CN106730572A - A kind of new construction trampoline for being easy to assemble and disassemble - Google Patents
A kind of new construction trampoline for being easy to assemble and disassemble Download PDFInfo
- Publication number
- CN106730572A CN106730572A CN201611139064.5A CN201611139064A CN106730572A CN 106730572 A CN106730572 A CN 106730572A CN 201611139064 A CN201611139064 A CN 201611139064A CN 106730572 A CN106730572 A CN 106730572A
- Authority
- CN
- China
- Prior art keywords
- trampoline
- new construction
- easy
- pipe
- disassembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63B—APPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
- A63B5/00—Apparatus for jumping
- A63B5/11—Trampolines
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63B—APPARATUS FOR PHYSICAL TRAINING, GYMNASTICS, SWIMMING, CLIMBING, OR FENCING; BALL GAMES; TRAINING EQUIPMENT
- A63B2225/00—Miscellaneous features of sport apparatus, devices or equipment
- A63B2225/09—Adjustable dimensions
Landscapes
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Physical Education & Sports Medicine (AREA)
- Ladders (AREA)
- Tents Or Canopies (AREA)
Abstract
The invention discloses a kind of new construction trampoline be easy to and assemble and disassemble, including ring pipe, support feet standpipe and spring face, the bottom formation framework that described support feet standpipe is uniformly arranged on ring pipe respectively is installed by solid, it is characterized in that, described spring face is arranged in framework by bungee and Plastic fastener, also include T-shaped handrail, described T-shaped handrail is detachably arranged in a side of framework and extends upwardly to the top in spring face.Through the above way, the new construction trampoline for being easy to assemble and disassemble of the invention, ring pipe, support feet standpipe, spring face, T-shaped handrail are all dismountable settings, transport, installation, dismounting are all easier, time saving and energy saving, the advantage in terms of production, the accumulating splitted by solid, installed to obtain product, so as to reach trampoline in production and the upgrading of accumulating, manufacturing cost optimization is reached, while structural stability is strong, security performance is high.
Description
Technical field
The present invention relates to the technical field of trampoline, more particularly to a kind of new construction trampoline for being easy to assemble and disassemble.
Background technology
Now with the raising of people's quality of the life, increasingly focus on leisure, trampoline is a kind of recreation trip that people like
Happy facility, trampoline as it is a kind of integrate amusement and body-building outdoor activity articles for use, some large-scale recreation grounds almost with
Place is visible, and small sized bouncing bed is mainly used in the entertainment for children of the occasions such as family, is increasingly favored by consumer.
Trampoline of the prior art, the support feet for including framework, the spring face in the framework and framework lower end is stood
Pipe, is connected between framework and spring face by extension spring or bungee, and user jumps on spring face, in the process that it falls
In, a downward pressure can be applied to spring face, the spring face declines along its normal direction displacement under the effect of the pressure, when
When pressure is removed, the spring face and extension spring or bungee will provide response force, promote spring face to keep in the center, and take this, and use
Can back and forth be bounced on spring face, and then reach the effect of sport and body-building.
But, when people state trampoline in design, although substantial amounts of work has been done in trampoline quality, with regard to its trampoline in folding
Some effects are achieved in folded, merging, but trampoline installs more complicated in an assembling process, is not easy to dismounting, wastes time and energy,
Moulding is also less attractive in appearance, split, merge structure thinking in or a vacancy, ensure trampoline high-quality on the premise of,
Production, accumulating advantage cannot upgrade all the time.
The content of the invention
The present invention solves the technical problem of a kind of new construction trampoline for being easy to assemble and disassemble of offer, ring pipe, support
Pin standpipe, spring face, T-shaped handrail are all dismountable settings, and transport, installation, dismounting are all easier, time saving and energy saving, pass through
Advantage in terms of solid splits, install to obtain product production, accumulating, so as to reach trampoline in production and the upgrading of accumulating,
Manufacturing cost optimization is reached, while structural stability is strong, security performance is high.
In order to solve the above technical problems, one aspect of the present invention is:It is easy to the new of assembly and disassembly there is provided a kind of
Structure trampoline, including ring pipe, support feet standpipe and spring face, install described support feet standpipe equal respectively by solid
Framework is formed on the even bottom for being arranged on ring pipe, and described spring face is arranged in framework by bungee and Plastic fastener, also
Including T-shaped handrail, described T-shaped handrail is detachably arranged in a side of framework and extends upwardly to the top in spring face.
In a preferred embodiment of the present invention, described spring face is shaped as circle, the diameter in described spring face
Less than the diameter of ring pipe.
In a preferred embodiment of the present invention, described Plastic fastener uses one side Plastic fastener or two-sided Plastic fastener.
In a preferred embodiment of the present invention, described one side Plastic fastener includes the first positioning pipe, the second positioning pipe, determines
Position block and connecting plate, described locating piece are arranged on the centre position of connecting plate bottom, and the first described positioning pipe and second are determined
Position pipe is symmetrically arranged at the right and left of locating piece and is located on connecting plate, and the two ends of described bungee pass through lock respectively
Collar is connected in the first positioning pipe and the second positioning pipe, and ring Guan Houzai spiral-locks are bypassed in the middle part of described band fixed
In the block of position.
In a preferred embodiment of the present invention, the edge of described locating piece is provided with arc groove.
In a preferred embodiment of the present invention, described two-sided Plastic fastener includes locating button, fixed plate and connecting hole, institute
The two ends that the locating button stated is arranged on the rear end of fixed plate and locating button are bent to the both sides up and down of fixed plate, described company respectively
Connect hole to be horizontally installed in fixed plate, described spring face is attached by connecting hole with two-sided Plastic fastener, and described is elastic
Circle bypasses ring Guan Houzai spiral-locks in the locating button of the upper and lower both sides of fixed plate.
In a preferred embodiment of the present invention, the described telescopically adjustable height of T-shaped handrail.
In a preferred embodiment of the present invention, described ring pipe is made up of multistage arc point circle pipe, described arc
The two ends of shape point circle pipe are provided with the square bore that rises that contracts being engaged.
In a preferred embodiment of the present invention, described new construction trampoline also includes square pipe fitting, described support
The upper port of pin standpipe is respectively welded at the bottom of square pipe fitting, and the left and right two-port of described square pipe fitting is respectively provided with
In the junction of arc point circle pipe.
In a preferred embodiment of the present invention, described new construction trampoline also includes V-arrangement supporting fixing device, described
V-arrangement supporting fixing device is arranged between adjacent two support feets standpipe.
The beneficial effects of the invention are as follows:It is of the invention be easy to assembly and disassembly new construction trampoline, ring pipe, support feet standpipe,
Spring face, T-shaped handrail are all dismountable settings, and transport, installation, dismounting are all easier, time saving and energy saving, by solid folding
Divide, install come the advantage in terms of the production, the accumulating that obtain product, so as to reach trampoline in production and the upgrading of accumulating, reach system
Cost optimization is made, while structural stability is strong, security performance is high.
Brief description of the drawings
Technical scheme in order to illustrate more clearly the embodiments of the present invention, below will be to that will make needed for embodiment description
Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for
For those of ordinary skill in the art, on the premise of not paying creative work, other can also be obtained according to these accompanying drawings
Accompanying drawing, wherein:
Fig. 1 is the structural representation of a preferred embodiment of the new construction trampoline that the present invention is easy to assembly and disassembly;
Fig. 2 is the structural representation of one side Plastic fastener;
Fig. 3 is the structural representation of two-sided Plastic fastener;
Fig. 4 is the assembling schematic diagram of ring pipe;
Mark in accompanying drawing for:1st, ring pipe, 2, support feet standpipe, 3, spring face, 4, bungee, 5, Plastic fastener, 6, T-shaped helps
Hand, 7, square pipe fitting, 8, V-arrangement supporting fixing device, 11, arc point circle pipe, 12, square contracting rise bore, 51, one side plastic cement
Button, 52, two-sided Plastic fastener, the 511, first positioning pipe, the 512, second positioning pipe, 513, locating piece, 514, connecting plate, 515, locking
Circle, 521, locating button, 522, fixed plate, 523, connecting hole.
Specific embodiment
The technical scheme in the embodiment of the present invention will be clearly and completely described below, it is clear that described implementation
Example is only a part of embodiment of the invention, rather than whole embodiments.Based on the embodiment in the present invention, this area is common
All other embodiment that technical staff is obtained under the premise of creative work is not made, belongs to the model of present invention protection
Enclose.
As shown in figure 1, the embodiment of the present invention includes:
A kind of new construction trampoline for being easy to assemble and disassemble, including ring pipe 1, support feet standpipe 2 and spring face 3, are pacified by solid
Framework is formed on the bottom that the described support feet standpipe 2 of dress is uniformly arranged on ring pipe 1 respectively, and described spring face 3 is by pine
Tight rope 4 is arranged in framework with Plastic fastener 5, and also including T-shaped handrail 6, described T-shaped handrail 6 is detachably arranged in framework
One side simultaneously extends upwardly to the top in spring face 3.
Wherein, the described telescopically adjustable height of T-shaped handrail 6.Because the spring face having is smaller, if flat during spring
Weighing apparatus grasps bad, just there is the possibility thrown from trampoline, therefore, a T-shaped handrail 6 is set on trampoline, T-shaped handrail can be used
6 handrail complete jump, security performance is high, while convenient regulation height, suitable different crowd is used.
In above-mentioned, described spring face 3 is shaped as circle, and the diameter in described spring face 3 is straight less than ring pipe 1
Footpath, described spring face 3 is arranged in ring pipe 1 by bungee 4 and Plastic fastener 5, convenient assembly and disassembly.
Further, described Plastic fastener 5 is using the Plastic fastener 52 of one side Plastic fastener 51 or two-sided.
As shown in Fig. 2 described one side plastic cement 51 is buckled including the first positioning pipe 511, the second positioning pipe 512, locating piece 513
With connecting plate 514, described locating piece 513 is arranged on the centre position of the bottom of connecting plate 514, the first described positioning pipe 511
The right and left of locating piece 513 is symmetrically arranged at the second positioning pipe 512 and be located on connecting plate 514.Described is elastic
The two ends of rope 4 are connected in the first positioning pipe 511 and the second positioning pipe 512 by clamp ring 515 respectively, described band 4
Middle part bypass after ring pipe 1 again spiral-lock in locating piece 513.
Wherein, equal diameters of the first described positioning pipe 511 and the second positioning pipe 512 and more than the diameter of bungee 4.
Described locating piece 513 is shaped as semicircular structure, and the edge of locating piece 513 is provided with arc groove, facilitate bungee 4 to detain
It is not easily shifted in the arc groove of locating piece 513.
As shown in figure 3, described two-sided Plastic fastener 52 includes locating button 521, fixed plate 522 and connecting hole 523, it is described
The two ends that locating button 521 is arranged on the rear end of fixed plate 522 and locating button 521 are bent to the both sides up and down of fixed plate 522 respectively,
Described connecting hole 523 is horizontally installed in fixed plate 522.Described spring face 3 passes through connecting hole 523 and two-sided Plastic fastener 52
It is attached, described band 4 bypasses after ring pipe 1 locating button 521 of the spiral-lock in fixed plate both sides about 522 again
It is interior, it is not easily shifted.
As shown in figure 4, described ring pipe 1 is made up of multistage arc point circle pipe 11, described arc point encloses pipe 11
Two ends are provided with the square contracting being engaged and rise bore 12, rise by bore 12 by multistage arc point by the square contracting being engaged
The circle composition ring of pipe 11 pipe 1, convenient assembly and disassembly.Wherein, the rise length of bore 12 of described square contracting is 30-35mm.
Further, described new construction trampoline also includes square pipe fitting 7, the upper port of described support feet standpipe 2
The bottom of square pipe fitting 7 is respectively welded at, the left and right two-port of described square pipe fitting 7 is separately positioned on adjacent arc point
Enclose the junction of pipe 11, convenient assembly and disassembly.
In the present embodiment, described new construction trampoline also includes V-arrangement supporting fixing device 8, described V-arrangement supporting & stablizing dress
Put 8 to be arranged between adjacent two support feets standpipe 2, structural stability is strong, and security performance is high.
In sum, the new construction trampoline for being easy to assemble and disassemble of the invention, ring pipe 1, support feet standpipe 2, spring face 3, T
Shape handrail 6 be all it is dismountable set, transport, install, dismounting is all easier, time saving and energy saving, splitted by solid, install come
The advantage in terms of production, the accumulating of product is obtained, so as to reach trampoline in production and the upgrading of accumulating, manufacturing cost is reached optimal
Change, while structural stability is strong, security performance is high.
Embodiments of the invention are the foregoing is only, the scope of the claims of the invention is not thereby limited, it is every to utilize this hair
Equivalent structure or equivalent flow conversion that bright description is made, or directly or indirectly it is used in other related technology necks
Domain, is included within the scope of the present invention.
Claims (10)
1. a kind of new construction trampoline for being easy to assemble and disassemble, including ring pipe, support feet standpipe and spring face, are installed by solid
Framework is formed on the bottom that described support feet standpipe is uniformly arranged on ring pipe respectively, it is characterised in that described spring face
It is arranged in framework by bungee and Plastic fastener, also including T-shaped handrail, described T-shaped handrail is detachably arranged in framework
A side and extend upwardly to the top in spring face.
2. the new construction trampoline for being easy to assembly and disassembly according to claim 1, it is characterised in that described spring face is shaped as
Circle, the diameter in described spring face is less than the diameter of ring pipe.
3. it is according to claim 1 be easy to assembly and disassembly new construction trampoline, it is characterised in that described Plastic fastener uses one side
Plastic fastener or two-sided Plastic fastener.
4. it is according to claim 3 be easy to assembly and disassembly new construction trampoline, it is characterised in that described one side Plastic fastener includes
First positioning pipe, the second positioning pipe, locating piece and connecting plate, described locating piece are arranged on the centre position of connecting plate bottom,
Described the first positioning pipe and the second positioning pipe is symmetrically arranged at the right and left of locating piece and is located on connecting plate, described
The two ends of bungee be connected in the first positioning pipe and the second positioning pipe by clamp ring respectively, the middle part of described band
Ring Guan Houzai spiral-locks are bypassed in locating piece.
5. it is according to claim 4 be easy to assembly and disassembly new construction trampoline, it is characterised in that the edge of described locating piece sets
It is equipped with arc groove.
6. it is according to claim 3 be easy to assembly and disassembly new construction trampoline, it is characterised in that described two-sided Plastic fastener includes
Locating button, fixed plate and connecting hole, the two ends of rear end and locating button that described locating button is arranged on fixed plate are bent to respectively
The both sides up and down of fixed plate, described connecting hole is horizontally installed in fixed plate, described spring face by connecting hole with it is two-sided
Plastic fastener is attached, and described band bypasses ring Guan Houzai spiral-locks in the locating button of the upper and lower both sides of fixed plate.
7. it is according to claim 1 be easy to assembly and disassembly new construction trampoline, it is characterised in that described T-shaped handrail is scalable
Regulation height.
8. it is according to claim 1 be easy to assembly and disassembly new construction trampoline, it is characterised in that described ring pipe is by multistage
Arc point circle pipe composition, the two ends of described arc point circle pipe are provided with the square contracting being engaged and rise bore.
9. it is according to claim 1 be easy to assembly and disassembly new construction trampoline, it is characterised in that described new construction trampoline is also wrapped
Square pipe fitting is included, the upper port of described support feet standpipe is respectively welded at the bottom of square pipe fitting, described square
The left and right two-port of pipe fitting is separately positioned on the junction of arc point circle pipe.
10. it is according to claim 1 be easy to assembly and disassembly new construction trampoline, it is characterised in that described new construction trampoline is also
Including V-arrangement supporting fixing device, described V-arrangement supporting fixing device is arranged between adjacent two support feets standpipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2016/111854 WO2018103146A1 (en) | 2016-12-08 | 2016-12-23 | Easily assembled and disassembled trampoline with new structure |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611121147 | 2016-12-08 | ||
CN2016111211471 | 2016-12-08 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106730572A true CN106730572A (en) | 2017-05-31 |
Family
ID=58879998
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611139064.5A Pending CN106730572A (en) | 2016-12-08 | 2016-12-12 | A kind of new construction trampoline for being easy to assemble and disassemble |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN106730572A (en) |
WO (1) | WO2018103146A1 (en) |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29919912U1 (en) * | 1999-11-12 | 2000-01-20 | Won World Of Nature Warenhande | trampoline |
US6264583B1 (en) * | 1997-11-26 | 2001-07-24 | Rolland Wayne Rich | Trampoline with elastic frame attachment system |
CN201212506Y (en) * | 2008-06-30 | 2009-03-25 | 俞振贤 | T-shaped connecting piece |
CN201399182Y (en) * | 2009-03-08 | 2010-02-10 | 朱希龙 | Trampoline |
DE202010003761U1 (en) * | 2010-03-17 | 2010-07-15 | Bellicon Ag | Tightly holding device |
CN201973011U (en) * | 2011-01-20 | 2011-09-14 | 杭州亨冠运动器材有限公司 | Leather buckle used for bouncing bed |
CN202446712U (en) * | 2011-12-29 | 2012-09-26 | 朱希龙 | Small trampoline |
CN203663324U (en) * | 2013-12-10 | 2014-06-25 | 戴振东 | Structure for connecting jump cloth and frame of trampoline and trampoline with structure |
CN204073223U (en) * | 2014-09-15 | 2015-01-07 | 郑金田 | A kind of spring trampoline fence lock cavil head |
CN205007493U (en) * | 2015-09-25 | 2016-02-03 | 戴奕光 | Trampoline with plastic is buckled |
CN205127259U (en) * | 2015-10-09 | 2016-04-06 | 李文星 | Trampoline connection structure |
CN205127257U (en) * | 2015-10-09 | 2016-04-06 | 李文星 | Firm type trampoline |
CN206414665U (en) * | 2016-12-08 | 2017-08-18 | 常熟铭坤金属制品有限公司 | A kind of new construction trampoline for being easy to assemble and disassemble |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015170181A2 (en) * | 2014-05-06 | 2015-11-12 | Masato Ikegami | Trampoline assembly having adjustable resilient members |
CN204543368U (en) * | 2015-03-06 | 2015-08-12 | 曾广安 | Trampoline and erecting tools thereof |
CN205598498U (en) * | 2016-04-20 | 2016-09-28 | 雅楷投资有限公司 | Easily folding elasticity rope body -building trampoline |
CN205683467U (en) * | 2016-06-03 | 2016-11-16 | 邵之洋 | Dismountable single handrail trampoline |
-
2016
- 2016-12-12 CN CN201611139064.5A patent/CN106730572A/en active Pending
- 2016-12-23 WO PCT/CN2016/111854 patent/WO2018103146A1/en active Application Filing
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6264583B1 (en) * | 1997-11-26 | 2001-07-24 | Rolland Wayne Rich | Trampoline with elastic frame attachment system |
DE29919912U1 (en) * | 1999-11-12 | 2000-01-20 | Won World Of Nature Warenhande | trampoline |
CN201212506Y (en) * | 2008-06-30 | 2009-03-25 | 俞振贤 | T-shaped connecting piece |
CN201399182Y (en) * | 2009-03-08 | 2010-02-10 | 朱希龙 | Trampoline |
DE202010003761U1 (en) * | 2010-03-17 | 2010-07-15 | Bellicon Ag | Tightly holding device |
CN201973011U (en) * | 2011-01-20 | 2011-09-14 | 杭州亨冠运动器材有限公司 | Leather buckle used for bouncing bed |
CN202446712U (en) * | 2011-12-29 | 2012-09-26 | 朱希龙 | Small trampoline |
CN203663324U (en) * | 2013-12-10 | 2014-06-25 | 戴振东 | Structure for connecting jump cloth and frame of trampoline and trampoline with structure |
CN204073223U (en) * | 2014-09-15 | 2015-01-07 | 郑金田 | A kind of spring trampoline fence lock cavil head |
CN205007493U (en) * | 2015-09-25 | 2016-02-03 | 戴奕光 | Trampoline with plastic is buckled |
CN205127259U (en) * | 2015-10-09 | 2016-04-06 | 李文星 | Trampoline connection structure |
CN205127257U (en) * | 2015-10-09 | 2016-04-06 | 李文星 | Firm type trampoline |
CN206414665U (en) * | 2016-12-08 | 2017-08-18 | 常熟铭坤金属制品有限公司 | A kind of new construction trampoline for being easy to assemble and disassemble |
Also Published As
Publication number | Publication date |
---|---|
WO2018103146A1 (en) | 2018-06-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204543368U (en) | Trampoline and erecting tools thereof | |
CN206414665U (en) | A kind of new construction trampoline for being easy to assemble and disassemble | |
CN206896663U (en) | A kind of trampoline with foldable protection handrail | |
CN203087199U (en) | Combined cat climbing frame | |
CN106730572A (en) | A kind of new construction trampoline for being easy to assemble and disassemble | |
CN104675102A (en) | Scaffold wall-linking element and scaffold construction method | |
CN205971635U (en) | Multifunctional bicycle goods shelves | |
CN204233706U (en) | A kind of multi-functional ball-collecting rack | |
CN208779312U (en) | A kind of street lamp post | |
CN208993823U (en) | Tricycle child safety seat | |
CN201855550U (en) | Portable basketball stand | |
CN204456977U (en) | A kind of platform mechanism of recreation facility | |
CN208576645U (en) | A kind of saddle bottom case with rain-proof shell | |
CN203147060U (en) | Assembled independent hanger | |
CN110278825A (en) | Wind-brace frame | |
CN205988558U (en) | Roller type seesaw | |
CN204641978U (en) | There is the support frame structure of multistage adjustment | |
CN209195094U (en) | A kind of music performance chorus platform | |
CN205182125U (en) | Simulation basketball stands for shooting toy | |
CN204797322U (en) | Folding crib that to reequip can sway | |
CN208799714U (en) | A kind of anti-slip type horizontal bar | |
CN205649808U (en) | Goal that confession children played | |
CN204337767U (en) | A kind of hydraulic giant of real-time collecting rainwater | |
CN108952196A (en) | A kind of elevator protection canopy | |
CN213491879U (en) | Basketball stand with basket ring anti-drop function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170531 |