CN106779344A - A kind of method based on distribution network planning of the battalion with information integration - Google Patents
A kind of method based on distribution network planning of the battalion with information integration Download PDFInfo
- Publication number
- CN106779344A CN106779344A CN201611089000.9A CN201611089000A CN106779344A CN 106779344 A CN106779344 A CN 106779344A CN 201611089000 A CN201611089000 A CN 201611089000A CN 106779344 A CN106779344 A CN 106779344A
- Authority
- CN
- China
- Prior art keywords
- data
- planning
- distribution network
- distribution
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009826 distribution Methods 0.000 title claims abstract description 54
- 230000010354 integration Effects 0.000 title claims abstract description 20
- 238000000034 method Methods 0.000 title claims abstract description 18
- 238000013507 mapping Methods 0.000 claims abstract description 18
- 238000004458 analytical method Methods 0.000 claims abstract description 16
- 238000004519 manufacturing process Methods 0.000 claims description 6
- 238000013500 data storage Methods 0.000 claims description 3
- 230000007812 deficiency Effects 0.000 claims description 3
- 229920006395 saturated elastomer Polymers 0.000 claims description 3
- 238000004919 topotaxy Methods 0.000 claims description 3
- 230000001131 transforming effect Effects 0.000 claims description 3
- 238000012800 visualization Methods 0.000 claims description 3
- 230000002159 abnormal effect Effects 0.000 claims 1
- 230000009466 transformation Effects 0.000 claims 1
- 230000003340 mental effect Effects 0.000 abstract description 2
- 210000003205 muscle Anatomy 0.000 abstract description 2
- 238000006467 substitution reaction Methods 0.000 abstract description 2
- 238000005096 rolling process Methods 0.000 abstract 1
- 240000002853 Nelumbo nucifera Species 0.000 description 2
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 2
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000013499 data model Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
- G06Q10/06375—Prediction of business process outcome or impact based on a proposed change
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
A kind of method based on distribution network planning of the battalion with information integration, containing following steps:1) distribution network planning basic data is integrated;2) Distribution Network Equipment and marketing customer information mapping;3) the unified device model of planning is built;4) power network As-Is analysis;5) electric power demand forecasting;6) programme establishment;7) programme assessment.Present invention has the advantages that:Information integration is matched somebody with somebody by battalion, by the data form required for Electric Power Network Planning, automatic receipts money is realized by data-interface, the quality of data is improved in uniform data source;Build planning Unified Device model, realize that automatic calculating is analyzed, the mode of the traditional manual receipts money of substitution and artificial establishment programme, both save artificial receipts and provide cost, the muscle power of designer can be liberated again, release designer's is mental, not only solves the problems, such as that programming is difficult, moreover it is possible to lift the quality of programme;Easy receipts money flow, promotes planning day-to-day authorized strength work, lifting planning rolling to repair volume promptness.
Description
Technical field
The invention belongs to power industry Electric Power Network Planning system, distribution network planning method of the battalion with information integration is based especially on.
Background technology
With the progressively development of computer technology and Power System Planning Theory, Many researchers are aided in Electric Power Network Planning
Decision system has carried out tentative R&D work, but these systems have common defect mostly:Function is not perfect enough, related
Information needs largely to be manually entered, and lacks and is interacted with other information system in grid company, it is impossible to ensure data renewal and
Shi Xing, it is impossible to which program results is fed directly to other relevant departments.
Under traditional Electric Power Network Planning pattern, receive money and expend a large amount of manpower and materials, the quality of data is not high, and inefficiency is asked
Topic can not analyse position, and scheme updates not in time.Due to being difficult to easily obtain accurate data supporting, existing ripe planning is auxiliary
Decision-making software is helped, fails to play one's part to the full.And, should most understand power supply unit personnel's leading role of on-site actual situations
Without embodiment so that the science of programme, reasonability wait further raising.Additionally, after new planning specific responsibility catcher, one
Cut and learn from beginning, the culture of high-quality professional needs long-term process.These problems are also further caused in planning work
In work, there are difficult decision-making, evaluation hardly possible, the difficult three big difficult points of establishment.
One good Electric Power Network Planning system must be well embedded in the existing information system of grid company, used as power network
A part for corporate information system, can ensure its practicality.Therefore, scientific and effective Electric Power Network Planning aid decision-making system is needed
The information system having had is used as support, while the day-to-day that it tackles planning provides good support.
The content of the invention
The present invention is of low quality for layout data present in above-mentioned conventional electrical distribution net planning, receives money inefficiency
The problems such as provide a kind of based on distribution network planning method of the battalion with information integration, the inventive method Applied Computer Techniques pass through
Grid company ESB, distribution network planning in integrated distribution GIS, distribution production, marketing, metering four-in-one, scheduling system
Required grid equipment account data and service data is drawn, realizes that layout data receives money automatically, then by Distribution Network Equipment and market
Customer information is mapped, so as to form the integration data model at "-line-change-family of standing ", information integration is matched somebody with somebody based on battalion
Achievement, carries out power network As-Is analysis, the electric power demand forecasting before planning, then carry out programme by support of distribution GIS platform
Establishment, then carries out programme assessment and ancillary investment decision-making.
The present invention can be realized by following technical measures:
A kind of method based on distribution network planning of the battalion with information integration, comprises the following steps:
Step 1:Distribution network planning basic data is integrated to extract distribution GIS, distribution production, battalion by data-interface automatically
Pin, metering four-in-one, scheduling system data, using Sqoop and Kettle Data Integrations, these data are cleaned,
By data storage service after conversion, loading, unification is stored in foundation of planning database, realizes that layout data receives money automatically;
The data that wherein distribution generalized information system need to be extracted include:Distribution Network Equipment machine account, spatial topotaxy, drawing, geography information;Match somebody with somebody
The data that net production system need to be extracted include:Distribution Network Equipment technical parameter, outage information, equipment deficiency;Marketing system need to take out
The data for taking include:User profile, user power utilization information, actual track line loss, actual table area line loss, comprehensive line loss, line loss are different
Normal information;The data that metering four-in-one system need to be extracted include:Distribution transforming daily load data;The packet that scheduling system need to be extracted
Include:Transformer station, high-tension line, medium-voltage line daily load data;
Step 2:Distribution Network Equipment is reflected the data of each business domains by guiding principle of equipment with marketing customer information mapping
Penetrate, mapping point automatic mapping and manually mapping two ways;Automatic mapping is mainly with the equipment sheet after information integration is matched somebody with somebody by battalion
Based on the established incidence relation of body, not associated carries out Auto-matching realization mapping according to device name;Remaining equipment is led to
Cross and manually mapped;
Step 3:The unified device model of planning is built using the Various types of data in foundation of planning database as distribution net equipment
Different attribute component, total be divided into basic data component, service data component, marketing data component and space data set
Part;
Step 4:Power network As-Is analysis are based on unified Distribution Network Equipment model, and distribution network planning technological guidance principle is made
It is analysis strategy, grid structure, operation water with reference to gridding Planning Principles to high-tension apparatus capacity-load ratio and low and medium voltage distribution network
The indices such as flat, equipment level are calculated, and diagnostic analysis is carried out to electric present situation power network, and combing goes out the problem of power network presence,
And be shown index of correlation data along Butut in GIS;
Step 5:Electric power demand forecasting is marketing domain user power utilization amount, maximum negative according to national economy history and prediction data
The history annual data such as lotus and part throttle characteristics, using total load time series method, classed load prediction, saturated density method, it is considered to
Large user influences with distributed power source, and intervening branch administrative division, year-by-year with reference to expert carries out the prediction calculating of electric power total load;
Step 6:Programme establishment is based on power network As-Is analysis and electric power demand forecasting result, with Current Situation and demand
To be oriented to, power network planning scheme is worked out;
Step 7:Programme assessment is based on planning state power grid topological relation, solution of the assessment Current Situation in each planning time
Certainly situation and planning the end of term remaining situation.And assess power network leading indicator (operating index, equipment level, net in project period
Three aspects of frame structure) situation of change, with the reasonable of visualization, list means reflection electric grid investment and power network project arrangement
Property, facilitates planning personnel to the integrated regulation of planned project, for investment decision provides foundation.
Advantages of the present invention or usefulness:
Advantage based on distribution network planning method of the battalion with information integration is with information integration, by Electric Power Network Planning institute by battalion
The data form of needs, realizes that automatic receipts provides by data-interface, and the quality of data is improved in uniform data source;Build planning system
One device model, realizes the automatic mode for calculating analysis, the traditional manual receipts money of substitution and artificial establishment programme, both saves
It is artificial to receive money cost, the muscle power of designer can be liberated again, release designer's is mental, not only solves asking for programming hardly possible
Topic, moreover it is possible to lift the quality of programme;Easy receipts money flow, promotes planning day-to-day authorized strength work, lifting planning to roll
Repair volume promptness.
Brief description of the drawings
Fig. 1 is that the present invention is schemed the step of being matched somebody with somebody the distribution network planning of information integration based on battalion;
Fig. 2 is the unified device model figure of present invention planning;
Fig. 3 is present device model table graph of a relation.
Specific embodiment
Fig. 1, Fig. 2 are seen, shown in Fig. 3;A kind of method based on distribution network planning of the battalion with information integration, including following step
Suddenly:
Step 1:Distribution network planning basic data is integrated to extract distribution GIS, distribution production, battalion by data-interface automatically
Pin, metering four-in-one, scheduling system data, using Sqoop and Kettle Data Integrations, these data are cleaned,
By data storage service after conversion, loading, unification is stored in foundation of planning database, realizes that layout data receives money automatically;
The data that wherein distribution generalized information system need to be extracted include:Distribution Network Equipment machine account, spatial topotaxy, drawing, geography information;Match somebody with somebody
The data that net production system need to be extracted include:Distribution Network Equipment technical parameter, outage information, equipment deficiency;Marketing system need to take out
The data for taking include:User profile, user power utilization information, actual track line loss, actual table area line loss, comprehensive line loss, line loss are different
Normal information;The data that metering four-in-one system need to be extracted include:Distribution transforming daily load data;The packet that scheduling system need to be extracted
Include:Transformer station, high-tension line, medium-voltage line daily load data;
Step 2:Distribution Network Equipment is reflected the data of each business domains by guiding principle of equipment with marketing customer information mapping
Penetrate, mapping point automatic mapping and manually mapping two ways;Automatic mapping is mainly with the equipment sheet after information integration is matched somebody with somebody by battalion
Based on the established incidence relation of body, not associated carries out Auto-matching realization mapping according to device name;Remaining equipment is led to
Cross and manually mapped;
Step 3:The unified device model of planning is built using the Various types of data in foundation of planning database as distribution net equipment
Different attribute component, total be divided into basic data component, service data component, marketing data component and space data set
Part;
Step 4:Power network As-Is analysis are based on unified Distribution Network Equipment model, and distribution network planning technological guidance principle is made
It is analysis strategy, grid structure, operation water with reference to gridding Planning Principles to high-tension apparatus capacity-load ratio and low and medium voltage distribution network
The indices such as flat, equipment level are calculated, and diagnostic analysis is carried out to electric present situation power network, and combing goes out the problem of power network presence,
And be shown index of correlation data along Butut in GIS;
Step 5:Electric power demand forecasting is marketing domain user power utilization amount, maximum negative according to national economy history and prediction data
The history annual data such as lotus and part throttle characteristics, using total load time series method, classed load prediction, saturated density method, it is considered to
Large user influences with distributed power source, and intervening branch administrative division, year-by-year with reference to expert carries out the prediction calculating of electric power total load;
Step 6:Programme establishment is based on power network As-Is analysis and electric power demand forecasting result, with Current Situation and demand
To be oriented to, power network planning scheme is worked out;
Step 7:Programme assessment is based on planning state power grid topological relation, solution of the assessment Current Situation in each planning time
Certainly situation and planning the end of term remaining situation.And assess power network leading indicator (operating index, equipment level, net in project period
Three aspects of frame structure) situation of change, with the reasonable of visualization, list means reflection electric grid investment and power network project arrangement
Property, facilitates planning personnel to the integrated regulation of planned project, for investment decision provides foundation.
Claims (1)
1. it is a kind of based on battalion with information integration distribution network planning method, the invention is characterised in that, comprise the following steps:
Step 1:Distribution network planning basic data is integrated to extract distribution GIS, distribution production, marketing, meter by data-interface automatically
Amount four-in-one, scheduling system data, using Sqoop and Kettle Data Integrations, these data are cleaned, is changed,
By data storage service after loading, unification is stored in foundation of planning database, realizes that layout data receives money automatically;Wherein match somebody with somebody
The data that net generalized information system need to be extracted include:Distribution Network Equipment machine account, spatial topotaxy, drawing, geography information;Distribution is produced
The data that system need to be extracted include:Distribution Network Equipment technical parameter, outage information, equipment deficiency;The number that marketing system need to be extracted
According to including:User profile, user power utilization information, actual track line loss, actual table area line loss, comprehensive line loss, line loss abnormal information;
The data that metering four-in-one system need to be extracted include:Distribution transforming daily load data;The data that scheduling system need to be extracted include:Power transformation
Stand, high-tension line, medium-voltage line daily load data;
Step 2:Distribution Network Equipment is mapped the data of each business domains by guiding principle of equipment with marketing customer information mapping, is reflected
Penetrate point automatic mapping and manually mapping two ways;Automatic mapping be mainly with by battalion with the shape of equipment after information integration in itself
Into incidence relation based on, it is not associated Auto-matching is carried out according to device name to realize mapping;Remaining equipment is by artificial
Mapped manually;
Step 3:Build the unified device model of planning using the Various types of data in foundation of planning database as distribution net equipment not
Same attribute component, total be divided into basic data component, service data component, marketing data component and spatial data component;
Step 4:Power network As-Is analysis be based on unified Distribution Network Equipment model, using distribution network planning technological guidance principle as point
Analysis strategy, with reference to gridding Planning Principles to the grid structure of high-tension apparatus capacity-load ratio and low and medium voltage distribution network, operation level, set
The indices such as standby level are calculated, and carry out diagnostic analysis to electric present situation power network, and combing goes out the problem of power network presence, and by phase
Achievement data is closed to be shown along Butut in GIS;
Step 5:Electric power demand forecasting according to national economy history and prediction data, marketing domain user power utilization amount, peak load and
The history annual data such as part throttle characteristics, using total load time series method, classed load prediction, saturated density method, it is considered to big to use
Family influences with distributed power source, and intervening branch administrative division, year-by-year with reference to expert carries out the prediction calculating of electric power total load;
Step 6:Programme establishment is based on power network As-Is analysis and electric power demand forecasting result, with Current Situation and demand to lead
To establishment power network planning scheme;
Step 7:Programme assessment is based on planning state power grid topological relation, solution feelings of the assessment Current Situation in each planning time
Condition and the remaining situation in the planning end of term.And assess power network leading indicator in project period (operating index, equipment level, rack knot
Three aspects of structure) situation of change, with the reasonability of visualization, list means reflection electric grid investment and power network project arrangement, side
Just planning personnel is to the integrated regulation of planned project, for investment decision provides foundation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611089000.9A CN106779344A (en) | 2016-11-28 | 2016-11-28 | A kind of method based on distribution network planning of the battalion with information integration |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611089000.9A CN106779344A (en) | 2016-11-28 | 2016-11-28 | A kind of method based on distribution network planning of the battalion with information integration |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106779344A true CN106779344A (en) | 2017-05-31 |
Family
ID=58913308
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611089000.9A Pending CN106779344A (en) | 2016-11-28 | 2016-11-28 | A kind of method based on distribution network planning of the battalion with information integration |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106779344A (en) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108876154A (en) * | 2018-06-22 | 2018-11-23 | 国网辽宁省电力有限公司朝阳供电公司 | A kind of Electric Power Network Planning big data analysis system |
CN109327323A (en) * | 2017-08-01 | 2019-02-12 | 全球能源互联网研究院 | A kind of planning of new-energy grid-connected power telecom network and optimization method and system |
CN109636124A (en) * | 2018-11-18 | 2019-04-16 | 韩霞 | Power industry low-voltage platform area line loss analyzing method and processing system based on big data |
CN109857918A (en) * | 2018-12-11 | 2019-06-07 | 国网浙江省电力有限公司杭州供电公司 | Planning system for power distribution network |
CN110188972A (en) * | 2019-03-12 | 2019-08-30 | 贵州电网有限责任公司 | A kind of non-special customer cut-in method of 10kV power distribution network |
CN110209713A (en) * | 2019-06-26 | 2019-09-06 | 国家电网有限公司 | Abnormal grid structure recognition methods and device |
CN110310098A (en) * | 2019-07-10 | 2019-10-08 | 云南电网有限责任公司电力科学研究院 | A kind of dynamic programming problems library method for auto constructing and device |
CN110310048A (en) * | 2019-07-10 | 2019-10-08 | 云南电网有限责任公司电力科学研究院 | A kind of distribution planning overall process appraisal procedure and device |
CN110322157A (en) * | 2019-07-10 | 2019-10-11 | 云南电网有限责任公司电力科学研究院 | A kind of distribution planning overall process assessment system |
CN110532327A (en) * | 2019-08-22 | 2019-12-03 | 深圳供电局有限公司 | Artificial intelligent power grid line planning method |
CN111210129A (en) * | 2019-12-28 | 2020-05-29 | 深圳供电局有限公司 | Power distribution network planning service management information system based on meshing |
CN112200458A (en) * | 2020-10-12 | 2021-01-08 | 贵州电网有限责任公司 | Power distribution network planning data application method and system |
CN112817958A (en) * | 2021-02-25 | 2021-05-18 | 广东电网有限责任公司 | Electric power planning data acquisition method and device and intelligent terminal |
CN113505951A (en) * | 2021-03-31 | 2021-10-15 | 国网山西省电力公司吕梁供电公司 | Distribution network planning overall process evaluation management system |
CN114006374A (en) * | 2021-12-24 | 2022-02-01 | 国网北京市电力公司 | Unitized power grid management method, device, equipment and medium |
CN114065554A (en) * | 2022-01-11 | 2022-02-18 | 国网北京市电力公司 | Power distribution network online planning method, device, equipment and medium |
CN117610823A (en) * | 2023-11-07 | 2024-02-27 | 南京南瑞信息通信科技有限公司 | Marketing and debugging through method and system for power generation side user |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010106916A1 (en) * | 2009-03-16 | 2010-09-23 | 株式会社日本Aeパワーシステムズ | Integral three-phase gas insulated switchgear |
CN104504183A (en) * | 2014-12-10 | 2015-04-08 | 广州供电局有限公司 | Power distribution network intelligent planning system based on automatic optimization |
-
2016
- 2016-11-28 CN CN201611089000.9A patent/CN106779344A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010106916A1 (en) * | 2009-03-16 | 2010-09-23 | 株式会社日本Aeパワーシステムズ | Integral three-phase gas insulated switchgear |
CN104504183A (en) * | 2014-12-10 | 2015-04-08 | 广州供电局有限公司 | Power distribution network intelligent planning system based on automatic optimization |
Cited By (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109327323A (en) * | 2017-08-01 | 2019-02-12 | 全球能源互联网研究院 | A kind of planning of new-energy grid-connected power telecom network and optimization method and system |
CN109327323B (en) * | 2017-08-01 | 2022-09-30 | 全球能源互联网研究院 | New energy grid-connected power communication network planning and optimizing method and system |
CN108876154A (en) * | 2018-06-22 | 2018-11-23 | 国网辽宁省电力有限公司朝阳供电公司 | A kind of Electric Power Network Planning big data analysis system |
CN109636124A (en) * | 2018-11-18 | 2019-04-16 | 韩霞 | Power industry low-voltage platform area line loss analyzing method and processing system based on big data |
CN109857918A (en) * | 2018-12-11 | 2019-06-07 | 国网浙江省电力有限公司杭州供电公司 | Planning system for power distribution network |
CN109857918B (en) * | 2018-12-11 | 2023-08-08 | 国网浙江省电力有限公司杭州供电公司 | Planning system for power distribution network |
CN110188972A (en) * | 2019-03-12 | 2019-08-30 | 贵州电网有限责任公司 | A kind of non-special customer cut-in method of 10kV power distribution network |
CN110188972B (en) * | 2019-03-12 | 2022-12-09 | 贵州电网有限责任公司 | 10kV power distribution network non-private line customer access method |
CN110209713A (en) * | 2019-06-26 | 2019-09-06 | 国家电网有限公司 | Abnormal grid structure recognition methods and device |
CN110310098A (en) * | 2019-07-10 | 2019-10-08 | 云南电网有限责任公司电力科学研究院 | A kind of dynamic programming problems library method for auto constructing and device |
CN110322157A (en) * | 2019-07-10 | 2019-10-11 | 云南电网有限责任公司电力科学研究院 | A kind of distribution planning overall process assessment system |
CN110310048A (en) * | 2019-07-10 | 2019-10-08 | 云南电网有限责任公司电力科学研究院 | A kind of distribution planning overall process appraisal procedure and device |
CN110532327A (en) * | 2019-08-22 | 2019-12-03 | 深圳供电局有限公司 | Artificial intelligent power grid line planning method |
CN111210129A (en) * | 2019-12-28 | 2020-05-29 | 深圳供电局有限公司 | Power distribution network planning service management information system based on meshing |
CN112200458A (en) * | 2020-10-12 | 2021-01-08 | 贵州电网有限责任公司 | Power distribution network planning data application method and system |
CN112200458B (en) * | 2020-10-12 | 2023-10-20 | 贵州电网有限责任公司 | Power distribution network planning data application method and system |
CN112817958A (en) * | 2021-02-25 | 2021-05-18 | 广东电网有限责任公司 | Electric power planning data acquisition method and device and intelligent terminal |
CN113505951A (en) * | 2021-03-31 | 2021-10-15 | 国网山西省电力公司吕梁供电公司 | Distribution network planning overall process evaluation management system |
CN114006374A (en) * | 2021-12-24 | 2022-02-01 | 国网北京市电力公司 | Unitized power grid management method, device, equipment and medium |
CN114065554A (en) * | 2022-01-11 | 2022-02-18 | 国网北京市电力公司 | Power distribution network online planning method, device, equipment and medium |
CN117610823A (en) * | 2023-11-07 | 2024-02-27 | 南京南瑞信息通信科技有限公司 | Marketing and debugging through method and system for power generation side user |
CN117610823B (en) * | 2023-11-07 | 2024-05-31 | 南京南瑞信息通信科技有限公司 | Marketing and debugging through method and system for power generation side user |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106779344A (en) | A kind of method based on distribution network planning of the battalion with information integration | |
CN113159339B (en) | One-area one-index line loss management method and system based on big data | |
CN104504508B (en) | The taiwan area closed-loop data analysis method returned based on step analysis and small echo | |
CN108122068A (en) | A kind of power distribution network risk-averse retailer method and system | |
CN107123982A (en) | A kind of distribution network reliability analysis method of economic benefit based on equipment alteration | |
CN109409769A (en) | Based on the rural power grids returns of investment integrated evaluating method for improving Set Pair Analysis | |
CN108631295A (en) | The online accurate calculation system of theory wire loss of measured data | |
CN104361236B (en) | The appraisal procedure of power equipment health status | |
CN106952047A (en) | A kind of data processing method and device for electric grid investment benefit | |
CN111967658B (en) | Comprehensive power failure analysis method based on marketing and distribution information integration platform | |
CN105469194A (en) | Power distribution network main equipment operation efficiency evaluation method based on load duration curve | |
CN104268720A (en) | Scientific-and-technological-talent job-title classification evaluation method | |
CN112446534A (en) | Construction period prediction method and device for power transmission and transformation project | |
CN108197805A (en) | A kind of electric energy and natural gas competitiveness integrated evaluating method that planning guidance is substituted available for electric energy | |
CN108564245A (en) | A kind of distribution efficiency of investment evaluation method based on DEA analyses | |
CN109389272A (en) | A kind of comprehensive estimation method and system for voltage coordination control strategy effect | |
CN109615185A (en) | A kind of unit mass guarantee ability evaluation method based on Fuzzy AHP | |
CN104092215B (en) | Distribution transformer capacity control method and system | |
CN106709619A (en) | Method for generating energy efficiency monitoring system by applying common information model configuration | |
CN111178676A (en) | Power distribution network project investment assessment method and system | |
WO2022011968A1 (en) | Multi-agent investment proportion optimization method and system based on cooperative game | |
CN112348352B (en) | Big data analysis-based automatic generation method for electric power budget proposal scheme | |
CN105956755A (en) | Method and system for establishing quantitative relationship of general power line loss rate influencing factors | |
Guoliang et al. | Evaluating power grid enterprise's investment returns | |
CN102035210B (en) | Relaxative-constraint powerless equipment optimization method for power system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170531 |