A method of replacement concrete host
Technical field
The present invention relates to building material technical fields, and in particular to a method of replacement concrete host.
Background technique
As Urbanization in China is constantly pushed ahead, concrete is used widely, and consequent is concrete
Demand it is increasing, in order to meet market needs, some concrete mixers need to update, with improve production effect
Rate.And since the routine work amount of blender is larger, it will be beset by technical hitches, also need that part replacement will be damaged at this time
Get off to repair.The method of existing replacement concrete host, mainly in such a way that overall pulling down is reconstructed again, such method
It is more not only to repair long in time limit, artificial demand, but also the not reproducible use of original host supporting structure or utilization rate are lower.
Summary of the invention
To solve the above problems, the present invention devises a kind of method for replacing concrete host, there is short time limit, manually need
It asks small, original host auxiliary facility can be made full use of.
To achieve the above object, the invention adopts the following technical scheme:A method of replacement concrete host, including
Following operating procedure:
(1), according to original old position of host machine, I-steel is welded at the top of high building by its upper limb, and inside high building
Supporting square tube is installed to reinforce to high building, while removing the connection bolt between old master's machine and host upper cover;
(2), on the I-steel at the top of high building install two lifting ring flat-plates, lift ring flat-plate can pass through " the T shape of upper part
Slot " is fastened on I-steel bottom wing, and the lower part for lifting ring flat-plate is provided with for connecting the through-hole for lifting cucurbit, two lifting ring flat-plates point
Cucurbit is not lifted with host and upper cover lifting cucurbit connect, the hook of upper cover lifting cucurbit is first solidly connected to host upper cover, is lifted
It separates host upper cover with old master's machine, and removes host upper cover;
(3), installation host supporting leg, hopper will be held together and be fixed on host supporting leg, and will hold together between hopper and host platform with
And cutting is carried out between old master's machine and host platform and is separated;
(4), after cutting separation, old master's machine removed using host lifting cucurbit, then according to new host outer dimension pair
Host platform is modified, and using host lifting cucurbit by new host mobility to host platform after finishing, and is completed new
Fixation between host and host platform;
(5), mobile host supporting leg make to hold together hopper to be located at the lower section of new host discharge port, then by host supporting leg and new host
It is connected and fixed, removes supporting square tube, and complete the assembling between host upper cover and new host.
As a kind of further improvements in methods for replacing concrete host of the utility model:In step(4)In to old master
After machine platform is modified, the structure of host platform includes the outdoor main unit platform and the interior master that is fixed on host supporting leg after finishing
Machine platform, the interior host platform are rectangular frame structure, and host support base is arranged on interior host platform, four host supporting legs
It is fixedly connected with interior host platform, the outdoor main unit platform includes measuring layer fixed station, and measuring layer fixed station offers for centre
The plate body that host is torn open for mouth, and measuring layer platform is provided on measuring layer fixed station, four supporting legs of outdoor main unit platform are solid respectively
The position at four angles of measuring layer fixed station is set calmly, the lower portion of outer host platform is arranged in the interior host platform,
The host of concrete mixing plant is mounted on the host support base of interior host rack, and is located at host and is torn open for above mouth.
Beneficial effect
Compared with prior art, the invention has the advantages that:A kind of replacement concrete host of the present invention
Method, first original host overall structure is reinforced, platform empties, and then replaces host, such transformation side using lifting cucurbit
Method can make the original corollary system of host(Feed proportioning system, water system, metering system)It makes full use of, reduces engineering cost.Tool
Have the advantages that short time limit, artificial demand be few, working efficiency effectively improves.
Detailed description of the invention
Fig. 1 is that concrete mixer replaces host pre-structure schematic diagram in the present invention;
Structural schematic diagram when Fig. 2 is concrete mixer replacement host in the present invention;
Fig. 3 is the structural schematic diagram in the present invention after concrete mixer replacement host;
Fig. 4 is the structural schematic diagram that ring flat-plate is lifted in the present invention;
Fig. 5 is the structural schematic diagram of inside and outside host platform in the present invention.
It is marked in figure:1, former concrete mixer system, 101, high building, 102, host upper cover, 103, Jiu Zhuji, 104, master
Machine platform, 105, hold together hopper, 2, I-steel, 3, supporting square tube, 4, lifting ring flat-plate, 5, host lift cucurbit, 6, upper cover lift calabash
Reed, 7, host supporting leg, 8, new host, 9, supporting leg, 10, outdoor main unit platform, 1001, measuring layer fixed station, 1002, measuring layer it is flat
Platform, 11, interior host platform, 1101 host support bases.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples, and the present embodiment is with technical solution of the present invention
Premised on, give detailed embodiment.
As shown, a kind of method for replacing concrete host of the present invention, in the following ways:In concrete original
When host 103 of haveing been friends in the past maintenance or upgrading, first according to original 103 position of old master's machine, installs and reinforce inside mixing plant
Supporting square tube 3 does basis to fix the general frame of blender for the dismounting of following components.It is pushed up in mixing plant high building 101
Portion's installation I-steel 2 will simultaneously be welded and fixed at the top of the upper limb of I-steel 2 and high building 101, and I-steel 2 not only acts as general frame
Effect, and 4 intercalation of ring flat-plate will be lifted by the "T"-shaped slot of lifting ring flat-plate 4 and reinforcing 2 bottom wing of I-steel, as lifting
The sliding bar of ring flat-plate 4 uses, mobile hoisting ring plate 4 after installation is fixed, it is ensured that its slipping smoothness is without interference phenomenon.Host lifts calabash
Reed 5 and upper cover lift cucurbit 6 and are separately connected different lifting ring flat-plates 4 by the circular hole on lifting ring flat-plate 4, while lifting the another of cucurbit
One end is separately connected old master's machine 103 and host upper cover 102;I-steel 2, lifting ring flat-plate 4 and lifting cucurbit structure are pushed up in high building 101
Portion is fixed, and can be used as maintenance tool reuse.Lifting cucurbit one end has been connected and fixed 102 after old master's machine 103 and host upper cover,
The connector between old master's machine 103 and host upper cover 102 is removed, pedestrian's work point of going forward side by side is from original old master's machine 103 and host upper cover
102, and the mobile removal by original old master's machine 103 after separation by lifting cucurbit on reinforcing I-steel 2.Then according to new
8 outer dimension of host modifies host platform 104, while by reinforcing I-steel 2, lifting ring flat-plate 4, lifting hoist system
By on the host platform 9 of the installation of new host 8 after conditioning after transformation and upgrade, then hopper 105 is held together in cutting, it is put down with host
The separation of 104 lower surface of platform;Host supporting leg 7 is assembled simultaneously, and the hopper 105 that holds together under cutting is mounted on host supporting leg 7, it is mobile
Host supporting leg 7 makes to hold together hopper 105 to be located at the lower section of stirring 8 discharge port of machine host.Then host upper cover 102, transformation and upgrade are assembled
Rear new host 8 and hold together hopper 105, finally carries out the concrete mixer after debugging upgrading.So far, replacement concrete stirs
Mix machine host completion.
Further, the step(4)In, after modifying to old master's machine platform, 104 structure of host platform includes repairing
Outdoor main unit platform 10 after whole and the interior host platform 11 being fixed on host supporting leg 7, the interior host platform 11 is rectangle frame
Frame structure, the setting 1101 of host support base is on interior host platform 11, four host supporting legs 7 and the fixed company of interior host platform 11
It connects, the outdoor main unit platform 10 includes measuring layer fixed station 1001, and measuring layer fixed station 1001 is that centre offers host and tears open and replaces
The plate body of mouth, and measuring layer platform 1002 is provided on measuring layer fixed station 1001, four supporting legs 9 difference of outdoor main unit platform 10
It is fixed at the position at four angles of measuring layer fixed station 1001, outer host platform 10 is arranged in the interior host platform 11
Lower portion, the host 8 of concrete mixing plant is mounted on the host support base 1101 of interior host rack 11, and is torn open positioned at host
For above mouth
This method takes full advantage of the supporting structure of original host, saves construction cost, and short time limit, artificial demand
Amount is few.Moreover, reinforcing I-steel 2, lifting 4 system of ring flat-plate for being fixed on 101 top of mixing plant high building are also reusable,
Greatly save following maintenance cost.
The above described is only a preferred embodiment of the present invention, be not intended to limit the present invention in any form, though
So the present invention has been disclosed as a preferred embodiment, and however, it is not intended to limit the invention, any technology people for being familiar with this profession
Member, without departing from the scope of the present invention, when the technology contents using the disclosure above make a little change or modification
It is right according to the technical essence of the invention for the equivalent embodiment of equivalent variations, but without departing from the technical solutions of the present invention
Any simple modification, equivalent change and modification made by above embodiments, all of which are still within the scope of the technical scheme of the invention.