CN106742787B - A kind of tied silk conveyer and shear force wall reinforcing steel bar web frame construction method - Google Patents

A kind of tied silk conveyer and shear force wall reinforcing steel bar web frame construction method Download PDF

Info

Publication number
CN106742787B
CN106742787B CN201611105753.4A CN201611105753A CN106742787B CN 106742787 B CN106742787 B CN 106742787B CN 201611105753 A CN201611105753 A CN 201611105753A CN 106742787 B CN106742787 B CN 106742787B
Authority
CN
China
Prior art keywords
box
tied silk
silk
repeater
bundle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611105753.4A
Other languages
Chinese (zh)
Other versions
CN106742787A (en
Inventor
何景洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu comlola Special Ceramics Co., Ltd.
Original Assignee
Jiangsu Comlola Special Ceramics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Comlola Special Ceramics Co Ltd filed Critical Jiangsu Comlola Special Ceramics Co Ltd
Priority to CN201611105753.4A priority Critical patent/CN106742787B/en
Publication of CN106742787A publication Critical patent/CN106742787A/en
Application granted granted Critical
Publication of CN106742787B publication Critical patent/CN106742787B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65DCONTAINERS FOR STORAGE OR TRANSPORT OF ARTICLES OR MATERIALS, e.g. BAGS, BARRELS, BOTTLES, BOXES, CANS, CARTONS, CRATES, DRUMS, JARS, TANKS, HOPPERS, FORWARDING CONTAINERS; ACCESSORIES, CLOSURES, OR FITTINGS THEREFOR; PACKAGING ELEMENTS; PACKAGES
    • B65D83/00Containers or packages with special means for dispensing contents
    • B65D83/02Containers or packages with special means for dispensing contents for dispensing rod-shaped articles, e.g. needles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Control And Other Processes For Unpacking Of Materials (AREA)
  • Basic Packing Technique (AREA)

Abstract

The present invention provides a kind of tied silk conveyer and shear force wall reinforcing steel bar web frame construction methods, belong to the realm of building construction, tied silk conveyer, including babinet and holder, babinet and are positioned on holder;Top of the box has openable case lid;Babinet includes storage box, repeater box and the conveying box to connect successively from top to bottom;Storage box has funnelform bottom;The baffle that can be opened or closed is equipped between storage box and repeater box;The blend stop to fall for stopping bundle silk is equipped between repeater box and conveying box;The side wall of repeater box is connected with the cutter that can cut off band on bundle silk;It includes the push rod set on conveying box side wall that conveying box, which has Tui Si mechanisms, Tui Si mechanisms, and push rod can slide in the horizontal direction, and wire hole is additionally provided with out in conveying box side wall.Construction method applies above-mentioned tied silk conveyer.The working time can substantially be reduced, promote working efficiency.

Description

A kind of tied silk conveyer and shear force wall reinforcing steel bar web frame construction method
Technical field
The present invention relates to the realm of building construction, in particular to a kind of tied silk conveyer and shear force wall reinforcing steel bar web frame Construction method.
Background technology
Shear wall is horizontal loading caused by being primarily subjected to wind load or geological process in house or structures and vertical lotus The wall of load, prevents structure shear from destroying.Shear wall is generally made with armored concrete, needs pre-production in the construction process Bar-mat reinforcement.
The more reinforcing bars arrangement to interweave in length and breadth in bar-mat reinforcement, is tied at the cross node of each intersection using tied silk It pricks.
At present when carrying out tying up this process, tied silk is manually put into suitable position, then uses tool to tied silk It is tied up.In the construction process, it constructs to the region that do not construct as the progress worker of construction needs to keep moving position, And tied silk itself will not move, it is therefore desirable to which worker carries a certain amount of tied silk and constructs, when the tied silk of carrying has used it It goes to take again afterwards;Tied silk is as unit of tying, and every a bundle is a bundle, and bundle silk is bound by a band, cuts off band Bundle silk is broken.
In addition, the portable tied silk arrangement of worker is chaotic, worker needs the long period when taking a tied silk every time Resolution a tied silk could be taken out from the tied silk of a pile confusion.Entire process is more unreasonable and not practicable Tool can be used or effective method is managed, and causes to occupy more time in this process, seriously delays construction progress.
Invention content
The present invention provides a kind of tied silk conveyer and shear force wall reinforcing steel bar web frame construction methods, it is intended to solve above-mentioned ask Topic.
The invention is realized in this way:
A kind of tied silk conveyer, including babinet and holder, the babinet are positioned on the holder;The top of the box tool There is openable case lid;The babinet includes storage box, repeater box and the conveying box to connect successively from top to bottom;
The storage box has funnelform bottom;Being equipped between the storage box and the repeater box can open or close Baffle;
The blend stop to fall for stopping bundle silk is equipped between the repeater box and the conveying box;The side wall of the repeater box The cutter of band on bundle silk can be cut off by being connected with;
The conveying box has Tui Si mechanisms, and the Tui Si mechanisms include the push rod set on the conveying box side wall, described Push rod can slide in the horizontal direction, be additionally provided with out wire hole in conveying box side wall, the push rod can be by the tied silk in conveying box From it is described go out wire hole release.
Further, the inside of the repeater box is horizontal and positioned opposite has two horizontal stripes, the baffle to be positioned over described On horizontal stripe;The side of the repeater box offers the through-hole of bar shaped, one end of the baffle from the through-hole extend to it is described in Outside case.
Further, the part that the baffle is located at outside repeater box bends downward to form grip part.
Further, the width of the repeater box only allows a bundle of bundle silk to pass through.
Further, the storage box bottom is equipped with perforation, is equipped with mandril in the storage box, and the bottom of the mandril is from institute Perforation is stated to extend to outside the babinet;
The mandril includes connected jacking part and push-and-pull portion, and the jacking part is to match with the bottom of the storage box Incline structure.
Further, the side wall of the repeater box offers the side opening of bar shaped, and the cutter is turned by what is be vertically arranged Axis is rotationally connected with the side opening;The one end of the cutter on the inside of the repeater box have blade, the cutter it is another End extends to the outside of the repeater box.
Further, the cutter is located at one end outside the repeater box and is connected with spring between the repeater box.
Further, the side wall of the repeater box is additionally provided with openable side door.
Further, the Tui Si mechanisms have vertically spaced two groups;
The Tui Si mechanisms further include level and the support bar that is oppositely arranged on the inside of the conveying box, and the push rod is placed In on the support bar;The side wall of the conveying box is equipped with strip-shaped hole in the horizontal direction, and one end of the push rod is from the bar shaped Hole extends to outside the conveying box;
The wire hole that goes out of Tui Si mechanisms described in two groups is respectively arranged on the opposite two side walls of conveying box.
A kind of shear force wall reinforcing steel bar web frame construction method, using above-mentioned tied silk conveyer, bundle silk is positioned over tied silk conveying In the storage box of machine, opening baffle makes a bundle of bundle silk fall in repeater box and closes baffle;
Cutting off the band on bundle silk with cutter makes tied silk fall in conveying box;The tied silk is gone out wire hole by operation push rod certainly Release the conveying box;
Reinforcing bar is tied up with tied silk.
Tied silk conveyer and shear force wall reinforcing steel bar web frame construction method provided by the invention, a large amount of tied silk can be stored in In tied silk conveyer, makes worker that need not all leave station within a very long time and go tied silk of taking.Meanwhile tied silk conveyer The design of Zhong Ge mechanisms enables bundle silk to complete the process for falling and being cut, and a handful of tied silks can be pulled to babinet Outside, worker can easily take to single tied silk in work each time, substantially save in these backmans The time consumed on work improves the construction efficiency of bar-mat reinforcement, reduces the working time during entire building construction.It adopts In the construction process with this tied silk conveyer, the working time can be reduced, promote working efficiency.
Description of the drawings
Fig. 1 is the front view of tied silk conveyer provided in an embodiment of the present invention;
Fig. 2 is the sectional view of tied silk conveyer provided in an embodiment of the present invention;
Fig. 3 is the left side view of tied silk conveyer provided in an embodiment of the present invention;
Fig. 4 is the right side view of tied silk conveyer provided in an embodiment of the present invention;
Fig. 5 is the schematic cross-sectional view of tied silk conveyer provided in an embodiment of the present invention when in use;
Fig. 6 is section view signal of the tied silk conveyer provided in an embodiment of the present invention when in use after two bundle bundle silk clampings Figure;
Fig. 7 is that tied silk conveyer provided in an embodiment of the present invention uses mandril to push the bundle silk of two bundle clampings open when in use When schematic cross-sectional view;
Fig. 8 is the partial enlarged view of Fig. 7;
Fig. 9 is the schematic cross-sectional view of tied silk conveyer repeater box provided in an embodiment of the present invention;
Figure 10 is the schematic cross-sectional view of conveying box in tied silk conveyer provided in an embodiment of the present invention.
Reference numeral summarizes:Babinet 100;Case lid 101;Storage box 110;Perforation 111;Mandril 112;Jacking part 113;Push-and-pull Portion 114;Repeater box 120;Horizontal stripe 121;Baffle 122;Grip part 123;Blend stop 124;Side door 125;Cutter 126;Shaft 127;Bullet Spring 128;Side opening 129;Conveying box 140;Support bar 141;Push rod 142;Strip-shaped hole 143;Go out wire hole 144;Holder 200;Partition board 210;Tie silk 300;Tied silk 301;Band 302.
Specific implementation mode
In order to make those skilled in the art more fully understand technical scheme of the present invention, below in conjunction with the accompanying drawings and embodiment party The present invention is described in further detail for formula.
Embodiment.
A kind of shear force wall reinforcing steel bar web frame construction method is present embodiments provided, can mainly be applied in building construction process The bar-mat reinforcement of middle shear wall is bound.Tied silk conveyer is used in this construction method.
As Figure 1-Figure 4, tied silk conveyer includes babinet 100 and holder 200, and babinet 100 is positioned on holder 200; 100 top of babinet has openable case lid 101;Babinet 100 includes the storage box 110 to connect, relaying successively from top to bottom Case 120 and conveying box 140;
Storage box 110 has funnelform bottom;Being equipped between storage box 110 and repeater box 120 can open or close Baffle 122;The blend stop 124 to fall for stopping bundle silk 300 is equipped between repeater box 120 and conveying box 140;Repeater box 120 Side wall is connected with the cutter 126 that can cut off band 302 on bundle silk 300;Conveying box 140 has Tui Si mechanisms, pushes away a machine Structure includes the push rod 142 set on 140 side wall of conveying box, and push rod 142 can slide in the horizontal direction, 140 side wall of conveying box also It is equipped with out wire hole 144, push rod 142 can release the tied silk 301 in conveying box 140 from wire hole 144 is gone out.
The bundle silk 300 tied up with band 302 is placed in the storage box 110 of tied silk conveyer, opening baffle 122 makes A bundle of bundle silk 300 falls in repeater box 120 and closes baffle 122;
Cutting off the band 302 on bundle silk 300 with cutter 126 makes tied silk 301 fall in conveying box 140;Operate push rod 142 Tied silk 301 is released into conveying box 140 from wire hole 144 is gone out;
Reinforcing bar is tied up with tied silk 301.
Babinet 100 is the primary structure of tied silk conveyer, and holder 200 plays support and promotes the work of 140 height of conveying box With.Case lid 101 is arranged behind the top of babinet 100, opening can be taken in and out bundle silk 300 into storage box 110.Storage box The bundle silk 300 that 110 funnelform bottoms keep it internal slides to repeater box 120 along inclined bottom structure.Storage box 110 The baffle 122 being arranged between repeater box 120 can stop that bundle silk 300 falls.It is arranged between repeater box 120 and conveying box 140 Blend stop 124 can stop the bundle silk 300 in repeater box 120 fall.
At work, opening baffle 122 makes a bundle of bundle silk 300 fall in repeater box 120 and closes baffle 122, uses The cutter 126 of 120 side wall activity of repeater box setting cuts off the band 302 for tying up silk 300, and tied silk 301 is made to scatter;It scatters Tied silk 301 no longer by the blocking of blend stop 124, can just be entirely fallen in conveying box 140.
Tui Si mechanisms can by the tied silk 301 in conveying box 140 from go out from wire hole 144 release storage box 110.This mechanism has A little similar automatic chopsticks-distributing machines.Push rod 142, which moves backward, makes tied silk 301 to whereabouts, and push rod 142 and one end of tied silk 301 is made to paste It closes, and then pushes push rod 142, the tied silk 301 in 142 front of push rod can be released from wire hole 144 is gone out, make the objective tied silk of quantity 301 part is exposed to outside, so that worker is easily taken out a tied silk 301 from there and uses.
In this tied silk conveyor applications to work progress, a large amount of tied silk 301 is enable to be stored in tied silk conveyer, Make worker that need not all leave station within a very long time and goes tied silk 301 of taking.Meanwhile tied silk conveyer Zhong Ge mechanisms Design, enables bundle silk 300 to complete the process for falling and being cut, and a handful of tied silks 301 can be pulled to babinet 100 Outside, worker can easily take to single tied silk 301 in work each time, substantially save in these backmans The time consumed on work improves the construction efficiency of bar-mat reinforcement, reduces the working time during entire building construction.
Specifically, the inside of repeater box 120 is horizontal and positioned opposite has two horizontal stripes 121, baffle 122 to be positioned over horizontal stripe On 121;The side of repeater box 120 offers the through-hole of bar shaped, and one end of baffle 122 is extended to from through-hole outside repeater box 120. Horizontal stripe 121 plays the supporting role to baffle 122, and baffle 122 is enable to be slided in the top of horizontal stripe 121.
The part that baffle 122 is located at outside repeater box 120 bends downward to form grip part 123.Bend downward holding for structure It holds portion 123 and facilitates gripping, worker is facilitated to push and pull baffle 122.
As shown in figure 5, in the technical scheme, the width of repeater box 120 only allows a bundle of bundle silk 300 to pass through.This knot Structure can ensure that tying 300 single group of silk falls, 126 energy of cutter that will not be stuck in repeater box 120, while be arranged in repeater box 120 It is enough that the band 302 for tying silk 300 is cut off.
As shown in fig. 6, the bundle silk 300 in the storage box 110 of bottom funnel-shaped portion is when falling, it is understood that there may be two bundle bundle silks The case where 300 mutual clamping, two bundle bundle silks 300 cannot all fall at this time, for this purpose, it is equipped with perforation 111 in 110 bottom of storage box, Mandril 112 is equipped in storage box 110, the bottom of the mandril 112 is extended to from perforation 111 outside babinet 100;Mandril 112 includes Connected jacking part 113 and push-and-pull portion 114, jacking part 113 are the incline structure to match with the bottom of storage box 110.
As shown in fig. 7, when there is the case where two bundle bundle 300 clampings of silk, upward penetrator ram 112 makes its jacking part 113 will A bundle bundle silk 300 jack up, can by two bundle phase clampings bundle silk 300 be detached out of same level, make its will not clamping, another bundle Bundle silk 300 can smoothly fall to repeater box 120.The design of the jacking part 113 of incline structure, can not only make in mandril 112 It smoothly jacks up bundle silk 300, and its structure to match with 110 bottom of storage box can be affixed with storage box 110 It closes, the whereabouts for tying silk 300 will not be hindered in the case of usual.Again, the jacking part 113 Yu push-and-pull portion 114 of mutual oblique, makes mandril 112 will not downwards fall along perforation 111, and jacking part 113 is made steadily to be in inside storage box 110.Meanwhile it as shown in figure 8, wearing The top in hole 111 output with 113 matched groove of jacking part, so that jacking part 113 is trapped in the position, will not convex Go out.
As shown in figure 9, the side wall of repeater box 120 offers the side opening 129 of bar shaped, cutter 126 is by being vertically arranged Shaft 127 is rotationally connected with side opening 129;Cutter 126 has a blade close to one end of the inside of repeater box 120, cutter 126 it is another End extends to the outside of repeater box 120.
Cutter 126 is strip structure, passes through the side opening 129 of repeater box 120, blade to be located inside repeater box 120, the other end It is conveniently operated outside repeater box 120.Shaft 127 is vertically arranged, and cutter 126 passes through shaft 127 and repeater box 120 It is connected, cutter 126 is enable to rotate in the horizontal plane;When work, one end outside repeater box 120 is located at by cutter 126 and is turned Dynamic cutter 126, the blade for keeping it internal cut off the band 302 tied on silk 300.
Cutter 126 is located at one end outside repeater box 120 and is connected with spring 128 between repeater box 120.Cutter 126 is logical It crosses spring 128 with repeater box 120 to be connected, cutter 126 is enable to be maintained at certain position.Cutter 126 can pass through after release The active force homing of spring 128.
For convenience of the band 302 that cutter 126 is cut off is taken out, the side wall of repeater box 120 is additionally provided with openable side door 125。
Referring to Fig. 10, Tui Si mechanisms have vertically spaced two groups;Tui Si mechanisms further include horizontal and set relatively The support bar 141 in 140 inside of conveying box is set, push rod 142 is positioned on support bar 141;The side wall of conveying box 140 is along level side It is extended to outside conveying box 140 from strip-shaped hole 143 to one end equipped with strip-shaped hole 143, push rod 142;Liang Zutuisi mechanisms go out Wire hole 144 is respectively arranged on the opposite two side walls of conveying box 140.
Two groups of settings for going out wire hole 144 enable two workers to use the tied silk conveyer simultaneously, due to tied silk conveyer A large amount of tied silks 301 of storage inside make it be fully able to meet two work Man's Demands.Support bar 141 plays support push rod 142 Effect, the end of push rod 142 passes through strip-shaped hole 143, the design of 143 structure of strip-shaped hole that push rod 142 is enable to slide.
It can be seen that the tied silk conveyer of this structure can be completed to push into conveying, cutting, the separation etc. of product bundle silk 300 Program sex work makes worker that can use incessantly substantially and arrives tied silk 301, and more important is tied silks 301 from going out from wire hole 144 It stretches out, there are proportional spacings between each tied silk 301, facilitate worker quickly to twist and get a tied silk 301, when substantially reducing work Between.
It uses this tied silk conveyer in the construction process, the working time can be reduced, promote working efficiency.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest range caused.

Claims (10)

1. a kind of tied silk conveyer, for conveying tied silk, wherein a bundle of tied silk is a bundle, which is characterized in that including babinet and Holder, the babinet are positioned on the holder;The top of the box has openable case lid;The babinet from top to bottom according to Secondary storage box, repeater box and conveying box including connecting;
The storage box has funnelform bottom;The gear that can be opened or closed is equipped between the storage box and the repeater box Plate;
The blend stop to fall for stopping bundle silk is equipped between the repeater box and the conveying box;The side wall activity of the repeater box The cutter of band on bundle silk can be cut off by being connected with;
It includes the push rod set on the conveying box side wall, the push rod that the conveying box, which has Tui Si mechanisms, the Tui Si mechanisms, It can slide in the horizontal direction, wire hole is additionally provided with out in conveying box side wall, the push rod can be by the tied silk in conveying box from institute State out wire hole release.
2. tied silk conveyer according to claim 1, which is characterized in that the inside of the repeater box is horizontal and positioned opposite There are two horizontal stripes, the baffle to be positioned on the horizontal stripe;The side of the repeater box offers the through-hole of bar shaped, the baffle One end extended to outside the repeater box from the through-hole.
3. tied silk conveyer according to claim 2, which is characterized in that the baffle be located at the part outside repeater box to Under be bent to form grip part.
4. tied silk conveyer according to claim 1, which is characterized in that the width of the repeater box only allows a bundle of bundle silk Pass through.
5. tied silk conveyer according to claim 1, which is characterized in that the storage box bottom is equipped with perforation, described to deposit Mandril is equipped in storage tank, the bottom of the mandril is extended to from the perforation outside the babinet;
The mandril includes connected jacking part and push-and-pull portion, and the jacking part is to incline with what the bottom of the storage box matched Biassed fabric.
6. tied silk conveyer according to claim 1, which is characterized in that the side wall of the repeater box offers the side of bar shaped Hole, the cutter are rotationally connected with the side opening by the shaft being vertically arranged;The cutter is on the inside of the repeater box One end there is blade, the other end of the cutter extends to the outside of the repeater box.
7. tied silk conveyer according to claim 6, which is characterized in that the cutter is located at one outside the repeater box It is connected with spring between end and the repeater box.
8. tied silk conveyer according to claim 7, which is characterized in that the side wall of the repeater box is additionally provided with openable Side door.
9. tied silk conveyer according to claim 1, which is characterized in that the Tui Si mechanisms have vertically spaced Two groups;
The Tui Si mechanisms further include level and the support bar that is oppositely arranged on the inside of the conveying box, and the push rod is positioned over institute It states on support bar;The side wall of the conveying box is equipped with strip-shaped hole in the horizontal direction, and one end of the push rod is prolonged from the strip-shaped hole It extends to outside the conveying box;
The wire hole that goes out of Tui Si mechanisms described in two groups is respectively arranged on the opposite two side walls of conveying box.
10. a kind of shear force wall reinforcing steel bar web frame construction method, using claim 1-9 any one of them tied silk conveyers, It is characterized in that:
Bundle silk is positioned in the storage box of tied silk conveyer, and opening baffle makes a bundle of bundle silk fall in repeater box and close gear Plate;
Cutting off the band on bundle silk with cutter makes tied silk fall in conveying box;Operation push rod releases the tied silk from wire hole is gone out The conveying box;
Reinforcing bar is tied up with tied silk.
CN201611105753.4A 2016-12-05 2016-12-05 A kind of tied silk conveyer and shear force wall reinforcing steel bar web frame construction method Active CN106742787B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611105753.4A CN106742787B (en) 2016-12-05 2016-12-05 A kind of tied silk conveyer and shear force wall reinforcing steel bar web frame construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611105753.4A CN106742787B (en) 2016-12-05 2016-12-05 A kind of tied silk conveyer and shear force wall reinforcing steel bar web frame construction method

Publications (2)

Publication Number Publication Date
CN106742787A CN106742787A (en) 2017-05-31
CN106742787B true CN106742787B (en) 2018-10-26

Family

ID=58878732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611105753.4A Active CN106742787B (en) 2016-12-05 2016-12-05 A kind of tied silk conveyer and shear force wall reinforcing steel bar web frame construction method

Country Status (1)

Country Link
CN (1) CN106742787B (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE20307180U1 (en) * 2003-04-30 2003-09-25 Cramer-Zimmermann, Etta von, 12205 Berlin Kitchen spaghetti sticks storage container has cover with sub-surface trap lines and hinged dispenser hatch for regulated discharge
ITTO20050591A1 (en) * 2005-08-29 2007-02-28 Sidergas Srl REINFORCEMENT ELEMENT FOR A WELDING CONTAINER
CN202725900U (en) * 2012-05-16 2013-02-13 浙江工商职业技术学院 Binding wire baiting machine
CN104724474A (en) * 2015-03-12 2015-06-24 东莞市三信精密机械有限公司 Material sorting device

Also Published As

Publication number Publication date
CN106742787A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN207042557U (en) A kind of chemical fertilizer caking automation breaker
CN203805145U (en) Loading and lifting hopper and building concrete stirring and pumping integrated machine comprising same
UA94490C2 (en) Bale tongs for coupling to working machine
CN106742787B (en) A kind of tied silk conveyer and shear force wall reinforcing steel bar web frame construction method
CN108086700B (en) A kind of wall device of laying bricks automatically for construction
US2925162A (en) Vessel
CN208616953U (en) Mobile construction waste processing equipment
CN206407583U (en) A kind of conveyer material guide structure with automatic sorting function
CN208531003U (en) A kind of quickly pack tool
CN102640740A (en) Full-automatic mouse-trapping box
CN104429413B (en) Wet plant fiber smashing device
CN209184115U (en) Telescopic aluminum gripper specific purpose tool
CN107896638A (en) A kind of portable strawberry picker
CN214213100U (en) Machine tool waste collection box
CN207595335U (en) A kind of baler snap fastener device
CN205318207U (en) Panel feeding device in panel drilling numerical control device
CN217321461U (en) Packaging bag for collecting titanium alloy waste cutting slag
CN220108717U (en) Novel net cutting and cutter hanging mechanism of round bale bundling machine
CN204682192U (en) A kind of fish pond manual batch device
CN216826060U (en) Washing article raw materials misce bene feed mechanism
CN215557548U (en) Waste collecting device for steel plate production
CN203753885U (en) Valve spool sleeve conveying device
CN214524707U (en) Packing guide
CN209442887U (en) A kind of chicken droppings deodorant device for environment-protecting cultivation
CN212786987U (en) Growing-fattening pig feeding trough optimization structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180917

Address after: 221400 Xinyi City Economic Development Zone, Xuzhou, Jiangsu (south of Xin Dai Road, west of Shanghai Road)

Applicant after: Jiangsu comlola Special Ceramics Co., Ltd.

Address before: 473000 1 building 401, oil construction company, Guan Zhuang Town, Wancheng District, Nanyang, Henan

Applicant before: He Jingzhou

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant