/2 valve, double films section deflation valve, double films section pressure sensor, by drive section charging valve, By drive section deflate valve, by drive section pressure measuring module, by drive section vacuum-pumping valve, test section deflation valve, experiment Section vacuum-pumping valve, test section pressure sensor, vacuum pump set.Implement function such as:
1st, segmented pressure measurement and data record
By drive section connection high-pressure measurement pipeline, measurement gas path on-off, the high pressure after valve 1 are controlled by valve 1 Low pressure measurement pipeline is connected on pressure measxurement pipeline, low pressure measurement pipe drive test amount gas path on-off is controlled by valve 2.
As shown in Fig. 2 needing pressure to be possible to hundreds of kPas from tens handkerchiefs depending on experiment by drive section.If using solid Determine range sensorses, will certainly there is the not enough situation of certainty of measurement.The present invention is applied in combination using three kinds of sensors, and high pressure is passed Sensor P31 (0~2MPa), low pressure sensor P32 (0~150KPa), (0~3KPa, resistance to compression is more than vacuum transducer P33 150KPa) measure by the pressure P3 of drive section, therefore, in order to improve test measurement precision, devise using three kinds of sensors point The form of section measurement.When to being evacuated or during charge operation by drive section, first Open valve 1, by by the gas of drive section It is incorporated into, opens high pressure sensor P31 and begin with reading, then judges according to following rules.
Work as P31 in pumping process>During Pset1, represent that current pressure values are higher, current pressure values use high pressure sensor P31 is measured, and is P3=P31;Pset1 is set to the range upper limit of low pressure sensor, for example, could be arranged to 150KMpa.
Work as P31<During Pset1, it is smaller to represent current pressure values, Open valve 2, by judging that P32 obtains current pressure values;
Work as P32>During Pset2, current pressure values are P3=P32, and otherwise current pressure values are P3=P33;Pset2 is set to The range upper limit of vacuum transducer, for example, could be arranged to 3KPa.
Valve 2 is closed in gas replenishment process, using high pressure sensor P31 measurements by the pressure P3 of drive section.
By PLC controls, storage is pressure P3 to the break-make of above-mentioned judgement and valve with show value.
All data acquisitions are carried out according to 20Hz sample rates, when on-test, by drive section near single clip film location Total-pressure probe has unexpected pressure and rises, now as flash test state, records now each sampled point pressure value conduct Test parameters participates in follow-up data and calculates.Trystate can relatively accurately be recorded using this kind of samples storage mode, it is to avoid The error that artificial sensing tape comes.
2nd, automatic pressure regulation
From the figure 3, it may be seen that wind tunnel operation process main control parameters are drive section gas pressure P1, double film intersegmental part pressure P2, by driving gas pressure P3, test section pressure P4.Wind tunnel operation control system is to realize above-mentioned parameter adjustment and each portion What isloation state was controlled and designed.
(1) drive section gas pressure P1 regulations:
The regulation of drive section gas pressure is main to be completed by switch drive section charge valve.Because pipeline bore is limited and is filled Gas process pressure sensor reaction speed is limited, if charge valve is controlled only with direct threshold value setting method be easily caused Pressure overshoot phenomenon.If overshoot is larger, declined by vent valve pressure whard to control.Therefore it is required that gas replenishment process is controllable.Root According to bleed pressure Psource and by the relation between drive section volume, inflation rule is summarized as follows:
Work as Psource>During 15MPa, P1 stops inflation (0.95 when reaching α times of setting value<α<0.97);
Work as Psource<15MPa and Psource>During 10MPa, P1 stops inflation (0.97 when reaching β times of setting value<β< 0.99);
Work as Psource<During 10MPa, assert that air pressure is not enough, it is necessary to open compressor inflation.
After aeration phase stops, after drive section gas pressure balancing (about 30s), the difference between contrast P1 and setting value is small Then assert that inflation is completed more than setting value in 1% or P1.Otherwise opening point mold filling formula, that is, close to enter again after opening charge valve 2s Row judges until inflation terminates.
(2) double film section gas pressure P2 regulations:
Directly drive section gas is taken in double film sections by 1/2 valve to be inflated, finally obtain P2=1/2P1, its pressurising speed Cannot directly be adjusted by 1/2 valve.If too fast by drive section inflation rate, and 1/2 valve inflation rate cannot meet condition Cause pressure difference between P1 and P2 larger, easily cause double film section diaphragms to rupture in advance, cause test failure, and easily cause vacuum Unit is damaged with low pressure sensor.
Therefore, setting segmentation airing form is taken, when the two pressure difference is more than setting value Perror (taking 1/2P1 setting values) Drive section charge valve is closed, stops inflation, treat the two P1:P2 pressure ratios are close to 2:Restart inflation when 1.For example:Setting P1 10MPa is inflated to, then (P1-P2)>During 5MPa, the drive section charging valve is controlled to close, until during (P1-P2)≤5MPa, Reopen drive section charging valve.
(3) adjusted by drive section gas pressure P3:
It is adjusted by charge valve, vavuum pump two ways by the regulation of drive section gas pressure.When setup pressure value is small It is evacuated, it is necessary to open vavuum pump in an atmospheric pressure or when needing and changing by gas condition in drive section.Pumping process The start and stop of vavuum pump and the switch of vacuum valve is directly controlled to realize.
Gas replenishment process is similar with drive section gas pressure P1 regulations, also takes segmented to inflate.
Work as Psource>During 10MPa, P3 stops inflation (0.97 when reaching 1 times of the α of setting value<α1<0.99);
Work as Psource<During 10MPa, assert that air pressure is not enough, it is necessary to open compressor inflation.
After drive section inflation stops, after waiting drive section gas pressure balancing, judge whether the pressure P3 of detection conforms to Ask, think to meet the requirements if the difference between the pressure P3 and setting value of detection is more than setting value less than 1% or P3, fill Gas is completed, if undesirable, open drive section charging valve and drive section charging valve is closed after N seconds, until detection Pressure P3 meets the requirements;
(4) test section gas pressure P4 regulations:
When vacuumizing, gas circuit valve and vacuum-pumping valve, vacuumize to test section where turn on sensor, work as pressure During less than setting value and when continuing more than 10s, complete to vacuumize, close vacuum-pumping valve,;Real-time monitoring current vacuum level is big In setting value, more than then reopening vacuum-pumping valve vacuumize process.
Control method, comprises the following steps:
(1) PLC module control is vacuumized to test section, until setup pressure value;
(2) in (1) vacuum, PLC module is controlled to carrying out pressure regulation by drive section P3, until reaching setting Pressure value;
(3) after the completion of (1) (2) step, PLC module control is to drive section and the section inflation of double films, until drive section and double Film section pressure reaches setup pressure value;
(4) whether PLC module judges be satisfied by requiring by the pressure of drive section, test section, drive section and double films section, if Meet and require to close all valves, start experiment, if being unsatisfactory for requiring, timing 15 minutes, has waited since the step (3) Still backlog demand after finishing, ejects Manual test dialog box application manual intervention;
(5) PLC module opens double film section vent valves, self-driven section of test air-flow, double films section, is flowed to by drive section and tested Section, is tested.Off-test after double film section rupture 1s;All vent valves, off-test are opened in PLC controls.
After P1~P4 sections of pressure is satisfied by requiring, all of valve is closed.
Double film section deflation valves are opened, P2 is declined rapidly, P1 and P2 pressure differences expand rapidly, make rupture of diaphragm, complete real Test.Duration of test runs 1s, opens all deflation valves after 2s.
Test section needs in process of the test to ensure low-pressure state, by the start and stop and the vacuum valve that directly control vavuum pump Switch to realize.
As shown in figure 4, using distributed control mode, control system is by a main control computer being arranged between gas control It is connected with main control PLC by EPA.Main control PLC is capable of achieving locally, remotely control manually with equipment room scene PLC communications Function, so both remote operation can also be switched to local mode and be controlled at the scene between gas control.System realizes valve Door operation and vacuum pump operation automation function, and with functions such as real time data monitoring, overpressure protections.Whole control program is carried The automaticity of source of the gas control high, simultaneity factor has good autgmentability.
High-pressure gas circuit is all moved to the less testing ground of personnel activity, effectively realizes high-pressure air source and personnel's Isolation.Fed back through operations staff, system run all right reliability is simple and efficient to handle, largely improves wind tunnel operation efficiency. Simultaneously because operated pneumatic valve is deflated, repeatability preferably, compared with artificial operation, effectively improves wind tunnel operation precision.
System's operating mode is divided into two kinds of remote monitoring and local operation, and the two is cut by primary control program between observing and controlling Change.It is located at three buildings directly over test section between observing and controlling, operating desk and main control computer are located therein.
3rd, remote monitoring
System mainly operates in remote monitoring pattern, i.e. operating personnel by operating desk button between observing and controlling or runs on work Control interface on control machine operates all parts.
Operate under remote monitoring mode, be arranged at the touch-screen beside wind-tunnel line and be only used for showing current state, it is impossible to Carry out any operation input.Under remote monitoring pattern, system operation can be made in manually, partly by the selecting switch of operating desk again Automatically, automatic three kinds of different modes, valve state is constant in each mode handoff procedure.
(1) manual mode
System operation is in remote monitoring mode, operating desk selection manual mode.The all controls of system pass through under this pattern Operating desk entity button is carried out, and each is switched each button correspondence, is clicked button by operating personnel and is operated, in background program It is not provided with safety interlocking.
(2) semiautomatic-mode
Under semiautomatic-mode, operated by the entity button on testing stand, but simplify operation button quantity and carry out Corresponding safety interlocking sets, it is ensured that experiment is smoothed out.
(3) automatic mode
Under automatic mode, after setting operation state (drive section pressure, by drive section pressure), click " beginning " and press Button, is automatically performed drive section charge operation, and provides prompt message, and personnel to be operated carry out next step operation after confirming, and according to Experiment process is carried out according to this.For automatic mode, operating personnel can cancel the pattern according to actual conditions in test process, and Subsequent manual operation can conveniently be carried out.
4th, local operation
After setting local operation in primary control program, primary control program and operating desk button lose operation input function, only Do status display.System is operated by being arranged on the local touch-screen near double film sections.Touch-screen shows current main pressure Force parameter, can operate all valve switch and show its current state in real time.
As shown in figure 5, listing all operationss flow once tested.
(1) " on-test " button, setting or confirmation parameter determination test parameters are clicked on.
Set drive section pressure (MPa), 0-1, acquiescence (are limited by drive section pressure (MPa) and rupture of membranes threshold coefficient 0.8).Other specification only shows.
(2) vacuum pump set sends to vacuum pump set and vacuumizes instruction according to set device state;
" starting to vacuumize " ACK button is clicked on, test section vacuum pump system open command is opened vacuum-pumping valve, opened " vacuum meter valve "
(3) according to test requirements document, it is evacuated by drive section after inflating or vacuumizing and fills test gas;
Two options are ejected by drive section, experiment gas or air is filled.
Experiment gas is filled in selection, open by drive section " vacuum pump valve, open by drive section " pressure measurement main valve ", open and " survey true Empty valve ", vavuum pump is closed after reaching predetermined vacuum degree.Open " test gas valve " and fill test gas, determined according to setting pressure, Whether close " survey vacuum valve ".Keep " pressure measurement main valve ".After inflation is finished, close " test gas valve ".
Air is filled in selection, opens " test gas valve " and fills test gas, is determined according to setting pressure, if closes and " surveys true Empty valve ".Keep " pressure measurement main valve ".After inflation is finished, close " test gas valve ".
(3) drive section is filled with the test gas of specified pressure;
Drive section " charge valve " is opened, and " pressure valve " is closed, and after test pressure is charged to, is closed " charge valve ".
(4) ensure to be closed by the operated pneumatic valve in drive section and drive section before starting experiment;
Automatically check " by drive section vent valve " and whether " drive section vent valve " is closed mode, point out " whether rupture of membranes "
(5) main folder film is deflated, the rupture of diaphragm of main folder film and single clip film.Test gas is formed after jet pipe;
Whether inspection is finished, ejection " rupture of membranes " dialog box, and selection is to open " main folder film vent valve ".
(6) deflated by drive section, vacuum pump set is closed, emptying;
Opening is " by drive section vent valve ", " drive section vent valve ", closing vacuum pump set respective valves, unlatching " test section Vent valve ".
(7) experiment is finished
Vent valve is kept to open, other valve closings.
5th, experimental report
Experimental report function essential record current operator, experiment the rupture of membranes time and corresponding drive section, double films section and By drive section rupture of membranes when pressure value.This function measuring point has two decision procedures:One is to press double film section release button moment; Two is not press button but automatic rupture of membranes moment, is now needed by judging that double film section pressure decline more than setting value X.
Experimental report should be with function be derived automatically from, and specific form is with reference to given reference paper.
All pressure sensors should have demarcates zero point function.
6th, interlock requirement
(1) it is identical with drive section pressure by drive section after rupture of membranes, by calibration device for high range pressure transducer in drive section (0~ When 20MPa) judging pressure more than 1.5MPa, can not be opened by drive section measurement gas circuit valve 1 (prevents after rupture of membranes without abundant Deflation turns on measurement gas circuit valve, causes sensor degradation).
(2) when being opened by drive section charge valve, can not be opened by valve in drive section vacuum and low pressure measurement gas circuit, it is impossible to It is manually opened.
(3) test requirements document drive section state is X MPa, when drive section inflation reaches 0.8X MPa, (has now been completed P3, P4 pressure are adjusted) it is in by drive section measurement gas circuit valve and is closed, vacuumize the closing of branch road pneumatic operated valve.(prevent diaphragm from manufacturing Error causes prematurely ruptured membrane).
(4) when being outranged by drive section low pressure sensor, closed by drive section measurement gas circuit valve 2, and send alarm.
(5) drive section and multiple sensors measurement same positions are provided with by drive section and test section, should first open big Range sensorses, select the sensor for showing suitable range to export further according to the change of actual value by switch valve operation.
All equal setting range limitations of input information, all show values set alarm limit system.
The above, optimal specific embodiment only of the invention, but protection scope of the present invention is not limited thereto, Any one skilled in the art the invention discloses technical scope in, the change or replacement that can be readily occurred in, Should all be included within the scope of the present invention.
The content not being described in detail in description of the invention belongs to the known technology of professional and technical personnel in the field.

Claims (7)

1. a kind of impulse wind tunnel operation control system, it is characterised in that:Put including PLC module, drive section charging valve, drive section Air valve, drive section pressure sensor, 1/2 valve, double films section deflation valve, double films section pressure sensor, inflated by drive section Valve, valve of being deflated by drive section, by drive section pressure measuring module, by drive section vacuum-pumping valve, test section deflation valve, Test section vacuum-pumping valve, test section pressure sensor, vacuum pump set;
The drive section charging valve is used to be controlled under the control of PLC module the inflation of drive section, the drive section vent valve , for the deflation of the control drive section under the control of PLC module, the drive section pressure sensor is for detecting drive section for door Pressure P1, and it is sent to PLC module;
1/2 valve controls the inflation of double film sections under the control of PLC module, and double film section deflation valves are used in PLC module Control under the double films sections of control deflation, described pair of film section pressure sensor is used to measure the pressure P2 of double films sections, and is sent to PLC module;
Controlled to be inflated by drive section under the control of PLC module by drive section charging valve, by drive section deflation valve in PLC moulds Control to be deflated by drive section under the control of block, by drive section vacuum-pumping valve controlled under the control of PLC module by drive section with Vacuum pump set is connected, and is measured under the control of PLC module by the pressure P3 of drive section by drive section pressure measuring module;
The deflation of test section deflation valve Control experiment section under the control of PLC module, test section vacuum-pumping valve is in PLC module Control under Control experiment section connected with vacuum pump set, test section pressure sensor measures test section under the control of PLC module Pressure P4;
What vacuum pump set was connected under the control of PLC module for it is vacuumized by drive section or test section;
PLC module controls the drive section charging valve to open for drive section is inflated, and receives the drive section pressure sensor and uses In the pressure P1 of detection;It is double film section inflations that PLC module controls 1/2 valve opening, receives described pair of film section pressure sensing Device is used for the pressure P2 for detecting, when the difference of P1-P2 is more than the half of drive section pressure set points, controls the drive section to fill Air valve is closed, until when the difference of P1-P2 is less than or equal to the half of P1 setting values, reopening drive section charging valve;
As bleed pressure Psource>During 15MPa, control drive section charging valve is closed when P1 reaches α times of setting value, is stopped Inflation, 0.95<α<0.97, as bleed pressure 10MPa<Psource<During 15MPa, control drives when P1 reaches β times of setting value Section charging valve is closed, and stops inflation, 0.97<β<0.99, as bleed pressure Psource<During 10MPa, compressor is opened in control For source of the gas is inflated;After drive section inflation stops, after waiting drive section gas pressure balancing, judge whether the pressure P1 of detection meets It is required that, think to meet the requirements if the difference between the pressure P1 and setting value of detection is more than setting value less than 1% or P1, Inflation is completed, if undesirable, open drive section charging valve and drive section charging valve is closed after N seconds, until detection Pressure P1 meet the requirements;
PLC module control is opened by drive section vacuum-pumping valve, and control vacuum pump set receives the quilt to being vacuumized by drive section Drive section pressure sensor is used for the pressure P3 for detecting, when the pressure P3 of detection reaches setup pressure value, PLC module control is taken out Vacuum valve is closed, and it is to be inflated by drive section to control described unlatching by drive section charging valve;As bleed pressure Psource> During 10MPa, control drive section charging valve is closed when P3 reaches 1 times of the α of setting value, stops inflation, 0.97<α1<0.99;Work as gas Source pressure Psource<During 10MPa, control to open compressor for source of the gas is inflated;After drive section inflation stops, drive section gas is waited After body pressure balance, judge whether the pressure P3 of detection meets the requirements, if the difference between the pressure P3 and setting value of detection Less than 1% or P3 then thinks to meet the requirements more than setting value, inflation is completed, if undesirable, opened drive section and is filled Drive section charging valve is closed after air valve N seconds, until the pressure P3 of detection meets the requirements;
PLC module Control experiment section vacuum-pumping valve is opened, and control vacuum pump set is vacuumized to test section, and PLC module receives examination The pressure P4 that section pressure sensor sends test section is tested, when the pressure P4 of test section reaches setup pressure value, PLC module control Test section vacuum-pumping valve is closed;
After PLC module detection P1, P2, P3, P4 are satisfied by requiring, all valves are closed;
When on-test, the double film section deflation valve openings of PLC module control, the gas of drive section breaks through pair diaphragm of films section and enters Enter by drive section, then break through single-iris and enter test section;Drive section deflation valve is opened after the time of specifying, by drive section vent valve Door and test section deflation valve, complete experiment.
2. impulse wind tunnel operation control system according to claim 1, it is characterised in that by drive section pressure measuring module bag Include high-pressure measurement pipeline, low pressure measurement pipeline, the first valve, the second valve, high pressure sensor, low pressure sensor and Vacuum transducer;The first Valve controlling high-pressure measurement pipeline is connected with by drive section, and second Valve controlling is low Pressure pressure measures pipeline and measures pipeline connection, the pressure in high pressure sensor measurement high-pressure measurement pipeline with high-pressure P31, low pressure sensor and vacuum transducer measurement low pressure measurement pipeline in pressure, pressure measuring value be respectively P32 and P33;
After PLC module control is opened by drive section vacuum-pumping valve, the first valve opening, high pressure sensor measurement high pressure pressure are controlled Pressure P31 in power measurement pipeline, and PLC module is sent to, PLC module is using P31 as by the pressure P3 of drive section;Work as pressure Less than when the range upper limit equal to low pressure sensor, the second valve, low pressure sensor measurement are opened in PLC module control to power P31 Pressure P32 in low pressure measurement pipeline, and PLC module is sent to, PLC module is using P32 as by the pressure of drive section P3;When the range upper limits of the pressure P32 less than or equal to vacuum transducer, vacuum transducer measurement low pressure measurement pipeline is opened Interior pressure P33, and PLC module is sent to, PLC module is using P33 as by the pressure P3 of drive section;Set when pressure P3 reaches During level pressure force value, PLC module control vacuum-pumping valve and the second valve closing, PLC module is using P31 as by the pressure of drive section Power P3.
3. impulse wind tunnel operation control system according to claim 2, it is characterised in that the PLC module includes first PLC, the 2nd PLC and the 3rd PLC;First PLC receives the control instruction of the 3rd PLC, control drive section charging valve, driving Duan Fangqi valves, 1/2 valve, double films section deflation valve, valve of being deflated by drive section charging valve, by drive section, the first valve, The opening and closing of the second valve, test section deflation valve, receive drive section pressure sensor, double films section pressure sensor, examination The pressure data that section pressure sensor sends is tested, and is sent to the 3rd PLC;The control that 2nd PLC receives the 3rd PLC refers to Order, control by drive section vacuum-pumping valve, test section vacuum-pumping valve, vacuum pump set opening and closing, and by vacuum pump set Running state parameter timing is sent to the 3rd PLC;3rd PLC receives the outside test parameters instruction for sending, experiment and prepares Instruction, on-test, instruct and are sent to a PLC, will control by drive section vacuum-pumping valve, test section vacuum-pumping valve, true The opening and closing instruction of empty unit is sent to the 2nd PLC.
4. impulse wind tunnel operation control system according to claim 2, it is characterised in that when setting the blowing pressure is higher than being driven During dynamic section low pressure sensor range, when PLC module control is opened by drive section charging valve, by drive section vacuum-pumping valve and the Two valve closings are simultaneously locked, it is impossible to manually opened.
5. impulse wind tunnel operation control system according to claim 2, it is characterised in that when pressure in test section gas replenishment process When P1 reaches 0.8 times of setting value, PLC module control vacuum-pumping valve and the second valve closing are simultaneously locked, it is impossible to manually opened.
6. impulse wind tunnel operation control system according to claim 2, it is characterised in that low pressure sensor and vacuum transducer When measured pressure value exceedes itself range, PLC module sends alarm signal.
7. a kind of control method based on impulse wind tunnel operation control system described in claim 1 or 2, it is characterised in that including such as Lower step:
(1) PLC module control is vacuumized to test section, until setup pressure value;
(2) in (1) vacuum, PLC module is controlled to carrying out pressure regulation by drive section, until reaching setting pressure Value;
(3) after the completion of (1) (2) step, PLC module control is inflated to drive section and double film sections, until drive section and double film sections Pressure reaches setup pressure value;
(4) whether PLC module judges be satisfied by requiring by the pressure of drive section, test section, drive section and double films section, if met It is required that closing all valves, start experiment, if being unsatisfactory for requiring, timing 15 minutes, wait 15 minutes are started since step (3) Still backlog demand, applies for manual intervention afterwards;
(5) PLC module opens double film section vent valves, self-driven section of test air-flow, double films section, flows to test section by drive section, enters Row experiment, off-test after double film section rupture 1s;All vent valves are opened in PLC controls.
CN201611203362.6A 2016-12-23 2016-12-23 A kind of impulse wind tunnel operation control system and impulse wind tunnel progress control method Active CN106840582B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611203362.6A CN106840582B (en) 2016-12-23 2016-12-23 A kind of impulse wind tunnel operation control system and impulse wind tunnel progress control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611203362.6A CN106840582B (en) 2016-12-23 2016-12-23 A kind of impulse wind tunnel operation control system and impulse wind tunnel progress control method

Publications (2)

Publication Number Publication Date
CN106840582A true CN106840582A (en) 2017-06-13
CN106840582B CN106840582B (en) 2019-04-09

Family

ID=59137030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611203362.6A Active CN106840582B (en) 2016-12-23 2016-12-23 A kind of impulse wind tunnel operation control system and impulse wind tunnel progress control method

Country Status (1)

Country Link
CN (1) CN106840582B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107806977A (en) * 2017-11-29 2018-03-16 中国航空工业集团公司沈阳空气动力研究所 A kind of high enthalpy impulse wind tunnel pipe structure of the wide Mach number of combined type
CN108051176A (en) * 2017-11-29 2018-05-18 中国航空工业集团公司沈阳空气动力研究所 A kind of high enthalpy tube wind tunnel driving tube body of width Mach number
CN108181078A (en) * 2017-12-19 2018-06-19 中国航天空气动力技术研究院 A kind of piston for gun wind tunnel stops stop device
CN108398272A (en) * 2017-12-14 2018-08-14 中国航天空气动力技术研究院 A kind of fuel system and method for the experiment of shock tunnel super burn engine inlets
CN108662173A (en) * 2018-07-02 2018-10-16 中北大学 A kind of valve for connecting shock tube low pressure stage and vacuum pump
CN108760217A (en) * 2018-04-28 2018-11-06 北京航天长征飞行器研究所 A kind of wind tunnel operation control system based on distributed structure/architecture
CN108827072A (en) * 2018-08-24 2018-11-16 杜蘅轩 It is a kind of can inflation/deflation transmitting moving system
CN110987359A (en) * 2019-12-25 2020-04-10 中国空气动力研究与发展中心低速空气动力研究所 Pressure control system for PSP dynamic calibration device
CN111006841A (en) * 2019-11-29 2020-04-14 中国航天空气动力技术研究院 Wide-area air inlet pressure regulating system for hypersonic wind tunnel
CN111521349A (en) * 2020-04-21 2020-08-11 博众精工科技股份有限公司 Inflation and deflation control method, device and system, electronic equipment and medium
CN111751074A (en) * 2020-07-01 2020-10-09 中国科学院力学研究所 Detonation-driven high-enthalpy shock tunnel automatic inflation control system
CN112729750A (en) * 2020-12-22 2021-04-30 中国空气动力研究与发展中心超高速空气动力研究所 Three-branch series hypersonic wind tunnel overall structure
CN112945510A (en) * 2021-05-07 2021-06-11 中国空气动力研究与发展中心超高速空气动力研究所 Total pressure rapid regulation and control method for reducing hypersonic wind tunnel starting impact
CN113720571A (en) * 2021-06-02 2021-11-30 中国航天空气动力技术研究院 Ludwieg tubular static wind tunnel and starting method thereof
CN114184349A (en) * 2022-02-15 2022-03-15 中国空气动力研究与发展中心高速空气动力研究所 Method for obtaining supersonic jet static operation pressure matching point of jet wind tunnel
CN114544136A (en) * 2022-04-22 2022-05-27 中国航空工业集团公司沈阳飞机设计研究所 Embedded surface pressure gradient measuring device
CN116907789A (en) * 2023-09-12 2023-10-20 中国航空工业集团公司沈阳空气动力研究所 Multi-system synchronous identification method and device based on pressure measurement

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003075289A (en) * 2001-08-31 2003-03-12 Mitsubishi Heavy Ind Ltd Heat storage body heating type wind tunnel system having preheater utilizing exhaust gas and method for controlling burner in wind tunnel system
CN104932565A (en) * 2015-06-04 2015-09-23 中国空气动力研究与发展中心高速空气动力研究所 High-precision temporary punching type injecting transonic speed wind tunnel flow field control structure
CN105203253A (en) * 2015-10-14 2015-12-30 中国航空工业集团公司哈尔滨空气动力研究所 Multi-range pressure measuring segmentation collecting control method suitable for wind tunnel experiment
CN105651482A (en) * 2015-12-29 2016-06-08 中国航天空气动力技术研究院 Control system and method of stop valve and total pressure regulating valve in hypersonic wind tunnel

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003075289A (en) * 2001-08-31 2003-03-12 Mitsubishi Heavy Ind Ltd Heat storage body heating type wind tunnel system having preheater utilizing exhaust gas and method for controlling burner in wind tunnel system
CN104932565A (en) * 2015-06-04 2015-09-23 中国空气动力研究与发展中心高速空气动力研究所 High-precision temporary punching type injecting transonic speed wind tunnel flow field control structure
CN105203253A (en) * 2015-10-14 2015-12-30 中国航空工业集团公司哈尔滨空气动力研究所 Multi-range pressure measuring segmentation collecting control method suitable for wind tunnel experiment
CN105651482A (en) * 2015-12-29 2016-06-08 中国航天空气动力技术研究院 Control system and method of stop valve and total pressure regulating valve in hypersonic wind tunnel

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
褚卫华 等: "2m×2m超声速风洞流场控制策略研究与实现", 《实验液体力学》 *

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108051176B (en) * 2017-11-29 2019-11-15 中国航空工业集团公司沈阳空气动力研究所 A kind of high enthalpy tube wind tunnel of width Mach number drives tube body
CN108051176A (en) * 2017-11-29 2018-05-18 中国航空工业集团公司沈阳空气动力研究所 A kind of high enthalpy tube wind tunnel driving tube body of width Mach number
CN107806977B (en) * 2017-11-29 2024-04-09 中国航空工业集团公司沈阳空气动力研究所 Combined wide Mach number high enthalpy pulse wind tunnel tube structure
CN107806977A (en) * 2017-11-29 2018-03-16 中国航空工业集团公司沈阳空气动力研究所 A kind of high enthalpy impulse wind tunnel pipe structure of the wide Mach number of combined type
CN108398272A (en) * 2017-12-14 2018-08-14 中国航天空气动力技术研究院 A kind of fuel system and method for the experiment of shock tunnel super burn engine inlets
CN108181078A (en) * 2017-12-19 2018-06-19 中国航天空气动力技术研究院 A kind of piston for gun wind tunnel stops stop device
CN108760217A (en) * 2018-04-28 2018-11-06 北京航天长征飞行器研究所 A kind of wind tunnel operation control system based on distributed structure/architecture
CN108760217B (en) * 2018-04-28 2020-03-24 北京航天长征飞行器研究所 Wind tunnel operation control system based on distributed architecture
CN108662173A (en) * 2018-07-02 2018-10-16 中北大学 A kind of valve for connecting shock tube low pressure stage and vacuum pump
CN108662173B (en) * 2018-07-02 2019-08-23 中北大学 It is a kind of for connecting the valve of shock tube low pressure stage and vacuum pump
CN108827072A (en) * 2018-08-24 2018-11-16 杜蘅轩 It is a kind of can inflation/deflation transmitting moving system
CN111006841A (en) * 2019-11-29 2020-04-14 中国航天空气动力技术研究院 Wide-area air inlet pressure regulating system for hypersonic wind tunnel
CN111006841B (en) * 2019-11-29 2022-07-05 中国航天空气动力技术研究院 Wide-area air inlet pressure regulating system for hypersonic wind tunnel
CN110987359A (en) * 2019-12-25 2020-04-10 中国空气动力研究与发展中心低速空气动力研究所 Pressure control system for PSP dynamic calibration device
CN111521349A (en) * 2020-04-21 2020-08-11 博众精工科技股份有限公司 Inflation and deflation control method, device and system, electronic equipment and medium
CN111751074A (en) * 2020-07-01 2020-10-09 中国科学院力学研究所 Detonation-driven high-enthalpy shock tunnel automatic inflation control system
CN112729750A (en) * 2020-12-22 2021-04-30 中国空气动力研究与发展中心超高速空气动力研究所 Three-branch series hypersonic wind tunnel overall structure
CN112729750B (en) * 2020-12-22 2022-04-22 中国空气动力研究与发展中心超高速空气动力研究所 Three-branch series hypersonic wind tunnel overall structure
CN112945510B (en) * 2021-05-07 2021-09-03 中国空气动力研究与发展中心超高速空气动力研究所 Total pressure rapid regulation and control method for reducing hypersonic wind tunnel starting impact
CN112945510A (en) * 2021-05-07 2021-06-11 中国空气动力研究与发展中心超高速空气动力研究所 Total pressure rapid regulation and control method for reducing hypersonic wind tunnel starting impact
CN113720571A (en) * 2021-06-02 2021-11-30 中国航天空气动力技术研究院 Ludwieg tubular static wind tunnel and starting method thereof
CN113720571B (en) * 2021-06-02 2023-12-12 中国航天空气动力技术研究院 Ludwieg tubular static wind tunnel and starting method thereof
CN114184349A (en) * 2022-02-15 2022-03-15 中国空气动力研究与发展中心高速空气动力研究所 Method for obtaining supersonic jet static operation pressure matching point of jet wind tunnel
CN114184349B (en) * 2022-02-15 2022-04-15 中国空气动力研究与发展中心高速空气动力研究所 Method for obtaining supersonic jet static operation pressure matching point of jet wind tunnel
CN114544136A (en) * 2022-04-22 2022-05-27 中国航空工业集团公司沈阳飞机设计研究所 Embedded surface pressure gradient measuring device
CN114544136B (en) * 2022-04-22 2022-08-19 中国航空工业集团公司沈阳飞机设计研究所 Embedded surface pressure gradient measuring device
CN116907789A (en) * 2023-09-12 2023-10-20 中国航空工业集团公司沈阳空气动力研究所 Multi-system synchronous identification method and device based on pressure measurement
CN116907789B (en) * 2023-09-12 2023-11-28 中国航空工业集团公司沈阳空气动力研究所 Multi-system synchronous identification method and device based on pressure measurement

Also Published As

Publication number Publication date
CN106840582B (en) 2019-04-09

Similar Documents

Publication Publication Date Title
CN106840582B (en) A kind of impulse wind tunnel operation control system and impulse wind tunnel progress control method
CN104791231B (en) Leak detection system and method for air compressor
CN102706752B (en) On-line soft infusion bag heat-seal strength detection device and soft infusion bag production line
CN102706753B (en) On-line soft infusion bag heat-seal strength detection device and soft infusion bag production line
CN211317615U (en) Full-automatic pressure verification instrument
CN103786932B (en) A kind of transfusion flexible bag heat sealing strength on-line measuring device and infusion soft bag production line
CN103398830B (en) A kind of grease chamber&#39;s sealing leak hunting method of load ratio bridging switch
CN107036829A (en) High-accuracy multifunctional railcar brake system test platform and its application method
US20210072110A1 (en) Installation and Method for Detecting and Locating a Leak in a Fluid Transport Circuit, Notably of an Aircraft
CN102620894B (en) Automatic leakage-detecting machine for sealed connecting terminal of compressor
US10086960B2 (en) Diagnostic kit and method for container processing machine
CN111122069A (en) Dynamic test system for turbine oxygen pump of engine
JPH03170040A (en) Accuracy confirmation device for automatic safety valve inspection device
CN105785263A (en) Method and device for detecting switching value of pressure switch
CN101846568B (en) Internal pressure tester of lighter
JPH06294708A (en) Method and system for testing durability of operating pedal
EP2582513B1 (en) Automatic envelope leak detection during tire curing
KR100974400B1 (en) Apparatus for testing vacuum leak of sealed product
CN205958030U (en) Valve status on -line monitoring system
CN206311287U (en) A kind of wire harness leakage tester
CN109253392B (en) Control method of helium leak detection filling recovery device
CN211347275U (en) Automatic pressure detection device for cavity workpiece
CN214010647U (en) Rapid verification system for aircraft tire pressure gauge
CN106018164A (en) Full-automatic gas adsorption and desorption system and process
JPH07318401A (en) Method and device for testing expansion

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant