CN106761916B - Constructing tunnel water discharge method - Google Patents

Constructing tunnel water discharge method Download PDF

Info

Publication number
CN106761916B
CN106761916B CN201611138464.4A CN201611138464A CN106761916B CN 106761916 B CN106761916 B CN 106761916B CN 201611138464 A CN201611138464 A CN 201611138464A CN 106761916 B CN106761916 B CN 106761916B
Authority
CN
China
Prior art keywords
water
drainpipe
pumping
pumping plants
pumps
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611138464.4A
Other languages
Chinese (zh)
Other versions
CN106761916A (en
Inventor
于占华
王志科
李野
刘百合
宋海丰
李向光
解佳飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 19th Bureau Group No.2 Engineering Co., Ltd
East China Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Second Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201611138464.4A priority Critical patent/CN106761916B/en
Publication of CN106761916A publication Critical patent/CN106761916A/en
Application granted granted Critical
Publication of CN106761916B publication Critical patent/CN106761916B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/22Adaptations of pumping plants for lifting sewage

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The present invention relates to constructing tunnel central trench counter-slope water discharge methods.It mainly solves the problems, such as counter-slope impeded drainage when current constructing tunnel and invents.Two pumping plants are set in inclined shaft, two pumping plants are connected by drainpipe A, and inverted arch stays half range not construct and digs catch pit when constructing, and No. three pumping plants are located in catch pit, and the water pump of No. three pumping plants is connected with the water pump of No. two pumping plants by drainpipe B, C;The water pump of No. three pumping plants is connected with drainpipe D, E, F;Interim catch pit is set at face, the water in interim catch pit is pumped into drainpipe D through two water pumps, is discharged through each pumping plant;Water pump is set in inverted arch end, pump outlet is connected with drainpipe E and drainpipe F, and the water of inverted arch end is pumped into drainpipe E and drainpipe F through water pump, is discharged through each pumping plant, is connected between Central drain and each drainpipe by pre-buried water pipe;On the water pump at the place of leading connect with the water pump of inverted arch end point by pipeline G.Advantage is that drainage effect is good.

Description

Constructing tunnel water discharge method
Technical field:
The present invention relates to constructing tunnel central trench counter-slope water discharge methods.
Technical field:
At present when constructing tunnel, tunnel is longer, and backwater area is bigger, big along slope charge for remittance counter-slope pump drainage difficulty.Current is anti- There is impeded drainage in slope water discharge method, cause charge for remittance cross flow everywhere, influence to construct, and inverted arch ponding is more, easily flood inverted arch, on It is excessive to lead ponding, influences construction personnel and vehicle pass-through, influences area surface construction.
Summary of the invention:
Technical problem to be solved by the invention is to provide a kind of counter-slope drainage effect is good, the short constructing tunnel of water discharge time Water discharge method.
Above-mentioned purpose is achieved in that sets two pumping plants in inclined shaft, i.e. No.1 pumping plant and No. two pumping plants, wherein No. two Pumping plant is located at the front of No.1 pumping plant, and No.1 pumping plant includes five water pumps, and No. two pumping plants include four water pumps, the water of No.1 pumping plant Pump is connected with the water pump of No. two pumping plants by drainpipe A, on the left of the route apart from the small mileage direction of 600 meters or so of intersection If No. three pumping plants, inverted arch stays half range not construct when constructing, and it is 10 meters that a length is dug at this, and depth is 1 meter, and width is 6 meters Catch pit, No. three pumping plants include five water pumps, and five water pumps of No. three pumping plants are all located in catch pit, No. three pumping plants Five water pumps water outlet and the water inlet of four water pumps of No. two pumping plants between be connected by drainpipe B and drainpipe C, i.e., It is connected between the water inlet of two water pumps of the water outlet and No. two pumping plants of three water pumps of No. three pumping plants with drainpipe B, No. three It is connected between the water outlet of remaining two water pumps of pumping plant and the water inlet of remaining two water pumps of No. two pumping plants with drainpipe C, The drainpipe B and drainpipe C connected between No. two pumping plants and No. three pumping plants is hung on two molded chemise faces;
The water inlet of the two of them water pump of No. three pumping plants is connected with drainpipe D, the another two water pump of No. three pumping plants into The mouth of a river is connected with drainpipe E, and the water inlet of the 5th water pump of No. three pumping plants is connected with drainpipe F, and described this three and three The other end of the connected drainpipe of the water inlet of five water pumps of number pumping plant is all located at 10 meters away from inverted arch end;
Interim catch pit is set at face, and two water pumps are set near interim catch pit, the water warp in interim catch pit The two described water pumps are pumped into drainpipe D, are drained into No. two pumping plants through No. three pumping plants, then be discharged through No.1 pumping plant;
Six water pumps are set in inverted arch end, wherein the water outlet of three water pumps is connected with the drainpipe E other end, the other three The water outlet of water pump is connected with drainpipe F, and the water of inverted arch end is pumped into drainpipe E and drainpipe F through six water pumps In, No. two pumping plants are drained into through No. three pumping plants, then be discharged through No.1 pumping plant, pass through pre-buried water between Central drain and each drainpipe Pipe is connected;Set two water pumps at the upper place of leading, the water outlet of the two water pumps be located in six water pumps of inverted arch end point one It is connected between the water inlet of a water pump by pipeline G.
The invention has the advantages that the draining of central trench counter-slope can be made to be resolved due to being equipped with multi stage pumping station, drainage pipeline, The water of inverted arch and face is eased, and draining is not flowed backward, and the pump drainage time is short, and wall can save space, construction and driving on pipeline Convenient, drainage effect is good.
Detailed description of the invention:
Fig. 1 is flowing line arrangement states schematic diagram of the invention.
Specific embodiment:
Referring to Fig.1, two pumping plants, i.e. No.1 pumping plant 1 and No. two pumping plants 2 are set in inclined shaft, wherein No. two pumping plants are located at one The front of number pumping plant, No.1 pumping plant include five water pumps, and No. two pumping plants include four water pumps, the water pump of No.1 pumping plant and No. two pumps The water pump stood is connected by drainpipe A3, sets No. three pumps on the left of the route apart from the small mileage direction of 600 meters or so of intersection Stand 4, inverted arch stays half range not construct when constructing, and it is 10 meters that a length is dug at this, depth is 1 meter, and width is 6 meters and catchments Hole, No. three pumping plants include five water pumps, and five water pumps of No. three pumping plants are all located in catch pit, and five of No. three pumping plants Be connected between the water outlet of water pump and the water inlet of four water pumps of No. two pumping plants by drainpipe B5 and drainpipe C6, i.e., No. three It is connected between the water inlet of two water pumps of the water outlet and No. two pumping plants of three water pumps of pumping plant with drainpipe B, No. three pumping plants It is connected between the water outlet of remaining two water pumps and the water inlet of remaining two water pumps of No. two pumping plants with drainpipe C, No. two The drainpipe B and drainpipe C connected between pumping plant and No. three pumping plants is hung on two molded chemise faces;
The water inlet of the two of them water pump of No. three pumping plants is connected with drainpipe D7, the another two water pump of No. three pumping plants into The mouth of a river is connected with drainpipe E8, and the water inlet of the 5th water pump of No. three pumping plants is connected with drainpipe F9, described this three with The other end of the connected drainpipe of the water inlet of five water pumps of No. three pumping plants is all located at 10 meters away from inverted arch end;
Interim catch pit 10 is set at face, and two water pumps, the water in interim catch pit are set near interim catch pit It is pumped into drainpipe D through the two described water pumps, is drained into No. two pumping plants through No. three pumping plants, then be discharged through No.1 pumping plant;
Six water pumps are set in inverted arch end, wherein the water outlet of three water pumps is connected with the drainpipe E other end, the other three The water outlet of water pump is connected with drainpipe F, and the water of inverted arch end is pumped into drainpipe E and drainpipe F through six water pumps In, No. two pumping plants are drained into through No. three pumping plants, then be discharged through No.1 pumping plant, pass through pre-buried water between Central drain and each drainpipe Pipe is connected;Set two water pumps at the upper place of leading, the water outlet of the two water pumps be located in six water pumps of inverted arch end point one It is connected between the water inlet of a water pump by pipeline G11.

