CN106827177A - The vibrating method of bubble removing is removed in a kind of prefabricated pipe section production - Google Patents

The vibrating method of bubble removing is removed in a kind of prefabricated pipe section production Download PDF

Info

Publication number
CN106827177A
CN106827177A CN201710053632.8A CN201710053632A CN106827177A CN 106827177 A CN106827177 A CN 106827177A CN 201710053632 A CN201710053632 A CN 201710053632A CN 106827177 A CN106827177 A CN 106827177A
Authority
CN
China
Prior art keywords
pipe section
mould
prefabricated pipe
vibrator
blanking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710053632.8A
Other languages
Chinese (zh)
Other versions
CN106827177B (en
Inventor
温利军
杨光芒
刘世辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Technology Hunan Co Ltd
Original Assignee
China State Construction Technology Hunan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Technology Hunan Co Ltd filed Critical China State Construction Technology Hunan Co Ltd
Priority to CN201710053632.8A priority Critical patent/CN106827177B/en
Publication of CN106827177A publication Critical patent/CN106827177A/en
Application granted granted Critical
Publication of CN106827177B publication Critical patent/CN106827177B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/08Producing shaped prefabricated articles from the material by vibrating or jolting
    • B28B1/093Producing shaped prefabricated articles from the material by vibrating or jolting by means directly acting on the material, e.g. by cores wholly or partly immersed in the material or elements acting on the upper surface of the material

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Moulds, Cores, Or Mandrels (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The invention provides the vibrating method that bubble removing is removed in a kind of production of prefabricated pipe section, the artificial vibrating spear of prior arts is substituted in particular by the multiple transverse direction vibrators of increase on mould, by the cooperation of longitudinal vibrator and lateral oscillators, so that direction concrete produces relative motion with prefabricated pipe section die surface in length and breadth during concrete placings, concrete rubber cement is attached to die surface in process of vibrating, blibbing is covered by concrete rubber cement after prefabricated components shaping, so as to improve prefabricated pipe section transverse direction Forming Quality, solve the problems, such as that prefabricated pipe section transverse direction number of bubbles is excessive.The number of bubbles of the prefabricated pipe section horizontal direction using vibrating method of the invention than being molded only with the method for longitudinal vibrator reduces 93% or so.The present invention pinpoints the problems from unique angle, using oscillation crosswise source is increased, the bubble of horizontal direction is processed to vibrate mulching method, and required device is simple to manufacture, effect is significant, and less investment, it is easy to constructing operation and management, is easy to promotion and implementation.

Description

The vibrating method of bubble removing is removed in a kind of prefabricated pipe section production
Technical field
The present invention relates to section of jurisdiction production vibrating method, particularly, it is related to a kind of prefabricated pipe section production to go vibrating for bubble removing Method.
Background technology
With the continuous expansion of Modernized City Construction scale, subway, can used as a kind of effective vehicles Solve the problems, such as that urban traffic pressure is excessive.Subway segment is typically made by the way of prefabricated at this stage.People are in ground iron pipe It is a problem demanding prompt solution to find that precast concrete blibbing is eliminated in the manufacturing process of piece.People for bubble this The preventing and treating of the common quality defect of prefabricated pipe section production carried out analysis from many aspects, for the research of concrete vibrating mode, prior art It is that prefabricated pipe section is produced by the cooperation of longitudinal form vibrator and artificial vibration rod, to reduce precast concrete surface gas Bubble.
But plug-in type vibrating rod is the arrangement and vibrating time vibrated a little according to the decision of the size and experience of working face, by people Work constraint is larger, and quality is difficult to control to;Plug-in type vibrating rod vibrate the reinforcing bar that is also possible to encounter in section of jurisdiction and pre- Tubulation die inner surface, so as to influence the quality of production and the mold use life-span of section of jurisdiction;And due to livewire work, this side There is certain risk in formula.Additionally, artificial vibrating is unsuitable for automatic assembly line operation.
At present, industry personnel from the directions such as raw material, slump, concrete vibrating mode, water reducer studied why Sample reduces prefabricated pipe section blibbing, but reduce be only longitudinal direction bubble, the bubble of horizontal direction or a lot.
The content of the invention
Present invention aim at the vibrating method that bubble removing is removed in a kind of prefabricated pipe section production of offer, to solve prefabricated pipe section table The more technical problem of face transverse direction bubble.
To achieve the above object, the invention provides the vibrating method that bubble removing is removed in a kind of production of prefabricated pipe section, specifically,
Carry out according to the following steps:
(1), installed on prefabricated pipe section mould and be no less than 6 vibrators, by a longitudinal vibrator and a transverse-vibration Dynamic device is divided into 1 group, is arranged in mould both sides and middle part;
(2), when blanking is produced, lateral oscillators are first opened, until material is lower full to mould lockhole position, the lockhole position Put and refer specifically to be located at the most middle lockhole of mould horizontal direction side plate;
(3), stop blanking, close lateral oscillators, open longitudinal vibrator, continue lower full remaining material;
(4) the ambilateral longitudinal vibrator of mould, is closed, is retained mould middle part longitudinal vibrator and is continued to vibrate 1min.
The vibrating method of bubble removing is removed in a kind of prefabricated pipe section production, specifically, is carried out according to the following steps:
(1), installed on prefabricated pipe section mould and be no less than 6 vibrators, by a longitudinal vibrator and a transverse-vibration Dynamic device is divided into 1 group, is arranged in mould both sides and middle part;
(2), when blanking is produced, lateral oscillators are first opened, until material is lower full to mould 1/3, stops blanking;
(3), after vibration 1min, continue at blanking to the 2/3 of mould, stop blanking;
(4), after vibration 1min, lower full remaining material is continued;
(5) lateral oscillators, are closed, longitudinal vibrator is opened, after vibration 1min, vibrator is closed.
Especially, the prefabricated pipe section mould mould steel making, by one piece of base plate, four pieces of side plates, two pieces of top boards The specificity precast concrete mould for tunnel duct piece production of composition is connected, has injected hole in the middle of the base plate.
Especially, the clear distance between every group of two vibrators of the vibrator is 2cm, prevents two vibrators in operating Middle collision.
Especially, the vibrator is attached on the base plate of the prefabricated pipe section mould by bolt.
Especially, the blanking velocity is 20s/m3, blanking velocity can not ether it is fast, it is not in place with without vibration;Blanking Speed also can not ether it is slow, in order to avoid during placement layer by layer, cold seam phenomenon is produced between layers.
Further, the frequency of the vibrator is 50Hz, and the vertically and horizontally vibrator is transported by the centrifugation of vibrator Dynamic, driven mold vibrates in direction in length and breadth respectively together.
Further, the vibrator of the vibrator group ragged edge positioned at die edge from the longitudinal side plate of mould two away from From 20cm is, the transverse and longitudinal vibrator in the middle part of mould is located at apart from the both sides of mould injected hole 1cm respectively.
Further, the lockhole is located on the prefabricated pipe section die side plate, and bottom is 12cm with a distance from base plate.
The invention has the advantages that:
The present invention substitutes the artificial vibrating spear of prior art by increasing transverse direction vibrator so that horizontal during concrete placings Direction concrete produces relative motion with prefabricated pipe section die surface, and concrete rubber cement is attached to die surface in process of vibrating, Blibbing is covered by concrete rubber cement after prefabricated components shaping, so as to improve prefabricated pipe section transverse direction Forming Quality, is solved The excessive problem of prefabricated pipe section transverse direction number of bubbles.Using vibrating method of the invention than the method only with longitudinal vibrator The number of bubbles of the section of jurisdiction horizontal direction of shaping reduces 93% or so.The present invention pinpoints the problems from unique angle, horizontal using increasing To vibration source, the bubble of horizontal direction is processed in the form of vibrating covering, and device is simple to manufacture needed for the inventive method, effect Fruit is notable, and less investment, it is easy to constructing operation and management, is easy to promotion and implementation.
In addition to objects, features and advantages described above, the present invention also has other objects, features and advantages. Below with reference to figure, the present invention is further detailed explanation.
Brief description of the drawings
The accompanying drawing for constituting the part of the application is used for providing a further understanding of the present invention, schematic reality of the invention Apply example and its illustrate, for explaining the present invention, not constitute inappropriate limitation of the present invention.
In the accompanying drawings:
Fig. 1 is prefabricated pipe section longitudinal direction side plate schematic diagram of the present invention;
Fig. 2 is prefabricated pipe section transverse direction side plate schematic diagram of the present invention;
Fig. 3 is the mounting means schematic diagram of prefabricated pipe section mold vibration device under mode of vibration of the present invention;
Fig. 4 is the mounting means schematic diagram of prefabricated pipe section mold vibration device under conventional vibration mode;
Reference:
1st, base plate, 2, longitudinal vibrator, 3, lateral oscillators, 4, injected hole, 5, lockhole, 6, side plate, 7, top board.
Specific embodiment
Embodiments of the invention are described in detail below in conjunction with accompanying drawing, but the present invention can be limited according to claim Fixed and covering multitude of different ways is implemented.
Embodiment 1
Referring to Fig. 1, Fig. 2 and Fig. 3, there is provided the vibrating method of bubble removing is removed in a kind of prefabricated pipe section production, is entered according to the following steps OK:
(1), installed on prefabricated pipe section mould and be no less than 6 form vibrators, the prefabricated pipe section mould is to use mould Tool steel making, the specificity produced for tunnel duct piece being made up of one piece of 1, four pieces of base plate top board 7 of side plate 6, two is mixed Solidifying soil prefabricated-member mould, the form vibrator is led to for 1 group respectively by a longitudinal vibrator 2 and a lateral oscillators 3 Cross and be bolted to the two edges of prefabricated pipe section die bottom plate 1 and middle part, wherein, the clear distance between every group of two vibrators It is 2cm, the vibrator of the vibrator group ragged edge positioned at die edge is with a distance from the longitudinal side plate 6 of mould two 20cm, it is the both sides of 1cm, institute that the transverse and longitudinal vibrator in the middle part of mould is located at the distance away from mould injected hole 4 respectively The centrifugal motion that vertically and horizontally vibrator passes through vibrator is stated, driven mold vibrates in direction in length and breadth respectively together, and frequency is 50Hz, So as to overcome the open defects such as concrete outer surface bubble, pitted skin.
(2), when blanking is produced, lateral oscillators 3 are first opened, it is 20s/m to control blanking velocity3, continue blanking to position In the prefabricated pipe section die side plate 6, distance of the bottom away from base plate 1 is the position of lockhole 5 of 12cm, stops blanking.Blanking velocity Can not ether it is fast, it is not in place with without vibration;Blanking velocity also can not ether it is slow, in order to avoid during placement layer by layer, produce between layers Cold seam phenomenon.
(3) lateral oscillators 3, are closed, longitudinal vibrator 2 is opened, keeps blanking velocity constant, continue lower full remaining Material.
(4) the ambilateral longitudinal vibrator 2 of prefabricated pipe section mould, is closed, retains the middle vibration of longitudinal vibrator 2 1min After close.
Embodiment 2
Referring to Fig. 1, Fig. 2 and Fig. 3, there is provided the vibrating method of bubble removing is removed in a kind of prefabricated pipe section production, is entered according to the following steps OK:
(1), installed on prefabricated pipe section mould and be no less than 6 form vibrators, the prefabricated pipe section mould is to use mould Tool steel making, the specificity produced for tunnel duct piece being made up of one piece of 1, four pieces of base plate top board 7 of side plate 6, two is mixed Solidifying soil prefabricated-member mould, the form vibrator is led to for 1 group respectively by a longitudinal vibrator 2 and a lateral oscillators 3 Cross and be bolted to the two edges of prefabricated pipe section die bottom plate 1 and middle part, wherein, the clear distance between every group of two vibrators It is 2cm, the vibrator of the vibrator group ragged edge positioned at die edge is with a distance from the longitudinal side plate 6 of mould two 20cm, it is the both sides of 1cm, institute that the transverse and longitudinal vibrator in the middle part of mould is located at the distance away from mould injected hole 4 respectively The centrifugal motion that vertically and horizontally vibrator passes through vibrator is stated, driven mold vibrates in direction in length and breadth respectively together, and frequency is 50Hz, So as to overcome the open defects such as concrete outer surface bubble, pitted skin.
(2), when blanking is produced, lateral oscillators 3 are first opened, it is 20s/m to control blanking velocity3, until material is lower completely extremely At mould 1/3, stop blanking.Blanking velocity can not ether it is fast, it is not in place with without vibration;Blanking velocity also can not ether it is slow, with When exempting from placement layer by layer, cold seam phenomenon is produced between layers.
(3), after vibration 1min, keep blanking velocity constant, continue at blanking to the 2/3 of segment die, stop blanking;
(4), after vibration 1min, keep blanking velocity constant, continue lower full remaining material;
(5) lateral oscillators 3, are closed, longitudinal vibrator 2 is opened, is closed after vibration 1min.
Embodiment 3
The embodiment is the preferred embodiment of embodiment 1.
Referring to Fig. 1, Fig. 2 and Fig. 3, there is provided the vibrating method of bubble removing is removed in a kind of prefabricated pipe section production, is entered according to the following steps OK:
(1), 6 form vibrators are installed on prefabricated pipe section mould, the prefabricated pipe section mould is to use mould steel Make, the specificity concrete for tunnel duct piece production being made up of one piece of 1, four pieces of base plate top board 7 of side plate 6, two is pre- Part forming die, the form vibrator be divided into 3 groups be bolted on the two edges of prefabricated pipe section die bottom plate 1 and in Portion, one of longitudinal vibrator 2 and a lateral oscillators 3 are 1 group, and the clear distance between every group of two vibrators is 2cm, The vibrator of the vibrator group ragged edge positioned at die edge is 20cm with a distance from the longitudinal side plate 6 of mould two, described It is the both sides of 1cm that transverse and longitudinal vibrator in the middle part of mould is located at the distance away from mould injected hole 4 respectively, described vertically and horizontally to shake Dynamic centrifugal motion of the device by vibrator, driven mold vibrates in direction in length and breadth respectively together, and frequency is 50Hz, mixed so as to overcome The open defects such as solidifying soil outer surface bubble, pitted skin.
(2), when blanking is produced, lateral oscillators 3 are first opened, it is 20s/m to control blanking velocity3, continue blanking to position In the prefabricated pipe section die side plate 6, distance of the bottom away from base plate 1 is the position of lockhole 5 of 12cm, stops blanking.Blanking velocity Can not ether it is fast, it is not in place with without vibration;Blanking velocity also can not ether it is slow, in order to avoid during placement layer by layer, produce between layers Cold seam phenomenon.
(3) lateral oscillators 3, are closed, longitudinal vibrator 2 is opened, keeps blanking velocity constant, continue lower full remaining Material.
(4) the ambilateral longitudinal vibrator 2 of prefabricated pipe section mould, is closed, retains the middle vibration of longitudinal vibrator 2 1min After close.
Embodiment 4
The embodiment is the preferred embodiment of embodiment 2.
Referring to Fig. 1, Fig. 2 and Fig. 3, there is provided the vibrating method of bubble removing is removed in a kind of prefabricated pipe section production, is entered according to the following steps OK:
(1), 6 form vibrators are installed on prefabricated pipe section mould, the prefabricated pipe section mould is to use mould steel Make, the specificity concrete for tunnel duct piece production being made up of one piece of 1, four pieces of base plate top board 7 of side plate 6, two is pre- Part forming die, the form vibrator be divided into 3 groups be bolted on the two edges of prefabricated pipe section die bottom plate 1 and in Portion, one of longitudinal vibrator 2 and a lateral oscillators 3 are 1 group, and the clear distance between every group of two vibrators is 2cm, The vibrator of the vibrator group ragged edge positioned at die edge is 20cm with a distance from the longitudinal side plate 6 of mould two, described It is the both sides of 1cm that transverse and longitudinal vibrator in the middle part of mould is located at the distance away from mould injected hole 4 respectively, described vertically and horizontally to shake Dynamic centrifugal motion of the device by vibrator, driven mold vibrates in direction in length and breadth respectively together, and frequency is 50Hz, mixed so as to overcome The open defects such as solidifying soil outer surface bubble, pitted skin.
(2), when blanking is produced, lateral oscillators 3 are first opened, it is 20s/m to control blanking velocity3, until material is lower completely extremely At mould 1/3, stop blanking.Blanking velocity can not ether it is fast, it is not in place with without vibration;Blanking velocity also can not ether it is slow, with When exempting from placement layer by layer, cold seam phenomenon is produced between layers.
(3), after vibration 1min, keep blanking velocity constant, continue at blanking to the 2/3 of segment die, stop blanking;
(4), after vibration 1min, keep blanking velocity constant, continue lower full remaining material;
(5) lateral oscillators 3, are closed, longitudinal vibrator 2 is opened, is closed after vibration 1min.
Comparative example
Referring to Fig. 4, conventional vibration pattern is carried out according to the following steps:
(1), 3 longitudinal form vibrators 2 are installed on prefabricated pipe section mould, longitudinal form vibrator 2 leads to Cross and be bolted to the two edges of prefabricated pipe section die bottom plate 1 and middle part, the vibrator positioned at die edge is from mould The distance of two longitudinal side plates 6 is 20cm, the longitudinal vibrator 2 in the middle part of mould be located at away from mould injected hole 4 away from From the centrifugal motion that the side for 1cm, the longitudinal vibrator 2 pass through vibrator, driven mold vibrates in longitudinal direction together, frequency Rate is 50Hz.
(2), when blanking is produced, whole longitudinal vibrators 2 are opened, it is 20s/m to control blanking velocity3, until material is lower full To mould 1/3, stop blanking.
(3), after vibration 30s, continue blanking to lockhole position, stop blanking;
(4), after vibration 50s, keep blanking velocity constant, continue lower full remaining material.
(5) the ambilateral longitudinal vibrator 2 of mould, is closed, is closed after retaining the middle vibration of longitudinal vibrator 2 1min.
Longitudinal direction number of bubbles in section of jurisdiction is 0~16/10cm under conventional vibration mode2, section of jurisdiction transverse direction number of bubbles is 0 ~195/10cm2;Longitudinal direction number of bubbles in section of jurisdiction is 0~15/10cm under mode of vibration of the present invention2, section of jurisdiction transverse direction bubble Quantity is 0~14/10cm2.Comparative illustration, the present invention can effectively reduce the gas of horizontal direction in prefabricated pipe section production process Bubble quantity, greatly improves the quality of production, and method is simple, and effect is obvious, it is easy to promote.
The preferred embodiments of the present invention are the foregoing is only, is not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.It is all within the spirit and principles in the present invention, made any repair Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (9)

1. the vibrating method of bubble removing is removed in a kind of prefabricated pipe section production, it is characterised in that carried out according to the following steps:
(1), installed on prefabricated pipe section mould and be no less than 6 vibrators, by a longitudinal vibrator and a lateral oscillators It is divided into 1 group, is arranged in mould both sides and middle part;
(2), when blanking is produced, lateral oscillators are first opened, until material is lower full to mould lockhole position, the lockhole position tool Body refers at the most middle lockhole of mould horizontal direction side plate;
(3), stop blanking, close lateral oscillators, open longitudinal vibrator, continue lower full remaining material;
(4) the ambilateral longitudinal vibrator of mould, is closed, is retained mould middle part longitudinal vibrator and is continued to vibrate 1min.
2. the vibrating method of bubble removing is removed in a kind of prefabricated pipe section production, it is characterised in that carried out according to the following steps:
(1), installed on prefabricated pipe section mould and be no less than 6 vibrators, by a longitudinal vibrator and a lateral oscillators It is divided into 1 group, is arranged in mould both sides and middle part;
(2), when blanking is produced, lateral oscillators are first opened, until material is lower full to mould 1/3, stops blanking;
(3), after vibration 1min, continue at blanking to the 2/3 of mould, stop blanking;
(4), after vibration 1min, lower full remaining material is continued;
(5) lateral oscillators, are closed, longitudinal vibrator is opened, after vibration 1min, vibrator is closed.
3. the vibrating method of bubble removing is removed in a kind of prefabricated pipe section production according to claim 1 and 2, it is characterised in that institute State prefabricated pipe section mould mould steel making, connected by one piece of base plate, four blocks of side plates, two pieces of top boards constitute for tunnel The specificity precast concrete mould of road section of jurisdiction production, has injected hole in the middle of the base plate.
4. the vibrating method of bubble removing is removed in a kind of prefabricated pipe section production according to claim 1 and 2, it is characterised in that institute It is 2cm to state the clear distance between every group of two vibrators of vibrator.
5. the vibrating method of bubble removing is removed in a kind of prefabricated pipe section production according to claim 1 and 2, it is characterised in that institute Vibrator is stated to be attached on the base plate of the prefabricated pipe section mould by bolt.
6. the vibrating method of bubble removing is removed in a kind of prefabricated pipe section production according to claim 1 and 2, it is characterised in that institute State blanking velocity and be 20s/m3
7. the vibrating method of bubble removing is removed in a kind of prefabricated pipe section production according to claim 1 and 2, it is characterised in that institute The frequency for stating vibrator is 50Hz, and the centrifugal motion that the vertically and horizontally vibrator passes through vibrator, driven mold is distinguished together In the vibration of direction in length and breadth.
8. the vibrating method of bubble removing is removed in a kind of prefabricated pipe section production according to claim 1 and 2, it is characterised in that institute Rheme is 20cm in the vibrator of the vibrator group ragged edge of die edge with a distance from the longitudinal side plate of mould two, described to be located at Transverse and longitudinal vibrator in the middle part of mould is located at apart from the both sides of mould injected hole 1cm respectively.
9. the vibrating method of bubble removing is removed in a kind of prefabricated pipe section production according to claim 1, it is characterised in that the lock In on the prefabricated pipe section die side plate, bottom is 12cm with a distance from base plate to hole position.
CN201710053632.8A 2017-01-22 2017-01-22 The vibrating method of bubble removing is removed in a kind of prefabricated pipe section production Active CN106827177B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710053632.8A CN106827177B (en) 2017-01-22 2017-01-22 The vibrating method of bubble removing is removed in a kind of prefabricated pipe section production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710053632.8A CN106827177B (en) 2017-01-22 2017-01-22 The vibrating method of bubble removing is removed in a kind of prefabricated pipe section production

Publications (2)

Publication Number Publication Date
CN106827177A true CN106827177A (en) 2017-06-13
CN106827177B CN106827177B (en) 2018-11-30

Family

ID=59120349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710053632.8A Active CN106827177B (en) 2017-01-22 2017-01-22 The vibrating method of bubble removing is removed in a kind of prefabricated pipe section production

Country Status (1)

Country Link
CN (1) CN106827177B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107738349A (en) * 2017-10-13 2018-02-27 中铁四局集团第四工程有限公司 A kind of method for prefabricating suitable for large-scale section of jurisdiction
CN107756600A (en) * 2017-11-20 2018-03-06 上海师范大学 Cement section of jurisdiction arc surface receives water floating device automatically
CN108044765A (en) * 2017-11-24 2018-05-18 绍兴市永坚建筑科技有限公司 A kind of cast vibrating method of precast concrete
CN108705668A (en) * 2018-05-08 2018-10-26 上海浦东混凝土制品有限公司 A kind of concrete pipe sheet pours the system of smashing and concrete pipe sheet pours the method for smashing

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03266605A (en) * 1990-03-16 1991-11-27 Showa Concrete Ind Co Ltd Retaining mold apparatus of concrete member
CN1100025A (en) * 1993-09-09 1995-03-15 任华国 Method for production of side mould of prefabricated hollow floor
CN101439553A (en) * 2008-12-30 2009-05-27 朱春生 Method for pouring and molding large scale disposal wallboard and mould carriage thereof
CN103046441A (en) * 2012-12-27 2013-04-17 中国建筑第六工程局有限公司 Slab ballastless track self-compacting concrete pouring construction method
CN203863800U (en) * 2014-05-29 2014-10-08 桂林永福龙港绿色环保建材有限公司 Vibration device for cement partition board pouring

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03266605A (en) * 1990-03-16 1991-11-27 Showa Concrete Ind Co Ltd Retaining mold apparatus of concrete member
CN1100025A (en) * 1993-09-09 1995-03-15 任华国 Method for production of side mould of prefabricated hollow floor
CN101439553A (en) * 2008-12-30 2009-05-27 朱春生 Method for pouring and molding large scale disposal wallboard and mould carriage thereof
CN103046441A (en) * 2012-12-27 2013-04-17 中国建筑第六工程局有限公司 Slab ballastless track self-compacting concrete pouring construction method
CN203863800U (en) * 2014-05-29 2014-10-08 桂林永福龙港绿色环保建材有限公司 Vibration device for cement partition board pouring

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107738349A (en) * 2017-10-13 2018-02-27 中铁四局集团第四工程有限公司 A kind of method for prefabricating suitable for large-scale section of jurisdiction
CN107756600A (en) * 2017-11-20 2018-03-06 上海师范大学 Cement section of jurisdiction arc surface receives water floating device automatically
CN107756600B (en) * 2017-11-20 2024-05-24 上海师范大学 Automatic water collecting and trowelling device for circular arc surface of cement duct piece
CN108044765A (en) * 2017-11-24 2018-05-18 绍兴市永坚建筑科技有限公司 A kind of cast vibrating method of precast concrete
CN108705668A (en) * 2018-05-08 2018-10-26 上海浦东混凝土制品有限公司 A kind of concrete pipe sheet pours the system of smashing and concrete pipe sheet pours the method for smashing

Also Published As

Publication number Publication date
CN106827177B (en) 2018-11-30

Similar Documents

Publication Publication Date Title
CN106827177A (en) The vibrating method of bubble removing is removed in a kind of prefabricated pipe section production
CN101439553B (en) Method for pouring and molding large scale disposal wallboard and mould carriage thereof
CN203542797U (en) Concrete-building-block forming machine
CN101992500B (en) Concrete pipe platform vibration moulding process and device thereof
CN105908973A (en) Micro vibration technique for improving foundation construction technology
CN103396072A (en) Autoclaved fly ash aerated concrete blank manufacturing method
CN105503071B (en) Haydite compounded wall board production technology flow and equipment
CN111002430B (en) Concrete compaction equipment
CN108705668A (en) A kind of concrete pipe sheet pours the system of smashing and concrete pipe sheet pours the method for smashing
CN102581920A (en) Production method of light wallboard
EP0677362A1 (en) Method and apparatus for producing a concrete product
EP2527118A1 (en) Lower part of shaft with channel
CN112976279B (en) Processing method of autoclaved aerated concrete building material
CN111916760B (en) Energy-saving and environment-friendly continuous casting and slicing production equipment for lead storage battery grid
CN104002374A (en) Plaster concrete building block forming machine
CN110259135B (en) Concrete vibrating equipment
CN204546739U (en) For the end face clout device for excising of air entrained concrete longitudinal cutter
CN217729145U (en) Concrete conveying and distributing device
CN108655150A (en) A kind of broken remanufacture line of discarded concrete
CN212764016U (en) Prevent prefabricated case roof beam template of centre form come-up
CN212421656U (en) A vibrating device for concrete shaping process
CN211566406U (en) Production device of aerated concrete reinforced wallboard
CN208262279U (en) A kind of steel wire welder
CN203994199U (en) Plaster concrete block machine
CN114378936B (en) Manufacturing system and manufacturing method for pressed sound screen plate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant