CN106760069A - A kind of prefabricated board wall fixed installation technique and construction - Google Patents
A kind of prefabricated board wall fixed installation technique and construction Download PDFInfo
- Publication number
- CN106760069A CN106760069A CN201710020709.1A CN201710020709A CN106760069A CN 106760069 A CN106760069 A CN 106760069A CN 201710020709 A CN201710020709 A CN 201710020709A CN 106760069 A CN106760069 A CN 106760069A
- Authority
- CN
- China
- Prior art keywords
- board wall
- groove
- bolt
- fixed installation
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims abstract description 33
- 238000000034 method Methods 0.000 title claims abstract description 18
- 238000010276 construction Methods 0.000 title claims abstract description 13
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 11
- 239000010959 steel Substances 0.000 claims abstract description 11
- 239000011083 cement mortar Substances 0.000 claims abstract description 7
- 239000000463 material Substances 0.000 claims description 7
- 238000013461 design Methods 0.000 claims description 5
- 239000004570 mortar (masonry) Substances 0.000 claims description 5
- 238000012423 maintenance Methods 0.000 claims description 3
- 238000007789 sealing Methods 0.000 claims description 3
- 239000002344 surface layer Substances 0.000 claims description 3
- 125000006850 spacer group Chemical group 0.000 claims 1
- 238000009408 flooring Methods 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 4
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000009417 prefabrication Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/74—Removable non-load-bearing partitions; Partitions with a free upper edge
- E04B2/82—Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
- E04B2/821—Connections between two opposed surfaces (i.e. floor and ceiling) by means of a device offering a restraining force acting in the plane of the partition
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Finishing Walls (AREA)
Abstract
The invention discloses a kind of prefabricated board wall fixed installation technique and construction, it is adaptable to which prefabricated assembled board wall is fixedly connected with building stratum.Mainly including prefabricated assembled board wall, building stratum, angle cleat with holes, split bolt, pre-embedded bolt, reserved groove etc..Prefabricated assembled board wall is concentrated by factory and made, reserved groove is held being connected with building stratum, equally, flooring and the prefabricated assembled board wall place of being connected also reserve groove, it is fixedly connected by split bolt, pre-embedded bolt with angle steel with holes, installation deviation is flexibly controlled with adjusting gasket.After installing, exposed groove is filled into covering in reserved groove cement mortar, complete fixed installation.The present invention is rational in infrastructure, and speed of application is fast, and installation accuracy is high, and in place, without repeatedly adjustment deviation, fixation is finished and covers connecting node using cement mortar achievable once mounting, and good concealment does not influence structure overall appearance.
Description
Technical field
The present invention relates to a kind of board wall fixed installation technique, and in particular to a kind of prefabricated board wall fixed installation technique
And construction.
Background technology
As new building technology and continuing to develop for material are widely used with progress, prefabrication.
In the country that many building industrializations are flourishing, prefabrication experienced long-term experiment and application, modernization it is prefabricated
Assembled architecture product can be with the various functions of highly integrated building, and the form and component of building are very exquisite.I
State's construction demand amount is big, construction speed fast, necessary development prefabrication, then to prefabricated construction node
Detailing requiments also more and more higher.
The content of the invention
Goal of the invention:The invention aims to solve deficiency of the prior art, there is provided a kind of reasonable in design,
Speed of application is fast, and installation accuracy is high, and in place, without repeatedly adjustment deviation, fixation is finished and uses cement bonded sand achievable once mounting
Slurry covering connecting node, good concealment, do not influence structure overall appearance a kind of prefabricated board wall fixedly mount technique and
Construction.
Technical scheme:A kind of prefabricated board wall fixed installation technique of the present invention, comprises the following steps:
(1)Structure sheaf is constructed:Structure sheaf construction reserves groove and bolt embedment according to design requirement, and groove size uses 160mm
× 160mm × 30mm, the deviation of pre-embedded bolt is not more than 2mm, and ensures that pre-embedded bolt top must not exceed the mark of structure surface layer
It is high;
(2)Prefabricated assembled board wall factorial praluction:The size of reserved groove, the reserved groove in position Ying Yu buildings stratum are corresponding,
And strictly controlling the deviation of pre-embedded bolt and split bolt, it is ensured that fixed angle steel can be easily installed;
(3)Transport, lifting:Transported from factory into lifting field process in board wall, the protection to sheet material groove should be strengthened, kept away
Exempt to cause sheet material local damage because protection is improper, influence lifts quality with lifting speed;
(4)Fixed installation:High-strength bolt is selected in fixed installation;
(5)Groove is covered:Sealing groove is covered using mortar;
(6)Maintenance.
Further, step(4)Fixed installation should be greater than spiral shell from the high-strength bolt for being not less than M12, the size of bolt hole
Bolt nominal diameter 2-3mm, bolt pitch of holes should be not more than 500mm.
Further, step(5)The mortar is using the cement mortar for being not less than M15.
The invention also discloses a kind of prefabricated board wall fixed installation construction, including assembled board wall, building stratum, company
Angle steel, the reserved groove in building stratum, the reserved groove of board wall are connect, the reserved groove of the board wall is separately positioned on the two of assembled board wall
Side, the reserved groove of board wall and the junction of the reserved groove in building stratum of both sides are connected by angle cleat, the assembling
Formula board wall connects two angle cleats by split bolt, and the angle cleat is connected solid with building stratum by pre-embedded bolt simultaneously
It is fixed.
Further, the small 3-5mm of depth of the length that the split bolt two ends are stretched out groove more reserved than board wall.
Further, the angle cleat and assembled board wall, building are equipped with adjusting gasket between stratum.
Further, the adjusting gasket uses rubber or steel plate washer.
Beneficial effect:The present invention is rational in infrastructure, and speed of application is fast, and installation accuracy is high, achievable once mounting in place, without
Deviation is repeatedly adjusted, fixation is finished and covers connecting node using cement mortar, and good concealment does not influence structure overall appearance.
Brief description of the drawings
Fig. 1 is prefabricated board wall fixed installation organigram of the invention.
Specific embodiment
A kind of prefabricated board wall fixed installation construction as shown in Figure 1, including assembled board wall 1, building stratum 2, company
Angle steel 3, the building stratum reserved groove 9 of reserved groove 6, board wall are connect, the reserved groove 9 of the board wall is separately positioned on assembled board wall 1
Both sides, the junction that the reserved groove 9 of the board wall of both sides reserves groove 6 with building stratum is connected by angle cleat 3, institute
State assembled board wall 1 and two angle cleats 3 are connected by split bolt 4, the angle cleat 3 passes through pre-embedded bolt 5 and building simultaneously
Stratum 2 is connected.
The small 3-5mm of depth of the length that the two ends of the split bolt 4 are stretched out groove 9 more reserved than board wall.
Adjusting gasket 7 is equipped between the angle cleat 3 and assembled board wall 1, building stratum 2, the adjusting gasket 7 is adopted
With rubber or steel plate washer.
Prefabricated assembled board wall 1 is concentrated by factory and made, and the reserved groove in reserved building stratum is held being connected with building stratum 2
6, equally, the reserved groove 9 of board wall is also reserved on building stratum 2 with the place of being connected of prefabricated assembled board wall 1, with angle cleat with holes
3 are fixedly connected by split bolt 4, pre-embedded bolt 5, installation deviation are flexibly controlled with adjusting gasket 7, finally with nut 8
It is fixed.After installing, exposed groove is filled into covering with cement mortar at the reserved groove 6 in building stratum, complete fixed peace
Dress.
Two ends set the reserved groove 6 in building stratum when the described bottom of prefabricated assembled board wall 1 is prefabricated in the factory, and are easily installed
Fixed rear enclosed treatment;Corresponding groove is also left on the building stratum 2 when structure sheaf is constructed in advance, and pre- according to installation site
Bury bolt 5;The angle cleat 3 with holes determines angle steel size according to the reserved size of groove 6 in building stratum, and meets design
It is required that.
A kind of above-mentioned prefabricated board wall fixed installation technique, specifically includes following steps:
(4)Structure sheaf is constructed:Structure sheaf construction reserves groove and bolt embedment according to design requirement, and groove size uses 160mm
× 160mm × 30mm, the deviation of pre-embedded bolt is not more than 2mm, and ensures that pre-embedded bolt top must not exceed the mark of structure surface layer
It is high;
(5)Prefabricated assembled board wall factorial praluction:The size of reserved groove, the reserved groove in position Ying Yu buildings stratum are corresponding,
And strictly controlling the deviation of pre-embedded bolt and split bolt, it is ensured that fixed angle steel can be easily installed;
(6)Transport, lifting:Transported from factory into lifting field process in board wall, the protection to sheet material groove should be strengthened, kept away
Exempt to cause sheet material local damage because protection is improper, influence lifts quality with lifting speed;
(4)Fixed installation:High-strength bolt is selected in fixed installation;
(5)Groove is covered:Sealing groove is covered using mortar;
(6)Maintenance.
The present invention is rational in infrastructure, and speed of application is fast, and installation accuracy is high, and achievable once mounting in place, is adjusted without multiple
Deviation, fixation is finished and covers connecting node using cement mortar, and good concealment does not influence structure overall appearance.
The above, is only presently preferred embodiments of the present invention, and any formal limitation is not made to the present invention, though
So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention, any to be familiar with this professional technology people
Member, without departing from the scope of the present invention, when making a little change or modification using the technology contents of the disclosure above
It is the Equivalent embodiments of equivalent variations, as long as being the content without departing from technical solution of the present invention, according to technical spirit of the invention
Any simple modification, equivalent variations and the modification made to above example, still fall within the range of technical solution of the present invention.
Claims (7)
1. a kind of prefabricated board wall fixed installation technique, it is characterised in that:Comprise the following steps:
(1)Structure sheaf is constructed:Structure sheaf construction reserves groove and bolt embedment according to design requirement, and groove size uses 160mm
× 160mm × 30mm, the deviation of pre-embedded bolt is not more than 2mm, and ensures that pre-embedded bolt top must not exceed the mark of structure surface layer
It is high;
(2)Prefabricated assembled board wall factorial praluction:The size of reserved groove, the reserved groove in position Ying Yu buildings stratum are corresponding,
And strictly controlling the deviation of pre-embedded bolt and split bolt, it is ensured that fixed angle steel can be easily installed;
(3)Transport, lifting:Transported from factory into lifting field process in board wall, the protection to sheet material groove should be strengthened, kept away
Exempt to cause sheet material local damage because protection is improper, influence lifts quality with lifting speed;
(4)Fixed installation:High-strength bolt is selected in fixed installation;
(5)Groove is covered:Sealing groove is covered using mortar;
(6)Maintenance.
2. a kind of prefabricated board wall fixed installation technique according to claim 1, it is characterised in that:Step(4)Gu
From the high-strength bolt for being not less than M12, the size of bolt hole should be greater than bolt diameter 2-3mm, bolt pitch of holes to Dingan County's dress
No more than 500mm.
3. a kind of prefabricated board wall fixed installation technique according to claim 1, it is characterised in that:Step(5)Institute
Mortar is stated using the cement mortar for being not less than M15.
4. a kind of prefabricated board wall fixed installation technique according to claim 1, it is characterised in that:A kind of dress
Structure with the prefabricated board wall fixed installation of formula includes assembled board wall(1), building stratum(2), angle cleat(3), building stratum reserve
Groove(6), the reserved groove of board wall(9), the board wall reserves groove(9)It is separately positioned on assembled board wall(1)Both sides, both sides
The reserved groove of board wall(9)Groove is reserved with building stratum(6)Junction pass through angle cleat(3)It is connected, the dress
With formula board wall(1)By split bolt(4)Connect two angle cleats(3), the angle cleat(3)Pass through pre-embedded bolt simultaneously
(5)With building stratum(2)It is connected.
5. a kind of prefabricated board wall fixed installation technique according to claim 4, it is characterised in that:Described pair of drawing spiral shell
Bolt(4)The length that two ends are stretched out reserves groove than board wall(9)The small 3-5mm of depth.
6. a kind of prefabricated board wall fixed installation technique according to claim 4, it is characterised in that:The joint angle
Steel(3)With assembled board wall(1), building stratum(2)Between be equipped with adjusting gasket(7).
7. a kind of prefabricated board wall fixed installation technique according to claim 6, it is characterised in that:The spacer
Piece(7)Using rubber or steel plate washer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710020709.1A CN106760069A (en) | 2017-01-12 | 2017-01-12 | A kind of prefabricated board wall fixed installation technique and construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710020709.1A CN106760069A (en) | 2017-01-12 | 2017-01-12 | A kind of prefabricated board wall fixed installation technique and construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106760069A true CN106760069A (en) | 2017-05-31 |
Family
ID=58947824
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710020709.1A Pending CN106760069A (en) | 2017-01-12 | 2017-01-12 | A kind of prefabricated board wall fixed installation technique and construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106760069A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108360564A (en) * | 2018-04-17 | 2018-08-03 | 中国冶集团有限公司 | A kind of foundation bolt fixes the piping lane port temporary plugging method of prefabricated board |
CN108505538A (en) * | 2018-04-17 | 2018-09-07 | 中国冶集团有限公司 | A kind of city integrated piping lane temporary plugging method |
CN108532627A (en) * | 2018-04-17 | 2018-09-14 | 中国冶集团有限公司 | A kind of bolt fixes the piping lane port temporary plugging method of prefabricated board |
CN110241954A (en) * | 2019-06-19 | 2019-09-17 | 江苏华特建筑装饰股份有限公司 | Assembled architecture inner partition plate mounting assembly |
CN110258808A (en) * | 2019-05-31 | 2019-09-20 | 郑州航空工业管理学院 | A kind of assembled architecture reinforcement assembly and assembled architecture |
CN111519757A (en) * | 2020-04-16 | 2020-08-11 | 闫旺升 | Assembled concrete building connection structure |
CN112282071A (en) * | 2020-09-11 | 2021-01-29 | 中国建筑第八工程局有限公司 | Mounting structure of external wall panel and construction method thereof |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1788173A1 (en) * | 1990-03-22 | 1993-01-15 | Ilya A Rokhlin | Wall enclosure of framed building |
DE29608828U1 (en) * | 1996-05-17 | 1996-09-26 | Moos, Gerold, 35767 Breitscheid | Wall element |
KR20110092934A (en) * | 2010-02-11 | 2011-08-18 | 주식회사 극동피유테크 | Insulation pad for supporting partitions at cold storage and method of building partitions using the pad |
CN203174770U (en) * | 2013-04-19 | 2013-09-04 | 深圳海龙建筑制品有限公司 | Connection structure of prefabricated column and construction site base and building |
EP2905393A1 (en) * | 2014-02-05 | 2015-08-12 | Zurecon AG | Device for the subdivision of spaces and metal support |
CN205063032U (en) * | 2015-10-27 | 2016-03-02 | 文登蓝岛建筑工程有限公司 | Wall connection node structure |
CN205502243U (en) * | 2016-03-04 | 2016-08-24 | 文登蓝岛建筑工程有限公司 | Steel I -column with built -in fitting rigid coupling |
CN106193328A (en) * | 2016-08-25 | 2016-12-07 | 初明进 | A kind of interlayer connection node |
-
2017
- 2017-01-12 CN CN201710020709.1A patent/CN106760069A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1788173A1 (en) * | 1990-03-22 | 1993-01-15 | Ilya A Rokhlin | Wall enclosure of framed building |
DE29608828U1 (en) * | 1996-05-17 | 1996-09-26 | Moos, Gerold, 35767 Breitscheid | Wall element |
KR20110092934A (en) * | 2010-02-11 | 2011-08-18 | 주식회사 극동피유테크 | Insulation pad for supporting partitions at cold storage and method of building partitions using the pad |
CN203174770U (en) * | 2013-04-19 | 2013-09-04 | 深圳海龙建筑制品有限公司 | Connection structure of prefabricated column and construction site base and building |
EP2905393A1 (en) * | 2014-02-05 | 2015-08-12 | Zurecon AG | Device for the subdivision of spaces and metal support |
CN205063032U (en) * | 2015-10-27 | 2016-03-02 | 文登蓝岛建筑工程有限公司 | Wall connection node structure |
CN205502243U (en) * | 2016-03-04 | 2016-08-24 | 文登蓝岛建筑工程有限公司 | Steel I -column with built -in fitting rigid coupling |
CN106193328A (en) * | 2016-08-25 | 2016-12-07 | 初明进 | A kind of interlayer connection node |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108360564A (en) * | 2018-04-17 | 2018-08-03 | 中国冶集团有限公司 | A kind of foundation bolt fixes the piping lane port temporary plugging method of prefabricated board |
CN108505538A (en) * | 2018-04-17 | 2018-09-07 | 中国冶集团有限公司 | A kind of city integrated piping lane temporary plugging method |
CN108532627A (en) * | 2018-04-17 | 2018-09-14 | 中国冶集团有限公司 | A kind of bolt fixes the piping lane port temporary plugging method of prefabricated board |
CN110258808A (en) * | 2019-05-31 | 2019-09-20 | 郑州航空工业管理学院 | A kind of assembled architecture reinforcement assembly and assembled architecture |
CN110258808B (en) * | 2019-05-31 | 2024-05-14 | 郑州航空工业管理学院 | Assembly type building reinforcing component and assembly type building |
CN110241954A (en) * | 2019-06-19 | 2019-09-17 | 江苏华特建筑装饰股份有限公司 | Assembled architecture inner partition plate mounting assembly |
CN111519757A (en) * | 2020-04-16 | 2020-08-11 | 闫旺升 | Assembled concrete building connection structure |
CN112282071A (en) * | 2020-09-11 | 2021-01-29 | 中国建筑第八工程局有限公司 | Mounting structure of external wall panel and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106760069A (en) | A kind of prefabricated board wall fixed installation technique and construction | |
CN104060853B (en) | Lightweight steel construction modularization house | |
CN205153114U (en) | Lightweight steel structure modularized residential building | |
CN108824632A (en) | A kind of prefabricated assembled bay window constructing structure of residential building and method | |
CN206157955U (en) | External connecting device of prefabricated wallboard | |
CN109138227A (en) | Without exterior sheathing exterior-wall heat insulation and structure-integrated pouring molding construction technology | |
CN104153495A (en) | Multifunctional lightweight concrete curtain wall connecting structure | |
CN206873673U (en) | A kind of assembling type steel structure out-hung panel node | |
CN206468008U (en) | Outer wall of basement one side formwork support system | |
CN204001309U (en) | A kind of syndeton of Multi-function light concrete curtain wall | |
CN207829207U (en) | Steel construction assembled architecture unit combined wall | |
CN206916990U (en) | Assembled cast-in-place concrete sandwiched thermal-insulating wall steel skeleton template system and connector | |
CN204753834U (en) | Partition plate of scissors stair and connection structure of floor roof beam | |
CN204983237U (en) | Framework composition outer wall system | |
CN208996190U (en) | A kind of profile steel house | |
WO2014117719A1 (en) | Light composite floor slab | |
CN201099982Y (en) | Rotating arc stairway joist assembly model | |
CN205475679U (en) | Modular prefabricated balcony | |
CN209082681U (en) | A kind of prefabricated assembled bay window constructing structure of residential building | |
CN111809792B (en) | Assembled precast concrete wallboard | |
CN206512893U (en) | A kind of prefabricated assembled board wall I-steel bolt joint construction | |
CN209457195U (en) | A kind of outer waterproof inside holding Side fascia of half external hanging type | |
CN203821685U (en) | Building component | |
CN202416742U (en) | Mounting structure for reinforced concrete prefabricated stair | |
CN206428848U (en) | A kind of steel house assembling type outer wall plate installs node |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |
|
RJ01 | Rejection of invention patent application after publication |