CN106765911A - Control method and device of central air-conditioning cooler and controller - Google Patents

Control method and device of central air-conditioning cooler and controller Download PDF

Info

Publication number
CN106765911A
CN106765911A CN201611110683.1A CN201611110683A CN106765911A CN 106765911 A CN106765911 A CN 106765911A CN 201611110683 A CN201611110683 A CN 201611110683A CN 106765911 A CN106765911 A CN 106765911A
Authority
CN
China
Prior art keywords
cold
integrated operation
operation parameter
rate
refrigeration requirement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611110683.1A
Other languages
Chinese (zh)
Other versions
CN106765911B (en
Inventor
王娟
刘华
张治平
王升
孙栋军
刘国林
刘羽松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201611110683.1A priority Critical patent/CN106765911B/en
Publication of CN106765911A publication Critical patent/CN106765911A/en
Application granted granted Critical
Publication of CN106765911B publication Critical patent/CN106765911B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/46Improving electric energy efficiency or saving
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/54Control or safety arrangements characterised by user interfaces or communication using one central controller connected to several sub-controllers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Signal Processing (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The embodiment of the invention discloses a control method, a device and a controller of a central air-conditioning cooler. The method comprises the following steps: updating the comprehensive operation parameters according to the self operation parameters and the comprehensive operation parameters, and setting and storing the working state; sending the updated comprehensive operation parameters to a downstream first controller, so that the downstream controller updates and sets again according to the updated comprehensive operation parameters and stores the working state until the updated comprehensive operation parameters meet preset operation conditions, and sending operation information to the upstream controller; and after receiving the preset time of the running information, controlling the running of the cold machine according to the stored working state. The technical scheme provided by the embodiment of the invention realizes the decoupling control of each cold machine in the central air-conditioning system, achieves the purpose of universal development of the control program of the cold machine, and simultaneously ensures the timely effectiveness of the cold supply at the tail end and the comfort of a room at the tail end.

Description

A kind of control method of central air-conditioning cold, device and controller
Technical field
The present embodiments relate to technical field of central air, more particularly to a kind of control method of central air-conditioning cold, Device and controller.
Background technology
In computer room in Large Central Air Conditioning System system cooling is carried out using cold.According to the size of cooling needs, generally have Many identical cold or cold of different sizes are connected in parallel, and semen donors are adjusted by controlling the unlatching number of units of cold, To meet system end refrigeration requirement.
The energy consumption of air-conditioning system accounts for half of whole building energy consumption or so, and cold is the energy consumption rich and influential family of whole computer room, accounts for Whole energy consumption of machine room more than half, therefore the fractional energy savings of cold is the important indicator for influenceing building energy conservation.The center for using at present Control system is all the group control system of centralization, the central controller decision-making cold in whole system, water pump, cooling tower, water valve Deng opening and mutually regulation.Control of the centralized group control system to cold, generally refers to certain condition, judges system System just increases a cold after reaching a certain condition, and judgement system is shut off a cold after reaching certain another condition.
The control of above-mentioned centralization is in advance by the configuration mode of cold write-in central controller, in different cold number of units And, it is necessary to change control program of the central controller to cold when there is size cold, cause the controller of this centralization Cannot be common in a variety of central air conditioner systems.And due to the hysteresis quality of comprehensive pipe network time so that centerized fusion The end comfortableness of cold is poor.
The content of the invention
The embodiment of the present invention provides a kind of control method of central air-conditioning cold, device and controller, to improve cold In end while cooling comfortableness, strengthen the versatility of controller control program.
In a first aspect, the embodiment of the invention provides a kind of control method of central air-conditioning cold, the method includes:
Integrated operation parameter is updated according to self-operating parameter and integrated operation parameter, working condition is set and store;
Downstream the first controller sends the integrated operation parameter after the renewal, to cause downstream controller according to Integrated operation parameter is updated and sets and store working condition again after renewal, until integrated operation parameter after the renewal Meet preset operating conditions, upstream controller sends operation information;
After the operation information preset duration is received, run according to the working state control cold of the storage.
Second aspect, the embodiment of the present invention additionally provides a kind of control device of central air-conditioning cold, and the device includes:
Integrated operation parameter update module, for updating integrated operation ginseng according to self-operating parameter and integrated operation parameter Number, sets and stores working condition;
Integrated operation parameter sending module, the integrated operation ginseng after the renewal is sent for downstream the first controller Number, to cause downstream controller to be updated again according to integrated operation parameter after the renewal and set and store work shape State, until integrated operation parameter meets preset operating conditions after the renewal, upstream controller sends operation information;
Cold operation control module, for after the operation information preset duration is received, according to the work of the storage Make state control refrigerator operation.
The third aspect, the embodiment of the present invention additionally provides a kind of controller, and the controller is provided including the embodiment of the present invention Central air-conditioning cold control device.
The control method of central air-conditioning cold provided in an embodiment of the present invention, by according to self-operating parameter and comprehensive fortune Line parameter updates integrated operation parameter, sets and store working condition;It is comprehensive after downstream the first controller transmission renewal Operational factor is closed, to cause downstream controller to be updated again according to integrated operation parameter after the renewal and set and store Working condition, until integrated operation parameter meets preset operating conditions after the renewal, upstream controller sends operation information; After the operation information preset duration is received, run according to the working state control cold of the storage.Realize center The uneoupled control of each cold in air-conditioning system, has reached the purpose of cold control program generalization exploitation, while ensure that end The timely and effective property and the comfortableness in end room of cooling.
Brief description of the drawings
Technical scheme in order to illustrate more clearly the embodiments of the present invention, below will be to that will make needed for embodiment description Accompanying drawing does one and simply introduces, it should be apparent that, drawings in the following description are some embodiments of the present invention, for this For the those of ordinary skill of field, on the premise of not paying creative work, can also obtain other according to these accompanying drawings Accompanying drawing.
Fig. 1 is a kind of control method flow chart of central air-conditioning cold that the embodiment of the present invention one is provided;
Fig. 2 be the embodiment of the present invention one provide central air-conditioning cold control method in integrated operation parameter transmission stream Journey schematic diagram;
Fig. 3 is a kind of control method flow chart of central air-conditioning cold that the embodiment of the present invention two is provided;
Fig. 4 is a kind of control method flow chart of central air-conditioning cold that the embodiment of the present invention three is provided;
Fig. 5 is a kind of structural representation of the control device of central air-conditioning cold that the embodiment of the present invention four is provided.
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples.It is understood that this place is retouched The specific embodiment stated is used only for explaining the present invention, rather than limitation of the invention.It also should be noted that, in order to just Part rather than entire infrastructure related to the present invention is illustrate only in description, accompanying drawing.
Embodiment one
Fig. 1 is a kind of control method flow chart of central air-conditioning cold that the embodiment of the present invention one is provided, and the present embodiment can For the control of central air-conditioning cold running status, the method can be performed by the control device of central air-conditioning cold, the device Can be realized by the mode of software and/or hardware, the device can be integrated in any offer, and there is central air-conditioning cold to run shape In the controller of state control function.
Referring to Fig. 1, the control method of the central air-conditioning cold, including:
S110, integrated operation parameter is updated according to self-operating parameter and integrated operation parameter, set and store work shape State.
In the present embodiment, the control method of central air-conditioning cold is realized based on formation internet between many cold 's.At least one cold is included in central air conditioner system, wherein, the quantity to cold does not do specific restriction, and every cold is big It is small can be with identical, it is also possible to it is different.Every cold has the operational factor of itself, and self-operating parameter includes:Refrigerating capacity, work( The performance parameter that the cold such as rate, rate of load condensate and rated cooling capacity have itself.Integrated operation parameter can be prediction refrigeration requirement And general power.Integrated operation parameter is an amount that change is constantly updated with cold self-operating parameter.Optionally, it is described from Body operational factor includes:Refrigerating capacity, the integrated operation parameter includes:Prediction refrigeration requirement;Accordingly, it is described according to itself fortune Line parameter and integrated operation parameter update integrated operation parameter, set and store working condition, including:It is more than in the refrigerating capacity During the prediction refrigeration requirement, original prediction refrigeration requirement is kept, set and store working condition to close;In the refrigerating capacity No more than the prediction refrigeration requirement when, will predict that the difference of refrigeration requirement and refrigerating capacity is updated to predict refrigeration requirement, set And working condition is stored to open.Exemplary, the refrigerating capacity of cold A is 1000-2000kW, the i.e. maximum cooling capacity of cold A It is 2000kW, minimum refrigerating capacity is 1000kW.When the prediction refrigeration requirement for being transferred to cold A is 3500kW, sets and store The working condition of cold A is freezed to open with maximum refrigerating capacity 2000kW, while prediction refrigeration requirement is updated to 1500kW, and the prediction refrigeration requirement after renewal is passed into next cold.When the prediction refrigeration requirement for being transferred to cold A is During 800kW, because the minimum refrigerating capacity of cold A is 1000kW, it is impossible to meet prediction refrigeration requirement, set and store cold A's Working condition is closing, to realize the purpose of saving energy consumption.And original prediction refrigeration requirement is passed into next cold.
S120, downstream the first controller send the integrated operation parameter after the renewal, to cause downstream controller root Updated again according to integrated operation parameter after the renewal and set and store working condition, until comprehensively being transported after the renewal Line parameter meets preset operating conditions, and upstream controller sends operation information.
In the present embodiment, the controller of downstream first can be a priority level lower than itself cold cold it is corresponding Controller.Exemplary, integrated operation parameter transmission in the control method of the central air-conditioning cold that Fig. 2 is provided for the present embodiment Schematic flow sheet.As shown in Fig. 2 having N platform cold, cold A, cold B, cold C, cold D, cold in central air conditioner system E ... cold N, a cold module is formed, cold total quantity is N, and N is any positive integer, and N can be 1, can be 2, can Being 7,8,9.Calculating integrated operation parameter is sent and updated since cold A.Operational factors and input of the cold A according to itself Integrated operation parameter, calculate whether itself opens, set and store the working condition of itself, and update integrated operation parameter. The integrated operation parameter after renewal is sent to cold B simultaneously, cold B is transmitted more according to itself operational factor and cold A Integrated operation parameter after new, calculates whether itself opens, and sets and store the working condition of itself, and updates comprehensive fortune again Line parameter.The integrated operation parameter that will be updated again is sent to cold C, according to above-mentioned rule so circulating transfer.Every cold After updating integrated operation parameter, judge whether the integrated operation parameter after updating meets preset operating conditions, until after updating Untill integrated operation parameter meets preset operating conditions, and upstream the controller of cold sends operation information.Wherein, bar is preset Part is to predict refrigeration requirement in default convergency value and 0 interval range after updating.Default convergency value presets for user A good cold value, the minimum cold of refrigeration is met for characterizing.Default convergency value is smaller, cold in central air conditioner system Cooling effect it is better.Refrigeration requirement is predicted after renewal closer to O, when each cold is run by the state of storage, closer to first Begin prediction refrigeration requirement value, and refrigeration performance is better, and end room cooling more can be close to actual demand, and the comfort level in room is got over It is high.
S130, after the operation information preset duration is received, according to the storage working state control cold transport OK.
In the present embodiment, pipe network has time-lag effect, exemplary, in certain hot summer, on certain office block Noon, 8 demand refrigerating capacitys were 7000KW, but often due to the time-lag effect of pipe network, can be only achieved demand system thirty in the morning eight Cold so that user's comfortableness is poor.In order to reach more preferable comfortableness, predict refrigeration requirement with end load to be regulated and controled. If pipe network lag time is t=20min, the same day 10:00 load prediction refrigeration requirement value is 7000kW, then each cold Will be 9:When 40 by the prediction refrigeration requirement for receiving be 7000kW when, each cold according to storage working state control cold Operation so that the 7000kW refrigerating capacitys of forecast demand are reached after pipe network system operation 20min.
The control method of the central air-conditioning cold that the present embodiment is provided, joins by according to self-operating parameter and integrated operation Number updates integrated operation parameter, sets and store working condition;Downstream the first controller sends the comprehensive fortune after the renewal Line parameter, to cause downstream controller to be updated again according to integrated operation parameter after the renewal and set and store work State, until integrated operation parameter meets preset operating conditions after the renewal, upstream controller sends operation information;Connecing After receiving the operation information preset duration, run according to the working state control cold of the storage.Realize central air-conditioning The uneoupled control of each cold in system, has reached the purpose of cold control program generalization exploitation, while ensure that end cooling Timely and effective property and end room comfortableness.
Embodiment two
Fig. 3 is the control method flow chart of the central air-conditioning cold that the embodiment of the present invention two is provided, and the present embodiment is above-mentioned On the basis of embodiment, entered according to the step for self-operating parameter and integrated operation parameter renewal integrated operation parameter to described Optimization is gone:Obtain the current priority of itself;When from as the first priority, the integrated operation parameter of input, root are received Integrated operation parameter is updated according to self-operating parameter and the integrated operation parameter of the input;When from as other priority, The integrated operation parameter that the controller of upstream first sends is received, according to self-operating parameter and the integrated operation parameter of the input Update integrated operation parameter.
Referring to Fig. 3, the control method of the central air-conditioning cold, including:
S310, the current priority of itself of acquisition.
In the present embodiment, every cold has the priority of itself, and each priority only corresponds to a cold. In the control method of central air-conditioning cold, integrated operation parameter is to update transmission by every sequencing of the priority of cold 's.In a central air conditioner system, the priority of each cold can be determined by following combined factors:Cold is current to be opened Off-mode, the priority of external setting-up, the height of cold performance and cold accumulated running time.What each cold priority was calculated Criterion:A. the cold that open preferentially is remained on, and the cold that close preferentially keeps off status;B. external setting-up priority is high Cold is first opened, and the low cold of external setting-up priority is first closed;C. performance cold high is preferentially opened, and the low cold of performance is excellent First close;D. accumulated running time most short cold is preferentially opened, and cold run time cold most long is preferentially closed.Each cold The sequencing of the criterion that priority is calculated is a>b>c>d.Specifically, the priority of cold is represented with Arabic numerals, numeral It is smaller, represent that the priority of cold is higher.Exemplary, the priority of cold A is 1, and the priority of cold B is 2, then cold A Priority be higher than the priority of cold B.According to the priority of above-mentioned setting, each controller can be by reading setting Priority, obtains the priority of itself, and then can realize realizing identical refrigeration by minimum energy consumption.
S330, from as the first priority when, receive input integrated operation parameter, according to self-operating parameter and institute The integrated operation parameter for stating input updates integrated operation parameter.
In the present embodiment, all controllers all set same program, and program includes at least two-part computing Component, one of them is the first priority budget component, and another is then other priority arithmetic components, is getting priority Afterwards, computing is carried out into corresponding component according to the priority selection for obtaining.
After outside delivers prediction refrigeration requirement value, every cold receives prediction refrigeration requirement in central air conditioner system. According to the own priority for obtaining, the integrated operation parameter of input is received by the cold of the first priority, that is, receive outside The prediction refrigeration requirement of transmission.The cold of the first priority is cold according to the prediction of the operational factor of itself and the outside transmission for receiving Amount demand, judges the working condition of itself, that is, open or close.Exemplary, when the maximum system of the cold of the first priority When cold is more than the prediction refrigeration requirement that the outside for receiving is transmitted, the cold of the first priority is set and stored for closed mode, And keep original prediction refrigeration requirement to pass to the cold of the second priority;Connect when the refrigerating capacity of the cold of the first priority is less than During the prediction refrigeration requirement of the outside transmission of receipts, the cold of the first priority is set and stored for opening, and will predict cold The difference of the refrigerating capacity of the cold of amount demand and the first priority is as new prediction refrigeration requirement and the prediction after renewal is cold Amount demand passes to the cold of the second priority.Wherein, the difference of the refrigerating capacity of the cold of prediction refrigeration requirement and the first priority When being worth the cold unlatching for the first priority, other cold need the remaining refrigerating capacity for meeting.
S330, from as other priority when, receive the controller of upstream first send integrated operation parameter, according to from Body operational factor and the integrated operation parameter of the input update integrated operation parameter.
When the priority of cold is not or not first priority, the synthesis that cold more higher leveled than own priority sends is received Operational factor, and operational factor and the integrated operation parameter of reception according to itself, judge the working condition of itself, that is, open also It is to close.Working condition is set and stored, and updates integrated operation parameter.Exemplary, the cold of third priority receives the The integrated operation parameter of the cold transmission of two priority, the integrated operation parameter can include remaining refrigerating capacity.When the 3rd excellent When the refrigerating capacity of the cold of first level is more than remaining refrigerating capacity, the working condition for setting and storing the cold of third priority is closed, And remaining refrigerating capacity is kept into the constant cold for passing to the 4th priority;When the refrigerating capacity of the cold of third priority is not more than During remaining refrigerating capacity, the working condition for setting and storing the cold of third priority is opened, and remaining refrigerating capacity is excellent with the 3rd The difference of the refrigerating capacity of the cold of first level passes to the cold of the 4th priority as integrated operation parameter.Next cold is according to biography It is progressive come integrated operation parameter carry out correlation computations, after the completion of result of calculation is equally passed into again next cold.
S340, downstream the first controller send the integrated operation parameter after the renewal, to cause downstream controller root Updated again according to integrated operation parameter after the renewal and set and store working condition, until comprehensively being transported after the renewal Line parameter meets preset operating conditions, and upstream controller sends operation information.
S350, after the operation information preset duration is received, according to the storage working state control cold transport OK.
The control method of the central air-conditioning cold that the present embodiment is provided, by the difference according to own priority, according to certainly Body operational factor and integrated operation parameter update integrated operation parameter, realize the decoupling control of each cold in central air conditioner system System, has effectively reached the optimum control between each cold.
In a preferred embodiment of the present embodiment, the self-operating parameter includes own power, the synthesis Operational factor also includes:General power;Accordingly, it is described to be updated according to self-operating parameter and the integrated operation parameter of the input Integrated operation parameter, also includes:General power is updated according to own power and the general power of the input;Accordingly, it is described upward Trip controller sends operation information, also includes:The general power after updating is sent to the first priority controller and finally predict cold Amount demand.
Cold self-operating parameter includes own power, wherein, own power is when cold is set and is stored as open state When, cold produces the electrical power value of the refrigerating capacity needs consumption of setting, it is understood that be, the such electrical power energy of cold consumption Enough produce default refrigeration.In central air conditioner system, the integrated operation parameter of the cold transmission of each priority, including it is real-time The prediction refrigeration requirement (remaining refrigerating capacity) and general power of renewal.Wherein, the cold in each priority transmits integrated operation parameter During, general power is an amount for real-time update as remaining refrigerating capacity.Exemplary, in central air conditioner system, Including four cold, respectively cold A, cold B, cold C and cold D, and the sequencing of cold priority are followed successively by:Cold A>Cold B>Cold C>Cold D.Wherein, to open, the working condition of cold B is closing to the working condition of cold A and cold C, Then pass to itself work(that the general power in the integrated operation parameter of cold D produces setting refrigerating capacity to need for cold A and cold B The sum of rate.Integrated operation parameter meets pre-conditioned after renewal, and the general power after updating is sent to the first priority controller, So that obtaining user can check corresponding general power.
Optionally, after the general power after updating is sent to the first priority controller, according to the work of the storage Also include before state control refrigerator operation:When from as the first priority, according to the general power after the renewal for receiving and Final prediction refrigeration requirement calculates Energy Efficiency Ratio COP.Wherein, Energy Efficiency Ratio COP is the prediction refrigeration requirement value and satisfaction of outside transmission The ratio of the general power after the difference of final prediction refrigeration requirement during default convergency value and renewal.Energy Efficiency Ratio COP values are bigger, produce The electrical power of raw preset cooling capacity consumption is fewer, and energy saving is higher.
The control method of the central air-conditioning cold that the present embodiment is provided, by sending renewal to the first priority controller After general power afterwards, step is increased before being run according to the working state control cold of the storage:Excellent certainly as first During first level, Energy Efficiency Ratio COP is calculated according to the general power after the renewal for receiving and final prediction refrigeration requirement, can be by COP Value weighs the height of the cold-supplying energy-saving performance of central air-conditioning cold.
Embodiment three
Fig. 4 is the control method flow chart of the central air-conditioning cold that the embodiment of the present invention three is provided, and the present embodiment is above-mentioned On the basis of embodiment, after the general power after according to the renewal for receiving calculates Energy Efficiency Ratio COP, according to the work of the storage Make to increase following steps before state control refrigerator operation:Rate of load condensate is lowered according to default ratio, after causing according to downward The COP that rate of load condensate correspondence is calculated meets default observable index condition.And by the working state control according to the storage Cold is run, and is specifically optimized for:Working state control cold according to the downward preload rate correspondence storage is run.
Referring to Fig. 4, the control method of the central air-conditioning cold, including:
S410, the current priority of itself of acquisition.
S420, when from as the first priority, the integrated operation parameter of input is received, according to own power, maximum negative The prediction refrigeration requirement of lotus rate, rated cooling capacity and the input updates prediction refrigeration requirement and general power, sets and store work Make state.
S430, from as other priority when, receive the controller of upstream first send prediction refrigeration requirement and total work Rate, prediction refrigeration requirement and general power according to own power, peak load rate, rated cooling capacity and the input update prediction Refrigeration requirement and general power, set and store working condition.
S440, downstream the first controller send the prediction refrigeration requirement and general power after the renewal, to cause downstream Controller is updated and sets and store working condition again according to prediction refrigeration requirement after the renewal, until the renewal Prediction refrigeration requirement meets preset operating conditions afterwards, and the general power after updating and final prediction are sent to the first priority controller Refrigeration requirement.
S450, when from as the first priority, according to the general power after the renewal for receiving and final prediction cold need Seek calculating Energy Efficiency Ratio COP.
S460, rate of load condensate is lowered according to default ratio, with the COP for causing to be calculated according to the afterload rate correspondence of downward Meet default observable index condition.
In the present embodiment, rate of load condensate (load rate, LR) is the ratio between refrigerating capacity and cold rated cooling capacity of cold. To same cold, rated cooling capacity is fixed value, then rate of load condensate is bigger, and the refrigerating capacity that cold is produced is more, refrigeration Better.Rate of load condensate in every self-operating parameter of cold includes a peak load rate (LRmax) and a minimum Rate of load condensate (LRmin).For same refrigeration unit, identical refrigerating capacity can correspond to multiple rate of load condensates, and wherein some is born The corresponding energy consumption of lotus rate is minimum.By the method according to above-mentioned calculating COP, condition of the cycle calculations in the demand for meeting refrigerating capacity Under, the corresponding Energy Efficiency Ratio COP of each rate of load condensate, until COP meets default observable index condition.The default observable index condition can be with Concrete condition setting according to cold unit.Exemplary, the optimal energy-conservation effect of the cold unit can be determined according to test of many times Really corresponding COP scopes, can be using COP scopes as default observable index condition, to realize the effect of optimal energy-conservation.
Exemplary, when predicting that refrigeration requirement meets pre-conditioned after renewal, each is completed under current loads rate Cold transmission is calculated, and after having calculated total Energy Efficiency Ratio COP, the rate of load condensate of all cold lowers rate of load condensate according to default ratio, And calculated with the renewal that the rate of load condensate after downward re-starts general power and prediction refrigeration requirement, wherein, the preset ratio is not More than 10%.Preferably, the preset ratio is 5%.Above-mentioned adjustment ratio is chosen, can be in rational calculated load and calculating In time, the variable quantity of rate of load condensate is reduced as far as possible, it is to avoid the mutation of COP values.Predict that refrigeration requirement meets after renewal pre- If during service condition, rate of load condensate will be lowered according to default ratio, and calculate by rate of load condensate on the basis of a upper rate of load condensate The corresponding COP of current loads rate, until COP meets default observable index condition.
S470, the working state control for meeting default observable index condition correspondence storage according to the COP that is calculated are cold Machine runs.
Corresponding rate of load condensate when meeting default observable index condition according to COP, according to the working condition that each controller is stored Corresponding cold is controlled to work respectively, to allow that whole cold unit runs under optimal energy-saving effect.
The control method of the central air-conditioning cold that the present embodiment is provided, rate of load condensate is lowered by according to default ratio, with So that meeting default observable index condition according to the corresponding COP being calculated of afterload rate is lowered;Accordingly, calculated according to described The COP for arriving meets the working state control cold operation of default observable index condition correspondence storage.Ensureing the comfortable of end room While property, to allow whole cold unit to be run under optimal energy-saving effect, central air-conditioning cold is substantially increased Energy-saving effect.
In a preferred embodiment of the present embodiment, the COP being calculated according to downward afterload rate correspondence Meet default observable index condition, be specifically optimized for:The corresponding COP being calculated of afterload rate is lowered less than downward preload rate pair The COP that should be calculated;Accordingly, it is described to meet default observable index condition correspondence storage according to the COP being calculated Working state control cold is run, and is specifically optimized for:Working state control cold according to the correspondence storage of preload rate is lowered is transported OK.Because the variation tendency of the performance curve according to cold, the rate of load condensate of cold from maximum change to minimum when, the COP of cold Value is first increases and then decreases, i.e., when downward trend occur in total COP values, it is believed that the optimal performance of cold has been found Point, being not required to lower rate of load condensate again carries out follow-up COP calculating, and now transmission is calculated and terminated.According to the downward preload rate pair The working state control cold operation that should be stored.
The preferred embodiment that the present embodiment is provided, rate of load condensate is lowered by according to default ratio, makes downward afterload The COP that rate correspondence is calculated is less than the COP that downward preload rate correspondence is calculated;Accordingly, born according to before the downward The working state control cold operation of lotus rate correspondence storage.While the comfortableness in end room is ensured, further increase The energy-saving effect of central air-conditioning cold, the fractional energy savings of cold can improve 10%, and especially in transition season, fractional energy savings can be improved 25%..
Example IV
Fig. 5 is a kind of structural representation of the control device of central air-conditioning cold provided in an embodiment of the present invention, the device Including:Integrated operation parameter update module 510, integrated operation parameter sending module 520 and cold operation control module 530, under It is specifically described in face of each module.
The integrated operation parameter update module 510, for updating comprehensive according to self-operating parameter and integrated operation parameter Operational factor is closed, working condition is set and store;
The integrated operation parameter sending module 520, the synthesis after the renewal is sent for downstream the first controller Operational factor, to cause downstream controller to be updated again according to integrated operation parameter after the renewal and set and store work Make state, until integrated operation parameter meets preset operating conditions after the renewal, upstream controller sends operation information;
The cold operation control module 530, for after the operation information preset duration is received, being deposited according to described The working state control cold operation of storage.
Optionally, the self-operating parameter includes:Refrigerating capacity, the integrated operation parameter includes:Prediction refrigeration requirement;
Accordingly, the integrated operation parameter update module 510, specifically for:
When the refrigerating capacity is more than the prediction refrigeration requirement, original prediction refrigeration requirement is kept, set and store work Make state to close;
When the refrigerating capacity is not more than the prediction refrigeration requirement, will predict that refrigeration requirement updates with the difference of refrigerating capacity It is prediction refrigeration requirement, sets and store working condition to open.
Optionally, predict that refrigeration requirement meets preset operating conditions after the renewal, including:
Predict refrigeration requirement in default convergency value and 0 interval range after the renewal.
Optionally, the integrated operation parameter update module 510, including:
Priority acquiring unit, for obtaining the current priority of itself;
First integrated operation parameter updates, for when from as the first priority, receiving the integrated operation parameter of input, Integrated operation parameter is updated according to self-operating parameter and the integrated operation parameter of the input;
Second integrated operation parameter updates, and is sent for when from as other priority, receiving the controller of upstream first Integrated operation parameter, integrated operation parameter is updated according to self-operating parameter and the integrated operation parameter of the input.
Optionally, the self-operating parameter includes own power, and the integrated operation parameter also includes:General power;
Accordingly, the integrated operation parameter update module 510, also includes:
General power updating block, for updating general power according to own power and the general power of the input;
Accordingly, the integrated operation parameter sending module 520, is additionally operable to:
The general power after updating and final prediction refrigeration requirement are sent to the first priority controller.
Optionally, also include:
Energy Efficiency Ratio COP computing modules, for the first priority controller send update after general power after, according to Before the working state control cold operation of the storage, when from as the first priority, after the renewal for receiving General power and final prediction refrigeration requirement calculate Energy Efficiency Ratio COP.
Optionally, the self-operating parameter includes:Rate of load condensate and rated cooling capacity;
Accordingly, the integrated operation parameter update module 510, specifically for:
Refrigerating capacity is calculated according to rate of load condensate and rated cooling capacity;
Prediction refrigeration requirement is updated according to the refrigerating capacity.
Optionally, also include:
Rate of load condensate lowers module, after calculating Energy Efficiency Ratio COP for the general power after according to the renewal for receiving, according to Before the working state control cold operation of the storage, rate of load condensate is lowered according to default ratio, after causing according to downward The COP that rate of load condensate correspondence is calculated meets default observable index condition;
Accordingly, the cold operation control module 530, specifically for:
Working state control cold according to the downward preload rate correspondence storage is run.
Optionally, the COP being calculated according to downward afterload rate correspondence meets default observable index condition, including:
Lower the COP COPs that is calculated corresponding less than downward preload rate that afterload rate correspondence is calculated;
Accordingly, the working condition that default observable index condition correspondence storage is met according to the COP being calculated Control refrigerator operation, including:
Working state control cold according to the correspondence storage of preload rate is lowered is run.
Optionally, the preset ratio is not more than 10%.
Optionally, the preset ratio is 5%.
The control device of central air-conditioning cold provided in an embodiment of the present invention, by according to self-operating parameter and comprehensive fortune Line parameter updates integrated operation parameter, sets and store working condition;It is comprehensive after downstream the first controller transmission renewal Operational factor is closed, to cause downstream controller to be updated again according to integrated operation parameter after the renewal and set and store Working condition, until integrated operation parameter meets preset operating conditions after the renewal, upstream controller sends operation information; After the operation information preset duration is received, run according to the working state control cold of the storage.Realize center The uneoupled control of each cold in air-conditioning system, has reached the purpose of cold control program generalization exploitation, while ensure that end The timely and effective property and the comfortableness in end room of cooling.
The control device of the central air-conditioning cold that the embodiment of the present invention is provided can perform any embodiment of the present invention and be carried The control method of the central air-conditioning cold of confession, possesses the corresponding functional module of execution method and beneficial effect.
The embodiment of the present invention additionally provides a kind of controller, and the controller includes central air-conditioning provided in an embodiment of the present invention The control device of cold, with identical module, it is possible to achieve identical function, will not be described here.
Note, above are only presently preferred embodiments of the present invention and institute's application technology principle.It will be appreciated by those skilled in the art that The invention is not restricted to specific embodiment described here, can carry out for a person skilled in the art various obvious changes, Readjust and substitute without departing from protection scope of the present invention.Therefore, although the present invention is carried out by above example It is described in further detail, but the present invention is not limited only to above example, without departing from the inventive concept, also More other Equivalent embodiments can be included, and the scope of the present invention is determined by scope of the appended claims.

Claims (23)

1. a kind of control method of central air-conditioning cold, it is characterised in that including:
Integrated operation parameter is updated according to self-operating parameter and integrated operation parameter, working condition is set and store;
Downstream the first controller sends the integrated operation parameter after the renewal, to cause downstream controller according to the renewal Integrated operation parameter is updated and sets and store working condition again afterwards, until integrated operation parameter meets after the renewal Preset operating conditions, upstream controller transmission operation information;
After the operation information preset duration is received, run according to the working state control cold of the storage.
2. method according to claim 1, it is characterised in that the self-operating parameter includes:Refrigerating capacity, the synthesis Operational factor includes:Prediction refrigeration requirement;
Accordingly, it is described that integrated operation parameter is updated according to self-operating parameter and integrated operation parameter, set and store work State, including:
When the refrigerating capacity is more than the prediction refrigeration requirement, original prediction refrigeration requirement is kept, set and store work shape State is closing;
When the refrigerating capacity is not more than the prediction refrigeration requirement, prediction refrigeration requirement is updated to the difference of refrigerating capacity pre- Refrigeration requirement is surveyed, working condition is set and store to open.
3. method according to claim 1 and 2, it is characterised in that predict that refrigeration requirement meets default fortune after the renewal Row condition, including:
Predict refrigeration requirement in default convergency value and 0 interval range after the renewal.
4. method according to claim 1, it is characterised in that it is described according to self-operating parameter and integrated operation parameter more New integrated operation parameter, including:
Obtain the current priority of itself;
When from as the first priority, the integrated operation parameter of input is received, according to self-operating parameter and the input Integrated operation parameter updates integrated operation parameter;
When from as other priority, the integrated operation parameter that the controller of upstream first sends is received, joined according to self-operating Number and the integrated operation parameter of the input update integrated operation parameter.
5. method according to claim 4, it is characterised in that the self-operating parameter includes own power, described comprehensive Closing operational factor also includes:General power;
Accordingly, it is described that integrated operation parameter is updated according to self-operating parameter and the integrated operation parameter of the input, also wrap Include:
General power is updated according to own power and the general power of the input;
Accordingly, the upstream controller sends operation information, also includes:
The general power after updating and final prediction refrigeration requirement are sent to the first priority controller.
6. method according to claim 5, it is characterised in that the total work after updating is being sent to the first priority controller After rate, also include before being run according to the working state control cold of the storage:
When from as the first priority, efficiency is calculated according to the general power after the renewal for receiving and final prediction refrigeration requirement Compare COP.
7. method according to claim 6, it is characterised in that the self-operating parameter includes:Rate of load condensate and specified system Cold;
Accordingly, it is described that integrated operation parameter is updated according to self-operating parameter and the integrated operation parameter of the input, including:
Refrigerating capacity is calculated according to rate of load condensate and rated cooling capacity;
Prediction refrigeration requirement is updated according to the refrigerating capacity.
8. method according to claim 7, it is characterised in that the general power after according to the renewal for receiving calculates efficiency After than COP, also include before being run according to the working state control cold of the storage:
Rate of load condensate is lowered according to default ratio, it is default according to the corresponding COP satisfactions being calculated of afterload rate are lowered to cause Observable index condition.
Accordingly, the working state control cold according to the storage is run, including:
The working state control cold for meeting default observable index condition correspondence storage according to the COP being calculated is run.
9. method according to claim 8, it is characterised in that described according to lowering what afterload rate correspondence was calculated COP meets default observable index condition, including:
Lower the COP COPs that is calculated corresponding less than downward preload rate that afterload rate correspondence is calculated;
Accordingly, the working state control that default observable index condition correspondence storage is met according to the COP being calculated Cold is run, including:
Working state control cold according to the correspondence storage of preload rate is lowered is run.
10. method according to claim 9, it is characterised in that the preset ratio is not more than 10%.
11. methods according to claim 10, it is characterised in that the preset ratio is 5%.
A kind of 12. control devices of central air-conditioning cold, it is characterised in that including:
Integrated operation parameter update module, for updating integrated operation parameter according to self-operating parameter and integrated operation parameter, Set and store working condition;
Integrated operation parameter sending module, the integrated operation parameter after the renewal is sent for downstream the first controller, with So that downstream controller is updated and sets and store working condition again according to integrated operation parameter after the renewal, until Integrated operation parameter meets preset operating conditions after the renewal, and upstream controller sends operation information;
Cold operation control module, for after the operation information preset duration is received, according to the work shape of the storage State control refrigerator operation.
13. devices according to claim 12, it is characterised in that the self-operating parameter includes:Refrigerating capacity, it is described comprehensive Closing operational factor includes:Prediction refrigeration requirement;
Accordingly, the integrated operation parameter update module, specifically for:
When the refrigerating capacity is more than the prediction refrigeration requirement, original prediction refrigeration requirement is kept, set and store work shape State is closing;
When the refrigerating capacity is not more than the prediction refrigeration requirement, prediction refrigeration requirement is updated to the difference of refrigerating capacity pre- Refrigeration requirement is surveyed, working condition is set and store to open.
14. device according to claim 12 or 13, it is characterised in that predict that refrigeration requirement meets after the renewal default Service condition, including:
Predict refrigeration requirement in default convergency value and 0 interval range after the renewal.
15. devices according to claim 12, it is characterised in that the integrated operation parameter update module, including:
Priority acquiring unit, for obtaining the current priority of itself;
First integrated operation parameter updates, for when from as the first priority, receiving the integrated operation parameter of input, according to Self-operating parameter and the integrated operation parameter of the input update integrated operation parameter;
Second integrated operation parameter updates, for when from as other priority, receiving the comprehensive of the controller of upstream first transmission Operational factor is closed, integrated operation parameter is updated according to self-operating parameter and the integrated operation parameter of the input.
16. devices according to claim 15, it is characterised in that the self-operating parameter includes own power, described Integrated operation parameter also includes:General power;
Accordingly, the integrated operation parameter update module, also includes:
General power updating block, for updating general power according to own power and the general power of the input;
Accordingly, the integrated operation parameter sending module, is additionally operable to:
The general power after updating and final prediction refrigeration requirement are sent to the first priority controller.
17. devices according to claim 16, it is characterised in that also include:
Energy Efficiency Ratio COP computing modules, for after the general power after updating is sent to the first priority controller, according to described Before the working state control cold operation of storage, when from as the first priority, according to the total work after the renewal for receiving Rate and final prediction refrigeration requirement calculate Energy Efficiency Ratio COP.
18. devices according to claim 17, it is characterised in that the self-operating parameter includes:Rate of load condensate and specified Refrigerating capacity;
Accordingly, the integrated operation parameter update module, specifically for:
Refrigerating capacity is calculated according to rate of load condensate and rated cooling capacity;
Prediction refrigeration requirement is updated according to the refrigerating capacity.
19. devices according to claim 18, it is characterised in that also include:
Rate of load condensate lowers module, after calculating Energy Efficiency Ratio COP for the general power after according to the renewal for receiving, according to described Before the working state control cold operation of storage, rate of load condensate is lowered according to default ratio, to cause according to downward afterload The COP that rate correspondence is calculated meets default observable index condition;
Accordingly, the cold operation control module, specifically for:
Working state control cold according to the downward preload rate correspondence storage is run.
20. devices according to claim 19, it is characterised in that described to correspond to what is be calculated according to downward afterload rate COP meets default observable index condition, including:
Lower the COP COPs that is calculated corresponding less than downward preload rate that afterload rate correspondence is calculated;
Accordingly, the working state control that default observable index condition correspondence storage is met according to the COP being calculated Cold is run, including:
Working state control cold according to the correspondence storage of preload rate is lowered is run.
21. devices according to claim 20, it is characterised in that the preset ratio is not more than 10%.
22. devices according to claim 21, it is characterised in that the preset ratio is 5%.
A kind of 23. controllers, it is characterised in that the control device of the central air-conditioning cold including claim 12-22.
CN201611110683.1A 2016-12-06 2016-12-06 Control method and device of central air-conditioning cooler and controller Active CN106765911B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611110683.1A CN106765911B (en) 2016-12-06 2016-12-06 Control method and device of central air-conditioning cooler and controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611110683.1A CN106765911B (en) 2016-12-06 2016-12-06 Control method and device of central air-conditioning cooler and controller

Publications (2)

Publication Number Publication Date
CN106765911A true CN106765911A (en) 2017-05-31
CN106765911B CN106765911B (en) 2019-09-10

Family

ID=58879178

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611110683.1A Active CN106765911B (en) 2016-12-06 2016-12-06 Control method and device of central air-conditioning cooler and controller

Country Status (1)

Country Link
CN (1) CN106765911B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109838876A (en) * 2019-02-19 2019-06-04 陈娟 Central air-conditioning freezing computer room team control management system
CN112484246A (en) * 2020-11-04 2021-03-12 珠海格力电器股份有限公司 Auxiliary programming method, device and equipment for air conditioner controller
CN113091234A (en) * 2021-04-08 2021-07-09 贵州汇通华城股份有限公司 Method and system for selecting on-off state of refrigeration host
CN114440419A (en) * 2021-12-31 2022-05-06 博锐尚格科技股份有限公司 Control method, device and equipment for secondary pump system of cold station and storage medium
CN114923266A (en) * 2022-07-20 2022-08-19 蘑菇物联技术(深圳)有限公司 Method, apparatus and medium for controlling chiller of central air conditioning system

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5585839A (en) * 1978-12-21 1980-06-28 Mitsubishi Electric Corp Air conditioning control system
KR100664504B1 (en) * 2005-03-04 2007-01-04 삼성전자주식회사 Operation control method for multi type air conditioner
CN101231018A (en) * 2007-01-26 2008-07-30 Lg电子株式会社 System and method for controlling demand of multi-air-conditioner
EP2410254A2 (en) * 2010-07-23 2012-01-25 LG Electronics, Inc. Air conditioner and method for controlling the same
CN102607146A (en) * 2012-04-06 2012-07-25 谭仲禧 Central air-conditioning system and control method thereof
CN105091213A (en) * 2015-06-09 2015-11-25 邻元科技(北京)有限公司 Refrigerator system and control method based on acentric network and refrigerator controller
CN204943795U (en) * 2015-09-22 2016-01-06 山东广成节能科技有限公司 A kind of central air conditioner room efficiency optimization system
CN105627506A (en) * 2015-12-25 2016-06-01 深圳达实智能股份有限公司 Building cooling load prediction method and device of air conditioning refrigerator
CN205505299U (en) * 2016-02-29 2016-08-24 雅讯东方(山东)科技有限公司 Central air conditioning intelligence temperature control system

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5585839A (en) * 1978-12-21 1980-06-28 Mitsubishi Electric Corp Air conditioning control system
KR100664504B1 (en) * 2005-03-04 2007-01-04 삼성전자주식회사 Operation control method for multi type air conditioner
CN101231018A (en) * 2007-01-26 2008-07-30 Lg电子株式会社 System and method for controlling demand of multi-air-conditioner
EP1950504B1 (en) * 2007-01-26 2014-01-08 LG Electronics Inc. System and method for controlling demand of multi-air conditioner
EP2410254A2 (en) * 2010-07-23 2012-01-25 LG Electronics, Inc. Air conditioner and method for controlling the same
CN102607146A (en) * 2012-04-06 2012-07-25 谭仲禧 Central air-conditioning system and control method thereof
CN105091213A (en) * 2015-06-09 2015-11-25 邻元科技(北京)有限公司 Refrigerator system and control method based on acentric network and refrigerator controller
CN204943795U (en) * 2015-09-22 2016-01-06 山东广成节能科技有限公司 A kind of central air conditioner room efficiency optimization system
CN105627506A (en) * 2015-12-25 2016-06-01 深圳达实智能股份有限公司 Building cooling load prediction method and device of air conditioning refrigerator
CN205505299U (en) * 2016-02-29 2016-08-24 雅讯东方(山东)科技有限公司 Central air conditioning intelligence temperature control system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109838876A (en) * 2019-02-19 2019-06-04 陈娟 Central air-conditioning freezing computer room team control management system
CN109838876B (en) * 2019-02-19 2022-03-08 陈娟 Group control management system for central air-conditioning refrigerating machine room
CN112484246A (en) * 2020-11-04 2021-03-12 珠海格力电器股份有限公司 Auxiliary programming method, device and equipment for air conditioner controller
CN113091234A (en) * 2021-04-08 2021-07-09 贵州汇通华城股份有限公司 Method and system for selecting on-off state of refrigeration host
CN114440419A (en) * 2021-12-31 2022-05-06 博锐尚格科技股份有限公司 Control method, device and equipment for secondary pump system of cold station and storage medium
CN114440419B (en) * 2021-12-31 2023-10-27 博锐尚格科技股份有限公司 Control method, device, equipment and storage medium of cold station secondary pump system
CN114923266A (en) * 2022-07-20 2022-08-19 蘑菇物联技术(深圳)有限公司 Method, apparatus and medium for controlling chiller of central air conditioning system

Also Published As

Publication number Publication date
CN106765911B (en) 2019-09-10

Similar Documents

Publication Publication Date Title
CN106765911B (en) Control method and device of central air-conditioning cooler and controller
CN104134100B (en) A kind of energy-saving management system based on cloud computing
CN109708258A (en) A kind of temperature of ice house feedforward-Fuzzy control system and control method based on load dynamic change
CN105444356A (en) Intelligent energy efficiency optimizing control system for central air conditioning system and control method of intelligent energy efficiency optimizing control system
CN107255355B (en) Air conditioning system control device and method
CN114383299B (en) Central air-conditioning system operation strategy optimization method based on big data and dynamic simulation
CN108168052B (en) optimal start-stop control method for central air-conditioning refrigeration system
CN109917646B (en) System and method for optimizing operation of regional cooling and heating equipment
CN101655272A (en) Energy-saving control management system of network central air conditioner and method thereof
CN204902127U (en) Terminal coordinated control's of air conditioner water system and air conditioner economizer
CN104898422A (en) Hierarchical optimization method for united cold supply system
CN113701321B (en) Energy-saving frequency conversion control method for central air-conditioning water pump
CN112344522B (en) Load distribution type optimal configuration method for central air-conditioning cooler system
CN112611076A (en) Subway station ventilation air conditioner energy-saving control system and method based on ISCS
CN115930369A (en) Central air-conditioning system energy-saving method based on intelligent control
CN116592417A (en) Centralized heating system optimal control method and system based on load prediction
CN107166646A (en) Central air conditioner main machine optimization operation control system and method based on Distributed Calculation
Zhuang et al. A decentralized method for energy conservation of an HVAC system
CN110486896A (en) A kind of tandem air-conditioning system optimal control method based on water cooler energy consumption model
CN113218040A (en) Energy efficiency improvement control method for central air-conditioning system
CN201081365Y (en) Power-saving operation control system for central air conditioning system in hotel with intelligent information management function
CN106839295A (en) For the low-temperature receiver centralized control system and control method of air conditioning test device
CN113609778B (en) Multi-objective optimization method and system for comprehensive energy system
TWI776544B (en) Energy-saving control method and device for temperature control equipment
WO2022246627A1 (en) Method and apparatus for controlling refrigerating device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant