CN106834643B - Roller hearth heat-treated furnace conveying roller installation accuracy control method - Google Patents

Roller hearth heat-treated furnace conveying roller installation accuracy control method Download PDF

Info

Publication number
CN106834643B
CN106834643B CN201611236001.1A CN201611236001A CN106834643B CN 106834643 B CN106834643 B CN 106834643B CN 201611236001 A CN201611236001 A CN 201611236001A CN 106834643 B CN106834643 B CN 106834643B
Authority
CN
China
Prior art keywords
roller
furnace
way
installation
adjustment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611236001.1A
Other languages
Chinese (zh)
Other versions
CN106834643A (en
Inventor
杨建潮
陈剑英
王鹤言
陈文娟
范兴建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Tianjin Corp Ltd
Original Assignee
MCC Tiangong Group Tianjin Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Tianjin Corp Ltd filed Critical MCC Tiangong Group Tianjin Corp Ltd
Priority to CN201611236001.1A priority Critical patent/CN106834643B/en
Publication of CN106834643A publication Critical patent/CN106834643A/en
Application granted granted Critical
Publication of CN106834643B publication Critical patent/CN106834643B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/0006Details, accessories not peculiar to any of the following furnaces
    • C21D9/0012Rolls; Roll arrangements
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D9/00Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
    • C21D9/0056Furnaces through which the charge is moved in a horizontal straight path
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27BFURNACES, KILNS, OVENS, OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
    • F27B9/00Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity
    • F27B9/14Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity characterised by the path of the charge during treatment; characterised by the means by which the charge is moved during treatment
    • F27B9/20Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity characterised by the path of the charge during treatment; characterised by the means by which the charge is moved during treatment the charge moving in a substantially straight path tunnel furnace
    • F27B9/24Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity characterised by the path of the charge during treatment; characterised by the means by which the charge is moved during treatment the charge moving in a substantially straight path tunnel furnace being carried by a conveyor
    • F27B9/2407Furnaces through which the charge is moved mechanically, e.g. of tunnel type; Similar furnaces in which the charge moves by gravity characterised by the path of the charge during treatment; characterised by the means by which the charge is moved during treatment the charge moving in a substantially straight path tunnel furnace being carried by a conveyor the conveyor being constituted by rollers (roller hearth furnace)

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat Treatments In General, Especially Conveying And Cooling (AREA)
  • Tunnel Furnaces (AREA)

Abstract

The invention discloses a kind of roller hearth heat-treated furnace conveying roller installation accuracy control methods, including roller-way assembling, lifting, benchmark roller-way accurate adjustment be whole, non-referenced roller-way accurate adjustment, the installation of roller-way driving device, the step of roller-way entirety adjustment, reference roller is rationally arranged in the method for the present invention, divides different installment work faces, and control accuracy index is installed as foundation using benchmark roller-way items, adjustment installation this working face working roll precision, installation effectiveness is improved, installation speed is accelerated, ensures installation quality;And it installs that order is clear, accurate positioning, avoids the problem of doing over again, delaying work.The method of the present invention accelerates installation progress, while taking and being superimposed progressive mode, it is ensured that installation error is not overproof rationally by auxiliary mounting tools such as 5m steel leveling rulers, it can be achieved that several roller-ways are one group of integrated regulation.

Description

Roller hearth heat-treated furnace conveying roller installation accuracy control method
Technical field
The present invention relates to heating furnace mechanical equipment installation fields, and in particular to a kind of proximate matter roller hearth heat-treated furnace conveying roller Installation accuracy control method.
Background technology
Furnace rolls road is the critical movements part of roller hearth heat-treated furnace.Furnace rolls road subjects the proximate matter of heat treatment process Weight, also determines the running orbit of proximate matter, and the vertically and horizontally sideslip of proximate matter thereby determines that.The installation accuracy in furnace rolls road is hot place The basic assurance for managing stove kinematic accuracy, so the installation quality of rollgang is extremely important in heat-treatment furnace.Due to general proximate matter Heat-treatment furnace has stove effective length long, the feature more than roller-way quantity, and conventional roller-way method is the mounting and adjusting by one end, It is pushed ahead successively by root roller-way.It is excessive that it be easy to cause final cumulative errors during the installation process, several groups of end roller-way can not disappear Except excessive error, it has to which rework aspect occurs.
Invention content
In order to solve the problems in the existing technology, the present invention provides a kind of roller hearth heat-treated furnace conveying roller installation essence Control method is spent, solves the problems, such as that conveying roller installation error is big in the prior art, does over again.
To achieve the above object, the technical solution that the present invention takes is:
A kind of roller hearth heat-treated furnace conveying roller installation accuracy control method, includes the following steps:
(1) furnace roller assembling, lifting:It is in place to adjust furnace roller bearing according to installation reference line and bearing block for furnace roller apparent size Seat carries out firm banking after centering is levelling;Then it is in place to carry out furnace roller;
(2) accurate adjustment of benchmark roller-way is whole:Determine that reference for installation roller-way is gone forward side by side according to furnace length and furnace rolls road reasonable quantity Row position degree, levelness, Pass line adjustment;
(3) non-referenced roller-way accurate adjustment:Benchmark roller-way carries out the location and installation of other rollers, absolute altitude control size tune It is whole;
(4) furnace roller driving device is installed, furnace roller entirety adjustment:After the adjustment confirmation of furnace roller precision is errorless, roller-way can be carried out The adjustment of the in place and shaft coupling installation accuracy of driving motor;Water cooling furnace roller rotary joint is after roller-way transmission motor adjustment It carries out.
The step (1) refers to since feed end, installs the sub- drive end bearing pedestal of furnace roller and fixed end bearing block first, Absolute altitude, levelness are controlled using optical level and frame level;Foundation bolt is pre-tightened after bearing block for furnace roller levelling capturing.
Step (2) the benchmark roller-way chooses point at input and output material end and centre position three.
Step (2) the benchmark roller-way accurate adjustment is whole to be specially:Steel wire frame is welded in stove inner wall of end, is laid according to drawing Heat-treatment furnace center line and driving side furnace roller diameter of axle auxiliary installation steel wire and first group of feed end roller-way longitudinal center line three peace Fill control line;Theodolite is erected in heat-treatment furnace subcenter line extended line, after being directed at stove center line A-A, is rotated counterclockwise 90 ° can obtain control line B-B;A, a' are obtained using steel tape measurement control line and feed end roller-way center line distance, finely tunes feed end Roller-way ensures a=a', can guarantee that the roller-way longitudinal center line and heat-treatment furnace central axis, furnace roller absolute altitude utilize water in this way Quasi- instrument and Sopwith staff adjustment detection;Reference roller absolute altitude and position degree adjustment finishes, stove axis driving end vertical at the top of and horizontal position Two pieces of dial gauges are installed, rotate clockwise 180 °, are somebody's turn to do by the way that the numerical value obtained in the reading weighted average of different location is detectable Root furnace roller axially and radially shifting amount whether within the scope of design requirement.
