CN106773813A - Power consumption control method and device - Google Patents

Power consumption control method and device Download PDF

Info

Publication number
CN106773813A
CN106773813A CN201611071186.5A CN201611071186A CN106773813A CN 106773813 A CN106773813 A CN 106773813A CN 201611071186 A CN201611071186 A CN 201611071186A CN 106773813 A CN106773813 A CN 106773813A
Authority
CN
China
Prior art keywords
duration
electricity consumption
user
remaining
remaining electricity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611071186.5A
Other languages
Chinese (zh)
Other versions
CN106773813B (en
Inventor
于红峰
张涛
刘家豪
王百振
朱卓民
邵月芳
郑爱华
孙国蕾
谢地
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Juancheng Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Juancheng Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Juancheng Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Juancheng Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority to CN201611071186.5A priority Critical patent/CN106773813B/en
Publication of CN106773813A publication Critical patent/CN106773813A/en
Application granted granted Critical
Publication of CN106773813B publication Critical patent/CN106773813B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the present invention provides a kind of power consumption control method and device, and methods described includes:Obtain the weather condition in region residing for user;Judge whether weather condition meets default inclement weather conditions;If meeting, the electricity consumption remaining sum of user is obtained;According to electricity consumption remaining sum and current power unit price, the remaining electricity consumption duration of user is calculated;Whether remaining electricity consumption duration is judged less than the first duration, the time interval at a length of predetermined time and current time when described first;If remaining electricity consumption duration is less than first duration, according to remaining electricity consumption duration and the first duration, the second duration is calculated;Send control instruction to intelligent electric meter terminal.Methods described causes user in inclement weather, after facing arrearage, the situation that intelligent electric meter terminal trips and powers off, without charging of going out in inclement weather so that Consumer's Experience is lifted.

Description

Power consumption control method and device
Technical field
The present invention relates to power domain, in particular to a kind of power consumption control method and device.
Background technology
With the progress of society, increasing user begins to use intelligent electric meter terminal, intelligent electric meter terminal can with During the electricity consumption balance depletion at family, can automatic trip.When in bad weather, user power utilization balance depletion, if it has to face Bad weather is outgoing to charge, and user experience is poor.
The content of the invention
In view of this, the purpose of the embodiment of the present invention is to provide a kind of power consumption control method and device, above-mentioned to solve Problem.
To achieve these goals, the technical scheme that the embodiment of the present invention is used is as follows:
In a first aspect, the embodiment of the invention provides a kind of power consumption control method, methods described includes:Obtain residing for user The weather condition in region;Judge whether the weather condition meets default inclement weather conditions;If the weather condition meets pre- If inclement weather conditions, the electricity consumption remaining sum of the user is obtained;According to the electricity consumption remaining sum and current power unit price, calculate described The remaining electricity consumption duration of user;Whether the remaining electricity consumption duration is judged less than the first duration, when a length of default when described first Carve the time interval with current time;If the remaining electricity consumption duration is less than first duration, during according to the remaining electricity consumption Long and described first duration, calculates the second duration;Control instruction is sent to intelligent electric meter terminal, the control instruction includes the Two durations, so that intelligent electric meter terminal trips after extending second duration.
Second aspect, the embodiment of the invention provides a kind of power consumption control device, and described device includes:First obtains mould Block, the weather condition for obtaining region residing for user;First judge module, for judging it is pre- whether the weather condition meets If inclement weather conditions;Second acquisition module, if meeting default inclement weather conditions for the weather condition, obtains the use The electricity consumption remaining sum at family;First computing module, for according to the electricity consumption remaining sum and current power unit price, calculating the surplus of the user Remaining electricity consumption duration;Second judge module, for judging the remaining electricity consumption duration whether less than the first duration, first duration It is predetermined time and the time interval at current time;Second computing module, if for the remaining electricity consumption duration less than described the One duration, according to the remaining electricity consumption duration and first duration, calculates the second duration;Sending module, for sending control Instructing intelligent electric meter terminal, the control instruction includes the second duration, so that during intelligent electric meter terminal extension described second Tripped after length.
Compared with prior art, a kind of power consumption control method and device provided in an embodiment of the present invention, by judging user Whether the weather condition in residing region meets default inclement weather conditions, if meeting, when calculating the remaining electricity consumption of the user It is long, if the remaining electricity consumption duration is less than first duration, control instruction to intelligent electric meter terminal is sent, so that intelligence electricity Meter terminal trips after extending second duration, in this way so that user in inclement weather, without facing arrearage Afterwards, the situation that intelligent electric meter terminal trips and powers off, without charging of going out in inclement weather so that Consumer's Experience is lifted.
To enable the above objects, features and advantages of the present invention to become apparent, preferred embodiment cited below particularly, and coordinate Appended accompanying drawing, is described in detail below.
Brief description of the drawings
Technical scheme in order to illustrate more clearly the embodiments of the present invention, below will be attached to what is used needed for embodiment Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, thus be not construed as it is right The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 is the schematic diagram that intelligent electric meter terminal provided in an embodiment of the present invention, server and property platform are interacted.
Fig. 2 is the structured flowchart of server provided in an embodiment of the present invention.
Fig. 3 is a kind of flow chart of power consumption control method that first embodiment of the invention is provided.
Fig. 4 is the flow chart of step S360 in a kind of power consumption control method that second embodiment of the invention is provided.
Fig. 5 is the flow chart of step S360 in a kind of power consumption control method that third embodiment of the invention is provided.
Fig. 6 is the flow chart of step S500 in a kind of power consumption control method that fourth embodiment of the invention is provided.
Fig. 7 is the flow chart of step S600 in a kind of power consumption control method that fifth embodiment of the invention is provided.
Fig. 8 is the flow chart of step S700 in a kind of power consumption control method that sixth embodiment of the invention is provided.
Fig. 9 is a kind of structured flowchart of power consumption control device that seventh embodiment of the invention is provided.
Specific embodiment
Below in conjunction with accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Ground description, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.Generally exist The component of the embodiment of the present invention described and illustrated in accompanying drawing can be arranged and designed with a variety of configurations herein.Cause This, the detailed description of the embodiments of the invention to providing in the accompanying drawings is not intended to limit claimed invention below Scope, but it is merely representative of selected embodiment of the invention.Based on embodiments of the invention, those skilled in the art are not doing The every other embodiment obtained on the premise of going out creative work, belongs to the scope of protection of the invention.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined in individual accompanying drawing, then it need not be further defined and explained in subsequent accompanying drawing.Meanwhile, of the invention In description, term " first ", " second " etc. are only used for distinguishing description, and it is not intended that indicating or implying relative importance.
Fig. 1 shows that intelligent electric meter terminal 100 provided in an embodiment of the present invention, server 200 and property platform 300 are carried out Interactive schematic diagram.The server 200 can carry out communication link by network and one or more intelligent electric meter terminals 100 Connect, to enter row data communication or interaction.The server 200 can be carried out by network with one or more property platforms 300 Communication connection, to enter row data communication or interaction.The server 200 can be the webserver or data server etc..
As shown in Fig. 2 being the block diagram of the server 200.The server 200 includes memory 201, treatment Device 202 and mixed-media network modules mixed-media 203.
Memory 201 can be used to storing software program and module, power consumption control method such as in the embodiment of the present invention and Corresponding programmed instruction/the module of device, software program and module of the processor 202 by operation storage in memory 201, So as to perform various function application and data processing, that is, realize that the application issue in the embodiment of the present invention recommends method.Storage Device 201 may include high speed random access memory, may also include nonvolatile memory, such as one or more magnetic storage device, Flash memory or other non-volatile solid state memories.Further, the software program and module in above-mentioned memory 201 be also May include:Operating system 221 and service module 222.Wherein operating system 221, for example, can be LINUX, UNIX, WINDOWS, It may include the various component softwares for management system task (such as memory management, storage device control, power management etc.) And/or drive, and can mutually be communicated with various hardware or component software, so as to provide the running environment of other software component.Clothes On the basis of business module 222 operates in operating system 221, and network service by operating system 221 is monitored come automatic network Request, completes corresponding data processing, and return to result to client according to request.That is, service module 222 is used In to client offer network service.
Mixed-media network modules mixed-media 203 is used to receive and send network signal.Above-mentioned network signal may include wireless signal or have Line signal.
It is appreciated that the structure shown in Fig. 2 be only illustrate, the server 200 may also include it is more more than shown in Fig. 2 or The less component of person, or with the configuration different from shown in Fig. 2.Each component shown in Fig. 2 can using hardware, software or Its combination is realized.In addition, the server in the embodiment of the present invention can also include the server of multiple specific difference in functionalitys.
Fig. 3 shows a kind of flow chart of power consumption control method that first embodiment of the invention is provided, and refers to Fig. 3, this Embodiment describes the handling process of server, and methods described includes:
Step S310, obtains the weather condition in region residing for user.
The platform that the weather condition in region residing for user can be opened from weather bureau is obtained, it is also possible to from other weather forecasts Application program in obtain.
Weather condition can include fine day, cloudy day, light rain, heavy rain, heavy rain, hail, slight snow, heavy snow, snowstorm, spout Wind, typhoon, tsunami etc..
Further, the weather condition can include the situation of more details, for example, temperature level, humidity condition, air Haze index etc..
Step S320, judges whether the weather condition meets default inclement weather conditions.
The default inclement weather conditions can be cloudy day, light rain, heavy rain, heavy rain, hail, slight snow, heavy snow, snowstorm, Cyclone, typhoon, tsunami etc..
Further, it is also possible to which the default inclement weather conditions are set to temperature less than first threshold, or air mist Haze index is more than Second Threshold degree situation, it is, of course, understood that can also be the combination of the two, the present invention limit to In this.
Step S330, if the weather condition meets default inclement weather conditions, obtains the electricity consumption remaining sum of the user.
The electricity consumption remaining sum of user can be directly obtained from intelligent electric meter terminal, it is also possible to by collector collection intelligence electricity The electricity consumption remaining sum of the user on meter terminal, server goes to obtain the electricity consumption remaining sum of user again from the collector.
Step S340, according to the electricity consumption remaining sum and current power unit price, calculates the remaining electricity consumption duration of the user.
If for example, the electricity consumption remaining sum be 2 pieces, current power unit price for 1 piece/when, then during the now remaining electricity consumption of user A length of electricity consumption remaining sum/current power unit price=2/1=2 hours.
Further, can also be counted according to the general power of the electricity consumption of the electricity consumption remaining sum, current power unit price and user Calculate the remaining electricity consumption duration under current power.
Whether step S350, judge the remaining electricity consumption duration less than the first duration, a length of predetermined time when described first With the time interval at current time.
Predetermined time can be set to time for starting a business morning at payment, the then predetermined time at for example, 8 points It is set to 8 points of morning.
Wherein, predetermined time corresponding for each user could be arranged to identical, it is also possible to according to circumstances, for every Individual user sets different predetermined times.Each user is set into different predetermined times, then for different user, user's body Test more preferably.
If for example, current time be at 8 points in the evening on the 1st of September in 2015, the predetermined time be 8 points of morning, then first when A length of 12 hours.
Step S360, if the remaining electricity consumption duration is less than first duration, according to the remaining electricity consumption duration and institute The first duration is stated, the second duration is calculated.
Fig. 4 is referred to, used as a kind of implementation method, step S360 includes:
Step S411, the remaining electricity consumption duration is subtracted by first duration, obtains the 3rd duration.
If for example, a length of 2 hours during the remaining electricity consumption, a length of 12 hours when described first, then now the 3rd when it is a length of 10 hours.
Step S412, the credit grade of the user is obtained from credit platform.
The credit platform can be bank, credit card centre, Third-party payment platform, for example, Alipay platform etc..
Credit grade can be divided into it is excellent, it is good, in, it is poor;Credit grade can also be divided according to score.
Whether step S413, judge the credit grade more than the first predetermined threshold value.
First predetermined threshold value, can be configured according to demand, and for the different demarcation method of credit grade, its Corresponding first predetermined threshold value can set difference.
Step S414, if the credit grade is more than first predetermined threshold value, is multiplied by first pre- by the 3rd duration If weight, second duration is obtained.
Described first default weight can be configured according to demand, setting it is more long, then the second duration is more long, then intelligence The time of ammeter terminal extension tripping operation is more long.
If good for example, the credit grade is according to excellent, in, difference is divided, and it is poor that first predetermined threshold value is set to, and Described first default weight is set to 1.5, when the credit grade is more than " poor ", then now second when a length of 10*1.5=15 Hour.
In this way, user's extension high for user credit degree carrys out the longer trip time so that credit rating is high User Experience Degree lifting.
Fig. 5 is referred to, used as another embodiment, step S360 includes:
Step S421, the remaining electricity consumption duration is subtracted by first duration, obtains the 3rd duration.
Step S422, obtains the first position residing for the user.
Can be by the third party application of map, such as Baidu map, third party's interface such as moral map high etc. is provided, Get the first position residing for the user;Can also be that the residing for the user is obtained by other global positioning systems One position.
Step S423, according to the first position, obtains the second place of the payment point nearest with the first position.
According to the first position, can from Utilities Electric Co., or national grid etc. the interface that provides of platform, inquire Correspond to the second place of the payment point nearest with the first position.
Step S424, obtains the traffic information of the first position and the second place.
Can be by the third party application of map, such as Baidu map, third party's interface such as moral map high etc. is provided, Obtain the traffic information of the first position and the second place.
Step S425, if the traffic information meets pre-conditioned, the second default weight is multiplied by by the 3rd duration, Obtain second duration.
It is described it is pre-conditioned can be congestion in road, road maintenance, road distance, can be according to not more than the 3rd threshold value etc. Same situation is configured.
The identical or difference that described second default weight can be set with the described first default weight, can be according to demand Be configured, setting it is more long, then the second duration is more long, then intelligent electric meter terminal extension tripping operation time it is more long.
If for example, it is described it is pre-conditioned be congestion in road, and the described first default weight is set to 2, when road conditions letter Breath is when meeting congestion in road, then now second when it is a length of 10*2=20 hours.
This mode, it is contemplated that the load conditions at user present position and payment so that user is because load conditions are led The delay payment situation of cause, is also not so that intelligent power terminal trips and powers off so that user experience is further lifted.
Step S370, sends control instruction to intelligent electric meter terminal, and the control instruction includes the second duration, so that intelligence Can be tripped after ammeter terminal extension second duration.
Fig. 6 is referred to, used as a kind of implementation method, methods described also includes:
Step S510, receives and pays request, and described payment asks to include the amount of money to be paid and customer identification number.
Step S520, according to the customer identification number, inquires about the corresponding property platform of the customer identification number.
The server is connected with the property platform of each cell in advance, and it is right with it to store each customer identification number The mapping relations of the property platform answered, by the customer identification number, just can inquire the corresponding property of the customer identification number Platform.
Step S530, sends the first prompting message to the property platform, so that the property platform receives described the After one prompting message, distribution counterpart staff opens the corresponding intelligent electric meter terminal of the customer identification number.
First prompting message can be the prompting message of short message, wechat, multimedia message, or other forms.
In this way so that user, can be after payment, at once after the intelligent electric meter terminal tripping operation because of arrearage The corresponding intelligent electric meter terminal of the customer identification number is opened by the staff of property, and need not be after payment, then oneself goes Look for the staff of property to open intelligent electric meter terminal and extend power off time, further improve Consumer's Experience.
Fig. 7 is referred to, used as a kind of implementation method, methods described also includes:
Step S610, user profile is obtained from property platform.
Step S620, inquires about the corresponding electricity consumption remaining sum of the user profile.
Step S630, according to the electricity consumption remaining sum and current power unit price, calculates the remaining electricity consumption duration of the user.
Whether step S640, judge the remaining electricity consumption duration less than the 4th duration.
4th duration can be configured according to demand, more long, the then prompting that property platform can be earlier of setting User goes payment, can reduce generation of the user because of power-off condition caused by arrearage.
Step S650, if the remaining electricity consumption duration is less than the 4th duration, sends the second prompting message to the thing Industry platform, second prompting message includes the user profile and the remaining electricity consumption duration, so that the property platform root Corresponding user is reminded to pay the fees in advance according to second prompting message.
Second prompting message can be the prompting message of short message, wechat, multimedia message, or other forms.
In this way so that when the remaining electricity consumption duration of user is less than four duration, can be put down by property The staff of platform reminds user to remove electricity payment in time, it is possible to reduce hair of the user because of power-off condition caused by arrearage It is raw, improve Consumer's Experience.
Fig. 8 is referred to, used as a kind of implementation method, methods described also includes:
Step S710, obtains the reading in intelligent electric meter terminal.
Server can be directly connected to intelligent electric meter terminal, obtain the reading in intelligent electric meter terminal;Server also may be used It is indirectly connected with intelligent electric meter terminal, for example, being connected with the intelligent electric meter terminal by data acquisition unit, obtains intelligence electricity Reading in meter terminal.
Step S720, judges whether the reading and the history electricity consumption quantity of user meet preset relation.
Reading in the intelligent electric meter terminal of the user that server will can get every time, is stored, in this, as The history electricity consumption quantity of user.
The preset relation can be configured according to demand, for example, the preset relation could be arranged to:The reading The 4th threshold value is not differed with the average electricity consumption quantity of the history of user.It is of course also possible to be other preset relations, it is not limited to This.
Step S730, if the reading and the history electricity consumption quantity of the user are unsatisfactory for the preset relation, sends the Three prompting messages are to property platform, so that the property platform is according to the 3rd prompting message, distribution counterpart staff's inspection Repair the intelligent electric meter terminal.
The average electricity consumption quantity of the reading and the history of user is compared, for example, the difference number of degrees are more than the 4th threshold value, Send the 3rd prompting message to property platform.
3rd prompting message can be the prompting message of short message, wechat, multimedia message, or other forms.
Server can in time find whether the reading in current intelligent electric meter terminal meets the consumption habit of user, if hair Now it is unsatisfactory for, is then probably that intelligent electric meter terminal goes wrong, therefore send the 3rd prompting message to property platform, so that described According to the 3rd prompting message, distribution counterpart staff overhauls the intelligent electric meter terminal to property platform, by this side Formula, can in time overhaul the intelligent electric meter terminal, it is to avoid user influences user because intelligent electric meter terminal goes wrong Electricity consumption, further improve Consumer's Experience.
Whether power consumption control method provided in an embodiment of the present invention, met by the weather condition for judging region residing for user Default inclement weather conditions, if meeting, calculate the remaining electricity consumption duration of the user, if the remaining electricity consumption duration is less than institute The first duration is stated, then sends control instruction to intelligent electric meter terminal, so that intelligent electric meter terminal is jumped after extending second duration Lock, in this way so that user in inclement weather, after facing arrearage, intelligent electric meter terminal tripping operation and power off Situation, without charging of going out in inclement weather so that Consumer's Experience is lifted.
Fig. 9 is referred to, is the high-level schematic functional block diagram of the power consumption control device 800 that seventh embodiment of the invention is provided.Institute Stating power consumption control device 800 includes the first acquisition module 810, the first judge module 820, the second acquisition module 830, the first calculating Module 840, the second judge module 850, the second computing module 860, and sending module 870.
First acquisition module 810, the weather condition for obtaining region residing for user.
First judge module 820, for judging whether the weather condition meets default inclement weather conditions.
Second acquisition module 830, if meeting default inclement weather conditions for the weather condition, obtains the use The electricity consumption remaining sum at family.
First computing module 840, for according to the electricity consumption remaining sum and current power unit price, calculating the user's Remaining electricity consumption duration.
Second judge module 850, for judging the remaining electricity consumption duration whether less than the first duration, described first Shi Changwei predetermined times and the time interval at current time.
Second computing module 860, if being less than first duration for the remaining electricity consumption duration, according to described surplus Remaining electricity consumption duration and first duration, calculate the second duration.
Used as a kind of implementation method, second computing module 860 is described surplus specifically for first duration is subtracted Remaining electricity consumption duration, obtains the 3rd duration;The credit grade of the user is obtained from credit platform;Whether judge the credit grade More than the first predetermined threshold value;If the credit grade is more than first predetermined threshold value, the 3rd duration is multiplied by first pre- If weight, second duration is obtained.
Used as another embodiment, second computing module 860 is described specifically for first duration is subtracted Remaining electricity consumption duration, obtains the 3rd duration;Obtain the first position residing for the user;According to the first position, obtain with The second place of the nearest payment point in the first position;Obtain the traffic information of the first position and the second place; If the traffic information meets pre-conditioned, the 3rd duration is multiplied by the second default weight, obtains second duration.
The sending module 870, for sending control instruction to intelligent electric meter terminal, the control instruction includes second Duration, so that intelligent electric meter terminal trips after extending second duration.
Used as a kind of implementation method, described device also includes processing module 880, and request, the payment are paid for receiving Request includes the amount of money to be paid and customer identification number;According to the customer identification number, the customer identification number correspondence is inquired about Property platform;The first prompting message to the property platform is sent, so as to the property platform receives described first remind After information, distribution counterpart staff opens the corresponding intelligent electric meter terminal of the customer identification number.
Each module can, by software code realization, can equally be realized by hardware such as IC chip above.
It should be noted that each embodiment in this specification is described by the way of progressive, each embodiment weight Point explanation is all difference with other embodiment, between each embodiment identical similar part mutually referring to.
The technique effect and preceding method of the power consumption control device that the embodiment of the present invention is provided, its realization principle and generation Embodiment is identical, is to briefly describe, and device embodiment part does not refer to part, refers in corresponding in preceding method embodiment Hold.
In several embodiments provided herein, it should be understood that disclosed apparatus and method, it is also possible to pass through Other modes are realized.Device embodiment described above is only schematical, for example, flow chart and block diagram in accompanying drawing Show the device of multiple embodiments of the invention, the architectural framework in the cards of method and computer program product, Function and operation.At this point, each square frame in flow chart or block diagram can represent one the one of module, program segment or code Part a, part for the module, program segment or code is used to realize holding for the logic function for specifying comprising one or more Row instruction.It should also be noted that at some as in the implementation replaced, the function of being marked in square frame can also be being different from The order marked in accompanying drawing occurs.For example, two continuous square frames can essentially be performed substantially in parallel, they are sometimes Can perform in the opposite order, this is depending on involved function.It is also noted that every in block diagram and/or flow chart The combination of the square frame in individual square frame and block diagram and/or flow chart, can use the function or the special base of action for performing regulation Realized in the system of hardware, or can be realized with the combination of computer instruction with specialized hardware.
In addition, each functional module in each embodiment of the invention can integrate to form an independent portion Divide, or modules individualism, it is also possible to which two or more modules are integrated to form an independent part.
If the function is to realize in the form of software function module and as independent production marketing or when using, can be with Storage is in a computer read/write memory medium.Based on such understanding, technical scheme is substantially in other words The part contributed to prior art or the part of the technical scheme can be embodied in the form of software product, the meter Calculation machine software product is stored in a storage medium, including some instructions are used to so that a computer equipment (can be individual People's computer, server, or network equipment etc.) perform all or part of step of each embodiment methods described of the invention. And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage (ROM, Read-Only Memory), arbitrary access Memory (RAM, Random Access Memory), magnetic disc or CD etc. are various can be with the medium of store program codes.Need It is noted that herein, such as first and second or the like relational terms are used merely to an entity or operation Made a distinction with another entity or operation, and not necessarily require or imply these entities or exist between operating any this Actual relation or order.And, term " including ", "comprising" or its any other variant be intended to nonexcludability Comprising so that process, method, article or equipment including a series of key elements not only include those key elements, but also wrapping Include other key elements being not expressly set out, or also include for this process, method, article or equipment is intrinsic wants Element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that wanted including described Also there is other identical element in process, method, article or the equipment of element.
The preferred embodiments of the present invention are the foregoing is only, is not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.It is all within the spirit and principles in the present invention, made any repair Change, equivalent, improvement etc., should be included within the scope of the present invention.It should be noted that:Similar label and letter exists Similar terms is represented in following accompanying drawing, therefore, once being defined in a certain Xiang Yi accompanying drawing, then it is not required in subsequent accompanying drawing It is further defined and is explained.
The above, specific embodiment only of the invention, but protection scope of the present invention is not limited thereto, and it is any Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all contain Cover within protection scope of the present invention.Therefore, protection scope of the present invention described should be defined by scope of the claims.

Claims (10)

1. a kind of power consumption control method, it is characterised in that methods described includes:
Obtain the weather condition in region residing for user;
Judge whether the weather condition meets default inclement weather conditions;
If the weather condition meets default inclement weather conditions, the electricity consumption remaining sum of the user is obtained;
According to the electricity consumption remaining sum and current power unit price, the remaining electricity consumption duration of the user is calculated;
Whether judge the remaining electricity consumption duration less than the first duration, when described first a length of predetermined time and current time when Between be spaced;
If the remaining electricity consumption duration is less than first duration, according to the remaining electricity consumption duration and first duration, meter Calculate the second duration;
Control instruction is sent to intelligent electric meter terminal, the control instruction includes the second duration, so that intelligent electric meter terminal is prolonged Tripped after length second duration.
2. method according to claim 1, it is characterised in that according to the remaining electricity consumption duration and first duration, The second duration is calculated, including:
First duration is subtracted into the remaining electricity consumption duration, the 3rd duration is obtained;
The credit grade of the user is obtained from credit platform;
Judge the credit grade whether more than the first predetermined threshold value;
If the credit grade is more than first predetermined threshold value, the 3rd duration is multiplied by the first default weight, obtains institute State the second duration.
3. method according to claim 1, it is characterised in that according to the remaining electricity consumption duration and first duration, The second duration is calculated, including:
First duration is subtracted into the remaining electricity consumption duration, the 3rd duration is obtained;
Obtain the first position residing for the user;
According to the first position, the second place of the payment point nearest with the first position is obtained;
Obtain the traffic information of the first position and the second place;
If the traffic information meets pre-conditioned, the 3rd duration is multiplied by the second default weight, obtains described second Duration.
4. method according to claim 1, it is characterised in that methods described also includes:
Receive and pay request, described payment asks to include the amount of money to be paid and customer identification number;
According to the customer identification number, the corresponding property platform of the customer identification number is inquired about;
The first prompting message to the property platform is sent, so that after the property platform receives first prompting message, Distribution counterpart staff opens the corresponding intelligent electric meter terminal of the customer identification number.
5. method according to claim 1, it is characterised in that methods described also includes:
User profile is obtained from property platform;
Inquire about the corresponding electricity consumption remaining sum of the user profile;
According to the electricity consumption remaining sum and current power unit price, the remaining electricity consumption duration of the user is calculated;
Judge the remaining electricity consumption duration whether less than the 4th duration;
If the remaining electricity consumption duration is less than the 4th duration, the second prompting message is sent to the property platform, described the Two prompting messages include the user profile and the remaining electricity consumption duration, so that the property platform is reminded according to described second Information reminding corresponding user pay the fees in advance.
6. method according to claim 1, it is characterised in that methods described also includes:
Obtain the reading in intelligent electric meter terminal;
Judge whether the reading and the history electricity consumption quantity of user meet preset relation;
If the reading is unsatisfactory for the preset relation with the history electricity consumption quantity of the user, the 3rd prompting message to thing is sent Industry platform, so that the property platform is according to the 3rd prompting message, distribution counterpart staff overhauls the intelligent electric meter Terminal.
7. a kind of power consumption control device, it is characterised in that described device includes:
First acquisition module, the weather condition for obtaining region residing for user;
First judge module, for judging whether the weather condition meets default inclement weather conditions;
Second acquisition module, if meeting default inclement weather conditions for the weather condition, obtains more than the electricity consumption of the user Volume;
First computing module, for according to the electricity consumption remaining sum and current power unit price, when calculating the remaining electricity consumption of the user It is long;
Second judge module, it is a length of default when described first for whether judging the remaining electricity consumption duration less than the first duration Moment and the time interval at current time;
Second computing module, if being less than first duration for the remaining electricity consumption duration, according to the remaining electricity consumption duration And first duration, calculate the second duration;
Sending module, for sending control instruction to intelligent electric meter terminal, the control instruction includes the second duration, so that intelligence Can be tripped after ammeter terminal extension second duration.
8. device according to claim 7, it is characterised in that second computing module, specifically for by described first Duration subtracts the remaining electricity consumption duration, obtains the 3rd duration;The credit grade of the user is obtained from credit platform;Judge institute Whether credit grade is stated more than the first predetermined threshold value;If the credit grade is more than first predetermined threshold value, by the described 3rd Duration is multiplied by the first default weight, obtains second duration.
9. device according to claim 7, it is characterised in that second computing module, specifically for by described first Duration subtracts the remaining electricity consumption duration, obtains the 3rd duration;Obtain the first position residing for the user;According to described first Position, obtains the second place of the payment point nearest with the first position;The first position is obtained with the second place Traffic information;If the traffic information meets pre-conditioned, the 3rd duration is multiplied by the second default weight, obtains institute State the second duration.
10. device according to claim 7, it is characterised in that described device also includes processing module, pays for receiving Request, described payment asks to include the amount of money to be paid and customer identification number;According to the customer identification number, the use is inquired about The corresponding property platform of family identifier;The first prompting message to the property platform is sent, so that the property platform is received After first prompting message, distribution counterpart staff opens the corresponding intelligent electric meter terminal of the customer identification number.
CN201611071186.5A 2016-11-29 2016-11-29 Power consumption control method and device Active CN106773813B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611071186.5A CN106773813B (en) 2016-11-29 2016-11-29 Power consumption control method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611071186.5A CN106773813B (en) 2016-11-29 2016-11-29 Power consumption control method and device

Publications (2)

Publication Number Publication Date
CN106773813A true CN106773813A (en) 2017-05-31
CN106773813B CN106773813B (en) 2019-07-02

Family

ID=58905312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611071186.5A Active CN106773813B (en) 2016-11-29 2016-11-29 Power consumption control method and device

Country Status (1)

Country Link
CN (1) CN106773813B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110209060A (en) * 2019-05-23 2019-09-06 无锡小天鹅电器有限公司 A kind of control method and device, equipment and computer storage medium
CN110609160A (en) * 2018-06-15 2019-12-24 云丁智能科技(北京)有限公司 Intelligent ammeter control method and device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120159508A1 (en) * 2010-12-15 2012-06-21 Masanobu Katagi Task management system, task management method, and program
CN102568108A (en) * 2012-01-17 2012-07-11 石家庄科林电气股份有限公司 Prepayment reminding method for intelligent electric meter based on remote charge control mode
KR20130065844A (en) * 2011-12-02 2013-06-20 한국전자통신연구원 System and method for managing energy equipments efficiency in intelligent building
CN103595816A (en) * 2013-11-25 2014-02-19 国家电网公司 Integrated electric marketing charge-reminding platform system
CN203535722U (en) * 2013-11-14 2014-04-09 贵州大学 Intelligent electric meter having delay function
CN203722762U (en) * 2014-02-08 2014-07-16 江苏省电力公司常州供电公司 Electricity bill payment reminding system
CN105308905A (en) * 2013-06-18 2016-02-03 思科技术公司 Dynamically adjusting network parameters using weather forecasts

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120159508A1 (en) * 2010-12-15 2012-06-21 Masanobu Katagi Task management system, task management method, and program
KR20130065844A (en) * 2011-12-02 2013-06-20 한국전자통신연구원 System and method for managing energy equipments efficiency in intelligent building
CN102568108A (en) * 2012-01-17 2012-07-11 石家庄科林电气股份有限公司 Prepayment reminding method for intelligent electric meter based on remote charge control mode
CN105308905A (en) * 2013-06-18 2016-02-03 思科技术公司 Dynamically adjusting network parameters using weather forecasts
CN203535722U (en) * 2013-11-14 2014-04-09 贵州大学 Intelligent electric meter having delay function
CN103595816A (en) * 2013-11-25 2014-02-19 国家电网公司 Integrated electric marketing charge-reminding platform system
CN203722762U (en) * 2014-02-08 2014-07-16 江苏省电力公司常州供电公司 Electricity bill payment reminding system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘伟桓: "配网检修停电时间模型及在可靠性评估中的应用", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑(月刊)》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110609160A (en) * 2018-06-15 2019-12-24 云丁智能科技(北京)有限公司 Intelligent ammeter control method and device
CN110609160B (en) * 2018-06-15 2021-07-13 云丁智能科技(北京)有限公司 Intelligent ammeter control method and device
CN110209060A (en) * 2019-05-23 2019-09-06 无锡小天鹅电器有限公司 A kind of control method and device, equipment and computer storage medium

Also Published As

Publication number Publication date
CN106773813B (en) 2019-07-02

Similar Documents

Publication Publication Date Title
AU2022202616B2 (en) Method and apparatus for facilitating the operation of an on-site energy storage system to co-optimize battery dispatch
ur Rehman et al. Sizing battery energy storage and PV system in an extreme fast charging station considering uncertainties and battery degradation
Opiyo Impacts of neighbourhood influence on social acceptance of small solar home systems in rural western Kenya
CN106204931A (en) A kind of keyholed back plate that takes the most in real time manages system and method
CN111873841A (en) Intelligent charging station management system
Thatte et al. Robust bidding strategy for wind power plants and energy storage in electricity markets
CN105474501B (en) The electric discharge start time decision systems of electrical storage device and the determining method of the electric discharge start time of electrical storage device
CN104937803A (en) Power management system
US20130131880A1 (en) Power management apparatus and method
CN116780583B (en) Intelligent energy storage method, system, equipment and medium for photovoltaic power generation
Aghamolaei et al. Feasibility analysis of community-based PV systems for residential districts: A comparison of on-site centralized and distributed PV installations
CN102262664A (en) Quality estimating method and quality estimating device
CN106773813A (en) Power consumption control method and device
CN109978525A (en) A kind of electric vehicle replaceable battery method of commerce and system
Barnes et al. Sizing and economic assessment of energy storage with real-time pricing and ancillary services
CN106696732A (en) Monitoring system and method of electromobile charging station
CN110555612A (en) Payment system and method based on credit rating evaluation of power consumer
CN111210260A (en) Electricity price data processing method and device, computer equipment and storage medium
JP7297004B2 (en) Power supply system and power management method
CN110544037A (en) Fee urging system and method based on credit rating evaluation of power consumer
CN108665362A (en) A kind of distributed power station accounting system
CN107404532A (en) Shared electricity consumption interactive system and method
CN108596384A (en) The method and apparatus of pre- electricity payment
CN105844342A (en) Short-term electricity market forecasting system and method
CN111160663A (en) Prediction method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant