CN106704708B - The supporting structure and its construction method of heat distribution pipeline in pipe gallery - Google Patents

The supporting structure and its construction method of heat distribution pipeline in pipe gallery Download PDF

Info

Publication number
CN106704708B
CN106704708B CN201710027470.0A CN201710027470A CN106704708B CN 106704708 B CN106704708 B CN 106704708B CN 201710027470 A CN201710027470 A CN 201710027470A CN 106704708 B CN106704708 B CN 106704708B
Authority
CN
China
Prior art keywords
pipe gallery
heat distribution
distribution pipeline
cylinder
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710027470.0A
Other languages
Chinese (zh)
Other versions
CN106704708A (en
Inventor
侯振华
曾毅
郭鹏杰
林明钊
周立朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Technology Group North China Co.,Ltd.
Original Assignee
China State Construction Technology Beijing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Technology Beijing Co Ltd filed Critical China State Construction Technology Beijing Co Ltd
Priority to CN201710027470.0A priority Critical patent/CN106704708B/en
Publication of CN106704708A publication Critical patent/CN106704708A/en
Application granted granted Critical
Publication of CN106704708B publication Critical patent/CN106704708B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/02Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/22Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical & Material Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Supports For Pipes And Cables (AREA)
  • Building Environments (AREA)

Abstract

The present invention relates to the supporting structure and its construction method of heat distribution pipeline in a kind of pipe gallery, which includes the column for being located in the heat distribution pipeline both sides, and the column is erected between the top plate and bottom plate of the pipe gallery;And be embedded at the top of the column in the top plate and form the first anchor section, bottom is embedded in formation second in the bottom plate and is anchored section.Support heat distribution pipeline is fixed using the column for being folded in heat distribution pipeline both sides, it is embedded in the top plate of pipe gallery at the top of the column, bottom is embedded in the bottom plate of pipe gallery, so the longitudinal thrust of heat distribution pipeline can be effectively transmitted in the structure of pipe gallery by the column, and the thrust of heat distribution pipeline is unloaded while playing fixed heat distribution pipeline.Pipe gallery and the integral force structure of megarelief, which can be reduced to unlimited rigidity on vertical section, so as to form a power transmission closed-loop from the power transmission of heat distribution pipeline pressure to the earth, it can be ensured that structure stablizes safety.

Description

The supporting structure and its construction method of heat distribution pipeline in pipe gallery
Technical field
The present invention relates to building materials field of stents, the supporting structure and its construction party of heat distribution pipeline in a kind of pipe gallery are refered in particular to Method.
Background technology
Underground pipe gallery is also known as " common trench " or " Common Ducts ", is exactly underground urban duct synthesis corridor.In city A tunnel space is built in city underground, and the various utilities pipelines such as electric power, communication, combustion gas, heat supply, plumbing are integrated in one, if There are special access hole, hoisting port and monitoring system, implements unified planning, Uniting, unified construction and management, be to ensure city The important infrastructure and " lifeline " of city's operation.It is to implement same planning, design, construction and safeguard, is built in honest underground Public utility for being laid with municipal public use pipeline.
Pipe gallery is concrete structure, and Normal practice has to be made by field cast-in-place, is also had pre- by factory Made of on-site consolidation processed.Pipe gallery includes bottom plate, top plate and erects wallboard between the bottom panel and top panel, passes through bottom Plate, top plate and wallboard are enclosed accommodating space, and various pipes are placed in the accommodating space, in order to ensure the safety of pipeline, It is provided with dividing wall in pipe gallery, i.e., pipe gallery is separated into multiple spaces.
The heat distribution pipeline being arranged in pipe gallery is made of pipe, and inside has flowing hot water, the usual heating power Pipe diameter is smaller, and the thrust that flowing hot water generates the heat distribution pipeline due to flowing is also little, so it is typically employed in heat Heat distribution pipeline is supported using the holder of concrete structure form at hydraulic piping, to stop or support pushing away suffered by the heat distribution pipeline Power, but since concrete support needs to carry out secondary construction, the scene in pipe gallery again after the completion of pipe gallery construction Execution conditions are limited, and secondary operation precision controlling is difficult, is also unfavorable for site environment.In addition, for the heat distribution pipeline of major diameter, Suffered thrust is larger, commonly reaches hundred tonnes, if continuing to use traditional concrete support, one side support strength is not Foot, another aspect difficulty of construction are larger.
Invention content
It is an object of the invention to overcome the deficiencies of existing technologies, a kind of holder knot of heat distribution pipeline in pipe gallery is provided Structure and its construction method solve pipe gallery in the prior art and support support strength existing for heat distribution pipeline using concrete support Insufficient and big difficulty of construction problem.
Realizing the technical solution of above-mentioned purpose is:
The present invention provides a kind of supporting structures of heat distribution pipeline in pipe gallery, including are located in the heat distribution pipeline two The column of side, the column are erected between the top plate and bottom plate of the pipe gallery;And institute is embedded at the top of the column It states and forms the first anchor section in top plate, bottom is embedded in formation second in the bottom plate and is anchored section.
The present invention fixes support heat distribution pipeline using the column for being folded in heat distribution pipeline both sides, and the top of the column is embedded In the top plate of pipe gallery, bottom is embedded in the bottom plate of pipe gallery, so the column can be by the longitudinal direction of heat distribution pipeline Thrust is effectively transmitted in the structure of pipe gallery, and the thrust of heat distribution pipeline is unloaded while playing fixed heat distribution pipeline. Pipe gallery is the structure for being embedded in underground, the integral force structure with megarelief, when the longitudinal thrust of heat distribution pipeline passes through When column is transmitted on pipe gallery, the greatly stress together with pipe gallery, so the pipe gallery can letter on vertical section Unlimited rigidity is turned to, so as to form a power transmission closed-loop from the power transmission of heat distribution pipeline pressure to the earth, accordingly even when big straight The heat distribution pipeline of diameter forms hundred tonnes of high thrust, and can also ensure that structure stablizes safety.In addition use column that there is construction Convenient feature, when constructing pipe gallery, can first by the top and bottom of column in the form of built-in fitting it is primary it is pre-buried at Type subsequently when setting up heat distribution pipeline, then by the middle part connection construction of column, solves the construction of conventional concrete holder The big problem of difficulty.
In pipe gallery of the present invention the supporting structure of heat distribution pipeline further improvement lies in that, the first of two columns It is anchored in section and is connected with first crossbar, the first crossbar is attached at the outer surface that two described first are anchored section and with described the One anchor section is fixedly connected.
In pipe gallery of the present invention the supporting structure of heat distribution pipeline further improvement lies in that, it is described first be anchored section top End is installed with top sealing plate, and the outside that the edge of the top sealing plate is anchored section to described first extends and horizontal with corresponding described first Bar is fixedly connected.
In pipe gallery of the present invention the supporting structure of heat distribution pipeline further improvement lies in that, the second of two columns It is anchored in section and is connected with second crossbar, the second crossbar is attached at the outer surface that two described second are anchored section and with described the Two anchor sections are fixedly connected.
In pipe gallery of the present invention the supporting structure of heat distribution pipeline further improvement lies in that, it is described second be anchored section bottom End is installed with bottom sealing plate, and the outside that the edge of the bottom sealing plate is anchored section to described second extends and horizontal with corresponding described second Bar is fixedly connected.
The present invention also provides a kind of construction methods of the supporting structure of heat distribution pipeline in pipe gallery, including walk as follows Suddenly:
Column is provided, the column includes top cylinder, middle part cylinder and bottom cylinder;
When construction pipe gallery, the bottom of the bottom cylinder is embedded in the bottom plate of the pipe gallery and forms second It is anchored section, and protrudes out the bottom plate at the top of the bottom cylinder and forms second connection end, the second connection end is corresponded to Set on the both sides of the heat distribution pipeline;
It will be embedded at the top of the top cylinder in the top plate of the pipe gallery and form the first anchor section, and the top The bottom of portion's cylinder protrudes out the top plate and forms the first connecting pin, and first connecting pin is opposite with the second connection end Setting;And
The middle part cylinder is placed between first connecting pin and the second connection end, and is connect with described first End is fixedly connected with the second connection end, so as to form the column of the heat distribution pipeline both sides is located in.
In pipe gallery of the present invention the construction method of the supporting structure of heat distribution pipeline further improvement lies in that, will be described Before being embedded at the top of the cylinder of top in the top plate of the pipe gallery, further include:
There is provided first crossbar, by the first crossbar be attached at two top cylinder outer surface and with the top cylinder It is fixedly connected, and the first crossbar is embedded in together with the first anchor section in the top plate.
In pipe gallery of the present invention the construction method of the supporting structure of heat distribution pipeline further improvement lies in that, will be described Before being embedded at the top of the cylinder of top in the top plate of the pipe gallery, further include:
Top sealing plate is provided, the top sealing plate is fixedly connected on to the top of the top cylinder, and will be on the top sealing plate The edge for protruding out the top cylinder is fixedly connected with the corresponding first crossbar.
In pipe gallery of the present invention the construction method of the supporting structure of heat distribution pipeline further improvement lies in that, will be described Before the bottom of bottom cylinder is embedded in the bottom plate of the pipe gallery, further include:
There is provided second crossbar, by the second crossbar be attached at two bottom cylinders outer surface and with the bottom cylinder It is fixedly connected, and the second crossbar is embedded in together with the second anchor section in the bottom plate.
In pipe gallery of the present invention the construction method of the supporting structure of heat distribution pipeline further improvement lies in that, will be described Before the bottom of bottom cylinder is embedded in the bottom plate of the pipe gallery, further include:
Bottom sealing plate is provided, the bottom sealing plate is fixedly connected on to the bottom end of the bottom cylinder, and will be on the bottom sealing plate The edge for protruding out the bottom cylinder is fixedly connected with corresponding above-mentioned second crossbar.
Description of the drawings
Fig. 1 is the side view when supporting structure of heat distribution pipeline in pipe gallery of the present invention is set on pipe gallery.
Fig. 2 is to perceive the pre- schematic diagram for being embedded in structure in top plate and bottom plate in Fig. 1.
Fig. 3 is the explosive decomposition structural schematic diagram of the supporting structure of heat distribution pipeline in pipe gallery of the present invention.
Fig. 4 is that the supporting structure of heat distribution pipeline in pipe gallery of the present invention omits the structural schematic diagram of pipe gallery.
Fig. 5 is the side view of Fig. 4.
The sectional view of bottom in Fig. 6 to Fig. 4.
Specific implementation mode
The invention will be further described in the following with reference to the drawings and specific embodiments.
Refering to fig. 1 and Fig. 2, the present invention provides the supporting structures and its construction party of heat distribution pipeline in a kind of pipe gallery Method, for fixing the large-scale heat distribution pipeline in pipe gallery, which refers to that diameter exists for the effect of the supporting structure The pipeline of 900mm to 1200mm, certain supporting structure can be used for the heat distribution pipeline of fixed minor diameter.Stream in heat distribution pipeline Dynamic hot water can generate pipeline larger thrust, and when the diameter of heat distribution pipeline is when 900mm is to 1200mm diameters, hot water is produced Raw thrust can reach hundred tonnes, and thrust big in this way proposes challenge to the supporting structure of heat distribution pipeline, which must It must can support the high thrust, it is ensured that the safety of heat distribution pipeline also ensures that the structure safety of pipe gallery.The holder knot of the present invention Structure is embedded at the top and bottom of the column in comprehensive pipe gallery structure by the way that the column of sandwiched heat distribution pipeline is arranged, and is passed through The longitudinal thrust of heat distribution pipeline is effectively transmitted in the structure of pipe gallery by column, which becomes one with the earth again Body is formed the power transmission closed-loop that thrust is transmitted to the earth by column, it is ensured that stability under loading safety.The holder of the present invention Structure plays the role of unloading the thrust of heat distribution pipeline while fixed heat distribution pipeline.In addition the pillar is easy for construction, The supporting structure of the present invention provides powerful support for the construction of the fast and high quality of the large-scale heat distribution pipeline of pipe gallery.Below The supporting structure and its construction method of heat distribution pipeline in pipe gallery of the present invention are illustrated in conjunction with attached drawing.
As shown in Figure 1, the present invention provides a kind of supporting structure 21 of heat distribution pipeline in pipe gallery, the supporting structure 21 For fixing the heat distribution pipeline 11 in pipe gallery 10, which includes bottom plate 12, wallboard 14 and top plate 13, bottom Plate 12, wallboard 14 and top plate 13 are enclosed pipe gallery, and also multiple independences are separated out by wallboard 14 in pipe gallery Space, to separate different types of pipeline.The supporting structure 21 of the present invention includes being located in standing for 11 both sides of heat distribution pipeline Column 211, column 211 is erected between the top plate 13 of pipe gallery 10 and bottom plate 12, and in conjunction with shown in Fig. 2, the top of column 211 is buried It is located in top plate 13 and forms the first anchor section 2111, the bottom of column 211 is embedded in formation second in bottom plate 12 and is anchored section 2112. By first anchor section 2111 and second be anchored section 2112 column 211 is connected with pipe gallery 10, formed it is integrated by Power structure, then the both sides of heat distribution pipeline 11 are folded in by column 211, since the hot water of internal flow is produced on heat distribution pipeline 11 Raw longitudinal thrust acts on the column 211 for being folded in 11 both sides of heat distribution pipeline, will be transmitted to longitudinal thrust by column 211 Onto pipe gallery 10, which also acts unloading heat distribution pipeline longitudinal thrust while fixed heat distribution pipeline 11 Effect.Pipe gallery 10 is embedded in underground, the integral force structure with megarelief, so as to which pipe gallery 10 breaks vertical It can be reduced to unlimited rigidity on face, closed so being formed a power transmission by 11 pressure power transmission of heat distribution pipeline to the earth Ring can effectively ensure stability under loading and stress safety.
As the better embodiment of the present invention, in conjunction with shown in Fig. 3 and Fig. 4, the first of two columns 211 is anchored section First crossbar 212 is connected on 2111, which is attached at the outer surface of two first anchor sections 2111 and with first It is anchored section 2111 to be fixedly connected, first anchor section 2111 of two columns 211 is connected laterally at one by first crossbar 212 It rises, when the first anchor section 2111 is embedded in top plate 13, which is also embedded in top plate 13 together.This first The setting of cross bar 212 increases power transmission area, and the longitudinal thrust of heat distribution pipeline 11 is enabled to more uniformly to be transmitted to synthesis It on piping lane 10, rather than is anchored section 2111 only by first be embedded in top plate 13 and carries out single-point power transmission, avoid only by the One anchor section 2111 carries out power transmission and easy tos produce the phenomenon that power transmission point is destroyed by larger thrust.Preferably, first is horizontal Bar 212 is arranged the front and rear sides at the top of column 211, the front and rear sides refer to along heat distribution pipeline 11 move towards direction before and after Side.First crossbar 212 uses double flute steel construction, two channel steels to be arranged side by side and be fixedly connected with 211 top of column.
In conjunction with shown in Fig. 5, section 2111 is anchored as another better embodiment of the present invention, first in column 211 Top is installed with top sealing plate 214, and the outside that the edge of the top sealing plate 214 is anchored section 2111 to first extends and with corresponding first Cross bar 212 is fixedly connected.Setting top sealing plate 214 can also increase power transmission area, and top sealing plate 214 is fixed with first crossbar 212 Connection, strengthens the bonding strength of first crossbar 212 so that stable structure is integrally formed in supporting structure 21, can be better Realize power transmission function.
As shown in Figures 2 to 6, the another better embodiment as the present invention, second in two columns 211 is anchored section Second crossbar 213 is connected on 2112, which is attached at the outer surface of two second anchor sections 2112 and with second Section 2112 is anchored to be fixedly connected.Second anchor section 2112 of two columns 211 is connected laterally at one by second crossbar 213 It rises, when the second anchor section 2112 is embedded in bottom plate 12, which is also embedded in bottom plate 12 together.This second The setting of cross bar 213 increases power transmission area, and the longitudinal thrust of heat distribution pipeline 11 is enabled to more uniformly to be transmitted to synthesis It on piping lane 10, rather than is anchored section 2112 only by second be embedded in bottom plate 12 and carries out single-point power transmission, avoid only by the Two anchor segments 2112 carry out power transmission and easy to produce the phenomenon that power transmission point is destroyed by larger thrust.Preferably, second is horizontal The front and rear sides in 211 bottom of column are arranged in bar 213, the front and rear sides refer to along heat distribution pipeline 11 move towards direction before and after Side.Second crossbar 213 uses double flute steel construction, two channel steels to be arranged side by side and be fixedly connected with 211 bottom of column.
As another better embodiment of the present invention, bottom is installed in the bottom end of the second anchor section 2112 of column 211 Sealing plate 215, the edge of bottom sealing plate 215, which extends and fixed with corresponding second crossbar 213 to the outside of the second anchor section 2112, to be connected It connects.Setting bottom sealing plate 215 can also increase power transmission area, and bottom sealing plate 215 is fixedly connected with second crossbar 213, strengthen the The bonding strength of two cross bars 213 so that stable structure is integrally formed in supporting structure 21, can preferably realize power transmission function.
As another better embodiment of the present invention, column 211 of the invention uses segmental structure, includes top column Body 211a, middle part cylinder 211b and bottom cylinder 211c are embedded at the top of the cylinder 211a of top in top plate 13 and form first It is anchored section 2111, and the bottom of top cylinder 211a protrudes out top plate 13 and forms the first connecting pin 2113, bottom cylinder 211c's Bottom, which is embedded in bottom plate 12, forms the second anchor section 2112, and protruding out bottom plate 12 at the top of the cylinder 211c of bottom forms the second company End 2114, the first connecting pin 2113 and second connection end 2114 is connect by connecting flange 2115 and middle part cylinder 211b fastenings to connect It connects, to connect the column 211 to be formed set on 11 side of heat distribution pipeline.Column 211 is designed to that segmental structure can be convenient for applying Top cylinder 211a and bottom cylinder 211c first can be embedded to corresponding top plate by work in 10 work progress of pipe gallery In bottom plate, then when setting up heat distribution pipeline 11, then middle part cylinder 211b is connected to top cylinder 211a and bottom cylinder 211c is upper, can also be saved working hour while facilitating construction.Column 211 uses steel structure column, should in conjunction with shown in Fig. 6 Steel structure column is square column, and reinforcing plate is provided in the middle part of the inside of square column, to improve the structural strength of steel structure column.It adopts With steel structure column, its own stress and switching performance are apparently higher than concrete structure, are the heat distribution pipeline 11 of integrated management 10 The construction of fast and high quality provides powerful support.
As shown in Figure 1, when setting up heat distribution pipeline 11, is poured on the bottom plate 12 of pipe gallery 10 and is formed with support pier 15, Using the 15 support heat distribution pipeline 11 of support pier of concrete structure, support is provided for heat distribution pipeline 11.And the holder knot of the present invention Structure 21 moves towards interval setting along heat distribution pipeline 11, that is, is arranged along the length direction interval of heat distribution pipeline 11, between being somebody's turn to do It is rationally designed away from thrust caused by foundation heat distribution pipeline 11.Actuating system of the supporting structure 21 as heat distribution pipeline 11, Can longitudinal thrust effectively be passed into pipe gallery (along the thrust for moving towards direction of heat distribution pipeline 11), pass through pipe gallery The larger longitudinal thrust is greatly carried together, it can be ensured that the stabilization of structure and the stabilization of stress.
The present invention also provides a kind of construction methods of the supporting structure of heat distribution pipeline in pipe gallery, below to the construction Method illustrates.
The construction method of the supporting structure of heat distribution pipeline includes the following steps in the pipe gallery of the present invention:
As shown in figure 3, providing column 211, which includes top cylinder 211a, middle part cylinder 211b and bottom Cylinder 211c;
In conjunction with shown in Fig. 1 and Fig. 2, when constructing pipe gallery 10, bottom cylinder 211c is embedded in pipe gallery 10 Second is formed in bottom plate 12 and is anchored section 2112, and will be protruded out bottom plate 12 at the top of the cylinder 211c of the bottom and connected with forming second End 2114 is connect, which is correspondingly arranged to the both sides of heat distribution pipeline 11;In embedded bottom cylinder 211c, according to The position of the paving location setting bottom cylinder 211c of heat distribution pipeline 11 so that bottom cylinder 211c is set to heat distribution pipeline 11 Both sides;
It will be embedded at the top of the cylinder 211a of top in the top plate 13 of pipe gallery 10 and form the first anchor section 2111, and The bottom of top cylinder 211a is protruded out into top plate 13 and forms the first connecting pin 2113, which is connected End 2114 is connect to be oppositely arranged;
When setting up heat distribution pipeline 11, by middle part cylinder 211b be placed in the first connecting pin 2113 and second connection end 2114 it Between and be fixedly connected with the first connecting pin 2113 and second connection end 2114, so as to form 11 both sides of heat distribution pipeline are folded in Column 211.Middle part cylinder 211b is fastenedly connected by connecting flange 2115 and the first connecting pin 2113 and second connection end 2114.
It is anchored section 2112 by the first anchor section 2111 and second column 211 is connected with pipe gallery 10, be formed The force structure of one, then the both sides of heat distribution pipeline 11 are folded in by column 211, due to internal flow on heat distribution pipeline 11 Longitudinal thrust caused by hot water acts on the column 211 for being folded in 11 both sides of heat distribution pipeline, will be given by column 211 longitudinal Thrust is transmitted on pipe gallery 10, and it is vertical which also acts unloading heat distribution pipeline while fixed heat distribution pipeline 11 Effect to thrust.Pipe gallery 10 is embedded in underground, the integral force structure with megarelief, so as to by pipe gallery 10 can be reduced to unlimited rigidity on vertical section, so it is formed a biography by 11 pressure power transmission of heat distribution pipeline to the earth Force-closed ring can effectively ensure stability under loading and stress safety.Had the characteristics that using column it is easy for construction, construction integrate When piping lane, can first by the top and bottom of column in the form of built-in fitting a Preembedded, subsequently set up heat distribution pipeline When, then by the middle part connection construction of column, solve the problems, such as that the difficulty of construction of conventional concrete holder is big.
As the better embodiment of the present invention, the top of pipe gallery 10 is embedded at the top of by top cylinder 211a Further include before in plate 13:
First crossbar 212 is provided, by first crossbar 212 be attached at two top cylinder 211a outer surface and with top column Body 211a is fixedly connected, and the anchor of first crossbar 212 and first section 2111 is embedded in together in top plate 12.Pass through first crossbar 212 link together two top cylinder 211a, and first crossbar 212 and first is anchored section 2111 and is embedded in top plate 12 together Interior, which increase power transmission areas, and the longitudinal thrust of heat distribution pipeline 11 is enabled to more uniformly to be transmitted on pipe gallery 10, Rather than be anchored section 2111 only by first be embedded in top plate 13 and carry out single-point power transmission, it avoids only being anchored section by first 2111 carry out power transmissions and easy to produce the phenomenon that power transmission point is destroyed by larger thrust.Preferably, first crossbar 212 is arranged Front and rear sides at the top of the cylinder 211a of top, the front and rear sides refer to the front and back side for moving towards direction along heat distribution pipeline 11. First crossbar 212 uses double flute steel construction, two channel steels to be arranged side by side and be fixedly connected with 211 top of column.
As another better embodiment of the present invention, pipe gallery 10 is embedded at the top of by top cylinder 211a Before in top plate 13, further include:
Top sealing plate 214 is provided, top sealing plate 214 is fixedly connected on to the top of top cylinder 211a, and will be on top sealing plate 214 The edge for protruding out top cylinder 211a is fixedly connected with corresponding first crossbar 212.Setting top sealing plate 214 can also increase biography Power area, and top sealing plate 214 is fixedly connected with first crossbar 212, strengthens the bonding strength of first crossbar 212 so that holder Stable structure is integrally formed in structure 21, can preferably realize power transmission function.
As the another better embodiment of the present invention, the bottom of bottom cylinder 211c is being embedded in pipe gallery 10 Before in bottom plate 12, further include:
There is provided second crossbar 213, by second crossbar 213 be attached at two bottom cylinder 211c outer surface and with bottom column Body 211c is fixedly connected, and the anchor of second crossbar 213 and second section 2112 is embedded in together in bottom plate 12.The second crossbar 213 setting increases power transmission area, and the longitudinal thrust of heat distribution pipeline 11 is enabled to more uniformly to be transmitted to pipe gallery It on 10, rather than is anchored section 2112 only by second be embedded in bottom plate 12 and carries out single-point power transmission, avoid only through the second anchor Segment 2112 carries out power transmission and easy tos produce the phenomenon that power transmission point is destroyed by larger thrust.Preferably, second crossbar 213 Front and rear sides in 211 bottom of column are set, which refers to the front and back side for moving towards direction along heat distribution pipeline 11.The Two cross bars 213 use double flute steel construction, two channel steels to be arranged side by side and be fixedly connected with 211 bottom of column.
As another better embodiment of the present invention, the bottom of bottom cylinder 211c is being embedded in pipe gallery 10 Before in bottom plate 12, further include:
Bottom sealing plate 125 is provided, bottom sealing plate 215 is fixedly connected on to the bottom end of bottom cylinder 211c, and will be on bottom sealing plate 215 The edge for protruding out bottom cylinder 211c is fixedly connected with corresponding second crossbar 213.Setting bottom sealing plate 215 can also increase biography Power area, and bottom sealing plate 215 is fixedly connected with second crossbar 213, strengthens the bonding strength of second crossbar 213 so that holder Stable structure is integrally formed in structure 21, can preferably realize power transmission function
Preferably, the column 211 of the present invention uses steel structure column, in conjunction with shown in Fig. 6, which is square column, It is provided with reinforcing plate in the middle part of the inside of square column, to improve the structural strength of steel structure column.Using steel structure column, its own by Power and switching performance are apparently higher than concrete structure, and the construction for the fast and high quality of the heat distribution pipeline 11 of integrated management 10 provides Powerful support.As shown in Figure 1, when setting up heat distribution pipeline 11, is poured on the bottom plate 12 of pipe gallery 10 and be formed with support pier 15, using the 15 support heat distribution pipeline 11 of support pier of concrete structure, support is provided for heat distribution pipeline 11.And the holder of the present invention Structure 21 moves towards interval setting along heat distribution pipeline 11, that is, is arranged along the length direction interval of heat distribution pipeline 11, should Spacing is rationally designed according to thrust caused by heat distribution pipeline 11.Power train of the supporting structure 21 as heat distribution pipeline 11 System, effectively can pass to pipe gallery (along the thrust for moving towards direction of heat distribution pipeline 11) by longitudinal thrust, pass through synthesis Piping lane and the earth carry the larger longitudinal thrust together, it can be ensured that the stabilization of structure and the stabilization of stress.
The present invention has been described in detail with reference to the accompanying drawings, those skilled in the art can be according to upper It states and bright many variations example is made to the present invention.Thus, certain details in embodiment should not constitute limitation of the invention, this Invention will be using the range that the appended claims define as protection scope of the present invention.

Claims (9)

1. the supporting structure of heat distribution pipeline in a kind of pipe gallery, which is characterized in that including being located in the heat distribution pipeline both sides Column, the column is erected between the top plate and bottom plate of the pipe gallery;And it is embedded at the top of the column described First is formed in top plate and is anchored section, and bottom is embedded in formation second in the bottom plate and is anchored section;First anchor of two columns It connects and is connected with first crossbar in section, the first crossbar is attached at two described first and is anchored the outer surface of section and with described first Section is anchored to be fixedly connected;
The column uses segmental structure, including top cylinder, middle part cylinder and bottom cylinder, the middle part cylinder to connect institute State top cylinder and the bottom cylinder.
2. the supporting structure of heat distribution pipeline in pipe gallery as described in claim 1, which is characterized in that described first is anchored section Top be installed with top sealing plate, the outside that the edge of the top sealing plate is anchored section to described first extends and with corresponding described the One cross bar is fixedly connected.
3. the supporting structure of heat distribution pipeline in pipe gallery as described in claim 1, which is characterized in that two columns Be connected with second crossbar in second anchor section, the second crossbar be attached at the outer surface that two described second are anchored section and with institute The second anchor section is stated to be fixedly connected.
4. the supporting structure of heat distribution pipeline in pipe gallery as claimed in claim 3, which is characterized in that described second is anchored section Bottom end be installed with bottom sealing plate, the outside that the edge of the bottom sealing plate is anchored section to described second extends and with corresponding described the Two cross bars are fixedly connected.
5. the construction method of the supporting structure of heat distribution pipeline in a kind of pipe gallery, which is characterized in that include the following steps:
Column is provided, the column includes top cylinder, middle part cylinder and bottom cylinder;
When construction pipe gallery, the bottom of the bottom cylinder is embedded in the bottom plate of the pipe gallery and forms the second anchor Section, and protrude out the bottom plate at the top of the bottom cylinder and form second connection end, the second connection end is correspondingly arranged at The both sides of the heat distribution pipeline;
It will be embedded at the top of the top cylinder in the top plate of the pipe gallery and form the first anchor section, and the top column The bottom of body protrudes out the top plate and forms the first connecting pin, sets first connecting pin is opposite with the second connection end It sets;And
The middle part cylinder is placed between first connecting pin and the second connection end, and with first connecting pin and The second connection end is fixedly connected, so as to form the column of the heat distribution pipeline both sides is located in.
6. the construction method of the supporting structure of heat distribution pipeline in pipe gallery as claimed in claim 5, which is characterized in that inciting somebody to action Before being embedded at the top of the top cylinder in the top plate of the pipe gallery, further include:
First crossbar is provided, the first crossbar is attached at the outer surface of two top cylinders and is fixed with the top cylinder Connection, and the first crossbar is embedded in together with the first anchor section in the top plate.
7. the construction method of the supporting structure of heat distribution pipeline in pipe gallery as claimed in claim 6, which is characterized in that inciting somebody to action Before being embedded at the top of the top cylinder in the top plate of the pipe gallery, further include:
Top sealing plate is provided, the top sealing plate is fixedly connected on to the top of the top cylinder, and will be protruded out on the top sealing plate The edge for going out the top cylinder is fixedly connected with the corresponding first crossbar.
8. such as the construction method of the supporting structure of heat distribution pipeline in pipe gallery described in claim 5 or 6, which is characterized in that Before the bottom of the bottom cylinder is embedded in the bottom plate of the pipe gallery, further include:
Second crossbar is provided, the second crossbar is attached at the outer surface of two bottom cylinders and is fixed with the bottom cylinder Connection, and the second crossbar is embedded in together with the second anchor section in the bottom plate.
9. the construction method of the supporting structure of heat distribution pipeline in pipe gallery as claimed in claim 8, which is characterized in that inciting somebody to action Before the bottom of the bottom cylinder is embedded in the bottom plate of the pipe gallery, further include:
Bottom sealing plate is provided, the bottom sealing plate is fixedly connected on to the bottom end of the bottom cylinder, and will be protruded out on the bottom sealing plate The edge for going out the bottom cylinder is fixedly connected with corresponding above-mentioned second crossbar.
CN201710027470.0A 2017-01-16 2017-01-16 The supporting structure and its construction method of heat distribution pipeline in pipe gallery Active CN106704708B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710027470.0A CN106704708B (en) 2017-01-16 2017-01-16 The supporting structure and its construction method of heat distribution pipeline in pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710027470.0A CN106704708B (en) 2017-01-16 2017-01-16 The supporting structure and its construction method of heat distribution pipeline in pipe gallery

Publications (2)

Publication Number Publication Date
CN106704708A CN106704708A (en) 2017-05-24
CN106704708B true CN106704708B (en) 2018-09-18

Family

ID=58907535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710027470.0A Active CN106704708B (en) 2017-01-16 2017-01-16 The supporting structure and its construction method of heat distribution pipeline in pipe gallery

Country Status (1)

Country Link
CN (1) CN106704708B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277821B (en) * 2017-12-13 2020-06-30 苍南县交通建设工程有限公司 Pipe gallery
CN108252723A (en) * 2018-04-12 2018-07-06 北京市热力工程设计有限责任公司 A kind of segmented heating-power tunnel antiskid item
CN108797760A (en) * 2018-06-19 2018-11-13 新疆铁道勘察设计院有限公司 The construction method of rail yard drainage pipeline temporary support structure
CN109854817B (en) * 2019-02-01 2023-09-29 北京市热力工程设计有限责任公司 Rear-assembled high-thrust thermal pipeline fixing support and method
CN112283449A (en) * 2020-11-12 2021-01-29 北京市热力工程设计有限责任公司 Heating power pipeline fixing support with end part connected with embedded pore plate structure

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4076199A (en) * 1976-07-06 1978-02-28 Paulsen George T Cable support method and apparatus
CN202074119U (en) * 2011-04-21 2011-12-14 杭州市地下管道开发有限公司 Circular pipe rack support and circular pipe rack
CN204753627U (en) * 2015-04-30 2015-11-11 黑龙江宇辉新型建筑材料有限公司 Prefabricated comprehensive piping lane
CN205530345U (en) * 2016-04-07 2016-08-31 中国电建集团贵阳勘测设计研究院有限公司 Modular many storehouses utility tunnel structure
CN205742270U (en) * 2016-07-05 2016-11-30 宏大国源(芜湖)资源环境治理有限公司 A kind of prefabricated piping lane
CN105971017A (en) * 2016-07-12 2016-09-28 中国电建集团昆明勘测设计研究院有限公司 Supporting type pipe gallery structure
CN206478303U (en) * 2017-01-16 2017-09-08 赵泽昊 The supporting structure of heat distribution pipeline in pipe gallery

Also Published As

Publication number Publication date
CN106704708A (en) 2017-05-24

Similar Documents

Publication Publication Date Title
CN106704708B (en) The supporting structure and its construction method of heat distribution pipeline in pipe gallery
AU2014407470B2 (en) Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall and manufacturing method thereof
CN210564534U (en) Rectangular pipe jacking oblique crossing construction structure
CN109914472B (en) Soft soil area assembled comprehensive pipe gallery and construction method thereof
CN107642252B (en) Old building free removal is double to increase rebuilding construction technique
CN105735323B (en) The inverse deep footing groove enclosing structure for making to combine with Percussion Piles of spray anchor and its construction method
CN206478303U (en) The supporting structure of heat distribution pipeline in pipe gallery
CN109914644A (en) A kind of assembled heat insulation masonry wall and preparation method thereof
CN110424455A (en) The underground confined space is without fertile slot structure side wall big steel form plate system and construction method
CN103362517A (en) Assembled jacking pipe
CN206538783U (en) Jacking prefabricated box culvert
CN110985042A (en) Urban comprehensive pipe gallery and underground shallow-buried underground tunnel combined supporting system and process
WO2017071111A1 (en) Underground pipe gallery protection structure
CN103205986A (en) Concrete raft foundation construction-joint grouting device and construction method
CN110552378A (en) Underground space roof subsides post-cast strip and seals structure in advance
CN205894103U (en) Prefabricated parabola type utility tunnel
CN211113740U (en) Prestressed steel cylinder concrete pipe with base
CN107514012A (en) A kind of partial precast assembly steel concrete combination underground pipe gallery for exempting from template
CN203452103U (en) Waterstop
CN106088762B (en) A kind of prefabricated assembled round underground granary of insertion slot type encased steel plate
CN204098067U (en) Side's culvert formula underground pipe gallery
CN103469766B (en) Method for connecting rigid body and flexible body of dam foundation of reservoir
CN106088759B (en) The equal stepped prefabricated assembled circular underground granary of steel plated inside and outside one kind
CN106088764B (en) A kind of stepped prefabricated assembled circular underground granary of encased steel plate
CN206529796U (en) A kind of outer wall formwork of basement installs strengthening construction platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221117

Address after: 102600 Free Trade Innovation Service in Daxing Airport Area, Free Trade Pilot Zone, No. 1, Yuanping North Road, Lixian Town, Daxing District, Beijing

Patentee after: CSCEC Technology Group North China Co.,Ltd.

Address before: Room 050, Floor 4, Building 2, No. 55, Xinhua North Road, Tongzhou District, Beijing 101199

Patentee before: CHINA CONSTRUCTION SCIENCE & TECHNOLOGY (BEIJING) CO.,LTD.