CN106810043A - A kind of melting furnaces flow control methods for reinforcing fiber glass - Google Patents

A kind of melting furnaces flow control methods for reinforcing fiber glass Download PDF

Info

Publication number
CN106810043A
CN106810043A CN201510857113.8A CN201510857113A CN106810043A CN 106810043 A CN106810043 A CN 106810043A CN 201510857113 A CN201510857113 A CN 201510857113A CN 106810043 A CN106810043 A CN 106810043A
Authority
CN
China
Prior art keywords
brick
glass
melting furnaces
amount
reinforcing fiber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510857113.8A
Other languages
Chinese (zh)
Inventor
刘青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Xin Xin Glass Fiber Reinforced Plastic Product Factory
Original Assignee
Chongqing Xin Xin Glass Fiber Reinforced Plastic Product Factory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Xin Xin Glass Fiber Reinforced Plastic Product Factory filed Critical Chongqing Xin Xin Glass Fiber Reinforced Plastic Product Factory
Priority to CN201510857113.8A priority Critical patent/CN106810043A/en
Publication of CN106810043A publication Critical patent/CN106810043A/en
Pending legal-status Critical Current

Links

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The invention discloses a kind of melting furnaces flow control methods for reinforcing fiber glass, including overflow launder brick, adjusting brick and guiding brick, the overflow launder brick is arranged on the junction of pool wall after melting furnaces melting end both sides tank block and melting end, overflow launder brick is connected with brick is oriented to, adjusting brick is rotatably arranged on overflow launder brick and is oriented to the junction of brick, it is oriented on the side of brick and temperature control rifle is installed, groove is provided with the guiding brick, groove bottom land is provided with spout hole, and discharge structure is provided with immediately below the spout hole;The need for being changed pull amount is ensured in the case of not changing fusing amount, disclosure satisfy that the production of thickness ㎜ glass substrates from 0.3 ㎜ to 3.0, according to fusing amount=pull amount+spillway discharge, i.e. in the case where fusing amount keeps constant, pull amount is changed by accurate adjustment, it is to avoid cause product quality to be affected because of the fluctuation of melting furnaces fusing amount.

Description

A kind of melting furnaces flow control methods for reinforcing fiber glass
Technical field
The present invention relates to glass production field, a kind of melting furnaces flow control methods for reinforcing fiber glass are specifically referred to.
Background technology
Tank block is the position for being washed away most serious in whole glass furnace by high-temperature glass liquid in glass furnace,Refractory material as glass furnace tank block all has the characteristic that high temperature resistance corrodes and anti-glass metal washes away,But in actually used,Such refractory material can only play the use time of extension glass furnace pool wall,Tank block still can wash away erosion by high-temperature glass liquid,It is more infusibilized due to tank block refractory material relatively-high temperature glass metal,So being etched the refractory material of high-temperature glass liquid or being present in glass metal with refractory material little particle or with the glassy form of fritting,Eventually cause the plethora and strip flaw of finished product,Largely effect on glass quality,E-glass particularly harsh to quality requirement,Its influence becomes apparent from,So reducing influence of the tank block refractory material to glass metal quality,The high quality glass problem that particularly display base plate glass furnace is paid close attention to is produced very much always.
In addition, in production E-glass(Such as PDP glass, panel glass, liquid-crystalline glasses etc. are touched)When,Because the thickness of glass all includes from 0.1mm to 3.0mm,And thinner strength of glass is lower,The pull speed of glass plate also preferably must be held in relatively small scope,To ensure that glass plate is thin,Require that pull speed can not be fast again,Thus the actual pull amount of limitation glass must be corresponding with the thickness of the glass of production,Thinner glass,Its pull amount is also small,The objective fluctuation for also causing glass pull amount needs in actual production larger,And the fusing amount that the larger fluctuation of glass pull amount certainly will be also required to melting furnaces glass metal also has and significantly adjusts,But the fluctuation of fusing amount can cause the disorder of melting furnaces,While adjusting pull amount under normal circumstances,Also fusing amount progressively can slowly be reduced,The influence to melting furnaces stability is controlled in acceptable scope as far as possible in this way,But this mode certainly will cause the time interval between two kinds of variety productions long,The total output of product is caused to reduce,Even if simultaneously slow reduce fusing amount,Also influence of the fluctuation of fusing amount to melting furnaces stability cannot completely be avoided.
The content of the invention
It is an object of the invention to provide a kind of melting furnaces flow control methods for reinforcing fiber glass, by the spillway discharge of accurate regulation glass metal, it is convenient to be excluded containing the glass metal for being washed the pool wall refractory material impurity for corroding peeling, and then ensure requirement of the various thickness glass productions to pull amount.
The purpose of the present invention is achieved through the following technical solutions:
A kind of melting furnaces flow control methods for reinforcing fiber glass, including overflow launder brick, adjusting brick and guiding brick, the overflow launder brick is arranged on the junction of pool wall after melting furnaces melting end both sides tank block and melting end, overflow launder brick is connected with brick is oriented to, adjusting brick is rotatably arranged on overflow launder brick and is oriented to the junction of brick, is oriented on the side of brick and is provided with temperature control rifle, and groove is provided with the guiding brick, groove bottom land is provided with spout hole, and discharge structure is provided with immediately below the spout hole.The present invention is operationally, unnecessary glass metal can be under the rotation of adjusting brick regulation in melting furnaces, flow through and be oriented to brick again by the spout hole outflow of guiding brick bottom, the pool wall refractory material impurity and glass metal cooling collection for corroding and peeling off will be washed under the cooling condition of discharge structure, it is free to rotate installed in the temperature control rifle being oriented on brick side, by the way of combustion gas and air pre-mixing are burnt again, and adjusted with the elevational change of metal level in melting furnaces, the consumption of the mobility status regulating gas according to the glass metal for overflowing, glass metal stream stabilization is maintained in suitable viscosity, ensure the stability of overflow glass flow quantity;The need for the present invention can change pull amount is ensured in the case of not changing fusing amount, disclosure satisfy that the production of thickness ㎜ glass substrates from 0.3 ㎜ to 3.0, according to fusing amount=pull amount+spillway discharge, i.e. in the case where fusing amount keeps constant, pull amount is changed by accurate adjustment, it is to avoid cause product quality to be affected because of the fluctuation of melting furnaces fusing amount.
The discharge structure includes water quenching pipe, guide pipe and collects dolly, and the water quenching pipe is obliquely installed and is connected between spout hole and guide pipe, and guide pipe is connected with dolly is collected.Cooled down in water quenching pipe by the glass metal of spout hole, then collection dolly is caused by guide pipe, finally the glass chip by glass metal cooling generation under the focusing on for collecting dolly is recycled, and reduces the cost of glass production.
The water quenching pipe includes spray thrower, inner layer sleeve and outer layer sleeve, cooling chamber is provided between inner layer sleeve and outer layer sleeve, spray thrower is arranged in inner layer sleeve, two water inlet As are arranged at intervals with the side of kiln in outer layer sleeve, water inlet B is provided with the opposite side of outer layer sleeve, water inlet A, water inlet B are connected with spray thrower.The glass metal for overflowing is cooled down in water quenching pipe, two kinds of water quenching methods can be used, when sprinkling water quenching method is carried out to overflow glass metal, water with pressure is flowed into by the water inlet B of spray thrower, sprayed by bar shaped mouth spray, form several layers of water curtain and be sprayed at the enterprising water-filling of glass metal and quench glass, while effectively being cooled down to inner layer glass;When water logging water quenching method is carried out to overflow glass metal, in the cooling chamber that water with pressure is entered between inner layer sleeve and outer layer sleeve by two outer layer sleeves near spaced water inlet A on the side of kiln, first inner layer sleeve is cooled down, then flowed out from inner layer sleeve and outer layer sleeve upper opening, left from inner layer sleeve inner side again, and start water quenching glass.
The guide pipe includes special-shaped tube seat and support base, and support base is connected by supporting plate with the middle part of special-shaped tube seat, and the notch of special-shaped tube seat is connected with dolly is collected.After forming glass chip after water quenching pipe cools down glass metal, the cooling water of mixing flows through special-shaped tube seat together with chip, is finally collected dolly and focuses on.
The spray thrower includes multiple spaced bar shaped mouth sprays, and spacing between two adjacent bar shaped mouth sprays is L, and 50 ㎜≤L≤100 ㎜.The spacing of the adjacent two bar shaped spray head on spray thrower is arranged on 50 ㎜≤L≤100 ㎜ so that the several layers of water curtain that water quenching pipe is formed when carrying out and spraying water quenching method cooling are more uniform, it is ensured that the good cooling effect of glass metal.
The present invention compared with prior art, has the following advantages and advantages:
1st, a kind of melting furnaces flow control methods for reinforcing fiber glass of the invention, the need for being changed pull amount is ensured in the case of not changing fusing amount, disclosure satisfy that the production of thickness ㎜ glass substrates from 0.3 ㎜ to 3.0, according to fusing amount=pull amount+spillway discharge, i.e. in the case where fusing amount keeps constant, pull amount is changed by accurate adjustment, it is to avoid cause product quality to be affected because of the fluctuation of melting furnaces fusing amount;
2nd, a kind of melting furnaces flow control methods for reinforcing fiber glass of the invention, cooled down in water quenching pipe by the glass metal of spout hole, collection dolly is caused by guide pipe again, the last glass chip under the focusing on for collecting dolly by glass metal cooling generation is recycled, and reduces the cost of glass production;
3rd, a kind of melting furnaces flow control methods for reinforcing fiber glass of the invention, the spacing of the adjacent two bar shaped spray head on spray thrower is arranged on 50 ㎜≤L≤100 ㎜, so that the several layers of water curtain that water quenching pipe is formed when carrying out and spraying water quenching method cooling are more uniform, it is ensured that the good cooling effect of glass metal.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the embodiment of the present invention, constitutes the part of the application, does not constitute the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the structural representation of water quenching pipe;
Mark and corresponding parts title in accompanying drawing:
1- overflow launders brick, 2- adjusting bricks, 3- temperature controls rifle, 4- are oriented to brick, 5- spray throwers, 6- water quenchings pipe, 7- abnormity tube seat, 8- support bases, 9- supporting plates, 10- and collect dolly, 11- water inlet Bs, 12- bar shapeds mouth spray, 13- water inlet As, 14- outer layer sleeves, 15- inner layer sleeves, 16- spout holes.
Specific embodiment
To make the object, technical solutions and advantages of the present invention become more apparent, with reference to embodiment and accompanying drawing, the present invention is described in further detail, and exemplary embodiment of the invention and its explanation are only used for explaining the present invention, not as a limitation of the invention.
Embodiment
As depicted in figs. 1 and 2, a kind of melting furnaces flow control methods for reinforcing fiber glass of the invention, including overflow launder brick 1, adjusting brick 2 and guiding brick 4, the overflow launder brick 1 is arranged on the junction of pool wall after melting furnaces melting end both sides tank block and melting end, overflow launder brick 1 is connected with brick 4 is oriented to, adjusting brick 2 is rotatably arranged on overflow launder brick 1 and is oriented to the junction of brick 4, it is oriented on the side of brick 4 and temperature control rifle 3 is installed, groove is provided with the guiding brick 4, groove bottom land is provided with spout hole 16, and discharge structure is provided with immediately below the spout hole 16;The discharge structure includes water quenching pipe 6, guide pipe and collects dolly 10, and the water quenching pipe 6 is obliquely installed and is connected between spout hole 16 and guide pipe, and guide pipe is connected with dolly 10 is collected.
The present invention is operationally, unnecessary glass metal can be under the rotation of adjusting brick 2 regulation in melting furnaces, guiding brick 4 is flowed through to be flowed out by the spout hole 16 of the bottom of guiding brick 4 again, the pool wall refractory material impurity and glass metal cooling collection for corroding and peeling off will be washed under the cooling condition of discharge structure, it is free to rotate installed in the temperature control rifle 3 being oriented on the side of brick 4, by the way of combustion gas and air pre-mixing are burnt again, and adjusted with the elevational change of metal level in melting furnaces, the consumption of the mobility status regulating gas according to the glass metal for overflowing, glass metal stream stabilization is maintained in suitable viscosity, ensure the stability of overflow glass flow quantity;The need for the present invention can change pull amount is ensured in the case of not changing fusing amount, disclosure satisfy that the production of thickness ㎜ glass substrates from 0.3 ㎜ to 3.0, according to fusing amount=pull amount+spillway discharge, i.e. in the case where fusing amount keeps constant, pull amount is changed by accurate adjustment, it is to avoid cause product quality to be affected because of the fluctuation of melting furnaces fusing amount;Cooled down in water quenching pipe 6 by the glass metal of spout hole 16, then collection dolly 10 is caused by guide pipe, finally the glass chip by glass metal cooling generation under the focusing on for collecting dolly 10 is recycled, and reduces the cost of glass production.
Cooled down in 6 pairs of glass metals for overflowing of water quenching pipe, two kinds of water quenching methods can be used, when sprinkling water quenching method is carried out to overflow glass metal, water with pressure is flowed into by the water inlet B 11 of spray thrower, sprayed by bar shaped mouth spray, form several layers of water curtain and be sprayed at the enterprising water-filling of glass metal and quench glass, while effectively being cooled down to inner layer glass;When water logging water quenching method is carried out to overflow glass metal, water with pressure passes through in the cooling chamber that two outer layer sleeves 14 are entered between inner layer sleeve 15 and outer layer sleeve 14 near spaced water inlet A 13 on the side of kiln, first inner layer sleeve 15 is cooled down, then flowed out from inner layer sleeve 15 and the upper opening of outer layer sleeve 14, left from the inner side of inner layer sleeve 15 again, and start water quenching glass;Wherein, the spacing of the adjacent two bar shaped spray head on spray thrower is arranged on 50 ㎜≤L≤100 ㎜ so that the several layers of water curtain that water quenching pipe 6 is formed when carrying out and spraying water quenching method cooling are more uniform, it is ensured that the good cooling effect of glass metal;After forming glass chip after water quenching pipe 6 cools down glass metal, the cooling water of mixing flows through special-shaped tube seat together with chip, is finally collected dolly 10 and focuses on.
Above-described specific embodiment; the purpose of the present invention, technical scheme and beneficial effect are further described; should be understood that; the foregoing is only specific embodiment of the invention; the protection domain being not intended to limit the present invention; all any modification, equivalent substitution and improvements within the spirit and principles in the present invention, done etc., should be included within the scope of the present invention.

Claims (5)

1. a kind of melting furnaces flow control methods for reinforcing fiber glass, it is characterised in that:Including overflow launder brick(1), adjusting brick(2)With guiding brick(4), the overflow launder brick(1)It is arranged on the junction of pool wall after melting furnaces melting end both sides tank block and melting end, overflow launder brick(1)With guiding brick(4)It is connected, adjusting brick(2)It is rotatably arranged on overflow launder brick(1)With guiding brick(4)Junction, be oriented to brick(4)Side on temperature control rifle is installed(3), the guiding brick(4)Groove is inside provided with, groove bottom land is provided with spout hole(16), in the spout hole(16)Underface is provided with discharge structure;Operationally, unnecessary glass metal can be under the rotation of adjusting brick regulation in melting furnaces, flow through and be oriented to brick again by the spout hole outflow of guiding brick bottom, the pool wall refractory material impurity and glass metal cooling collection for corroding and peeling off will be washed under the cooling condition of discharge structure, it is free to rotate installed in the temperature control rifle being oriented on brick side, by the way of combustion gas and air pre-mixing are burnt again, and adjusted with the elevational change of metal level in melting furnaces, the consumption of the mobility status regulating gas according to the glass metal for overflowing, glass metal stream stabilization is maintained in suitable viscosity, ensure the stability of overflow glass flow quantity;The need for the present invention can change pull amount is ensured in the case of not changing fusing amount, disclosure satisfy that the production of thickness ㎜ glass substrates from 0.3 ㎜ to 3.0, according to fusing amount=pull amount+spillway discharge, i.e. in the case where fusing amount keeps constant, pull amount is changed by accurate adjustment, it is to avoid cause product quality to be affected because of the fluctuation of melting furnaces fusing amount.
2. a kind of melting furnaces flow control methods for reinforcing fiber glass according to claim 1, it is characterised in that:The discharge structure includes water quenching pipe(6), guide pipe and collect dolly(10), the water quenching pipe(6)It is obliquely installed and is connected to spout hole(16)And guide pipe between, guide pipe with collect dolly(10)Connection.
3. a kind of melting furnaces flow control methods for reinforcing fiber glass according to claim 1, it is characterised in that:The water quenching pipe includes spray thrower(5), inner layer sleeve(15)And outer layer sleeve(14), inner layer sleeve(15)With outer layer sleeve(14)Between be provided with cooling chamber, spray thrower(5)Installed in inner layer sleeve(15)It is interior, in outer layer sleeve(14)Two water inlet As are arranged at intervals with the side of kiln(13), in outer layer sleeve(14)Opposite side on be provided with water inlet B(11), water inlet A(13), water inlet B(11)With spray thrower(5)Connection.
4. a kind of melting furnaces flow control methods for reinforcing fiber glass according to claim 1, it is characterised in that:The guide pipe includes special-shaped tube seat(7)And support base(8), support base(8)By supporting plate(9)With special-shaped tube seat(7)Middle part connection, special-shaped tube seat(7)Notch with collect dolly(10)Connection.
5. a kind of melting furnaces flow control methods for reinforcing fiber glass according to claim 3, it is characterised in that:The spray thrower(5)Including multiple spaced bar shaped mouth sprays(12), adjacent two bar shaped mouth sprays(12)Between spacing be L, and 50 ㎜≤L≤100 ㎜.
CN201510857113.8A 2015-11-29 2015-11-29 A kind of melting furnaces flow control methods for reinforcing fiber glass Pending CN106810043A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510857113.8A CN106810043A (en) 2015-11-29 2015-11-29 A kind of melting furnaces flow control methods for reinforcing fiber glass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510857113.8A CN106810043A (en) 2015-11-29 2015-11-29 A kind of melting furnaces flow control methods for reinforcing fiber glass

Publications (1)

Publication Number Publication Date
CN106810043A true CN106810043A (en) 2017-06-09

Family

ID=59156547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510857113.8A Pending CN106810043A (en) 2015-11-29 2015-11-29 A kind of melting furnaces flow control methods for reinforcing fiber glass

Country Status (1)

Country Link
CN (1) CN106810043A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111517636A (en) * 2020-06-01 2020-08-11 河南光远新材料股份有限公司 Flash device and production line suitable for low dielectric glass fiber production
CN113185090A (en) * 2021-04-16 2021-07-30 浙江荣星新材料科技有限公司 Tail brick assembly for glass melting furnace and installation process thereof
CN114634293A (en) * 2022-02-21 2022-06-17 河北光兴半导体技术有限公司 Overflow brick mounting device and using method thereof
CN116730587A (en) * 2023-06-01 2023-09-12 湖南洪康新材料科技有限公司 Glass liquid overflow receiving device and use method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111517636A (en) * 2020-06-01 2020-08-11 河南光远新材料股份有限公司 Flash device and production line suitable for low dielectric glass fiber production
CN113185090A (en) * 2021-04-16 2021-07-30 浙江荣星新材料科技有限公司 Tail brick assembly for glass melting furnace and installation process thereof
CN113185090B (en) * 2021-04-16 2022-11-29 浙江荣星新材料科技有限公司 Tail brick assembly for glass melting furnace and installation process thereof
CN114634293A (en) * 2022-02-21 2022-06-17 河北光兴半导体技术有限公司 Overflow brick mounting device and using method thereof
CN116730587A (en) * 2023-06-01 2023-09-12 湖南洪康新材料科技有限公司 Glass liquid overflow receiving device and use method thereof

Similar Documents

Publication Publication Date Title
CN100361912C (en) Method and device for producing thin glass panes
CN104148599B (en) A kind of clad material solid-liquid compound horizontal casting former and method
TWI469937B (en) Float bath for manufacturing float glass and cooling method of the same
CN109304432B (en) Single-point unbalanced protection casting device for ultrathin large-size aluminum-containing steel special-shaped blank and using method
TWI754423B (en) Circumferential gas supply element and gas supply method
CN104174823A (en) Clad material solid/liquid composite continuous-casting forming device and method
CN106810043A (en) A kind of melting furnaces flow control methods for reinforcing fiber glass
CN106270439A (en) A kind of Spraying Water of Nozzles in Secondary Cooling method improving continuous casting billet gross segregation
CN108996895A (en) A kind of glass substrate overflow molding crystallization control device
KR101440839B1 (en) Flat glass production by means of flotation with no fixed point
CN102050561A (en) Optical glass bubbler
CN104084550B (en) The continuous casting steel billet production control method of rolling slab
CN111940716B (en) Method for preventing rare earth steel continuous casting nozzle from being blocked
CN106810042A (en) A kind of melting furnaces flow control structure for reinforcing fiber glass
CN204125328U (en) A kind of melting furnaces overflow treatment system device
CN206645999U (en) A kind of clarification structure for 3D glass furnace ears pond
CN104743776A (en) Method for producing float plate glass
CN203461947U (en) Optimized throat of unit furnace
CN201793467U (en) Tank furnace used for producing basalt continuous filaments
CN109396409B (en) Single-point non-equilibrium protection casting method for producing ultrathin large-size aluminum-containing steel special-shaped blank
CN111170618B (en) Molten glass steady flow control mechanism suitable for tin bath inlet of special glass float process
CN204174067U (en) A kind of spiral tube water-cooled bubbler
CN208279488U (en) A kind of glass furnace equipped with novel observation through-hole
CN209021188U (en) A kind of continuous casting production Argon metallurgical plant
CN206157024U (en) Glass furnace

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170609