The non-referenced roller-way accurate adjustment of step (3) is specially:Using reference roller as reference for installation, install successively two reference rollers it Between furnace roller;Furnace roller spacing is measured using inside micrometer and positions its position, by calculating steel leveling ruler upper surface absolute altitude, obtains stove One group of roller-way elevation difference can be accurately controlled in 0.2mm by frame level of the frame on leveling ruler, utilize 5m by roller installed height mark Every group of steel leveling ruler only needs to measure a new furnace roller absolute altitude, remaining delay table measures top surface and steel on furnace roller using clearance gauge The gap of leveling ruler is, it can be achieved that elevation difference controls within the scope of 0.2mm;During the installation process will different location take a sample test mounted roller with Absolute altitude, position degree deviation between reference roller, deviation such as occur should disappear difference in time.
The beneficial effects of the invention are as follows:Reference roller is rationally arranged in the method for the present invention, divides different installment work faces, with base Quasi- roller-way items installation control accuracy index is foundation, and adjustment installation this working face working roll precision improves installation effectiveness, adds Fast installation speed ensures installation quality;And it installs that order is clear, accurate positioning, avoids the problem of doing over again, delaying work.
The method of the present invention is rationally by auxiliary mounting tools such as 5m steel leveling rulers, it can be achieved that several furnace rollers are one group and integrally adjust It is whole, accelerate installation progress, while taking and being superimposed progressive mode, it is ensured that installation error is not overproof.
Description of the drawings
Roller-way selection and measuring instrument bit selecting schematic diagram on the basis of Fig. 1;
Roller-way accurate adjustment and furnace roller spacing detection scheme of installation on the basis of Fig. 2;
Fig. 3 is that installation tool pendulum position schematic diagram is installed and detected to single group furnace roller;
In figure:1- theodolites, 2- spirit levels, 3- horizon rules, 4- dial gauges, 5- inside micrometers, 6- reference rollers,
7- steel leveling rulers, 8- frame levels.
Specific implementation mode
The present invention will be described in detail with reference to the accompanying drawings and detailed description.
Furnace roller system used in roller hearth type heating furnace is substantially organized and is become:Furnace roller, roller-way transmission motor (band speed reducer), stove The components such as roll bearing seat, shaft coupling, water cooling furnace roller rotary joint.According to installation reference line and bearing block for furnace roller apparent size, just Position adjustment bearing block for furnace roller, firm banking is carried out after centering is levelling;Then it is in place to carry out furnace roller.According to furnace length and furnace rolls Road reasonable quantity determines reference for installation roller-way.The general input and output material end and three groups of centre position roller-way chosen is reference for installation roller (ginseng See attached drawing 1).Benchmark roller carries out the precision adjustment of other furnace rollers;After the adjustment confirmation of furnace roller precision is errorless, roller-way can be carried out Transmit the adjustment of the in place and shaft coupling installation accuracy of motor (with speed reducer);Water cooling furnace roller rotary joint in principle should be in roller-way It is carried out after transmission motor (band speed reducer) adjustment.
The flow of installation of furnace roller:
Roller-way assembling, whole → non-referenced roller-way accurate adjustment of lifting → benchmark roller-way accurate adjustment → roller-way driving device installation roller-way are whole Body adjustment.
(1) since feed end, furnace roller drive end bearing pedestal and fixed end bearing block, absolute altitude, levelness are installed first It is controlled using optical level 2 and frame level 8;Foundation bolt is pre-tightened after bearing block levelling capturing.Furnace roller drive end bearing The installation of pedestal and fixed end bearing block must strictly observe requirement and the specification of drawing.Furnace roller is installed just by auxiliary tool Position, the position of coarse adjustment furnace roller and bearing block.
(2) it is the various installation accuracies for ensureing furnace roller, setting reference roller 6 (general selection input and output material end and centre position three Locate point), as positioning datum, carries out longitudinally adjusted (relative to heat-treatment furnace center line), laterally adjusts (roller center line phase To reference roller longitudinal center line), Pass line adjustment.The installation of furnace roller, accuracy detection must carry out various essences on the basis of reference roller Degree adjustment.
(3) steel wire frame is welded in stove inner wall of end, heat-treatment furnace center line and driving side roller-way axis is laid according to drawing Three installation control lines of diameter auxiliary installation steel wire and feed end roller-way longitudinal center line.Prolong in heat-treatment furnace subcenter line Long coil holder founds theodolite 1, and after being directed at stove center line A-A, control line B-B can be obtained counterclockwise by being rotated by 90 °.Utilize coil of strip ruler measurement B-B obtains a, a' with feed end roller-way center line distance, finely tunes feed end roller-way, ensures a=a', can guarantee that the roller-way is axial in this way Center line and heat-treatment furnace central axis, roll shaft absolute altitude utilize spirit level and Sopwith staff adjustment detection (attached drawing 1 is shown in signal).Benchmark Roller absolute altitude and position degree adjustment finish, and drive end vertical top and horizontal position to install two pieces of dial gauges 4 in furnace roller, rotate clockwise 180 °, by the numerical value obtained in the reading weighted average of different location can detect the root roll shaft axially and radially shifting amount whether Within the scope of design requirement, the adjustment of reference roller 6 can guarantee accurate installation by this method.(attached drawing 2 is shown in signal)
(4) using reference roller as reference for installation, the furnace roller between two reference rollers is installed successively.Furnace roller spacing is divided using internal diameter thousand Ruler 5, which measures, positions its position.By calculating 7 upper surface absolute altitude of steel leveling ruler, roller-way installed height mark is obtained, by frame on leveling ruler One group of roller-way (4-5 roots) elevation difference can be accurately controlled in 0.2mm by frame level 8.It only needs to measure for 7 every groups using 5m steel leveling ruler A piece roller-way absolute altitude, remaining delay table is using top surface and the gap of steel leveling ruler on clearance gauge measurement roller-way, it can be achieved that mark Highness change can reduce within the scope of 0.2mm due to the error in reading that sighting distance increases and generates, and greatly improve roll shaft absolute altitude Installation accuracy.It can ensure roller-way levelness deviation in design and specification allowable range (attached drawing 3 is shown in signal).It was installing Absolute altitude between mounted roller and reference roller, position degree, levelness deviation are taken a sample test in different location in journey, deviation such as occur should be timely Disappear difference, avoids accumulated error that from can not finally eliminating.Fast Installation and it can be ensured by the above method:Furnace roller verticality (stove Roll axis is with respect to heat-treatment furnace center line), the furnace roller depth of parallelism (between two roller of arbitrary neighborhood), furnace roller absolute altitude (roller top horizontal plane with Designed elevation face), the design size of roller levelness etc..
(5) installation of roller driving device
It should be noted that the fit dimension of shaft coupling when installation, faying face must not damage and sliding injury, the longitudinal bias of shaft coupling Should be less than 0.40mm with axial deviation, the gap of shaft coupling between 8.5mm to 9.5mm, this index using dial gauge and Clearance gauge reading control.
(6) whole furnace roller components install, repetition measurement finished product items Con trolling index, if any overproof individual fine tunings.
Through the above steps, it can be achieved that heat-treatment furnace furnace roller quickly, is accurately installed.
Above by reference to drawings and examples, the present invention is schematically described, description is not limiting.This field Common construction technical staff can understand that in practical applications, certain may occur for the set-up mode of each component in the present invention It is a little to change, and other staff may also make similar Design under its enlightenment.It should be pointed out that without departing from the present invention's Design aim, all obvious changes and its similar Design, are all included in the scope of protection of the present invention.

Claims (2)

1. a kind of roller hearth heat-treated furnace conveying roller installation accuracy control method, which is characterized in that include the following steps:
(1) furnace roller assembling, lifting:According to installation reference line and bearing block for furnace roller apparent size, bearing block for furnace roller is adjusted in place, is looked for Just levelling rear progress firm banking;Then it is in place to carry out furnace roller;Since feed end, furnace roller drive end bearing pedestal is installed first With fixed end bearing block, absolute altitude, levelness are controlled using optical level and frame level;After bearing block for furnace roller levelling capturing Pre-tighten foundation bolt;
(2) accurate adjustment of benchmark roller-way is whole:Determine that reference for installation roller-way is gone forward side by side line position according to furnace length and furnace rolls road reasonable quantity Degree of setting, levelness, Pass line adjustment;The benchmark roller-way chooses point at input and output material end and centre position three;Benchmark roller-way accurate adjustment It is whole to be specially:Steel wire frame is welded in stove inner wall of end, heat-treatment furnace center line and the driving side furnace roller diameter of axle are laid according to drawing Auxiliary installation steel wire and first group of feed end roller-way longitudinal center line three install control line;In heat-treatment furnace subcenter line Extended line erects theodolite, and after being directed at stove center line A-A, control line B-B can be obtained counterclockwise by being rotated by 90 °;Utilize coil of strip dipstick metering It surveys control line and obtains a, a' with feed end roller-way center line distance, finely tune feed end roller-way, ensure a=a', can guarantee the stove in this way Roller longitudinal center line and heat-treatment furnace central axis, furnace roller absolute altitude utilize spirit level and Sopwith staff adjustment detection;Reference roller absolute altitude And position degree adjustment finishes, and drives end vertical top and horizontal position to install two pieces of dial gauges in stove axis, rotates clockwise 180 °, lead to The numerical value that the reading weighted average in different location obtains is crossed to can detect the root furnace roller axially and radially whether shifting amount is designing In claimed range;
(3) non-referenced roller-way accurate adjustment:Benchmark roller-way carries out the location and installation of other furnace rollers, absolute altitude control size adjusting;
(4) furnace roller driving device is installed, furnace roller entirety adjustment:After the adjustment confirmation of furnace roller precision is errorless, roller-way transmission can be carried out The adjustment of the in place and shaft coupling installation accuracy of motor;Water cooling furnace roller rotary joint terminates laggard in roller-way transmission motor adjustment Row.
2. roller hearth heat-treated furnace conveying roller installation accuracy control method according to claim 1, which is characterized in that the step Suddenly (3) non-referenced roller-way accurate adjustment is specially:Using reference roller as reference for installation, the furnace roller between two reference rollers is installed successively;Furnace roller Spacing is measured using inside micrometer and positions its position, by calculating steel leveling ruler upper surface absolute altitude, is obtained furnace roller installed height mark, is led to 0.2mm can be accurately controlled in by one group of roller-way elevation difference by crossing frame level of the frame on leveling ruler, only using every group of 5m steel leveling rulers A new furnace roller absolute altitude need to be measured, remaining delay table measures the gap of top surface and steel leveling ruler on furnace roller using clearance gauge, Elevation difference control can be achieved within the scope of 0.2mm;It to be taken a sample test between mounted roller and reference roller in different location during the installation process Absolute altitude, position degree deviation situation, deviation such as occur should disappear difference in time.
CN201611236001.1A 2016-12-28 2016-12-28 Roller hearth heat-treated furnace conveying roller installation accuracy control method Active CN106834643B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611236001.1A CN106834643B (en) 2016-12-28 2016-12-28 Roller hearth heat-treated furnace conveying roller installation accuracy control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611236001.1A CN106834643B (en) 2016-12-28 2016-12-28 Roller hearth heat-treated furnace conveying roller installation accuracy control method

Publications (2)

Publication Number Publication Date
CN106834643A CN106834643A (en) 2017-06-13
CN106834643B true CN106834643B (en) 2018-07-17

Family

ID=59112642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611236001.1A Active CN106834643B (en) 2016-12-28 2016-12-28 Roller hearth heat-treated furnace conveying roller installation accuracy control method

Country Status (1)

Country Link
CN (1) CN106834643B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241302A (en) * 2019-06-18 2019-09-17 中冶宝钢技术服务有限公司 The roller system installation adjusting method of cold rolled continuous annealing unit
CN110560509A (en) * 2019-10-10 2019-12-13 中冶天工集团天津有限公司 Coiler mandrel adjusting method
CN110560510A (en) * 2019-10-10 2019-12-13 中冶天工集团天津有限公司 Edge overflow control method for coiling machine
CN110757145B (en) * 2019-10-22 2021-05-14 中国二十冶集团有限公司 Method for adjusting roller way positions in batches
CN111361966A (en) * 2019-12-27 2020-07-03 合肥恒力装备有限公司 Roller way type transmission deviation rectifying method
CN111690802B (en) * 2020-06-17 2021-11-09 广西先进铝加工创新中心有限责任公司 Method for installing and debugging furnace roller of roller-hearth heat treatment furnace
CN112048606B (en) * 2020-09-01 2022-04-22 江苏省机械研究设计院有限责任公司 Adjusting and mounting method of horizontal conveying roller and adjusting tool
CN116372566B (en) * 2023-06-05 2023-08-15 宁德厦钨新能源材料有限公司 Roller rod horizontal adjustment device and calibration method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0559439A (en) * 1991-08-27 1993-03-09 Kawasaki Steel Corp Method for controlling cooling of steel pipe in roller hearth type heat treatment furnace
CN102380766A (en) * 2011-05-23 2012-03-21 中天建设集团浙江安装工程有限公司 Installation method of roller way equipment
CN103388066A (en) * 2012-05-10 2013-11-13 五冶集团上海有限公司 Control method of installation precision of centralized transmission roller table of oriented silicon steel annealing furnace
CN103575193A (en) * 2012-07-24 2014-02-12 五冶集团上海有限公司 Method for rapidly and accurately detecting installation quality of strip steel support roller system in horizontal type annealing furnace
CN104976891A (en) * 2014-04-02 2015-10-14 中国二十冶集团有限公司 First-side-then-middle annealing furnace roller mounting adjusting construction method
CN105063317A (en) * 2015-08-24 2015-11-18 中国一冶集团有限公司 Furnace roller installation device and furnace roller installation method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0559439A (en) * 1991-08-27 1993-03-09 Kawasaki Steel Corp Method for controlling cooling of steel pipe in roller hearth type heat treatment furnace
CN102380766A (en) * 2011-05-23 2012-03-21 中天建设集团浙江安装工程有限公司 Installation method of roller way equipment
CN103388066A (en) * 2012-05-10 2013-11-13 五冶集团上海有限公司 Control method of installation precision of centralized transmission roller table of oriented silicon steel annealing furnace
CN103575193A (en) * 2012-07-24 2014-02-12 五冶集团上海有限公司 Method for rapidly and accurately detecting installation quality of strip steel support roller system in horizontal type annealing furnace
CN104976891A (en) * 2014-04-02 2015-10-14 中国二十冶集团有限公司 First-side-then-middle annealing furnace roller mounting adjusting construction method
CN105063317A (en) * 2015-08-24 2015-11-18 中国一冶集团有限公司 Furnace roller installation device and furnace roller installation method

Also Published As

Publication number Publication date
CN106834643A (en) 2017-06-13

Similar Documents

Publication Publication Date Title
CN106834643B (en) Roller hearth heat-treated furnace conveying roller installation accuracy control method
CN105223969B (en) A kind of sensor mounting adjustment system and laser leveling benchmark device
CN102589488B (en) Optical vernier and method for detecting planeness and gradient using same
CN207147390U (en) Architectural engineering finely tunes measurement apparatus with flatness
CN106482693A (en) A kind of gauge head unit improving gears tooth pitch certainty of measurement and its method of adjustment
CN110196019A (en) A kind of laser sensor caliberating device and its scaling method
CN105783678B (en) A kind of ingot-containing tube inner hole linearity testing apparatus
CN102636137A (en) REVO (Resident Encrypted Variable Output) measuring head position posture calibrating method in joint arm type coordinate measuring machine
CN109737884A (en) A kind of quiet dynamic deformation amount on-Line Monitor Device of axial workpiece and method
CN107116374B (en) A kind of main shaft of numerical control machine tool knife handle and vibration measuring method with vibration measurement with laser function
CN102704915A (en) Calibration console and calibration method of inclinometer while drilling
CN206073936U (en) A kind of general cambered surface cam mechanism accuracy detection experimental provision
CN104556660A (en) Height adjustment device for support column
CN201322608Y (en) Shifting cam measuring apparatus
CN106885584A (en) Inclinometer composition error test device and measuring method
CN109112937B (en) Fine and rapid measuring method for pavement evenness
CN102607463A (en) Theodolite laser target measurement method for rotary reflector surface antennas
CN208350013U (en) A kind of equipment that road is calibrated with laser ranging formula section tester high-precision calibrating
CN105444676A (en) Measuring probe multi-directional positioning device applicable to online scanning
CN104061898B (en) Automatic detection device for accuracy of horizontal angle measurement
CN104266664B (en) Spiral error compensation method and measuring equipment for pipeline center line measurement
CN203572431U (en) Vibration-proof shaft coupling centering device
CN103162712A (en) Method for treating errors of angle measurement of circular grating and compensating skew of shafting
CN102654384A (en) Dynamic radius positioning direct measurement method of rotary-platform-type precision centrifugal machine
CN109112936B (en) Road surface flatness becomes more meticulous quick measuring device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant