CN106761643A - A kind of system and method for the continuous back-up sand separate stratum fracfturing of achievable water-jet - Google Patents

A kind of system and method for the continuous back-up sand separate stratum fracfturing of achievable water-jet Download PDF

Info

Publication number
CN106761643A
CN106761643A CN201611217342.4A CN201611217342A CN106761643A CN 106761643 A CN106761643 A CN 106761643A CN 201611217342 A CN201611217342 A CN 201611217342A CN 106761643 A CN106761643 A CN 106761643A
Authority
CN
China
Prior art keywords
sand
main body
continuous
pipe
jet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611217342.4A
Other languages
Chinese (zh)
Inventor
姜勇
范登洲
杨志伟
刘锐
赵晓伟
史玮平
海显莲
张明霞
张国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201611217342.4A priority Critical patent/CN106761643A/en
Publication of CN106761643A publication Critical patent/CN106761643A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/10Valve arrangements in drilling-fluid circulation systems
    • E21B21/106Valve arrangements outside the borehole, e.g. kelly valves

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention relates to oil field compression fracture technical field, more particularly to a kind of system and method for the continuous back-up sand separate stratum fracfturing of achievable water-jet, the system includes underground process pipe string, it is connected to the well head continuous sand flushing device of the underground process pipe string upper end, after the method lives in the injection of row perforation and continuous back-up sand by underground process duct, sand washing is carried out by well head continuous sand flushing device again, insulated by back-up sand and replace underseal to insulate, avoid the damage of tubing string bottom packer, packing reliability is ensure that, tubing string construction hop count and construction safety is improve.

Description

A kind of system and method for the continuous back-up sand separate stratum fracfturing of achievable water-jet
Technical field
The present invention relates to oil field compression fracture technical field, more particularly to a kind of continuous back-up sand separate stratum fracfturing of achievable water-jet System and method, the apparatus and method be applied to straight well, directional well, horizontal well layering section fracturing reform.
Background technology
The process pipe string that hydraulic jet perforation generally uses injector plus bottom packer with fracturing integrated tubing string is dragged Dynamic to realize multistage pressure break, the influence of the layer anisotropism that the process pipe string can be eliminated, packing is more reliable, therefore application is more Extensively.
, it is necessary to implement the transformation of huge discharge volume fracturing for compact oil reservoir, to form the chicken-wire cracking of complexity, increase Drainage area, reaches the purpose for increasing production and improying productivity, and attempts adding the underseal to carry out compact oil reservoir body every process pipe string using injector at present Product fracturing reform, but on the one hand under huge discharge, the process pipe string is wriggled seriously, causes bottom packer midway to damage, it is impossible to It is reliable to insulate reservoir, it is necessary to frequently change tubing string, on the other hand because the technique adds sand larger, cause packer sand occur Card phenomenon, so not only extends construction period, and increased construction risk.So using for reference coiled tubing back-up sand layering work Skill, it is proposed that insulate mode instead of underseal with back-up sand layered mode, but because conventional hydraulic jetting fracturing tubing string does not possess Sand washing function, in fracturing process and after pressure break is finished when needing sand washing operation, in addition it is also necessary under enter a sand-flushing pipe column, operational procedure Many, the cycle is long, it is necessary to explore highly efficient hydro-jet fracturing technology tubing string.
The content of the invention
In order to overcome existing hydraulic jetting fracturing to keep a grip on not to possess sand washing function, it is necessary under enter a sand washing and keep a grip on not Foot, the system and method it is an object of the invention to propose a kind of continuous back-up sand separate stratum fracfturing of achievable water-jet.
To realize above-mentioned technical purpose, the present invention is adopted the following technical scheme that and is achieved.
A kind of system of the continuous back-up sand separate stratum fracfturing of achievable water-jet, the system includes underground process pipe string, connection In the well head continuous sand flushing device of the underground process pipe string upper end.
Preferably, the well head continuous sand flushing device includes a ring valve main body;The ring valve main body two ends connect one respectively Top sub and a bottom pipe nipple;A central tube is connected between the ring valve main body internal upper part pipe nipple and bottom pipe nipple;In described The upper end of heart pipe is provided with a plug;Form annular space between the central tube and the ring valve main body, the top sub with The annular space connects to form fluid course, is slided in the annular space and is provided with a piston, the closure of the piston activity The fluid course;The top of the central tube is provided with the heart tube side hole communicated with the annular space;In the ring valve main body It is provided with the ring valve side opening communicated with the annular space;Be arranged a main body set outside the ring valve main body, the main body be arranged with The main body side opening that the ring valve side opening is communicated.
Preferably, the main body side opening external side connector, oily nonyl, lower high-pressure fire hose, the first reversing control valve successively, the One reversing control valve connects cement pump truck by pipeline.
Preferably, the top and bottom of the main body set connect upper flange and lower flange respectively;The upper flange is sheathed on On the top sub, the upper end of the top sub connects a top connection.
Preferably, the upper end of the top connection is sequentially connected high-pressure fire hose, the second reversing control valve;Described second changes The cement pump truck is connected to control valve.
Preferably, it is provided with cartridge between the upper flange and main body set.
Preferably, an elevator is arranged outside the top sub, the elevator is located at the upper end of the upper flange.
Preferably, the underground process pipe string includes sleeve pipe, is arranged in the oil pipe in sleeve pipe, and oil pipe lower end is connected with safety Give up, the lower end given up in safety is connected with injector by pipeline, guiding check valve is connected in injector lower end;The oil pipe Connect the lower flange.
Another object of the present invention, a kind of method of the achievable continuous back-up sand separate stratum fracfturing of water-jet, including following step Suddenly:
Process pipe string under step 1, lower going-into-well, the first fragment position that injector alignment need to be transformed;
Step 2, from oil pipe with 0.5m3/ min injects perforating fluid, carries out coiled tubing hydraulic perforating;When load fluid to nozzle 9 apart from 200m when, improve discharge capacity to 2.0m3/ min carries out abrasive perforating, and during perforation, perforating fluid injects from coiled tubing, oil pipe Annular space with sleeve pipe is returned out;
After the completion of step 3, perforation, the annular space injection fracturing fluid of oil pipe and sleeve pipe, while oil pipe keeps the base of 0.2m3/min Liquid discharge capacity;
After the complete first paragraph of step 4, pressure break, calculated since main pressure break latter end, phase is replaced by the annular space of oil pipe and sleeve pipe Sand amount is answered, after settling 1 hour, sand face is visited with underground process pipe string, back-up sand again or replacing well head are carried out according to sand result is visited Continuous sand flushing device;
Step 5, repeat step 1-4 complete remaining each section of pressure break.
Step 6, dismounting fracture well head, are replaced by well head continuous sand flushing device, are gone out sand grains using the direct circulation of this tubing string Pit shaft.
Beneficial effects of the present invention:
1st, the system underground process pipe string coordinates well head continuous sand flushing device, it is not necessary to specially descend sand-flushing pipe column, one time again Tubing string is realized carrying out perforation, pressure break and sand washing to oil-gas Layer, and efficiency of construction is high.
2nd, in pressing crack construction, insulated by back-up sand and replace underseal to insulate, it is to avoid the damage of tubing string bottom packer, it is ensured that Packing reliability, improves tubing string construction hop count and construction safety.
Brief description of the drawings
A kind of Fig. 1 structural representations of the system of the achievable continuous back-up sand separate stratum fracfturing of water-jet of the invention
In figure:1- top connections;2- elevators;3- top subs;4- upper flanges;5- cartridges;6- plugs;7- ring valve masters Body;8- pistons;9- central tubes;10- main body sets;11- lower flanges;12- bottoms pipe nipple;13- side connectors;14- unions;15;Upper height Pressure rotary hose;High-pressure fire hose under 16-;The reversing control valves of 17- first;The reversing control valves of 18- second;19- oil pipes;20- safety Give up;21- injectors;22- guiding check valves;23- sleeve pipes.
Specific embodiment
The invention will be further described below in conjunction with the accompanying drawings:
Embodiment 1
As shown in figure 1, a kind of system of achievable continuous back-up sand separate stratum fracfturing of water-jet provided in an embodiment of the present invention, The system includes underground process pipe string, is connected to the well head continuous sand flushing device of the underground process pipe string upper end.
Operation principle of the invention is:By connecting a well head continuous sand flushing device on the process pipe string of underground, by underground After process duct lives in the injection of row perforation and continuous back-up sand, then sand washing is carried out by well head continuous sand flushing device, generation is insulated by back-up sand Insulated for underseal, it is to avoid the damage of tubing string bottom packer, it is ensured that packing reliability, improve tubing string construction hop count and construction Safety.
Embodiment 2
On the basis of embodiment 1, as shown in figure 1, the well head continuous sand flushing device includes a ring valve main body 7;It is described The two ends of ring valve main body 7 connect a top sub 3 and a bottom pipe nipple 12 respectively;The internal upper part pipe nipple 3 of the ring valve main body 7 and bottom A central tube 9 is connected between pipe nipple 12;The upper end of the central tube 9 is provided with a plug 6;The central tube 9 and the ring valve master Annular space is formed between body 7, the top sub 3 connects to form fluid course with the annular space, the annular space Interior slip is provided with a piston 8, the closure fluid course of the activity of the piston 8;The top of the central tube 9 be provided with it is described The heart tube side hole that annular space is communicated;The ring valve main body 7 is provided with the ring valve side opening communicated with the annular space;The ring Main body set 10 is arranged outside valve body 7, the main body set 10 is provided with the main body side opening communicated with the ring valve side opening.
The main body side opening external side connector 13, oily nonyl 14, lower high-pressure fire hose 16, the first reversing control valve 17 successively, First reversing control valve 17 connects cement pump truck by pipeline.
The top and bottom of the main body set 10 are sequentially connected upper flange 4 and lower flange 11;The upper flange 4 is sheathed on institute State on top sub 3, the upper end of the top sub 3 connects a top connection 1.
Cartridge 5 is provided between the upper flange 4 and main body set 10, the sealing property of main body set 10 is improved.
The upper end of the top connection 1 is sequentially connected high-pressure fire hose 15, the second reversing control valve 18;Second commutation Control valve 18 connects the cement pump truck.
An elevator 2 is arranged outside the top sub 3, the elevator 2 is located at the upper end of the upper flange 4, by the elevator The well head continuous sand flushing device can be moved easily.
The operation principle of well head continuous sand flushing device:In normal sand washing operation, the sand cleaning fluid that cement pump truck is pumped out passes through The annular that second reversing control valve 18, upper high-pressure fire hose 15, top sub 3 enter between ring valve main body 7 and central tube 9 is empty Between, promote piston 8 to move down, after piston 8 closes ring valve side opening, sand cleaning fluid enters bottom pipe nipple 12 by the side opening of central tube 9 With underground process pipe string inner chamber, positive sand washing operation is carried out.When need make up a joint (make up a joint refer to oil drilling when, creeping into A measure in journey.Because drilling, well are constantly deepened, drill string will also be lengthened in time.Drill string is mainly made up of drilling rod, is boring During entering, whenever bating after a piece length for drilling rod, just to drilling rod is accessed in drill string, this process is just named and connect It is single).Cement pump truck works on, and allows sand cleaning fluid to enter from main body side opening, and sand cleaning fluid reaches ring valve main body 7 by ring valve side opening And the annular space between central tube 9, promote piston 8 to move up, until piston 8 is closed between ring valve main body 7 and central tube 9 Annular space to top sub 3 fluid course, sand cleaning fluid by the side opening of central tube 9 enter bottom pipe nipple 12 and oil pipe inner chamber, enter Capable not termination of pumping continuous sand flushing operation.Now well head can make up a joint operation, it is single connected after, first open and lead to the second of oil pipe Reversing control valve 18, is then shut off leading to the first reversing control valve 17 of main body side opening connector, and the stream of sand cleaning fluid is changed again To making sand cleaning fluid carry out positive sand washing via underground process pipe string and top sub 3 again.Connection tubing string is required in oil each time Pipe top connects set ring valve reversing assembly in advance, repeats aforesaid operations, you can realize not termination of pumping continuous sand flushing operation.
Embodiment 3
On the basis of embodiment 1, the underground process pipe string includes sleeve pipe 23, is arranged in the oil pipe 19 in sleeve pipe 23, The lower end of oil pipe 19 is connected with safety and gives up 20, injector 21 is connected with by pipeline in give up 20 lower end of safety, in injector 21 lower ends connect guiding check valve 22.The technique keeps a grip on simple structure, easy construction.
Embodiment 4
In order to overcome existing hydraulic jetting fracturing to keep a grip on not to possess sand washing function, it is necessary under enter a sand washing and keep a grip on not Foot, the present invention provides a kind of method of the achievable continuous back-up sand separate stratum fracfturing of water-jet, comprises the following steps:
Process pipe string under step 1, lower going-into-well, injector 21 is aligned the first fragment position that need to be transformed.
Step 2, from oil pipe 19 with 0.5m3/ min injects perforating fluid, carries out the hydraulic perforating of coiled tubing 19.
Wherein, when load fluid to nozzle 9 is apart from 200m, discharge capacity to 2.0m is improved3/ min carries out abrasive perforating, perforation When, perforating fluid is injected from coiled tubing 19, and the annular space of oil pipe 19 and sleeve pipe 23 is returned out.
After the completion of step 3, perforation, annular space (i.e. the abbreviation of annular space) the injection fracturing fluid of oil pipe 19 and sleeve pipe 23, together When oil pipe 19 keep 0.2m3The base fluid discharge capacity of/min.
4th, after the complete first paragraph of pressure break, calculated since main pressure break latter end, phase is replaced by the annular space of oil pipe 19 and sleeve pipe 23 Sand amount is answered, after settling 1 hour, sand face is visited with underground process pipe string, back-up sand again or replacing well head are carried out according to sand result is visited Continuous sand flushing device.
Wherein, sand result two kinds of situations again are visited, one kind is that sand face position is too low, then back-up sand to sand face height is being designed again 0.5m below perforated interval;Another kind is as sand face position is too high, then to dismantle fracture well head, is replaced by well head continuous sand flushing device, Direct circulation sand washing, adjustment sand face height 0.5m below design perforated interval are carried out by this tubing string.
Step 5, repeat step 1-4 complete remaining each section of pressure break.
Step 6, dismounting fracture well head, are replaced by well head continuous sand flushing device, are gone out sand grains using the direct circulation of this tubing string Pit shaft.
Obviously, those skilled in the art can carry out various changes and modification without deviating from essence of the invention to the present invention God and scope.So, if these modifications of the invention and modification belong to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising these changes and modification.

Claims (9)

1. the system of the continuous back-up sand separate stratum fracfturing of a kind of achievable water-jet, it is characterised in that:The system includes underground technique Tubing string, is connected to the well head continuous sand flushing device of the underground process pipe string upper end.
2. the system that the continuous back-up sand separate stratum fracfturing of water-jet can be realized according to claim 1, it is characterised in that:The well Mouth continuous sand flushing device includes a ring valve main body (7);Ring valve main body (7) two ends connect a top sub (3) and one respectively Bottom pipe nipple (12);A central tube (9) is connected between the ring valve main body (7) internal upper part pipe nipple (3) and bottom pipe nipple (12);Institute The upper end for stating central tube (9) is provided with a plug (6);Annular is formed between the central tube (9) and the ring valve main body (7) empty Between, the top sub (3) connects to form fluid course with the annular space, is slided in the annular space and is provided with a piston (8), the closure fluid course of piston (8) activity;The top of the central tube (9) is provided with and the annular space phase Logical heart tube side hole;The ring valve main body (7) is provided with the ring valve side opening communicated with the annular space;The ring valve main body (7) a main body set (10) is arranged outside, the main body set (10) is provided with the main body side opening communicated with the ring valve side opening.
3. the system of the continuous back-up sand separate stratum fracfturing of achievable water-jet according to claim 2, it is characterised in that:It is described Main body side opening external side connector (13), oily nonyl (14), lower high-pressure fire hose (16), the first reversing control valve (17), first successively Reversing control valve (17) connects cement pump truck by pipeline.
4. the system of the continuous back-up sand separate stratum fracfturing of achievable water-jet according to claim 1, it is characterised in that:It is described The top and bottom of main body set (10) connect upper flange (4) and lower flange (11) respectively;The upper flange (4) is sheathed on described On portion's pipe nipple (3), the upper end of the top sub (3) connects a top connection (1).
5. the system of the continuous back-up sand separate stratum fracfturing of achievable water-jet according to claim 4, it is characterised in that:It is described The upper end of top connection (1) is sequentially connected high-pressure fire hose (15), the second reversing control valve (18);Second reversing control valve (18) the cement pump truck is connected.
6. the system of the continuous back-up sand separate stratum fracfturing of achievable water-jet according to claim 4, it is characterised in that:It is described Cartridge (5) is provided between upper flange (4) and the main body set (10).
7. the system of the continuous back-up sand separate stratum fracfturing of achievable water-jet according to claim 4, it is characterised in that:It is described An elevator (2), upper end of the elevator (2) positioned at the upper flange (4) are arranged outside top sub (3).
8. the system of the continuous back-up sand separate stratum fracfturing of achievable water-jet according to claim 4, it is characterised in that:It is described Underground process pipe string includes sleeve pipe (23), is arranged in the oil pipe (19) in sleeve pipe (23), and oil pipe (19) lower end is connected with peace Give up entirely (20), injector (21) is connected with by pipeline in the give up lower end of (20) of the safety, in injector (21) lower end Connection guiding check valve (22);The oil pipe (19) connects the lower flange (11).
9. a kind of method of the continuous back-up sand separate stratum fracfturing of achievable water-jet, comprises the following steps, it is characterised in that:Including with Lower step,
Process pipe string under step 1, lower going-into-well, the first fragment position that injector alignment need to be transformed;
Step 2, from oil pipe with 0.5m3/ min injects perforating fluid, carries out coiled tubing hydraulic perforating;When load fluid to the distance of nozzle 9 During 200m, discharge capacity to 2.0m is improved3/ min carries out abrasive perforating, and during perforation, perforating fluid injects from coiled tubing, oil pipe and sleeve pipe Annular space return out;
After the completion of step 3, perforation, the annular space injection fracturing fluid of oil pipe and sleeve pipe, while oil pipe keeps 0.2m3The base fluid row of/min Amount;
After the complete first paragraph of step 4, pressure break, calculated since main pressure break latter end, corresponding sand is replaced by the annular space of oil pipe and sleeve pipe Amount, after settling 1 hour, sand face is visited with underground process pipe string, and according to visiting, sand result carries out back-up sand again or replacing well head is continuous Sand flushing device;
Step 5, repeat step 1-4 complete remaining each section of pressure break.
Step 6, dismounting fracture well head, are replaced by well head continuous sand flushing device, and sand grains is gone out into pit shaft using the direct circulation of this tubing string.
CN201611217342.4A 2016-12-26 2016-12-26 A kind of system and method for the continuous back-up sand separate stratum fracfturing of achievable water-jet Pending CN106761643A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611217342.4A CN106761643A (en) 2016-12-26 2016-12-26 A kind of system and method for the continuous back-up sand separate stratum fracfturing of achievable water-jet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611217342.4A CN106761643A (en) 2016-12-26 2016-12-26 A kind of system and method for the continuous back-up sand separate stratum fracfturing of achievable water-jet

Publications (1)

Publication Number Publication Date
CN106761643A true CN106761643A (en) 2017-05-31

Family

ID=58925805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611217342.4A Pending CN106761643A (en) 2016-12-26 2016-12-26 A kind of system and method for the continuous back-up sand separate stratum fracfturing of achievable water-jet

Country Status (1)

Country Link
CN (1) CN106761643A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107461182A (en) * 2017-09-08 2017-12-12 中国石油天然气股份有限公司 Layering fracturing sand control method
CN109138874A (en) * 2018-10-08 2019-01-04 大庆荣氏采油技术开发有限公司 A kind of water injection well fouling cleaning method
CN111594126A (en) * 2020-06-08 2020-08-28 中国石油天然气集团有限公司 Sand-filling layered fracturing method for coiled tubing
CN113530517A (en) * 2021-09-17 2021-10-22 中煤科工集团西安研究院有限公司 Combined segmented fracturing device, asynchronous two-way extraction system and method
CN115653560A (en) * 2022-11-11 2023-01-31 中国石油天然气集团有限公司 Horizontal well single upper seal pipe column sand filling staged fracturing implementation method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1752404A (en) * 2004-09-20 2006-03-29 西安益友石油科技有限公司 Gas well separate layer fracturing and producing integrated well completing pipe string and technique
CN101173606A (en) * 2007-03-16 2008-05-07 安东石油技术(集团)有限公司 Controllable disjoint sandblaster
CN102094586A (en) * 2010-12-24 2011-06-15 中国石油天然气股份有限公司 Ground sand washing device for horizontal well and application method thereof
CN103015952A (en) * 2012-12-12 2013-04-03 山东瑞丰石油技术有限责任公司 Method for packing multiple layers of gravel in one time
CN203978409U (en) * 2014-04-26 2014-12-03 西安澳能石油设备有限公司 Tubing string for back-up sand separate stratum fracfturing technique
CN104213895A (en) * 2013-06-05 2014-12-17 中国石油天然气股份有限公司 Hydraulic sand jet perforation, fracture and sand filling integrated technological method
CA2929853A1 (en) * 2013-11-18 2015-05-21 Lubrizol Oilfield Solutions, Inc. Proppant cluster forming composition comprising a zeta potential altering composition comprising an amine-phosphate reaction product and a coating crosslinking composition
CN206753560U (en) * 2016-12-26 2017-12-15 中国石油天然气股份有限公司 A kind of system of the continuous back-up sand separate stratum fracfturing of achievable water-jet

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1752404A (en) * 2004-09-20 2006-03-29 西安益友石油科技有限公司 Gas well separate layer fracturing and producing integrated well completing pipe string and technique
CN101173606A (en) * 2007-03-16 2008-05-07 安东石油技术(集团)有限公司 Controllable disjoint sandblaster
CN102094586A (en) * 2010-12-24 2011-06-15 中国石油天然气股份有限公司 Ground sand washing device for horizontal well and application method thereof
CN103015952A (en) * 2012-12-12 2013-04-03 山东瑞丰石油技术有限责任公司 Method for packing multiple layers of gravel in one time
CN104213895A (en) * 2013-06-05 2014-12-17 中国石油天然气股份有限公司 Hydraulic sand jet perforation, fracture and sand filling integrated technological method
CA2929853A1 (en) * 2013-11-18 2015-05-21 Lubrizol Oilfield Solutions, Inc. Proppant cluster forming composition comprising a zeta potential altering composition comprising an amine-phosphate reaction product and a coating crosslinking composition
CN203978409U (en) * 2014-04-26 2014-12-03 西安澳能石油设备有限公司 Tubing string for back-up sand separate stratum fracfturing technique
CN206753560U (en) * 2016-12-26 2017-12-15 中国石油天然气股份有限公司 A kind of system of the continuous back-up sand separate stratum fracfturing of achievable water-jet

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107461182A (en) * 2017-09-08 2017-12-12 中国石油天然气股份有限公司 Layering fracturing sand control method
CN107461182B (en) * 2017-09-08 2019-08-06 中国石油天然气股份有限公司 Layering fracturing sand control method
CN109138874A (en) * 2018-10-08 2019-01-04 大庆荣氏采油技术开发有限公司 A kind of water injection well fouling cleaning method
CN111594126A (en) * 2020-06-08 2020-08-28 中国石油天然气集团有限公司 Sand-filling layered fracturing method for coiled tubing
CN113530517A (en) * 2021-09-17 2021-10-22 中煤科工集团西安研究院有限公司 Combined segmented fracturing device, asynchronous two-way extraction system and method
CN113530517B (en) * 2021-09-17 2021-12-14 中煤科工集团西安研究院有限公司 Combined segmented fracturing device, asynchronous two-way extraction system and method
CN115653560A (en) * 2022-11-11 2023-01-31 中国石油天然气集团有限公司 Horizontal well single upper seal pipe column sand filling staged fracturing implementation method

Similar Documents

Publication Publication Date Title
CN106761643A (en) A kind of system and method for the continuous back-up sand separate stratum fracfturing of achievable water-jet
CN102536185B (en) Multi-stage draggable water-jet packer tubular column and technology
CN104929603B (en) Sleeve pipe infinite stages staged fracturing method
CN202108493U (en) Water jetting multi-cluster subsection fracturing strings of horizontal well
CN104213895B (en) Hydraulic jet perforation pressure break and back-up sand combination operation process method
CN103089204B (en) Double-coal-bed layered pressure control device combining coal discharging and coal mining
CN206753560U (en) A kind of system of the continuous back-up sand separate stratum fracfturing of achievable water-jet
CN107905776B (en) A kind of gas well fracturing drainage system and method
CN202117638U (en) Novel gas lifting downhole tool of continuous oil tube
CN103161432B (en) Lift separate-layer production string
CN106401925A (en) Downhole gas-liquid transduction booster pump
CN202500541U (en) Tubular column of gas well plumb shaft multi-level layering fracturing technology
CN102080646B (en) Layer mining anti-gas pump for pumping well
CN204082116U (en) Oil well horizontal well oil jacket is with note formula two envelope single deck tape-recorder volume fracturing tubing string
CN110439528B (en) Carbon dioxide acid fracturing method for low-permeability heterogeneous carbonate rock gas reservoir
CN201963531U (en) Slice mining anti-gas pump for pumping wells
CN111764880A (en) Offshore heavy oil thermal production well steam injection and oil extraction integrated lifting device and operation method thereof
CN204024624U (en) Multistage big orifice annular space throttling sandblaster
CN101446188B (en) Single upper seal sand blasting perforation fracturing technology
CN200975246Y (en) Integrating layered water distributor
CN204357410U (en) A kind of wear-resisting straight well multilayer seam net fracturing technology tubing string
CN205012973U (en) Machine pump drainage liquid gas production device
CN202832462U (en) Unblocking device capable of carrying out separate layer acid treatment and negative pressure acid discharge
CN103362470B (en) Oil/gas Well annular mechanical packing packer
CN202731855U (en) Oil pumping unit drive rodless hydraulic oil pumping system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531