CN106760580A - A kind of method of high-altitude Build Security net - Google Patents

A kind of method of high-altitude Build Security net Download PDF

Info

Publication number
CN106760580A
CN106760580A CN201611184142.3A CN201611184142A CN106760580A CN 106760580 A CN106760580 A CN 106760580A CN 201611184142 A CN201611184142 A CN 201611184142A CN 106760580 A CN106760580 A CN 106760580A
Authority
CN
China
Prior art keywords
steel wire
wire rope
fixed
floor face
longitudinal steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611184142.3A
Other languages
Chinese (zh)
Inventor
凌红兵
汪文友
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI YAOHAI STEEL STRUCTURE Co Ltd
Original Assignee
ANHUI YAOHAI STEEL STRUCTURE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI YAOHAI STEEL STRUCTURE Co Ltd filed Critical ANHUI YAOHAI STEEL STRUCTURE Co Ltd
Priority to CN201611184142.3A priority Critical patent/CN106760580A/en
Publication of CN106760580A publication Critical patent/CN106760580A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • E04G21/3261Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
    • E04G21/3266Safety nets

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention discloses a kind of method of high-altitude Build Security net, including:Left side floor face (1), right side floor face (2) and column (3), it is characterized in that being:Described left side floor face (1) the right is provided with many root posts of a row (3), described right side floor face (2) left side is provided with many root posts of a row (3), the present invention using the present invention using a kind of simple structure, it is practical and convenient, can construct simple cost-saved the features such as a kind of high-altitude Build Security net method.

Description

A kind of method of high-altitude Build Security net
Technical field
The present invention relates to building field, and in particular to a kind of method of high-altitude Build Security net.
Background technology
Safety measure problem in cantilever frame construction, the spacing that is separated by every building is 24 meters, and the position encorbelmented outward is complete Portion is hanging part, the safety measure without any fall arrest.Overhanging portion scaffolding is protected according to routine such as, per building Building part scaffold is about 57400 cubic metres, and it is larger that quantities expense is set up in space, it is therefore desirable to which a new technical scheme is come Meet actual demand.
The content of the invention
In order to overcome the shortcomings of that above-mentioned middle prior art is present, the present invention using a kind of simple structure, it is practical and convenient, can apply A kind of method of the high-altitude Build Security net of the features such as work is simple cost-saved.
The purpose of the present invention is realized by following scheme:A kind of method of high-altitude Build Security net, including:Left side building Aspect, right side floor face and column, it is characterized in that being:Described left side floor face the right is provided with many root posts of a row, described The right side floor face left side be provided with many root posts of a row, comprise the following steps:1) two row's columns are longitudinally provided with vertical between any two Connected to wirerope-winding, the fixation after the circle of winding one on column of longitudinal steel wire rope re-extends into and a circle is wound on next column It is fixed, the like;
2) after previous step is completed, it is fixed on the longitudinal steel wire rope on the left side using transverse steel wire rope left end, right-hand member is temporary Do not fix;
3) after the completion of previous step, safety net is drawn from the right through using rope by fixed perforation is used on safety net To the left side, after after the transverse steel wire rope that whole piece safety net both sides pass through and are fixed on both sides, using spending blue bolt by transverse steel wire Rope is fixed on the longitudinal steel wire rope on right side, and several groups are constituted successively, forms one safe leader of plane.
Preferably, described longitudinal steel wire rope uses a diameter of 16mm.
Preferably, described transverse steel wire rope uses a diameter of 10mm.
A kind of crane system for steelframe lifting of the invention, its advantage is:
(1) can ensure safety, but it is cost-saved;
(2) it is practical and convenient, it is easy to operate;
(3) it is time saving and energy saving, can improve production efficiency.
Specifically, safety net can reach protective action later using one layer, without being built from bottom, reach cost-effective Purpose, in order to increase safety coefficient, can up and down build layer 2-3 successively, improve safety coefficient effect, as can be seen from the above should The characteristics of scheme has easy to operate, practical.
Brief description of the drawings
Fig. 1 is the schematic diagram of partial structurtes of the present invention.
Fig. 2 is structural representation of the invention.
Wherein:1st, left side floor face, 2, right side floor face, 3, column, 4, longitudinal steel wire rope, 5, transverse steel wire rope.
Specific embodiment
As shown in Figure 1:A kind of method of high-altitude Build Security net, including left side floor face 1, right side floor face 2 and column 3, it is characterized in that being:Described the right of left side floor face 1 is provided with many root posts 3 of a row, and the described left side of right side floor face 2 sets There are many root posts 3 of a row, comprise the following steps:1) longitudinal direction of two row's column 3 is provided with the company of winding of longitudinal steel wire rope 4 between any two Connect, the fixation after the circle of winding one on column 3 of longitudinal steel wire rope 4 re-extends into the circle of winding one on next column 3 and fixes, successively class Push away;
2) after previous step is completed, it is fixed on the longitudinal steel wire rope 4 on the left side using the left end of transverse steel wire rope 5, right-hand member Wouldn't fix;
After the completion of previous step, safety net is pulled to from the right through using rope by fixed perforation is used on safety net The left side, after after the transverse steel wire rope 5 that whole piece safety net both sides pass through and are fixed on both sides, using spending blue bolt by transverse steel wire rope The 5 longitudinal steel wire ropes 4 for being fixed on right side, constitute several groups successively, form one safe leader of plane, described longitudinal steel wire rope 4 Using a diameter of 16mm, described transverse steel wire rope 5 uses a diameter of 10mm.
Embodiment
This programme is implemented, and refer to Fig. 1 and Fig. 2,1) longitudinal direction of two row's column 3 is provided with longitudinal steel between any two Cord 4 is intertwined and connected, and the fixation after the circle of winding one on column 3 of longitudinal steel wire rope 4 re-extends into and a circle is wound on next column 3 It is fixed, the like, the intersection after the circle of winding one on column 3 of longitudinal steel wire rope 4 is fixed by both using " U " type card, Longitudinal steel wire rope 4 uses a diameter of 16mm, fixed with proof strength;
2) after previous step is completed, it is fixed on the longitudinal steel wire rope 4 on the left side using the left end of transverse steel wire rope 5, right-hand member Wouldn't fix, transverse steel wire rope 5 uses a diameter of 10mm;
3) after previous step is completed, will be used on safety net fixed perforation through using rope by safety net from the right The left side is pulled to, after after the transverse steel wire rope 5 that whole piece safety net both sides pass through and are fixed on both sides, using spending blue bolt by horizontal steel Cord 5 is fixed on the longitudinal steel wire rope 4 on right side, and several groups are constituted successively, forms one safe leader of plane, completes this operation, In order to ensure safe stability, multiple tracks identical safety net can be set up on column 3, safety coefficient be improved, while this programme Greatly save cost.
Finally it should be noted that:Above example is only used to illustrate the present invention and not limit technology described in the invention Scheme;Therefore, although this specification with reference to each above-mentioned embodiment to present invention has been detailed description, this Field it is to be appreciated by one skilled in the art that still can be modified to the present invention or equivalent;And all do not depart from this The technical scheme of the spirit and scope of invention and its improvement, all should cover in scope of the presently claimed invention.

Claims (3)

1. a kind of method of high-altitude Build Security net, including:Left side floor face (1), right side floor face (2) and column (3), it is special Levy is to be:Described left side floor face (1) the right is provided with many root posts of a row (3), and described right side floor face (2) left side sets There is many root posts of a row (3), comprise the following steps:1) two row's columns (3) are longitudinally provided with into longitudinal steel wire rope (4) between any two to twine Around connection, longitudinal steel wire rope (4) fixation after the circle of winding one on column (3) re-extends into winding one on next column (3) and encloses It is fixed, the like;
2) after previous step is completed, it is fixed on the longitudinal steel wire rope (4) on the left side using transverse steel wire rope (5) left end, right-hand member Wouldn't fix;
3) after the completion of previous step, safety net is pulled to a left side from the right through using rope by fixed perforation is used on safety net Side, after after the transverse steel wire rope (5) that whole piece safety net both sides pass through and are fixed on both sides, using spending blue bolt by transverse steel wire rope (5) the longitudinal steel wire rope (4) on right side is fixed on, several groups is constituted successively, form one safe leader of plane.
2. the method for a kind of high-altitude Build Security net according to claim 1, it is characterised in that:Described longitudinal steel wire rope (4) a diameter of 16mm is used.
3. the method for a kind of high-altitude Build Security net according to claim 1, it is characterised in that:Described transverse steel wire rope (5) a diameter of 10mm is used.
CN201611184142.3A 2016-12-20 2016-12-20 A kind of method of high-altitude Build Security net Pending CN106760580A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611184142.3A CN106760580A (en) 2016-12-20 2016-12-20 A kind of method of high-altitude Build Security net

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611184142.3A CN106760580A (en) 2016-12-20 2016-12-20 A kind of method of high-altitude Build Security net

Publications (1)

Publication Number Publication Date
CN106760580A true CN106760580A (en) 2017-05-31

Family

ID=58893993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611184142.3A Pending CN106760580A (en) 2016-12-20 2016-12-20 A kind of method of high-altitude Build Security net

Country Status (1)

Country Link
CN (1) CN106760580A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2090405U (en) * 1991-03-18 1991-12-11 福建省福州台美华纤维工业有限公司 Net-type heat insulation device
JPH09112634A (en) * 1995-10-18 1997-05-02 Katsu Denki Koji Kk Method and device for stretched attachment of danger preventive rope
FR2772411A1 (en) * 1997-12-16 1999-06-18 Baudin Chateauneuf Protective system for falling objects
DE202005010078U1 (en) * 2005-06-27 2005-10-13 Holzmayr, Johann Speedily removable device to span walkways at airports or building sites has vertical supports on path, wire rope holder at separating wall height, tubular holding device running across vertical supports with push-in coupling elements
CN103236656A (en) * 2013-04-08 2013-08-07 国家电网公司 Column suspension type crossing structure and operating method thereof
CN203393628U (en) * 2013-07-15 2014-01-15 中建五局土木工程有限公司 Ground basket device
CN104018440A (en) * 2014-06-30 2014-09-03 布鲁克(成都)工程有限公司 Flexible barrier net
CN104499723A (en) * 2014-12-12 2015-04-08 中国十七冶集团有限公司 Movable safety net and installation method thereof
JP2016098552A (en) * 2014-11-21 2016-05-30 キョーワ株式会社 Suspender and method of holding component on member using the suspender

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2090405U (en) * 1991-03-18 1991-12-11 福建省福州台美华纤维工业有限公司 Net-type heat insulation device
JPH09112634A (en) * 1995-10-18 1997-05-02 Katsu Denki Koji Kk Method and device for stretched attachment of danger preventive rope
FR2772411A1 (en) * 1997-12-16 1999-06-18 Baudin Chateauneuf Protective system for falling objects
DE202005010078U1 (en) * 2005-06-27 2005-10-13 Holzmayr, Johann Speedily removable device to span walkways at airports or building sites has vertical supports on path, wire rope holder at separating wall height, tubular holding device running across vertical supports with push-in coupling elements
CN103236656A (en) * 2013-04-08 2013-08-07 国家电网公司 Column suspension type crossing structure and operating method thereof
CN203393628U (en) * 2013-07-15 2014-01-15 中建五局土木工程有限公司 Ground basket device
CN104018440A (en) * 2014-06-30 2014-09-03 布鲁克(成都)工程有限公司 Flexible barrier net
JP2016098552A (en) * 2014-11-21 2016-05-30 キョーワ株式会社 Suspender and method of holding component on member using the suspender
CN104499723A (en) * 2014-12-12 2015-04-08 中国十七冶集团有限公司 Movable safety net and installation method thereof

Similar Documents

Publication Publication Date Title
CN114458001A (en) Portable hanging flower basket suspension that construction was used is decorated to outdoor vestibule in high altitude
CN105568856B (en) A kind of dilute cable stayed-cable bridge Suo Liang method for synchronously constructing
CN103236656B (en) Column suspension type crossing structure and operating method thereof
CN104577876A (en) Plug-in hanging basket for live working of helicopter
CN204391605U (en) A kind of helicopter live line working plug-in type hanging basket
CN102082400B (en) Simple line spanning frame
CN203284126U (en) Simple composite gantry high-altitude weight hoisting device
CN106760580A (en) A kind of method of high-altitude Build Security net
CN107795133B (en) Integral protective frame platform and construction method thereof
CN203569906U (en) Anti-sliding device of canopy sloping roof without column
CN106401157A (en) Movable operation platform and high-altitude construction method
CN203475801U (en) Telescopic steel platform for elevator shaft
CN203096620U (en) Steel pipe arch rib operation platform
CN102108801A (en) Guide rail system for use on end part of cross arms of helicopter-assembled power transmission line iron tower
CN205772893U (en) A kind of king-tower function at most lifting traction apparatus
CN205633460U (en) Building material transports frame
CN205472340U (en) People's passageway on instrument formula tower crane
CN204530465U (en) High pier bridge pier shaft internal inspection system
CN204633283U (en) A kind of built on stilts general cable hook suspension device
CN203685006U (en) Insulated rope ladder for overhead power transmission lines
CN210087353U (en) Bailey beam supporting system for subway station construction
CN105207119B (en) Electrified span construction method for high-voltage wires and protective device of construction
CN102963780B (en) Prestress heavy drop press monomer framework memorial archway winding method
CN101949117A (en) Safety insulating net structure of highway
CN203878962U (en) Independent supporting device for high-place operation hanging basket cantilever

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531

RJ01 Rejection of invention patent application after publication