CN106779344A - A kind of method based on distribution network planning of the battalion with information integration - Google Patents

A kind of method based on distribution network planning of the battalion with information integration Download PDF

Info

Publication number
CN106779344A
CN106779344A CN201611089000.9A CN201611089000A CN106779344A CN 106779344 A CN106779344 A CN 106779344A CN 201611089000 A CN201611089000 A CN 201611089000A CN 106779344 A CN106779344 A CN 106779344A
Authority
CN
China
Prior art keywords
data
planning
distribution network
distribution
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611089000.9A
Other languages
Chinese (zh)
Inventor
王昌照
王雁雄
李彦生
姜建宏
曾为
李爽
杨建康
徐华
张学华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dali Power Supply Bureau of Yunnan Power Grid Co Ltd
Kunming Enersun Technology Co Ltd
Original Assignee
Dali Power Supply Bureau of Yunnan Power Grid Co Ltd
Kunming Enersun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dali Power Supply Bureau of Yunnan Power Grid Co Ltd, Kunming Enersun Technology Co Ltd filed Critical Dali Power Supply Bureau of Yunnan Power Grid Co Ltd
Priority to CN201611089000.9A priority Critical patent/CN106779344A/en
Publication of CN106779344A publication Critical patent/CN106779344A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • G06Q10/06375Prediction of business process outcome or impact based on a proposed change
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of method based on distribution network planning of the battalion with information integration, containing following steps:1) distribution network planning basic data is integrated;2) Distribution Network Equipment and marketing customer information mapping;3) the unified device model of planning is built;4) power network As-Is analysis;5) electric power demand forecasting;6) programme establishment;7) programme assessment.Present invention has the advantages that:Information integration is matched somebody with somebody by battalion, by the data form required for Electric Power Network Planning, automatic receipts money is realized by data-interface, the quality of data is improved in uniform data source;Build planning Unified Device model, realize that automatic calculating is analyzed, the mode of the traditional manual receipts money of substitution and artificial establishment programme, both save artificial receipts and provide cost, the muscle power of designer can be liberated again, release designer's is mental, not only solves the problems, such as that programming is difficult, moreover it is possible to lift the quality of programme;Easy receipts money flow, promotes planning day-to-day authorized strength work, lifting planning rolling to repair volume promptness.

Description

A kind of method based on distribution network planning of the battalion with information integration
Technical field
The invention belongs to power industry Electric Power Network Planning system, distribution network planning method of the battalion with information integration is based especially on.
Background technology
With the progressively development of computer technology and Power System Planning Theory, Many researchers are aided in Electric Power Network Planning Decision system has carried out tentative R&D work, but these systems have common defect mostly:Function is not perfect enough, related Information needs largely to be manually entered, and lacks and is interacted with other information system in grid company, it is impossible to ensure data renewal and Shi Xing, it is impossible to which program results is fed directly to other relevant departments.
Under traditional Electric Power Network Planning pattern, receive money and expend a large amount of manpower and materials, the quality of data is not high, and inefficiency is asked Topic can not analyse position, and scheme updates not in time.Due to being difficult to easily obtain accurate data supporting, existing ripe planning is auxiliary Decision-making software is helped, fails to play one's part to the full.And, should most understand power supply unit personnel's leading role of on-site actual situations Without embodiment so that the science of programme, reasonability wait further raising.Additionally, after new planning specific responsibility catcher, one Cut and learn from beginning, the culture of high-quality professional needs long-term process.These problems are also further caused in planning work In work, there are difficult decision-making, evaluation hardly possible, the difficult three big difficult points of establishment.
One good Electric Power Network Planning system must be well embedded in the existing information system of grid company, used as power network A part for corporate information system, can ensure its practicality.Therefore, scientific and effective Electric Power Network Planning aid decision-making system is needed The information system having had is used as support, while the day-to-day that it tackles planning provides good support.
The content of the invention
The present invention is of low quality for layout data present in above-mentioned conventional electrical distribution net planning, receives money inefficiency The problems such as provide a kind of based on distribution network planning method of the battalion with information integration, the inventive method Applied Computer Techniques pass through Grid company ESB, distribution network planning in integrated distribution GIS, distribution production, marketing, metering four-in-one, scheduling system Required grid equipment account data and service data is drawn, realizes that layout data receives money automatically, then by Distribution Network Equipment and market Customer information is mapped, so as to form the integration data model at "-line-change-family of standing ", information integration is matched somebody with somebody based on battalion Achievement, carries out power network As-Is analysis, the electric power demand forecasting before planning, then carry out programme by support of distribution GIS platform Establishment, then carries out programme assessment and ancillary investment decision-making.
The present invention can be realized by following technical measures:
A kind of method based on distribution network planning of the battalion with information integration, comprises the following steps:
Step 1:Distribution network planning basic data is integrated to extract distribution GIS, distribution production, battalion by data-interface automatically Pin, metering four-in-one, scheduling system data, using Sqoop and Kettle Data Integrations, these data are cleaned, By data storage service after conversion, loading, unification is stored in foundation of planning database, realizes that layout data receives money automatically; The data that wherein distribution generalized information system need to be extracted include:Distribution Network Equipment machine account, spatial topotaxy, drawing, geography information;Match somebody with somebody The data that net production system need to be extracted include:Distribution Network Equipment technical parameter, outage information, equipment deficiency;Marketing system need to take out The data for taking include:User profile, user power utilization information, actual track line loss, actual table area line loss, comprehensive line loss, line loss are different Normal information;The data that metering four-in-one system need to be extracted include:Distribution transforming daily load data;The packet that scheduling system need to be extracted Include:Transformer station, high-tension line, medium-voltage line daily load data;
Step 2:Distribution Network Equipment is reflected the data of each business domains by guiding principle of equipment with marketing customer information mapping Penetrate, mapping point automatic mapping and manually mapping two ways;Automatic mapping is mainly with the equipment sheet after information integration is matched somebody with somebody by battalion Based on the established incidence relation of body, not associated carries out Auto-matching realization mapping according to device name;Remaining equipment is led to Cross and manually mapped;
Step 3:The unified device model of planning is built using the Various types of data in foundation of planning database as distribution net equipment Different attribute component, total be divided into basic data component, service data component, marketing data component and space data set Part;
Step 4:Power network As-Is analysis are based on unified Distribution Network Equipment model, and distribution network planning technological guidance principle is made It is analysis strategy, grid structure, operation water with reference to gridding Planning Principles to high-tension apparatus capacity-load ratio and low and medium voltage distribution network The indices such as flat, equipment level are calculated, and diagnostic analysis is carried out to electric present situation power network, and combing goes out the problem of power network presence, And be shown index of correlation data along Butut in GIS;
Step 5:Electric power demand forecasting is marketing domain user power utilization amount, maximum negative according to national economy history and prediction data The history annual data such as lotus and part throttle characteristics, using total load time series method, classed load prediction, saturated density method, it is considered to Large user influences with distributed power source, and intervening branch administrative division, year-by-year with reference to expert carries out the prediction calculating of electric power total load;
Step 6:Programme establishment is based on power network As-Is analysis and electric power demand forecasting result, with Current Situation and demand To be oriented to, power network planning scheme is worked out;
Step 7:Programme assessment is based on planning state power grid topological relation, solution of the assessment Current Situation in each planning time Certainly situation and planning the end of term remaining situation.And assess power network leading indicator (operating index, equipment level, net in project period Three aspects of frame structure) situation of change, with the reasonable of visualization, list means reflection electric grid investment and power network project arrangement Property, facilitates planning personnel to the integrated regulation of planned project, for investment decision provides foundation.
Advantages of the present invention or usefulness:
Advantage based on distribution network planning method of the battalion with information integration is with information integration, by Electric Power Network Planning institute by battalion The data form of needs, realizes that automatic receipts provides by data-interface, and the quality of data is improved in uniform data source;Build planning system One device model, realizes the automatic mode for calculating analysis, the traditional manual receipts money of substitution and artificial establishment programme, both saves It is artificial to receive money cost, the muscle power of designer can be liberated again, release designer's is mental, not only solves asking for programming hardly possible Topic, moreover it is possible to lift the quality of programme;Easy receipts money flow, promotes planning day-to-day authorized strength work, lifting planning to roll Repair volume promptness.
Brief description of the drawings
Fig. 1 is that the present invention is schemed the step of being matched somebody with somebody the distribution network planning of information integration based on battalion;
Fig. 2 is the unified device model figure of present invention planning;
Fig. 3 is present device model table graph of a relation.
Specific embodiment
Fig. 1, Fig. 2 are seen, shown in Fig. 3;A kind of method based on distribution network planning of the battalion with information integration, including following step Suddenly:
Step 1:Distribution network planning basic data is integrated to extract distribution GIS, distribution production, battalion by data-interface automatically Pin, metering four-in-one, scheduling system data, using Sqoop and Kettle Data Integrations, these data are cleaned, By data storage service after conversion, loading, unification is stored in foundation of planning database, realizes that layout data receives money automatically; The data that wherein distribution generalized information system need to be extracted include:Distribution Network Equipment machine account, spatial topotaxy, drawing, geography information;Match somebody with somebody The data that net production system need to be extracted include:Distribution Network Equipment technical parameter, outage information, equipment deficiency;Marketing system need to take out The data for taking include:User profile, user power utilization information, actual track line loss, actual table area line loss, comprehensive line loss, line loss are different Normal information;The data that metering four-in-one system need to be extracted include:Distribution transforming daily load data;The packet that scheduling system need to be extracted Include:Transformer station, high-tension line, medium-voltage line daily load data;
Step 2:Distribution Network Equipment is reflected the data of each business domains by guiding principle of equipment with marketing customer information mapping Penetrate, mapping point automatic mapping and manually mapping two ways;Automatic mapping is mainly with the equipment sheet after information integration is matched somebody with somebody by battalion Based on the established incidence relation of body, not associated carries out Auto-matching realization mapping according to device name;Remaining equipment is led to Cross and manually mapped;
Step 3:The unified device model of planning is built using the Various types of data in foundation of planning database as distribution net equipment Different attribute component, total be divided into basic data component, service data component, marketing data component and space data set Part;
Step 4:Power network As-Is analysis are based on unified Distribution Network Equipment model, and distribution network planning technological guidance principle is made It is analysis strategy, grid structure, operation water with reference to gridding Planning Principles to high-tension apparatus capacity-load ratio and low and medium voltage distribution network The indices such as flat, equipment level are calculated, and diagnostic analysis is carried out to electric present situation power network, and combing goes out the problem of power network presence, And be shown index of correlation data along Butut in GIS;
Step 5:Electric power demand forecasting is marketing domain user power utilization amount, maximum negative according to national economy history and prediction data The history annual data such as lotus and part throttle characteristics, using total load time series method, classed load prediction, saturated density method, it is considered to Large user influences with distributed power source, and intervening branch administrative division, year-by-year with reference to expert carries out the prediction calculating of electric power total load;
Step 6:Programme establishment is based on power network As-Is analysis and electric power demand forecasting result, with Current Situation and demand To be oriented to, power network planning scheme is worked out;
Step 7:Programme assessment is based on planning state power grid topological relation, solution of the assessment Current Situation in each planning time Certainly situation and planning the end of term remaining situation.And assess power network leading indicator (operating index, equipment level, net in project period Three aspects of frame structure) situation of change, with the reasonable of visualization, list means reflection electric grid investment and power network project arrangement Property, facilitates planning personnel to the integrated regulation of planned project, for investment decision provides foundation.

Claims (1)

1. it is a kind of based on battalion with information integration distribution network planning method, the invention is characterised in that, comprise the following steps:
Step 1:Distribution network planning basic data is integrated to extract distribution GIS, distribution production, marketing, meter by data-interface automatically Amount four-in-one, scheduling system data, using Sqoop and Kettle Data Integrations, these data are cleaned, is changed, By data storage service after loading, unification is stored in foundation of planning database, realizes that layout data receives money automatically;Wherein match somebody with somebody The data that net generalized information system need to be extracted include:Distribution Network Equipment machine account, spatial topotaxy, drawing, geography information;Distribution is produced The data that system need to be extracted include:Distribution Network Equipment technical parameter, outage information, equipment deficiency;The number that marketing system need to be extracted According to including:User profile, user power utilization information, actual track line loss, actual table area line loss, comprehensive line loss, line loss abnormal information; The data that metering four-in-one system need to be extracted include:Distribution transforming daily load data;The data that scheduling system need to be extracted include:Power transformation Stand, high-tension line, medium-voltage line daily load data;
Step 2:Distribution Network Equipment is mapped the data of each business domains by guiding principle of equipment with marketing customer information mapping, is reflected Penetrate point automatic mapping and manually mapping two ways;Automatic mapping be mainly with by battalion with the shape of equipment after information integration in itself Into incidence relation based on, it is not associated Auto-matching is carried out according to device name to realize mapping;Remaining equipment is by artificial Mapped manually;
Step 3:Build the unified device model of planning using the Various types of data in foundation of planning database as distribution net equipment not Same attribute component, total be divided into basic data component, service data component, marketing data component and spatial data component;
Step 4:Power network As-Is analysis be based on unified Distribution Network Equipment model, using distribution network planning technological guidance principle as point Analysis strategy, with reference to gridding Planning Principles to the grid structure of high-tension apparatus capacity-load ratio and low and medium voltage distribution network, operation level, set The indices such as standby level are calculated, and carry out diagnostic analysis to electric present situation power network, and combing goes out the problem of power network presence, and by phase Achievement data is closed to be shown along Butut in GIS;
Step 5:Electric power demand forecasting according to national economy history and prediction data, marketing domain user power utilization amount, peak load and The history annual data such as part throttle characteristics, using total load time series method, classed load prediction, saturated density method, it is considered to big to use Family influences with distributed power source, and intervening branch administrative division, year-by-year with reference to expert carries out the prediction calculating of electric power total load;
Step 6:Programme establishment is based on power network As-Is analysis and electric power demand forecasting result, with Current Situation and demand to lead To establishment power network planning scheme;
Step 7:Programme assessment is based on planning state power grid topological relation, solution feelings of the assessment Current Situation in each planning time Condition and the remaining situation in the planning end of term.And assess power network leading indicator in project period (operating index, equipment level, rack knot Three aspects of structure) situation of change, with the reasonability of visualization, list means reflection electric grid investment and power network project arrangement, side Just planning personnel is to the integrated regulation of planned project, for investment decision provides foundation.
CN201611089000.9A 2016-11-28 2016-11-28 A kind of method based on distribution network planning of the battalion with information integration Pending CN106779344A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611089000.9A CN106779344A (en) 2016-11-28 2016-11-28 A kind of method based on distribution network planning of the battalion with information integration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611089000.9A CN106779344A (en) 2016-11-28 2016-11-28 A kind of method based on distribution network planning of the battalion with information integration

Publications (1)

Publication Number Publication Date
CN106779344A true CN106779344A (en) 2017-05-31

Family

ID=58913308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611089000.9A Pending CN106779344A (en) 2016-11-28 2016-11-28 A kind of method based on distribution network planning of the battalion with information integration

Country Status (1)

Country Link
CN (1) CN106779344A (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108876154A (en) * 2018-06-22 2018-11-23 国网辽宁省电力有限公司朝阳供电公司 A kind of Electric Power Network Planning big data analysis system
CN109327323A (en) * 2017-08-01 2019-02-12 全球能源互联网研究院 A kind of planning of new-energy grid-connected power telecom network and optimization method and system
CN109636124A (en) * 2018-11-18 2019-04-16 韩霞 Power industry low-voltage platform area line loss analyzing method and processing system based on big data
CN109857918A (en) * 2018-12-11 2019-06-07 国网浙江省电力有限公司杭州供电公司 Planning system for power distribution network
CN110188972A (en) * 2019-03-12 2019-08-30 贵州电网有限责任公司 A kind of non-special customer cut-in method of 10kV power distribution network
CN110209713A (en) * 2019-06-26 2019-09-06 国家电网有限公司 Abnormal grid structure recognition methods and device
CN110310098A (en) * 2019-07-10 2019-10-08 云南电网有限责任公司电力科学研究院 A kind of dynamic programming problems library method for auto constructing and device
CN110310048A (en) * 2019-07-10 2019-10-08 云南电网有限责任公司电力科学研究院 A kind of distribution planning overall process appraisal procedure and device
CN110322157A (en) * 2019-07-10 2019-10-11 云南电网有限责任公司电力科学研究院 A kind of distribution planning overall process assessment system
CN110532327A (en) * 2019-08-22 2019-12-03 深圳供电局有限公司 Artificial intelligent power grid line planning method
CN111210129A (en) * 2019-12-28 2020-05-29 深圳供电局有限公司 Power distribution network planning service management information system based on meshing
CN112200458A (en) * 2020-10-12 2021-01-08 贵州电网有限责任公司 Power distribution network planning data application method and system
CN112817958A (en) * 2021-02-25 2021-05-18 广东电网有限责任公司 Electric power planning data acquisition method and device and intelligent terminal
CN113505951A (en) * 2021-03-31 2021-10-15 国网山西省电力公司吕梁供电公司 Distribution network planning overall process evaluation management system
CN114006374A (en) * 2021-12-24 2022-02-01 国网北京市电力公司 Unitized power grid management method, device, equipment and medium
CN114065554A (en) * 2022-01-11 2022-02-18 国网北京市电力公司 Power distribution network online planning method, device, equipment and medium
CN117610823A (en) * 2023-11-07 2024-02-27 南京南瑞信息通信科技有限公司 Marketing and debugging through method and system for power generation side user

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010106916A1 (en) * 2009-03-16 2010-09-23 株式会社日本Aeパワーシステムズ Integral three-phase gas insulated switchgear
CN104504183A (en) * 2014-12-10 2015-04-08 广州供电局有限公司 Power distribution network intelligent planning system based on automatic optimization

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010106916A1 (en) * 2009-03-16 2010-09-23 株式会社日本Aeパワーシステムズ Integral three-phase gas insulated switchgear
CN104504183A (en) * 2014-12-10 2015-04-08 广州供电局有限公司 Power distribution network intelligent planning system based on automatic optimization

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109327323A (en) * 2017-08-01 2019-02-12 全球能源互联网研究院 A kind of planning of new-energy grid-connected power telecom network and optimization method and system
CN109327323B (en) * 2017-08-01 2022-09-30 全球能源互联网研究院 New energy grid-connected power communication network planning and optimizing method and system
CN108876154A (en) * 2018-06-22 2018-11-23 国网辽宁省电力有限公司朝阳供电公司 A kind of Electric Power Network Planning big data analysis system
CN109636124A (en) * 2018-11-18 2019-04-16 韩霞 Power industry low-voltage platform area line loss analyzing method and processing system based on big data
CN109857918A (en) * 2018-12-11 2019-06-07 国网浙江省电力有限公司杭州供电公司 Planning system for power distribution network
CN109857918B (en) * 2018-12-11 2023-08-08 国网浙江省电力有限公司杭州供电公司 Planning system for power distribution network
CN110188972A (en) * 2019-03-12 2019-08-30 贵州电网有限责任公司 A kind of non-special customer cut-in method of 10kV power distribution network
CN110188972B (en) * 2019-03-12 2022-12-09 贵州电网有限责任公司 10kV power distribution network non-private line customer access method
CN110209713A (en) * 2019-06-26 2019-09-06 国家电网有限公司 Abnormal grid structure recognition methods and device
CN110310098A (en) * 2019-07-10 2019-10-08 云南电网有限责任公司电力科学研究院 A kind of dynamic programming problems library method for auto constructing and device
CN110322157A (en) * 2019-07-10 2019-10-11 云南电网有限责任公司电力科学研究院 A kind of distribution planning overall process assessment system
CN110310048A (en) * 2019-07-10 2019-10-08 云南电网有限责任公司电力科学研究院 A kind of distribution planning overall process appraisal procedure and device
CN110532327A (en) * 2019-08-22 2019-12-03 深圳供电局有限公司 Artificial intelligent power grid line planning method
CN111210129A (en) * 2019-12-28 2020-05-29 深圳供电局有限公司 Power distribution network planning service management information system based on meshing
CN112200458A (en) * 2020-10-12 2021-01-08 贵州电网有限责任公司 Power distribution network planning data application method and system
CN112200458B (en) * 2020-10-12 2023-10-20 贵州电网有限责任公司 Power distribution network planning data application method and system
CN112817958A (en) * 2021-02-25 2021-05-18 广东电网有限责任公司 Electric power planning data acquisition method and device and intelligent terminal
CN113505951A (en) * 2021-03-31 2021-10-15 国网山西省电力公司吕梁供电公司 Distribution network planning overall process evaluation management system
CN114006374A (en) * 2021-12-24 2022-02-01 国网北京市电力公司 Unitized power grid management method, device, equipment and medium
CN114065554A (en) * 2022-01-11 2022-02-18 国网北京市电力公司 Power distribution network online planning method, device, equipment and medium
CN117610823A (en) * 2023-11-07 2024-02-27 南京南瑞信息通信科技有限公司 Marketing and debugging through method and system for power generation side user
CN117610823B (en) * 2023-11-07 2024-05-31 南京南瑞信息通信科技有限公司 Marketing and debugging through method and system for power generation side user

Similar Documents

Publication Publication Date Title
CN106779344A (en) A kind of method based on distribution network planning of the battalion with information integration
CN113159339B (en) One-area one-index line loss management method and system based on big data
CN104504508B (en) The taiwan area closed-loop data analysis method returned based on step analysis and small echo
CN108122068A (en) A kind of power distribution network risk-averse retailer method and system
CN107123982A (en) A kind of distribution network reliability analysis method of economic benefit based on equipment alteration
CN109409769A (en) Based on the rural power grids returns of investment integrated evaluating method for improving Set Pair Analysis
CN108631295A (en) The online accurate calculation system of theory wire loss of measured data
CN104361236B (en) The appraisal procedure of power equipment health status
CN106952047A (en) A kind of data processing method and device for electric grid investment benefit
CN111967658B (en) Comprehensive power failure analysis method based on marketing and distribution information integration platform
CN105469194A (en) Power distribution network main equipment operation efficiency evaluation method based on load duration curve
CN104268720A (en) Scientific-and-technological-talent job-title classification evaluation method
CN112446534A (en) Construction period prediction method and device for power transmission and transformation project
CN108197805A (en) A kind of electric energy and natural gas competitiveness integrated evaluating method that planning guidance is substituted available for electric energy
CN108564245A (en) A kind of distribution efficiency of investment evaluation method based on DEA analyses
CN109389272A (en) A kind of comprehensive estimation method and system for voltage coordination control strategy effect
CN109615185A (en) A kind of unit mass guarantee ability evaluation method based on Fuzzy AHP
CN104092215B (en) Distribution transformer capacity control method and system
CN106709619A (en) Method for generating energy efficiency monitoring system by applying common information model configuration
CN111178676A (en) Power distribution network project investment assessment method and system
WO2022011968A1 (en) Multi-agent investment proportion optimization method and system based on cooperative game
CN112348352B (en) Big data analysis-based automatic generation method for electric power budget proposal scheme
CN105956755A (en) Method and system for establishing quantitative relationship of general power line loss rate influencing factors
Guoliang et al. Evaluating power grid enterprise's investment returns
CN102035210B (en) Relaxative-constraint powerless equipment optimization method for power system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170531