CN106829529A - A kind of automatic boxing method for steel structure workshop - Google Patents

A kind of automatic boxing method for steel structure workshop Download PDF

Info

Publication number
CN106829529A
CN106829529A CN201710041919.9A CN201710041919A CN106829529A CN 106829529 A CN106829529 A CN 106829529A CN 201710041919 A CN201710041919 A CN 201710041919A CN 106829529 A CN106829529 A CN 106829529A
Authority
CN
China
Prior art keywords
moulding bed
steel
container
wire rope
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710041919.9A
Other languages
Chinese (zh)
Other versions
CN106829529B (en
Inventor
王宇伟
刘敏
陈哉国
何文俊
王俊杰
王再胜
费建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhongnan Lvjian Technology Group Co ltd
Original Assignee
Zhejiang Zhongnan Construction Group Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhongnan Construction Group Steel Structure Co Ltd filed Critical Zhejiang Zhongnan Construction Group Steel Structure Co Ltd
Priority to CN201710041919.9A priority Critical patent/CN106829529B/en
Publication of CN106829529A publication Critical patent/CN106829529A/en
Application granted granted Critical
Publication of CN106829529B publication Critical patent/CN106829529B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G65/00Loading or unloading
    • B65G65/30Methods or devices for filling or emptying bunkers, hoppers, tanks, or like containers, of interest apart from their use in particular chemical or physical processes or their application in particular machines, e.g. not covered by a single other subclass
    • B65G65/32Filling devices
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G35/00Mechanical conveyors not otherwise provided for

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Ship Loading And Unloading (AREA)

Abstract

The invention discloses a kind of automatic boxing method for steel structure workshop, comprise the following steps:A () hydraulic test is installed;Equipment connection in the lifting of (b) moulding bed and moulding bed;C () steel member is set aside on moulding bed with bracket packing;D () bracket departs from subgrade case;E () traction moulding bed enters container;F () traction moulding bed goes out from container;G () extracts the groove steel rail in container out, then with crane being transported on container crane to automobile.The present invention is converted to existing machinery by traditional semi-mechanization, mechanization degree is improved, and this transformation causes that operating efficiency is improved, and product production capacity increases, cause that labour's input is decreased simultaneously, labourer needs the work for participating in by hand to be changed into push-botton operation work from script;Because of the transformation of mode of operation, the handling and loading time saves many to the present invention in logistics/cost of transportation, therefore logistics/cost of transportation is also reduced.

Description

A kind of automatic boxing method for steel structure workshop
Technical field
The present invention relates to Container Transport technical field, and in particular to a kind of automatic boxing method for steel structure workshop.
Background technology
Container Transport is widely used in the fields such as ship, highway transportation by the advantage of its own, carried with FCL, The advantages such as freight is low, protection is high, cold storing and fresh-keeping.Early stage packaging cargo in case be it is artificial in bulk, workman loose mail piece by piece Load.With the development of technology, goods is aided in using conveyer belt, workman transports goods from conveyer belt be placed on container again In.Pallet is invented by improving, so-called pallet is exactly to store and transport wrapping tool, can be stacked upon many package set, Transportation and packing unit is formed, makes the operating process of transportation and packing and management process more succinct, goods is placed on pallet to go out together Goods, is put in manually or electrically fork truck.Weak point is that manual method efficiency is low, and the time is long.Fork truck method limitation is larger, Inapplicable for component long, goods is overweight not to be applied to yet, and needs professional driver, and front sight is blind spot, and frequently turnover has peace Full hidden danger.If electri forklift needs to change storage battery and tire per 1-2, costly.If fuel oil fork truck need refuel material and Time-based maintenance, it is costly, and tail gas has pollution to environment.
The product of steel structure Workshop Production is that steel member build is big and irregular with other products maximum difference.Steel The transport of component mainly divides highway transportation, inland waterway transport and marine transportation, seldom using air transportation.Tried one's best during transport and adopted Containerize that shipping is defeated, general load step is as follows:
1) size and the weight of steel construction according to live place selects suitable loop wheel machine;
2) need to lay rubber blanket using hanging belt or in steel wire rope and steel construction contact position when lifting, protect steel construction Coating prevent damage;
3) before casing, steel construction is placed on prefabricated bracket (chassis);
4), it is necessary to carry out tying up bundle to it firmly after component is installed;
5) component is packed into the container by the way of crane allocation and transportation with fork truck pushing tow interior.
When using Container Transport, traditional obvious operating efficiency of semi-mechanization bin patterns is too low, how to improve dress Goods efficiency is the technical issues that need to address.
The content of the invention
Present invention aim at solving above-mentioned technical problem present in prior art, there is provided a kind of for steel structure workshop Automatic boxing method, high with mechanization degree, operating efficiency is improved, and product production capacity increases, and labour's input is reduced, and is transported into The effect of this reduction.
In order to solve the above-mentioned technical problem, the present invention is adopted the following technical scheme that:
A kind of automatic boxing method for steel structure workshop, it is characterised in that comprise the following steps:
A () hydraulic test is installed:The height of the base plate according to container, places subgrade case on the ground, and to subgrade case Setting highly carry out integral position adjustment, the height of subgrade case is highly kept identical with the setting of the base plate of container, Subgrade case surface sets two groove steel rails, then eight carrying tankettes with hydraulic oil pump are placed on into channel-section steel by design spacing In track;
Equipment connection in the lifting of (b) moulding bed and moulding bed:Using crane lifting moulding bed, by two slideways of moulding bed and bottom Groove steel rail it is corresponding, every carrying tankette is respectively arranged between the limiting plate of moulding bed, then using pre-installation and formal Install twice installation method the pipeline of hydraulic oil pump is installed in the tube seat band of moulding bed, keep pipeline smooth-going, then by pipeline with Tankette connection is carried, the hook of the first steel cord ends on the hoist engine of subgrade case afterbody is then connected to moulding bed afterbody Otic placode on, the second steel wire rope is bypassed the fixed pulley of subgrade case front end, and the hook of the second steel cord ends is connected to tire On the otic placode of frame afterbody;
C () steel member is set aside on moulding bed with bracket packing:Steel member is classified, then will be sorted using crane Steel pipe fitting is fitly hung in bracket from the bottom up, then lays one layer of rubber blanket in the top of steel construction, then the one of bracket Layback goes out rope, and rope is fixed on the opposite side of bracket along neonychium, and steel member and bracket packing is integral, to steel Component ties up bundle firmly, then bracket is hung on moulding bed, and the edge of bracket is withheld and moved forward and backward, and adjustment bracket is in moulding bed On position, in the middle of moulding bed top surface and bracket crossbeam bottom surface difference 2cm, then will container the inside laying with subgrade case surface Identical groove steel rail, then the groove steel rail in container is connected with the groove steel rail on subgrade case;
D () bracket departs from subgrade case:Start hydraulic oil pump, control carries hydraulic jack on tankette by moulding bed top 4cm is risen, bracket is departed from 2cm with subgrade case;
E () traction moulding bed enters container:Start the button that rotates forward of hoist engine, the second steel wire rope is by fixed pulley Effect, traction moulding bed is steadily moved toward container direction, while the first steel wire rope is also moved to container direction, controls hoist engine Power stability, moulding bed is at the uniform velocity entered into container;
F () traction moulding bed goes out from container:After moulding bed is completely into container, hoist engine is closed down, by hydraulic oil pump The hydraulic jack that will be carried on tankette declines 4cm, moulding bed is separated 2cm with bracket so that bracket falls container the inside, so Start the button that rotates backward of hoist engine afterwards, the first steel wire rope is moved to hoist engine, traction moulding bed goes out from container, finally closes Hoist engine;
G () extracts the groove steel rail in container out, then with crane being transported on container crane to automobile.
Further, in step (a), in the setting to subgrade case is highly specifically adjusted, the height of subgrade case is first calculated The distance between setting height of the base plate of degree and container, selects the chock of dimension, and chock is placed on the ground, horizontal To the chock with vertical arrangement on same straight line, then subgrade case is horizontally disposed with chock, keeps the height of subgrade case Degree highly keeps identical with the setting of the base plate of container.
Further, in step (a), groove steel rail is carried out to cut limb according to tankette following height is carried, is then used Angle welding mode is fixed to groove steel rail with subgrade case, groove steel rail is carried out cutting limb primarily to groove steel rail and road Length requirement during base case angle welding, meets the code requirement of groove steel rail setting.
Further, in step (b), before the tube seat band that pipeline is installed into moulding bed, the surface to pipeline is cleaned, The surface of pipeline is mainly kept into smooth, cleaning, pressure, flow and working media further according to hydraulic oil pump select phase The pipe joint answered so that pipeline is tight with corresponding carrying tankette connection, air tight, bore then to pipeline, wall thickness and Material is checked, it is ensured that the quality that pipeline is installed, and pipeline installs the good work that just can ensure that hydraulic oil pump and carry tankette Make performance.
Further, in step (b), pipeline is installed in the tube seat of moulding bed band internal procedure, and the carrying first according to corresponding to is small The position of tank selects the pipeline of corresponding length, carries out pipeline pre-installation, it is to avoid directly wrapping phenomena occurs to pipeline in laying, can subtract Few pressure loss, then pad is laid in tube seat band, the then position of the carrying tankette according to corresponding to, by pipeline along pipe The inner left wall laying of groove band, the width according still further to tube seat band lays pipeline, carries out pipeline and formally pacify successively from left to right Dress, can eliminate the vibration of pipeline, reduce the time delay of pipeline oil transportation process, while each bar pipeline is arranged into neat, improve aesthetic property.
Further, in step (e), before starting hoist engine, the first steel wire rope and the second steel wire rope to hoist engine brush away ash Dirt, is coated with 50 DEG C of deep fat, and deep fat is impregnated with the wire rope core of the first steel wire rope and the second steel wire rope, and first is then wiped respectively Unnecessary deep fat on steel wire rope and the second steel wire rope, can maintain the first steel wire rope and the second steel wire rope so that the first steel Cord and the second steel wire rope keep sizable ability to bear, improve the service life of the first steel wire rope and the second steel wire rope.
Further, in step (f), after closing hoist engine, then cut off the electricity supply, controller is put into zero-bit, is braked with safety brake Stop tight, then hoist engine, the first steel wire rope and the second steel wire rope are conserved and checked, improve security.
The present invention is by adopting the above-described technical solution, have the advantages that:
1st, the present invention is converted to existing machinery by traditional semi-mechanization, and mechanization degree is improved, and this changes so that work It is improved as efficiency, product production capacity increases, by 3~5 cars of vanning become 15 cars of existing daily vanning, operating efficiency daily originally It is 3~5 times of traditional semi-mechanization pattern;Cause that labour's input is decreased simultaneously, labourer needs ginseng by hand by script With work be changed into push-botton operation work.
2nd, because of the transformation of mode of operation, the handling and loading time saves many, therefore thing to the present invention in logistics/cost of transportation Stream/cost of transportation is also reduced.
Brief description of the drawings
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is a kind of structural representation of automatic packing device for steel structure workshop of the invention;
Fig. 2 is steel member and the integral structural representation being reasonably placed on moulding bed of bracket packing in the present invention;
Fig. 3 is the structural representation that moulding bed is arranged on subgrade case in the present invention;
Fig. 4 is the structural representation that hoist engine is arranged on subgrade case in the present invention;
Fig. 5 is the structural representation that groove steel rail is arranged on subgrade case in the present invention;
Fig. 6 is the structure enlarged diagram at A in Fig. 1;
Fig. 7 is the structure enlarged diagram at B in Fig. 3.
In figure, 1- containers;2- subgrade cases;3- hoist engines;4- groove steel rails;5- carries tankette;6- moulding beds;7- holds in the palm Frame;8- hydraulic oil pumps;9- pipelines;10- fixed pulleys;The steel wire ropes of 11- first;The steel wire ropes of 12- second;13- slideways;14- tube seat bands; 15- is linked up with;16- otic placodes.
Specific embodiment
As shown in Figures 1 to 7, it is a kind of automatic boxing method for steel structure workshop of the invention, comprises the following steps:
A () hydraulic test is installed:The height of the base plate according to container 1, places subgrade case 2 on the ground, and to roadbed The setting of case 2 highly carries out integral position adjustment, and the height of subgrade case 2 is highly kept into phase with the setting of the base plate of container 1 Together.In the setting to subgrade case 2 is highly specifically adjusted, the height of subgrade case 2 and setting for the base plate of container 1 are first calculated The distance between height is put, the chock of dimension is selected, chock is placed on the ground, laterally the chock with vertical arrangement sets In on same straight line, then subgrade case 2 is horizontally disposed with chock, height and the base plate of container 1 of holding subgrade case 2 Height is set and keeps identical.
On the surface of subgrade case 2, two groove steel rails 4 are set, then by eight carrying tankettes 5 of the hydraulic oil pump 8 of 40 tons of band It is placed in groove steel rail 4 by design spacing.It is that a kind of can substitute traditional removing with rolling bar as handbarrow to carry tankette 5 Fortune equipment, in carrying large equipment, road equipment farther out, uses cooperatively, for heavy goods with crow bar or claw jack Movement, substantial amounts of manpower and time can be saved, carrying out that when some jumboes are installed in place portal frame can be substituted.
Groove steel rail 4 is carried out to cut limb according to the following height of tankette 5 is carried, then using angle welding mode to channel-section steel Track 4 is fixed with subgrade case 2, groove steel rail 4 is carried out cutting limb primarily to groove steel rail 4 and the angle welding of subgrade case 2 When length requirement, meet groove steel rail 4 setting code requirement.
(b) moulding bed 6 lift and moulding bed 6 on equipment connection:Using crane lifting moulding bed 6, by two slideways 13 of moulding bed 6 Groove steel rail 4 with bottom is corresponding, and slideway 13 uses back-off channel-section steel, and every carrying tankette 5 is respectively arranged on the limit of moulding bed 6 Between the plate of position.Before pipeline 9 to be installed to the tube seat of moulding bed 6 band 14, pipeline 9 of the selection with sufficient intensity, then to pipeline 9 Surface cleaned, the surface of pipeline 9 is mainly kept into smooth, cleaning.And.Pressure, stream further according to hydraulic oil pump 8 Amount and working media, select corresponding pipe joint so that pipeline 9 is connected tightly with corresponding carrying tankette 5, air tight, Then bore to pipeline 9, wall thickness and material are checked, it is ensured that the quality that pipeline 9 is installed, and pipeline 9 is installed well could be really Protect hydraulic oil pump 8 and carry the service behaviour of tankette 5.
The tube seat that the pipeline 9 of hydraulic oil pump 8 is installed to installation method twice moulding bed 6 is installed using pre-installation and formally again In band 14.Pipeline 9 is installed in the tube seat of moulding bed 6 14 internal procedures of band, first the position selection of the carrying tankette 5 according to corresponding to The pipeline 9 of corresponding length, carries out pipeline 9 and pre-installs, it is to avoid directly wrapping phenomena occurs to pipeline 9 in laying, can reduce the pressure loss. Pad is laid in tube seat band 14 again, then the position of the carrying tankette 5 according to corresponding to, by pipeline 9 along tube seat band 14 Inner left wall laying, lay pipeline 9 successively from left to right according still further to tube seat 14 width of band, carry out the formal peace of pipeline 9 Dress, can eliminate the vibration of pipeline 9, reduce the time delay of the oil transportation process of pipeline 9, while each bar pipeline 9 is arranged neatly, improve attractive in appearance Property.Then keep pipeline 9 to smooth out, then pipeline 9 is connected with tankette 5 is carried.
Then the hook 15 of the end of the first steel wire rope 11 on the hoist engine 3 of the afterbody of subgrade case 2 is connected to the afterbody of moulding bed 6 Otic placode 16 on, the second steel wire rope 12 bypasses the fixed pulley 10 of the front end of subgrade case 2, and by the hook of the end of the second steel wire rope 12 15 are connected on the otic placode 16 of the afterbody of moulding bed 6.When the first steel wire rope 11 and the whole root surface corrosion of the second steel wire rope 12 reach naked eyes When apparent, the first steel wire rope 11 and the second steel wire rope 12 cannot be used.
C () steel member is set aside on moulding bed 6 with the packing of bracket 7:Steel member is classified, then using crane by after classification Steel pipe fitting be fitly hung in bracket 7 from the bottom up.One layer of rubber blanket is laid in the top of steel construction again, then in bracket 7 Side pull out rope, and rope is fixed on the opposite side of bracket 7 along neonychium, steel member and bracket 7 are packaged into one Body, bundle is tied up to steel member firm.
Bracket 7 is hung on moulding bed 6 again, the edge of bracket 7 is withheld and moved forward and backward, adjustment bracket 7 is in moulding bed 6 On position, the crossbeam bottom surface difference 2cm in the middle of the top surface of moulding bed 6 and bracket 7.Then by the laying of the inside of container 1 and subgrade case 2 Surface identical groove steel rail, then the groove steel rail in container 1 is connected with the groove steel rail on subgrade case 2.
D () bracket 7 departs from subgrade case 2:Start hydraulic oil pump 8, the hydraulic jack of 5 tons on tankette 5 is carried in control The jacking 4cm of moulding bed 6 is made bracket 7 depart from 2cm with subgrade case 2 by top.
E () traction moulding bed 6 enters container 1:In the afterbody of subgrade case 2, one 10 tons of hoist engine 3 is set, hoist engine 3 It is fixed necessary firm, solid, firm, prevent from toppling over and sliding when moulding bed 6 is drawn, the base of hoist engine 3 must be smooth solid. Before starting hoist engine 3, the first steel wire rope 11 and the second steel wire rope 12 to hoist engine 3 brush away black dirt.50 DEG C of deep fat is coated with, And deep fat is impregnated with the wire rope core of the first steel wire rope 11 and the second steel wire rope 12, the first steel wire rope 11 and the second steel are then wiped respectively Unnecessary deep fat in cord 12, can maintain the first steel wire rope 11 and the second steel wire rope 12 so that the He of the first steel wire rope 11 Second steel wire rope 12 keeps sizable ability to bear, improves the service life of the first steel wire rope 11 and the second steel wire rope 12.
Start the button that rotates forward of hoist engine 3, the effect that the second steel wire rope 12 passes through fixed pulley 10, traction moulding bed 6 is past The direction of container 1 is steadily moved, while the first steel wire rope 11 is also moved to the direction of container 1, controls the power stability of hoist engine 3, Moulding bed 6 is at the uniform velocity entered into container 1.
F () traction moulding bed 6 goes out from container 1:After moulding bed 6 is completely into container 1, hoist engine 3 is closed down, by hydraulic pressure The hydraulic jack that oil pump 8 will be carried on tankette 5 declines 4cm, moulding bed 6 is separated 2cm with bracket 7 so that bracket 7 falls packaging The inside of case 1.Then start hoist engine 3 and rotate backward button, the first steel wire rope 11 moves to hoist engine 3, traction moulding bed 6 go out from Container 1, finally closes hoist engine 3.
After closing hoist engine 3, then cut off the electricity supply, controller is put into zero-bit, safety brake braking stop is used, then to hoist engine 3rd, the first steel wire rope 11 and the second steel wire rope 12 are conserved and checked, improve security.
Be should be noted when using hoist engine 3:(1) in the operation of hoist engine 3, anyone must not cross over the He of the first steel wire rope 11 Second steel wire rope 12, in this process, operating personnel must not leave hoist engine 3;(2) in operation such as power-off condition, should cut Power-off source;(3) no over-loading is used;(4) when hoist engine 3 starts and stops, speed must gradually increase or reduce.
G () extracts the groove steel rail in container 1 out, then container 1 is hung with crane transported on automobile, can carry out phase The record answered.
Traditional steel components packing method is shown in Table 1 with the contrast table of steel member packing method of the present invention:
Content Traditional steel components packing method Steel member packing method of the present invention
The vanning time Slowly Hurry up, if the time it is original 1/3.
Mechanization degree It is low It is high
Logistics/cost of transportation It is high Reduce
Table 1
The present invention is converted to existing machinery by traditional semi-mechanization, and mechanization degree is improved, and this changes so that work Efficiency is improved, and product production capacity increases, and by 3~5 cars of vanning become 15 cars of existing daily vanning daily originally, operating efficiency is 3~5 times of traditional semi-mechanization pattern;Cause that labour's input is decreased simultaneously, labourer is needed to participate in by hand by script Work be changed into push-botton operation work.The present invention because of the transformation of mode of operation, save in logistics/cost of transportation by the handling and loading time Many, therefore logistics/cost of transportation also reduces.
Specific embodiment of the invention is these are only, but technical characteristic of the invention is not limited thereto.It is any with this hair It is to solve essentially identical technical problem based on bright, realizes essentially identical technique effect, done simple change, etc. With replacement or modification etc., all it is covered by among protection scope of the present invention.

Claims (7)

1. a kind of automatic boxing method for steel structure workshop, it is characterised in that comprise the following steps:
A () hydraulic test is installed:The height of the base plate according to container, places subgrade case, and subgrade case is set on the ground Putting height carries out integral position adjustment, the height of subgrade case is highly kept into identical with the setting of the base plate of container, in roadbed Case surface sets two groove steel rails, then eight carrying tankettes with hydraulic oil pump are placed on into groove steel rail by design spacing It is interior;
Equipment connection in the lifting of (b) moulding bed and moulding bed:Using crane lifting moulding bed, by two slideways of moulding bed and the groove of bottom Steel track is corresponding, and every carrying tankette is respectively arranged between the limiting plate of moulding bed, then using pre-installation and formal installation Be installed to the pipeline of hydraulic oil pump in the tube seat band of moulding bed by installation method twice, keeps pipeline smooth-going, then by pipeline and carry Tankette is connected, and the hook of the first steel cord ends on the hoist engine of subgrade case afterbody then is connected into the ear of moulding bed afterbody On plate, the second steel wire rope is bypassed the fixed pulley of subgrade case front end, and the hook of the second steel cord ends is connected to moulding bed tail On the otic placode in portion;
C () steel member is set aside on moulding bed with bracket packing:Steel member is classified, then using crane by sorted steel pipe Part is fitly hung in bracket from the bottom up, then lays one layer of rubber blanket in the top of steel construction, then in a layback of bracket Go out rope, and rope is fixed on the opposite side of bracket along neonychium, steel member and bracket packing is integral, to steel member Tie up bundle firm, then bracket is hung on moulding bed, the edge of bracket is withheld and moved forward and backward, adjustment bracket is on moulding bed Position, the crossbeam bottom surface difference 2cm in the middle of moulding bed top surface and bracket is then identical with subgrade case surface by the laying of container the inside Groove steel rail, then the groove steel rail in container is connected with the groove steel rail on subgrade case;
D () bracket departs from subgrade case:Start hydraulic oil pump, control carries hydraulic jack on tankette by moulding bed jacking 4cm, makes bracket depart from 2cm with subgrade case;
E () traction moulding bed enters container:Start hoist engine rotates forward button, the work that the second steel wire rope passes through fixed pulley With traction moulding bed is steadily moved toward container direction, while the first steel wire rope is also moved to container direction, controls hoist engine work( Rate stabilization, moulding bed is at the uniform velocity entered into container;
F () traction moulding bed goes out from container:After moulding bed is completely into container, hoist engine is closed down, will be removed by hydraulic oil pump Hydraulic jack on fortune tankette declines 4cm, moulding bed is separated 2cm with bracket so that bracket falls container the inside, Ran Houqi The button that rotates backward of hoist engine is moved, the first steel wire rope is moved to hoist engine, traction moulding bed goes out from container, finally closes elevator Machine;
G () extracts the groove steel rail in container out, then with crane being transported on container crane to automobile.
2. a kind of automatic boxing method for steel structure workshop according to claim 1, it is characterised in that:In step (a), In the setting to subgrade case is highly specifically adjusted, the first setting of the base plate of the height of calculating subgrade case and container is highly The distance between, the chock of dimension is selected, chock is placed on the ground, laterally with the chock of vertically arrangement located at same On straight line, then subgrade case is horizontally disposed with chock, keeps the setting of the height of subgrade case and the base plate of container highly Keep identical.
3. a kind of automatic boxing method for steel structure workshop according to claim 1, it is characterised in that:In step (a), Groove steel rail is carried out to cut limb according to tankette following height is carried, then using angle welding mode to groove steel rail and roadbed Case is fixed.
4. a kind of automatic boxing method for steel structure workshop according to claim 1, it is characterised in that:In step (b), Before the tube seat band that pipeline is installed into moulding bed, the surface to pipeline is cleaned, pressure, flow further according to hydraulic oil pump And working media, corresponding pipe joint is selected, bore then to pipeline, wall thickness and material are checked.
5. a kind of automatic boxing method for steel structure workshop according to claim 1, it is characterised in that:In step (b), Pipeline is installed in the tube seat of moulding bed band internal procedure, and first the position of the carrying tankette according to corresponding to selects the pipe of corresponding length Road, carries out pipeline pre-installation, then pad is laid in tube seat band, and then the position of the carrying tankette according to corresponding to, will manage Curb the inner left wall laying of tube seat band, and the width according still further to tube seat band is laid pipeline, managed successively from left to right Formally install on road.
6. a kind of automatic boxing method for steel structure workshop according to claim 1, it is characterised in that:In step (e), Before starting hoist engine, the first steel wire rope and the second steel wire rope to hoist engine brush away black dirt, are coated with 50 DEG C of deep fat, and by heat The wire rope core of the steel wire rope of oil saturated first and the second steel wire rope, it is unnecessary on the first steel wire rope and the second steel wire rope then to wipe respectively Deep fat.
7. a kind of automatic boxing method for steel structure workshop according to claim 1, it is characterised in that:In step (f), After closing hoist engine, then cut off the electricity supply, controller is put into zero-bit, uses safety brake braking stop, then to hoist engine, the first steel wire Rope and the second steel wire rope are conserved and checked.
CN201710041919.9A 2017-01-20 2017-01-20 A kind of automatic boxing method for steel structure workshop Active CN106829529B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710041919.9A CN106829529B (en) 2017-01-20 2017-01-20 A kind of automatic boxing method for steel structure workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710041919.9A CN106829529B (en) 2017-01-20 2017-01-20 A kind of automatic boxing method for steel structure workshop

Publications (2)

Publication Number Publication Date
CN106829529A true CN106829529A (en) 2017-06-13
CN106829529B CN106829529B (en) 2018-09-21

Family

ID=59119789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710041919.9A Active CN106829529B (en) 2017-01-20 2017-01-20 A kind of automatic boxing method for steel structure workshop

Country Status (1)

Country Link
CN (1) CN106829529B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107724690A (en) * 2017-11-27 2018-02-23 中建局集团第建筑有限公司 Movable steel pipe inner partition plate installation sleeve device, installation system and construction method thereof
CN107934022A (en) * 2017-11-02 2018-04-20 广东精工钢结构有限公司 A kind of vanning frock of large-scale component
CN108001929A (en) * 2017-11-06 2018-05-08 金华送变电工程有限公司三为电力分公司 Transformer conveying device and transformer carrying method
CN110816951A (en) * 2019-09-30 2020-02-21 中航成飞民用飞机有限责任公司 Transportation mechanism for packaging and dispatching aircraft parts and method for packaging and dispatching aircraft parts
CN114261647A (en) * 2021-12-24 2022-04-01 北京航星机器制造有限公司 40 chi container

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100219610A1 (en) * 2009-02-27 2010-09-02 Sandor Wayne Shapery Container transport system
CN201980559U (en) * 2010-12-29 2011-09-21 天津二十冶建设有限公司 Transporting tire frame for steel component
CN203187124U (en) * 2013-04-26 2013-09-11 汪砚秋 Device for loading and unloading long cargoes in container
CN203394083U (en) * 2013-07-17 2014-01-15 中国建筑第六工程局有限公司 Sliding synchronous device for steel structures
CN203794128U (en) * 2014-04-29 2014-08-27 中国核工业二三建设有限公司 Heavy equipment transporting tooling
CN203855113U (en) * 2014-03-14 2014-10-01 上海钢之杰钢结构建筑***有限公司 Electric track trolley for transporting steel structures
CN203865327U (en) * 2014-04-30 2014-10-08 浙江东南网架股份有限公司 Multi-functional pallet frame for conveying of steel structure container
CN205577444U (en) * 2016-04-01 2016-09-14 中国建筑第八工程局有限公司 Track is organized - trailing component of bed -jig conveying instrument system in advance
CN106044665A (en) * 2016-05-26 2016-10-26 中国建筑第二工程局有限公司 Extra-heavy component small space shifting device and implementation method thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100219610A1 (en) * 2009-02-27 2010-09-02 Sandor Wayne Shapery Container transport system
CN201980559U (en) * 2010-12-29 2011-09-21 天津二十冶建设有限公司 Transporting tire frame for steel component
CN203187124U (en) * 2013-04-26 2013-09-11 汪砚秋 Device for loading and unloading long cargoes in container
CN203394083U (en) * 2013-07-17 2014-01-15 中国建筑第六工程局有限公司 Sliding synchronous device for steel structures
CN203855113U (en) * 2014-03-14 2014-10-01 上海钢之杰钢结构建筑***有限公司 Electric track trolley for transporting steel structures
CN203794128U (en) * 2014-04-29 2014-08-27 中国核工业二三建设有限公司 Heavy equipment transporting tooling
CN203865327U (en) * 2014-04-30 2014-10-08 浙江东南网架股份有限公司 Multi-functional pallet frame for conveying of steel structure container
CN205577444U (en) * 2016-04-01 2016-09-14 中国建筑第八工程局有限公司 Track is organized - trailing component of bed -jig conveying instrument system in advance
CN106044665A (en) * 2016-05-26 2016-10-26 中国建筑第二工程局有限公司 Extra-heavy component small space shifting device and implementation method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107934022A (en) * 2017-11-02 2018-04-20 广东精工钢结构有限公司 A kind of vanning frock of large-scale component
CN108001929A (en) * 2017-11-06 2018-05-08 金华送变电工程有限公司三为电力分公司 Transformer conveying device and transformer carrying method
CN107724690A (en) * 2017-11-27 2018-02-23 中建局集团第建筑有限公司 Movable steel pipe inner partition plate installation sleeve device, installation system and construction method thereof
CN107724690B (en) * 2017-11-27 2024-01-16 中建一局集团第一建筑有限公司 Complete device for installing movable steel pipe inner partition plate, installation system and construction method of complete device
CN110816951A (en) * 2019-09-30 2020-02-21 中航成飞民用飞机有限责任公司 Transportation mechanism for packaging and dispatching aircraft parts and method for packaging and dispatching aircraft parts
CN110816951B (en) * 2019-09-30 2022-07-12 中航成飞民用飞机有限责任公司 Transportation mechanism for packaging and dispatching aircraft parts and method for packaging and dispatching aircraft parts
CN114261647A (en) * 2021-12-24 2022-04-01 北京航星机器制造有限公司 40 chi container
CN114261647B (en) * 2021-12-24 2023-08-08 北京航星机器制造有限公司 40-ruler container

Also Published As

Publication number Publication date
CN106829529B (en) 2018-09-21

Similar Documents

Publication Publication Date Title
CN106829529B (en) A kind of automatic boxing method for steel structure workshop
CN104386075B (en) Wagon for transporting commercial trucks and loading method for wagon
CN106004609B (en) The handling method of Self-loading-unloading boxcar
CN107311038A (en) Possesses the lifting dolly of wire rope fiction drive cleaning function
CN205203151U (en) Transport vechicle is with railway carriage or compartment body with lift ceiling
CN103112505A (en) Big-gradient lifting transportation method of trackless transport device
CN210821972U (en) Cargo lifting structure of transport vehicle
CN105016258B (en) Hand-held combines yoke carrier
CN206069000U (en) Cargo handling auxiliary device
CN203079340U (en) Dust-proof overhead hopper
CN212049634U (en) Aggregate device for loading bulk cargo without landing
CN204250051U (en) A kind of railway truck transporting commercial truck
CN207108268U (en) Possesses the lifting dolly of wire rope fiction drive cleaning function
CN105000506A (en) Combined fork arm vehicle-mounted carrying vehicle
CN206511675U (en) A kind of automatic packing device for steel structure workshop
CN206050993U (en) Material bag Palletised carry equipment
CN205365337U (en) Carriage detachable freight train
CN202827007U (en) Dual-purpose trailer used in highway and railway
CN208265646U (en) A kind of container crane for U-shaped berth
CN107618425A (en) A kind of dumper with limit for tonnage function
CN203941004U (en) A kind of minitype wheeled transporter climbing test board
CN206781612U (en) Heavy caliber nonmetal flexible multiple tube transport vehicle
CN207794723U (en) A kind of stereo garage of machine multi-plate structure
CN205014006U (en) Lubricating oil refuels pump truck
CN205222153U (en) Double -deck carloader

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 311400 No.18, Changkou East Street, Changkou Town, Fuyang District, Hangzhou City, Zhejiang Province

Patentee after: Zhejiang Zhongnan Lvjian Technology Group Co.,Ltd.

Address before: No.245, BINKANG Road, Binjiang District, Hangzhou City, Zhejiang Province 310052

Patentee before: ZHEJIANG ZHONGNAN CONSTRUCTION GROUP STEEL STRUCTURE Co.,Ltd.