CN106813653A - The outer bay window of arcuate building exterior wall embraces frame post actinobacillus device and line-putting method - Google Patents

The outer bay window of arcuate building exterior wall embraces frame post actinobacillus device and line-putting method Download PDF

Info

Publication number
CN106813653A
CN106813653A CN201710143131.9A CN201710143131A CN106813653A CN 106813653 A CN106813653 A CN 106813653A CN 201710143131 A CN201710143131 A CN 201710143131A CN 106813653 A CN106813653 A CN 106813653A
Authority
CN
China
Prior art keywords
unwrapping wire
floor
layer
frame post
bay window
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710143131.9A
Other languages
Chinese (zh)
Other versions
CN106813653B (en
Inventor
史杰
邵艳丽
蔡志文
杨金铃
申腾
靳俊杰
李晋杰
马翔
侯于波
张大伟
刘天军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Sanjian Group Co Ltd
Original Assignee
Shanxi No3 Construction Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi No3 Construction Engineering Co filed Critical Shanxi No3 Construction Engineering Co
Priority to CN201710143131.9A priority Critical patent/CN106813653B/en
Publication of CN106813653A publication Critical patent/CN106813653A/en
Application granted granted Critical
Publication of CN106813653B publication Critical patent/CN106813653B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/10Plumb lines
    • G01C15/105Optical plumbing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/002Active optical surveying means
    • G01C15/004Reference lines, planes or sectors

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Frame post actinobacillus device and line-putting method are embraced the invention discloses a kind of outer bay window of arcuate building exterior wall, the evagination of the different interlayers existed when solving the problems, such as that the window both sides evagination on the arc exterior wall on the construction line-putting difference floor embraces frame post embraces frame post and distortion easily occurs.Frame post is embraced in the 4th layer of outer bay window(8)Unwrapping wire mark on be provided with positioning rod(11), in positioning rod(11)Front end be respectively arranged with preceding unwrapping wire guide wheel(17)With rear unwrapping wire guide wheel(18), in positioning rod(11)Rear end be fixedly installed A-frame(15), in A-frame(15)Top be provided with two-wire actinobacillus wheel(16), in preceding vertical unwrapping wire rope(19)Lower end and rear vertical unwrapping wire rope(20)Lower end between be provided with positioning suspender(12), in positioning suspender(12)On be provided with laser level(13).Construction method of the present invention is simple, and the frock on-site consolidation for being used is easy.

Description

The outer bay window of arcuate building exterior wall embraces frame post actinobacillus device and line-putting method
Technical field
The present invention relates to a kind of actinobacillus device embraced when the casting of frame post is constructed to the outer bay window of arcuate building exterior wall, especially relate to And a kind of evagination of the arc outer wall of building for frame structure embraces the actinobacillus device and line-putting method when frame post is constructed.
Background technology
With making rapid progress for urban architecture, the exterior wall of some frame buildings is set to arc, the window on arc exterior wall Family is raised type, in order to complete window moulding construction, it is necessary to carry out unwrapping wire on every floor plate of frame building to determine Window both sides evagination embraces the casting position of frame post.Window both sides evagination embraces the Linear Control that frame post is poured, and is to need to carry out floor Transmission, making an armful frame post for whole building exterior wall same position can be on the same line position on alien invasion, be built with meeting Build the attractive in appearance of alien invasion.Existing window both sides evagination embrace frame post payingoff construction method be:In bottom floor or top floor On, the outer edge that frame post is embraced in side is found by frame column or control line, the width according to window measures another from the side line The sideline of layer window, then, is fallen toward last layer or toward next layer of messenger wire with line, is so moved in circles, until whole building embraces frame Post unwrapping wire is completed, and then carries out embracing reinforcing bar colligation and the pouring construction of frame post.The method is relatively more suitable for exterior wall for vertical elevation Framed building, when external wall elevation is arc-shaped, use the method unwrapping wire, have that angle control error is big, reference point is non-constant, The unwrapping wire error of interlayer is easily caused, causes the window both sides evagination on the arc exterior wall on different floors to embrace frame post not at one On vertical line, the outward appearance of building has been badly influenced.
The content of the invention
Frame post actinobacillus device and line-putting method are embraced the invention provides a kind of outer bay window of arcuate building exterior wall, is solved and is being applied The window both sides evagination on arc exterior wall on work unwrapping wire difference floor embraces the unwrapping wire error existed during frame post causes greatly different layers Between evagination embrace frame post occur distortion technical problem.
The present invention is to solve above technical problem by the following technical programs:
A kind of outer bay window of arcuate building exterior wall embraces frame post actinobacillus device, including framework pours the 4th floor plate and the 3rd of building Floor plate, is provided with pre- the 4th layer of outer bay window for pouring and embraces frame post, in third layer floor in the arc outboard end of the 4th floor plate Arc outboard end be correspondingly arranged on the outer bay window of the pre- third layer for pouring and embrace frame post, set in the arc outboard end of the 4th floor plate Pre- the 4th layer of outer bay window for pouring embrace frame post at be provided with the 4th layer of outer bay window embrace frame post unwrapping wire mark, in the 4th layer of evagination Window to be embraced and be provided with positioning rod on the unwrapping wire mark of frame post, and the empty arc outboard end in the 4th floor plate is chosen in the front end for positioning rod Outside, positioning rod front end be respectively arranged with before unwrapping wire guide wheel and rear unwrapping wire guide wheel, positioning rod rear end fix A-frame is provided with, the top of A-frame is provided with two-wire actinobacillus wheel, preceding vertical unwrapping wire rope is released from two-wire actinobacillus wheel Put down vertically downward by after preceding unwrapping wire guide wheel, vertical unwrapping wire rope is released after unwrapping wire guide wheel later from two-wire actinobacillus wheel afterwards Put down vertically downward, positioning suspender be provided between the lower end of preceding vertical unwrapping wire rope and the lower end of rear vertical unwrapping wire rope, Laser level is provided with positioning suspender, positioning suspender, positioning rod, preceding vertical unwrapping wire rope and rear vertical unwrapping wire rope are to set Put on same vertical plane.
Hung oneself in positioning suspender and be connected to pendant.
A kind of outer bay window of arcuate building exterior wall embraces frame post line-putting method, comprises the following steps:
Pre- the 4th layer of outer bay window for pouring that the first step, the arc outboard end of the 4th floor plate that building is poured in framework are set The marking line of position on the floor where the 4th layer of outer bay window embraces the medial surface of frame post is marked at the position for embracing frame post;
Second step, unwrapping wire guide wheel and rear unwrapping wire guide wheel before the front end of positioning rod is respectively provided with, consolidate in the rear end of positioning rod A-frame is set surely, two-wire actinobacillus wheel is set on the top of A-frame, and make preceding unwrapping wire guide wheel, rear unwrapping wire guide wheel and three Angle support is in same plane;
3rd step, the marking line that position on the floor that rod is placed into where the 4th layer of outer bay window embraces the medial surface of frame post will be positioned On, and the front end of positioning rod is chosen sky in the outside of the arc outboard end of the 4th floor plate;
4th step, the vertical unwrapping wire rope from before the releasing of two-wire actinobacillus wheel, the end of preceding vertical unwrapping wire rope after preceding unwrapping wire guide wheel by hanging down Directly put down downwards;The vertical unwrapping wire rope from after the releasing of two-wire actinobacillus wheel, the end of vertical unwrapping wire rope is vertical after unwrapping wire guide wheel later afterwards Directly put down downwards;
5th step, between the lower end of the lower end of preceding vertical unwrapping wire rope and rear vertical unwrapping wire rope positioning suspender is connected, hung in positioning Bar is hung oneself and is connected to pendant, and laser level is set on positioning suspender;
6th step, by two-wire actinobacillus wheel control positioning suspender be lowered into downwards at the arc outboard end of third layer floor, and Positioning suspender is in same level with third layer floor, gone out by the laser level unwrapping wire set on positioning suspender The marking line of position on floor where the medial surface of the outer bay window armful frame post of the pre- third layer for pouring of third layer floor;
7th step, by two-wire actinobacillus wheel control positioning suspender be lowered into downwards at the arc outboard end of second layer floor, and Positioning suspender is in same level with second layer floor, gone out by the laser level unwrapping wire set on positioning suspender The marking line of position on floor where the medial surface of the outer bay window armful frame post of the pre- second layer for pouring of second layer floor;
8th step, by two-wire actinobacillus wheel control positioning suspender be lowered into downwards at the arc outboard end of ground floor floor, and Positioning suspender is in same level with ground floor floor, gone out by the laser level unwrapping wire set on positioning suspender The marking line of position on floor where the medial surface of the outer bay window armful frame post of the pre- ground floor for pouring of ground floor floor.
The step of first step is repeated to eight steps, can go out the building where the outer bay window of the 4th floor embraces the lateral surface of frame post with unwrapping wire The marking line of position on plate, and set up template according to two marking lines and carry out the 4th layer of outer bay window and embrace frame post pouring.
The present invention solves the outer bay window of existing arcuate building exterior wall and embraces that frame post is not straight and the not positive problem of angle, construction party Method is simple, and the frock on-site consolidation for being used is easy.
Brief description of the drawings
Fig. 1 is the structural representation of actinobacillus device of the invention;
Fig. 2 is the overall structure diagram that the outer bay window of arcuate building exterior wall of the invention embraces frame post;
Fig. 3 is the location drawing that pre- the 4th layer of outer bay window for pouring of the invention embraces frame post 8;
Fig. 4 is the mark line chart of position on the floor at the place of medial surface 9 that the 4th layer of outer bay window of the invention embraces frame post 8;
Fig. 5 is the location drawing that the outer bay window of the pre- third layer for pouring of the invention embraces frame post 7;
Fig. 6 be present invention determine that the outer bay window of third layer embrace the medial surface 10 of frame post 7 where floor on position mark line chart.
Specific embodiment
The present invention is described in detail below in conjunction with the accompanying drawings:
A kind of outer bay window of arcuate building exterior wall embraces frame post actinobacillus device, including framework pours the 4th floor plate 4 and the of building Three floor plates 3, are provided with pre- the 4th layer of outer bay window for pouring and embrace frame post 8, in third layer in the arc outboard end of the 4th floor plate 4 The arc outboard end of floor 3 is correspondingly arranged on the outer bay window of the pre- third layer for pouring and embraces frame post 7, outside the arc of the 4th floor plate 4 Pre- the 4th layer of outer bay window for pouring that side is set is embraced and the unwrapping wire mark that the 4th layer of outer bay window embraces frame post 8 is provided with frame post 8, 4th layer of outer bay window is embraced and positioning rod 11 is provided with the unwrapping wire mark of frame post 8, and sky is chosen at the 4th layer in the front end for positioning rod 11 The outside of the arc outboard end of floor 4, unwrapping wire guide wheel 17 and rear unwrapping wire guide wheel before the front end of positioning rod 11 is respectively arranged with 18, A-frame 15 is fixedly installed in the rear end of positioning rod 11, the top of A-frame 15 is provided with two-wire actinobacillus wheel 16, preceding vertical unwrapping wire rope 19 is released from two-wire actinobacillus wheel 16 and put down vertically downward by after preceding unwrapping wire guide wheel 17, afterwards vertically Unwrapping wire rope 20 is released from two-wire actinobacillus wheel 16 and put down vertically downward after unwrapping wire guide wheel 18 later, in preceding vertical unwrapping wire rope 19 Lower end and the lower end of rear vertical unwrapping wire rope 20 between be provided with positioning suspender 12, be provided with laser demarcation on positioning suspender 12 Instrument 13, positioning suspender 12, positioning rod 11, preceding vertical unwrapping wire rope 19 and rear vertical unwrapping wire rope 20 are provided in same vertical plane On.
Hung oneself in positioning suspender 12 and be connected to pendant 21, preceding vertical unwrapping wire rope 19 and rear vertical unwrapping wire rope 20 is in and is tightened shape State.
A kind of outer bay window of arcuate building exterior wall embraces frame post line-putting method, comprises the following steps:
Pre- the 4th layer of evagination for pouring that the first step, the arc outboard end of the 4th floor plate 4 that building is poured in framework are set Window embraces the marking line of position on the floor marked at the position of frame post 8 where the 4th layer of outer bay window embraces the medial surface 9 of frame post 8, should Marking line is to determine 2 points of A, B on floor by elder generation, is obtained after scribed line;
Second step, unwrapping wire guide wheel 17 and rear unwrapping wire guide wheel 18 before the front end of positioning rod 11 is respectively provided with, in positioning rod 11 Rear end A-frame 15 is fixedly installed, two-wire actinobacillus wheel 16 is set on the top of A-frame 15, and make preceding unwrapping wire guide wheel 17th, rear unwrapping wire guide wheel 18 and A-frame 15 are in same plane;
3rd step, the mark that position on the floor that rod 11 is placed into where the 4th layer of outer bay window embraces the medial surface 9 of frame post 8 will be positioned On note line, and the front end of positioning rod 11 is set to choose sky in the outside of the arc outboard end of the 4th floor plate 4;
4th step, from two-wire actinobacillus wheel 16 release before vertical unwrapping wire rope 19, the end of preceding vertical unwrapping wire rope 19 is led by preceding unwrapping wire Put down vertically downward after wheel 17;The vertical unwrapping wire rope 20 from after the releasing of two-wire actinobacillus wheel 16, afterwards the end of vertical unwrapping wire rope 20 pass through Put down vertically downward after unwrapping wire guide wheel 18 afterwards;
5th step, the connection positioning suspender 12 between the lower end of the lower end of preceding vertical unwrapping wire rope 19 and rear vertical unwrapping wire rope 20, Positioning suspender 12 is hung oneself and is connected to pendant 21, and laser level 13 is set on positioning suspender 12;
6th step, by two-wire actinobacillus wheel 16 control positioning suspender 12 be lowered at the arc outboard end of third layer floor 3 downwards, And positioning suspender 12 is in same level with third layer floor 3, thrown by the laser set on positioning suspender 12 The floor at the place of medial surface 10 that the outer bay window of the pre- third layer for pouring that the unwrapping wire of line instrument 13 goes out third layer floor 3 embraces frame post 7 is upper The marking line put;
7th step, by two-wire actinobacillus wheel 16 control positioning suspender 12 be lowered at the arc outboard end of second layer floor 2 downwards, And positioning suspender 12 is in same level with second layer floor 2, thrown by the laser set on positioning suspender 12 The unwrapping wire of line instrument 13 go out second layer floor 2 the outer bay window of the pre- second layer for pouring embrace the medial surface of frame post 6 where floor on position Marking line;
8th step, by two-wire actinobacillus wheel 16 control positioning suspender 12 be lowered at the arc outboard end of ground floor floor 1 downwards, And positioning suspender 12 is in same level with ground floor floor 1, thrown by the laser set on positioning suspender 12 The unwrapping wire of line instrument 13 go out ground floor floor 1 the outer bay window of the pre- ground floor for pouring embrace the medial surface of frame post 5 where floor on position Marking line.

Claims (3)

1. a kind of outer bay window of arcuate building exterior wall embraces frame post actinobacillus device, including framework pours the 4th floor plate of building(4) With third layer floor(3), in the 4th floor plate(4)Arc outboard end be provided with pre- the 4th layer of outer bay window for pouring embrace frame post (8), in third layer floor(3)Arc outboard end be correspondingly arranged on the outer bay window of the pre- third layer for pouring and embrace frame post(7), the 4th Floor plate(4)Pre- the 4th layer of outer bay window for the pouring armful frame post that sets of arc outboard end(8)Place is provided with the 4th layer of outer bay window Embrace frame post(8)Unwrapping wire mark, it is characterised in that in the 4th layer of outer bay window armful frame post(8)Unwrapping wire mark on be provided with positioning Rod(11), position rod(11)Front end choose sky in the 4th floor plate(4)Arc outboard end outside, positioning rod (11)Front end be respectively arranged with preceding unwrapping wire guide wheel(17)With rear unwrapping wire guide wheel(18), in positioning rod(11)Rear end fix set It is equipped with A-frame(15), in A-frame(15)Top be provided with two-wire actinobacillus wheel(16), preceding vertical unwrapping wire rope(19)From Two-wire actinobacillus wheel(16)Release by preceding unwrapping wire guide wheel(17)Put down vertically downward afterwards, afterwards vertical unwrapping wire rope(20)From two-wire Actinobacillus wheel(16)Release through unwrapping wire guide wheel later(18)Put down vertically downward afterwards, in preceding vertical unwrapping wire rope(19)Lower end with Vertical unwrapping wire rope afterwards(20)Lower end between be provided with positioning suspender(12), in positioning suspender(12)On be provided with laser level (13), positioning suspender(12), positioning rod(11), preceding vertical unwrapping wire rope(19)With rear vertical unwrapping wire rope(20)It is provided in same On vertical plane.
2. a kind of outer bay window of arcuate building exterior wall according to claim 1 embraces frame post actinobacillus device, it is characterised in that fixed Position suspension rod(12)Hang oneself and be connected to pendant(21).
3. a kind of outer bay window of arcuate building exterior wall embraces frame post line-putting method, comprises the following steps:
The first step, the 4th floor plate that building is poured in framework(4)Pre- the 4th layer for pouring that sets of arc outboard end it is outer Bay window embraces frame post(8)Position at mark the 4th layer of outer bay window embrace frame post(8)Medial surface(9)The mark of position on the floor at place Note line;
Second step, positioning rod(11)Front end be respectively provided with preceding unwrapping wire guide wheel(17)With rear unwrapping wire guide wheel(18), in positioning Rod(11)Rear end A-frame is fixedly installed(15), in A-frame(15)Top set two-wire actinobacillus wheel(16), and And make preceding unwrapping wire guide wheel(17), rear unwrapping wire guide wheel(18)And A-frame(15)In same plane;
3rd step, rod will be positioned(11)It is placed into the 4th layer of outer bay window and embraces frame post(8)Medial surface(9)The floor at place is upper In the marking line put, and make positioning rod(11)Front end choose sky in the 4th floor plate(4)Arc outboard end outside;
4th step, from two-wire actinobacillus wheel(16)Vertical unwrapping wire rope before releasing(19), preceding vertical unwrapping wire rope(19)End by preceding Unwrapping wire guide wheel(17)Put down vertically downward afterwards;From two-wire actinobacillus wheel(16)Vertical unwrapping wire rope after releasing(20), vertical unwrapping wire rope afterwards (20)End through later unwrapping wire guide wheel(18)Put down vertically downward afterwards;
5th step, in preceding vertical unwrapping wire rope(19)Lower end and rear vertical unwrapping wire rope(20)Lower end between connect positioning suspender (12), in positioning suspender(12)Hang oneself and be connected to pendant(21), in positioning suspender(12)Upper setting laser level(13);
6th step, by two-wire actinobacillus wheel(16)Control positioning suspender(12)It is lowered into third layer floor downwards(3)Arc outside At side, and make positioning suspender(12)With third layer floor(3)In same level, by positioning suspender(12)On The laser level of setting(13)Unwrapping wire goes out third layer floor(3)The outer bay window of the pre- third layer for pouring embrace frame post(7)Inner side Face(10)The marking line of position on the floor at place;
7th step, by two-wire actinobacillus wheel(16)Control positioning suspender(12)It is lowered into second layer floor downwards(2)Arc outside At side, and make positioning suspender(12)With second layer floor(2)In same level, by positioning suspender(12)On The laser level of setting(13)Unwrapping wire goes out second layer floor(2)The outer bay window of the pre- second layer for pouring embrace frame post(6)Inner side The marking line of position on floor where face;
8th step, by two-wire actinobacillus wheel(16)Control positioning suspender(12)It is lowered into ground floor floor downwards(1)Arc outside At side, and make positioning suspender(12)With ground floor floor(1)In same level, by positioning suspender(12)On The laser level of setting(13)Unwrapping wire goes out ground floor floor(1)The outer bay window of the pre- ground floor for pouring embrace frame post(5)Inner side The marking line of position on floor where face.
CN201710143131.9A 2017-03-10 2017-03-10 Arc building outer wall outer convex window frame holding column paying-off device and paying-off method Active CN106813653B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710143131.9A CN106813653B (en) 2017-03-10 2017-03-10 Arc building outer wall outer convex window frame holding column paying-off device and paying-off method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710143131.9A CN106813653B (en) 2017-03-10 2017-03-10 Arc building outer wall outer convex window frame holding column paying-off device and paying-off method

Publications (2)

Publication Number Publication Date
CN106813653A true CN106813653A (en) 2017-06-09
CN106813653B CN106813653B (en) 2023-03-03

Family

ID=59116163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710143131.9A Active CN106813653B (en) 2017-03-10 2017-03-10 Arc building outer wall outer convex window frame holding column paying-off device and paying-off method

Country Status (1)

Country Link
CN (1) CN106813653B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110726401A (en) * 2018-07-17 2020-01-24 米亚索乐装备集成(福建)有限公司 Positioning line drawing method

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08338136A (en) * 1995-06-14 1996-12-24 Fujita Corp Elevator device for construction
CN101514586A (en) * 2009-01-14 2009-08-26 北京江河幕墙股份有限公司 Hanger rail type electric hanging boat and high-rise long span house, bridge building construction method and use thereof
CN101713196A (en) * 2009-10-27 2010-05-26 山西省第三建筑工程公司 Suspended cable type winter construction heat-insulating shed and building method thereof
CN202119374U (en) * 2011-07-12 2012-01-18 涂闽杰 Arc building structure setting-out detector
CN202997429U (en) * 2012-12-25 2013-06-12 高凡军 Pay-off stand for construction
CN203967707U (en) * 2014-07-30 2014-11-26 国家电网公司 A kind of heavy cable actinobacillus device
CN204220876U (en) * 2014-10-24 2015-03-25 苏州惠斯福自动化科技有限公司 Double dynamical automatic wire feeder
CN204255361U (en) * 2014-11-25 2015-04-08 重庆电子工程职业学院 Building operation line falls
CN105040970A (en) * 2015-08-05 2015-11-11 中国建筑第二工程局有限公司 High formwork system of comprehensive gymnasium and construction method thereof
CN105214229A (en) * 2014-05-26 2016-01-06 黄维 A kind of building with fire fighting and rescue system
CN106123873A (en) * 2016-07-26 2016-11-16 中国二十二冶集团有限公司 Upright projection positioning measuring device location cultellation construction method
CN106441250A (en) * 2016-08-30 2017-02-22 中冶天工集团天津有限公司 Thread release device and projecting method used for building control point vertical projecting
CN206540553U (en) * 2017-03-10 2017-10-03 山西省第三建筑工程公司 The outer bay window of arcuate building exterior wall embraces frame post actinobacillus device

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08338136A (en) * 1995-06-14 1996-12-24 Fujita Corp Elevator device for construction
CN101514586A (en) * 2009-01-14 2009-08-26 北京江河幕墙股份有限公司 Hanger rail type electric hanging boat and high-rise long span house, bridge building construction method and use thereof
CN101713196A (en) * 2009-10-27 2010-05-26 山西省第三建筑工程公司 Suspended cable type winter construction heat-insulating shed and building method thereof
CN202119374U (en) * 2011-07-12 2012-01-18 涂闽杰 Arc building structure setting-out detector
CN202997429U (en) * 2012-12-25 2013-06-12 高凡军 Pay-off stand for construction
CN105214229A (en) * 2014-05-26 2016-01-06 黄维 A kind of building with fire fighting and rescue system
CN203967707U (en) * 2014-07-30 2014-11-26 国家电网公司 A kind of heavy cable actinobacillus device
CN204220876U (en) * 2014-10-24 2015-03-25 苏州惠斯福自动化科技有限公司 Double dynamical automatic wire feeder
CN204255361U (en) * 2014-11-25 2015-04-08 重庆电子工程职业学院 Building operation line falls
CN105040970A (en) * 2015-08-05 2015-11-11 中国建筑第二工程局有限公司 High formwork system of comprehensive gymnasium and construction method thereof
CN106123873A (en) * 2016-07-26 2016-11-16 中国二十二冶集团有限公司 Upright projection positioning measuring device location cultellation construction method
CN106441250A (en) * 2016-08-30 2017-02-22 中冶天工集团天津有限公司 Thread release device and projecting method used for building control point vertical projecting
CN206540553U (en) * 2017-03-10 2017-10-03 山西省第三建筑工程公司 The outer bay window of arcuate building exterior wall embraces frame post actinobacillus device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110726401A (en) * 2018-07-17 2020-01-24 米亚索乐装备集成(福建)有限公司 Positioning line drawing method

Also Published As

Publication number Publication date
CN106813653B (en) 2023-03-03

Similar Documents

Publication Publication Date Title
CN107100358A (en) Without the special bracket of encorbelmenting of off-load industrialization security protection, support body and its construction method
CN105735481B (en) Core tube of high-rise building lifting platform climbs attemperator and its construction method
CN104389268B (en) A kind of steel tower column with location structure and construction method for hanging thereof
CN207063515U (en) A kind of scalable aluminium frame template
CN107419802A (en) A kind of Precast Concrete Frame and construction method
CN108086326A (en) A kind of underwater concreting construction method and device
CN106088493A (en) A kind of pin key connects mounting structure and the construction thereof of prefabricated bench
CN110499702A (en) A kind of cable saddle positioning reinforcing device of Cable-stayed Bridge Pylon
CN206540553U (en) The outer bay window of arcuate building exterior wall embraces frame post actinobacillus device
CN106813653A (en) The outer bay window of arcuate building exterior wall embraces frame post actinobacillus device and line-putting method
CN101838986B (en) Disassembling tool type lattice column and construction method thereof
CN207548722U (en) A kind of superimposed sheet storage rack
CN207846904U (en) A kind of concrete prefabricated stairs of accurate positioning
CN207194333U (en) A kind of hollow stair of marking time of precast concrete
CN206379110U (en) A kind of filling pile construction analogue means
CN205822198U (en) Cast-in-place concrete pile perfusion controls device
CN207144477U (en) The clear-water concrete exposed joint strip template of Measurement of Elevator tower
CN206503068U (en) A kind of bridge construction anti-drop device
CN102383591A (en) Construction device and construction technology for slip formworks and reverse formworks
CN106049849B (en) A kind of adjustable drawbar attached plate stand apparatus and construction method
CN205975995U (en) Cast -in -place concrete floor indent steel tube frame
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN204298736U (en) A kind of steel tower column with location structure
CN207469300U (en) A kind of double skin wall constructions of underground garage
CN210976551U (en) External hanging protective frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No.266 Taihang East Street, Changzhi City, Shanxi Province 046000

Patentee after: SHANXI THIRD CONSTRUCTION Co.,Ltd.

Country or region after: China

Address before: No.266 Taihang East Street, Changzhi City, Shanxi Province 046000

Patentee before: SHANXI NO.3 CONSTRUCTION ENGINEERING CO.,LTD.

Country or region before: China

CP03 Change of name, title or address