CN106834887A - The method that Thin Specs RE510L steel is produced based on ESP bar strip continuous casting and rolling flow paths - Google Patents

The method that Thin Specs RE510L steel is produced based on ESP bar strip continuous casting and rolling flow paths Download PDF

Info

Publication number
CN106834887A
CN106834887A CN201611263595.5A CN201611263595A CN106834887A CN 106834887 A CN106834887 A CN 106834887A CN 201611263595 A CN201611263595 A CN 201611263595A CN 106834887 A CN106834887 A CN 106834887A
Authority
CN
China
Prior art keywords
steel
re510l
esp
continuous casting
strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611263595.5A
Other languages
Chinese (zh)
Other versions
CN106834887B (en
Inventor
谢国海
秦哲
刘宏志
王福良
朱经涛
狄丽华
严进宝
吴进
罗继锋
于长江
喻尧
杜希恩
王学伦
刘守杰
安守勇
孙庆强
季伟斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rizhao Steel Holding Group Co Ltd
Original Assignee
Rizhao Baohua New Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rizhao Baohua New Material Co Ltd filed Critical Rizhao Baohua New Material Co Ltd
Priority to CN201611263595.5A priority Critical patent/CN106834887B/en
Publication of CN106834887A publication Critical patent/CN106834887A/en
Application granted granted Critical
Publication of CN106834887B publication Critical patent/CN106834887B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C33/00Making ferrous alloys
    • C22C33/04Making ferrous alloys by melting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21BROLLING OF METAL
    • B21B1/00Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
    • B21B1/46Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/02Ferrous alloys, e.g. steel alloys containing silicon
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/04Ferrous alloys, e.g. steel alloys containing manganese
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/06Ferrous alloys, e.g. steel alloys containing aluminium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/12Ferrous alloys, e.g. steel alloys containing tungsten, tantalum, molybdenum, vanadium, or niobium
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22CALLOYS
    • C22C38/00Ferrous alloys, e.g. steel alloys
    • C22C38/14Ferrous alloys, e.g. steel alloys containing titanium or zirconium

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Heat Treatment Of Sheet Steel (AREA)

Abstract

The present invention provides a kind of method that Thin Specs RE510L steel is produced based on ESP bar strip continuous casting and rolling flow paths, including selection raw material, wherein, raw material include by mass percentage:0.03~0.07% C, 0.10~0.40% Si, 0.90~1.40% Mn, 0.02~0.04% Als, 0.008~0.020% Ti, 0.01~0.03% Nb ,≤0.0030% S ,≤0.015% P ,≤0.004% N, remaining is ferro element;Raw material are carried out the refining of converter smelting, LF stoves and RH stoves successively;The hot-strip that the molten steel to be formed generates different-thickness by ESP producing lines will be refined from RH stoves;Wherein, in ESP producing lines, roughing outlet temperature is 920~980 DEG C, and the temperature of finish rolling outlet is 800~870 DEG C;Using the cooling hot-rolled strip of segmented mode before section cooling, 550~620 DEG C are cooled to, it is coiled strip steel to be batched subsequently into coiling machine, after coiled strip steel slow cooling, smooth coiled storage are carried out using 1%~2.0% smooth amount.Using the present invention, traditional hot rolling high cost is solved, the problems such as energy consumption is big.

Description

The method that Thin Specs RE510L steel is produced based on ESP bar strip continuous casting and rolling flow paths
Technical field
The present invention relates to metal material processing and field shaping technique, more specifically, it is related to a kind of based on ESP sheet billets The method that continuous casting and rolling flow produces Thin Specs RE510L steel.
Background technology
In recent years, persistently dropping with steel market, steel is constantly in meagre profit or without sharp state, forces steel producer Have to inquire into Jiang Benzhi roads, and the domestic attention degree at present to environmental protection is further strengthened, environmental requirement is again unprecedented strict, because This inquires into drop, and originally process for producing steel and iron of environmental protection has become the road of very necessary existence again.
Make full use of ESP development and application new products to meet national general planning and sector planning, meet national modulation wound phase Policy Conditions are closed, disclosure satisfy that technique modernization, equipment enlarging, production intensification, resource and energy circulationization, energy consumption are minimum Change, the optimized high start developing goal of economic benefit, for propulsion steel industry energy-saving and emission-reduction and technological progress, promote enterprise Transition and upgrade, scientific and technical innovation and product restructuring, all tool are of great significance.
Be the bearing capacity for improving automobile with the development of auto industry, extension automotive service life and energy-conservation, section material with And safety traffic etc. require, with high-strength steel sheet produce automotive frame, it has also become development trend.High-strength vehicle crossbeam steel is not But will have intensity higher, plasticity, toughness, good fatigue properties and processability, while also require that steel degree of purity compared with High, inclusion balling degree is high, microscopic structure is excellent.
At present, domestic and international Thin Specs (thickness h < 2.0mm) beam steel mainly using hot-rolled coil pickling, it is cold rolling, move back The production technology of fire, regarding to the issue above, the present invention proposes a kind of based on ESP bar strip continuous casting and rolling flow paths production Thin Specs The method of RE510L steel.
The content of the invention
In view of the above problems, thin rule are produced based on ESP bar strip continuous casting and rolling flow paths it is an object of the invention to provide one kind The method of lattice RE510L steel, to solve traditional hot rolling high cost, the problems such as energy consumption is big, reaches energy-conserving and environment-protective and reduces cost Purpose.
The present invention provides a kind of method that Thin Specs RE510L steel is produced based on ESP bar strip continuous casting and rolling flow paths, including:
Selection raw material, wherein, raw material include by mass percentage:0.03~0.07% C, 0.10~0.40% Si, 0.90~1.40% Mn, 0.02~0.04% Als, 0.008~0.020% Ti, 0.01~0.03% Nb ,≤ 0.0030% S ,≤0.015% P ,≤0.004% N, remaining is ferro element;
Raw material are carried out the refining of converter smelting, LF stoves and RH stoves successively;
The hot-strip that the molten steel to be formed generates different-thickness by ESP producing lines will be refined from RH stoves;Wherein, produced in ESP In line, roughing outlet temperature is 920~980 DEG C, and the temperature of finish rolling outlet is 800~870 DEG C;
Using the cooling hot-rolled strip of segmented mode before section cooling, 550~620 DEG C are cooled to, are batched subsequently into coiling machine It is coiled strip steel, after coiled strip steel slow cooling, smooth coiled storage is carried out using 1%~2.0% smooth amount.
Furthermore it is preferred that scheme be, in ESP producing lines, 5.0~6.0m/min of pulling speed of continuous casting, slab thickness 90~ 110mm。
Furthermore it is preferred that scheme be, in ESP producing lines, roughing inlet temperature be >=950 DEG C, sensing heating outlet temperature Spend is 1050~1170 DEG C.
Furthermore it is preferred that scheme be that the thickness of hot-strip is 1.0~3.5mm.
Furthermore it is preferred that scheme be that the metallographic structure of the RE510L steel of production is ferrite and pearlite, wherein, The yield strength of RE510L steel is >=420MPa, and tensile strength is >=540MP, and elongation percentage is >=28%.
Knowable to technical scheme above, what the present invention was provided produces Thin Specs based on ESP bar strip continuous casting and rolling flow paths The method of RE510L steel, using ESP completely without head continuous casting and rolling technique of sheet bar low cost production hot rolling Thin Specs RE510L automobiles Crossbeam steel, the technological process of production is short, can solve the problem that traditional hot rolling high cost, the problems such as energy consumption is big, and the technological process of production is short, category In low energy consumption green manufacturing process regime, the hot-rolled product stable performance produced, plate shape are good, dimensional tolerance is small, hot rolling State can reach 1.0mm Ultra-thin bands, can reduce cold rolling process rolling pass, reach " with Bao Daihou, with hot Dai Leng " section The purpose that can be lowered consumption.
In order to realize above-mentioned and related purpose, one or more aspects of the invention include the spy that will be explained in below Levy.Following explanation and accompanying drawing is described in detail some illustrative aspects of the invention.However, these aspects are indicated only It is some modes in the various modes for can be used principle of the invention.Additionally, it is contemplated that including all these aspects with And their equivalent.
Brief description of the drawings
By reference to the content of the explanation below in conjunction with accompanying drawing, and it is more fully understood from to of the invention, the present invention Other purposes and result will be more apparent and should be readily appreciated that.In the accompanying drawings:
Fig. 1 is to produce Thin Specs RE510L steel based on ESP bar strip continuous casting and rolling flow paths according to the embodiment of the present invention Method flow schematic diagram;
Fig. 2 is the structural representation of the matrix of the RE510L steel according to the embodiment of the present invention.
Identical label indicates similar or corresponding feature or function in all of the figs.
Specific embodiment
In the following description, for purposes of illustration, in order to provide the comprehensive understanding to one or more embodiments, explain Many details are stated.It may be evident, however, that these embodiments can also be realized in the case of without these details.
The problems such as traditional hot rolling cost high energy consumption for foregoing proposition is big, the present invention proposes a kind of based on ESP thin plates The method that continuous-casting tandem-rolling flow produces Thin Specs RE510L steel, various thickness specifications are directly generated using ESP techniques from continuous casting Strip RE510L steel, can reduce production cost, realize with Bao Daihou, with economic results in society very high.
Wherein, ESP (Endless Strip Production, strip production without a head) producing line, is newly-built new of AVM hereinafter enlightening Generation sheet billet continuous casting and rolling production line, once being cast due to it can produce a whole piece steel band, the no any cutting head cutting tail in centre, Thus have the advantages that Total continuity strip is produced, wall scroll continuous casting line has the big band broadband of outstanding production capacity, large-scale production The features such as steel and quality strip steel, the conversion cost from molten steel to hot rolled coil are low, production-line technique arrangement is the compactest.
Specific embodiment of the invention is described in detail below with reference to accompanying drawing.
In order to illustrate the side that Thin Specs RE510L steel is produced based on ESP bar strip continuous casting and rolling flow paths of present invention offer Method, Fig. 1 shows the side that Thin Specs RE510L steel is produced based on ESP bar strip continuous casting and rolling flow paths according to embodiments of the present invention Method flow.
As shown in figure 1, the side that Thin Specs RE510L steel is produced based on ESP bar strip continuous casting and rolling flow paths that the present invention is provided Method includes:
S110:Selection raw material, wherein, raw material include by mass percentage:0.03~0.07% C, 0.10~ 0.40% Si, 0.90~1.40% Mn, 0.02~0.04% Als, 0.008~0.020% Ti, 0.01~0.03% Nb ,≤0.0030% S ,≤0.015% P ,≤0.004% N, remaining is ferro element;
S120:Raw material are carried out converter smelting, LF stoves successively to smelt and the refining of RH stoves;
S130:The hot-strip that the molten steel to be formed generates different-thickness by ESP producing lines will be refined from RH stoves;Wherein, exist In ESP producing lines, roughing outlet temperature is 920~980 DEG C, and the temperature of finish rolling outlet is 800~870 DEG C;
S140:Using the cooling hot-rolled strip of segmented mode before section cooling, 550~620 DEG C are cooled to, subsequently into coiling machine It is coiled strip steel to batch, and after coiled strip steel slow cooling, smooth coiled storage is carried out using 1%~2.0% smooth amount.
Above-mentioned steps are the specific method using ESP Process Production RE510L steel, present invention production Thin Specs RE510L steel Method specifically include smelting procedure, completely without head ESP CSPs operation, refrigerating work procedure, coiling process, i.e.,:Mixed iron Stove → molten iron pretreatment → BOF (converter smelting) → LF → RH → ESP continuous casting and rollings → section cooling → batch → slow cooling → flat Whole → finished product.RE510L steel yield strength >=420MPa prepared by the present invention, tensile strength is >=540MP, elongation percentage for >= 28% metallographic structure is ferrite and pearlite, and Fig. 2 shows the matrix of RE510L steel according to embodiments of the present invention Structure.The present invention using completely without head ESP continuous casting and rolling technique of sheet bar can efficiently, low cost produce RE510L steel, product has Performance, dimensionally stable and the thin advantage of specification.
In step S110 of the invention, in the raw material selection for generating low RE510L steel, contents of the C in raw material For:0.03~0.07%, research shows, as w (C) >=0.07%, steel plate is directly changed into during roller repairing by γ The F of various forms, without there are two phase in version of the γ to F+Fe3C.As w (C)≤0.07%, it is more easy to obtain AF, and AF has Splendid toughness and splendid solderability.Therefore, C content is controlled 0.03%~0.07% in the present invention.
Contents of the Si in raw material be:In addition to the intensity that can improve steel, Si can improve horse for 0.10~0.40%, Si The stability of retained austenite between family name's body lath, while the temperature range that the Low-Temperature Temper Brittleness for also improving steel occurs, weighs very much What is wanted is that silicon can prevent Carbon diffusion, delays the precipitation and accumulation of cementite, improves the stability of martensite, therefore can be effective The anti-temper softening ability for improving steel allows developed steel to be tempered at a higher temperature, is conducive to raising Heat-Treatment of Steel to fit Should be able to power.Therefore Si contents control in the present invention is 0.10%~0.40%.
Contents of the Mn in raw material be:The maximum effect of 0.9%~1.4%, Mn is to improve the quenching degree of steel, while It is important solution strengthening element.Manganese is carbide former, can also be existed with solid solution condition, also with refinement pearlite group The effect knitted, thus the intensity and hardness of ferrite austenite can be improved.Mn also has one to the anti-temper softening ability for improving steel Fixed effect, but Mn contents it is higher when have the tendency of coarsened grain and increase temper brittleness, bring difficulty to processing.Therefore in this hair Bright middle Mn contents control is 0.9%~1.4%.
Contents of the Nb in raw material be:0.010%~0.030%, niobium plays crystal grain refinement and precipitation enhancement, from And obtain the mechanical property Proper Match of high intensity and high tenacity;Recrystallization temperature is improved, high temperature rolling is realized.Therefore in the present invention Middle Nb contents control is 0.010%~0.030%.
Contents of the Ti in raw material be:0.008%~0.020%, Ti are a kind of strong carbide and nitride shape Into element, separated out in high temperature course of hot rolling, can effectively suppress growing up for austenite crystal, play a part of crystal grain thinning, TiN, TiC precipitate may also operate as the effect of precipitation strength, thus Ti contents control in the present invention 0.008%~ 0.020%.
In the step s 120, converter, LF stoves, the smelting of RH stoves are carried out according to the composition of above-mentioned (step S110).That is, Molten iron obtains the molten steel of required composition by the refining of LF stoves again after converter smelting.
In step s 130, in ESP producing lines, the temperature that strand enters roughing entrance is >=950 DEG C, and middle base is entering Initially entered before mm finishing mill unit in induction heater, (sensing heating outlet temperature is 1050~1170 DEG C to IH, from induction heater Out enter mm finishing mill unit, and the temperature of finish rolling outlet is not less than 820 DEG C, also, in ESP producing lines, according to the actual requirements, Different parameters are set in generation equipment, so as to generate the RE510L steel of 1.0~3.5mm not equal thickness.
In an embodiment of the present invention, between the thickness and its yield strength, tensile strength of the RE510L steel of generation into anti- Than if the thickness of the RE510L steel of generation is big, then its yield strength and tensile strength can reduce, if generation is low The thickness of RE510L steel is small, then its yield strength and tensile strength can increase.
, wherein it is desired to explanation, IH is sensing heating outlet temperature, after induction heater is cut positioned at rotating hub, finish rolling Position before machine, the effect of sensing heating is heating strip, it is ensured that final rolling temperature, it may also be said to be the temperature of base in the middle of regulation Degree, depending on IH temperature is according to strip finish rolling requirement and consideration to strip steel surface quality, final rolling temperature can be caused not less than a certain temperature Close, the energy is then wasted higher than a certain temperature.
In ESP producing lines, the molten steel for smelting out from RH stoves enters conticaster, is carried out with the pulling rate of 5.0~6.0m/min Casting, is directly entered 3 frame roughing mills and is made middle base, then by rocking shears, by strand head from conticaster strand out Wedge-shaped segment is segmented and is cut away, then strand enter piler (effect of piler be when equipment below breaks down, can With offline at this piler).Directly pass through during normal rolling, then in the middle of base through rotary hub type flying shear crop end, subsequently into Induction heater is heated to 1050~1170 DEG C, subsequently enters mm finishing mill unit, and hot-strip is out generated from mm finishing mill unit.From essence The hot-strip of crew grouping is rolled by batching storage after section cooling.
According to the method for above-mentioned generation RE510L steel, the present invention is further described according to following specific embodiment.
Embodiment 1
In embodiment completely without head ESP bar strip continuous casting and rolling flow paths production RE510L steel technological process for mixed iron blast → Molten iron pretreatment → BOF → LF → RH → ESP continuous casting and rollings → section cooling → batch → slow cooling → smooth → finished product.
The raw material such as the present embodiment molten iron, steel scrap carry out converter smelting, LF refining, RH refinings, molten steel composition control successively It is C:0.035Wt%;Si:0.15Wt%;Mn:1.05Wt%;Als:0.032Wt%;Nb:0.012Wt%;Ti: 0.013Wt%;S:0.0020Wt%;P:0.012Wt%;N:0.0032Wt%.Balance of Fe.
LF, RH refining molten steel by ESP producing lines continuous casting, roughing, sensing heating, finish rolling, section cooling, batch, it is smooth The hot-strip of technique productions different-thickness.
18 DEG C of the continuous casting working procedure control tundish degree of superheat, pulling rate 5.5m/min, slab thickness 95mm.
Strand is rolled through three passage roughing, 1050 DEG C of roughing inlet temperature, 980 DEG C of roughing outlet temperature.
To be controlled at 1120 DEG C through the sensed stove heat of base product in the middle of roughing, induction furnace IH outlet temperatures.
Base in the middle of sensed heating is rolled into 1.0mm thickness hot-strips through 5 passage finish rolling, exit temperature at finishing exists 850℃。
By steel band through section cooling, 630 DEG C are cooled to using leading portion refrigerating mode, are batched as coiled subsequently into coiling machine Strip.
Smooth coiled storage is carried out to the coiled strip steel after slow cooling using 1% smooth amount.
The performance of the RE510L steel of generation is as shown in table 1:
Table 1
Embodiment 2
In embodiment completely without head ESP bar strip continuous casting and rolling flow paths production RE510L steel technological process for mixed iron blast → Molten iron pretreatment → BOF → LF → RH → ESP continuous casting and rollings → section cooling → batch → slow cooling → smooth → finished product.
The raw material such as the present embodiment molten iron, steel scrap carry out converter smelting, LF refining, RH refinings, molten steel composition control successively It is C:0.038Wt%;Si:0.18Wt%;Mn:1.08Wt%;Als:0.030Wt%;Nb:0.018Wt%;Ti: 0.013Wt%;S:0.0020Wt%;P:0.012Wt%;N:0.0035Wt%, balance of Fe.
LF, RH refining molten steel by ESP producing lines continuous casting, roughing, sensing heating, finish rolling, section cooling, batch, it is smooth The hot-strip of technique productions different-thickness.
20 DEG C of the continuous casting working procedure control tundish degree of superheat, pulling rate 5.5m/min, slab thickness 95mm.
Strand is rolled through three passage roughing, 1050 DEG C of roughing inlet temperature, 980 DEG C of roughing outlet temperature.
To be controlled at 1140 DEG C through the sensed stove heat of base product in the middle of roughing, induction furnace IH outlet temperatures.
Base in the middle of sensed heating is rolled into 1.2mm thickness hot-strips through 5 passage finish rolling, exit temperature at finishing exists 850℃。
By steel band through section cooling, 630 DEG C are cooled to using leading portion refrigerating mode, it is coiled subsequently into coiling machine, will be slow Cold rear hot rolling carries out smooth being taken into storehouse in rolls using 1% smooth amount
The performance of the RE510L steel of generation is as shown in table 2:
Table 2
Embodiment 3
In embodiment completely without head ESP bar strip continuous casting and rolling flow paths production RE510L steel technological process for mixed iron blast → Molten iron pretreatment → BOF → LF → RH → ESP continuous casting and rollings → section cooling → batch → slow cooling → smooth → finished product.
The raw material such as the present embodiment molten iron, steel scrap carry out converter smelting, LF refining, RH refinings, molten steel composition control successively It is C:0.040Wt%;Si:0.20Wt%;Mn:1.10Wt%;Als:0.032Wt%;Nb:0.020Wt%;Ti: 0.013Wt%;S:0.0025Wt%;P:0.012Wt%;N:0.0033Wt%.Balance of Fe.
LF, RH refining molten steel by ESP producing lines continuous casting, roughing, sensing heating, finish rolling, section cooling, batch, it is smooth The hot-strip of technique productions different-thickness.
21 DEG C of the continuous casting working procedure control tundish degree of superheat, pulling rate 5.5m/min, slab thickness 95mm.
Strand is rolled through three passage roughing, 1040 DEG C of roughing inlet temperature, 970 DEG C of roughing outlet temperature.
To be controlled at 1150 DEG C through the sensed stove heat of base product in the middle of roughing, induction furnace IH outlet temperatures.
Base in the middle of sensed heating is rolled into 1.5mm thickness hot-strips, exit temperature at finishing control through 5 passage finish rolling At 840 DEG C.
By steel band through section cooling, 620 DEG C are cooled to using leading portion refrigerating mode, are batched as coiled subsequently into coiling machine Strip, smooth coiled storage is carried out to the coiled strip steel after slow cooling using 1% smooth amount.
The performance of the RE510L steel of generation is as shown in table 3:
Table 3
Embodiment 4
In embodiment completely without head ESP bar strip continuous casting and rolling flow paths production RE510L steel technological process for mixed iron blast → Molten iron pretreatment → BOF → LF → RH → ESP continuous casting and rollings → section cooling → batch → slow cooling → smooth → finished product.
The raw material such as the present embodiment molten iron, steel scrap carry out converter smelting, LF refining, RH refinings, molten steel composition control successively It is C:0.042Wt%;Si:0.22Wt%;Mn:1.10Wt%;Als:0.032Wt%;Nb:0.020Wt%;Ti: 0.014Wt%;S:0.0020Wt%;P:0.012Wt%;N:0.0035Wt%.Balance of Fe.
LF, RH refining molten steel by ESP producing lines continuous casting, roughing, sensing heating, finish rolling, section cooling, batch, it is smooth The hot-strip of technique productions different-thickness.
20 DEG C of the continuous casting working procedure control tundish degree of superheat, pulling rate 5.5m/min, slab thickness 95mm.
Strand is rolled through three passage roughing, 1030 DEG C of roughing inlet temperature, 970 DEG C of roughing outlet temperature.
To be controlled at 1130 DEG C through the sensed stove heat of base product in the middle of roughing, induction furnace IH outlet temperatures;
Base in the middle of sensed heating is rolled into 1.8mm thickness hot-strips, exit temperature at finishing control through 5 passage finish rolling At 840 DEG C.
By steel band through section cooling, 620 DEG C are cooled to using leading portion refrigerating mode, it is coiled subsequently into coiling machine, will be slow Cold rear hot rolling carries out smooth being taken into storehouse in rolls using 1% smooth amount.
The performance of the RE510L steel of generation is as shown in table 4:
Table 4
Embodiment 5
In embodiment completely without head ESP bar strip continuous casting and rolling flow paths production RE510L steel technological process for mixed iron blast → Molten iron pretreatment → BOF → LF → RH → ESP continuous casting and rollings → section cooling → batch → slow cooling → smooth → finished product.
The raw material such as the present embodiment molten iron, steel scrap carry out converter smelting, LF refining, RH refinings, molten steel composition control successively It is C:0.045Wt%;Si:0.23Wt%;Mn:1.12Wt%;Als:0.031Wt%;Nb:0.022Wt%;Ti: 0.013Wt%;S:0.0020Wt%;P:0.012Wt%;N:0.0030Wt%.Balance of Fe.
LF, RH refining molten steel by ESP producing lines continuous casting, roughing, sensing heating, finish rolling, section cooling, batch, it is smooth The hot-strip of technique productions different-thickness.
22 DEG C of the continuous casting working procedure control tundish degree of superheat, pulling rate 5.3m/min, slab thickness 95mm.
Strand is rolled through three passage roughing, 1020 DEG C of roughing inlet temperature, 960 DEG C of roughing outlet temperature.
To be controlled at 1130 DEG C through the sensed stove heat of base product in the middle of roughing, induction furnace IH outlet temperatures.
Base in the middle of sensed heating is rolled into 2.0mm thickness hot-strips, exit temperature at finishing control through 5 passage finish rolling At 830 DEG C.
By steel band through section cooling, 620 DEG C are cooled to using leading portion refrigerating mode, are batched as coiled subsequently into coiling machine Strip.
Smooth coiled storage is carried out to the coiled strip steel after slow cooling using 1% smooth amount.
The performance of the RE510L steel of generation is as shown in table 5:
Table 5
Embodiment 6
In embodiment completely without head ESP bar strip continuous casting and rolling flow paths production RE510L steel technological process for mixed iron blast → Molten iron pretreatment → BOF → LF → RH → ESP continuous casting and rollings → section cooling → batch → slow cooling → smooth → finished product.
The raw material such as the present embodiment molten iron, steel scrap carry out converter smelting, LF refining, RH refinings, molten steel composition control successively It is C:0.052Wt%;Si:0.25Wt%;Mn:1.15Wt%;Als:0.031Wt%;Nb:0.022Wt%;Ti: 0.014Wt%;S:0.0020Wt%;P:0.012Wt%;N:0.0035Wt%.Balance of Fe.
LF, RH refining molten steel by ESP producing lines continuous casting, roughing, sensing heating, finish rolling, section cooling, batch, it is smooth The hot-strip of technique productions different-thickness.
22 DEG C of the continuous casting working procedure control tundish degree of superheat, pulling rate 5.3m/min, slab thickness 95mm.
Strand is rolled through three passage roughing, 1010 DEG C of roughing inlet temperature, 960 DEG C of roughing outlet temperature.
To be controlled at 1130 DEG C through the sensed stove heat of base product in the middle of roughing, induction furnace IH outlet temperatures.
Base in the middle of sensed heating is rolled into 2.5mm thickness hot-strips, exit temperature at finishing control through 5 passage finish rolling At 830 DEG C.
By steel band through section cooling, 620 DEG C are cooled to using leading portion refrigerating mode, are batched as coiled subsequently into coiling machine Strip is coiled, and smooth coiled storage is carried out to the coiled strip steel after slow cooling using 1% smooth amount.
The performance of the RE510L steel of generation is as shown in table 6:
Table 6
Embodiment 7
In embodiment completely without head ESP bar strip continuous casting and rolling flow paths production RE510L steel technological process for mixed iron blast → Molten iron pretreatment → BOF → LF → RH → ESP continuous casting and rollings → section cooling → batch → slow cooling → smooth → finished product.
The raw material such as the present embodiment molten iron, steel scrap carry out converter smelting, LF refining, RH refinings, molten steel composition control successively It is C:0.051Wt%;Si:0.26Wt%;Mn:1.15Wt%;Als:0.030Wt%;Nb:0.023Wt%;Ti: 0.015Wt%;S:0.0020Wt%;P:0.012Wt%;N:0.0030Wt%.Balance of Fe.
LF, RH refining molten steel by ESP producing lines continuous casting, roughing, sensing heating, finish rolling, section cooling, batch, it is smooth The hot-strip of technique productions different-thickness.
22 DEG C of the continuous casting working procedure control tundish degree of superheat, pulling rate 5.3m/min, slab thickness 95mm.
Strand is rolled through three passage roughing, 1010 DEG C of roughing inlet temperature, 955 DEG C of roughing outlet temperature.
To be controlled at 1125 DEG C through the sensed stove heat of base product in the middle of roughing, induction furnace IH outlet temperatures.
Base in the middle of sensed heating is rolled into 2.5mm thickness hot-strips, exit temperature at finishing control through 5 passage finish rolling At 830 DEG C.
By steel band through section cooling, 615 DEG C are cooled to using leading portion refrigerating mode, are batched as coiled subsequently into coiling machine Strip is coiled, and smooth coiled storage is carried out to the coiled strip steel after slow cooling using 1% smooth amount.
The performance of the RE510L steel of generation is as shown in table 7:
Table 7
Embodiment 8
In embodiment completely without head ESP bar strip continuous casting and rolling flow paths production RE510L steel technological process for mixed iron blast → Molten iron pretreatment → BOF → LF → RH → ESP continuous casting and rollings → section cooling → batch → slow cooling → smooth → finished product.
The raw material such as the present embodiment molten iron, steel scrap carry out converter smelting, LF refining, RH refinings, molten steel composition control successively It is C:0.052Wt%;Si:0.30Wt%;Mn:1.28Wt%;Als:0.032Wt%;Nb:0.028Wt%;Ti: 0.020Wt%;S:0.0020Wt%;P:0.012Wt%;N:0.0036Wt%.Balance of Fe.
LF, RH refining molten steel by ESP producing lines continuous casting, roughing, sensing heating, finish rolling, section cooling, batch, it is smooth The hot-strip of technique productions different-thickness.
22 DEG C of the continuous casting working procedure control tundish degree of superheat, pulling rate 5.2m/min, slab thickness 95mm.
Strand is rolled through three passage roughing, 1000 DEG C of roughing inlet temperature, 950 DEG C of roughing outlet temperature.
To be controlled at 1140 DEG C through the sensed stove heat of base product in the middle of roughing, induction furnace IH outlet temperatures.
Base in the middle of sensed heating is rolled into 3.0mm thickness hot-strips, exit temperature at finishing control through 5 passage finish rolling At 820 DEG C.
By steel band through section cooling, 610 DEG C are cooled to using leading portion refrigerating mode, are batched as coiled subsequently into coiling machine Strip is coiled, and smooth coiled storage is carried out to the coiled strip steel after slow cooling using 1% smooth amount.
The performance of the RE510L steel of generation is as shown in table 8:
Table 8
Embodiment 9:
In embodiment completely without head ESP bar strip continuous casting and rolling flow paths production RE510L steel technological process for mixed iron blast → Molten iron pretreatment → BOF → LF → RH → ESP continuous casting and rollings → section cooling → batch → smooth → finished product.
The raw material such as the present embodiment molten iron, steel scrap carry out converter smelting, LF refining, RH refinings, molten steel composition control successively It is C:0.065Wt%;Si:0.37Wt%;Mn:1.35Wt%;Als:0.032Wt%;Nb:0.030Wt%;Ti: 0.022Wt%;S:0.0020Wt%;P:0.012Wt%;N:0.0036Wt%.Balance of Fe.
LF, RH refining molten steel by ESP producing lines continuous casting, roughing, sensing heating, finish rolling, section cooling, batch, it is smooth The hot-strip of technique productions different-thickness.
22 DEG C of the continuous casting working procedure control tundish degree of superheat, pulling rate 5.2m/min, slab thickness 95mm.
Strand is rolled through three passage roughing, 990 DEG C of roughing inlet temperature, 945 DEG C of roughing outlet temperature.
To be controlled at 1160 DEG C through the sensed stove heat of base product in the middle of roughing, induction furnace IH outlet temperatures.
Base in the middle of sensed heating is rolled into 3.5mm thickness hot-strips, exit temperature at finishing control through 5 passage finish rolling At 820 DEG C.
By steel band through section cooling, 610 DEG C are cooled to using leading portion refrigerating mode, are batched as coiled subsequently into coiling machine Strip is coiled, and smooth coiled storage is carried out to the coiled strip steel after slow cooling using 1% smooth amount.
The performance of the RE510L steel of generation is as shown in table 9:
Table 9
Embodiment 10:
In embodiment completely without head ESP bar strip continuous casting and rolling flow paths production RE510L steel technological process for mixed iron blast → Molten iron pretreatment → BOF → LF → RH → ESP continuous casting and rollings → section cooling → batch → smooth → finished product.
The raw material such as the present embodiment molten iron, steel scrap carry out converter smelting, LF refining, RH refinings, molten steel composition control successively It is C:0.03Wt%;Si:0.11Wt%;Mn:1.40Wt%;Als:0.030Wt%;Nb:0.020Wt%;Ti:0.01Wt%; S:0.0015Wt%;P:0.010Wt%;N:0.0025Wt%.Balance of Fe.
LF, RH refining molten steel by ESP producing lines continuous casting, roughing, sensing heating, finish rolling, section cooling, batch, it is smooth The hot-strip of technique productions different-thickness.
22 DEG C of the continuous casting working procedure control tundish degree of superheat, pulling rate 5.0m/min, slab thickness 90mm.
Strand is rolled through three passage roughing, 950 DEG C of roughing inlet temperature, 920 DEG C of roughing outlet temperature.
To be controlled at 1050 DEG C through the sensed stove heat of base product in the middle of roughing, induction furnace IH outlet temperatures.
Base in the middle of sensed heating is rolled into 3.0mm thickness hot-strips, exit temperature at finishing control through 5 passage finish rolling At 800 DEG C.
By steel band through section cooling, 550 DEG C are cooled to using leading portion refrigerating mode, are batched as coiled subsequently into coiling machine Strip is coiled, and smooth coiled storage is carried out to the coiled strip steel after slow cooling using 1% smooth amount.
The performance of the RE510L steel of generation is as shown in table 10:
Table 10
Embodiment 11:
In embodiment completely without head ESP bar strip continuous casting and rolling flow paths production RE510L steel technological process for mixed iron blast → Molten iron pretreatment → BOF → LF → RH → ESP continuous casting and rollings → section cooling → batch → smooth → finished product.
The raw material such as the present embodiment molten iron, steel scrap carry out converter smelting, LF refining, RH refinings, molten steel composition control successively It is C:0.068Wt%;Si:0.35Wt%;Mn:0.95Wt%;Als:0.028Wt%;Nb:0.010Wt%;Ti: 0.015Wt%;S:0.0023Wt%;P:0.011Wt%;N:0.0031Wt%.Balance of Fe.
LF, RH refining molten steel by ESP producing lines continuous casting, roughing, sensing heating, finish rolling, section cooling, batch, it is smooth The hot-strip of technique productions different-thickness.
22 DEG C of the continuous casting working procedure control tundish degree of superheat, pulling rate 6.0m/min, slab thickness 110mm.
Strand is rolled through three passage roughing, 970 DEG C of roughing inlet temperature, 980 DEG C of roughing outlet temperature.
To be controlled at 1170 DEG C through the sensed stove heat of base product in the middle of roughing, induction furnace IH outlet temperatures.
Base in the middle of sensed heating is rolled into 2.0mm thickness hot-strips, exit temperature at finishing control through 5 passage finish rolling At 870 DEG C.
By steel band through section cooling, 620 DEG C are cooled to using leading portion refrigerating mode, are batched as coiled subsequently into coiling machine Strip is coiled, and smooth coiled storage is carried out to the coiled strip steel after slow cooling using 1% smooth amount.
The performance of the RE510L steel of generation is as shown in table 11:
Table 11
Embodiment 12:
In embodiment completely without head ESP bar strip continuous casting and rolling flow paths production RE510L steel technological process for mixed iron blast → Molten iron pretreatment → BOF → LF → RH → ESP continuous casting and rollings → section cooling → batch → smooth → finished product.
The raw material such as the present embodiment molten iron, steel scrap carry out converter smelting, LF refining, RH refinings, molten steel composition control successively It is C:0.07Wt%;Si:0.40Wt%;Mn:1.0Wt%;Als:0.025Wt%;Nb:0.015Wt%;Ti:0.025Wt%; S:0.0018Wt%;P:0.009Wt%;N:0.0028Wt%.Balance of Fe.
LF, RH refining molten steel by ESP producing lines continuous casting, roughing, sensing heating, finish rolling, section cooling, batch, it is smooth The hot-strip of technique productions different-thickness.
22 DEG C of the continuous casting working procedure control tundish degree of superheat, pulling rate 5.5m/min, slab thickness 100mm.
Strand is rolled through three passage roughing, 970 DEG C of roughing inlet temperature, 980 DEG C of roughing outlet temperature.
To be controlled at 1150 DEG C through the sensed stove heat of base product in the middle of roughing, induction furnace IH outlet temperatures.
Base in the middle of sensed heating is rolled into 1.8mm thickness hot-strips, exit temperature at finishing control through 5 passage finish rolling At 850 DEG C.
By steel band through section cooling, 600 DEG C are cooled to using leading portion refrigerating mode, are batched as coiled subsequently into coiling machine Strip is coiled, and smooth coiled storage is carried out to the coiled strip steel after slow cooling using 1% smooth amount.
The performance of the RE510L steel of generation is as shown in table 12:
Table 12
It should be noted that floating of the RE510L steel of above-described embodiment generation on thickness is very small can ignore not Meter, yield strength and tensile strength have fluctuating for 30MPa, illustrate hereby in the present invention.
The thin based on the production of ESP bar strip continuous casting and rolling flow paths of present invention offer can be seen that by above-mentioned implementation method The method of specification RE510L steel, using ESP completely without head continuous casting and rolling technique of sheet bar low cost production hot rolling Thin Specs RE510L Steel for automobile crossbeam, the technological process of production is short, can solve the problem that traditional hot rolling high cost, the problems such as energy consumption is big, the technological process of production It is short, belong to low energy consumption green manufacturing process regime, the hot-rolled product stable performance produced, plate shape are good, dimensional tolerance is small, Hot-rolled state can reach 1.0mm Ultra-thin bands, can reduce cold rolling process rolling pass, reach " with Bao Daihou, with hot generation It is cold " energy-saving purpose.
Described in an illustrative manner above with reference to accompanying drawing according to proposed by the present invention based on ESP CSP streams The method that journey produces Thin Specs RE510L steel.It will be understood by those skilled in the art, however, that proposed for the invention described above The method that Thin Specs RE510L steel is produced based on ESP bar strip continuous casting and rolling flow paths, can also not depart from present invention On the basis of make various improvement.Therefore, protection scope of the present invention should be determined by the content of appending claims.

Claims (5)

1. it is a kind of based on ESP bar strip continuous casting and rolling flow paths produce Thin Specs RE510L steel method, it is characterised in that including:
Selection raw material, wherein, the raw material include by mass percentage:0.03~0.07% C, 0.10~0.40% Si, 0.90~1.40% Mn, 0.02~0.04% Als, 0.008~0.020% Ti, 0.01~0.03% Nb ,≤ 0.0030% S ,≤0.015% P ,≤0.004% N, remaining is ferro element;
The raw material are carried out the refining of converter smelting, LF stoves and RH stoves successively;
The hot-strip that the molten steel to be formed generates different-thickness by ESP producing lines will be refined from the RH stoves;Wherein, described In ESP producing lines, roughing outlet temperature is 920~980 DEG C, and the temperature of finish rolling outlet is 800~870 DEG C;
The hot-strip is cooled down using segmented mode before section cooling, 550~620 DEG C are cooled to, batched subsequently into coiling machine It is coiled strip steel, after the coiled strip steel slow cooling, smooth coiled storage is carried out using 1%~2.0% smooth amount.
2. as claimed in claim 1 to be based on the method that ESP bar strip continuous casting and rolling flow paths produce Thin Specs RE510L steel, it is special Levy and be,
In the ESP producing lines, 5.0~6.0m/min of pulling speed of continuous casting, 90~110mm of slab thickness.
3. as claimed in claim 1 to be based on the method that ESP bar strip continuous casting and rolling flow paths produce Thin Specs RE510L steel, it is special Levy and be,
In the ESP producing lines, roughing inlet temperature is >=950 DEG C, and the temperature of sensing heating outlet is 1050~1170 DEG C.
4. as claimed in claim 1 to be based on the method that ESP bar strip continuous casting and rolling flow paths produce Thin Specs RE510L steel, it is special Levy and be,
The thickness of the hot-strip is 1.0~3.5mm.
5. as claimed in claim 1 to be based on the method that ESP bar strip continuous casting and rolling flow paths produce Thin Specs RE510L steel, it is special Levy and be,
The metallographic structure of the RE510L steel of production is ferrite and pearlite, wherein, the yield strength of the RE510L steel for >= 420MPa, tensile strength is >=540MP, and elongation percentage is >=28%.
CN201611263595.5A 2016-12-30 2016-12-30 Method based on ESP bar strip continuous casting and rolling flow path production thin gauge RE510L steel Active CN106834887B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611263595.5A CN106834887B (en) 2016-12-30 2016-12-30 Method based on ESP bar strip continuous casting and rolling flow path production thin gauge RE510L steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611263595.5A CN106834887B (en) 2016-12-30 2016-12-30 Method based on ESP bar strip continuous casting and rolling flow path production thin gauge RE510L steel

Publications (2)

Publication Number Publication Date
CN106834887A true CN106834887A (en) 2017-06-13
CN106834887B CN106834887B (en) 2019-02-22

Family

ID=59116700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611263595.5A Active CN106834887B (en) 2016-12-30 2016-12-30 Method based on ESP bar strip continuous casting and rolling flow path production thin gauge RE510L steel

Country Status (1)

Country Link
CN (1) CN106834887B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107604256A (en) * 2017-08-16 2018-01-19 北京科技大学 A kind of preparation method of 700MPa levels automotive frame steel band
CN107723593A (en) * 2017-09-30 2018-02-23 日照宝华新材料有限公司 Based on the method that anti-natural ageing steel is produced completely without head sheet continuous casting and rolling
CN107893187A (en) * 2017-10-31 2018-04-10 日照钢铁控股集团有限公司 Based on the method that low-alloy high-strength steel is produced completely without head bar strip continuous casting and rolling flow path
CN108796189A (en) * 2018-04-26 2018-11-13 日照钢铁控股集团有限公司 Based on the Thin Specs RE700MC steel and preparation method thereof prepared completely without head bar strip continuous casting and rolling flow path
CN111676419A (en) * 2020-05-12 2020-09-18 首钢集团有限公司 Method for preparing S355MC steel coil based on multi-mode sheet billet continuous casting and rolling production line and product thereof
CN111996463A (en) * 2020-07-31 2020-11-27 马鞍山钢铁股份有限公司 Low-cost low-alloy steel coil and manufacturing method thereof
CN112522566A (en) * 2019-09-19 2021-03-19 宝山钢铁股份有限公司 Thin-specification patterned steel plate/strip and manufacturing method thereof
CN112746159A (en) * 2020-12-30 2021-05-04 日照钢铁控股集团有限公司 Method for flexibly producing steel for low-alloy high-strength seat slide rail
CN112941408A (en) * 2021-01-28 2021-06-11 日照钢铁控股集团有限公司 Method for manufacturing 500 MPa-grade seat sliding rail steel based on continuous casting and rolling line
CN112962026A (en) * 2021-01-31 2021-06-15 邯郸钢铁集团有限责任公司 Wide-width high-wear-resistance automobile compartment body steel and manufacturing method thereof
CN115382913A (en) * 2022-09-21 2022-11-25 福建鼎盛钢铁有限公司 Method for producing hot-rolled strip steel with thickness of 0.8mm based on full endless thin slab continuous casting and rolling

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101219434A (en) * 2008-01-25 2008-07-16 广州珠江钢铁有限责任公司 Method for producing steel for automobile wheel based on bar strip continuous casting and rolling flow path
CN105018842A (en) * 2015-07-28 2015-11-04 唐山钢铁集团有限责任公司 Method for producing steel belt for low-carbon niobium-microalloyed stamping through thin slab continuous casting and rolling
CN106222561A (en) * 2016-08-30 2016-12-14 日照宝华新材料有限公司 The method producing low-carbon (LC) fire-fighting equipment steel based on ESP bar strip continuous casting and rolling flow path

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101219434A (en) * 2008-01-25 2008-07-16 广州珠江钢铁有限责任公司 Method for producing steel for automobile wheel based on bar strip continuous casting and rolling flow path
CN105018842A (en) * 2015-07-28 2015-11-04 唐山钢铁集团有限责任公司 Method for producing steel belt for low-carbon niobium-microalloyed stamping through thin slab continuous casting and rolling
CN106222561A (en) * 2016-08-30 2016-12-14 日照宝华新材料有限公司 The method producing low-carbon (LC) fire-fighting equipment steel based on ESP bar strip continuous casting and rolling flow path

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107604256A (en) * 2017-08-16 2018-01-19 北京科技大学 A kind of preparation method of 700MPa levels automotive frame steel band
CN107723593A (en) * 2017-09-30 2018-02-23 日照宝华新材料有限公司 Based on the method that anti-natural ageing steel is produced completely without head sheet continuous casting and rolling
CN107893187A (en) * 2017-10-31 2018-04-10 日照钢铁控股集团有限公司 Based on the method that low-alloy high-strength steel is produced completely without head bar strip continuous casting and rolling flow path
CN108796189A (en) * 2018-04-26 2018-11-13 日照钢铁控股集团有限公司 Based on the Thin Specs RE700MC steel and preparation method thereof prepared completely without head bar strip continuous casting and rolling flow path
CN112522566A (en) * 2019-09-19 2021-03-19 宝山钢铁股份有限公司 Thin-specification patterned steel plate/strip and manufacturing method thereof
CN111676419A (en) * 2020-05-12 2020-09-18 首钢集团有限公司 Method for preparing S355MC steel coil based on multi-mode sheet billet continuous casting and rolling production line and product thereof
CN111996463A (en) * 2020-07-31 2020-11-27 马鞍山钢铁股份有限公司 Low-cost low-alloy steel coil and manufacturing method thereof
CN111996463B (en) * 2020-07-31 2021-12-14 马鞍山钢铁股份有限公司 Low-cost low-alloy steel coil and manufacturing method thereof
CN112746159A (en) * 2020-12-30 2021-05-04 日照钢铁控股集团有限公司 Method for flexibly producing steel for low-alloy high-strength seat slide rail
CN112941408A (en) * 2021-01-28 2021-06-11 日照钢铁控股集团有限公司 Method for manufacturing 500 MPa-grade seat sliding rail steel based on continuous casting and rolling line
CN112962026A (en) * 2021-01-31 2021-06-15 邯郸钢铁集团有限责任公司 Wide-width high-wear-resistance automobile compartment body steel and manufacturing method thereof
CN112962026B (en) * 2021-01-31 2022-06-10 邯郸钢铁集团有限责任公司 Wide-width high-wear-resistance automobile compartment body steel and manufacturing method thereof
CN115382913A (en) * 2022-09-21 2022-11-25 福建鼎盛钢铁有限公司 Method for producing hot-rolled strip steel with thickness of 0.8mm based on full endless thin slab continuous casting and rolling

Also Published As

Publication number Publication date
CN106834887B (en) 2019-02-22

Similar Documents

Publication Publication Date Title
CN106834887B (en) Method based on ESP bar strip continuous casting and rolling flow path production thin gauge RE510L steel
CN106756508B (en) The method for producing Thin Specs REH380LA steel based on ESP bar strip continuous casting and rolling flow paths
CN106756560B (en) The method for producing Thin Specs RE700L steel based on ESP bar strip continuous casting and rolling flow paths
CN106011421B (en) Method based on ESP bar strip continuous casting and rolling flow path production thin gauge S500MC steel
CN106834886B (en) Method based on ESP bar strip continuous casting and rolling flow path production thin gauge RE65Mn steel
CN106834924B (en) The method for producing Thin Specs SAPH440 steel based on ESP bar strip continuous casting and rolling flow paths
CN106702283A (en) Method for producing thin-gauge S355J0W steel based on ESP sheet billet continuous casting and rolling process
CN109371317B (en) 1000 MPa-grade ultra-fast cold-rolled dual-phase steel plate and preparation method thereof
CN104651734B (en) 1000MPa grade high-strength high-ductility medium managese steel containing aluminum and its manufacture method
CN106191681B (en) The ferritic method of mild steel is produced based on ESP bar strip continuous casting and rolling flow paths
CN106191680B (en) Method based on ESP bar strip continuous casting and rolling flow paths production DP600 steel
CN106011618B (en) Method based on ESP bar strip continuous casting and rolling flow paths production DP780 steel
CN106222561B (en) Method based on ESP bar strip continuous casting and rolling flow paths production low-carbon fire-fighting equipment steel
CN105177422B (en) Ultra-long thin EH36 steel and production method of ultra-long thin EH36 steel on steckle mill
CN104630641A (en) 800MPa-grade high-strength high-plasticity low-carbon medium-manganese steel and manufacturing method thereof
CN106077090A (en) The method producing Thin Specs checkered steel plate based on ESP bar strip continuous casting and rolling flow path
CN103993147B (en) A kind of cold-rolled steel sheet and preparation method thereof
CN112430787B (en) Low-yield-ratio high-strength cold-rolled hot-dip galvanized steel plate and manufacturing method thereof
CN108611563A (en) A kind of CSP flows excellent formability energy mild steel steel plate and its manufacturing method
CN107502819A (en) A kind of following Thin Specs cold-rolled biphase steels of 600MPa levels 0.6mm and preparation method thereof
CN106756561B (en) Method based on ESP bar strip continuous casting and rolling flow path production thin gauge RE52Mn steel
CN105543666B (en) A kind of yield strength 960MPa beam steels and its production method
CN106801195B (en) Method based on ESP bar strip continuous casting and rolling flow path production thin gauge RE75Cr1 steel
CN106834885B (en) The method for producing Thin Specs Q345 Series Steels based on ESP bar strip continuous casting and rolling flow paths
CN107747042A (en) A kind of high reaming steel of the economical great surface quality of 690MPa levels and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190307

Address after: 276806 600 Binhai Road, Arashiyama District, Rizhao City, Shandong.

Patentee after: Rizhao Steel Holding Group Co., Ltd.

Address before: 276806 West of Xiamen Road, Yuquan Road, South of Steel City Avenue and North of Chemical Avenue, Lanshan Town, Rizhao City, Shandong Province

Patentee before: RIZHAO BAOHUA NEW MATERIAL CO., LTD.

TR01 Transfer of patent right