CN106709143A - VFTO batch simulation analysis method and system based on ATP automatic modeling - Google Patents

VFTO batch simulation analysis method and system based on ATP automatic modeling Download PDF

Info

Publication number
CN106709143A
CN106709143A CN201611034056.4A CN201611034056A CN106709143A CN 106709143 A CN106709143 A CN 106709143A CN 201611034056 A CN201611034056 A CN 201611034056A CN 106709143 A CN106709143 A CN 106709143A
Authority
CN
China
Prior art keywords
vfto
atp
simulation
disconnecting switch
gis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611034056.4A
Other languages
Chinese (zh)
Other versions
CN106709143B (en
Inventor
臧英
黄启彦
韩克俊
于安迎
刘世明
杜建平
宋士瞻
李帅
徐莲环
韩蓬
周训通
王炳亮
马华辉
惠增明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Shandong University
Shandong Electrical Engineering and Equipment Group Co Ltd
Shandong Power Equipment Co Ltd
Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Shandong University
Shandong Electrical Engineering and Equipment Group Co Ltd
Shandong Power Equipment Co Ltd
Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Shandong University, Shandong Electrical Engineering and Equipment Group Co Ltd, Shandong Power Equipment Co Ltd, Zaozhuang Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611034056.4A priority Critical patent/CN106709143B/en
Publication of CN106709143A publication Critical patent/CN106709143A/en
Application granted granted Critical
Publication of CN106709143B publication Critical patent/CN106709143B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a VFTO batch simulation analysis method and system based on ATP automatic modeling. The method comprises the steps that an original ATP simulation model file describing steady information of a GIS station is read and stored into a database; the original ATP simulation model file is analyzed to obtain node names of all disconnecting switches possibly generating VFTO in the GIS station; the original ATP simulation model file is searched for character fields describing simulation information of the corresponding disconnecting switches, and the simulation information of the corresponding disconnecting switches is modified in the mode of file writing; ATP simulation model files of VFTO are obtained; the simulation information, described in the original ATP simulation model file, of all the disconnecting switches is traversed, and the ATP simulation model files of VFTO in the GIS station are established in a batch mode; batch simulation is performed on all the generated ATP simulation model files of VFTO, and a simulation result is output. Through the VFTO batch simulation analysis method and system, full automation and intellectualization can be realized in the batch modeling and simulation analysis process, operation is easy, the VFTO modeling and simulation analysis process is greatly simplified, and the work efficiency of relevant researchers is improved.

Description

VFTO batches simulating analysis and system based on ATP automatic modelings
Technical field
It is the invention belongs to the technical field that electric system simulation is calculated more particularly to a kind of based on ATP automatic modelings VFTO batches simulating analysis and system.
Background technology
With the raising and the continuous expansion of scale of voltage class of electric power system, GIS transformer stations have obtained extensively in power network General application.The very fast transient overvoltage (VFTO) that the operation of the disconnecting switch in GIS is produced is to the exhausted of system high pressure equipment Edge security threat is very big, is a problem of recent domestic GIS Substation Designs and researcher's common concern.Current pin To fixed GIS transformer stations and specific switch operation, the mechanism of production and emulation mode of VFTO have studied to obtain comparative maturity .However, GIS inside VFTO is influenceed by many factors, it is necessary to substantial amounts of emulation data carry out correlative study.
The characteristic of VFTO is influenceed by factors such as GIS station structures, component parameters, disconnecting switch operation positions.It is generally sharp VFTO shape informations are obtained with electromagnetism Transient State Simulation Software, but simulation calculation is only for specific GIS structures and limited operation Process, and the transient emulation ability changed setting up model and operating mode has requirement very high, the GIS stations VFTO emulation for carrying out at present Research work, mainly using the mode for manually building model, emulates to the grid switching operation under ad-hoc location specified conditions Analysis, need to such as change model parameter or operation order simulation model information, can only manually change simulation model, complex operation, The operating efficiency of simulation study is greatly reduced, is taken a substantial amount of time and manpower.On the other hand, in engineering practice, GIS stations Design and operations staff carry out the comprehensive simulation study of system, exigence general lack of time and ability to GIS stations VFTO One kind is simple to operate, accurately and reliably intelligent simulation analysis method and system.
The content of the invention
In order to solve the shortcoming of prior art, the present invention provides a kind of VFTO batch emulation point based on ATP automatic modelings Analysis method and system.The present invention is capable of implementation process full automation, the intellectuality of the analysis of batch modeling and simulation, operation letter It is single, VFTO modeling policy analysis processes are enormously simplify, improve the operating efficiency of related researcher.
To achieve the above object, the present invention uses following technical scheme:
A kind of VFTO batch simulating analysis based on ATP automatic modelings, including:
Read the original ATP simulation models file of description GIS stations steady state information and store into database;
Original ATP simulation models file is parsed, the nodename and Topology connection information of disconnecting switch in GIS stations is obtained, From which further follow that GIS is likely to occur the nodename of the disconnecting switch of VFTO in standing;
According to the nodename of the disconnecting switch that VFTO may occur, phase is described in original ATP simulation models file search The character field of the artificial intelligence of disconnecting switch is answered, the artificial intelligence of corresponding disconnecting switch is changed in the way of written document;
To describe in the original ATP simulation models file relevant position of character field write-in of VFTO signal generation models, obtain The ATP simulation model files of VFTO;
The artificial intelligence of all disconnecting switch described in original ATP simulation models file is traveled through, GIS stations are set up in batches The ATP simulation model files of VFTO;
The ATP simulation models file of all VFTO to generating carries out batch emulation, exports simulation result.
The Topology connection information is connected including disconnecting switch with bus, disconnecting switch and transformer are connected and kept apart Pass is connected with disconnecting switch.
The present invention need to only obtain description GIS and stand the ATP simulation model files of steady state information, you can automatically Mass production GIS stations VFTO simulation model files, and batch simulation result is analyzed, the efficiency of simulation study work is improve, Significantly reduce GIS stations developing operation personnel and related researcher workload when to VFTO modeling analysis.
Obtain during GIS stands after being likely to occur the nodename of the disconnecting switch of VFTO, hair is possible to during GIS is stood The nodename of the disconnecting switch of raw VFTO is stored into database in the form of character string.So for subsequently using node name Claim character string to be compared with the character string in ATP simulation model files, can reach and quickly and efficiently inquire about correspondence disconnecting switch Artificial intelligence, improves overall simulation efficiency.
Nodename character string according to the disconnecting switch for being likely to occur VFTO preserved in database is emulated with ATP Character string in model file is compared, and finds the artificial intelligence of correspondence disconnecting switch.Compared by character string, can looked into exactly Ask the artificial intelligence of corresponding disconnecting switch.
Original ATP simulation models file is parsed, a structure for description GIS substation informations is obtained;The structure In comprising the component type of each element, nodename and Topology connection information in GIS stations.
A kind of VFTO batch simulation analysis systems based on ATP automatic modelings, including:
Information module is read, it is configured as reading the original ATP simulation models file of description GIS stations steady state information and depositing In storage to database;
Parsing module, it is configured as parsing original ATP simulation models file, obtains the node of disconnecting switch in GIS stations Title and Topology connection information, from which further follow that GIS is likely to occur the nodename of the disconnecting switch of VFTO in standing;
Simulation model information modified module, it is configured as the nodename according to the disconnecting switch that VFTO may occur, The character field of the artificial intelligence of corresponding disconnecting switch is described in original ATP simulation models file search, is repaiied in the way of written document Change the artificial intelligence of corresponding disconnecting switch;
ATP simulation model file acquisition modules, its character field write-in for being configured as describing VFTO signal generation models In original ATP simulation models file relevant position, the ATP simulation model files of VFTO are obtained;
ATP simulation model files in batch sets up module, and it is configured as traveling through described in original ATP simulation models file The artificial intelligence of all disconnecting switch, sets up the ATP simulation model files of GIS stations VFTO in batches;
Batch simulation run module, its ATP simulation models file for being configured as all VFTO to generating carries out batch Emulation, exports simulation result.
The Topology connection information is connected including disconnecting switch with bus, disconnecting switch and transformer are connected and kept apart Pass is connected with disconnecting switch.
The system also includes data memory module, and it is likely to occur keeping apart for VFTO in being configured as standing GIS The nodename of pass is stored into database in the form of character string.
The system also artificial intelligence enquiry module including disconnecting switch, it is configured as according to the institute preserved in database It is likely to occur the nodename character string of the disconnecting switch of VFTO to be compared with the character string in ATP simulation model files, finds The artificial intelligence of correspondence disconnecting switch.
The parsing module is additionally configured to parse original ATP simulation models file, obtains a description GIS transformer stations letter The structure of breath;Comprising the component type of each element, nodename and Topology connection letter in GIS stations in the structure Breath.
Beneficial effects of the present invention are:
(1) present invention need to only obtain the ATP simulation model files of description GIS stations steady state information, you can automatically batch is raw Into GIS stations VFTO simulation model files, and batch simulation result is analyzed, improves the effect of simulation study work Rate, significantly reduces GIS stations developing operation personnel and related researcher workload when to VFTO modeling analysis;
(2) the VFTO shape informations produced during the grid switching operation of rapid solving GIS stations, are GIS Substation Designs, transformer's type Apparatus insulated design, GIS stations are distributed rationally etc. and to provide reference.
Brief description of the drawings
Fig. 1 is traditional VFTO emulation modelling method flow charts based on ATP softwares;
Fig. 2 is VFTO batch simulating analysis flow chart of the present invention based on ATP automatic modelings.
Specific embodiment
The present invention will be further described with embodiment below in conjunction with the accompanying drawings:
As shown in figure 1, traditional VFTO emulation modelling methods based on ATP softwares are, it is necessary to researcher's manual analysis GIS Substation structure, manual modification model topology structure and parameter in ATPDrew interfaces, preserves file, manually after the completion of modification Operation simulated program, then manually operated that simulation result importing MATLAB softwares are carried out into signal analysis, whole process can only be right The VFTO that disconnecting switch is produced at one in GIS stations carries out simulation analysis, need to such as study it is various in the case of VFTO, then need to enter repeatedly More than row operate.And the characteristic of VFTO is influenceed by factors such as GIS station structures, component parameters, disconnecting switch operation positions, make Needed to carry out the inefficient work of repeatability with above-described traditional modeling and simulating method, expend substantial amounts of manpower and when Between.
VFTO batch simulating analysis of the present invention based on ATP automatic modelings, can use MATLAB softwares, C language Programming and other programming languages come call ATP softwares realize emulation.
Be illustrated in figure 2 VFTO batch simulating analysis of the present invention based on ATP automatic modelings realizes flow, to borrow Help as a example by MATLAB instruments:
(1) using MATLAB read description GIS stand steady state information ATP simulation model file * .atp, MATLAB by * .atp document analysis are a struct structure, comprising component type, the node name of each element in GIS stations in structure Claim and Topology connection information.
The nodename of the disconnecting switch of VFTO may occur according in Topology connection information acquisition GIS stations, the section is preserved The entitled character string of point.The Topology connection of disconnecting switch is broadly divided into three kinds of situations:Disconnecting switch is connected with bus, isolated Switch is connected with transformer, disconnecting switch and disconnecting switch are connected, and the corresponding connecting node that need to preserve nodename is respectively Disconnecting switch and bus connecting node, disconnecting switch and transformer connecting node, disconnecting switch and disconnecting switch connecting node.
(2) according to the operation characteristic of ATP softwares, the character string in * .atp files with element two ends node name composition is imitative True strength part is named, and the character string preserved in step (1) is compared with the character string in * .atp files using MATLAB, and it is right to find Answer the artificial intelligence of disconnecting switch.
Modification to * .atp files is realized by using Document Editing order, the required modification made includes:Modification should be every Leave the simulation parameters and Topology connection of pass.
(3) MATLAB will pass through VFTO signals including switching information and the equivalent transient Model information of disconnecting switch, breaker Generation model is integrated into fixed character string, so that in write-in * .atp files relevant position in the form of data card, change VFTO believes The nodal information of number generation model, the port of VFTO signal generation models is replaced using the nodename preserved in step (1) Nodename, so as to by VFTO signals generation model access simulation model.
Wherein, VFTO signals generation model refers to being used for by dc source, disconnecting switch and breaker emulation original paper A simulation model of VFTO waveforms is produced, by this simulation model access master mould, operation emulation later can be steady to original VFTO waveforms are injected in states model, subsequent simulation is completed.
In the present invention, VFTO signals generation model is used to produce a shape for simulation model character string of VFTO waveforms In formula write-in original * .atp files, it is equivalent to be linked into a simulation model of VFTO waveforms in orthoform true mode, so that real The foundation of VFTO simulation models is showed.
(4) MATLAB names the * .atp files after the completion of modification with the nodename preserved in step (1), is saved in Under simulation document folder, so that ensure that each VFTO simulation models file of generation is named with a nodename for inequality, side Just artificial and computer automatic analysis are carried out after to its simulation result.
(5) (1)~(4) step is circulated, the disconnecting switch information in * .atp files is read one by one, generate corresponding VFTO Simulation model, until all disconnecting switch information there may be VFTO described in MATLAB traversal * .atp files, generation is entirely The possible VFTO simulation models file in portion, circulation terminates, and realizes that the batch of GIS stations VFTO simulation models is set up.
(6) a windows errorlevel, windows errorlevels is called to call ATP softwares in MATLAB Simulation kernel program Tpbig.exe runs simulation model file one by one, by all VFTO simulation models text of generation in step (5) Part carries out batch emulation, and simulation result is automatically saved under simulation document folder.
(7) MATLAB reads the GIS stations VFTO Simulation result data files under simulation document folder, generation VFTO emulation ripples Shape, is analyzed, than less using Modern Signal Analysis method (such as wavelet transformation, S-transformation etc.) to batch simulation result The signal characteristic of VFTO waveforms in the case of, obtains analysis report.
Compared with traditional simulation method, the method need to only obtain the ATP simulation model files of description GIS stations steady state information, Program automatically analyzes GIS stations topology information, all of disconnecting switch information in automatic traversal GIS stations, automatic change * .atp Simulation document, adds VFTO signal generation models, Mass production GIS stations VFTO simulation model files, automatic running in a model ATP simulated programs carry out simulation calculating, and batch simulation result is analyzed using Modern Methods, generation analysis Report.Whole simulation process full automation, only needs simple once-through operation, you can obtain the VFTO waveforms letter at whole GIS stations Breath and analysis report.The efficiency of simulation study work is substantially increased, work difficulty is reduced, GIS stations developing operation is alleviated Personnel and related researcher workload when to VFTO modeling analysis.
Present invention also offers a kind of VFTO batch simulation analysis systems based on ATP automatic modelings, the system includes:Read Take information module, parsing module, simulation model information modified module, ATP simulation model file acquisitions module, ATP simulation models Files in batch sets up module and batch simulation run module.
Wherein, information module is read, its original ATP simulation models text for being configured as reading description GIS stations steady state information Part is simultaneously stored into database.
Parsing module, it is configured as parsing original ATP simulation models file, obtains the node of disconnecting switch in GIS stations Title and Topology connection information, from which further follow that GIS is likely to occur the nodename of the disconnecting switch of VFTO in standing.
Parsing module is additionally configured to parse original ATP simulation models file, obtains one and describes GIS substation informations Structure;Comprising the component type of each element, nodename and Topology connection information in GIS stations in the structure.
Wherein, Topology connection information includes that disconnecting switch is connected and isolated with bus connection, disconnecting switch with transformer Switch is connected with disconnecting switch.
Simulation model information modified module, it is configured as the nodename according to the disconnecting switch that VFTO may occur, The character field of the artificial intelligence of corresponding disconnecting switch is described in original ATP simulation models file search, is repaiied in the way of written document Change the artificial intelligence of corresponding disconnecting switch.
ATP simulation model file acquisition modules, its character field write-in for being configured as describing VFTO signal generation models In original ATP simulation models file relevant position, the ATP simulation model files of VFTO are obtained.
ATP simulation model files in batch sets up module, and it is configured as traveling through described in original ATP simulation models file The artificial intelligence of all disconnecting switch, sets up the ATP simulation model files of GIS stations VFTO in batches.
Batch simulation run module, its ATP simulation models file for being configured as all VFTO to generating carries out batch Emulation, exports simulation result.
The system also includes data memory module, and it is likely to occur keeping apart for VFTO in being configured as standing GIS The nodename of pass is stored into database in the form of character string.
The system also artificial intelligence enquiry module including disconnecting switch, it is configured as according to the institute preserved in database It is likely to occur the nodename character string of the disconnecting switch of VFTO to be compared with the character string in ATP simulation model files, finds The artificial intelligence of correspondence disconnecting switch.
The present invention need to only obtain description GIS and stand the ATP simulation model files of steady state information, you can automatically Mass production GIS stations VFTO simulation model files, and batch simulation result is analyzed, the efficiency of simulation study work is improve, Significantly reduce GIS stations developing operation personnel and related researcher workload when to VFTO modeling analysis;Rapid solving The VFTO shape informations produced during the grid switching operation of GIS stations, are GIS Substation Designs, the apparatus insulated design of transformer's type, GIS stations Distribute rationally etc. and to provide reference.
Although above-mentioned be described with reference to accompanying drawing to specific embodiment of the invention, not to present invention protection model The limitation enclosed, one of ordinary skill in the art should be understood that on the basis of technical scheme those skilled in the art are not Need the various modifications made by paying creative work or deformation still within protection scope of the present invention.

Claims (10)

1. a kind of VFTO batch simulating analysis based on ATP automatic modelings, it is characterised in that including:
Read the original ATP simulation models file of description GIS stations steady state information and store into database;
Original ATP simulation models file is parsed, the nodename and Topology connection information of disconnecting switch in GIS stations is obtained, enters one Step show that GIS is likely to occur the nodename of the disconnecting switch of VFTO in standing;
According to the nodename of the disconnecting switch that VFTO may occur, original ATP simulation models file search description it is corresponding every The character field of the artificial intelligence of pass is left, the artificial intelligence of corresponding disconnecting switch is changed in the way of written document;
To describe in the original ATP simulation models file relevant position of character field write-in of VFTO signal generation models, obtain VFTO ATP simulation model files;
The artificial intelligence of all disconnecting switch described in original ATP simulation models file is traveled through, sets up GIS stations VFTO's in batches ATP simulation model files;
The ATP simulation models file of all VFTO to generating carries out batch emulation, exports simulation result.
2. a kind of VFTO batch simulating analysis based on ATP automatic modelings as claimed in claim 1, it is characterised in that The Topology connection information includes the connection of disconnecting switch and bus, disconnecting switch and transformer connection and disconnecting switch and isolates Switch connection.
3. a kind of VFTO batch simulating analysis based on ATP automatic modelings as claimed in claim 1, it is characterised in that Obtain during GIS stands after being likely to occur the nodename of the disconnecting switch of VFTO, be likely to occur VFTO's during GIS is stood The nodename of disconnecting switch is stored into database in the form of character string.
4. a kind of VFTO batch simulating analysis based on ATP automatic modelings as claimed in claim 3, it is characterised in that Nodename character string and ATP simulation model files according to the disconnecting switch for being likely to occur VFTO preserved in database In character string compare, find correspondence disconnecting switch artificial intelligence.
5. a kind of VFTO batch simulating analysis based on ATP automatic modelings as claimed in claim 1, it is characterised in that Original ATP simulation models file is parsed, a structure for description GIS substation informations is obtained;GIS is included in the structure The component type of each element, nodename and Topology connection information in standing.
6. a kind of VFTO batch simulation analysis systems based on ATP automatic modelings, it is characterised in that including:
Read information module, its be configured as read description GIS station steady state information original ATP simulation models file and store to In database;
Parsing module, it is configured as parsing original ATP simulation models file, obtains the nodename of disconnecting switch in GIS stations And Topology connection information, from which further follow that GIS is likely to occur the nodename of the disconnecting switch of VFTO in standing;
Simulation model information modified module, it is configured as the nodename according to the disconnecting switch that VFTO may occur, in original The simulation model file search of beginning ATP describes the character field of the artificial intelligence of corresponding disconnecting switch, and phase is changed in the way of written document Answer the artificial intelligence of disconnecting switch;
ATP simulation model file acquisition modules, the character field write-in that it is configured as describing VFTO signal generation models is original In ATP simulation model files relevant position, the ATP simulation model files of VFTO are obtained;
ATP simulation model files in batch sets up module, and it is configured as traveling through all described in original ATP simulation models file The artificial intelligence of disconnecting switch, sets up the ATP simulation model files of GIS stations VFTO in batches;
Batch simulation run module, its ATP simulation models file for being configured as all VFTO to generating carries out batch emulation, Output simulation result.
7. a kind of VFTO batch simulation analysis systems based on ATP automatic modelings as claimed in claim 6, it is characterised in that The Topology connection information includes the connection of disconnecting switch and bus, disconnecting switch and transformer connection and disconnecting switch and isolates Switch connection.
8. a kind of VFTO batch simulation analysis systems based on ATP automatic modelings as claimed in claim 6, it is characterised in that The system also includes data memory module, the node of its disconnecting switch that VFTO is likely to occur in being configured as standing GIS Title is stored into database in the form of character string.
9. a kind of VFTO batch simulation analysis systems based on ATP automatic modelings as claimed in claim 8, it is characterised in that The system also artificial intelligence enquiry module including disconnecting switch, it is configured as being possible to hair according to what is preserved in database The nodename character string of the disconnecting switch of raw VFTO is compared with the character string in ATP simulation model files, finds correspondence isolation The artificial intelligence of switch.
10. a kind of VFTO batch simulation analysis systems based on ATP automatic modelings as claimed in claim 6, it is characterised in that The parsing module is additionally configured to parse original ATP simulation models file, obtains a structure for description GIS substation informations Body;Comprising the component type of each element, nodename and Topology connection information in GIS stations in the structure.
CN201611034056.4A 2016-11-15 2016-11-15 VFTO batch simulation analysis method and system based on ATP automatic modeling Expired - Fee Related CN106709143B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611034056.4A CN106709143B (en) 2016-11-15 2016-11-15 VFTO batch simulation analysis method and system based on ATP automatic modeling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611034056.4A CN106709143B (en) 2016-11-15 2016-11-15 VFTO batch simulation analysis method and system based on ATP automatic modeling

Publications (2)

Publication Number Publication Date
CN106709143A true CN106709143A (en) 2017-05-24
CN106709143B CN106709143B (en) 2020-04-03

Family

ID=58941242

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611034056.4A Expired - Fee Related CN106709143B (en) 2016-11-15 2016-11-15 VFTO batch simulation analysis method and system based on ATP automatic modeling

Country Status (1)

Country Link
CN (1) CN106709143B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108334684A (en) * 2018-01-24 2018-07-27 三峡大学 VFTO modeling and analysis methods in disconnecting switch moving process
CN110990991A (en) * 2019-10-15 2020-04-10 山西大学 Method for analyzing ONE batch simulation result
CN111027164A (en) * 2018-10-08 2020-04-17 长城汽车股份有限公司 Automatic simulation analysis method and device based on STAR-CCM +
CN112364558A (en) * 2020-10-12 2021-02-12 中山大学 Double-layer optimization method and device for multi-base-body type wave power generation device
JP2022136002A (en) * 2021-03-05 2022-09-15 中国海洋大学 Optimization system and method for parameter configuration of wave energy device
CN117494532A (en) * 2024-01-02 2024-02-02 航天精工股份有限公司 Automatic finite element pretightening force data batch transmission and simulation calculation control method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8249851B2 (en) * 2009-01-09 2012-08-21 Korea Electric Power Corporation Monitoring system using real-time simulator
CN103970967A (en) * 2014-05-28 2014-08-06 山东大学 Electromagnetic transient simulation analysis system of electric power system
CN105022874A (en) * 2015-07-09 2015-11-04 国网山东省电力公司电力科学研究院 Digital simulation automatic modeling method and system for power distribution network
CN105869470A (en) * 2015-05-28 2016-08-17 国家电网公司 Extra-high voltage transformer station operation simulation method and system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8249851B2 (en) * 2009-01-09 2012-08-21 Korea Electric Power Corporation Monitoring system using real-time simulator
CN103970967A (en) * 2014-05-28 2014-08-06 山东大学 Electromagnetic transient simulation analysis system of electric power system
CN105869470A (en) * 2015-05-28 2016-08-17 国家电网公司 Extra-high voltage transformer station operation simulation method and system
CN105022874A (en) * 2015-07-09 2015-11-04 国网山东省电力公司电力科学研究院 Digital simulation automatic modeling method and system for power distribution network

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
尚德基: ""混合运用Matlab和Atp的电力***故障仿真"", 《大众科技》 *
苏盛 等: ""基于ATP的电磁暂态自动仿真程序"", 《电力自动化设备》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108334684A (en) * 2018-01-24 2018-07-27 三峡大学 VFTO modeling and analysis methods in disconnecting switch moving process
CN108334684B (en) * 2018-01-24 2021-10-12 三峡大学 VFTO modeling analysis method in opening and closing process of isolating switch
CN111027164A (en) * 2018-10-08 2020-04-17 长城汽车股份有限公司 Automatic simulation analysis method and device based on STAR-CCM +
CN111027164B (en) * 2018-10-08 2023-12-29 长城汽车股份有限公司 STAR-CCM+ based automatic simulation analysis method and device
CN110990991A (en) * 2019-10-15 2020-04-10 山西大学 Method for analyzing ONE batch simulation result
CN112364558A (en) * 2020-10-12 2021-02-12 中山大学 Double-layer optimization method and device for multi-base-body type wave power generation device
CN112364558B (en) * 2020-10-12 2023-06-20 中山大学 Double-layer optimization method and device for one-piece-type multi-body type wave energy power generation device
JP2022136002A (en) * 2021-03-05 2022-09-15 中国海洋大学 Optimization system and method for parameter configuration of wave energy device
JP7349178B2 (en) 2021-03-05 2023-09-22 中国海洋大学 Optimization system and method for parameter settings of wave energy devices
CN117494532A (en) * 2024-01-02 2024-02-02 航天精工股份有限公司 Automatic finite element pretightening force data batch transmission and simulation calculation control method
CN117494532B (en) * 2024-01-02 2024-04-16 航天精工股份有限公司 Automatic finite element pretightening force data batch transmission and simulation calculation control method

Also Published As

Publication number Publication date
CN106709143B (en) 2020-04-03

Similar Documents

Publication Publication Date Title
CN106709143A (en) VFTO batch simulation analysis method and system based on ATP automatic modeling
US10826292B2 (en) Multi-time-scale digital/analog hybrid simulation system and method for power distribution network and storage medium
CN102722764B (en) Integration network optimization computer-aided decision support System
CN103700036B (en) A kind of transient stability projecting integral method being suitable to power system Multiple Time Scales
CN111797450B (en) BIM-based power grid engineering model design system, method, equipment and storage medium
CN110852023B (en) Automatic generation method and device for primary main wiring diagram of intelligent substation
CN103197948A (en) Communication protocol script analyzing method of electricity intelligent equipment
CN106021344B (en) A kind of flexible CIME electric network model sharing method
Steinbrink et al. Smart grid co-simulation with MOSAIK and HLA: a comparison study
CN105140919A (en) Method for rapid topology analysis and establishment of topological island based on graph theory
CN104699907B (en) It is a kind of by the electrical-magnetic model of PSCAD to ADPSS and the automatic switching method of element figure
CN106339800A (en) Method of quickly analyzing topology of large grid based on Graphx
CN107153743B (en) VFTO intelligent simulation analysis method and system based on intelligent search algorithm
CN109857885A (en) Intelligent substation main wiring diagram automatic generation method based on SCD file
CN110569557A (en) Intelligent autonomous design platform for power transmission and transformation project and working method thereof
CN110109658A (en) A kind of ROS code generator and code generating method based on formalized model
CN103713523A (en) Influencing analysis method of whole intelligent substation model
CN107247827A (en) Empty terminal model modeling and automatic connecting method based on machine learning
CN105205039A (en) Customizable SCD (substation configuration description) file verification method
CN105373008A (en) Full physics model simulation method for electric power system
CN105335428A (en) Data conversion method and apparatus
CN109543156A (en) A kind of Substation switching automatic invoice issuance system based on IEC61850
Luo et al. Research on transmission and transformation engineering cost system based on BIM 3D modelling technology
CN103631854A (en) ICD and SCD consistency calibration method based on model objectification semantics
CN110096773A (en) Threedimensional model batch processing method and system for the exploitation of nuclear power station virtual emulation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200403

Termination date: 20211115