Claims (1)

1. constructing tunnel water discharge method, it is characterized in that: No.1 pumping plant (1) and No. two pumping plants (2) are set in inclined shaft, wherein No. two pumps For erect-position in the front of No.1 pumping plant, No.1 pumping plant includes five water pumps, and No. two pumping plants include four water pumps, the water pump of No.1 pumping plant Be connected with the water pump of No. two pumping plants by drainpipe A (3), on the route left side in the small mileage direction apart from 600 meters or so of intersection Side sets No. three pumping plants (4), and inverted arch stays half range not construct when constructing, and it is 10 meters that a length is dug at this, and depth is 1 meter, width For 6 meters of catch pit, No. three pumping plants include five water pumps, and five water pumps of No. three pumping plants are all located in catch pit, and three It by drainpipe B (5) and is drained between the water inlet of four water pumps of the water outlet and No. two pumping plants of five water pumps of number pumping plant Pipe C (6) is connected, i.e., with draining between the water inlet of two water pumps of the water outlet and No. two pumping plants of three water pumps of No. three pumping plants Pipe B is connected, and uses between the water outlet of remaining two water pumps of No. three pumping plants and the water inlet of remaining two water pumps of No. two pumping plants Drainpipe C is connected, and the drainpipe B and drainpipe C connected between No. two pumping plants and No. three pumping plants is hung on two molded linings On metope;
The water inlet of the two of them water pump of No. three pumping plants is connected with drainpipe D (7), the water inlet of the another two water pump of No. three pumping plants Mouth is connected with drainpipe E (8), and the water inlet of the 5th water pump of No. three pumping plants is connected with drainpipe F (9), and this three and No. three The other end of the connected drainpipe of the water inlet of five water pumps of pumping plant is all located at 10 meters away from inverted arch end;
Interim catch pit (10) are set at face, and two water pumps are set near interim catch pit, the water warp in interim catch pit The two water pumps are pumped into drainpipe D, are drained into No. two pumping plants through No. three pumping plants, then be discharged through No.1 pumping plant;
Six water pumps are set in inverted arch end, wherein the water outlet of three water pumps is connected with the drainpipe E other end, the other three water pump Water outlet be connected with drainpipe F, the water of inverted arch end is pumped into drainpipe E and drainpipe F through six water pumps, warp No. three pumping plants are drained into No. two pumping plants, then are discharged through No.1 pumping plant, pass through pre-buried water pipe phase between Central drain and each drainpipe Even;Two water pumps, the water outlet of the two water pumps and a water being located in six water pumps of inverted arch end point are set at the upper place of leading It is connected between the water inlet of pump by pipeline G (11).
CN201611138464.4A 2016-12-12 2016-12-12 Constructing tunnel water discharge method Active CN106761916B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611138464.4A CN106761916B (en) 2016-12-12 2016-12-12 Constructing tunnel water discharge method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611138464.4A CN106761916B (en) 2016-12-12 2016-12-12 Constructing tunnel water discharge method

Publications (2)

Publication Number Publication Date
CN106761916A CN106761916A (en) 2017-05-31
CN106761916B true CN106761916B (en) 2019-03-01

Family

ID=58879922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611138464.4A Active CN106761916B (en) 2016-12-12 2016-12-12 Constructing tunnel water discharge method

Country Status (1)

Country Link
CN (1) CN106761916B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107201908B (en) * 2017-06-16 2023-10-31 中铁五局集团有限公司 Construction method for deep-buried central ditch of tunnel in severe cold region
CN111963239A (en) * 2020-07-17 2020-11-20 中交一公局集团有限公司 Reverse slope drainage construction process

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11217994A (en) * 1998-01-30 1999-08-10 Maeda Corp Draining device for tunnel
JP2003193800A (en) * 2001-12-25 2003-07-09 Kazuhiko Mizuguchi Facility for draining spring water from railroad
CN102619560A (en) * 2012-04-17 2012-08-01 中铁十六局集团有限公司 Drainage and drainage method for long-distance reverse-slope tunnels
CN202937303U (en) * 2012-12-14 2013-05-15 中铁二十三局集团有限公司 Drainage system for extra-long tunnel
CN203594470U (en) * 2013-11-15 2014-05-14 中铁十二局集团第四工程有限公司 Automatic drainage device for adverse slope of long and large tunnel
CN203822372U (en) * 2014-04-24 2014-09-10 中铁第四勘察设计院集团有限公司 Comprehensive drainage system for ponded water in underground construction
CN204163745U (en) * 2014-10-29 2015-02-18 中铁建大桥工程局集团第五工程有限公司 A kind of tunnel props up hole counter-slope drainage system
CN105909309A (en) * 2016-06-14 2016-08-31 中铁十四局集团有限公司 Automatic drainage system of long tunnel reverse slope

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11217994A (en) * 1998-01-30 1999-08-10 Maeda Corp Draining device for tunnel
JP2003193800A (en) * 2001-12-25 2003-07-09 Kazuhiko Mizuguchi Facility for draining spring water from railroad
CN102619560A (en) * 2012-04-17 2012-08-01 中铁十六局集团有限公司 Drainage and drainage method for long-distance reverse-slope tunnels
CN202937303U (en) * 2012-12-14 2013-05-15 中铁二十三局集团有限公司 Drainage system for extra-long tunnel
CN203594470U (en) * 2013-11-15 2014-05-14 中铁十二局集团第四工程有限公司 Automatic drainage device for adverse slope of long and large tunnel
CN203822372U (en) * 2014-04-24 2014-09-10 中铁第四勘察设计院集团有限公司 Comprehensive drainage system for ponded water in underground construction
CN204163745U (en) * 2014-10-29 2015-02-18 中铁建大桥工程局集团第五工程有限公司 A kind of tunnel props up hole counter-slope drainage system
CN105909309A (en) * 2016-06-14 2016-08-31 中铁十四局集团有限公司 Automatic drainage system of long tunnel reverse slope

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
山岭特长隧道斜井高反坡距离排水施工技术;刘艳霞;《国防交通工程与技术》;20130131(第1期);第47-55页
特长隧道涌水综合反坡排水施工技术;刘牛生;《建筑》;20101231(第12期);第89-91页

Also Published As

Publication number Publication date
CN106761916A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN106761916B (en) Constructing tunnel water discharge method
JP6556506B2 (en) Sand collection device for dams, rivers and intakes
CN205495042U (en) Mine sewage clarification device in pit
CN106870398A (en) A kind of anti-clogging diving pump group part
CN204645011U (en) One-sided Main Corridor road-horizontal gallery-topmast hole ship lock dispersed delivery system
CN207975041U (en) A kind of pipeline pump pump body structure
CN206593710U (en) A kind of water stream and current surveying device
JP6147010B2 (en) Method of preventing sediment accumulation in rivers and sediment discharge system used therefor
CN205243863U (en) Centrifugal clarified water pump of diversion is irritated to non -
Kashkoli et al. Simultaneous study effect of guide pier and stepped chamber on hydraulic behavior of morning glory spill way
JP2013256757A (en) Temporary sewage relay pumping station/well construction method
CN204343385U (en) A kind of combined type water intake pumping station
CN211285659U (en) Drainage system for foundation pit
CN203769039U (en) Rainwater storage and drainage system for urban road
CN208501857U (en) A kind of drainage system that Box-shaped Drainage Culvert is not deposited
CN204804028U (en) Escape canal
US1972496A (en) Irrigating and draining device
CN208455654U (en) Base pit dewatering device
CN218622292U (en) Drainage structure for originating well
CN215594077U (en) Cable trench and tunnel backflow-preventing drainage structure
RU135329U1 (en) INTEGRATED STRUCTURE
JP4258008B2 (en) Pump dredging method and supporting device
CN209507783U (en) A kind of priming device of whole gravity flow
CN205676971U (en) A kind of water conservancy diversion energy-dissipating system of prefabricated pumping plant entrance
CN205078511U (en) Bath formula axial compressor submerged motor pump blower inlet casing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211203

Address after: Room 901, building 2, Zhongsu century building, 425 Xinjian North Road, Yuyao City, Ningbo City, Zhejiang Province, 315400

Patentee after: China Railway 19th Bureau Group East China Engineering Co.,Ltd.

Patentee after: China Railway 19th Bureau Group No.2 Engineering Co., Ltd

Address before: 111000 No. 17 Heping Road, Baita District, Liaoning, Liaoyang

Patentee before: CHINA RAILWAY 19TH BUREAU GROUP 2ND Co.,Ltd.

TR01 Transfer of patent right