CN106836718A - Precast floor system and its assembly method - Google Patents

Precast floor system and its assembly method Download PDF

Info

Publication number
CN106836718A
CN106836718A CN201710102906.8A CN201710102906A CN106836718A CN 106836718 A CN106836718 A CN 106836718A CN 201710102906 A CN201710102906 A CN 201710102906A CN 106836718 A CN106836718 A CN 106836718A
Authority
CN
China
Prior art keywords
keel
ceramic tile
laid
crab
floor board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710102906.8A
Other languages
Chinese (zh)
Inventor
罗少云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Olympic Polytron Technologies Inc
Original Assignee
Guangdong Olympic Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Olympic Polytron Technologies Inc filed Critical Guangdong Olympic Polytron Technologies Inc
Priority to CN201710102906.8A priority Critical patent/CN106836718A/en
Publication of CN106836718A publication Critical patent/CN106836718A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/02044Separate elements for fastening to an underlayer

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)

Abstract

The present invention provides a kind of precast floor system and its assembly method, and the system has included keel laid, plays keel laid and is supported by first level adjusting part;At least two pieces integrated floors, each integrated floor includes that one is installed keel and one piece of ceramic tile composite floor board, and each angle for installing keel is provided with support baseboard, and support baseboard is by the second Level tune modular support;Ceramic tile composite floor board is arranged on to be installed on keel, and a part at least one piece of ceramic tile composite floor board is taken and has been placed on keel laid, a part for ceramic tile composite floor board is taken and is placed on the corresponding support baseboard for installing keel of another ceramic tile composite floor board adjacent with the ceramic tile composite floor board.The method is the method that above-mentioned floor system is mated formation.Precast floor system of the invention uses dry construction, it is not necessary at the construction field (site) using cement, sand, concrete etc., reduces city environmental pollution, and construction cost is low, efficiency of construction is high.

Description

Precast floor system and its assembly method
Technical field
The present invention relates to construction and decoration field, more particularly, to the assembling of a kind of precast floor system and this system Method.
Background technology
At present ground, presently the most common ceramic tile laying side are laid in building, repairs profession construction commonly using ceramic tile Method is wet construction, i.e., mount on the ground ceramic tile using by cement and the husky concrete being mixed into, and is generally first existed during construction One layer of sand is laid on ground, then concrete is placed on sand, finally ceramic tile is mated formation on concrete.Due to whole Construction operation is all to carry out manual paving operation at the scene by bricklayer, therefore often expends a large amount of manpower and materials, and efficiency of construction Lowly.
Present wet construction there are problems that following:1st, cement, sand needed for constructing hold during municipal transport Easily drop and produce airborne dust, so as to pollute urban environment;2nd, the dust of job site generation, noise, smell, rubbish easily pollute Urban environment;3rd, bricklayer craft paving easily produces ceramic tile hollowing phenomenon, influences ceramic tile service life;4th, bricklayer craft paving pair The technology dependence of workman is very high, the problems such as paving out-of-flatness, ceramic tile opposite joint easily occur and do not form straight line;5th, the people of construction operation Power high cost, efficiency is low;6th, ceramic tile concrete binding paving mode can not solve the acoustic impacts lower floor of floor gap upper strata generation Problem;7th, with population aging the problems such as, current many young men are added and is unwilling to be engaged in bricklayer occupation, brought to industry Labour ensures difficult social concern.
Exactly currently widely used wet construction exist more than it is not enough, cause current floor to be mated formation and when house is fitted up The generally existing time is long, efficiency is low, high cost problem.
The content of the invention
The main object of the present invention is to provide that a kind of efficiency of construction is high and precast floor system of labor intensive low cost.
The precast floor system of high and labor intensive low cost it is a further object of the present invention to provide a kind of efficiency of construction Assembly method.
To realize above-mentioned main purpose, the precast floor system that the present invention is provided has included keel laid, plays keel laid Supported by first level adjusting part;At least two pieces integrated floors, each integrated floor includes that one is installed keel and one piece Ceramic tile composite floor board, each angle for installing keel is provided with support baseboard, and support baseboard is by the second Level tune component Support;Ceramic tile composite floor board is arranged on to be installed on keel, and a part at least one piece of ceramic tile composite floor board takes that to be placed on paving imperial On bone, a part for ceramic tile composite floor board is taken and is placed on another ceramic tile composite floor board corresponding peace adjacent with the ceramic tile composite floor board On the support baseboard of keel.
From such scheme, mat formation ceramic tile composite floor board when, do not need to use concrete, it is only necessary to will rise keel laid Mat formation on the ground, then polylith integrated floor is mated formation successively, due to first piece of ceramic tile composite floor board of integrated floor A part is taken and has been placed on keel laid, therefore only needs to regulate the horizontal level of keel laid, it can be ensured that first block of ceramic tile The horizontal level of composite floor board.A part for follow-up ceramic tile composite floor board takes the support baseboard for being placed on previous installation keel On, it is hereby ensured that the horizontal level of ceramic tile composite floor board subsequently mated formation.
It can be seen that, because the assembling construction of floor system need not use concrete, the pollution to city can be greatly reduced, And efficiency of construction is high, construction cost can also be reduced.
One preferred scheme is, first level adjusting part include fixed fastener, the first supporting part, the first crab-bolt part with And first adjusting screw rod, fixed fastener has been fastened on keel laid, and the first supporting part is arranged on the lower section of fixed fastener, the first anchor Spigot is arranged on the first supporting part, and the first adjusting screw rod can be screwed in the first crab-bolt part.
As can be seen here, by adjust the first adjusting screw rod of first level adjusting part be screwed into the first crab-bolt part away from From, first piece of horizontal level of integrated floor can be adjusted, therefore the horizontal level regulation of ceramic tile composite floor board is very simple, and And the technical ability that needs to be grasped is also uncomplicated, can substantially reduce construction cost.
Further scheme is that two buckling parts are provided with fixed fastener, and each buckling parts is provided with a convex tendon;Rise Be provided with a pair of sidewalls of keel laid with convex tendon matching groove, and rise keel laid by least two groups first level adjusting parts Support.
As can be seen here, keel laid will be played using buckling parts to be fixed on first level adjusting part, it is ensured that play keel laid It is fixed.And keel laid is supported using at least two groups first level adjusting parts, not only keel laid can be effectively supported, and Multigroup first level adjusting part can be conveniently adjusted to have adjusted the horizontal level of keel laid.
Further scheme is to rise be additionally provided with an inserted num on keel laid, and the 3rd adjusting screw rod can screw in embedded spiral shell In female.
It can be seen that, adjust keel laid by the setting inserted num on keel laid and by the 3rd adjusting screw rod Horizontal level so that the Level tune for playing keel laid is very simple.
Another scheme is that the second Level tune part includes the second supporting part being arranged on support baseboard, and second holds Heavy mail is provided with the second crab-bolt part, and the second adjusting screw rod can be screwed in the second crab-bolt part.
As can be seen here, component is reconciled using the second level to be adjusted the level height of support baseboard, so, regulation collection Into floor horizontal level when only need to adjust the second adjusting screw rod position, therefore ceramic tile composite floor board horizontal level Regulation is very simple, substantially reduces construction cost.
To realize above-mentioned another object, the assembly method of the precast floor system that the present invention is provided includes that paving dragon will be played Bone is mated formation on the ground, is played keel laid and is supported by first level adjusting part, is adjusted by adjusting first level adjusting part The horizontal level of keel laid;First integrated floor is mated formation on the ground, the first integrated floor include first install keel and First ceramic tile composite floor board a, angle of the first installation keel is provided with support baseboard, and support baseboard is by the second Level tune group Part is supported, and the horizontal level of the first ceramic tile composite floor board is adjusted by adjusting the second Level tune component;By the second integrated floor Mat formation on the ground, a part for the second ceramic tile composite floor board of the second integrated floor is taken the support for being placed on the first installation keel On base plate, the second Level tune component below the support baseboard of keel is installed by regulation second and adjusts the compound ground of the second ceramic tile The horizontal level of plate.
From such scheme, mat formation ceramic tile composite floor board when, keel laid and polylith integrated floor will be played and mated formation successively On the ground, taken due to a ceramic tile composite floor board part for first piece of integrated floor and be placed on keel laid, therefore only need to adjust The horizontal level of keel laid is saved, it can be ensured that first piece of horizontal level of ceramic tile composite floor board.The follow-up ceramic tile mated formation is answered The part on conjunction floor is taken and is placed on the support baseboard of previous installation keel, it is hereby ensured that the ceramic tile subsequently mated formation is combined The horizontal level on floor.
Because mating formation for floor system does not need to use concrete, the pollution to city, and construction can be greatly reduced The material that process is used is less, and the time required for can reducing the cost of construction, and construction is less, improves floor system Mat formation efficiency, so as to reduce the house finishing spent time.
Further scheme is that when having adjusted the horizontal level of keel laid, the first adjusting screw rod of regulation screws in the first crab-bolt Distance in part, when adjusting the horizontal level of the first ceramic tile composite floor board, the second adjusting screw rod of regulation is screwed in the second crab-bolt part Distance.
As can be seen here, the horizontal level regulation of keel laid and the horizontal level regulation of integrated floor are played respectively by regulation First adjusting screw rod of first level adjusting part is screwed into distance in the first crab-bolt part, regulation the second Level tune component The distance that second adjusting screw rod is screwed into the second crab-bolt part is realized, therefore the horizontal level regulation of ceramic tile composite floor board is very simple It is single, and the technical ability for needing to be grasped is also uncomplicated, can substantially reduce construction cost.
Brief description of the drawings
Fig. 1 is the structure chart of precast floor system embodiment of the present invention.
Fig. 2 is schematic enlarged-scale view at A in Fig. 1.
Fig. 3 is the partial structurtes that keel laid and first level adjusting part are played in precast floor system embodiment of the present invention Enlargement decomposition.
Fig. 4 is the structure chart of integrated floor in precast floor system embodiment of the present invention.
Fig. 5 is the partial structurtes point of integrated floor and the second Level tune part in precast floor system embodiment of the present invention Xie Tu.
Fig. 6 is the partial enlarged drawing of Fig. 5.
Fig. 7 is schematic enlarged-scale view at B in Fig. 1.
Fig. 8 is schematic enlarged-scale view at C in Fig. 1.
Fig. 9 is multiple structure charts for installing keel in precast floor system embodiment of the present invention.
Figure 10 is structure chart after first piece of integrated floor of mating formation in precast floor system embodiment of the present invention.
Figure 11 is structure chart after second piece of integrated floor of mating formation in precast floor system embodiment of the present invention.
Figure 12 is structure chart after 3rd piece of integrated floor of mating formation in precast floor system embodiment of the present invention.
Below in conjunction with drawings and Examples, the invention will be further described.
Specific embodiment
Precast floor system of the invention applies the floor system of the laying floor in building, repairs profession, and this Concrete need not be used in the assembling process of the precast floor system of invention, i.e., does not use husky, cement to be constructed, therefore The construction method of floor system is dry construction, can effectively reduce and The Surroundings in Cities is polluted, and traditional wet compared to rising Method is constructed, and assembly method efficiency of construction of the invention is very high, and cost is very low.
Referring to Fig. 1, there is precast floor system of the invention one to be played keel laid 10 and polylith integrated floor, such as collect Into floor 30, integrated floor 50, integrated floor 60 and integrated floor 70, certainly, Fig. 1 only schematically shows four pieces integrally Plate, can determine the quantity of used integrated floor according to the size of paving ground when actually mating formation.
Referring to Fig. 2 and Fig. 3, it is a concrete keel for strip to play keel laid 10, can be by concrete by mould It is molded into strip rule side.Certainly, play keel laid 10 to be not necessarily made using composite soil, it is also possible to use the metal materials such as steel, aluminium Material is made, or is made using other composite material section bars.The cross section for playing keel laid 10 is generally rectangular, and is playing paving One end of keel 10 is provided with a circular hole 12, and inserted num 13 is provided with circular hole 12, and adjusting screw rod 14 can screw in embedding Enter in nut 13, the lower end of adjusting screw rod 14 abuts on the ground, so, by the regulation to adjusting screw rod 14, can adjust Play the distance between keel laid 10 and ground.
Play keel laid 10 to be supported by multiple first level adjusting parts 20, each first level adjusting part 20 includes solid Determine fastener 21, the first supporting part 25 and two first adjusting screw rods 27, wherein, fixed fastener 21 can be fastened on keel laid On 10, in the present embodiment, fixed fastener 21 is made up of ABS material, and two buckling parts 23 are provided with fixed fastener 21, often A convex tendon 24 is provided with one surface of one buckling parts 23, in the present embodiment, two convex tendons 24 are oppositely arranged.Playing paving dragon A groove 11 is respectively arranged with a pair of sidewalls of bone 10, a convex tendon 24 can be fastened in a groove 11, therefore often One convex tendon 24 matches with a groove 11.So, being fixedly connected between fixed fastener and a keel laid 10 is realized. Also, two through holes 22 are provided with fixed fastener 21.
First supporting part 26 is arranged on the lower section of fixed fastener 21, can be made up of steel plate or aluminium sheet or composite panel, Two the first crab-bolt parts 26 are provided with first supporting part 26, internal thread is equipped with the inwall of each the first crab-bolt part 26. Also, the first crab-bolt part 26 passes through fixed fastener 21, specifically, the first crab-bolt part 26 passes through through hole 22.First adjusting screw rod 27 Can screw in the first crab-bolt part 26, and the lower end of the first adjusting screw rod 27 abuts on the ground.Therefore, adjusted by regulation first Section screw rod 27 is screwed into the distance in the first crab-bolt part 26, can adjust the distance between keel laid 10 and ground.Preferably, The length of the first adjusting screw rod 27 is between 50 millimeters to 100 millimeters.
As it is clear from fig. 2 that play keel laid 10 is supported on ground by multiple first level adjusting parts 20 and adjusting screw rod 13 On, and multiple first level adjusting parts 20 can be set according to the length for playing keel laid 10, such as at interval of 40 centimetres of settings One first level adjusting part 20.So, when having laid keel laid 10, keel laid has been determined according to the par line for pre-setting 10 horizontal level, as the horizontal reference that precast floor system is laid.
In the present embodiment, first piece of integrated floor mated formation is integrated floor 30, and a part for integrated floor 30 is taken and is placed on Rise on keel laid 10.Also, the structure of each piece of integrated floor is essentially identical, integrated floor 30 is introduced with reference to Fig. 4 to Fig. 6 Structure.Integrated floor 30 is disposed with ceramic tile 31, complex coagulation soil layer 32 and installs keel 33, ceramic tile 31 from top to bottom Ceramic tile composite floor board is constituted with complex coagulation soil layer 32, and ceramic tile 31 is abutted with complex coagulation soil layer 32.As seen from Figure 4, ceramic tile 31 is equal in magnitude with complex coagulation soil layer 32.Complex coagulation soil layer 32 is fixed on installation keel 33, is installed the bottom surface of keel 33 and is led to Adhesive is crossed to fix on the ground.
In the present embodiment, the gross thickness of ceramic tile composite floor board between 30 millimeters to 40 millimeters, the wherein thickness of ceramic tile 31 It is 12 millimeters, the thickness of complex coagulation soil layer 32 is between 18 millimeters to 28 millimeters.Ceramic tile 31 and complex coagulation soil layer 32 An entirety can be processed into, pastes tight between ceramic tile 31 and complex coagulation soil layer 32, hollowing phenomenon will not be formed, and it is flat Whole degree is high, is conducive to mating formation for ceramic tile composite floor board.
Keel 33 are installed substantially in the framework of matrix pattern, mainly by materials such as cement, sand, additives by being sufficiently stirred for, Again by mould molding, qualified products are turned into finally by maintenance, quality inspection.Certainly, install keel 33 can also using steel, aluminium, Composite material section bar etc. is made.
Installing the size of keel 33 needs to be determined according to the size of ceramic tile 31, specifically, the frame for installing keel 33 is smaller In the frame of ceramic tile 31.The thickness for installing keel 33 can also be adjusted accordingly according to job site laying height, generally, be installed Thickness of the thickness of keel 33 more than ceramic tile 31., it is necessary to be applied on the bottom surface for installing keel 33 when installing keel 33 due to mating formation Adhesive is smeared, therefore, in the present embodiment, the bottom for installing keel 33 is provided with the adhesive material containing groove of 5 millimeters deeps.The present embodiment In, adhesive can be glue for tile, cloud stone glue, cement cream etc., it is also possible to use other adhesives.
An angle is provided with an angle for installing keel 33 be provided with support baseboard 34, also, support baseboard 34 is by the Two Level tune components 40 are supported.As seen from Figure 6, the second Level tune part 40 includes being arranged on the second of the lower section of support baseboard 34 Supporting part 41, the second crab-bolt part 42 is provided with the middle part of the second supporting part 41, and interior spiral shell is provided with the inwall of the second crab-bolt part 42 Line.Second adjusting screw rod 43 can be screwed in the second crab-bolt part 42, and the lower end of the second adjusting screw rod 43 abuts on the ground.Branch The middle part for supportting base plate 34 is provided with a through hole 36, and the second crab-bolt part 42 is located in through hole 36, and the second adjusting screw rod 43 can be from Screwed in the second crab-bolt part 42 in through hole 36.Preferably, the length of the second adjusting screw rod 43 is between 50 millimeters to 100 millimeters.
Ceramic tile composite floor board is fixed on installation keel 33, and in the present embodiment, ceramic tile composite floor board passes through many self tapping spiral shells Nail 37 is fixed on installation keel 33, i.e., many tapping screws 37 sequentially pass through installation keel 33, complex coagulation soil layer 32 and Ceramic tile 31.Certainly, ceramic tile composite floor board can also be bonded on installation keel 33 by adhesive, be therefore, it can compound mixed Solidifying soil layer 32 sets one or more adhesive standing grooves near the one side for installing keel 33, and adhesive standing groove can be in strip Shape or the shape such as square, circular, and the depth of adhesive standing groove can be between 5 millimeters to 8 millimeters.
Certainly, many support baseboards 35 are additionally provided with first piece of integrated backplane 30, and are provided with support baseboard Through hole 39, as shown in figure 5, the lower section of support baseboard 35 is provided with supporting part 46, supporting part 46 is provided with a crab-bolt part, crab-bolt part Through hole 39 can be passed through, adjusting screw rod 47 can pass through through hole 39 and screw in crab-bolt part, therefore adjust the water of integrated backplane 30 During plane, in addition it is also necessary to which the distance that adjusting screw rod 47 screws in crab-bolt part is adjusted.On the follow-up integrated backplane mated formation, dragon is installed Support baseboard 35 and supporting part 46, adjusting screw rod 47 etc. are not provided with bone.
In order to realize that each piece of integrated floor subsequently mated formation keeps with the previous piece of integrated floor mated formation being level, In the present embodiment, a part for the ceramic tile composite floor board on first piece of integrated floor 30 mated formation is taken and has been placed on keel laid 10, And in the integrated floor subsequently mated formation, the ceramic tile composite floor board of the integrated floor only some be located on support baseboard, and phase A part for another piece of adjacent ceramic tile composite floor board is taken and is placed on the previous piece of support baseboard 34 of the installation keel 33 of integrated floor.
Specifically, as illustrated in figs. 7 and 8, in integrated floor 70, ceramic tile 71 and complex coagulation soil layer 72 are only located at integrated On four points a jiao of the support baseboard 74 of the installation keel 73 on floor 70, also, support baseboard 74 is by the second Level tune component 75 supports.Identical, in integrated floor 60, ceramic tile 61 and complex coagulation soil layer 62 are only located at the installation dragon of integrated floor 60 On four points a jiao of the support baseboard 64 of bone 63.And the ceramic tile 71 and a part for complex coagulation soil layer 72 of integrated floor 70 Take and be placed on support baseboard 64, from fig.7, it can be seen that a part for ceramic tile 71 and complex coagulation soil layer 72 is taken is placed on support baseboard 64 A quarter angle on.
So, after integrated floor 60 of mating formation, integrated floor 70 is mated formation at ground, by the ceramic tile 71 of integrated floor 70 And complex coagulation soil layer 72 is taken and is placed on support baseboard 64, then regulation positioned at the lower section of support baseboard 74 of integrated floor 70 the Two Level tune components 75, that is, adjust the distance that the second adjusting screw rod is screwed in the second crab-bolt part, so that integrated after mating formation Floor 70 keeps level with integrated floor 60, that is, ensure that ceramic tile 61 is located in same level with the upper surface of ceramic tile 71.
Referring to Fig. 9, when polylith integrated floor is mated formation on the ground, one piece of integrated floor to install keel another with adjacent One piece of installation keel adjoining of integrated floor, for example, the installation keel for installing keel 53 and integrated floor 30 of integrated floor 50 33 are abutted, and the lower left corner of installation keel 53 is connected on the upper right corner of the support baseboard 34 for installing keel 33.
During precast floor system of the invention of mating formation, the scope of operation play the operation of par line at the construction field (site) first, So that it is determined that floor system mat formation after horizontal level, it is then determined that rise a bunk put.Then, mated formation keel laid 10, i.e. basis Par line position set in advance has regulated the level height of keel laid 10 and has adjusted to the position parallel with par line.Paving , it is necessary to coat adhesive in the bottom surface for playing keel laid 10 when loading keel laid 10, keel laid 10 will be played by adhesive and be fixed on On ground.When having adjusted the horizontal level of keel laid 10, the first adjusting screw rod 27 of first level adjusting part 20 can be adjusted And adjusting screw rod 14.
Then, first piece of integrated floor 30 is installed, adhesive is spread in the bottom surface for installing keel 33 first, according to integrally The edge of integrated floor 30 is mated formation to rising on keel laid 10 in the orientation of plate 30, then to the branch for installing keel 33 of integrated floor 30 Second adjusting screw rod 43 of the second Level tune component 40 of the lower section of support base plate 34 is adjusted, while being carried out to adjusting screw rod 47 Regulation so that smooth the taking of ceramic tile composite floor board of integrated floor 30 has been placed on keel laid 10.It is pre- due to playing keel laid 10 First adjust to horizontal level, when the ceramic tile composite floor board of integrated floor 30 be adjusted to it is smooth take be placed on keel laid 10 when, The upper surface of ceramic tile 31 is parallel with keel laid 10 is played, that is, parallel to par line.As shown in Figure 10.Integrated floor 30 is mated formation Afterwards, a part for ceramic tile 31 and complex coagulation soil layer 32 is taken and has been placed on keel laid 10, and certainly, ceramic tile composite floor board is mainly Supported by installation keel 33.
Then, mat formation second piece of integrated floor 50, that is, walk and needs are installed successively along the bearing of trend of keel 10 of mating formation take Be placed on other integrated floors on keel laid 10, mat formation each piece of integrated floor when be required to adjust the integrated floor level Position.As shown in figure 11, a part for the ceramic tile composite floor board of integrated floor 50 is taken and has been placed on keel laid 10, and a part Take on the support baseboard 34 of the installation keel 33 for being placed on integrated floor 30, when adjusting the horizontal level of integrated floor 50, can adjust Save the second Level tune component 55 of the lower section of support baseboard 53 of integrated floor 50.Then, follow-up integrated floor of mating formation is continued, Untill a length direction of keel laid 10 is paved with integrated floor.
Then, the mode on the installation keel for putting front-seat integrated floor is taken according to heel row integrated floor it is sequentially completed residue and applies The installation of the integrated floor of work area, as shown in figure 12, mat formation integrated floor 60 when, the ceramic tile composite floor board one of integrated floor 60 Part is taken and is placed on the support baseboard 34 for installing keel 33, when adjusting the horizontal level of integrated floor 60, to integrated floor 60 The the second Level tune component 65 for installing the lower section of support baseboard 64 of keel 63 is adjusted, until the upper surface of integrated floor 60 Untill same level being located at the upper surface of integrated floor 30.Certainly, in the pavement process of integrated floor, it is possible to use par The integral level that the instruments such as guiding ruler carry out floor system detect and real-time adjustment.Using assembly method of the invention, apply Non- job type personnel can be allowed to pass through on floor during work.Carried out after 12 hours after all integrated floors are mated formation and finished Joint filling is processed, and whole construction operations are completed after finally carrying out paving face hygiene.
It can be seen that, floor system of the invention uses the assembly method of dry construction, compared to a traditional wet construction is played, can Substantially reduce tile laying to depend on workman's skill unduly, and improve conventional construction method apoplexy involving the solid organs, random construction environment, The efficiency of construction of tile laying is improved, the method for the present invention can improve efficiency of construction more than 60%, so as to greatly reduce during construction Between.
Additionally, the assembly method of floor system solves hollowing present in traditional tile laying, puts down by industrialization technology The whole degree quality problem such as not high, opposite joint is uneven, additionally it is possible to the human cost of tile laying more than 60% is reduced, due to playing paving dragon Bone, integrated floor are fabricated in factory and formed, and processing is industrialized in factory can be greatly lowered the materials such as cement, sand Waste, can also reduce the sound interference of floor gap, eliminate noise, dust, rubbish that traditional ceramic tile paving construction brings etc. Environmental problem.
Finally it is emphasized that the invention is not restricted to above-mentioned implementation method, such as playing keel laid, installing the manufacture material of keel The change such as change of change, integrated floor structure and shape of material should also be included in the protection domain of the claims in the present invention It is interior.

Claims (10)

1. precast floor system, it is characterised in that including
Keel laid is played, described keel laid is supported by first level adjusting part;
At least two pieces integrated floors, each integrated floor includes that one is installed keel and one piece of ceramic tile composite floor board, often One angle for installing keel is provided with support baseboard, and the support baseboard is by the second Level tune modular support;
The ceramic tile composite floor board is fixed on the installation keel, and a part at least one piece ceramic tile composite floor board is taken It is placed on described keel laid, a part for the ceramic tile composite floor board is taken and is placed on another porcelain adjacent with the ceramic tile composite floor board On the corresponding support baseboard for installing keel of brick composite floor board.
2. precast floor system according to claim 1, it is characterised in that:
The first level adjusting part includes fixed fastener, the first supporting part, the first crab-bolt part and the first adjusting screw rod, institute State fixed fastener be fastened on it is described rise on keel laid, first supporting part is arranged on the lower section of the fixed fastener, described the One crab-bolt part is arranged on first supporting part, and first adjusting screw rod can be screwed in the first crab-bolt part.
3. precast floor system according to claim 2, it is characterised in that:
Two buckling parts are provided with the fixed fastener, each buckling parts is provided with a convex tendon;
It is provided with described a pair of sidewalls of keel laid and the convex tendon matching groove.
4. the precast floor system according to any one of claims 1 to 3, it is characterised in that:
The second Level tune part includes the second supporting part being arranged on the support baseboard, is set on second supporting part There is the second crab-bolt part, the second adjusting screw rod can be screwed in the second crab-bolt part.
5. the precast floor system according to any one of claims 1 to 3, it is characterised in that:
It is fixedly connected by self-tapping screw between the ceramic tile composite floor board and the installation keel.
6. the assembly method of precast floor system, it is characterised in that including:
A keel laid will be played to mat formation on the ground, described keel laid is supported by first level adjusting part, by adjusting described the The one Level tune component regulation horizontal level for playing keel laid;
First integrated floor is mated formation on the ground, first integrated floor includes that the first installation keel and the first ceramic tile are multiple Floor is closed, an angle of the first installation keel is provided with support baseboard, and the support baseboard is by the second Level tune component Support, the horizontal level of the first ceramic tile composite floor board is adjusted by adjusting the second Level tune component;
Second integrated floor is mated formation on the ground, a part for the second ceramic tile composite floor board of second integrated floor is taken It is placed on the described first support baseboard for installing keel, by adjusting below the described second support baseboard for installing keel Second Level tune component adjusts the horizontal level of the second ceramic tile composite floor board.
7. the assembly method of precast floor system according to claim 6, it is characterised in that:
The first level adjusting part includes fixed fastener, the first supporting part, the first crab-bolt part and the first adjusting screw rod, institute State fixed fastener be fastened on it is described rise on keel laid, first supporting part is arranged on the lower section of the fixed fastener, described the One crab-bolt part is arranged on first supporting part, and first adjusting screw rod can be screwed in the first crab-bolt part;
During the horizontal level that regulation is described to play keel laid, adjust first adjusting screw rod screw in the first crab-bolt part away from From.
8. the assembly method of precast floor system according to claim 7, it is characterised in that:
Two buckling parts are provided with the fixed fastener, each buckling parts is provided with a convex tendon, described keel laid A pair of sidewalls on be provided with and the convex tendon matching groove.
9. the assembly method of the precast floor system according to any one of claim 6 to 8, it is characterised in that;
The second Level tune part includes the second supporting part being arranged on the support baseboard, is set on second supporting part There is the second crab-bolt part, the second adjusting screw rod can be screwed in the second crab-bolt part;
When adjusting the horizontal level of the first ceramic tile composite floor board, adjust second adjusting screw rod and screw in second crab-bolt Distance in part.
10. the assembly method of the precast floor system according to any one of claim 6 to 8, it is characterised in that:
Described keel laid or the installation keel are placed in face of ground, first in described keel laid or installation dragon Adhesive is smeared on the bottom surface of bone.
CN201710102906.8A 2017-02-24 2017-02-24 Precast floor system and its assembly method Pending CN106836718A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710102906.8A CN106836718A (en) 2017-02-24 2017-02-24 Precast floor system and its assembly method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710102906.8A CN106836718A (en) 2017-02-24 2017-02-24 Precast floor system and its assembly method

Publications (1)

Publication Number Publication Date
CN106836718A true CN106836718A (en) 2017-06-13

Family

ID=59133903

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710102906.8A Pending CN106836718A (en) 2017-02-24 2017-02-24 Precast floor system and its assembly method

Country Status (1)

Country Link
CN (1) CN106836718A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108049592A (en) * 2017-12-30 2018-05-18 浙江亚厦装饰股份有限公司 Ground pavement pedestal, mat formation component and method for paving
CN108316606A (en) * 2017-12-30 2018-07-24 浙江亚厦装饰股份有限公司 A kind of ground overhead system and its installation method
CN108425477A (en) * 2018-03-02 2018-08-21 中国建筑第八工程局有限公司 Assembled integrated raised flooring system
CN108979068A (en) * 2018-09-27 2018-12-11 河北松硕科技有限公司 A kind of quick assembled type composite brick and apply its floor panel structure
CN110242007A (en) * 2019-06-27 2019-09-17 苏州美瑞德建筑装饰有限公司 A kind of ultra-thin stone beehive board composite floor decoration plate and its assembled mounting structure
CN110528818A (en) * 2018-05-25 2019-12-03 广东博智林机器人有限公司 A kind of floor system of integrated wire and the construction method of the floor system
CN111535541A (en) * 2020-05-09 2020-08-14 灿高机电装备高邑有限公司 Construction method for laying framework leveling ceramic tiles
CN114941419A (en) * 2022-06-22 2022-08-26 上海蓝天房屋装饰工程有限公司 Assembled floor system and installation process thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020032105A (en) * 2000-10-25 2002-05-03 홍탁 Earthing type floor with filling mortar and joist and the method using the same
CN1408976A (en) * 2001-09-28 2003-04-09 江苏华东机房(集团)公司 Movable floor block and support keel, and movable floor system composed of them
CN102277948A (en) * 2011-06-30 2011-12-14 周强 Cement decorated composite board and construction method thereof
CN202131756U (en) * 2011-06-30 2012-02-01 周强 Cement decorative composite board
CN103526909A (en) * 2013-10-12 2014-01-22 无锡汉佳半导体科技有限公司 Quick-mounting type operating room grade level structure
US8820011B1 (en) * 2013-07-30 2014-09-02 Steven A Parks Stage floor assembly and method of making the same
CN105587095A (en) * 2015-12-28 2016-05-18 王柏泉 Height-adjustable keel and floor installation system comprising same
CN206512966U (en) * 2017-02-24 2017-09-22 广东奥景科技股份有限公司 Precast floor system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020032105A (en) * 2000-10-25 2002-05-03 홍탁 Earthing type floor with filling mortar and joist and the method using the same
CN1408976A (en) * 2001-09-28 2003-04-09 江苏华东机房(集团)公司 Movable floor block and support keel, and movable floor system composed of them
CN102277948A (en) * 2011-06-30 2011-12-14 周强 Cement decorated composite board and construction method thereof
CN202131756U (en) * 2011-06-30 2012-02-01 周强 Cement decorative composite board
US8820011B1 (en) * 2013-07-30 2014-09-02 Steven A Parks Stage floor assembly and method of making the same
CN103526909A (en) * 2013-10-12 2014-01-22 无锡汉佳半导体科技有限公司 Quick-mounting type operating room grade level structure
CN105587095A (en) * 2015-12-28 2016-05-18 王柏泉 Height-adjustable keel and floor installation system comprising same
CN206512966U (en) * 2017-02-24 2017-09-22 广东奥景科技股份有限公司 Precast floor system

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108049592A (en) * 2017-12-30 2018-05-18 浙江亚厦装饰股份有限公司 Ground pavement pedestal, mat formation component and method for paving
CN108316606A (en) * 2017-12-30 2018-07-24 浙江亚厦装饰股份有限公司 A kind of ground overhead system and its installation method
CN108049592B (en) * 2017-12-30 2024-04-02 浙江亚厦装饰股份有限公司 Floor paving base, paving assembly and paving method
CN108425477A (en) * 2018-03-02 2018-08-21 中国建筑第八工程局有限公司 Assembled integrated raised flooring system
CN110528818A (en) * 2018-05-25 2019-12-03 广东博智林机器人有限公司 A kind of floor system of integrated wire and the construction method of the floor system
CN108979068A (en) * 2018-09-27 2018-12-11 河北松硕科技有限公司 A kind of quick assembled type composite brick and apply its floor panel structure
CN110242007A (en) * 2019-06-27 2019-09-17 苏州美瑞德建筑装饰有限公司 A kind of ultra-thin stone beehive board composite floor decoration plate and its assembled mounting structure
CN111535541A (en) * 2020-05-09 2020-08-14 灿高机电装备高邑有限公司 Construction method for laying framework leveling ceramic tiles
CN114941419A (en) * 2022-06-22 2022-08-26 上海蓝天房屋装饰工程有限公司 Assembled floor system and installation process thereof
CN114941419B (en) * 2022-06-22 2024-03-01 上海蓝天房屋装饰工程有限公司 Assembled floor system and installation process thereof

Similar Documents

Publication Publication Date Title
CN106836718A (en) Precast floor system and its assembly method
CN206512966U (en) Precast floor system
CN103615110B (en) Random oblique netted nine-squares beam Hyperbolic Roof construction method
CN106381980B (en) A kind of ground tile paving technique
US9909322B1 (en) System and method for installing tile
CN201180366Y (en) Ultra-large area concrete construction surface construction and partition seam remaining construction apparatus
CN106065702A (en) A kind of splice floor tile and the preparation technology of this splicing floor tile and paving technique
CN108468413A (en) A kind of air-entrained concrete building block exempts from anti-hollowing construction method of plastering
CN104831926A (en) Paving method of joggle type block-shaped surface building floor
CN113789933A (en) Ground installation method for overhead building
CN112726931A (en) Green construction method of light steel keel gypsum plasterboard
CN115807519B (en) Detachable assembled ground installation adjusting system and assembling method thereof
CN205330078U (en) Ground composite decoration board's structure of mating formation
CN111663770A (en) Quick and easy combination and shaping mold for post-cast strip of cast-in-place slab and construction method of quick and easy combination and shaping mold
CN102251653A (en) Composite heat insulation board
CN205777398U (en) A kind of based on the mounting structure that ground is carried out modularity dry construction
CN210288947U (en) Wall surface installation system for assembled ceramic tile concrete composite board
CN210659110U (en) Assembly type overhead ground installation system of ceramic tile concrete composite board
CN206616725U (en) A kind of assembled decorative heat preservation partition plate
CN205777313U (en) Locking-type floor tile lays framework
CN103643781B (en) Indoor wall, ground decoration keel connecting member
CN210976452U (en) Ground keel frame with flatness adjusted by screw
CN211286527U (en) Ceramic tile mortar spreading tool
CN210659109U (en) Ground veneer leveling supporting device and ground veneer mounting structure
CN206174356U (en) Assembled ceramic tile wall surface and wall face mould piece

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned
AD01 Patent right deemed abandoned

Effective date of abandoning: 20230324