CN106814674A - Energy consumption monitoring system - Google Patents

Energy consumption monitoring system Download PDF

Info

Publication number
CN106814674A
CN106814674A CN201510853843.0A CN201510853843A CN106814674A CN 106814674 A CN106814674 A CN 106814674A CN 201510853843 A CN201510853843 A CN 201510853843A CN 106814674 A CN106814674 A CN 106814674A
Authority
CN
China
Prior art keywords
energy consumption
consumption monitoring
data acquisition
monitoring system
wireless
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510853843.0A
Other languages
Chinese (zh)
Inventor
朱旭东
蒋念平
沈龙才
黄霆毅
黄树茂
李政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Waigaoqiao Shipbuilding Offshore Engineering Project Management Co.,Ltd.
Original Assignee
Shanghai Shipyard Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Shipyard Co Ltd filed Critical Shanghai Shipyard Co Ltd
Priority to CN201510853843.0A priority Critical patent/CN106814674A/en
Publication of CN106814674A publication Critical patent/CN106814674A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/048Monitoring; Safety

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The invention discloses a kind of energy consumption monitoring system, it includes some pipelines, some energy consumption data acquisition modules and an energy consumption monitoring service device, and each energy consumption data acquisition module includes a Wireless data acquisition unit and some measuring instrumentss;Energy consumption monitoring service device is respectively connecting to each Wireless data acquisition unit by mobile communications network, the wireless transport module correspondence of each measuring instruments is wirelessly connected to Wireless data acquisition unit, each measuring instruments is correspondingly arranged in a pipeline, and for measuring the energy consumption data of corresponding pipeline, wireless transport module is used to by Wireless data acquisition unit send corresponding energy consumption data to energy consumption monitoring service device.The energy consumption monitoring system that the present invention is provided is used and wirelessly transmits energy consumption data, instead of wired connection come by way of transmitting energy consumption data, so as to break away from the constraint of cable, saving takes up room, shorten installation period, and reduce cable cost and maintenance cost.

