CN106801610A - Using layered construct section of jurisdiction block between jointing and using its connect method - Google Patents

Using layered construct section of jurisdiction block between jointing and using its connect method Download PDF

Info

Publication number
CN106801610A
CN106801610A CN201710145121.9A CN201710145121A CN106801610A CN 106801610 A CN106801610 A CN 106801610A CN 201710145121 A CN201710145121 A CN 201710145121A CN 106801610 A CN106801610 A CN 106801610A
Authority
CN
China
Prior art keywords
section
jurisdiction
connector
block
jurisdiction block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710145121.9A
Other languages
Chinese (zh)
Other versions
CN106801610B (en
Inventor
李波
朱海良
杨志豪
应卓清
黄德中
李开建
管攀峰
范杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Tunnel Equipment Technology Development Co ltd
Shanghai Tunnel Engineering Co Ltd
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Original Assignee
Shanghai Tunnel Engineering Co Ltd
Shanghai Tunnel Engineering and Rail Transit Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tunnel Engineering Co Ltd, Shanghai Tunnel Engineering and Rail Transit Design and Research Institute filed Critical Shanghai Tunnel Engineering Co Ltd
Priority to CN201710145121.9A priority Critical patent/CN106801610B/en
Publication of CN106801610A publication Critical patent/CN106801610A/en
Application granted granted Critical
Publication of CN106801610B publication Critical patent/CN106801610B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • E21D11/083Methods or devices for joining adjacent concrete segments

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The present invention relates to jointing between a kind of section of jurisdiction block of use layered construct and the method using its connection, the joint includes:It is embedded in the first connector in the first section of jurisdiction block in two adjacent section of jurisdiction blocks;And in the second section of jurisdiction block for being embedded in two adjacent section of jurisdiction blocks and the second connector for being adapted with first connector, it is relative slide first section of jurisdiction block and second section of jurisdiction block and second connector be arranged in first connector be connected so as to realize that first section of jurisdiction block is docked with second section of jurisdiction block.Jointing of the invention is fixed the first section of jurisdiction block and the second section of jurisdiction block using the first connector and the second connector, only need to slide the second section of jurisdiction block relative to the first section of jurisdiction block when mounted, realize single step (One Pass) simple assembling, it is time saving and energy saving to install, the assembled speed of section of jurisdiction can be accelerated, the engineering time is saved.

Description

Using layered construct section of jurisdiction block between jointing and using its connect method
Technical field
The present invention relates to the connector between the section of jurisdiction block in the monocyclic section of jurisdiction of Tunnel Engineering, refer in particular to a kind of using stacked structure Jointing and the method using its connection between the section of jurisdiction block made.
Background technology
Shield tunnel is by landing edge and the assembled structure of girth joint, list therein by some prefabricated pipe sections Endless tube piece is docked by girth joint by multiple section of jurisdiction blocks and formed, and is docked by landing edge per endless tube piece and connected, and current is vertical It is mainly to joint and girth joint and is attached using bolt.
(application publication number is CN105649648A to Chinese formerly patent 1, the section of jurisdiction of entitled class rectangle shield tunnel Attachment structure and its construction method) disclosed in have:It is respectively provided with for by two neighboring section of jurisdiction in the seam crossing of multiple section of jurisdiction piecemeals Piecemeal be connected with each other bolt, each bolt is disposed relative to domain section of jurisdiction inner ring surface apart from identical position.In Disclosed in the first patent 2 of state (application publication number is CN203796279U, and invention and created name is the shear structure of compound section of jurisdiction) Have:Shear structure by setting double ring bolt hole and the tenon, the groove that are adapted therewith in girth joint, with improve The shear resistant capacity of compound duct piece connector.
Attachment structure is bolt joint between above-mentioned section of jurisdiction block, and bolt connection has following defect:Bolt connection Management is more difficult, including joint stiffness control, the moment of torsion control of importing axle power and torque coefficient control;Bolt connection is operated It is time-consuming so that the engineering time is more long;The bolted just curved rigidity of section of jurisdiction ring is strong, because negative flexing resistance is low so that section of jurisdiction annular strain Greatly;The section cracky of easy leak and bolt hole at bolt hole and bolt.
The content of the invention
Defect it is an object of the invention to overcome prior art, there is provided connect between a kind of section of jurisdiction block of use layered construct Joint and the method using its connection, the management existed when being connected by screw bolts between solving section of jurisdiction block in the prior art are more stranded The engineering time is long, the multiple flexing resistance of bolt is low during difficult, operating cost causes section of jurisdiction annular strain greatly and easy leak and bolt hole at bolt Section cracky the problems such as.
Realizing the technical scheme of above-mentioned purpose is:
The invention provides jointing between a kind of section of jurisdiction block of use layered construct, including:
It is embedded in the first connector in the first section of jurisdiction block in two adjacent section of jurisdiction blocks;And
Second for being adapted in the second section of jurisdiction block being embedded in two adjacent section of jurisdiction blocks and with first connector Connector is relative to slide first section of jurisdiction block and second section of jurisdiction block and so that second connector is arranged in described the It is connected with the docking of second section of jurisdiction block so as to realize first section of jurisdiction block in a connection piece.
Jointing of the invention using the first connector and the second connector be fixed the first section of jurisdiction block and second pipe Tile, only needs to slide the second section of jurisdiction block relative to the first section of jurisdiction block when mounted, realizes single step (One- Pass) simple assembling, it is time saving and energy saving to install, and can accelerate the assembled speed of section of jurisdiction, saves the engineering time.First connector and Two connectors are embedded in corresponding section of jurisdiction block, will not cause breakage to the inner surface of section of jurisdiction block so that the section of jurisdiction that docking is formed The smooth interior surfaces of ring, it is to avoid open up the easy leak of bolt hole generation and the problem of cracky.First connector and second connects On the binding face of the section of jurisdiction block that fitting is set so that the positive and negative bending of section of jurisdiction ring has same rigidity so that section of jurisdiction ring stiffness By force, it is to avoid because bolt is arranged on inner ring surface so as to cause the low problem for causing section of jurisdiction annular strain big of negative flexing resistance.
The present invention using layered construct section of jurisdiction block between jointing further improvement is that, first connector In opening is installed with the binding face of first section of jurisdiction block, first connector is provided with the appearance with the open communication Groove;
Second connector is protruding outward with the opening phase in being formed with the binding face of second section of jurisdiction block The connecting rod of adaptation, the end of the connecting rod is formed with the connector being adapted with the tank;
When relative slip first section of jurisdiction block and the second section of jurisdiction block, the connecting rod is placed in the opening, institute Connector is stated to be arranged in the tank so that first section of jurisdiction block and the docking connection of second section of jurisdiction block.
The present invention using layered construct section of jurisdiction block between jointing further improvement is that, first connector Tank bottom be provided with cross bar, the end vertical of the cross bar is connected with base;
The connection bar part of second connector is anchored in the block of second section of jurisdiction and the connecting rod is anchored in institute The end vertical stated in the second section of jurisdiction block is connected with bearing.
The present invention using layered construct section of jurisdiction block between jointing further improvement is that, first connector It is laminated structure, the first connector of multiple stacking connections is embedded with the block of first section of jurisdiction;
Second connector is the second company that multiple stacking connections are also embedded with laminated structure, second section of jurisdiction block Fitting.
The present invention using layered construct section of jurisdiction block between jointing further improvement is that, first connector Binding face perpendicular to first section of jurisdiction block is set, and second connector sets perpendicular to the binding face of second section of jurisdiction block Put;Or
First connector is oblique to be embedded in the block of first section of jurisdiction, second connector is oblique be embedded in it is described In second section of jurisdiction block.
Present invention also offers a kind of side of jointing connecting tube tile between section of jurisdiction block using using layered construct Method, comprises the following steps:
Jointing between block is provided, jointing includes the first connector and mutually fitted with first connector between described piece The second connector matched somebody with somebody;
First connector is embedded in the first section of jurisdiction block in two adjacent section of jurisdiction blocks;
Second connector is embedded in the second section of jurisdiction block in two adjacent section of jurisdiction blocks;And
By first section of jurisdiction block and the relative slip of second section of jurisdiction block with so that second connector is arranged in institute State in the first connector it is achieved thereby that first section of jurisdiction block is connected with the docking of second section of jurisdiction block.
The method of jointing connecting tube tile further changes between the section of jurisdiction block using using layered construct of the invention Enter and be, first connector sets in opening is installed with the binding face of first section of jurisdiction block on first connector There is the tank with the open communication;Second connector is protruded outward in being formed with the binding face of second section of jurisdiction block With the connecting rod that is adapted of being open, the end of the connecting rod is formed with the connector being adapted with the tank;
The relative slip of first section of jurisdiction block and second section of jurisdiction block is included:
The connecting rod and the connector are placed in the side of the opening and the tank, it is relative to slide described first Section of jurisdiction block and second section of jurisdiction block so that the connecting rod and the connector are slidedly arranged in the opening and the tank, It is arranged in the tank so as to realize that first section of jurisdiction block and second section of jurisdiction block dock connection by the connector.
The method of jointing connecting tube tile further changes between the section of jurisdiction block using using layered construct of the invention Enter and be, the tank bottom of first connector is provided with cross bar, and the end vertical of the cross bar is connected with base;Described second The connection bar part of connector is anchored in the block of second section of jurisdiction and the connecting rod is anchored in the block of second section of jurisdiction End vertical is connected with bearing;
First connector is embedded in when in the block of first section of jurisdiction, by the base and first section of jurisdiction block Reinforcing bar be fixedly connected;
Second connector is embedded in when in the block of second section of jurisdiction, by the bearing and second section of jurisdiction block Reinforcing bar be fixedly connected.
The method of jointing connecting tube tile further changes between the section of jurisdiction block using using layered construct of the invention Enter and be, first connector is laminated structure, the first connection of multiple stacking connections is embedded with the block of first section of jurisdiction Part;
Second connector is the second company that multiple stacking connections are also embedded with laminated structure, second section of jurisdiction block Fitting.
The method of jointing connecting tube tile further changes between the section of jurisdiction block using using layered construct of the invention Enter and be, when burying first connector and second connector:
Binding face by first connector perpendicular to first section of jurisdiction block is set, and second connector is vertical Set in the binding face of second section of jurisdiction block;Or
It is embedded in first connector is oblique in the block of first section of jurisdiction, is embedded in second connector is oblique In the block of second section of jurisdiction.
Brief description of the drawings
Fig. 1 is the dimensional structure diagram of circular two endless tube pieces splicing.
Fig. 2 is the dimensional structure diagram with the first section of jurisdiction block of jointing between of the invention piece.
Fig. 3 is the dimensional structure diagram of the first section of jurisdiction block with interannular jointing of the invention.
Fig. 4 be the present invention using layered construct section of jurisdiction block between jointing structural representation.
Fig. 5 be the present invention using layered construct section of jurisdiction block between jointing be embedded in structural representation in the block of section of jurisdiction Figure.
Fig. 6 is to connect two structural representations of section of jurisdiction block using jointing between block in the present invention.
Fig. 7 is the side view of the first section of jurisdiction block in Fig. 5.
Fig. 8 is the side view of the second section of jurisdiction block in Fig. 5.
Fig. 9 is the structural representation of interannular jointing in section of jurisdiction of the present invention.
Figure 10 is the sectional view of the first plug connector in interannular jointing.
Figure 11 is the structural representation that interannular jointing is installed in section of jurisdiction.
Figure 12 and Figure 13 are the decomposition texture schematic diagram of two endless tube piece connection procedures.
Figure 14 is the partial side elevation view of the first endless tube piece.
Figure 15 is the partial side elevation view of the second endless tube piece.
Specific embodiment
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
The invention provides jointing between a kind of section of jurisdiction block of use layered construct and the method using its connection, tool The improvement that body acupuncture is carried out to the attachment structure of prefabricated pipe section in shield tunnel, refering to Fig. 1, the every endless tube piece in tunnel is by polylith Section of jurisdiction block docking is connected and formed, and connection is spliced between two adjacent endless tube pieces, is connected the invention provides being docked between the block of section of jurisdiction Jointing between block, additionally provides jointing and ring between the interannular jointing of splicing between two endless tube pieces, the block Between jointing realize quick connection, it is easy to operate during construction, save the engineering time, can solve the problem that bolt connection is deposited Defect.Hand hole is set with side, it is necessary to be stayed in the medial surface near section of jurisdiction when between the interannular and block of section of jurisdiction using bolt connection Convenient to operate, the setting of hand hole have impact on the complete of tunnel segment structure, is additionally filled so as to increased construction work in follow-up needs Sequence;And at the binding face between jointing is arranged on section of jurisdiction block between the block in the present invention, interannular jointing is arranged on section of jurisdiction ring Between Mosaic face at, do not interfere with the structural integrity of section of jurisdiction inner surface, the smooth interior surfaces of section of jurisdiction save follow-up filling work Sequence.During bolt connection operating cost so that the engineering time is more long, and jointing and interannular jointing reality between block in the present invention Single step (One-Pass) simple assembling is showed, it is time saving and energy saving to install, the assembled speed of section of jurisdiction can have been accelerated, when saving construction Between.Because bolt is arranged at the inner surface of section of jurisdiction during bolt connection so that ring just curved rigidity in section of jurisdiction is strong, negative flexing resistance is low, from And cause that section of jurisdiction annular strain is big, and between block in the present invention jointing be arranged on section of jurisdiction block binding face middle part so that pipe The positive and negative bending of loop has same rigidity so that section of jurisdiction ring stiffness is also strong, it is to avoid due to bolt be arranged on inner ring surface from And cause the low problem for causing section of jurisdiction annular strain big of negative flexing resistance.The section of easy leak and bolt hole is easy at bolt hole and bolt Breakage, and jointing and interannular jointing non-bolt hole are set between of the invention piece, it is to avoid open up bolt hole generation The easily problem of leak and cracky, and jointing is arranged between interior outer seal configuration, with preferable water-stagnating effect.Below Jointing and section of jurisdiction interannular jointing between the section of jurisdiction block using layered construct of the invention are illustrated with reference to accompanying drawing.
As shown in Figure 1, it is shown that the structure of circular two endless tube pieces splicing, the first endless tube piece 11 is spelled with the second endless tube piece 12 Connect in succession, the first endless tube piece 11 is to be connected to be formed by the docking of polylith section of jurisdiction block with the second endless tube piece 12, two adjacent pipes The first section of jurisdiction block 21 and the second section of jurisdiction block 22 docking connection in tile.Pass through between first endless tube piece 11 and the second endless tube piece 12 The splicing connection of interannular jointing, the first section of jurisdiction block 21 and the second section of jurisdiction block 22 dock connection by jointing between block.Certainly, Although Fig. 1 is circular section of jurisdiction, jointing is not limited only to the connection of circular section of jurisdiction between interannular jointing of the invention and block, The section of jurisdiction connection of other shapes, such as class rectangle section of jurisdiction, oval section of jurisdiction etc. can also be applied to.
As shown in Figures 2 and 3, it is shown that the structure of the first section of jurisdiction block 21, to pipe by taking the structure of the first section of jurisdiction block 21 as an example Piece block structure is illustrated, the structure all same of the structure of each section of jurisdiction block and the first section of jurisdiction block 21.First section of jurisdiction block 21 Shape is designed according to the shape of domain section of jurisdiction, and the first section of jurisdiction block 21 has binding face 211, and binding face 211 is on ring Two sides, jointing 30 between block is set on the binding face 211, the patch of the binding face 211 and adjacent another section of jurisdiction block Two docking connections of section of jurisdiction block are realized in the laminating of conjunction face.First section of jurisdiction block 21 also includes medial surface 212 and lateral surface 213, interior Side 212 is located at the inside of domain section of jurisdiction, and lateral surface 213 is located at the outside of domain section of jurisdiction.First section of jurisdiction block 21 also includes spelling Junction 111, Mosaic face 111 is two sides on longitudinal direction, and interannular jointing 40, the Mosaic face are set on Mosaic face 111 splice connection with the Mosaic face of another adjacent domain section of jurisdiction.Jointing and interannular connect between the block in the present invention Head constitutes the attachment structure of section of jurisdiction, realizes the quick connection of section of jurisdiction and the quick-assembling of section of jurisdiction block.
The method being attached jointing between the section of jurisdiction block of use layered construct of the invention and using it below Illustrate.
As shown in figure 4, jointing 30 includes the first connector 31 between the section of jurisdiction block of use layered construct of the invention With the second connector 32, with reference to shown in Fig. 5, the first connector 31 is embedded in the first section of jurisdiction block 21 in two adjacent section of jurisdiction blocks Interior, the second connector 32 is embedded in the second section of jurisdiction block 22 in two adjacent section of jurisdiction blocks and is mutually fitted with the first connector 31 Match somebody with somebody, it is relative to slide the He of the first section of jurisdiction block 21 with reference to shown in Fig. 6 in docking connection the first section of jurisdiction block 21 and the second section of jurisdiction block 22 Second section of jurisdiction block 22 simultaneously causes that the second connector 32 is fastened in the first connector 31 so as to realize the first section of jurisdiction block 21 and second The docking connection of section of jurisdiction block 22.In relative slip the first section of jurisdiction block 21 and the second section of jurisdiction block 22, if the first section of jurisdiction block 21 and second When section of jurisdiction block 22 is unlocked, the second connector 32 of the second section of jurisdiction block 22 can be placed in the side of the first connector 31, then Promote the first section of jurisdiction block 21 or the second section of jurisdiction block 22 so that the second connector 32 is fastened in the first connector 31;If first There is a section of jurisdiction block to fix in the section of jurisdiction block 22 of section of jurisdiction block 21 and second, then can promote another loose section of jurisdiction block so as to So that the second connector 32 is fastened in the first connector 31.
Slided by the second connector 32 and be fastened in the first connector 31, it is right between two adjacent section of jurisdiction blocks to realize It is simple to operate when connecing in succession, and installing, single step (One-Pass) simple assembling is realized, it is time saving and energy saving to install, can Accelerate the assembled speed of section of jurisdiction, save the engineering time.And first connector 31 and the second connector 32 also act the work of positioning With, it is capable of the installation site of positioning pipe tile, the correspondence of the second connector 32 is placed in the side of the first connector 31 when mounted, so After be slidably fastened the second connector 32 and the first connector 31.
As shown in Figure 4 and Figure 5, first connector 31 on the binding face 211 of the first section of jurisdiction block 21 in being installed with opening 311, the first connector 31 is provided with the tank 312 connected with opening 311;Second connector 32 is in the laminating of the second section of jurisdiction block 22 The connecting rod 321 being adapted with opening 311 for protruding outward is formed with face 221, the end of the connecting rod 321 is formed with and appearance The connector 322 that groove 312 is adapted, the size of the size more than opening 311 of the connector 322, so that the connector 322 Can be on ring by the spacing fixation in opening 311 after being arranged in tank 312.It is relative to slide the first section of jurisdiction block 21 and the second section of jurisdiction During block 22, connecting rod 321 is placed in opening 311, and connector 322 is fastened in tank 312 so that the He of the first section of jurisdiction block 21 The docking connection of second section of jurisdiction block 22.
Further, the bottom of tank 312 of first connector 31 is provided with cross bar 313, and the end vertical of cross bar 313 connects Base 314 is connected to, when the first connector 31 is embedded in the first section of jurisdiction block 21, the He of tank 312 of first connector 31 At the binding face of the first section of jurisdiction block 21, tank 312 is connected by opening 311 with the external world at binding face, entirely for opening 311 First connector 31 is embedded in the first section of jurisdiction block 21 completely, the base connected vertically that first connector 31 passes through setting 314 increase anchoring strength, improve the structural strength that the first connector 31 is embedded in the block of section of jurisdiction.The connecting rod of the second connector 32 321 parts are anchored in the second section of jurisdiction block 22, and the end vertical that the connecting rod 321 is anchored in the second section of jurisdiction block 22 is connected with branch Seat 323, the bearing 323 is used to increase the anchoring strength of the second connector 32, improves the structural strength of the second connector.Base 314 and bearing 323 when embedded, can be welded with the reinforcing bar in the block of section of jurisdiction, thus reinforce the first connector and second connection The anchoring strength of part.
Used as a better embodiment of the invention, as shown in Figure 7 and Figure 8, the first connector 31 is laminated structure, the The first connector 31 of multiple stacking connections is embedded with one section of jurisdiction block 21, multiple first connectors 31 is alignd and is set and fixed Connection, is embedded in the first section of jurisdiction block 21 together.Second connector 32 is also laminated structure, is also buried in the second section of jurisdiction block 22 There is the second connector 32 of multiple stacking connections, multiple second connectors 32 are alignd and is set and is fixedly connected, be embedded in together In second section of jurisdiction block 22.
As another better embodiment of the invention, as shown in figure 5, the first connector 31 is perpendicular to the first section of jurisdiction block 21 Binding face 211 set, the second connector 32 is set perpendicular to the binding face 221 of the second section of jurisdiction block 22;Or first connector 31 it is oblique be embedded in the first section of jurisdiction block 21, the second connector 32 is oblique to be embedded in the second section of jurisdiction block 22.Angularly disposed When a connection piece 31 and the second connector 32, the second connector 32 is arranged in the first connector 31 and forms wedge effect, makes Must connect more firm.First connector 31 and the second connector 32 are with oblique 1:20 binding faces for being installed to section of jurisdiction block.
As shown in Fig. 2 jointing 30 is installed on the binding face 211 of section of jurisdiction block between of the invention piece, in each section of jurisdiction block A binding face 211 on bury the first connector 31, the second connector 32 is buried on another binding face 211, with reference to Fig. 5 and Shown in Fig. 7, the binding face 211 of embedded first connector 31 is provided with the mounting groove of corresponding opening 311 and tank 312, mounting groove It is connected with opening 311 and tank 312, the notch size of the mounting groove adapts to the connector 322 of the second connector 32, in peace Pretend neighbour two section of jurisdiction blocks when, illustrated as a example by the first section of jurisdiction block 21 and the second section of jurisdiction block 22 are installed, by the second section of jurisdiction The binding face that the binding face 221 of the second connector 32 is embedded with the first connector 32 on the first section of jurisdiction block is embedded with block 22 211, in the mounting groove that the connector 321 of the second connector 32 is placed on the binding face 211 of the first section of jurisdiction block 21, then towards The direction of tank 312 promotes the second section of jurisdiction block 22 so that the connector 322 of second connector 32 is slidedly arranged in tank 312, The structure of mounting groove is eliminated in the first shown section of jurisdiction block in the figure 7.In practice of construction, it is only necessary to by the second connector 32 The mounting groove that is placed on the first section of jurisdiction block 21 of connector 322 in, then advance the second section of jurisdiction block 22 using shield structure jack Can complete assembled.For the ease of installing, the mounting groove opened up on the mounting surface of section of jurisdiction block is provided close to domain pipe is not installed The side of piece is set so that in installing pipe tile, it is only necessary to which the direction towards mounted domain section of jurisdiction promotes to be installed Section of jurisdiction block can complete install, the size of the mounting groove need to only meet can place connector 322.
As shown in Figure 2 and Figure 7, the binding face 211 in the first section of jurisdiction block 21 is provided with groove near one end of medial surface 212, Groove also is provided near the side of lateral surface 213, is filled out in two grooves and is provided with fluid sealant, form the inner seal structure of section of jurisdiction and outer Sealing structure, for the longitudinal seam between seal pipe tile, jointing 30 is arranged on inner seal structure and outer between of the invention piece Between sealing structure, jointing does not interfere with the sealing property of sealing structure between block so that section of jurisdiction has preferably sealing effect Really.
Jointing realizes jointing between the quick connection between the block of section of jurisdiction, the block and uses sheet between of the invention piece Structure, every thickness is 9mm, according to section of jurisdiction size and structure stress requirement, using different several first connectors of piece and the Two tie layer stitch welding connect and form a whole, and so as to meet the section of jurisdiction force request of different-diameter and industrial and mineral, i.e., are connected between block Depending on the quantity that joint 30 is set is calculated according to the actual pressure of shield tunnel, can be determined to connect between block according to actual pressure The quantity of the first connector of connection and the second connector is laminated in joint 30, can also be determined on each section of jurisdiction block according to actual pressure Jointing 30 between several sections of blocks is set.
Jointing has the beneficial effect that between of the invention piece:
Realize the function of single step (One-Pass) simple assembling simultaneously, structure is simplified so that first connects Fitting and the second connector not only maintain the due joint performance of attachment structure and endurance quality, and the simplification for passing through structure With the simplification of preparation method, the problem of conventional joint high cost is solved.
After the block positioning of section of jurisdiction, it is only necessary to which shield structure jack propulsion can complete assembled.
Breakage, the smooth interior surfaces of the section of jurisdiction that section of jurisdiction block and docking are formed will not be caused to section of jurisdiction block.
By way of being installed the stacking split of jointing between block and using multistage, small-bore, middle mouth is applicable to Footpath and bigbore section of jurisdiction, and only need to use a kind of metal punching and shearing die, it is cost-effective.
Present invention also offers jointing connecting tube tile between a kind of section of jurisdiction block using using stacked construction Method, the method for the connecting tube tile comprises the following steps:
As shown in Figure 4, there is provided jointing 30 between block, jointing 30 includes the first connector 31 and with first between the block The second connector 32 that connector 31 is adapted;
With reference to shown in Fig. 5, the first connector 31 is embedded in the first section of jurisdiction block 21 in two adjacent section of jurisdiction blocks;
Second connector 32 is embedded in the second section of jurisdiction block 22 in two adjacent section of jurisdiction blocks;
With reference to shown in Fig. 6, by the first section of jurisdiction block 21 and the relative slip of the second section of jurisdiction block 22 with so that the second connector 32 blocks It is achieved thereby that the first section of jurisdiction block 21 and the docking connection of the second section of jurisdiction block 22 in the first connector 31.
As shown in Fig. 5, Fig. 7 and Fig. 8, used as a better embodiment of the invention, first connector 31 is in the first pipe Opening 311 is installed with the binding face 211 of tile 21, the first connector 31 is provided with the tank 312 connected with opening 311;The Two connectors 32 in be formed with the binding face 221 of the second section of jurisdiction block 22 protrude outward with 311 connecting rods that are adapted of opening 321, the end of connecting rod 321 is formed with the connector 322 being adapted with tank 312;Managed by the first section of jurisdiction block 21 and second The relative slip of tile 22 includes:Connecting rod 321 and connector 322 are placed in the side of opening 311 and tank 312, it is relative to slide First section of jurisdiction block 21 and the second section of jurisdiction block 22 so that connecting rod 321 and connector 322 are slidedly arranged in opening 311 and tank 312, It is arranged in tank 312 so as to realize that the first section of jurisdiction block 21 and the second section of jurisdiction block 22 dock connection by connector 322.Wherein open Less than the size of tank 312, the size of connector 222 is more than the size of opening 311 to the size of mouth 311, so that the connection First 322 be arranged in tank 312 after can be on ring by the spacing fixation in opening 311.Managed by the first section of jurisdiction block 21 and second When tile 22 is slided relatively, by promoting one of section of jurisdiction block to realize, if the first section of jurisdiction block 21 and the second section of jurisdiction block 22 When unlocked, the second connector 32 of the second section of jurisdiction block 22 can be placed in the side of the first connector 31, then promote first The section of jurisdiction block 22 of section of jurisdiction block 21 or second so that the second connector 32 is fastened in the first connector 31;If the first section of jurisdiction block 21 With there is a section of jurisdiction block to fix in the second section of jurisdiction block 22, then can promote another loose section of jurisdiction block so that second Connector 32 is fastened in the first connector 31.
As shown in figure 5, used as another better embodiment of the invention, the bottom of tank 312 of the first connector 31 is provided with Cross bar 313, the end vertical of cross bar 313 is connected with base 314;The part of connecting rod 321 of the second connector 32 is anchored in second In section of jurisdiction block 22 and the end vertical that is anchored in the second section of jurisdiction block 22 of connecting rod 321 is connected with bearing 323;By the first connector 31 are embedded in when in the first section of jurisdiction block 21, and base 314 is fixedly connected with the reinforcing bar in the first section of jurisdiction block 21;By the second connector 32 are embedded in when in the second section of jurisdiction block 22, and bearing 323 is fixedly connected with the reinforcing bar in the second section of jurisdiction block 22.By setting base 314 and bearing 323, the anchoring strength of the first connector 31 of enhancing and the second connector 32, so as to improve the He of the first connector 31 Second connector 32 is embedded in the structural strength in the block of section of jurisdiction.
As shown in Figure 7 and Figure 8, as another better embodiment of the invention, the first connector 31 is laminated structure, the The first connector 31 of multiple stacking connections is embedded with one section of jurisdiction block 21;Second connector 32 is laminated structure, the second section of jurisdiction Also the second connector 32 of multiple stacking connections is embedded with block 22.Multiple first connectors 31 are alignd and is set and fixed company Connect, be embedded in together in the first section of jurisdiction block 21.Multiple second connectors 32 are alignd and is set and is fixedly connected, is embedded in together In two section of jurisdiction blocks 22.Every thickness of the first connector 31 and the second connector 32 is 9mm, is received according to section of jurisdiction size and structure Power requirement, is connect and is formed a whole, so as to meet difference using different several first connectors of piece and the second tie layer stitch welding The section of jurisdiction force request of diameter and industrial and mineral.
As another better embodiment of the invention, when burying the first connector 31 and the second connector 32:By first Connector 31 is set perpendicular to the binding face 211 of the first section of jurisdiction block 21, by the second connector 32 perpendicular to the second section of jurisdiction block 22 Binding face 221 is set;Or be embedded in the first connector 31 is oblique in the first section of jurisdiction block 21, bury the second connector 32 is oblique In the second section of jurisdiction block 22.In angularly disposed first connector 31 and the second connector 32, the second connector 32 is arranged in Wedge effect is formd in first connector 31 so that connection is more firm.First connector 31 and the second connector 32 are with oblique To 1:20 binding faces for being installed to section of jurisdiction block.
As shown in Fig. 2 jointing 30 is installed on the binding face 211 of section of jurisdiction block between of the invention piece, in each section of jurisdiction block A binding face 211 on bury the first connector 31, the second connector 32 is buried on another binding face 211, with reference to Fig. 5 and Shown in Fig. 7, the binding face 211 of embedded first connector 31 is provided with the mounting groove of corresponding opening 311 and tank 312, mounting groove It is connected with opening 311 and tank 312, the notch size of the mounting groove adapts to the connector 322 of the second connector 32, in peace Pretend neighbour two section of jurisdiction blocks when, illustrated as a example by the first section of jurisdiction block 21 and the second section of jurisdiction block 22 are installed, by the second section of jurisdiction The binding face that the binding face 221 of the second connector 32 is embedded with the first connector 32 on the first section of jurisdiction block is embedded with block 22 211, in the mounting groove that the connector 321 of the second connector 32 is placed on the binding face 211 of the first section of jurisdiction block 21, then towards The direction of tank 312 promotes the second section of jurisdiction block 22 so that the connector 322 of second connector 32 is slidedly arranged in tank 312, The structure of mounting groove is eliminated in the first shown section of jurisdiction block in the figure 7.In practice of construction, it is only necessary to by the second connector 32 The mounting groove that is placed on the first section of jurisdiction block 21 of connector 322 in, then advance the second section of jurisdiction block 22 using shield structure jack Can complete assembled.For the ease of installing, the mounting groove opened up on the mounting surface of section of jurisdiction block is provided close to domain pipe is not installed The side of piece is set so that in installing pipe tile, it is only necessary to which the direction towards mounted domain section of jurisdiction promotes to be installed Section of jurisdiction block can complete install, the size of the mounting groove need to only meet can place connector 322.
Illustrated to interannular jointing in section of jurisdiction of the invention and using its method for connecting below.
As shown in figure 9, section of jurisdiction interannular jointing 40 of the invention includes the first plug connector 41 and the second plug connector 42, knot Close shown in Figure 11, the first plug connector 41 is embedded in the first endless tube piece 11 in two adjacent endless tube pieces, on the first plug connector 41 If resilient retaining mechanism 411;Second plug connector 42 is adapted with the first plug connector 41, and second plug connector 42 is installed in phase On the second endless tube piece 12 in two adjacent endless tube pieces, the second plug connector 42 is inserted in the first plug connector 41 and by retaining mechanism 411 spacing clampings are it is achieved thereby that the first endless tube piece 11 and the splicing connection of the second endless tube piece 12.Retaining mechanism 411 is elastic component, During the second plug connector 42 is inserted into the first plug connector 41, the retaining mechanism 411 due to elastic deformation cause this second Plug connector 42 can be smoothly inserted into the first plug connector 41, after then the retaining mechanism 411 restores to the original state, serve retaining Function, it is therefore prevented that the second plug connector 42 is retreated so as to lock the second plug connector 42 spacing, realizes the first endless tube piece 11 and The splicing connection of two endless tube piece 12.
What interannular jointing of the invention employed the first plug connector and the second plug connector plugs connection, when mounted only Need to advance the second endless tube piece to the first endless tube piece and fitted with the first endless tube piece so that the second plug connector and the first grafting Part fastens.First plug connector and the second plug connector have not only acted as connection fastening the first endless tube piece and the second endless tube piece Effect, also act the effect of positioning, section of jurisdiction is positioned by aligning the first plug connector and the second plug connector during construction , then be inserted into the second plug connector in the first plug connector by installation site, realizes single step (One-Pass) and simply spells Dress, it is time saving and energy saving to install, and can accelerate the assembled speed of section of jurisdiction, saves the engineering time.Connect between interannular jointing and block When head is used together, i.e., jointing between the side setting block of ring is located on the block of section of jurisdiction, for connecting two adjacent pipes Tile, is located on the block of section of jurisdiction and interannular jointing is set on the side of longitudinal direction, for connecting two adjacent endless tube pieces, in reality During construction, each endless tube piece is formed by the docking connection of multiple section of jurisdiction blocks, and in splicing tubes tile, the section of jurisdiction block by setting thereon Jointing and adjacent section of jurisdiction block docking connection between the block put, by the environment jointing and the previous endless tube piece that set thereon Jointing and interannular jointing are to be promoted to previous endless tube piece direction and pacify between upper corresponding section of jurisdiction block splicing connection, block Dress, jointing and interannular are connected between completion block by only section of jurisdiction block to be installed need to be promoted once to previous endless tube piece direction The connection of joint, realizes single step (One-Pass) simple assembling, and it is time saving and energy saving to install, and can accelerate the assembly speed of section of jurisdiction Degree, saves the engineering time.
As shown in Figure 9 and Figure 10, first plug connector 41 has been internally formed spliced eye 412, with reference to shown in Figure 11, the grafting Hole 412 is embedded in the first endless tube piece 11 and opening 4121 is placed on the Mosaic face 111 of the first endless tube piece, retaining mechanism 411 Including at least one reed 413 on the first plug connector 41, the reed 413 sets to the inner inclination of the first plug connector 41 Put, a side of relatively close opening 4121 is fixedly connected with the first plug connector 41 on reed 413, is relatively distant from reed 413 Stretch into the inside of the first plug connector 41 in one end of opening 4121.Second plug connector 42 is installed in the Mosaic face of the second endless tube piece 12 On 121, the second plug connector 42 is provided with plush copper 421 away from the end of the Mosaic face 121 of the second endless tube piece 12.Second plug connector 42 It is inserted in when in the first plug connector 41, the plush copper 421 is inserted into spliced eye 412, with reference to Figure 12, plush copper 421 is to the first grafting During part 41 is inserted into, the reed 413 is extruded when plush copper 421 is by reed 413 so that reed 413 is squeezed by plush copper 421 Press and stretched out to the outside of the first plug connector 41 so that plush copper 421 can pass through reed 413, with reference to shown in Figure 13, when convex First 421 by reed 413 through being resetted and spacing clamping plush copper 421 after reed 413, it is achieved thereby that the first endless tube piece 11 and the The splicing connection of two endless tube piece 12.
In big round table-like in the small rear end in front end, front end is the Mosaic face 121 for being relatively distant from the second endless tube piece 12 to plush copper 421 One end, rear end is one end of the Mosaic face 121 of relatively close second endless tube piece 12.The rear end of plush copper 421 with diameter greater than second The diameter of the interlude body of plug connector 42, so that the bottom surface of the plush copper 421 forms the interlude sheet from the second plug connector 42 The circle round platform that the periphery of body stretches out, when plush copper 421 is inserted into the first 41 inside of plug connector, by the reed 413 End abuts against the round platform and realizes spacing clamping plush copper 421.The size phase of the size of the rear end of plush copper 421 and spliced eye 412 Adaptation.
Used as a better embodiment of the invention, reed 413 is at least one pair of, and relatively located at the first plug connector 41 Periphery.The plush copper 421 of the second plug connector 42 of insertion is blocked by the reed 413 being oppositely arranged.Is stretched on a pair of reeds 413 Mutually fitted with the size of the interlude body of the second plug connector 42 in the sandwiched space formed between side inside one plug connector 41 Match somebody with somebody.
As another better embodiment of the invention, the end on the first plug connector 41 away from the first endless tube piece 11 be in The horn-like structure of outer expansion, horn-like structure is the small frustum cone structure in the big rear end in front end, and front end is to be relatively distant from the first endless tube One end of the Mosaic face 111 of piece 11, rear end is one end of the Mosaic face 111 of relatively close first endless tube piece 11, the horn-like knot The end of structure improves the breakout capacity of first plug connector 41.
As another better embodiment of the invention, as shown in figures 9 and 11, near the second ring on the second plug connector 42 The end of the Mosaic face 121 of section of jurisdiction 12 is provided with threaded connection section 422, is embedded with and is threadedly coupled section 422 in the second endless tube piece 12 The branch sleeve 122 being adapted, the branch sleeve 122 is used to connect the second plug connector 42, the threaded connection of the second plug connector 42 Section 422 is screwed together on branch sleeve 122 and realizes the second plug connector 42 and be installed on the second endless tube piece 12.
As shown in figure 9, the second plug connector 42 is column structure, the front end of the second plug connector 42 is formed with plush copper 421, rear end Threaded connection section 422 is formed with, interlude body is step-like column structure, and interlude body is near the part of plush copper 421 Diameter less than the diameter near threaded connection section 422 part, on interlude body the length adaptation of the less part of diameter in The length of reed 413, the part being relatively large in diameter on interlude body is adapted with the rear end size of plush copper 421.
As shown in Figure 14 and Figure 15, the first plug connector 41 is in interval setting, second on the Mosaic face 111 of the first endless tube piece 11 Plug connector 42 in interval setting on the Mosaic face 121 of the second endless tube piece 12, in the spelling of the first endless tube piece 11 and the second endless tube piece 12 End in junction 111 and Mosaic face 121 near medial surface and lateral surface is provided with groove, with reference to shown in Fig. 3, on Mosaic face The filling with sealant in the groove of medial surface and lateral surface, forms the inner seal structure and outer seal configuration of section of jurisdiction, is used for Seal the ring seam of the interannular of section of jurisdiction, the first plug connector 41 and the second plug connector 42 when setting, located at the inner seal structure and Between outer seal configuration, inner seal structure and outer seal configuration will not be destroyed, interannular jointing does not interfere with sealing structure Sealing property so that section of jurisdiction has preferable sealing effectiveness.
As shown in figure 3, interannular jointing 40 of the invention is installed on the Mosaic face 111 of section of jurisdiction block, in each pipe The first plug connector 41 is buried on one Mosaic face 111 of tile, the second plug connector 42 is buried on another Mosaic face 111.Spelling When filling two endless tube pieces, as shown in Figure 11 to Figure 13, by the second plug connector 42 and previous ring on the section of jurisdiction block of band assembly endless tube piece The first plug connector 41 on (having installed) section of jurisdiction is aligned, and then the section of jurisdiction block is advanced to the direction of previous endless tube piece so that the Two plug connectors 42 are inserted in the first plug connector 41 and complete installation.Easy mounting means, shield need to be only utilized in construction It is assembled that structure jack advances section of jurisdiction block to be installed to complete.Interannular jointing employs retaining reed technology, it is ensured that connect Will not be extracted after head insertion, improve retaining ability.
The present invention is illustrated using the method for section of jurisdiction interannular jointing connection section of jurisdiction below.The side of the connection section of jurisdiction Method comprises the following steps:
As shown in Figure 9, there is provided interannular jointing 40, interannular jointing 40 includes the first plug connector 41 and is inserted with first The second plug connector 42 that fitting 41 is adapted;
With reference to shown in Figure 11, the first plug connector 41 is embedded in the first endless tube piece 11 in two adjacent endless tube pieces, the Resilient retaining mechanism 411 is set on one plug connector 41;
Second plug connector 42 is installed in the second endless tube piece 12 in two adjacent endless tube pieces;And
Second plug connector 42 is inserted in the first plug connector 41 and by the spacing clamping of retaining mechanism 411 so as to realize the One endless tube piece 11 is connected with the splicing of the second endless tube piece 12.Retaining mechanism 411 is elastic component, and first is inserted into the second plug connector 42 During plug connector 41, the retaining mechanism 411 enables that second plug connector 42 is smoothly inserted into due to elastic deformation In first plug connector 41, after then the retaining mechanism 411 restores to the original state, stopping function is served, it is therefore prevented that the second plug connector 42 Retreat so as to lock the second plug connector 42 spacing, realize the first endless tube piece 11 and the splicing connection of the second endless tube piece 12.
What interannular jointing of the invention employed the first plug connector and the second plug connector plugs connection, when mounted only Need to advance the second endless tube piece to the first endless tube piece and fitted with the first endless tube piece so that the second plug connector and the first grafting Part fastens.First plug connector and the second plug connector have not only acted as connection fastening the first endless tube piece and the second endless tube piece Effect, also act the effect of positioning, section of jurisdiction is positioned by aligning the first plug connector and the second plug connector during construction , then be inserted into the second plug connector in the first plug connector by installation site, realizes single step (One-Pass) and simply spells Dress, it is time saving and energy saving to install, and can accelerate the assembled speed of section of jurisdiction, saves the engineering time.
Used as a better embodiment of the invention, as shown in Figure 9 and Figure 10, being internally formed for the first plug connector 41 is slotting Hole 412 is connect, with reference to shown in Figure 11, spliced eye 412 is embedded in the first endless tube piece 11 and opening 4121 is placed in the first endless tube piece 11 Mosaic face 111 on, retaining mechanism 411 includes at least one reed 413 on the first plug connector 41, and reed 413 is to the The inner inclination of one plug connector 41 is set, and a side of relatively close opening 4121 is fixed with the first plug connector 41 on reed 413 Stretch into the inside of the first plug connector 41 in connection, one end that opening 4121 is relatively distant from reed 413.Second plug connector 42 is installed in On the Mosaic face 121 of the second endless tube piece 12, the end on the second plug connector 42 away from the Mosaic face 121 of the second endless tube piece 12 sets There is plush copper 421;Second plug connector 42 is inserted in when in the first plug connector 41, plush copper 421 is inserted into spliced eye 412 and extrudes Reed 413 stretches out to the outside of the first endless tube piece 11, and after plush copper 421 passes through reed 413, reed 413 resets so as to limiting card Tight plush copper 421 is so as to realize the first endless tube piece 11 and the splicing connection of the second endless tube piece 12.Plush copper 421 is in the big circle in the small rear end in front end Mesa-shaped, front end is the one end for the Mosaic face 121 for being relatively distant from the second endless tube piece 12, and rear end is relatively close second endless tube piece 12 One end of Mosaic face 121.The diameter of the interlude body with diameter greater than the second plug connector 42 of the rear end of plush copper 421, so that should The bottom surface of plush copper 421 forms the circle round platform stretched out from the periphery of the interlude body of the second plug connector 42, in plush copper 421 when being inserted into the first 41 inside of plug connector, abuts against the round platform by the end of the reed 413 and realizes spacing clamping plush copper 421.The size of the rear end of plush copper 421 is adapted with the size of spliced eye 412.
Used as another better embodiment of the invention, as shown in Figure 10 and Figure 11, reed 413 is at least one pair of, and phase To located at the periphery of the first plug connector 41.The plush copper of the second plug connector 42 of insertion is blocked by the reed 413 being oppositely arranged 421.The sandwiched space and the second plug connector 42 formed between the side inside the first plug connector 41 are stretched on a pair of reeds 413 The size of interlude body be adapted.
As another better embodiment of the invention, the end on the first plug connector 41 away from the first endless tube piece 11 be in The horn-like structure of outer expansion.Horn-like structure is the small frustum cone structure in the big rear end in front end, and front end is to be relatively distant from the first endless tube One end of the Mosaic face 111 of piece 11, rear end is one end of the Mosaic face 111 of relatively close first endless tube piece 11, the horn-like knot The end of structure improves the breakout capacity of first plug connector 41.
As another better embodiment of the invention, with reference to shown in Figure 11, near the second endless tube on the second plug connector 42 The end of the Mosaic face 121 of piece 12 is provided with threaded connection section 422;Second plug connector 42 is installed in bag in the second endless tube piece 12 Include:In the branch sleeve 122 that embedded in the second endless tube piece 12 and threaded connection section 422 is adapted;Threaded connection section 422 is screwed togather In branch sleeve 122.
As shown in figure 9, the second plug connector 42 is column structure, the front end of the second plug connector 42 is formed with plush copper 421, rear end Threaded connection section 422 is formed with, interlude body is step-like column structure, and interlude body is near the part of plush copper 421 Diameter less than the diameter near threaded connection section 422 part, on interlude body the length adaptation of the less part of diameter in The length of reed 413, the part being relatively large in diameter on interlude body is adapted with the rear end size of plush copper 421.Such as Figure 14 and Tu Shown in 15, in interval setting on the Mosaic face 111 of the first endless tube piece 11, the second plug connector 42 is in the second endless tube for the first plug connector 41 Interval setting on the Mosaic face 121 of piece 12, in the first endless tube piece 11 and the Mosaic face 111 and Mosaic face 121 of the second endless tube piece 12 The upper end near medial surface and lateral surface is provided with groove, with reference to shown in Fig. 3, near medial surface and lateral surface on Mosaic face Groove in filling with sealant, form the inner seal structure and outer seal configuration of section of jurisdiction, the ring of the interannular for sealing section of jurisdiction To seam, the first plug connector 41 and the second plug connector 42 when setting, between the inner seal structure and outer seal configuration, will not Destruction inner seal structure and outer seal configuration, interannular jointing do not interfere with the sealing property of sealing structure so that section of jurisdiction has There is preferable sealing effectiveness.
Table 1 below is given conventional bolt formula section of jurisdiction connector and is connect using jointing between of the invention piece and interannular The performance comparison of both connectors of head.
Jointing and interannular jointing performance are contrasted between the conventional bolt formula section of jurisdiction connector of table 1 and section of jurisdiction block of the present invention Table
The present invention is described in detail above in association with accompanying drawing embodiment, those skilled in the art can be according to upper State it is bright the present invention is made many variations example.Thus, some of embodiment details should not constitute limitation of the invention, this The scope that invention will be defined using appended claims is used as protection scope of the present invention.

Claims (10)

1. jointing between a kind of section of jurisdiction block of use layered construct, it is characterised in that including:
It is embedded in the first connector in the first section of jurisdiction block in two adjacent section of jurisdiction blocks;And
Second for being adapted in the second section of jurisdiction block being embedded in two adjacent section of jurisdiction blocks and with first connector is connected Part is relative to slide first section of jurisdiction block and second section of jurisdiction block and cause that second connector is arranged in described first and connects It is connected with the docking of second section of jurisdiction block so as to realize first section of jurisdiction block in fitting.
2. jointing between the section of jurisdiction block of layered construct is used as claimed in claim 1, it is characterised in that described first connects Fitting is provided with and the open communication in being installed with opening, first connector on the binding face of first section of jurisdiction block Tank;
Second connector in be formed with the binding face of second section of jurisdiction block protrude outward with it is described opening be adapted Connecting rod, the end of the connecting rod is formed with the connector being adapted with the tank;
When relative slip first section of jurisdiction block and the second section of jurisdiction block, the connecting rod is placed in the opening, the company Joint is arranged in the tank so that first section of jurisdiction block and the docking connection of second section of jurisdiction block.
3. jointing between the section of jurisdiction block of layered construct is used as claimed in claim 2, it is characterised in that described first connects The tank bottom of fitting is provided with cross bar, and the end vertical of the cross bar is connected with base;
The connection bar part of second connector is anchored in the block of second section of jurisdiction and the connecting rod is anchored in described the End vertical in two section of jurisdiction blocks is connected with bearing.
4. jointing between the section of jurisdiction block of layered construct is used as claimed in claim 2, it is characterised in that described first connects Fitting is laminated structure, and the first connector of multiple stacking connections is embedded with the block of first section of jurisdiction;
Second connector is the second connection that multiple stacking connections are also embedded with laminated structure, second section of jurisdiction block Part.
5. jointing between the section of jurisdiction block of layered construct is used as claimed in claim 2, it is characterised in that described first connects Fitting is set perpendicular to the binding face of first section of jurisdiction block, laminating of second connector perpendicular to second section of jurisdiction block Face is set;Or
First connector is oblique to be embedded in the block of first section of jurisdiction, and second connector is oblique to be embedded in described second In the block of section of jurisdiction.
6. it is a kind of using using layered construct section of jurisdiction block between jointing connecting tube tile method, it is characterised in that bag Include following steps;
Jointing between block is provided, jointing includes the first connector and is adapted with first connector between described piece Second connector;
First connector is embedded in the first section of jurisdiction block in two adjacent section of jurisdiction blocks;
Second connector is embedded in the second section of jurisdiction block in two adjacent section of jurisdiction blocks;And
Slide to cause that second connector is arranged in described the by first section of jurisdiction block and second section of jurisdiction block are relative It is achieved thereby that first section of jurisdiction block is connected with the docking of second section of jurisdiction block in a connection piece.
7. as claimed in claim 6 using the method for jointing connecting tube tile between the section of jurisdiction block using layered construct, Characterized in that, first connector is in being installed with opening, first connector on the binding face of first section of jurisdiction block It is provided with the tank with the open communication;Second connector is outside in being formed with the binding face of second section of jurisdiction block The connecting rod being adapted with the opening for protruding out, the end of the connecting rod is formed with the connection being adapted with the tank Head;
The relative slip of first section of jurisdiction block and second section of jurisdiction block is included:
The connecting rod and the connector are placed in the side of the opening and the tank, it is relative to slide first section of jurisdiction Block and second section of jurisdiction block so that the connecting rod and the connector are slidedly arranged in the opening and the tank, are passed through The connector is arranged in the tank so as to realize first section of jurisdiction block and the docking connection of second section of jurisdiction block.
8. as claimed in claim 7 using the method for jointing connecting tube tile between the section of jurisdiction block using layered construct, Characterized in that, the tank bottom of first connector is provided with cross bar, the end vertical of the cross bar is connected with base;It is described The connection bar part of the second connector is anchored in the block of second section of jurisdiction and the connecting rod is anchored in second section of jurisdiction block Interior end vertical is connected with bearing;
First connector is embedded in when in the block of first section of jurisdiction, by the steel in the base and first section of jurisdiction block Muscle is fixedly connected;
Second connector is embedded in when in the block of second section of jurisdiction, by the steel in the bearing and second section of jurisdiction block Muscle is fixedly connected.
9. as claimed in claim 7 using the method for jointing connecting tube tile between the section of jurisdiction block using layered construct, Characterized in that, first connector is laminated structure, the first of multiple stacking connections is embedded with the block of first section of jurisdiction Connector;
Second connector is the second connection that multiple stacking connections are also embedded with laminated structure, second section of jurisdiction block Part.
10. as claimed in claim 7 using the method for jointing connecting tube tile between the section of jurisdiction block using layered construct, Characterized in that, when embedded first connector and second connector:
Binding face by first connector perpendicular to first section of jurisdiction block is set, by second connector perpendicular to institute The binding face for stating the second section of jurisdiction block is set;Or
Be embedded in first connector is oblique in the block of first section of jurisdiction, by second connector it is oblique be embedded in it is described In second section of jurisdiction block.
CN201710145121.9A 2017-03-13 2017-03-13 Segment-to-segment connection joint using stacked structure and method of connection using the same Active CN106801610B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710145121.9A CN106801610B (en) 2017-03-13 2017-03-13 Segment-to-segment connection joint using stacked structure and method of connection using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710145121.9A CN106801610B (en) 2017-03-13 2017-03-13 Segment-to-segment connection joint using stacked structure and method of connection using the same

Publications (2)

Publication Number Publication Date
CN106801610A true CN106801610A (en) 2017-06-06
CN106801610B CN106801610B (en) 2020-05-05

Family

ID=58988076

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710145121.9A Active CN106801610B (en) 2017-03-13 2017-03-13 Segment-to-segment connection joint using stacked structure and method of connection using the same

Country Status (1)

Country Link
CN (1) CN106801610B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108915722A (en) * 2018-04-26 2018-11-30 中铁隧道集团二处有限公司 The combined type section of jurisdiction of operation posture can be monitored
CN110541717A (en) * 2019-09-26 2019-12-06 江苏大成轨道科技有限公司 Annular push-insert type connecting and fastening assembly for shield tunnel segment and application thereof
CN111794770A (en) * 2020-07-22 2020-10-20 中铁第一勘察设计院集团有限公司 Shield tunnel segment bolt hole reinforcing structure and construction method
CN112730083A (en) * 2020-12-28 2021-04-30 西南石油大学 Simulation system and experimental method for regulating duct piece dislocation by using tenon and mortise
CN112983472A (en) * 2021-03-10 2021-06-18 上海市隧道工程轨道交通设计研究院 Duct piece connecting method
CN114198118A (en) * 2021-12-25 2022-03-18 中铁工程装备集团有限公司 Underground engineering node processing structure and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19616143C1 (en) * 1996-04-23 1997-04-30 Hochtief Ag Hoch Tiefbauten Annular lining for tunnels, using rings with tongue and groove joints
WO1998003773A1 (en) * 1996-07-19 1998-01-29 C.V. Buchan Limited Connecting device for connecting concrete segments
GB2333799A (en) * 1998-01-29 1999-08-04 Buchan C V Ltd Device for joining two members together
JP3574848B2 (en) * 2001-09-17 2004-10-06 興建産業株式会社 Precast concrete member connection device
CN105484764A (en) * 2015-12-28 2016-04-13 上海建工集团股份有限公司 Segment longitudinal seam connecting assembly, tunnel segment structure and construction method
CN105649648A (en) * 2015-12-29 2016-06-08 宁波市轨道交通集团有限公司 Segment connecting structure of quasi rectangular shield tunnel and construction method thereof
CN106351672A (en) * 2016-09-08 2017-01-25 中国神华能源股份有限公司 Pipe segment joint and connecting method for pipe segment joint
CN106437755A (en) * 2016-09-08 2017-02-22 中国神华能源股份有限公司 Pipe section flexible joint and installation method thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19616143C1 (en) * 1996-04-23 1997-04-30 Hochtief Ag Hoch Tiefbauten Annular lining for tunnels, using rings with tongue and groove joints
WO1998003773A1 (en) * 1996-07-19 1998-01-29 C.V. Buchan Limited Connecting device for connecting concrete segments
GB2333799A (en) * 1998-01-29 1999-08-04 Buchan C V Ltd Device for joining two members together
JP3574848B2 (en) * 2001-09-17 2004-10-06 興建産業株式会社 Precast concrete member connection device
CN105484764A (en) * 2015-12-28 2016-04-13 上海建工集团股份有限公司 Segment longitudinal seam connecting assembly, tunnel segment structure and construction method
CN105649648A (en) * 2015-12-29 2016-06-08 宁波市轨道交通集团有限公司 Segment connecting structure of quasi rectangular shield tunnel and construction method thereof
CN106351672A (en) * 2016-09-08 2017-01-25 中国神华能源股份有限公司 Pipe segment joint and connecting method for pipe segment joint
CN106437755A (en) * 2016-09-08 2017-02-22 中国神华能源股份有限公司 Pipe section flexible joint and installation method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108915722A (en) * 2018-04-26 2018-11-30 中铁隧道集团二处有限公司 The combined type section of jurisdiction of operation posture can be monitored
CN110541717A (en) * 2019-09-26 2019-12-06 江苏大成轨道科技有限公司 Annular push-insert type connecting and fastening assembly for shield tunnel segment and application thereof
CN111794770A (en) * 2020-07-22 2020-10-20 中铁第一勘察设计院集团有限公司 Shield tunnel segment bolt hole reinforcing structure and construction method
CN112730083A (en) * 2020-12-28 2021-04-30 西南石油大学 Simulation system and experimental method for regulating duct piece dislocation by using tenon and mortise
CN112730083B (en) * 2020-12-28 2024-05-28 西南石油大学 Simulation system and experimental method for regulating and controlling segment staggering by using rebate
CN112983472A (en) * 2021-03-10 2021-06-18 上海市隧道工程轨道交通设计研究院 Duct piece connecting method
CN114198118A (en) * 2021-12-25 2022-03-18 中铁工程装备集团有限公司 Underground engineering node processing structure and construction method thereof

Also Published As

Publication number Publication date
CN106801610B (en) 2020-05-05

Similar Documents

Publication Publication Date Title
CN106939792A (en) Section of jurisdiction interannular jointing and the method using its connection
CN106801610A (en) Using layered construct section of jurisdiction block between jointing and using its connect method
CN108194099A (en) The connection structure of quick-assembling shield duct piece and its assembled engineering method
CN106761810A (en) A kind of large-deformation tunnel in soft rock supporting structure system and its construction method
CN106869122A (en) Prestressed concrete pipe pile Quick mechanical joint design
CN102587506A (en) Method for realizing butt joint of steel pipes by aid of axial cross plug board and butt joint part
DE3044148A1 (en) METHOD AND DEVICE FOR CONNECTING TUBES
CN104343117A (en) Concrete pipe pile connector
CN105650399A (en) Pipe rehabilitation method
CN106677809A (en) Contractible fabricated steel plate support
CN206971231U (en) The joint of assembling-type combination steel purlin is cross-linked structure
CN203796280U (en) Segment joint structure high in bearing capacity
CN206784431U (en) Telescopic joint for underground pipe gallery
CN1614291A (en) Damaged pipeline repairing apparatus and method thereof
KR20170001167A (en) Concrete strut and a manufacturing method and a retaining method
EP2369130B1 (en) Method for renovating a tunnel tube
CN204852692U (en) A connection structure for between spiral corrugated steel pipe
EP0825377B1 (en) Device and method for pipeline branchings
JP2007231522A (en) Bendable and joinable sheet panel, and tunnel reinforcing method
CN206753623U (en) Bow member
CN106223840A (en) Cluster type down-hole hammer and down-hole hammer monomer locked mechanism thereof
KR101599295B1 (en) Moudle unit and moudle unit for under-ground structure and under-ground structure construction method therewith
CN206478348U (en) Spigot-and-socket steel pipe anticreep mouthful device
JP6445478B2 (en) Construction method for underground structures
CN215891577U (en) Fixing and supporting device for mounting lining pipe joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221221

Address after: 200032 5th Floor, No. 1099 Wanping South Road, Xuhui District, Shanghai

Patentee after: SHANGHAI TUNNEL ENGINEERING Co.,Ltd.

Patentee after: SHANGHAI TUNNEL ENGINEERING & RAIL TRANSIT DESIGN AND Research Institute

Patentee after: Shanghai urban construction tunnel equipment technology development Co.,Ltd.

Address before: No. 1099, No. 5, Wan Ping Nan Road, Xuhui District, Shanghai

Patentee before: SHANGHAI TUNNEL ENGINEERING Co.,Ltd.

Patentee before: SHANGHAI TUNNEL ENGINEERING & RAIL TRANSIT DESIGN AND Research Institute