CN106790414A - City equipment management and maintenance method and system based on big data - Google Patents

City equipment management and maintenance method and system based on big data Download PDF

Info

Publication number
CN106790414A
CN106790414A CN201611089105.4A CN201611089105A CN106790414A CN 106790414 A CN106790414 A CN 106790414A CN 201611089105 A CN201611089105 A CN 201611089105A CN 106790414 A CN106790414 A CN 106790414A
Authority
CN
China
Prior art keywords
information
city equipment
alternative
city
maintenance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611089105.4A
Other languages
Chinese (zh)
Inventor
彭永光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Great Idea Touchplus Information Corp
Original Assignee
Wuhan Great Idea Touchplus Information Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Great Idea Touchplus Information Corp filed Critical Wuhan Great Idea Touchplus Information Corp
Priority to CN201611089105.4A priority Critical patent/CN106790414A/en
Publication of CN106790414A publication Critical patent/CN106790414A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/50Network services
    • H04L67/51Discovery or management thereof, e.g. service location protocol [SLP] or web services
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/50Network services
    • H04L67/56Provisioning of proxy services

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Health & Medical Sciences (AREA)
  • Computing Systems (AREA)
  • Computer Graphics (AREA)
  • Geometry (AREA)
  • Software Systems (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Navigation (AREA)
  • Instructional Devices (AREA)

Abstract

A kind of city equipment management and maintenance method based on big data, range information and traffic flow information according to each alternative personnel to the city equipment generate each alternative personal information to the estimated used time temporal information of the city equipment;Each alternative personnel's current task state is obtained, when task status is assigned, current task finishing time information is generated, and estimated used time temporal information is modified according to task completion time information, obtain final time used time;Most short alternative personnel of final time used time are safeguarded the object for performing and safeguarding as the city equipment, and short alternative personnel of final time used time second are safeguarded the alternative objects for performing and safeguarding as the city equipment;The alternative objects that the object and execution maintenance for performing maintenance is generated by third party's map application platform each reach the navigation information of the city equipment, and navigation information are sent on the respective mobile terminal of alternative objects for performing the object and execution maintenance safeguarded.

Description

City equipment management and maintenance method and system based on big data
Technical field
The present invention relates to urban digital technical field, more particularly to a kind of city equipment management service based on big data Method and system.
Background technology
Expand with the development of the city, more and more various city equipments are applied to townie every aspect.
As the continuous expansion of city size, each city equipment can be safeguarded in time, resident can be directly influenced Experience.And because city commuting time cost is improved so that city equipment often cannot on the whole be maintained personnel's money The rational allocation in source.
The content of the invention
In view of this, the present invention proposes a kind of city equipment management and maintenance method and system based on big data.
A kind of city equipment management and maintenance method based on big data, it comprises the following steps:
S1, from third party's map application platform obtain city in each city equipment coordinate value;And city equipment Present environmental information;
S2, the beyond the clouds model of each city equipment of server storage, usage cycles, manufacturer's information, recommended information, maintenance Notice information and three-dimensional panoramic model;
Each city equipment corresponding attendant's information bank is set in S3, beyond the clouds server, and by city equipment Failure is divided into different grades, the different attendant of different grade correspondences;
S4, the regular state image information for obtaining city equipment in different angles, and state image information is sent to cloud End server;Jump to step S5;
S5, cloud server are matched state image information with the three-dimensional panoramic model in cloud server, After success, continuation judges the fault level of the city equipment;And jump to step S6;
S6, according to determine fault level alternative personnel's matching is carried out from attendant's information bank of cloud server; After the match is successful, acquisition for mobile terminal personnel positioning information is held according to alternative personnel, jump to step S7;
S7, the location information of alternative personnel is projected on third party's map application platform, obtain each alternative personnel and arrive The range information and traffic flow information of the city equipment;Jump to step S8;
S8, to generate each according to the range information and traffic flow information of each alternative personnel to the city equipment alternative Estimated used time temporal information of the personal information to the city equipment;Jump to step S9;
S9, each alternative personnel's current task state is obtained, when task status is assigned, when generation current task is completed Between information, and estimated used time temporal information is modified according to task completion time information, obtain final time used time;Redirect To step S10;
S10, the object that most short alternative personnel of final time used time are safeguarded execution maintenance as the city equipment, and will Short alternative personnel of final time used time second safeguard the alternative objects for performing and safeguarding as the city equipment, jump to step S11;
S11, the alternative objects that the object for performing maintenance is generated by third party's map application platform and maintenance is performed are each From the navigation information for reaching the city equipment, and navigation information is sent to the object for performing maintenance and the alternative of maintenance is performed On the respective mobile terminal of object;Jump to step S12;
S12, after maintenance terminates, will perform safeguard other side confirm maintenance feedback information be sent to cloud server; Jump to step S13;
S13, cloud server by the maintenance record of the city equipment, maintenance time, attendant's information Store beyond the clouds On server.
In the city equipment management and maintenance method based on big data of the present invention, S9, each alternative personnel is obtained Current task state, when task status is assigned, generates current task finishing time information, and believe according to task completion time Breath is modified to estimated used time temporal information, obtains final time used time and includes;
S91, each alternative personnel's current task state is obtained, when task status is assigned, generation current task is completed Temporal information;
S92, by the historical data of third party's map application platform to the traffic flow information after the completion of current task;
S93, estimated used time temporal information is modified according to traffic flow information and task completion time information, obtained To final time used time.
In the city equipment management and maintenance method based on big data of the present invention, root is also included in the step S4 It is adjusted in the cycle of the state image information of different angles to obtaining city equipment according to the maintenance times of city equipment.
The present invention also provides a kind of city equipment management service system based on big data, and it is included such as lower unit:
Coordinate nvironment information acquisition unit, for obtaining each city equipment in city from third party's map application platform Coordinate value;And the environmental information at city equipment;
City equipment information configuration unit, for the model of each city equipment of server storage beyond the clouds, usage cycles, Manufacturer's information, recommended information, maintenance notice information and three-dimensional panoramic model;
Information bank dispensing unit, for setting the corresponding attendant's information of each city equipment in server beyond the clouds Storehouse, and the failure of city equipment is divided into different grades, the different attendant of different grade correspondences;
Image information acquisition unit, for periodically obtaining state image information of the city equipment in different angles, and by shape State image information is sent to cloud server;
Fault level judging unit, for by cloud server by the three-dimensional in state image information and cloud server Panorama model is matched, and after the match is successful, continuation judges the fault level of the city equipment;
Alternative personnel's matching unit, for according to the fault level for determining from attendant's information bank of cloud server Carry out alternative personnel's matching;After the match is successful, acquisition for mobile terminal personnel positioning information is held according to alternative personnel;
Apart from flow information acquiring unit, for the location information of alternative personnel to be projected into third party's map application platform On, obtain each alternative personnel to the range information and traffic flow information of the city equipment;
Estimated used time information determination unit, for range information and friendship according to each alternative personnel to the city equipment Through-current capacity information generates each alternative personal information to the estimated used time temporal information of the city equipment;
Final used time determining unit, for obtaining each alternative personnel's current task state, when task status is assigned, Generation current task finishing time information, and estimated used time temporal information is modified according to task completion time information, obtain To final time used time;
Alternative objects determining unit is performed, for most short alternative personnel of final time used time to be tieed up as the city equipment Shield performs the object safeguarded, and short alternative personnel of final time used time second are safeguarded into what execution was safeguarded as the city equipment Alternative objects;
Navigation information generate transmitting element, for by third party's map application platform generate perform safeguard object and The navigation information that the alternative objects safeguarded each reach the city equipment is performed, and navigation information is sent to the right of execution maintenance As and perform safeguard the respective mobile terminal of alternative objects on;
Information feedback unit, sends for after maintenance terminates, will perform the maintenance feedback information that the other side for safeguarding confirms To cloud server;
Repair message memory cell, for by cloud server by maintenance record, maintenance time, the dimension of the city equipment The storage of shield personal information is beyond the clouds on server.
In the city equipment management service system based on big data of the present invention, obtained in final used time determining unit Each alternative personnel's current task state is taken, when task status is assigned, generation current task finishing time information, and according to Task completion time information is modified to estimated used time temporal information, obtains final time used time and includes;
Each alternative personnel's current task state is obtained, when task status is assigned, the current task deadline is generated Information;
By the historical data of third party's map application platform to the traffic flow information after the completion of current task;
Estimated used time temporal information is modified according to traffic flow information and task completion time information, is obtained most Whole time used time.
In the city equipment management service system based on big data of the present invention, described image information acquisition unit In also include being entered in the cycle of the state image information of different angles to obtaining city equipment according to the maintenance times of city equipment Row adjustment.
Implement city equipment management and maintenance method based on big data that the present invention provides and system compared with prior art Have the advantages that:Can be given birth to according to the range information and traffic flow information of each alternative personnel to the city equipment Into each alternative personal information to the estimated used time temporal information of the city equipment;Obtain each alternative personnel's current task shape State, when task status is assigned, generates current task finishing time information, and according to task completion time information to estimated use When temporal information be modified, obtain final time used time;Most short alternative personnel of final time used time are set as the city It is standby to safeguard the object for performing and safeguarding, and short alternative personnel of final time used time second are performed into dimension as city equipment maintenance The alternative objects of shield;The alternative objects for performing the object safeguarded and performing maintenance are generated by third party's map application platform each From the navigation information for reaching the city equipment, and navigation information is sent to the object for performing maintenance and the alternative of maintenance is performed On the respective mobile terminal of object;After maintenance terminates, the maintenance feedback information that will perform the other side's confirmation safeguarded is sent to cloud End server;Cloud server services the maintenance record of the city equipment, maintenance time, attendant's information Store beyond the clouds On device.Realize the rational allocation to attendant's resource.
Brief description of the drawings
Fig. 1 is the city equipment management service system architecture diagram based on big data of the embodiment of the present invention.
Specific embodiment
As shown in figure 1, a kind of city equipment management and maintenance method based on big data of the embodiment of the present invention, it includes as follows Step:
S1, from third party's map application platform obtain city in each city equipment coordinate value;And city equipment Present environmental information;
S2, the beyond the clouds model of each city equipment of server storage, usage cycles, manufacturer's information, recommended information, maintenance Notice information and three-dimensional panoramic model;
Each city equipment corresponding attendant's information bank is set in S3, beyond the clouds server, and by city equipment Failure is divided into different grades, the different attendant of different grade correspondences;
S4, the regular state image information for obtaining city equipment in different angles, and state image information is sent to cloud End server;Jump to step S5;
S5, cloud server are matched state image information with the three-dimensional panoramic model in cloud server, After success, continuation judges the fault level of the city equipment;And jump to step S6;
S6, according to determine fault level alternative personnel's matching is carried out from attendant's information bank of cloud server; After the match is successful, acquisition for mobile terminal personnel positioning information is held according to alternative personnel, jump to step S7;
S7, the location information of alternative personnel is projected on third party's map application platform, obtain each alternative personnel and arrive The range information and traffic flow information of the city equipment;Jump to step S8;
S8, to generate each according to the range information and traffic flow information of each alternative personnel to the city equipment alternative Estimated used time temporal information of the personal information to the city equipment;Jump to step S9;
S9, each alternative personnel's current task state is obtained, when task status is assigned, when generation current task is completed Between information, and estimated used time temporal information is modified according to task completion time information, obtain final time used time;Redirect To step S10;
S10, the object that most short alternative personnel of final time used time are safeguarded execution maintenance as the city equipment, and will Short alternative personnel of final time used time second safeguard the alternative objects for performing and safeguarding as the city equipment, jump to step S11;
S11, the alternative objects that the object for performing maintenance is generated by third party's map application platform and maintenance is performed are each From the navigation information for reaching the city equipment, and navigation information is sent to the object for performing maintenance and the alternative of maintenance is performed On the respective mobile terminal of object;Jump to step S12;
S12, after maintenance terminates, will perform safeguard other side confirm maintenance feedback information be sent to cloud server; Jump to step S13;
S13, cloud server by the maintenance record of the city equipment, maintenance time, attendant's information Store beyond the clouds On server.
In the city equipment management and maintenance method based on big data of the present invention, S9, each alternative personnel is obtained Current task state, when task status is assigned, generates current task finishing time information, and believe according to task completion time Breath is modified to estimated used time temporal information, obtains final time used time and includes;
S91, each alternative personnel's current task state is obtained, when task status is assigned, generation current task is completed Temporal information;
S92, by the historical data of third party's map application platform to the traffic flow information after the completion of current task;
S93, estimated used time temporal information is modified according to traffic flow information and task completion time information, obtained To final time used time.
In the city equipment management and maintenance method based on big data of the present invention, root is also included in the step S4 It is adjusted in the cycle of the state image information of different angles to obtaining city equipment according to the maintenance times of city equipment.
The present invention also provides a kind of city equipment management service system based on big data, and it is included such as lower unit:
Coordinate nvironment information acquisition unit 1, sets for obtaining each city in city from third party's map application platform Standby coordinate value;And the environmental information at city equipment;
City equipment information configuration unit 2, for the model of each city equipment of server storage beyond the clouds, uses week Phase, manufacturer's information, recommended information, maintenance notice information and three-dimensional panoramic model;
Information bank dispensing unit 3, for setting the corresponding attendant's information of each city equipment in server beyond the clouds Storehouse, and the failure of city equipment is divided into different grades, the different attendant of different grade correspondences;
Image information acquisition unit 4, for periodically obtaining state image information of the city equipment in different angles, and by shape State image information is sent to cloud server;
Fault level judging unit 5, for by cloud server by three in state image information and cloud server Dimension panorama model is matched, and after the match is successful, continuation judges the fault level of the city equipment;
Alternative personnel's matching unit 6, for according to the fault level for determining from attendant's information bank of cloud server In carry out alternative personnel's matching;After the match is successful, acquisition for mobile terminal personnel positioning information is held according to alternative personnel;
Apart from flow information acquiring unit 7, put down for the location information of alternative personnel to be projected into third party's map application On platform, each alternative personnel to the range information and traffic flow information of the city equipment are obtained;
Estimated used time information determination unit 8, for the range information according to each alternative personnel to the city equipment and Traffic flow information generates each alternative personal information to the estimated used time temporal information of the city equipment;
Final used time determining unit 9, for obtaining each alternative personnel's current task state, is being assigned task status When, current task finishing time information is generated, and estimated used time temporal information is modified according to task completion time information, Obtain final time used time;
Alternative objects determining unit 10 is performed, for using most short alternative personnel of final time used time as the city equipment The object for performing and safeguarding is safeguarded, and short alternative personnel of final time used time second are performed into maintenance as city equipment maintenance Alternative objects;
Navigation information generate transmitting element 11, for by third party's map application platform generate perform safeguard object with And the navigation information that the alternative objects safeguarded each reach the city equipment is performed, and navigation information is sent to what execution was safeguarded On the respective mobile terminal of alternative objects that object and execution are safeguarded;
Information feedback unit 12, for the maintenance feedback information hair that the other side for safeguarding confirms after maintenance terminates, will to be performed It is sent to cloud server;
Repair message memory cell 13, for by cloud server by the maintenance record of the city equipment, maintenance time, Attendant's information Store is beyond the clouds on server.
In the city equipment management service system based on big data of the present invention, in final used time determining unit 9 Each alternative personnel's current task state is obtained, when task status is assigned, current task finishing time information, and root is generated Estimated used time temporal information is modified according to task completion time information, obtaining final time used time includes;
Each alternative personnel's current task state is obtained, when task status is assigned, the current task deadline is generated Information;
By the historical data of third party's map application platform to the traffic flow information after the completion of current task;
Estimated used time temporal information is modified according to traffic flow information and task completion time information, is obtained most Whole time used time.
In the city equipment management service system based on big data of the present invention, described image information acquisition unit Also include being entered in the cycle of the state image information of different angles to obtaining city equipment according to the maintenance times of city equipment in 4 Row adjustment.
Implement city equipment management and maintenance method based on big data that the present invention provides and system compared with prior art Have the advantages that:Can be given birth to according to the range information and traffic flow information of each alternative personnel to the city equipment Into each alternative personal information to the estimated used time temporal information of the city equipment;Obtain each alternative personnel's current task shape State, when task status is assigned, generates current task finishing time information, and according to task completion time information to estimated use When temporal information be modified, obtain final time used time;Most short alternative personnel of final time used time are set as the city It is standby to safeguard the object for performing and safeguarding, and short alternative personnel of final time used time second are performed into dimension as city equipment maintenance The alternative objects of shield;The alternative objects for performing the object safeguarded and performing maintenance are generated by third party's map application platform each From the navigation information for reaching the city equipment, and navigation information is sent to the object for performing maintenance and the alternative of maintenance is performed On the respective mobile terminal of object;After maintenance terminates, the maintenance feedback information that will perform the other side's confirmation safeguarded is sent to cloud End server;Cloud server services the maintenance record of the city equipment, maintenance time, attendant's information Store beyond the clouds On device.Realize the rational allocation to attendant's resource.
The step of method or algorithm for being described with reference to the embodiments described herein, directly can be held with hardware, processor Capable software module, or the two combination is implemented.Software module can be placed in random access memory, internal memory, read-only storage, Institute is public in electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technical field In the storage medium of any other forms known.
It is understood that for the person of ordinary skill of the art, can be done with technology according to the present invention design Go out other various corresponding changes and deformation, and all these changes and deformation should all belong to the protection model of the claims in the present invention Enclose.

Claims (6)

1. a kind of city equipment management and maintenance method based on big data, it comprises the following steps:
S1, from third party's map application platform obtain city in each city equipment coordinate value;And residing for city equipment In environmental information;
S2, the beyond the clouds model of each city equipment of server storage, usage cycles, manufacturer's information, recommended information, maintenance notice Information and three-dimensional panoramic model;
Each city equipment corresponding attendant's information bank is set in S3, beyond the clouds server, and by the failure of city equipment It is divided into different grades, the different attendant of different grade correspondences;
S4, the regular state image information for obtaining city equipment in different angles, and state image information is sent to high in the clouds clothes Business device;Jump to step S5;
S5, cloud server are matched state image information with the three-dimensional panoramic model in cloud server, are being matched into After work(, continuation judges the fault level of the city equipment;And jump to step S6;
S6, according to determine fault level alternative personnel's matching is carried out from attendant's information bank of cloud server; After with success, acquisition for mobile terminal personnel positioning information is held according to alternative personnel, jump to step S7;
S7, the location information of alternative personnel is projected on third party's map application platform, obtain each alternative personnel to the city The range information and traffic flow information of city's equipment;Jump to step S8;
S8, each alternative personnel is generated according to the range information and traffic flow information of each alternative personnel to the city equipment Estimated used time temporal information of the information to the city equipment;Jump to step S9;
S9, each alternative personnel's current task state is obtained, when task status is assigned, generation current task deadline letter Breath, and estimated used time temporal information is modified according to task completion time information, obtain final time used time;Jump to step Rapid S10;
S10, the object that most short alternative personnel of final time used time are safeguarded execution maintenance as the city equipment, and will be final The short alternative personnel of time used time second safeguard the alternative objects for performing and safeguarding as the city equipment, jump to step S11;
S11, the alternative objects that the object for performing maintenance is generated by third party's map application platform and maintenance is performed each are arrived Up to the navigation information of the city equipment, and navigation information is sent to the alternative objects for performing the object safeguarded and performing maintenance On respective mobile terminal;Jump to step S12;
S12, after maintenance terminates, will perform safeguard other side confirm maintenance feedback information be sent to cloud server;Redirect To step S13;
S13, cloud server service the maintenance record of the city equipment, maintenance time, attendant's information Store beyond the clouds On device.
2. the city equipment management and maintenance method of big data is based on as claimed in claim 1, it is characterised in that S9, acquisition are each Individual alternative personnel's current task state, when task status is assigned, generates current task finishing time information, and according to task Finishing time information is modified to estimated used time temporal information, obtains final time used time and includes;
S91, each alternative personnel's current task state is obtained, when task status is assigned, generate the current task deadline Information;
S92, by the historical data of third party's map application platform to the traffic flow information after the completion of current task;
S93, estimated used time temporal information is modified according to traffic flow information and task completion time information, obtained most Whole time used time.
3. the city equipment management and maintenance method of big data is based on as claimed in claim 2, it is characterised in that the step S4 In also include being entered in the cycle of the state image information of different angles to obtaining city equipment according to the maintenance times of city equipment Row adjustment.
4. a kind of city equipment management service system based on big data, it is included such as lower unit:
Coordinate nvironment information acquisition unit, the seat for obtaining each city equipment in city from third party's map application platform Scale value;And the environmental information at city equipment;
City equipment information configuration unit, for the model of each city equipment of server storage, usage cycles, manufacturer beyond the clouds Information, recommended information, maintenance notice information and three-dimensional panoramic model;
Information bank dispensing unit, for setting the corresponding attendant's information bank of each city equipment in server beyond the clouds, and The failure of city equipment is divided into different grades, the different attendant of different grade correspondences;
Image information acquisition unit, for periodically obtaining state image information of the city equipment in different angles, and by state diagram As information is sent to cloud server;
Fault level judging unit, for by cloud server by the three-dimensional panorama in state image information and cloud server Model is matched, and after the match is successful, continuation judges the fault level of the city equipment;
Alternative personnel's matching unit, for being carried out from attendant's information bank of cloud server according to the fault level for determining Alternative personnel's matching;After the match is successful, acquisition for mobile terminal personnel positioning information is held according to alternative personnel;
Apart from flow information acquiring unit, for the location information of alternative personnel to be projected into third party's map application platform, Obtain each alternative personnel to the range information and traffic flow information of the city equipment;
Estimated used time information determination unit, for range information and traffic flow according to each alternative personnel to the city equipment Amount information generates each alternative personal information to the estimated used time temporal information of the city equipment;
Final used time determining unit, for obtaining each alternative personnel's current task state, when task status is assigned, generation Current task finishing time information, and estimated used time temporal information is modified according to task completion time information, obtain most Whole time used time;
Alternative objects determining unit is performed, is held for most short alternative personnel of final time used time to be safeguarded as the city equipment The object that row is safeguarded, and it is alternative that short alternative personnel of final time used time second are safeguarded into execution is safeguarded as the city equipment Object;
Navigation information generates transmitting element, and the object and execution safeguarded are performed for being generated by third party's map application platform The alternative objects of maintenance each reach the navigation information of the city equipment, and navigation information is sent to perform the object safeguarded with And perform on the respective mobile terminal of alternative objects safeguarded;
Information feedback unit, cloud is sent to for after maintenance terminates, will perform the maintenance feedback information that the other side for safeguarding confirms End server;
Repair message memory cell, for by cloud server by the maintenance record of the city equipment, maintenance time, safeguard people Member's information Store is beyond the clouds on server.
5. the city equipment management service system of big data is based on as claimed in claim 4, it is characterised in that the final used time is true Each alternative personnel's current task state is obtained in order unit, when task status is assigned, the current task deadline is generated Information, and being modified to estimated used time temporal information according to task completion time information, obtaining final time used time includes;
Each alternative personnel's current task state is obtained, when task status is assigned, current task finishing time information is generated;
By the historical data of third party's map application platform to the traffic flow information after the completion of current task;
Estimated used time temporal information is modified according to traffic flow information and task completion time information, is finally used When the time.
6. the city equipment management service system of big data is based on as claimed in claim 5, it is characterised in that described image is believed Also include being believed in the status image of different angles obtaining city equipment according to the maintenance times of city equipment in breath acquiring unit The cycle of breath is adjusted.
CN201611089105.4A 2016-12-01 2016-12-01 City equipment management and maintenance method and system based on big data Pending CN106790414A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611089105.4A CN106790414A (en) 2016-12-01 2016-12-01 City equipment management and maintenance method and system based on big data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611089105.4A CN106790414A (en) 2016-12-01 2016-12-01 City equipment management and maintenance method and system based on big data

Publications (1)

Publication Number Publication Date
CN106790414A true CN106790414A (en) 2017-05-31

Family

ID=58914147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611089105.4A Pending CN106790414A (en) 2016-12-01 2016-12-01 City equipment management and maintenance method and system based on big data

Country Status (1)

Country Link
CN (1) CN106790414A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112767192A (en) * 2021-01-11 2021-05-07 广州图胜电力工程有限公司 Intelligent maintenance method for power equipment
CN114062843A (en) * 2021-11-11 2022-02-18 广东卓维网络有限公司 Power utilization fault inspection method and system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5642284A (en) * 1994-08-12 1997-06-24 Caterpillar Inc. Maintenance monitor system
CN102708699A (en) * 2012-04-28 2012-10-03 中国计量学院 WebGIS (Web Geographic Information System)-based traffic light fault supervision system
CN102725769A (en) * 2009-11-09 2012-10-10 通力股份公司 Location-based mobile workforce management system
US20140372737A1 (en) * 2013-06-17 2014-12-18 Hon Hai Precision Industry Co., Ltd. Electronic device and method for automatically waking up operating system of electronic device
CN106096738A (en) * 2016-05-31 2016-11-09 广东电网有限责任公司中山供电局 One reports processing method and system for repairment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5642284A (en) * 1994-08-12 1997-06-24 Caterpillar Inc. Maintenance monitor system
CN102725769A (en) * 2009-11-09 2012-10-10 通力股份公司 Location-based mobile workforce management system
CN102708699A (en) * 2012-04-28 2012-10-03 中国计量学院 WebGIS (Web Geographic Information System)-based traffic light fault supervision system
US20140372737A1 (en) * 2013-06-17 2014-12-18 Hon Hai Precision Industry Co., Ltd. Electronic device and method for automatically waking up operating system of electronic device
CN106096738A (en) * 2016-05-31 2016-11-09 广东电网有限责任公司中山供电局 One reports processing method and system for repairment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112767192A (en) * 2021-01-11 2021-05-07 广州图胜电力工程有限公司 Intelligent maintenance method for power equipment
CN114062843A (en) * 2021-11-11 2022-02-18 广东卓维网络有限公司 Power utilization fault inspection method and system

Similar Documents

Publication Publication Date Title
JP6745818B2 (en) Interactive data processing method and apparatus
CN111383022B (en) Background architecture method, system, computer equipment and storage medium for aggregated payment
WO2016078404A1 (en) Terminal management method, apparatus and system
TWI684150B (en) Regional information sharing method and device
CN107016033A (en) A kind of social network user information correlating method and device
WO2016107647A1 (en) Method and system for a real-time counting of a number of participants at a public happening
CN102521936A (en) Method for avoiding non-local cashing through point of sale (POS)
CN107637098B (en) Method and system for estimating the number of persons in one or more persons population a posteriori
US20170323194A1 (en) Path determination using robust optimization
CN110267207B (en) Intelligent position monitoring method and device and electronic equipment
CN106790414A (en) City equipment management and maintenance method and system based on big data
CN108156235A (en) Online verification method, apparatus, computer equipment and storage medium
CN107967759A (en) Mobile power leasing method, device, terminal and computer-readable recording medium
CN109544393A (en) Date storage method and device based on block chain
JP2017130923A5 (en)
CN107948274A (en) Business confirmation method and system, server, storage medium
JP7020100B2 (en) Information processing equipment, hazard map generation method and program
CN107528911A (en) Cloud platform system based on Internet of Things
CN110297863A (en) A kind of the high-precision map DecryptDecryption display system and method for power distribution network repairing
CN107358642A (en) A kind of method, apparatus and computer-readable recording medium for establishing 3-D view
CN107249192A (en) A kind of method for monitoring state and device of shared network section
CN107733707A (en) The multi-platform cut-in method of standard WIFI agreements
CN107665428A (en) Mobile payment identity identifying method, server and system
CN108225315A (en) A kind of road positioning method and device
Lin et al. An intelligent and interactive route planning maker for deploying new transportation services

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531