Description

Energy consumption monitoring system
Technical field
The present invention relates to a kind of energy consumption monitoring system, more particularly to a kind of long-range energy consumption wireless supervisory control system.
Background technology
It is the basis for realizing energy-saving and emission-reduction, energy consumption monitoring system to the energy consumption monitoring of pipeline in all kinds of construction areas System is the bulky systems that the energy consumption data unification in each region is sent to associated server and is monitored.
At present, the side in energy consumption monitoring system between all kinds of measuring instrumentss and server using wired connection Formula, such mode not only needs to undertake the cable cost of costliness, and take up room and maintenance process on Also increase many troubles.
The content of the invention
The technical problem to be solved in the present invention is that have to overcome energy consumption monitoring system in the prior art to use The mode of line connects all kinds of measuring instrumentss and server, causes to increase cable cost and maintenance cost, and account for With the defect for building space, there is provided a kind of energy consumption monitoring system.
The present invention is to solve above-mentioned technical problem by following technical proposals:
A kind of energy consumption monitoring system, its feature is, if the energy consumption monitoring system include some pipelines, Dry energy consumption data acquisition module and an energy consumption monitoring service device, each energy consumption data acquisition module include one Wireless data acquisition unit and some measuring instrumentss;
The energy consumption monitoring service device is respectively connecting to each wireless data by mobile communications network Collector, the wireless transport module correspondence of each measuring instruments is wirelessly connected to the data acquisition Device, each measuring instruments are correspondingly arranged in a pipeline, and for measuring the energy consumption number of corresponding pipeline According to the wireless transport module is used to send corresponding energy consumption data by the Wireless data acquisition unit To the energy consumption monitoring service device.
It is preferred that the energy consumption monitoring service device connection internet, the energy consumption monitoring service device is used for will The energy consumption data is distributed to the internet.
In this programme, the access and processing authority of Internet user are set on the energy consumption monitoring service device, User with authority can be after internet carries out authenticating user identification, can be to the energy consumption monitoring service Various types of data in device is consulted and processed.
It is preferred that the mobile communications network is that (General Packet Radio Service lead to GPRS With packet wireless service technology) network.
In this programme, when need transmit it is less and right to the energy consumption data of the energy consumption monitoring service device Under transmission rate request environment not high, from lower-cost GPRS network.
It is preferred that the channel radio between the wireless transport module and the corresponding Wireless data acquisition unit Letter frequency range is 433MHz.
In this programme, when need transmission energy consumption data it is less, and the wireless transport module with it is corresponding Wireless data acquisition unit environment apart from each other under, use the wireless communication frequency band of 433MHz Transmission energy consumption data.
It is preferred that the wireless transport module is ZigBee (ZigBee protocols, based on IEEE802.15.4 The low-power consumption LAN protocol of standard) wireless transport module.
In this programme, when needing, the energy consumption data of transmission is more, and the requirement to transmission rate is higher, and The wireless transport module under nearer environment, is used with the corresponding Wireless data acquisition unit ZigBee wireless transport modules transmit energy consumption data.
It is preferred that the measuring instrumentss include flowmeter and/or pressure gauge.
It is preferred that the energy consumption monitoring system also includes some motor switch valves, each motor switch Valve is correspondingly arranged in a pipeline, and the energy consumption monitoring service device is used to for break-make control instruction to pass through institute State Wireless data acquisition unit and the wireless transport module is sent to the control of corresponding motor switch valve Module.
In this programme, motor switch valve is used to control the break-make of corresponding pipeline, so as to control correspondence Pipeline in flow and pressure.
On the basis of common sense in the field is met, above-mentioned each optimum condition can be combined, and obtain final product this hair Bright each preferred embodiments.
Positive effect of the invention is:
The energy consumption monitoring system that the present invention is provided instead of and pass through using energy consumption data is wirelessly transmitted Wired connection transmits the mode of energy consumption data, and so as to break away from the constraint of cable, saving takes up room, contracting Short installation period, and reduce cable cost and maintenance cost.
Brief description of the drawings
Fig. 1 is the structural representation of the energy consumption monitoring system of present pre-ferred embodiments.
Specific embodiment
Name preferred embodiment, and become apparent from intactly illustrating the present invention with reference to accompanying drawing.
As shown in figure 1, the present embodiment provide energy consumption monitoring system include an energy consumption monitoring service device 1, Some energy consumption data acquisition modules 2, some motor switch valves 7 and some pipelines 8;
Each energy consumption data acquisition module 2 includes a Wireless data acquisition unit 3 and some measuring instrumentss, Wireless transport module 4 is respectively provided with each measuring instruments, the measuring instrumentss include flowmeter 5 and pressure Power table 6.
In the present embodiment, Fig. 1 shows 2 energy consumption data acquisition modules, 2,2 data acquisitions 5,4, flowmeter, 6,4, the pressure gauge motor switch valve of wireless transport module 4,4 of device 3,4 7 and 4 pipelines 8, can monitor the energy consumption data on 2 each 2 pipelines 8 in region.Although Fig. 1 The particular number of each generic module or part is shown, it is not limited to this quantity, also dependent on actual conditions It is adjusted correspondingly.
Energy consumption monitoring service device 1 is respectively connecting to each data acquisition by mobile communications network Device 3, the mobile communications network includes GPRS network, 3G (G mobile communication) network Or any one in 4G (forth generation mobile communication technology) network;
It is less to the energy consumption data of energy consumption monitoring service device 1 when needing to transmit, and to transmission rate request not Under environment high, preferentially from lower-cost GPRS network;
When needing, the energy consumption data of transmission is more, and needs faster in the environment of transmission rate, also optional With 3G network or 4G networks.
Each wireless transport module 4 correspondence is wirelessly connected to Wireless data acquisition unit 3, is wirelessly transferred mould Block 4 can select 433MHz wireless transport modules or ZigBee wireless transport modules;
When needing, the energy consumption data of transmission is less, and wireless transport module 4 and the phase of Wireless data acquisition unit 3 In the environment of farther out, energy consumption data is transmitted using the wireless communication frequency band of 433MHz;
When needing, the energy consumption data of transmission is more, and the requirement to transmission rate is higher, and wireless transport module 4 with Wireless data acquisition unit 3 under the nearer environment, transmitted using ZigBee wireless transport modules Energy consumption data.
Each wireless transport module 4 is connected respectively to flowmeter 5, pressure gauge 6 and motor switch Valve 7, flowmeter 5, pressure gauge 6 and motor switch valve 7 are correspondingly arranged in each pipeline 8 respectively.
Flowmeter 5 and pressure gauge 6 are used to measure in real time the energy consumption data of corresponding pipeline 8 and send to nothing Corresponding energy consumption data is passed through Wireless data acquisition unit by line transport module 4, wireless transport module 4 in real time 3 send to energy consumption monitoring service device 1.
Motor switch valve 7 is used to control the break-make of corresponding pipeline 8, when energy consumption monitoring service device 1 connects After receiving the break-make control instruction to pipeline 8, the break-make control instruction is passed through into Wireless data acquisition unit 3 and wireless transport module 4 send to the control module of corresponding motor switch valve 7, electric switching valve The control module of door 7 controls motor switch valve 7 according to the break-make control instruction, so as to control correspondence Pipeline 8 in flow and pressure.
The control module of motor switch valve 7 can be divided into remote control and local control, local when switching to Operated by the button of the guidance panel of the control module during control, when remote control is switched to by Energy consumption monitoring service device 1 is operated.
The flow and pressure data that energy consumption monitoring service device 1 will be received are focused on, and by flow And pressure data is measured, is stored, is counted, is analyzed, is tabulated, filed and printed, and is made for user With.
Energy consumption monitoring service device 1 connects internet 9, and all data and function are carried out into internet 9 sends out Cloth.In energy consumption monitoring service device 1, the access and operating right of user, the user Ke Tong with authority are set After crossing internet 9 and carrying out authenticating user identification, the Various types of data in energy consumption monitoring service device 1 is looked into Read and print, and energy consumption monitoring service device 1 can be operated by internet 9, so that control piper 8 break-make, flow and pressure in adjustment pipeline 8.
In the present embodiment, the energy consumption monitoring system by the way of being wirelessly transferred to all kinds of energy consumption datas Real time on-line monitoring, dynamic analysis and remote control are carried out, the mode of wire transmission energy consumption data is instead of, So as to break away from the constraint of cable, saving takes up room, shorten installation period, and reduce cable cost and Maintenance cost.The energy consumption monitoring system can be also managed by internet to all kinds of energy consumption datas, be User provides managerial convenience, reaches the target of fine-grained management.
Although the foregoing describing specific embodiment of the invention, those skilled in the art should manage Solution, this is merely illustrative of, and protection scope of the present invention is defined by the appended claims.Ability The technical staff in domain, can be to these implementation methods on the premise of without departing substantially from principle of the invention and essence Various changes or modifications are made, but these changes and modification each fall within protection scope of the present invention.

Claims (7)

1. a kind of energy consumption monitoring system, it is characterised in that it includes some pipelines, some energy consumption datas Acquisition module and an energy consumption monitoring service device, each energy consumption data acquisition module are adopted including a wireless data Storage and some measuring instrumentss;
The energy consumption monitoring service device is respectively connecting to each wireless data by mobile communications network Collector, the wireless transport module correspondence of each measuring instruments is wirelessly connected to the data acquisition Device, each measuring instruments are correspondingly arranged in a pipeline, and for measuring the energy consumption number of corresponding pipeline According to the wireless transport module is used to send corresponding energy consumption data by the Wireless data acquisition unit To the energy consumption monitoring service device.
2. energy consumption monitoring system as claimed in claim 1, it is characterised in that the energy consumption monitoring clothes Business device connection internet, the energy consumption monitoring service device is used to for the energy consumption data to be distributed to the interconnection Net.
3. energy consumption monitoring system as claimed in claim 1, it is characterised in that the mobile radio communication Network is GPRS network.
4. energy consumption monitoring system as claimed in claim 1, it is characterised in that described to be wirelessly transferred mould Wireless communication frequency band between block and the corresponding Wireless data acquisition unit is 433MHz.
5. energy consumption monitoring system as claimed in claim 1, it is characterised in that described to be wirelessly transferred mould Block is ZigBee wireless transport modules.
6. energy consumption monitoring system as claimed in claim 1, it is characterised in that the measuring instrumentss bag Include flowmeter and/or pressure gauge.
7. energy consumption monitoring system as claimed in claim 1, it is characterised in that the energy consumption monitoring system System also includes some motor switch valves, and each motor switch valve is correspondingly arranged in a pipeline, institute Stating energy consumption monitoring service device is used for break-make control instruction by the Wireless data acquisition unit and the nothing Line transport module is sent to the control module of corresponding motor switch valve.
CN201510853843.0A 2015-11-27 2015-11-27 Energy consumption monitoring system Pending CN106814674A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510853843.0A CN106814674A (en) 2015-11-27 2015-11-27 Energy consumption monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510853843.0A CN106814674A (en) 2015-11-27 2015-11-27 Energy consumption monitoring system

Publications (1)

Publication Number Publication Date
CN106814674A true CN106814674A (en) 2017-06-09

Family

ID=59155859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510853843.0A Pending CN106814674A (en) 2015-11-27 2015-11-27 Energy consumption monitoring system

Country Status (1)

Country Link
CN (1) CN106814674A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109067614A (en) * 2018-07-18 2018-12-21 李思炜 A kind of system and method measuring instrument terminal data acquisition and controlled
CN109933024A (en) * 2018-12-25 2019-06-25 安徽三马信息科技有限公司 A kind of industrial energy consumption monitoring management system
CN113587987A (en) * 2021-07-27 2021-11-02 江苏海恩德电气有限公司 Intelligent energy consumption monitoring cloud platform based on Internet of things

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110161023A1 (en) * 2009-12-29 2011-06-30 Gds Software (Shenzhen) Co.,Ltd System and method for measuring machine energy consumption and productivity
CN102434699A (en) * 2011-09-28 2012-05-02 克里特集团有限公司 Remote monitoring system of ball valve for long-distance pipeline and using method thereof
CN202600948U (en) * 2012-05-11 2012-12-12 南京苏商新能源科技有限公司 Wireless data acquisition device in energy consumption monitoring system
CN202904355U (en) * 2012-11-21 2013-04-24 宁波联胜资讯科技有限公司 Remote control device for building energy consumption equipment
CN203012939U (en) * 2012-12-03 2013-06-19 北京中诚盛源技术发展有限公司 Energy consumption monitoring system
CN103247163A (en) * 2013-05-15 2013-08-14 上海先之决信息科技发展有限公司 Wireless consumed energy acquisition equipment and consumed energy acquisition method
CN203260182U (en) * 2013-04-02 2013-10-30 上海贝力仪器有限公司 Remote monitoring measurement system for data wireless transmission
CN203909581U (en) * 2014-05-13 2014-10-29 张家港耐维思通电子科技有限公司 Enterprise energy consumption monitoring system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110161023A1 (en) * 2009-12-29 2011-06-30 Gds Software (Shenzhen) Co.,Ltd System and method for measuring machine energy consumption and productivity
CN102434699A (en) * 2011-09-28 2012-05-02 克里特集团有限公司 Remote monitoring system of ball valve for long-distance pipeline and using method thereof
CN202600948U (en) * 2012-05-11 2012-12-12 南京苏商新能源科技有限公司 Wireless data acquisition device in energy consumption monitoring system
CN202904355U (en) * 2012-11-21 2013-04-24 宁波联胜资讯科技有限公司 Remote control device for building energy consumption equipment
CN203012939U (en) * 2012-12-03 2013-06-19 北京中诚盛源技术发展有限公司 Energy consumption monitoring system
CN203260182U (en) * 2013-04-02 2013-10-30 上海贝力仪器有限公司 Remote monitoring measurement system for data wireless transmission
CN103247163A (en) * 2013-05-15 2013-08-14 上海先之决信息科技发展有限公司 Wireless consumed energy acquisition equipment and consumed energy acquisition method
CN203909581U (en) * 2014-05-13 2014-10-29 张家港耐维思通电子科技有限公司 Enterprise energy consumption monitoring system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109067614A (en) * 2018-07-18 2018-12-21 李思炜 A kind of system and method measuring instrument terminal data acquisition and controlled
CN109933024A (en) * 2018-12-25 2019-06-25 安徽三马信息科技有限公司 A kind of industrial energy consumption monitoring management system
CN113587987A (en) * 2021-07-27 2021-11-02 江苏海恩德电气有限公司 Intelligent energy consumption monitoring cloud platform based on Internet of things

Similar Documents

Publication Publication Date Title
CN106329721B (en) Integral intelligent electric energy meter and electric-power metering and Control protection system
CN101448277B (en) Method, system and device for processing wireless access network faults
WO2013076719A2 (en) Methods and systems of reading utility meters and methods and systems of transmitting utility meter data
CN107317397B (en) Power carrier communication-based Internet of things power supply management system and method
CN103595601A (en) Home gateway for internet of things monitoring and internet of things monitoring system
CN206773423U (en) A kind of four table centralized procurements and smart home integrated system based on power line carrier
CN110648437A (en) Entrance guard management system based on LoRa thing networking
CN205910817U (en) SF6 gas density wireless long -distance monitoring and early warning system
CN106814674A (en) Energy consumption monitoring system
US9129517B2 (en) Method and apparatus for collecting data from automatic meter reading for smart power grid
CN102889665B (en) Remote monitoring system and method for air conditioner
CN110220273A (en) A kind of Heating,Ventilating and Air Conditioning monitor supervision platform and its control method based on Internet of Things
CN206178422U (en) Oil field intelligence management and control device based on thing networking
CN103277872B (en) Computer based central air-conditioning remote monitoring and warning system
CN209676231U (en) A kind of wireless communication module and communication system
CN205247160U (en) Energy consumption monitored control system
CN111132386A (en) Edge computing gateway based on narrowband Internet of things
CN104102213B (en) A kind of tele-control system for material separation device and method
CN203455377U (en) Power consumption monitoring device
CN104360666A (en) Internet of Things comprehensive monitoring circuit for switching station
CN102546479A (en) Gateway for perceiving internet of things of coal yard
CN205209544U (en) Detection system
CN205430306U (en) Electric energy reactive power compensation monitored control system
CN106568177A (en) Energy-efficient central air conditioning remote monitoring equipment
CN109587025A (en) A kind of intelligent substation switch of port self study

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20211230

Address after: 202156 room 421, floor 4, building 1, No. 955, Gaoxiang Road, Pudong New Area, Shanghai

Applicant after: Shanghai Waigaoqiao Shipbuilding Offshore Engineering Project Management Co.,Ltd.

Address before: No.1 Jimo Road, Pudong New Area, Shanghai 202164

Applicant before: SHANGHAI SHIPYARD Co.,Ltd.

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170609