CN106812069B - The bottom basket downward putting device and method of the high buttress Hanging Basket in mountain area - Google Patents

The bottom basket downward putting device and method of the high buttress Hanging Basket in mountain area Download PDF

Info

Publication number
CN106812069B
CN106812069B CN201710118314.5A CN201710118314A CN106812069B CN 106812069 B CN106812069 B CN 106812069B CN 201710118314 A CN201710118314 A CN 201710118314A CN 106812069 B CN106812069 B CN 106812069B
Authority
CN
China
Prior art keywords
basket
fine
jack
screw nut
rolling screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710118314.5A
Other languages
Chinese (zh)
Other versions
CN106812069A (en
Inventor
李华军
李思望
谢伟春
汪建竹
张家华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU TRAFFIC ENGINEERING GROUP Co Ltd
Original Assignee
HANGZHOU TRAFFIC ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU TRAFFIC ENGINEERING GROUP Co Ltd filed Critical HANGZHOU TRAFFIC ENGINEERING GROUP Co Ltd
Priority to CN201710118314.5A priority Critical patent/CN106812069B/en
Publication of CN106812069A publication Critical patent/CN106812069A/en
Application granted granted Critical
Publication of CN106812069B publication Critical patent/CN106812069B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)
  • Metal Rolling (AREA)

Abstract

The present invention relates to a kind of bottom basket downward putting devices of the high buttress Hanging Basket in mountain area and method, gear jack to be placed in box beam, and the bottom basket of Hanging Basket is connected by fining twisted steel, for declining the bottom basket 1.7m of Hanging Basket;The bottom basket top of Hanging Basket after decline is equipped with gusset plate, gusset plate is fixedly connected by screw-thread steel connector and fine-rolling screw nut with the fining twisted steel being connected between hydraulic punching jack and the bottom basket of Hanging Basket, jack is placed in box beam by longitudinal and cross beam, backing plate is arranged on jack, fine-rolling screw nut is set on backing plate, two stringer middle setting backing plates and fine-rolling screw nut, two fine-rolling screw nuts are connect with fining twisted steel.Use fining twisted steel and jack as main tool, using the auxiliary device at scene, successfully weighing about 24tBottom basket smoothly vertically transferred about 74m.Each component of bottom exploded basket behind arrival ground.The device and method is that later high-altitude descending weight has started practicable precedent.It can be used on each construction site.

Description

The bottom basket downward putting device and method of the high buttress Hanging Basket in mountain area
Technical field
The present invention relates to a kind of grand bridges to build the high buttress Hanging Basket in construction, especially a kind of bottom basket of high buttress Hanging Basket Downward putting device and method.
Background technique
The BR-06 grand bridge of Teheran the north highway first stage of the project project is entire project the most key position.Bridge Location is located at the northern 9 degree of earthquake territories in Teheran.It is pre- across Wavelike steel webplate using 3 to bridge superstructure in order to mitigate bridge self weight Prestressed concrete continuous beam.Span of bridge is arranged as 83+153+83=319m.Left and right width spacing distance 2m.The bridge main span 1# pier Pier shaft left panel height 28m, right panel height 31m;On the hillside of the mulberry side koris TEHRAN.2# pier pier shaft or so width pier shaft is high 65.5m, the bridge main span 153m at the foot of the hill built up positioned at the mulberry koris opposite side SHRINE is across mulberry koris and winding public affairs Road.Bridge 2 pier is set to show especially magnificent in the mountain valley of overhanging cliff.The box beam 0 of BR-06 grand bridge#The a height of 8.8m in block center, conjunction Hold together section (17# block) high 3.5m.Deck-molding section is by 1.8 parabola variations.Steel web Construction of Continuous Box Beam using Hanging Basket gradually to Be pushed forward into technique.The 0 of the dividing strip of box beam or so width is arranged in its tower crane#At block.Cradle construction to the segment box beam 10# position It sets;Because of tower crane brachium 50m.Tower crane can not vertical direct hoisting heavy.Box beam closure segment is apart from tower crane center away from being 76.5m.There is 73m in its top surface from road surface.There is 84m apart from mulberry koris bottom.Closure segment construction, which finishes, to need to remove Hanging Basket.It hangs The top diamond shape frame of basket can fall back at the tower crane radius of gyration and remove, but bottom basket can not just be returned.
The bottom basket planar dimension of Hanging Basket are as follows: along bridge to 6.6m, direction across bridge 10m.
Every component always weighs about 24 tons.
Transferring bottom baskets with 25 tons of hoist engine " walking 3 " wirerope in 10m or so for height is not to be a problem;It can also use Loop wheel machine parks on the ground each section component dismounting to bottom basket.But for height 70m or more, loop wheel machine can not be torn open in this position It removes.The rope capacity that there is hoist engine using hoist engine decline bottom basket is inadequate, can not also transfer.
Summary of the invention
In order to solve the above-mentioned technical problem, the present invention proposes bottom basket downward putting device and the side of a kind of high buttress Hanging Basket in mountain area Method.
The technical scheme is that a kind of bottom basket downward putting device of the high buttress Hanging Basket in mountain area, including gear jack, essence Roll screw-thread steel, hydraulic punching jack, it is characterised in that: the gear jack is placed in box beam, and by passing through box beam The bottom basket of the fining twisted steel connection Hanging Basket of wing plate, for declining the bottom basket 1.7m of Hanging Basket;The bottom basket top of Hanging Basket after decline Equipped with gusset plate, gusset plate passes through screw-thread steel connector and fine-rolling screw nut and the bottom basket for being connected to hydraulic punching jack and Hanging Basket Between fining twisted steel be fixedly connected, the hydraulic punching jack is placed in box beam by longitudinal and cross beam, on jack It arranges backing plate, fine-rolling screw nut is set on backing plate.Two stringer middle setting backing plates and fine-rolling screw nut, two fine-rolling screw nuts and essence Roll screw-thread steel connection.
It is symmetrically welded and connected bar between the stringer of the bottom basket of the gusset plate and Hanging Basket, the fine-rolling screw nut on gusset plate passes through Chain block connects the stringer and front beam of the bottom basket of Hanging Basket, and wherein chain block one end connects fine-rolling screw nut by wirerope, The other end passes through wirerope longitudinal beam connected and front beam.
The fining twisted steel is formed by connecting by the screw-thread steel that more root long degree are 12m, passes through screw thread between two screw-thread steels Steel connector is fixedly connected, and pinions end with iron wire on screw-thread steel connector, for preventing stripped thread.
The important technological parameters of the punching jack: stretching force 973.1KN, oil pressure 51MPa, punching aperture areTentioning stroke is 200mm.
A kind of bottom basket pay-off method of the high buttress Hanging Basket in mountain area, comprising the following steps:
1) in construction to previous piece of position of block is closed up, the top plate and bottom plate at box beam center is arranged in advanceHole;
2) closure segment construction finishes, and top template, the skid beam component in closure segment box beam are removed in advance;
3) with the bottom basket 1.7m of 32t gear jack decline Hanging Basket;
4) it is penetrated down from the hole that box beam top surface is arranged with the fining twisted steel of 4.5m long, when reaching bottom plate, according to The secondary nut for screwing on fining twisted steel puts on gusset plate, then after screwing on screw-thread steel connector, and the bottom end of fining twisted steel is inserted into The front beam of bottom basket.Then upper padding plate is covered in the bottom of front beam, screws on fine-rolling screw nut and fixes;
5) in box beam top surface, position of opening arranges the lowering means of hydraulic punching jack, with the shoulder pole girder two of cradle construction Item, which is placed vertically, makees stringer, two stringer spacing 290mm.Backing plate I and fine-rolling screw nut II is arranged in center, and fine-rolling screw nut II is fixed Fining twisted steel prevent its downslide, a crossbeam is set up on two stringers, backing plate II is disposed on crossbeam, in backing plate II Between openCylinder jack is arranged on backing plate II in hole;
6) oil pump is first opened, oil inlet pipe supplies, and backing plate I and fine-rolling screw nut I, finish rolling spiral shell are withstood in hydraulic punching jack jacking Female II clamps fining twisted steel and rises 180mm;The fine-rolling screw nut II between two stringers also and then rises 180mm therebetween;Then oily Fuel cut-off is pumped, the fine-rolling screw nut II between following stringer is screwed off on backing plate I, hydraulic punching jack oil return, under backing plate I It falls, then fine-rolling screw nut II is screwed at backing plate I, passes, make the steady decline of bottom basket gradually.
The beneficial effects of the present invention are:
The present invention uses fining twisted steel and jack as main tool, using the auxiliary device at scene, successfully weight About 24tBottom basket smoothly vertically transferred about 74m.Each component of bottom exploded basket behind arrival ground.
The device and method is that later high-altitude descending weight has started practicable precedent.Each building can be used in On building site.
Detailed description of the invention
Fig. 1 is that the top plate and bottom plate at box beam center is arrangedHole schematic diagram;
Fig. 2 is the bottom basket schematic diagram for declining Hanging Basket using gear jack;
Fig. 3 is the right view of Fig. 2;
Fig. 4 is that gusset plate, connecting rod and chain block schematic diagram are installed on the basket of bottom;
Fig. 5 is partial enlarged view at I in Fig. 4;
Fig. 6 is partial enlarged view at II in Fig. 4;
Fig. 7 is the bottom basket schematic diagram that Hanging Basket is transferred using cylinder jack;
Fig. 8 is the right view of Fig. 7;
Fig. 9 is the cylinder jack and oil pump schematic diagram in lowering means;
Figure 10 is lowering means course of work schematic diagram;
Figure 11 is that the bottom basket of Hanging Basket is transferred to ground schematic diagram;
Figure 12 is the right view of Figure 11;
Figure 13 is partial enlarged view at B in Figure 12.
Specific embodiment
As shown in figure 1 to figure 13, the bottom basket downward putting device of the high buttress Hanging Basket in a kind of mountain area, including gear jack 1, finish rolling Screw-thread steel 2, hydraulic punching jack 11, gusset plate 3, backing plate I14, backing plate II15, backing plate III9, fine-rolling screw nut 4, screw-thread steel connect Connect device 6, chain block 5, wirerope I7, wirerope II8, connecting rod 10, fine-rolling screw nut I13, fine-rolling screw nut II16, oil pump 12 Deng.
Gear jack 1 is placed in box beam, and the fining twisted steel 2 by passing through box beam wing plate connects the bottom basket of Hanging Basket, For declining the bottom basket 1.7m of Hanging Basket;The bottom basket top of Hanging Basket after decline is equipped with gusset plate 3, and gusset plate 3 is connected by screw-thread steel Connect device 6 and fine-rolling screw nut 4 and the fixed company of the fining twisted steel 2 being connected between hydraulic punching jack 11 and the bottom basket of Hanging Basket It connects, punching jack 11 is placed in box beam by stringer 18 and crossbeam 17.It is placed vertically with shoulder pole girder two of cradle construction and makees stringer 18.Two 18 spacing 290mm of stringer, center setting backing plate I14 and fine-rolling screw nut II16.Fine-rolling screw nut II16 is fixed's Fining twisted steel 2 prevents its downslide.A crossbeam 17 is set up on two stringers 18.Backing plate II15 is disposed on crossbeam 17. Backing plate II15 is having a size of 500 × 400 × 30mm.It opens centreHole.The direction 500mm and the crossbeam side 640mm of backing plate II15 To identical.Cylinder jack 11 is set on backing plate II15.
Such as Fig. 4, shown in 5,6, it is symmetrically welded and connected bar 10 between the stringer of the bottom basket of gusset plate 3 and Hanging Basket, on gusset plate 3 Fine-rolling screw nut 4 by chain block 5 connect Hanging Basket bottom basket stringer and front beam, wherein 5 one end of chain block passes through steel Cord II8 connection fine-rolling screw nut 4, the other end pass through wirerope I7 longitudinal beam connected and front beam.
As shown in figure 13, fining twisted steel is formed by connecting by the screw-thread steel that more root long degree are 12m, is led between two screw-thread steels It crosses screw-thread steel connector to be fixedly connected, and pinions end with iron wire on screw-thread steel connector, for preventing stripped thread.
Fining twisted steel is unless cause specific.General cut lengths 12m.More than 70 m of decentralization just need to connect.In order to reliable Both ends are linked to be entirety.It is first separated by the length equity of screw-thread steel connector 6, is made at 2 both ends of fining twisted steel and want precession long Degree goes out mark.Guarantee 6 producing balanced forces of screw-thread steel connector in this way.To prevent midway stripped thread.It is used at 6 both ends of screw-thread steel connector 16# iron wire 19 pinions end (see Figure 13).
Now the construction procedure the decline of bottom basket is described below:
1) in construction to closing up previous piece (16 of block#Block) position;(depending on box beam span) is in advance at box beam center Top plate and bottom plate settingHole.Its distance, which is subject to, supports the front and rear beam center of bottom basket away from 5.8m, sees Fig. 1.
2) closure segment construction finishes, and the components such as top template, skid beam in closure segment box beam are removed in advance.
3) with the bottom basket 1.7m of 32t gear jack decline Hanging Basket.See Fig. 2,3.
4) it is first penetrated down from the hole that top surface of the beam is arranged with the fining twisted steel of 4.5m long, when reaching bottom plate, according to The secondary fine-rolling screw nut for screwing on fining twisted steel puts on gusset plate, then after screwing on screw-thread steel connector, the bottom end of fining twisted steel It is inserted into the front beam of bottom basket.Then upper padding plate III is covered in the bottom of front beam, screws on fine-rolling screw nut and fixes.
To prevent from shaking during decline.Bar is symmetrically welded and connected between gusset plate and stringer.After welding, hand is used Draw cucurbit one end by wirerope I connection fine-rolling screw nut, one end passes through wirerope II longitudinal beam connected and front beam.(i.e. steel wire Rope sling on crossbeam after be pressed on stringer) as the 2nd insurance.Form it into a frame entirety.See Fig. 6 (bottom basket thin portion) with 4 suspender belts in Fig. 2 are removed afterwards, are converted to Fig. 7,8 stress system.
5) in the device of box beam top surface position of opening arrangement decline.With shoulder pole girder (the long 640mm, height of cradle construction 240mm, width 214mm) two place vertically and make stringer.Two stringer spacing 290mm, center setting backing plate I and fine-rolling screw nut II.Finish rolling Nut II is fixedFining twisted steel prevent its downslide.A crossbeam is set up on two stringers.Pacify on crossbeam Set backing plate II.Backing plate II is having a size of 500 × 400 × 30mm.It opens centreHole.The direction 500mm of backing plate II and crossbeam The direction 640mm is identical.The YCW100B type jack that OVM is produced is set on backing plate II.See Fig. 9,10.
Punching jack main technical detail are as follows: stretching force 973.1KN, oil pressure 51MPa, punching apertureTensioning Stroke 200mm, size
Punching jack working principle:
As shown in Figure 10, it opens oil pump → oil inlet pipe fuel feeding → hydraulic punching jack jacks → and withstands backing plate I → finish rolling Nut I → fine-rolling screw nut II clamps fining twisted steel and rises → rises 180mm;Therebetween the fine-rolling screw nut II between two stringers also with Rise 180mm → oil pump fuel cut-off → the fine-rolling screw nut II between following stringer and screw off on backing plate I → hydraulic punching Jack oil return → the whereabouts backing plate I → fine-rolling screw nut II is screwed at backing plate I, and passes make the steady decline of bottom basket gradually, (see Figure 11,12).

Claims (3)

1. a kind of bottom basket downward putting device of the high buttress Hanging Basket in mountain area, including gear jack (1), fining twisted steel (2), hydraulic wear Heart jack (11), it is characterised in that: the gear jack (1) is placed in box beam, and the finish rolling by passing through box beam wing plate Screw-thread steel (2) connects the bottom basket of Hanging Basket, for declining the bottom basket 1.7m of Hanging Basket;The bottom basket top of Hanging Basket after decline is equipped with node Plate (3), gusset plate (3) is by screw-thread steel connector (6) and fine-rolling screw nut and is connected to hydraulic punching jack (11) and Hanging Basket Bottom basket between fining twisted steel (2) be fixedly connected, the hydraulic punching jack (11) pass through stringer (18) and crossbeam (17) it is placed in box beam, arranges backing plate on hydraulic punching jack (11), fine-rolling screw nut is set on backing plate, and two stringers (18) are just Centre setting backing plate and fine-rolling screw nut, two fine-rolling screw nuts are connect with fining twisted steel (2);The gusset plate (3) and Hanging Basket It is symmetrically welded and connected between the stringer of bottom basket bar (10), the fine-rolling screw nut on gusset plate (3) connects Hanging Basket by chain block (5) Bottom basket stringer and front beam, wherein chain block (5) one end connects fine-rolling screw nut by wirerope, and the other end passes through steel wire Rope longitudinal beam connected and front beam;The fining twisted steel (2) is formed by connecting by the screw-thread steel that more root long degree are 12m, two screw threads It is fixedly connected between steel by screw-thread steel connector (6), and pinions its both ends with iron wire (19) on screw-thread steel connector (6), For preventing stripped thread.
2. the bottom basket downward putting device of the high buttress Hanging Basket in mountain area according to claim 1, it is characterised in that: the hydraulic punching The technical data of jack (11): stretching force 973.1KN, oil pressure 51MPa, punching aperture areTentioning stroke is 200mm。
3. a kind of pay-off method of the bottom basket downward putting device using any high buttress Hanging Basket in mountain area of claims 1 or 2, It is characterized in that, comprising the following steps:
1) in construction to previous piece of position of block is closed up, the top plate and bottom plate at box beam center is arranged in advanceHole;
2) closure segment construction finishes, and top template, the skid beam component in closure segment box beam are removed in advance;
3) with the bottom basket 1.7m of 32t gear jack decline Hanging Basket;
4) it is penetrated from the hole that box beam top surface is arranged with the fining twisted steel of 4.5m long, when reaching bottom plate, is successively revolved down The nut of upper fining twisted steel puts on gusset plate, then after screwing on screw-thread steel connector, and bottom basket is inserted into the bottom end of fining twisted steel Front beam, then front beam bottom cover upper padding plate, screw on fine-rolling screw nut and fix;
5) in box beam top surface, position of opening arranges the lowering means of hydraulic punching jack, perpendicular with shoulder pole girder two of cradle construction It puts and makees stringer, backing plate I and fine-rolling screw nut II is arranged in two stringer spacing 290mm, center, and fine-rolling screw nut II is fixedEssence Rolling screw-thread steel prevents its downslide, and a crossbeam is set up on two stringers, and backing plate II is disposed on crossbeam, is opened among backing plate IIHydraulic punching jack is arranged in hole on backing plate II;
6) when transferring, fine-rolling screw nut I being revolved upwards first and rises 180mm, open oil pump, oil inlet pipe supplies, hydraulic punching jack jacking, Backing plate I and fine-rolling screw nut I is withstood, then the fine-rolling screw nut II between two stringers is screwed on a liter 180mm by oil pump fuel cut-off;, liquid The decline of heart jack is pressed to wear, backing plate I, fine-rolling screw nut I, fining twisted steel and fine-rolling screw nut II decline with hydraulic punching jack, Passes make the steady decline of bottom basket gradually.
CN201710118314.5A 2017-03-01 2017-03-01 The bottom basket downward putting device and method of the high buttress Hanging Basket in mountain area Active CN106812069B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710118314.5A CN106812069B (en) 2017-03-01 2017-03-01 The bottom basket downward putting device and method of the high buttress Hanging Basket in mountain area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710118314.5A CN106812069B (en) 2017-03-01 2017-03-01 The bottom basket downward putting device and method of the high buttress Hanging Basket in mountain area

Publications (2)

Publication Number Publication Date
CN106812069A CN106812069A (en) 2017-06-09
CN106812069B true CN106812069B (en) 2019-04-12

Family

ID=59116313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710118314.5A Active CN106812069B (en) 2017-03-01 2017-03-01 The bottom basket downward putting device and method of the high buttress Hanging Basket in mountain area

Country Status (1)

Country Link
CN (1) CN106812069B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158469B (en) * 2018-04-03 2021-01-26 中铁十五局集团有限公司 Integral downward hanging method for formwork for bridge hanging basket construction
CN112523112A (en) * 2020-11-19 2021-03-19 中国建筑第八工程局有限公司 Method for dismantling overhead suspension casting hanging basket
CN113308996A (en) * 2021-05-07 2021-08-27 中铁十一局集团第一工程有限公司 Lowering method based on cable-stayed bridge cradle bottom basket lowering device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11256521A (en) * 1998-03-09 1999-09-21 Sumitomo Constr Co Ltd Bridge erection device
CN101586330A (en) * 2008-05-22 2009-11-25 中铁十一局集团第一工程有限公司 Receding construction method of cradle of continuous girder bridge made of prestressing concrete
JP2009299418A (en) * 2008-06-17 2009-12-24 Kajima Corp Retreating and removing method and retreating device for travelling work vehicle for cantilever construction
CN203129025U (en) * 2013-03-28 2013-08-14 中交四航局第一工程有限公司 Suspension fixing device for hanging basket
CN203295982U (en) * 2013-06-07 2013-11-20 中交四航局第一工程有限公司 Hanging basket lifting system
CN105088967A (en) * 2014-05-15 2015-11-25 朱兴土 Program-controlled automatic lifting mechanism for bottom basket of hanging basket
CN105714683A (en) * 2016-02-23 2016-06-29 中国水利水电第十一工程局有限公司 Installation and dismantling method of high bent cast-in-situ aqueduct suspension type bailey frames
CN206570704U (en) * 2017-03-01 2017-10-20 杭州市交通工程集团有限公司 Block downward putting device in the bottom of the high buttress Hanging Basket in mountain area

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11256521A (en) * 1998-03-09 1999-09-21 Sumitomo Constr Co Ltd Bridge erection device
CN101586330A (en) * 2008-05-22 2009-11-25 中铁十一局集团第一工程有限公司 Receding construction method of cradle of continuous girder bridge made of prestressing concrete
JP2009299418A (en) * 2008-06-17 2009-12-24 Kajima Corp Retreating and removing method and retreating device for travelling work vehicle for cantilever construction
CN203129025U (en) * 2013-03-28 2013-08-14 中交四航局第一工程有限公司 Suspension fixing device for hanging basket
CN203295982U (en) * 2013-06-07 2013-11-20 中交四航局第一工程有限公司 Hanging basket lifting system
CN105088967A (en) * 2014-05-15 2015-11-25 朱兴土 Program-controlled automatic lifting mechanism for bottom basket of hanging basket
CN105714683A (en) * 2016-02-23 2016-06-29 中国水利水电第十一工程局有限公司 Installation and dismantling method of high bent cast-in-situ aqueduct suspension type bailey frames
CN206570704U (en) * 2017-03-01 2017-10-20 杭州市交通工程集团有限公司 Block downward putting device in the bottom of the high buttress Hanging Basket in mountain area

Also Published As

Publication number Publication date
CN106812069A (en) 2017-06-09

Similar Documents

Publication Publication Date Title
CN206570704U (en) Block downward putting device in the bottom of the high buttress Hanging Basket in mountain area
CN106812069B (en) The bottom basket downward putting device and method of the high buttress Hanging Basket in mountain area
CN104963301B (en) The dilatory translation downward putting device and method removed for pier top beam section and bridge pier
CN105401714B (en) A kind of attachment type raise scaffold and elevating method
CN101337515B (en) Execution method of integral hanging simple chain type suspension contact screen on electrified railroad
CN101906849A (en) Connecting device of steel column butt joint and installing method
CN107447665B (en) A kind of laying method of self-anchored suspension bridge construction cat road carrying rope
CN100494576C (en) Method for setting up box-type bridge body maintain engineering box outer hanging falsework
CN206942160U (en) Steel bar truss floor support plate lifting device
CN103615198A (en) Construction method for using parallel double-mast half-turning method to hoist large box type derrick
CN103556626B (en) Hanging structure for hoisting large-diameter hole drilling filling pile steel bar cage
CN203129025U (en) Suspension fixing device for hanging basket
CN206256387U (en) A kind of steel box-girder incremental launching construction steel nose girder
CN107142954A (en) The steel lifted trunk Lift-on/Lift-off System and its hanging method of a kind of integral hoisting
CN103979442B (en) The method of 6400 tons of Hydraulic double-type crane lifting cost tropsch reactors
CN108222006A (en) A kind of square construction method of underground continuous wall
CN106400688A (en) Main tower and construction method thereof
CN207017153U (en) Main push-towing rope inspection trolley lifting device
CN205591115U (en) Suspension type catwalk veil installing the system
CN101530774A (en) Welding top plate type flange lifting ear for large-scale equipment and manufacturing method thereof
CN209456910U (en) A kind of entirety drops formula beam column support removing tool
CN204198326U (en) I.e. hanging balance of well pumping unit control apparatus
CN206104558U (en) A device for changing width heavy plate mill hydraulic pressure AGC jar
CN206328690U (en) A kind of big discrepancy in elevation, large span stiff skeleton external wrapping concrete template construction equipment
CN204490406U (en) The two jack tension device of the heavy steel rope of ship lift

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant