China
Prior art keywords
test
power consumption
mobile terminal
group
frequency range
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710097070.7A
Other languages
Chinese (zh)
Other versions
CN106790902B (en
Inventor
梁振杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou TCL Mobile Communication Co Ltd
Original Assignee
Huizhou TCL Mobile Communication Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou TCL Mobile Communication Co Ltd filed Critical Huizhou TCL Mobile Communication Co Ltd
Priority to CN201710097070.7A priority Critical patent/CN106790902B/en
Publication of CN106790902A publication Critical patent/CN106790902A/en
Application granted granted Critical
Publication of CN106790902B publication Critical patent/CN106790902B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04MTELEPHONIC COMMUNICATION
    • H04M1/00Substation equipment, e.g. for use by subscribers
    • H04M1/24Arrangements for testing

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)
  • Telephone Function (AREA)

Abstract

The present invention discloses a kind of mobile terminal power consumption method of testing and system, and method includes step:A, establishment Socket, and bundling port, set up Socket connections;Power consumption test under B, the power consumption test carried out successively under each group 4G frequency ranges, each group 3G frequency ranges, the power consumption test under each group 2G frequency ranges;C, according to test result export test report.Present invention accomplishes the demand of network user's automatic test power consumption, the uniformity of power consumption output report is finally ensured so that whole power consumption test process can implement internet information management, and substantially increase testing efficiency.

Description

A kind of mobile terminal power consumption method of testing and system
Technical field
The present invention relates to field of mobile terminals, more particularly to a kind of mobile terminal power consumption method of testing and system.
Background technology
In the prior art, 2G, 3G, 4G call power consumption and stand-by power consumption testing tool are only capable of unit and use, i.e., cannot track Tool version information and use state;Will sufficiently understand when being tested every time and guiding test condition(Call, it is standby, Frequency range, channel, power, voltage, time etc.)Configuration, so often causing test result to have differences because condition configures different Problem, engineer and test man are also required to consume the substantial amounts of time and debug repeatedly and test;And instrument version and mobile phone now Frequency range is more and more, so to mobile terminal power consumption requirement also more and more higher.
Therefore, prior art has yet to be improved and developed.
The content of the invention
In view of above-mentioned the deficiencies in the prior art, it is an object of the invention to provide a kind of mobile terminal power consumption method of testing and System, it is intended to the power consumption test method testing efficiency that solves prior art is low, test effect difference the problems such as.
Technical scheme is as follows:
A kind of mobile terminal power consumption method of testing, wherein, including step:
A, establishment Socket, and bundling port, set up Socket connections;
Power consumption test under B, the power consumption test carried out successively under each group 4G frequency ranges, each group 3G frequency ranges, the work(under each group 2G frequency ranges Consumption test;
C, according to test result export test report.
Described mobile terminal power consumption method of testing, wherein, also include after the step A, before step B:
Verification tool version information, if version correspondence, activates test program and closes Socket connections, then carries out initial Change.
Described mobile terminal power consumption method of testing, wherein, in the step B, the power consumption test under each group 4G frequency ranges Journey is specifically included:
B11, first group of 4G frequency range of initialization;
B12, restart mobile terminal, net is looked in queued for log-on;
B13, judge whether to succeed in registration, if then entering step B14;
B14, circulation 4G test conditions simultaneously record test value.
Described mobile terminal power consumption method of testing, wherein, in the step B, the power consumption test under each group 3G frequency ranges Journey is specifically included:
B21, first group of 3G frequency range of initialization;
B22, restart mobile terminal, net is looked in queued for log-on;
B23, judge whether to succeed in registration, if then entering step B24;
B24, circulation 3G test conditions simultaneously record test value.
Described mobile terminal power consumption method of testing, wherein, in the step B, the power consumption test under each group 2G frequency ranges Journey is specifically included:
B31, first group of 2G frequency range of initialization;
B32, restart mobile terminal, net is looked in queued for log-on;
B33, judge whether to succeed in registration, if then entering step B34;
B34, circulation 2G test conditions simultaneously record test value.
A kind of mobile terminal power consumption test system, wherein, including:
Link block, for creating Socket, and bundling port, sets up Socket connections;
Test module, for carrying out the power consumption test under each group 4G frequency ranges, power consumption test, each group 2G under each group 3G frequency ranges successively Power consumption test under frequency range;
Output module, for exporting test report according to test result.
Described mobile terminal power consumption test system, wherein, also include:
Verification module, for checking tool version information, if version correspondence, activates test program and closes Socket connections, Then initialized.
Described mobile terminal power consumption test system, wherein, the test module includes:
First initialization unit, for initializing first group of 4G frequency range;
First restarts unit, and for restarting mobile terminal, net is looked in queued for log-on;
First judging unit, for judging whether to succeed in registration, if then entering first circulation unit;
First circulation unit, for circulating 4G test conditions and recording test value.
Described mobile terminal power consumption test system, wherein, the test module includes:
Second initialization unit, for initializing first group of 3G frequency range;
Second restarts unit, and for restarting mobile terminal, net is looked in queued for log-on;
Second judging unit, for judging whether to succeed in registration, if then entering second circulation unit;
Second circulation unit, for circulating 3G test conditions and recording test value.
Described mobile terminal power consumption test system, wherein, the test module includes:
3rd initialization unit, for initializing first group of 2G frequency range;
3rd restarts unit, and for restarting mobile terminal, net is looked in queued for log-on;
3rd judging unit, for judging whether to succeed in registration, if then entering the 3rd cycling element;
3rd cycling element, for circulating 2G test conditions and recording test value.
Beneficial effect:Present invention accomplishes the demand of network user's automatic test power consumption, power consumption output report is finally ensured The uniformity of announcement so that whole power consumption test process can implement internet information management, and substantially increase testing efficiency.
Brief description of the drawings
Fig. 1 is a kind of flow chart of mobile terminal power consumption method of testing preferred embodiment of the invention.
Fig. 2 is a kind of structured flowchart of mobile terminal power consumption test system preferred embodiment of the invention.
Specific embodiment
The present invention provides a kind of mobile terminal power consumption method of testing and system, for make the purpose of the present invention, technical scheme and Effect is clearer, clear and definite, and the present invention is described in more detail below.It should be appreciated that specific embodiment described herein Only it is used to explain the present invention, is not intended to limit the present invention.
Fig. 1 is referred to, Fig. 1 is a kind of flow chart of mobile terminal power consumption method of testing preferred embodiment of the invention, such as schemed Shown, it includes step:
S1, establishment Socket, and bundling port, set up Socket connections;
Power consumption test under S2, the power consumption test carried out successively under each group 4G frequency ranges, each group 3G frequency ranges, the work(under each group 2G frequency ranges Consumption test;
S3, according to test result export test report.
First, in step sl, it refers to set up Socket communications for IPv4/IPv6 internet domain environment to create Socket, And specific use length fix, in order, reliable connection oriented message transmission information, message information as include version, Sever, LastConfig, gsm, 3GPPLimit ... wait message identification.
Bundling port is the server address of binding, the address service driver, version information, test Case, text Part template, test report ....
When setting up Socket connections, solicited message need to be sent, to receive service attachment request and building for Socket mappings Vertical connection, sends message version, Sever, LastConfig, gsm, 3GPPLimit ... and waits message identification.
Further, after the step S1, before step S2 also include:
Verification tool version information, if version correspondence, activates test program and closes Socket connections, then carries out initial Change.
Particularly directed to the message identification of version, Socket sends current version information and is checked with tool version information, Message version ID Corresponding matchings, that is, start instrument and close Socket, will otherwise return to server and sends request again.
Wherein, if ID correspondences, i.e. Socket sends message version ID, version ID titles identical with instrument version Be ID correspondences, if ID is not corresponded to, Socket sends message version ID, version ID title different from instrument version Not to be inconsistent.
In the case that activation closing refers to message version ID Corresponding matchings, that is, activate startup program and close Socket companies Connect.
Initialization refers to according to standardized test system configurations Agilent DC 663XX Series Precisions power supplys and R&S CMU200 the condition such as CMW500 integrated wireless communication tester GPIB communication protocols address, frequency range, channel, power, voltage and open It is dynamic.
Judge whether initialization succeeds, specifically according to standardized test system configurations Agilent DC 663XX series Precision voltage source and R&S CMU200 CMW500 integrated wireless communication testers, if instrument communication agreement and embedded option are equal Test system can be met and initialized successfully, you can perform 2G 3G 4G power consumption tests, otherwise terminated to return by task and build again Vertical Socket.
Further, in the step S2, the power consumption test process under each group 4G frequency ranges is specifically included:
S211, first group of 4G frequency range of initialization;
S212, restart mobile terminal, net is looked in queued for log-on;
S213, judge whether to succeed in registration, if then entering step S214;
S214, circulation 4G test conditions simultaneously record test value.
Step S2 first carries out 4G power consumption tests, i.e., power consumption of conversing LTE and stand-by power consumption enter under various environment Row test.
In step S211, first group of 4G frequency range of initialization refers to that 4G networks frequency range is set from first group such as:LTE BC1 = " 1 critical field starts test.
In step S212, restart mobile terminal, queued for log-on and look for net, refer to that 4G networks abnormal registration occur and look for net, surveying Call drop or other are met in examination to be needed to look for the situation of net again, and mobile terminal needs to look for automatically to net could complete automatic test; The function that current mobile terminal has instant power-down to restart, so after control power supply, voltage is dropped into 2.5V from 3.8V, in 0.1s Interior to recover voltage to 3.8V, mobile terminal can complete to restart and the action for looking for net automatically.
In step S213, whether 4G network registries successfully refer to that 4G networks abnormal registration occur and look for net, if restarted automatically Successfully i.e. circulation 4G test conditions are tested with net is looked for, and otherwise mobile terminal will again be depressured and restart queued for log-on and look for net.
In step S214, circulation 4G test conditions simultaneously record test value, for example recorded Excel report in, that is, Say, tested since first group of 4G frequency range, then set second group such as:The critical fields of LTE BC2=" 2 start test, with this Analogize circulation to perform 4G test conditions and record test value.
In addition, in test process, also detecting 4G frequency ranges, that is, refer to that 4G tests frequency range condition loop termination to LTE BC41= " 41, if 4G test frequency range condition loop terminations, that is, export (4G) test report, still there is frequency range to test and switch next group 4G frequency ranges, again circulation performs 4G test conditions and records test value.
Switch next group of 4G frequency range and refer to that the setting of 4G networks frequency range switches to next group from current group, for example from the 3rd group such as: The critical fields of LTE BC3=" 3 start test, and next group of 4G tests frequency range of switching is LTE BC4=" 4.
Further, in the step S2, the power consumption test process under each group 3G frequency ranges is specifically included:
S221, first group of 3G frequency range of initialization;
S222, restart mobile terminal, net is looked in queued for log-on;
S223, judge whether to succeed in registration, if then entering step S224;
S224, circulation 3G test conditions simultaneously record test value.
Step S2 carries out 3G power consumption tests again, i.e., to CDMA2000 WCDMA TD-SCDMA call power consumption and stand-by power consumption Tested under various environment.
In step S221, first group of 3G frequency range of initialization refers to that 3G network frequency range is set from first group such as:WCDMA BC1 = " 1 critical field starts test.
In step S222, restart mobile terminal, queued for log-on and look for net, refer to that 3G network abnormal registration occurs and looks for net, surveying Call drop or other are met in examination to be needed to look for the situation of net again, and mobile terminal needs to look for automatically to net could complete automatic test; The function that current mobile terminal has instant power-down to restart, so after control power supply, voltage is dropped into 2.5V from 3.8V, in 0.1s Interior to recover voltage to 3.8V, mobile terminal can complete to restart and the action for looking for net automatically.
In step S223,3G network is registered whether and successfully refer to that 3G network abnormal registration occurs and looks for net, if restarted automatically Successfully i.e. circulation 3G test conditions are tested with net is looked for, and otherwise mobile terminal will again be depressured and restart queued for log-on and look for net.
In step S224, circulation 3G test conditions simultaneously record test value, for example recorded Excel report in, that is, Say, tested since first group of 3G frequency range, then set second group such as:The critical fields of WCDMA BC1=" 2 start test, with this Analogize circulation to perform 3G test conditions and record test value.
In addition, in test process, also detecting 3G frequency ranges, that is, refer to that 3G tests frequency range condition loop termination to WCDMA BC8 =" 8, if 3G test frequency range condition loop terminations, that is, export (3G) test report, still there is frequency range to test and switch next group 3G frequency ranges, again circulation performs 3G test conditions and records test value.
Switch next group of 3G frequency range and refer to that the setting of 3G network frequency range switches to next group from current group, for example from the 3rd group such as: The critical fields of WCDMA BC3=" 3 start test, and next group of 3G tests frequency range of switching is WCDMA BC4=" 4.
Further, in the step S2, the power consumption test process under each group 2G frequency ranges is specifically included:
S231, first group of 2G frequency range of initialization;
S232, restart mobile terminal, net is looked in queued for log-on;
S233, judge whether to succeed in registration, if then entering step S234;
S234, circulation 2G test conditions simultaneously record test value.
Step S2 finally carries out 2G power consumption tests, i.e., to GSM TDMA CDMA call power consumptions and stand-by power consumption various each Tested in the environment of sample.
In step S211, first group of 2G frequency range of initialization refers to that 2G networks frequency range is set from first group such as:GSM850 = "1 Critical field starts test.
In step S212, restart mobile terminal, queued for log-on and look for net, refer to that 2G networks abnormal registration occur and look for net, surveying Call drop or other are met in examination to be needed to look for the situation of net again, and mobile terminal needs to look for automatically to net could complete automatic test; The function that current mobile terminal has instant power-down to restart, so after control power supply, voltage is dropped into 2.5V from 3.8V, in 0.1s Interior to recover voltage to 3.8V, mobile terminal can complete to restart and the action for looking for net automatically.
In step S213, whether 2G network registries successfully refer to that 2G networks abnormal registration occur and look for net, if restarted automatically Successfully i.e. circulation 2G test conditions are tested with net is looked for, and otherwise mobile terminal will again be depressured and restart queued for log-on and look for net.
In step S214, circulation 2G test conditions simultaneously record test value, for example recorded Excel report in, that is, Say, tested since first group of 2G frequency range, then set second group such as:The critical fields of GSM900=" 2 start test, with such Circulation is pushed away to perform 2G test conditions and record test value.
In addition, in test process, also detecting 2G frequency ranges, that is, refer to that 2G tests frequency range condition loop termination to GSM900=" 4, if 2G test frequency range condition loop terminations, that is, export (2G) test report, still there is frequency range to test and switch next group of 2G Frequency range, again circulation performs 2G test conditions and records test value.
Switch next group of 2G frequency range and refer to that the setting of 2G networks frequency range switches to next group from current group, for example from the 3rd group such as: The critical fields of GSM1800=" 3 start test, and next group of 2G tests frequency range of switching is GSM1900=" 4.
The test report for finally exporting is, according to the power under test condition, to record maximum, minimum value and average value, and Average value setting background color is distinguish between, is determined whether in connection status before each condition test and after test, if Test value is effective, can be made marks with " PASS " in report, is otherwise done with " INVALID " and indicated, i.e., this test value is invalid , it is then sent to Agent(Agency)Carry out reversion treatment.
Agency therein refers to transfer service processing system, for different application layer field format reversion treatment, E-vison The managing functional module such as it is served by being docked with server.
Reversion treatment refers to for form reversion is processed, due to LabWindows language, character, field, template ... and E- Vison web services are not corresponded, therefore need to perform form reversion treatment by acting on behalf of.
The present invention also provides a kind of mobile terminal power consumption test system preferred embodiment, as shown in Fig. 2 it includes:
Link block 100, for creating Socket, and bundling port, sets up Socket connections;
Test module 200, for carrying out the power consumption test under each group 4G frequency ranges, power consumption test under each group 3G frequency ranges, each successively Power consumption test under group 2G frequency ranges;
Output module 300, for exporting test report according to test result.
Further, system also includes:
Verification module, for checking tool version information, if version correspondence, activates test program and closes Socket connections, Then initialized.
Further, the test module 200 includes:
First initialization unit, for initializing first group of 4G frequency range;
First restarts unit, and for restarting mobile terminal, net is looked in queued for log-on;
First judging unit, for judging whether to succeed in registration, if then entering first circulation unit;
First circulation unit, for circulating 4G test conditions and recording test value.
Further, the test module 200 includes:
Second initialization unit, for initializing first group of 3G frequency range;
Second restarts unit, and for restarting mobile terminal, net is looked in queued for log-on;
Second judging unit, for judging whether to succeed in registration, if then entering second circulation unit;
Second circulation unit, for circulating 3G test conditions and recording test value.
Further, the test module 200 includes:
3rd initialization unit, for initializing first group of 2G frequency range;
3rd restarts unit, and for restarting mobile terminal, net is looked in queued for log-on;
3rd judging unit, for judging whether to succeed in registration, if then entering the 3rd cycling element;
3rd cycling element, for circulating 2G test conditions and recording test value.
Ins and outs on above-mentioned modular unit have been described in detail in method above, therefore repeat no more.
One of ordinary skill in the art will appreciate that all or part of flow in above-described embodiment method, can be by Computer program is completed come the hardware for instructing correlation, and described computer program can be stored in a computer read/write memory medium In, program is upon execution, it may include the flow of the embodiment of above-mentioned each method.Storage medium therein can for magnetic disc, CD, Read-only memory(ROM)Or random access memory(RAM)Deng.
In sum, present invention accomplishes the demand of network user's automatic test power consumption, power consumption output report is finally ensured The uniformity of announcement so that whole power consumption test process can implement internet information management, and substantially increase testing efficiency.
It should be appreciated that application of the invention is not limited to above-mentioned citing, and for those of ordinary skills, can To be improved according to the above description or converted, all these modifications and variations should all belong to the guarantor of appended claims of the present invention Shield scope.

Claims (10)

1. a kind of mobile terminal power consumption method of testing, it is characterised in that including step:
A, establishment Socket, and bundling port, set up Socket connections;
Power consumption test under B, the power consumption test carried out successively under each group 4G frequency ranges, each group 3G frequency ranges, the work(under each group 2G frequency ranges Consumption test;
C, according to test result export test report.
2. mobile terminal power consumption method of testing according to claim 1, it is characterised in that after the step A, step B Also include before:
Verification tool version information, if version correspondence, activates test program and closes Socket connections, then carries out initial Change.
3. mobile terminal power consumption method of testing according to claim 1, it is characterised in that in the step B, each group 4G is frequently Power consumption test process under section is specifically included:
B11, first group of 4G frequency range of initialization;
B12, restart mobile terminal, net is looked in queued for log-on;
B13, judge whether to succeed in registration, if then entering step B14;
B14, circulation 4G test conditions simultaneously record test value.
4. mobile terminal power consumption method of testing according to claim 1, it is characterised in that in the step B, each group 3G is frequently Power consumption test process under section is specifically included:
B21, first group of 3G frequency range of initialization;
B22, restart mobile terminal, net is looked in queued for log-on;
B23, judge whether to succeed in registration, if then entering step B24;
B24, circulation 3G test conditions simultaneously record test value.
5. mobile terminal power consumption method of testing according to claim 1, it is characterised in that in the step B, each group 2G is frequently Power consumption test process under section is specifically included:
B31, first group of 2G frequency range of initialization;
B32, restart mobile terminal, net is looked in queued for log-on;
B33, judge whether to succeed in registration, if then entering step B34;
B34, circulation 2G test conditions simultaneously record test value.
6. a kind of mobile terminal power consumption test system, it is characterised in that including:
Link block, for creating Socket, and bundling port, sets up Socket connections;
Test module, for carrying out the power consumption test under each group 4G frequency ranges, power consumption test, each group 2G under each group 3G frequency ranges successively Power consumption test under frequency range;
Output module, for exporting test report according to test result.
7. mobile terminal power consumption test system according to claim 6, it is characterised in that also include:
Verification module, for checking tool version information, if version correspondence, activates test program and closes Socket connections, Then initialized.
8. mobile terminal power consumption test system according to claim 6, it is characterised in that the test module includes:
First initialization unit, for initializing first group of 4G frequency range;
First restarts unit, and for restarting mobile terminal, net is looked in queued for log-on;
First judging unit, for judging whether to succeed in registration, if then entering first circulation unit;
First circulation unit, for circulating 4G test conditions and recording test value.
9. mobile terminal power consumption test system according to claim 6, it is characterised in that the test module includes:
Second initialization unit, for initializing first group of 3G frequency range;
Second restarts unit, and for restarting mobile terminal, net is looked in queued for log-on;
Second judging unit, for judging whether to succeed in registration, if then entering second circulation unit;
Second circulation unit, for circulating 3G test conditions and recording test value.
10. mobile terminal power consumption test system according to claim 6, it is characterised in that the test module includes:
3rd initialization unit, for initializing first group of 2G frequency range;
3rd restarts unit, and for restarting mobile terminal, net is looked in queued for log-on;
3rd judging unit, for judging whether to succeed in registration, if then entering the 3rd cycling element;
3rd cycling element, for circulating 2G test conditions and recording test value.
CN201710097070.7A 2017-02-22 2017-02-22 Mobile terminal power consumption testing method and system Active CN106790902B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710097070.7A CN106790902B (en) 2017-02-22 2017-02-22 Mobile terminal power consumption testing method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710097070.7A CN106790902B (en) 2017-02-22 2017-02-22 Mobile terminal power consumption testing method and system

Publications (2)

Publication Number Publication Date
CN106790902A true CN106790902A (en) 2017-05-31
CN106790902B CN106790902B (en) 2021-03-23

Family

ID=58958515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710097070.7A Active CN106790902B (en) 2017-02-22 2017-02-22 Mobile terminal power consumption testing method and system

Country Status (1)

Country Link
CN (1) CN106790902B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108235357A (en) * 2018-01-02 2018-06-29 深圳市闻耀电子科技有限公司 Mobile telephone power consumption test method and relevant apparatus
CN111741154A (en) * 2020-07-15 2020-10-02 武汉博畅通信设备有限责任公司 Mobile phone radio frequency index testing system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012097651A1 (en) * 2011-01-21 2012-07-26 珠海世纪鼎利通信科技股份有限公司 Automatic drive test system in a mobile communications network
CN102917095A (en) * 2012-10-10 2013-02-06 青岛海信移动通信技术股份有限公司 Method and device for testing terminal based on Android
CN103746840A (en) * 2013-12-30 2014-04-23 迈普通信技术股份有限公司 Method and system for automatic checking of software version information of network equipment
CN103870384A (en) * 2012-12-11 2014-06-18 航天信息股份有限公司 Test case presumption method and system
CN104679631A (en) * 2015-03-23 2015-06-03 重庆蓝岸通讯技术有限公司 Testing method and system for equipment based on Android system
CN105376379A (en) * 2015-11-26 2016-03-02 惠州Tcl移动通信有限公司 Method and system for realizing automated testing of call power consumption and stand-by power consumption

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012097651A1 (en) * 2011-01-21 2012-07-26 珠海世纪鼎利通信科技股份有限公司 Automatic drive test system in a mobile communications network
CN102917095A (en) * 2012-10-10 2013-02-06 青岛海信移动通信技术股份有限公司 Method and device for testing terminal based on Android
CN103870384A (en) * 2012-12-11 2014-06-18 航天信息股份有限公司 Test case presumption method and system
CN103746840A (en) * 2013-12-30 2014-04-23 迈普通信技术股份有限公司 Method and system for automatic checking of software version information of network equipment
CN104679631A (en) * 2015-03-23 2015-06-03 重庆蓝岸通讯技术有限公司 Testing method and system for equipment based on Android system
CN105376379A (en) * 2015-11-26 2016-03-02 惠州Tcl移动通信有限公司 Method and system for realizing automated testing of call power consumption and stand-by power consumption

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108235357A (en) * 2018-01-02 2018-06-29 深圳市闻耀电子科技有限公司 Mobile telephone power consumption test method and relevant apparatus
CN111741154A (en) * 2020-07-15 2020-10-02 武汉博畅通信设备有限责任公司 Mobile phone radio frequency index testing system

Also Published As

Publication number Publication date
CN106790902B (en) 2021-03-23

Similar Documents

Publication Publication Date Title
CN104955045B (en) A kind of connection control method, device, terminal and system
CN102609356B (en) Terminal product driver loading stability testing method
CN111711494B (en) Automatic test method, system, equipment and medium for wireless communication module current consumption
CN104581785A (en) Wireless network testing method, testing device and mobile terminal
CN110784879A (en) Network mode switching test method, system, equipment and medium of communication module
CN106790902A (en) A kind of mobile terminal power consumption method of testing and system
CN110659021B (en) Development and test system for micro application in mobile terminal
CN106708688B (en) Module test method and terminal
CN106792818A (en) Data network changing method, device and terminal device based on network speed
CN109815076A (en) A kind of network interface card boot option detection method, system, terminal and storage medium
CN107608887A (en) A kind of method for creating virtual opetrating system test server
WO2020007250A1 (en) Pseudo base station identification on-off control method and device, mobile terminal, and storage medium
US20080027669A1 (en) Radio Device Testing System
AU2005291686B2 (en) Method for providing device IDs in a mobile radio device which identify said mobile radio device in a mobile radio network
CN114244703B (en) Bare metal server checking and deploying method, device, equipment and medium
CN113613239B (en) Network mode switching method, network mode switching device, medium, and electronic device
CN111541589B (en) Method, device and equipment for testing expansion module interface of intelligent terminal
CN108235760A (en) Power consumption antihunt means, its device and the electronic equipment of intelligent terminal
CN113993149A (en) Processing method and device of communication diagnosis log and readable storage medium
CN113178225A (en) Router Flash stability automatic test method, device and test terminal
CN104427529B (en) A kind of information processing method and terminal
CN107634851B (en) Method for dynamically configuring server by mobile terminal
CN116893978B (en) Test plan generation method, system and storage medium based on PTCRB authentication
WO2023169097A1 (en) 5g message terminal identification method, service platform and storage medium
CN111901185B (en) Account number management method and device for VoIP phone automatic test system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant